HomeMy WebLinkAboutCouncil.Agenda.09-15-2009.Packet �
�
e em er
� �
.
a e �rar eau
�
. .
issourl
�
CITY OF CAPE GIRARDEAU, MISSOURI
City Manager's Of�ce
401 Indepe�dence Street
� City Council Special Agenda
Tuesday, September 15; 2009
5:00 p.m.
Call to Order
Roll Call
Adoption of the Agenda
1. BILL NO. 09-151, a Resolution authorizing the City Manager to execute an agreement
with Nip Kelley Equipment Company, Inc., for the Shawnee Park Sports Complex
Improvements, in the City of Cape Girardeau, Missouri. Reading and Passage.
Letter No. 09-199
Action
2. BILL NO. 09-152, a Resolution of the City Council of the City of Cape Girardeau,
Missouri, directing the City Manager to make recommendations to the United States
Department of Transportation for carrier selection pertaining to Essential Air Service at
� the Cape Girardeau Regional Airport. Reading and Passage.
Letter No. 09-200
Action
3. Other business.
4. Adjournment of the City Council.
* * * * * * * * * *
The City Council of the City of Cape Girardeau, Missouri, may, as a part of a study session or
regular or special City Council meeting, hold a closed session to discuss legal actions, causes of
legal action or litigation, leasing, purchasing or sale of real estate, hiring, firing, disciplining,
promotion of personnel, employee labor relations, or confidential or privileged communications
with its attorneys. Specifically, the City Council will hold a closed session to discuss legal
actions and litigation, confidential communications with legal counsel, property acquisition, and
personnel matters, pursuant to RSMo. Sections 610.021(1), 610.021(2), and 610.021(3).
�
� CITY OF CAPE GIRARDEAU,MISSOURI
� Office of the City Manager
Council Letter No. 09-199
Agencla September 15, 2009
The Honorable Mayor
and
Members of the City Council
City of Cape Girardeau,Missouri
Subject: Resolution Authorizing the City Manager to Enter into a Contract for Shawnee
Park Sports Complea Improvements
Dear Mayor and Council Members:
One of the projects funded by the Pazks and Recreation/Storm Water Sales Tax is Shawnee Park Sports
Complex Improvements and a New Community Center. The Sports Complex Improvements consist of
the addition of three softbalUbaseball fields with fencing and lighting,construction of two soccer/football
fields and parking to serve the additional fields. The sports complex improvements also include two
concession stands. This portion of the project will be included with the community center in a later bid, �
however site development for the buildings are included with this bid.
� Four(4)bids were received which included a base bid and five(5)add alternates. The base bids were
$1,473,203.00 for the highest and$1,198,109.44 for the lowest. Nip Kelly Equipment Co.,Inc. submitted
the low base bid of$1,198,109.44. Add Altemate No. 1 for concrete walks,bleacher and dugout pads are
included with this contract for$33,000.00. The low bid for this item was submitted by Nip Kelly
Equipment Co.,Inc. The combined low bid for this project is$1,231,109.44. The estimate for this
project including the Add Alternate was$1,439,008.55. The available funds for this project is
$1,261,290.25.
It is recommended that the City Council authorize the City Manager to enter into a contract with Nip
Kelly Equipment Co.,Inc. A resolution authorizing a contract is attached for council consideration and
action.
Respec lly submit�ed,
� ��
u� ��
Daniel .Muser
Direct arks&Recreation
Scott A. yer
City M
� DDM/SAM:ms
Attachment
�
$ $ s � oosasaosso � � � s � � ss $ ss � ssssssoo8 �
� e 8 � m � � e S � g ^ $ n � ^ S � S 8 �
. � � �ry : n $n � � � � W � �o � m n �o � �o n � � � � � o � � � p � � K $ �
� � 6� N W. O O � ' � N b b � R � Y p � f�N Y� O �' A N M � H O
� N N N M N N N N N N M N M N�N M M M N N M M N M M N N N M M N M M N N M
� . { g � 8 � � g �8 -g � 8Q H $ 8 g � � ry g � � 8 8 g � g � g g g 8 8 8 g �g 8 � .
� t� � r � � m�� � � E p .� :m � o m o m � $ � � g A � v � � � � � � � � � �
� O � C � H h A N � f N N �
d N
� M N N-N M N M N N N N M N N N M N N N M M M M M M H N N N M M M M N N M
" . . '� '�.'� .. . � ... . . .'K 'K '� '� .. . .. `k * 'K `K '� 'K '� * .. �'�
� � � � 8 � 8g $g � 3g �4 $p ^ 8 � �}y� g =. 8s8 �s $v� B � �gS � <q� 3(� � � � �Q =Q. 85
V O � •� � ��`y( "y�� � i � F'{�v id � �pp �� 3 � N � ol '� � 3 n �q 7p'v a ot 8 :f � � � ti3 Ryj � $
� f �- � C-fl N O 10 .N r�V � 0 � R N t� N O ♦ e� VL � N 1�1 < N " � (+1 A
m � � Y�
� � U 3 N N N N N tl N �N N M M N N M M N N N N N N N M N M N M M N N N N N N N N
R
� m } � � � �., n � 8 n � � $ � $ � O10 o �i � � 8 � � � �., g � �y � � � t�y.8 Py �.3i �� �
p � �i °� � e.� � y� � fd n n o .0 � ad '�o � $ � 'Z e°Di � g e°4 � u'3 � A �
� ?� ^ ? ' � - N.a�� � � N. � ��'� �i �� .: i�'.7 `� .
f
. V M N N N N N N M N M M N M N N N M N M w N N N
� � 8 g $ g g g S g o $ g o g $ g g ry� � g g g 8 8 g $ g g g 8 $ g g g g g �8�
ry � o � � s � s � � $ � � gss � smsags � ssNs �; � � � � $ � g � '
�v V m a m �^{ o, m a . tV o. m o{ _ m . a n o �{ , g �!
O � H N N O � � M1 � ' C N � � N N CI f �O Y N f�l ^ ' N h � � ' � O
U2 M N N M N M N N M M w N N N M M M M Y� N M N N N N N M M M M N N.N
y � w « »
� 8 $ 8 8 8 �i, ' 8 o g S 8p ' 8 8 S 'ry 8 8 S $ 8 $�p 8ry SY1 8 '0 8p $O 8 8 S 8 8p 8p .
