Loading...
HomeMy WebLinkAboutPlanning & Zoning Commission Minutes 08-08-2012 CITY of CAPE GIRARDEAU � PLANNING & ZONING COMMISSION PLANNING AND ZONING COMMISSION MEETING MINUTES August 8, 2012 Present: Trae Bertrand, Wayne Bowen, Raymond Buhs, William Hinckley, Randy Kluge, Scott McClanahan, Ralph Maxton, Marcia Ritter and Thomas J. Welch Staff Present: Carol Peters and Ryan Shrimplin Call to Order: Chairman Bertrand called the meeting to order at 7:00 p.m. Approval of Minutes The minutes of the July 11, 2012 meeting were unanimously approved upon motion made by Mr. McClanahan and seconded by Mr. Kluge. Chairman Bertrand announced that the public hearings on requests by Dalhousie, LLC and Norwald/Meyr Properties to have their properties rezoned to Planned Development (PD) have been cancelled, as both applications have been withdrawn. � HEARINGS, DISCUSSION &VOTING 1. A public hearing was held on the request of Roland Properties, an Illinois LLC, to rezone property at 3364 Percy Drive from the C-2 (Highway Commercial) district to the M-1 (Light Manufacturing/Industrial) district. Mr. Ray Roland, CEO of Roland Machinery, spoke in favor of the request. He explained that his company is planning to demolish the existing 12,000 sq. ft. building on the site and replace it with a new 14,000 sq. ft. building. He is requesting the rezoning because the M-1 district is more suitable for the property given the existing uses. No one else spoke in favor of, or in opposition to the request. A motion was made by Mr. Bowen and seconded by Mr. Hinckley, to recommend approval of the rezoning request for 3364 Percy Drive from the C-2 (Highway Commercial) district to the M-1 (Light Manufacturing/Industrial) district. The motion passed with a vote of 8 in favor, 0 in opposition, and 0 abstaining. 2. A public hearing was held on the request of Midwest Energy d/b/a Younghouse Party Central, for a variance to allow a wall sign on a side of the building that does not have street frontage, at 2005 South Kingshighway. Mr. Patrick Sulser, Canedy Sign Company, spoke in favor of the request on behalf of the owner. Mr. Sulser explained that due to the orientation of the building, a northbound driver can't really see the sign on the front of the building until they have passed the location. Per the Zoning Ordinance, the building is allowed 229.5 sq. ft. of signage on the front of the building facing the street (north building elevation). The existing wall sign on this side is only 96 sq. ft. The owner would like to transfer the remaining 133.5 sq. ft. to the east building elevation where it would be more visible to the travelers along Kingshighway. Mr. Sulser further explained that a non-illuminated sign with a � changeable sign face is being proposed. No one else spoke in favor of, or in opposition to the request. Mr. Hinckley asked if a changeable sign is allowed. Mr. Shrimplin stated the proposed sign cannot be considered in reviewing this variance request. The Commission is only looking at whether or not to allow the square footage to be transferred. Staff will review the sign as part of the permitting process. A motion was made by Mr. Bowen and seconded Planning & Zoning Commission Meeting Minutes Page 2 l � �� by Mr. McClanahan, to approve the variance request to allow wall signage on the east side of the building, with the condition that the excess wall sign area from the north building elevation (133.5 sq. ft.) be transferred to the east building elevation. The motion passed with a vote of 8 in favor, 0 in opposition, and 0 abstaining. OTHER ITEMS AND COMMUNICATION Staff Communication Mr. Shrimplin explained that the Comprehensive Plan Oversight Committee was established in 2007 to oversee the implementation of the Comprehensive Plan. The Committee is comprised of inembers from the City Council, the Planning & Zoning Commission and City staff. Typically the Planning and Zoning Commission chairman and two other members serve on the committee. Currently, Mr. Hinckley, Mr. Buhs and Mrs. Ritter serve on the Committee. Mr. Buhs' term on the Planning and Zoning Commission will expire in November, therefore leaving a vacancy. Mr. Bertrand agreed to serve on the Committee. Mr. Hinckley stated he would be willing to step down if anyone else was interested. No one else expressed an interest. The Planning and Zoning Commission members to serve on the Comprehensive Plan Oversight Committee will be Mr. Bertrand, Mr. Hinckley and Mrs. Ritter. Adiournment Upon motion made by Mr. Bowen and seconded by Mr. Kluge, the meeting was adjourned unanimously at 7:15 p.m. � } �r Respectfully sub itted, , , � R n Kluge Secretary �