HomeMy WebLinkAboutEssentialServices.10-11.4thQtrTangible Result:
Current Overall Rating of This Result:
green
Measures (with desired trend and ultimate goal / benchmark)
Measure
Current State (should be Descriptive and\or A3Visual) for each measure
Measure
Solid Waste
Water
Waste Water
Tests
Violations
Calls
Solid Waste
Water Index
Waste Water Index
Regulatory Tests
Number of Violations
% Calls Resolved
Month
4th qtr
4th qtr
4th qtr
4th qtr
4th qtr
4th qtr
Essential Services
Desired Trend
Down
Down
Down
Down
Zero
Up
Trend
Up/Down
Up/Down
minor
Up/Down
Up/Down
Up/Down
Progress
no
no
n/a
n/a
n/a
Benchmark
$120/Ton
$2.5/100 cu ft
$1.6/100 cu ft
<0.3% failure
0
90%
Rating/Comment
fluctuation in collected tons drives the cost
fluctuation in usage drives the cost
fluctuation in usage drives the cost
% has not exceeded 0.14%; still need further
analysis
#s driven by # of rain events and WWTP
all but one month over 90%
Goal
$100/Ton
$2/100 cu ft
$1.45/100 cu ft
0% failure
0
95%
Red
r
Yell
Green
g
g
g
g
Champion:
Future State (If we do not change our strategy, what will the future result look like?)
The major driver of this result is the Waste Water Treatment Plant. With the successful April vote, there is a remedy in sight in 2014, however until the new plant is built any heavy
rain events will drive the number of violations indicator. The plans currently underway for Water and Transfer Station will provide much needed direction and prioritization for these
areas. The analysis will be instrumental for the prioritization of capital projects and not only maintenance of the existing infrastructure, but projects to support growth. Finally,
the plans will help position the City to meet future regulatory requirements. The analysis of the data including establishing better benchmarks should be completed within the next
few months.
Implementation Plan (Green=Task On Time/Ahead - Yellow=Task Running Behind - Red=Task Late - X=Milestone Date)
#
1
2
3
4
5
6
7
8
Outcome Measures
Measure
Leader
Tim Gramling
Tim Gramling/ Kelly Green
Tim Gramling/ Kelly Green
Tim Gramling/ Kelly Green
Tim Gramling
Tim Gramling
Heather Brooks
Heather Brooks
Heather Brooks
Tasks
Negotiate settlement w/ DNR on New WWTP & Election
WWTP Design & Bid (Bid Jan 2012, Award March 2012)
Construction WWTP (start June 2012, end June 2014)
Water Facility Plan
Transfer Station Supplemental Environmental Plan
Inflow/Infiltration Study & Fieldwork - Phase I (Dec 2011)
Review data for better indicators
Review Trash/Recycle Data (set new deadline)
Submitted:
Current
7/25/2011
Milestone Dates
Dec
X
g
g
g
g
g
y
y
Jan
g
g
g
g
g
g
y
y
Feb
g
g
g
g
g
g
y
y
After Implementation
Mar
g
g
g
g
g
g
y
X
Data for Month of :
April
X
g
g
g
g
g
y
g
May
g
g
g
X
g
y
g
June
g
g
g
g
g
X
g
July
4th Quarter 2010/11
Aug
X
X
X
Sept
Oct
X
Nov