N O � W O M g CI (Y N g G C m:t0 O S C 61 4> O I� b �D e� nl N Y�I �N N N N 17
O q, s �aN m _ � ' '- ,°.= � ' � � g � � � � �
tL C/� v, a R
Q M M N M H N N M M M N M M M N N N N N M N N N N N N N M N M M M M M M M
W � . '� . . . . .. , .
� C� C O O O m S N S O O O S .O O S N O a�0� � S O O O. O O � N 0 O $ S O H S 01 O O
W � — {7 a O ' G W N � O H O YI C
� V �s s � � � r � � � o � � � � � � . �(y �a � � � � n _ � � � � � � � � � � � �
W C H O O � � < � N � Y G� � N.N N C I y� 4D Y � tD q N H N iA � O OI Pl
� tV
� (n .�1 � N N M N N M N N H M N M N N M M M M N M N M N N N N M N N N N
J .N W » » V. « ...
Q � �, 8 h S R 8 i"'., 8 8 8 8 � 8 'o, $ �R. �R, � � S 8 S�, 8 � 8 � $ < S 8 8 8 '0 8 "�, 8 8
tn Y t� $^S' a g oi N �n � $ 0 8 � � � � w h � g� �. $ i m � 'Pv H `�7� � A P� n � 9�. �^v 3 �
� Z � � � ' N ' O� � N N ♦ �
a v, .: _ _
�
� N N N M N N N M M N.N N M M N M�N'N N N M N N N M M N N M N N N N N M N
a V
8 8 8 8 8 8 0 8 S 8. $ 8 8 8 8 8 8 � 8 8 8 8 8 8 8 8 $ 8 8 8 8 8 S 8 8 8
.s� � � � oss � ss ^ s � s � � � � � � � � � �
tL �» � � � . � � m�n oo n � � � � � � � � S � � � � � �, 8 m � .
O V O w � A ' tV N A. n�i � � N N a^i "� N O wl M Y Y W + N Oi .h- � Y .
[^1 �
� y
. w/ � n N N N N N M N N N M N-YM M M �i N N N N N N M M N N N N N N N N M N M M N
Qpp p p p p p p p p o p p p e �n p p C G p�n a� C p q p p p G
� � y� O O O O S O O O �O S�O S S .S O. O O � S �$ O O O O O O O O H O O R O O O O
Q t Cl + ~ l�`! S O O ad aC� W $ O tA A O � l��! wl !9 N
_ � � ?t� g � ` �i � � � N � � � � � � N � � � �i 8 R
g � ' a
y C/� - N M N N N N N M N N N N M N N N M N y N N M N N M M N N M M M M M M N
� Q �..�p p. N..� �.�..� " � �m��� 0'.� Cl .� � N f N O � N�^ N OI w � O � N A
a � O1
� f � O N N N�Y N M
�
- !/j 11; (j Y Y ) f/1 (=J tlj Vl IL 41 N N 1 T 1 Y � � U V � 1L IL IL LL Y. LL LL U U U 1L U 1L t.
j , J < U U U 1 �� J J N J J J N tl1 N % � � � M .� , , J J J J � � � 1 � ..I
Z �
O
F � w
. � 01. � � � U � `� .
� Q � �l
LL � �, S
uJ G
� LL � � O � Z � � - � N
b � � f m W
. U � p � � a ; ; � � W Z � 2
y+ � f tl � y � � V U � K y �'f0 � < < -X r � � � 0 � Wr N
W m = � LL' Iu � < GI < W t W y1 m�p ,.. W �� O � � a, )q 3 yK,
� p K W fN iC � W � U� W m N � Q F F � y� LL = f¢p f�q( W 6 G
N �� � J � 1� .J U' Y LL Z �� J - °� Y7 W t ' �
Z W � zpc� pW �< p cy�� r� � � o `� 3 Z �dZ
� . Z � � K O O U N 2 .N � U O � m. U. � 1' K q j S � � O� W W W j m S $ O O � < t <
s m r� �Zz � � �. � W m c� � 7 c� � n � '�' waaa c'S o o Z �d � � e
d � a� p � �< o p � o a o " � z F ° � <. � � �- � f � � � � � � � � � .
O m g U Z � U = W �' � � � O ? W � R' 1' K K N M � � � > O V O
n ..� Z � F f � � ¢
m �W LLLL O > > Y > K..K W � W � d W- W h W = Z O O 'O V V N 2 2 � a l � 'p
W O �4 1- � � W W � LL' F J t6 N St N V � IG � 2 d' � � � � �f � N � � S � �+ �+ V I O b �
W QL � N Rl R N b h O W � � N � � � �� � � � R N N N N N N N N N l7 � �NO � !�1 01 �
C
a
�
<
�
sssgs � asQssss s s � o � s � � o a o s �
� m g a e� � � � �X $ � � H o o � m � o � rv m a� � � �
c � � �
f N � N N � O IA A O ^ f` b N 1q N h 1�1 O � � m W W
� � ' N tV � � m $ o
� N M N M N M N' M�N M M N N N N N M M.N N M N N N M m
Ge000GeGocQp o coo S
N ' O O o O O N O,,,,ii O O O O ry G? � O N O O K.0
d t� �. $ � $ o � � r. � a v � a � ��'
. §� Y ao � �� .
N N N N N M N N N M N M N M N N N M .
'K 'K 'U 'J� 'U g
�n $ � g � � ti n o $ ao vi e S � o 0 0 o n
� iV $ N r� a � m m a � n $
. � O . � N A O � b tC CI o N C � ' N N N N � 'C
� � o �{ m e� H o wi � � �a �o m � � .�'( � a
� � N A � n e � v e! oi .- � �Yi 3S�. �v n � oo .- ot R $ ri .e � m
� ' ' � . N � � o� �
N N N�N N N N N N M M N M M M N M N M M M M .M �
�° � � w 8 n 8 � °' � � � �q � �i�, � S N $ x�
p h D CI p 1fl 1G O{yO p� C! ' � b tS {V b
C C N O �O ^ 1� N• W f ♦ ID � � 8
P q y
$ �� N ♦ Y O C
NN
N N N N N M N N N N M � M M M M M N *
C O S O O O O O O S O O O O O O N N O O O � O O� O O N
G � � m N O N N O N Q O O ' � � � a�- � n � m O O O S � �
� � .: M • � mr : : �; � � � �i x Fi " H "' "' ' � o �
� ^ N � � o
N N N M M M N N M N M N M N N M N N N N N N N O�
� O O O S � S O O O O � O S � O O S. N S N�
t� o � gi g � � �$ � �i v � `a °a w Y� $ �
2S
� �a ^ v v u� - o
N N N N N N M N M M M N M N N N W
� N N p * �
C O Oo � So O 4D Oe O N �1f{ N � O� Op OVp� N N V N O� O O Oy� 'S � E
V O � ^ � b � � �^ A C�{ m t^�{ � O O ^ A � YY P N O O if�l N �{� s
f. N N 09 Ol !� O q aD 1��1 � � � N NN � � .O N m
E � m �
� N N M N N �S N N N M N N N M M M N H M H M N M O �
°' Se 'oo 'oo $ 8 < 8G8 � n9aD�. M S o' � $ �.g, 8 8 N „a 'g
. Y Z� C 10 �O � 1`�' A �D ^ O 1�'� C> � t�V S � � S
.g J t7 Ol 1p � C
Z d �- O
M H M N N N N N M N N N N N M M 'K .
8 O O .O O O Q, O O O O �4 O O O O S N O Yl O O S O O
� � � � � � � � � g � � g � � � m � : W : � � � 'm � �
1q W f! N N N N q Y + ' N N O N � H N Y! � �
� <V tV tV
q1 N N N N N N N N N M N N N N N M H M K M N N
F
8 g g g 8 g g o g g 8 � $ F 9i $ � �$ 8 � o � $ F w
� 5}� � 3 9 � � � � � 3 `� R s � m « a m « o � ° � � �
�� b N/ � .. N t'� �I N
O O O `�I O � O �
N N N M N M N- p M N N Zy� N N = M M Z N = Z
� 1f� I. � �- Qr � p �y �A O� F Yf � !f 1f1 h 1-� /W- O W T
� O N aD � fD N ' N Q OI Q O O Q Q Q O a
ro {V t'{ 2� m o, 2 A A 2 Z Z Q
� LL' N N K 1' ' K ' 1'
� � � Q Q 6 3�� � `
Z Y Y Y � 4i uLL � v) �i li ILL T p Y > �p t > p vi p vi �p pp � � �
J N N tll � J ..� � J J � tl) < 41 41 Q M 41 Q .i Q � Q �yy a
a p � �
mg
Z J � o ps
O � S N � � 0
. f � �ZZ � W O W � :
� b
� Q � F tl a
Q a �
� 3 � W � a p Z .�e rm- w
� rc $ . o �k
. t� U � _ '� Y Z � � � U F^ U � �6 1� S
o � W � o � � W � o �CL � g � W � wW � � � �
? � � �. W ... W � ]C W � � O �
W a � Z � LL � W W W J � � < � � � N
� �a � z s � z z z � Q 3 a � a � = z
> � � � � � � �k � � � � `- � 3 � � � �
� � � � �
O o u�S � Q < Q �u a d �
� � � � � � � 3 3 3 a � `� <
{V. a 0 p N � U N SV N N N N �
`� ` ♦ W
�z C~I � � V O d � ♦ Y r Y - N t7 O N O .
a
� BILL NO. 09-151 RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE AN AGREEMENT WITH NIP KELLEY
EQUIPMENT COMPANY, INC. , FOR THE SHAWNEE
PARK SPORTS COMPLEX IMPROVEMENTS, IN THE
CITY OF CAPE GIR.ARDEAU, MISSOURI
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE
GIRARDEAU, MISSOURI, AS FOLLOWS :
ARTICLE l. The City Manager, for and on behalf of the City
of Cape Girardeau, Missouri, is hereby authorized to execute an
Agreement with Nip Kelley Equipment Company, Inc. , for the
Shawnee Park Sports Complex Improvements, in the City of Cape
Girardeau, Missouri . A copy of said Agreement is attached to
this Resolution and made a part hereof .
PASSED AND ADOPTED THIS DAY OF , 20
�
Jay B. Knudtson, Mayor
ATTEST:
Gayle L. Conrad, City Clerk
�
� CITY OF CAPE GIRARDEAU
PARKS AND RECREATION' DEPAF�TMENT
SITE IMPROVEMENTS ,
SHAWNEE PARK COMMUNITY CENTER
& SPORTS COMPLEX
STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR
ON THE BASIS OF A STIPULATED PRICE
THIS AGREEMENT is dated as of the day of in the year
2009 by and between the City of Cape Girardeau Parks and Reereation Department,
(hereinafter called OWNER) and Nip Kellev Equipment Company, Inc. (hereinafter calfed
CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set
forth, agree as follows:
Article 1. WORK.
� CONTRACTOR shall complete all Work as specified or indicated in the Contract
Documents. The Work is generally described as follows:
The work to be performed under these Contract Documents consists of site
grading, building pad preparation, asphaltic concrete driveway and parking areas,
installation of sanitary sewer lines and services, construction of stormwater detention
basins, construction of stormwater collection systems, construction of segmental block
retaining walls, sidewalk construction,the installation of sight lighting, and any other related
construction items as stated in the Specifications or shown on the Project Plans prepared
by Bowen Engineering & Surveying, Inc. and Dated August 3, 2009 for the City of Cape
Girardeau Parks and Recreation Department.
Article 2. ENGINEER.
The Project Engineer or his designee is to act as OWNER'S representative, assume all
duties and responsibilities and have the rights and authority assigned to ENGINEER in the
Contract Documents in connection with compfetion of the Work in accordance with the
Contract Documents.
�
A-1
Article 3. CONTRACT TIMES. �
3.1 The work will be substantially completed within ninetv ( 90 ) calendar days after the
date when the Contract Times commence to run as provided in paragraph 2.3 of the
General Conditions, and completed and ready for final payment in accordance with
paragraph 14.13 of the General Conditions within one hundred five
105 days after the date when the Contract Times commence to run.
3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the Work is not
completed within the times specified in paragraph 3.1 above, plus any extensions thereof
allowed in accordance with Article 12 of the General Conditions. They also recognize the
delays, expense and difficulties involved in proving the actual loss suffered by OWNER if
the Work is not competed on time. Accordingly, instead of requiring any such proof,
OWNER and CONTRACTOR agree that as liquidated-damages for delay (but not as a
penalty) CONTRACTOR shall pay OWN�R one tF�ousand ($1,000.00) for each day that
expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is
substantially complete. After Substantia( Completion, if CONTRACTOR shall neglect,
refuse or fail to complete the remaining Work within the time specified in paragraph 3.1 for
completion and readiness for final payment or any proper extension thereof granted by
OWNER, CONTRACTOR shall pay OWNER fifteen hundred ($1,500.00) for each day
that expires after the time specified in paragraph 3.1 for completion and readiness for final
payment. �,,,,r�
Article 4. CONTRACT PRICE.
OWNER shall pay CONTRACTOR for completion of the Work in accordance with the
Contract Documents an amount in current funds equal to the sum of the amounts
determined pursuant to paragraphs 4.1 and 4.2 below:
4.2 for all Unit Price Work, an amount equal to the sum of the established unit price for
each separately identified item of Unit Price Work times the estimated quantity of that item
as indicated in the bidding documents.
TOTAL OF ALL UNIT PRICES: One million, two hundred thirtv one thousand, one
hundred nine and 44 / 100 dollars ($ 1,231,109.44)
(Includes base bid of$1,198,109.44 and Add-Alternate No. 1 of$33,000.00)
As provided in paragraph 11.9 of the General Conditions estimated quantities are not
guaranteed, and determinations of actual quantities and classification are to be made by
ENGINEER as provided in paragraph 9.10 of the General Conditions. Unit prices have
been computed as provided in paragraph 11.9.2 of the General Conditions.
�
A-2
� Article 5. PAYMENT PROCEDURES.
CONTRACTOR shali submit Applications for Payment in accordance with Article 14 of the
General Conditions. Applications for Payment will be processed by ENGINEER as
provided in the General Conditions.
5.1 Progress payments;Refainage. OWNER shall make progress payments on account of
the Contract Price on the basis of CONTRACTOR'S Application for Payment as
recommended by ENGINEER, on or about the 10th day of each month during construction
as provided in paragraphs 5.1.1 and 5.1.2 below. All such payments will be measured by
the schedule of values established in paragraph 2.9 of the General Conditions (and in the
case of Unit Price Work based on the number of units completed) or, in the event there is
no schedule of values, as provided in the General Requirements.
5.1.1 Prior to Substantial Completion, progress payments will be made in an amount equal
to the percentage indicated below, but, in each case, less the aggregate of paym�nts
previously made and less such amounts as ENGINEER shall determine, or OWNER may
withhold, in accordance with paragraph 14.7 of the General Conditions.
90% of Work completed (with the balance being retainage). If Work has
been 50%completed as determined by ENGINEER, and if the character and
progress of the Work have been satisfactory to OWNER and ENGINEER,
� OWNER, on recommendation of ENGINEER, may determine that as long as
the character and progress of the Work remain satisfactory to them,there will
be no additional retainage on account of Work completed, in which case,the
remaining progress payments prior to Substantial Completion will be an
amount equal to 100% of the Work completed.
90% (with the balance being retainage) of materials and equipment not
incorporated in the Work(but delivered, suitably stored and accompanied by
documentations satisfactory to OWNER as provided in paragraph 14.2 of the
General Conditions).
5.1.2 Upon Substantial Completion, in an amount sufficient to increase total payments to
CONTRACTOR to 95%of the Contract Price (with the balance being retainage), less such
amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with
paragraph 14.7 of the General Conditions.
5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with
paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the
Contract Price as recommended by ENGINEER as provided in said paragraph 14.13.
Article 6. INTEREST.
All moneys not paid when due as provided in Article 14 of the General Conditions shall bear
� interest at the maximum rate allowed by law at the place of the Project.
A-3
Article 7. CONTRACTOR'S REPRESENTATIONS. �
In order to induce OWNER to enter into the Agreement, CONTRACTOR makes the
following representations:
7.1 CONTRACTOR has examined and carefully studied the Contract Documents
(including the Addenda listed in paragraph 8) and the other related data identified in the
Bidding Documents, including "technical data".
7.2 CONTRACTOR has visited the site and become familiar with and is satisfied as to the
general, local and site conditions that may affect cost, progress, perFormance and
furnishing of the Work.
7.3 CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws
and Regulations that may affect cost, progress, performance and furnishing of the Work.
7.4 CONTRACTOR has carefully studied all reports of explorations and tests of subsurface
conditions at or contiguous to the site and all d�awings of physicaf conditions in or relating
to existing surface or subsurface structures at or contiguous to the site (except
Underground Facilities) which have been identified in the Supplementary Conditions as
provided in paragraph 4.2.1 of the General Conditions. CONTRACTOR accepts the
determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent
of the "technical data" contained in such reports and drawings upon which CONTRACTOR �
is entitled to rely as provided in paragraph 4.2 of the Generaf conditions. CONTRACTOR
acknowledges that such reports and drawings are not Contract Documents and may not be
complete for CONTRACTOR'S purposes. CONTRACTOR acknowledges that OWNER
and ENGINEER do not assume responsibility for the accuracy or completeness of
information and data shown or indicated in the Contract Documents with respect to
Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and
carefully studied (or assumes responsibility for having done so) all such additional
supplementary examinations, investigations, exploratio�s, tests, studies and data
concerning conditions(surface, subsurface and Underground Facilities)at or contiguous to
the site or otherwise which may affect cost, progress, performance or furnishing of the
Work or which relate to any aspect of the means, methods, techniques, sequences and
procedures of construction to be employed by CONTRACTOR and safety precautions and
programs incident thereto. CONTRACTOR does not consider that any additional
examinations, investigations, explorations, tests, studies or data are necessary for the
performance and furnishing of the Work at the Contract Price, within the Contract Times
and in accordance with the other terms and conditions of the Contract Documents.
7.5 CONTRACTOR is aware of the general nature of work to be performed by OWNER
and others at the site that relates to the Work as indicated in the Contract Documents.
7.6 CONTRACTOR has correlated the information known to CONTRACTOR, information
and observation obtained from visits to the site, reports and drawings identified in the �
A-4
� Contract documents and all additional examinations, investigations, explorations, tests,
studies and data with the Contract Documents.
7.7 CONTRACTOR has given ENGINEER written notice of all conflicts, errors,ambiguities
or discrepancies that CONTRACTOR has discovered in the Contract Documents and the
written resolution thereof by ENGINEER is acceptable to CONTRACTOR, and the Contract
Documents are generally sufficient to indicate and convey understanding of all terms and
conditions for performance and furnishing of the Work.
Article 8. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire agreement between QWNER and
CONTRACTOR concerning the Work consist of the following:
8.1 This Agreement (pages 1 to 8 inclusive).
8.2 Exhibits to this Agreement (pages BF-1 to BF-11 , incfusive).
8.3 Performance, Payment, and other Bonds, identified as exhibits and consisting of
pages.
8.4 Notice to Proceed.
� 8.5 General Conditions (pages 1 to 55 , inclusive). (EJCDC No. 1910-8 1990 Edition)
8.6 Supplementary Conditions (pages SC-1 to SC- 5 , inclusive).
8.7 Specifications bearing the title Site Improvements Shawnee Park Community Center
& Sports Complex .
8.8 Drawings.
8.9 Addenda numbers 1 to 1 , inclusive.
8.10 CONTRACTOR'S Bid (pages BF-1 to BF-11 , inclusive).
8.11 Pursuant to 285.530 R.S. Mo, the contractor must affirm its enrollment and
participation in a federal work authorization program with respect to the employees
proposed to work in connection with the services requested herein by 1) submitting a
completed, notarized copy of AFFIDAVIT OF WORK AUTHORIZATION and 2) providing
documentation affirming the bidder's enrollment and participation in a federal work
authorization program with respect to the employees proposed to work in connection with
the services requested herein.
� 8.12 Documentation submitted by CONTRACTOR prior to Notice of Award (pages _to
, inclusive).
A-5
8.13 The following which may be delivered or issued after the Effective Date o� the
Agreement and are not attached hereto: All Written Amendments and other documents �"'�
amending, modifying or supplementing the Contract Documents pursuant to paragraphs 3.5
and 3.6 of the General Conditions.
The documents listed in paragraphs 8.2 et seq. above are attached to this Agreement
(except as expressly noted otherwise above).
There are no Contract Documents other than those listed above in the Article 8. The
Contract Documents may only be amended, modified or supplemented as provided in
paragraphs 3.5 and 3.6 of the General Conditions.
Article 9. MISCELLANEOUS.
9.1 Terms used in this Agreement which are defined in Article 1 of the General Conditions
will have the meanings indicated in the Generat Conditions.
9.2 No assignment by a party hereto of any rights under or interests in the Contract
Documents will be binding on another party hereto without the written consent of the party
sought to be bound; and, specifically but without limitation, moneys that may become due
and moneys that are due may not be assigned without such consent (except to the extent
that the effect of this restriction may be limited by law), and unless specifically stated to the
contrary in any written consent to an assignment no assignment will release or discharge �
the assignor from any duty or responsibility under the Contract Documents.
9.3 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and
legal representatives to the other party hereto, its partners, successors, assigns and legal
representatives in respect to all covenants, agreements and obligations contained in the
Contract Documents.
9.4 Any provision or part of the Contract Documents held to be void or unenforceable
under any Law or Regulation shall be deemed stricken, and all remaining provisions shall
continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the
Contract Documents shall be reformed to replace such stricken provision or part thereof
with a valid and enforceable provision that comes as close as possible to expressing the
intention of the stricken provision.
9.5 Pursuant to 292.675, R.S. Mo, the contractor is informed that all contractors or
subcontractors doing work on this project to provide, and require its on-site employees to
complete, a ten (10) hour course in construction safety and health approved by the
Occupational Safety and Health Administration ("OSHA") or similar program approved by
the Missouri Department of Labor and Industrial Relations which is at least as stringent as
an approved OSHA program. The training must be completed within sixty(60) days of the
date work on the project commences. On-site employees found on the worksite without
documentation of the required training shall have twenty (20) days to produce such �
A-6
� documentation.
9.6 The General Contractor shall provide to the City of Cape Girardeau City Engineer's
Office weekly certified payrolls from the General Contractor and all Subcontractors during
the course of the project. These must be provided on a weekly basis; if no work was done,
then a payroll stating "No Work Done" must be submitted.
�
�
A-7
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed the Agreement in
multipfe copies, One counterpart eaeh has been delivered to CONTRACTOR and �
ENGINEER and two counterparts to the OWNER. All portions of the Contract Documents
have been signed, initialed or identified by OWNER and CONTRACTOR or identified by
ENGINEER on their behalf.
This Agreement will be effective on , 2009 (which is the
Effective Date of the Agreement).
OWNER Citv of Cape Girardeau CONTRACTQR Niq Kellev Equipment
Scott Mever, Citv Manager Companv Inc.
BY: BY:
[CORPORATE SEAL] [CORPORATE SEAL]
Attest Attest
Address for giving notices Address for giving notices
410 Kiwanis Drive 41 North Spriqq St. �
Caqe Girardeau, MO 63701 Cape Girardeau MO 63701
(If OWNER is a public body, attach License No.
evidence of authority to sign and
resolution or other documents Agent for service of process:
authorizing execution of Agreement.
(If CONTRACTOR is corporation,
attach evidence of authority to sign.)
'�...J
A-8
� CITY OF CAPE GIRARDEAU
PARKS AND RECREATION DEPARTMENT
SITE IMPROVEMENTS
SHAWNEE PARK COMMUNITY CENTER
& SPORTS COMPLEX
BID FORM
(EJCDC 1910-18) (1990)
PROJECT IDENTIFICATION: The improvements consist of site grading, building pad
preparation, asphalticconcrete driveway and parking areas, installation of sanitary sewer
lines and services, construction of stormwater detention basins,construction of stormwater -
coHection systems, construction of segmental bfock retaining walls, sidewalk construction,
the installation of site tighting, and any other related construction items as stated in the
Specifications or shown on the Project Plans prepared by Bowen Engineering &Surveying,
Inc. and Dated August 3, 2009.
THIS BID IS SUBMITTED TO: DANIEI. D. MUSER, DIRECTOR
CITY OF CAPE GIRARDEAU
� PARKS AND RECREATION DEPARTMENT
A.C. BRASE ARENA
410 KIWANIS DRIVE
CAPE GIRARDEAU, MO 63701
1. The undersigned BIDDER proposes and agrees, if the Bid is accepted, to enter into an
agreement with OWNER in the form included in the Contract Documents to perform and
furnish all Work as specified or indicated in the Contract Documents for the Bid Frice and
within the Bid Times indicated in this Bid and in accordance with the other terms and
conditions of the Contract Documents.
2. BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to Bid
and Instructions to Bidders, including without limitation those dealing with the disposition of
Bid security. This Bid will remain subject to acceptance for sixty days after the day of Bid
opening. BIDDER will sign and deliver the required number of counterparts of the
Agreement with the Bonds and other documents required by the Bidding Requirements
within fifteen days after the date of OWNER'S notice of Award.
3. In submitting this Bid, BIDDER represents,as more fully set fortM in the Agreement, that:
(a) BIDDER has examined and carefully studied the Bidding Documents and the �
following:
�
BF-1
Addenda, receipt of all which is hereby acknowledged: �ListAddenda byAddendum Numberand Date)
Addendum #1 - 8/28/09 �
(b) BIDDER has visited the site and become familiar with and is satisfied as to the
general, local and site conditions that may affect cost, progress, performance and
furnishing of the Work;
(c) BIDDER is familiar with and is satisfied as to all federal, state and local Laws and
Regulations that may affect cost, progress, performance and furnishing of the Work.
(d) BIDDER has carefully studied all reports of explorations and tests of subsurface
conditions at or contiguous to the site and all drawings of physieal conditions-in or relating
to existing surface or subsurface structures at or contiguous to the site (except
Underground Facilities) which have been identified in the Supplementary Conditions as
provided in paragraph 4.2.1 of the General Conditions. BIDDER accepts the determination
set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent of the
"technical data" contained in such reports and drawings upon which BIDDER is entitled to
rely as provided in paragraph 4.2 of the General Condifions. BIDDER acknowledges that
such reports and drawings are not Contract Documents and may not be complete for
BIDDER'S purposes. BIDDER acknowledges that OWNER and Engineer do not assume �
responsibility for accuracy or completeness of information and data shown or indicated in
the Bidding Documents with respect to Underground Facilities at or contiguous to the site.
BIDDER has obtained and carefully studied (or assumes responsibility for having done so)
all such additional or supplementary examinations, investigations, explorations, tests,
studies and data concerning conditions(surface,subsurface and Underground Facilities)at
or contiguous to the site or otherwise which may affect cost progress, performance or
furnishing of the Work or which relate to any aspect of the means, methods, techniques,
sequences and procedures of construction to be employed by BIDDER and safety
precautions and programs incident thereto. BIDDER does not consider that any additional
examinations, investigations, explorations, tests, studies or data are necessary for the
determination of this Bid for performance and#urnishing of the Work in accordance with the
times, price and other terms and conditions of the Contract Documents. �
(e) BIDDER is aware of the general nature of Work to be performed by Owner and
others at the site that relates to Work for which this Bid is submitted as indicated in the
Contract Documents.
(f) BIDDER has correlated the information known to BIDDER, information and
observations obtained from visits to the site, reports and drawings identified in the Contract
Documents and all additional examinations, investigations, explorations, tests, studies and �
data with the Contract Documents.
�
B F-2
� (g) BIDDER has given Engineer written notice of all conflicts, errors, ambiguities or
d�screpancies that BIDDER has discovered in the Contract Documents and the written
resolution thereof by ENGINEER is acceptable to BIDDER, and the Contract Documents
are generally sufficient to indicate and convey understanding of all terms and conditions for
performing and furnishing the Work for which this Bid is submitted.
(h) This Bid is genuine and not made in the interest of or on behalf ofi any undisclosed
person, firm or corporation and is not submitted in conformity with any agreement or rules
of any group association, organization or corporation; BIDDER has not directly or indirectly
induced or solicited any other Bidder to submit a false or sham Bid; BIDDER has not
solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER
has not sought by collusion#o obtain for itself any advantage over any other Bidder or over
OWNER.
(i) Pursuant to 285.530 RSMo,the bidder must affirm its enrollment and participation in
a federal work authorization program with respect to the employees proposed to work in �
connection with the services requested herein by
• submitting a completed, notarized copy of AFFIDAVIT OF WORK
AUTHORIZATION and
� • providing documentation affirming the bidder's enrollment and participation in a
federal work authorization program with respect to the employees proposed to wvrk
in connection with the services requested herein.
• http�//www uscis.qov/portal/site/uscis
(j) Bidders are informed that the Project is subject to the requirements of Section
292.675, R.S. Mo, which requires all contractors or subcontractors doing work on the
Project to provide, and require its on-site employees to complete,a ten (10) hour course in
construction safety and health approved by the Occupational Safety and Health
Administration ("OSHA")or similar program approved by the Missouri Department of Labor
and Indus#rial Relations which is at least as stringent as an approved OSHA program. The
training must be completed within sixty (60) days of the date work on the Project
commences. On-site employees found on the worksite without documentation of the
required training shall have twenty (20) days to produce such documentation.
4. BIDDER wil! complete the Work in accordance with the Contract Documents for the
following price(s)
�
B F-3
UNIT PRICE BID
�
NO ITEM UNIT EST. UNIT TOTAL
Q-J-�r. PRICE EST. PRICE
1. TRAFFIC CONTROL LS. 1 $ �,� $ ^d�
2• EROSION CONTROL-SILT FENCE L.F. 4,820 $ a O $ �Q ;
3• CLEARING AND GRUBBING AC. 6.0 � � � $ D (,O ,U
EXCAVATION-COMMUNITY
4� CENTER,PARKING&BALL C.Y. 29,206 � ' �� $ � � ,
FIELDS
5 EXCAVATION-SOCCER& C.Y. 30,900 $ O v $ QD-O
FOOTBALL FIELDS
EMBANKMENT IN PLACE STAND
6' 'B'(SHRINKAGE NOT INCLUDED) C.Y. 2,510 $ � $ �� �
REMOVAL OF EXISTING
�' IMPROVEMENTS �'S" � $ �Q,(,'Y� � � `�Q,Qv
8. TREE REMOVAL EACH 2 $ , $ � �
UNDERGROUND ELECTRIC
9' SERVICE RELOCATION L.S. 1 $ O � ,� $ � O�
BALLFIELD FENCING,BACKSTOP
10. &DUGOUTS L.S. 1 $ � 0� $ ���
�� SEGMENTAL BLOCK RETAINING S.F. 2,800 $ � $ � J
WALLS(2 REQD.) � 8'�, ti,+,i/
6'WIDE CONCRETE STAIRWAY
12' WITH HANDRAIL L.S. 1 $ 6 ��Q��a � � �O�_�
� 13. SITE LIGHTING BALLFIELDS& LS. 1 $ $ r-
COMMUNITY CENTER �� � O• O • �
14. 4"ELECTRICAL CONDUIT&ROAD L.S. 1
BORE $ �0� � •6
15. 10"TYPE 1 AGGREGATE BASE S.Y. 2,925 $ g ,� $ a g a�
16. 8"TYPE 1 AGGREGATE BASE S.Y. 4,636 $ $ �
17. 6"TYPE 1 AGGREGATE BASE S.Y. 7,811 $ $
�$ HEAVY DUTY ASPHALT S.Y. 2,697 �
PAVEMENT � $ 1j L�(�, ��
19. RELEASE STRUCTURE(4'x 4') EACH 3 $ a ,OQ $ ��
20. JUNCTION MANHOLE(5'x 5') EACH 1 $ Q�� $ ����
21. GRATE INLET(3'x3') EACH 1 $ U $ �' �
22. AREA INLET(3'x 3') EACH 2 $ � $ � � �
23 4"THICK CONCRETE LOW FLOW S.Y. 140 $ $
CHANNEL , , Ob
24 36"STORM PIPE L.F. 270 $ �d $ � ,�
25. 18"STORM PIPE L.F. 805 $ � $ �
26. 15"STORM PIPE L.F. 117 $ , � $ � �
B F-4
27 12"RCP CLASS III LF. 267 �a �� $ �j�i9(B.�' .
28. 12"PVC SCHD.80 LF. 15 $ �� $ �c��,�
29. 10"PVC SCHD.80 L.F. 12 $ 3�,�'2 $ `�
30. 8"PVC SCHD.80 L.F. 9 $ � `� $ � � `a'�
31 CONNECTION TO EXISTING EACH 1 $ ,195,c� $ r��S�
SANITARY SEWER MANHOLE
32 SERVICE CONNECTION TO EACH 1 $ c32 $
EXISTINGSEWERSYSTEM f O(00. 2 IO(D�:�
33. SANITARY MANHOLE-4'DIA. EACH 6 $ f�S�.`'=� $ I�,�j�, �
34. 8"DIA.SDR35 SANITARY SEWER L.F. 1,247 $ a3 gs $ . 7 � 95
35. 8"x 4"SANITARY SEWER WYE L.F. 2 $ '�' $ ��� �
36. 4"DIA.SDR35 SANITARY SEWER L.F. 217 $ �$,�`� $ � `�
37. REMOVE&REPLACE CONCRETE S.Y. 11 $ �� � $ Q�
WALK
38 REMOVE&REPLACE ASPHALT S.Y. 45 $ � c7� $ �� ��
PAVEMENT �
REMOVE&REPLACE CONCRETE
39' PAVEMENT S.Y 27 $ �� ,� $ I ,a v �
40. SEWER SERVICE CONNECTION EACH 1 $ Q c�1 $ ��� �
TO MAINTENANCE BUILDING
41. �000 GAL.HOLDING TANK WITH L.S. 1 $ �0 $ �
PUMP&CONTROLS �8'� '� �S�,
42. 2"PVC SDR21 FORCE MAIN L.F. 689 $ 7,4� ' $ D �
43. AIR RELEABE VALVE&MANHOLE EACH 1 $ 31�O.`� � `�
44. 8"WATER LINE ADJUSTMENT L.S. 1 $ � `� $ '7 �(�,`�
45. 8"WATER LINE RELOCATION L.F. 68 $ L�7 �� $ a��J ��
46. 2"WATER LINE SERVICE L.F. 222 $ � 75 $ g'gal�, 5d
47. 1.5"WATER LINE SERVICE L.F. 137 $ 38 s� $ 5aF]'t�. 5�?
BASE BID TOTAL FOR ALL UNIT PRICES $ ���..
, -
I.. , .,D ,_A ,lJ _ ' „ .
,r � )cx r��i i vv
(Written figure)
In addition to the Base Bid, the following Add-Alternates will be considered when
determining the successful bidder for the project:
�
BF-5
ADD-ALTERNATES �
NO ITEM UNIT EST. UNIT TOTAL
Q-T-Y. PRICE EST. PRICE ��
4"CONCRETE FOR WALK, �
� BLEACHER&DUGOUT PADS S.Y. 1,320 $ �<j � $�, �� �
ADD-ALTERNATE NO. 1 TOTAL $ 33, � `�`�
���`�' �-�'1'�1�-�� �lc�-�SCI�'1 I (��
(Written figure)
NO ITEM UNIT EST. UNIT TOTAL
QN_ PRICE EST. PRfCE
2 2"ASPHALT PAVEMENT S.Y. 2,898 $ g,a� $ a3 J �rt.�.�
2"TYPE 5 AGGREGATE BASE S.Y. 2,915 $ ). 3`� $ 3 �/$9�so
ADD-ALTERNATE NO. 2 TOTAL $ ��� q�J'3,
5� �
7'���1 -- ��x �h�x�r� n- h � �� �s � - �r,�,� ��l��S
�n d �� ��� �er��-s
(Written figure)
NO ITEM UNIT EST. UNIT TOTAL
Q1-y_ PRICE EST. PRICE
3 2"ASPHALT PAVEMENT S.Y. 703 $ )� $Q $ g'a 9 S.�� �
2"TYPE 5 AGGREGATE BASE S.Y. 705 $ � �-� $ (��� 5�
ADD-ALTERNATE NO. 3 TOTAL $ 9��� 90
1 v`�r�Q. ��G�Sa'C G� `i�[Jc� /1 G�{����(,� � (�(/.Q2 f��6�l`C' � S .
_ � �
(Written figure)
BF-6
� NO ITEM UNIT EST. UNIT TOTAL
QN. PRICE EST. PRICE
4 SITE LIGHTING COMPLETE- LS. 1 $'`i�5,�� $ /g5,�?,�
SOCCER AND FOOTBALL FIELDS
ADD-ALTERNATE NO. 4 TOTAL $ � g-r"j� ���
D n hcr �.� i t� -�v� �c.��c�
(Written figure)
NO ITEM UNIT EST. UNIT TOTAL
QTY. PRICE EST. PRICE
5 SITE LIGHTING COMPLETE- LS. 1 $ � $ /(� S�S w
EXISTING SOCCER FIELD 3 ���s�•.
� �
ADD-ALTERNATE NO. 5 TOTAL $ ��� -rj3�
r?�. �l Yl �l�� `��S m�G� �1 u G�r.��( �'l�L�r
(Written figure)
TOTAL FOR ALL BID PRICES � �� s�n�� �O��, �`�
C.�� m % 1<< �-Z ��P h ������ s ,��- �e ��4 s����
e f 1��� h u.�oC�c af �i.,�-1 - , ,� �t ,1�1 T �'v�,.�-
(Wri en figure)
(Bid amounts are to be shown in both words and figures. In case of discrepancy, the
amount shown in words will govern. In case of error in extension, the unit and lump sum
� prices under each Pay Item will be considered correct, and these sums when properly
extended, shall constitute the Bid.)
B F-7
Unit Prices have been computed in accordance with paragraph 11.9.2 of the General �„
rnnditions.
BIDC�ER acknowledges that quantities are not guaranteed and final payment will be based �
on actual quantities determined as provided in the Contract Documents.
5. BIDDER agrees that the Work will be substantially complete within ninetv(90)calendar
days after the date when the Contract Times commences to run as provided in paragraph
2.3 of the General Conditions, and completed and ready for final payment in accordance
with paragraph 14.13 of the General Conditions within one hundred five (105Z cafendar
days after the date when the Contract Times commences to run.
BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of
;��I��re to complete the Work within the times specified in the Agreement.
6. The following documents are attached to and made a condition of this Bid:
(a) Required Bid Security in the form of bid bond or cashiers check.
(b) Required BIDDER'S Qualification Statement with supporting data.
(c) Any Addenda issued.
(d) Exhibit Affidavit of Work Authorization �`"�
(e) Exhibit Affidavit of Excessive Unemployment (if applicable)
(f) The E-Verify Program for Unemployment Verification Memorandum of
Understanding
7. Communications concerning this Bid shall be addressed to:
Name Vince Kelley
Address 41 North Sprigg St. Cape Girardeau, MO 63701
(a) Performance and Payment Bonding Company
Name Merchants Bonding Company
Address 2� oo Fleur Drive, Des Moines, IA 50321 �-
Agent\Power of Attorney Name (if used) Donald L. Wasoba �
Addr'ess 22 Avocado Tree Circle, St. Peters, MO 63376 �
B F-8
�8. Terms used in the Bid which are defined in the General conditions or Instructions will
have the meanings indicated in the General Conditions or Instructions.
SUBMITTED on S�'�'t` �3 , 20 0�
State Contractor License No. 0 01 0 5 7 5
IF BIDDER is:
An Individual
By (SEAL)
(Individual's Name)
doing business as
Business address:
Phone No.:
A Partnership
� By (SEAL)
(Firm Name)
(General Partner)
Business address
Phone No.:
�
B F-9
A Corporation �
gy Nip Kelley Equipment Comp y, Inc. (SEAL)
(Corporation Na e)
Missouri
(State of Inc or '
gy vince Kelley (SEAL)
(Name of P rson Authori d to Sign)
President
(Title)
(Corporate Seal)
.,'
AtteSt Frank Myers .���.
(Secre ary)
Business address: 4� North Sprigg St. ape Girardeau, MO 63701
Phone No.: ( 573) 334-0553
Date of Qualification to do business is � 974
A Joint Venture
By (SEAL) �
(Name)
(Address)
By (SEAL)
(Name)
11
(Address)
Phone Number and Address for receipt of official communications:
(Each joint venturer must sign. The manner of signing for each individual, partnership and
corporation that is a party to the joint venture should be in the manner indicated above.)
�
BF-10
CITY OF CAPE GIRARDEAU
Office of the City Manager
�
Council Letter Na 09-200
- September 15, 2009 -
The Honorable Mayor
and
Members of the City Council
City of Cape Girardeau, Missouri
Subject: Airport Staff and Airport Advisory Board Recommendations to the
United States Department of Transportation for Carrier Selection Pertaining to
Essentia[Air Service
Dear Mayor and Council Members:
On July 9, 2009,the United States Department of Transportation(U.S. DOT)requested
proposals to air carriers interested in providing Essential Air Service (EAS)to six
communities, including Cape Girardeau. The contracts awarded by the U.S. DOT will be
for a two-year term.
The U.S. DOT received proposals from five air carriers interested in providing air service
� at Cape Girardeau. Those carriers submitting proposals were:
• Multi-Aero, Inc. d/b/a Air Choice One, proposing daily service to either St. Louis
Lambert Airport and/or Memphis International Airport
• Gulfstream International Airlines, proposing daily service to St. Louis Lambert
Airport
• Alaska Juneau Aeronautics, Inc. d/b/a Seaport Airlines, proposing daily service to
Memphis International Airport
• Hyannis Air Service, Inc. d/b/a Cape Air, proposing daily service to St. Louis -
Lambert Airport
• Locair, Inc.,proposing four round-trip per week service to:
Kansas City International Airport, continue to Wichita, KS-Tulsa, OK
Branson,MO, continue to Little Rock,AR-Oklahoma City, OK-New Orleans, LA
Paducah, KY, continue to �incinnati, OH
Bowling Green, KY, continue to Atlanta, GA
Nashville,TN
The U.S. DOT has several factors they consider when determining which carrier will be
awarded the contract for the EAS routes. One of the factors considered by the U.S. DOT
includes their review of community comments. As such,the City has until September 16,
2009, to provide comments to the U.S. DOT regarding our opinions and recommendation
for awazd of the EAS contract.
�
Over the past month,the Airport staff and the Airport Advisory Board have worked very
diligently to research these proposals to ascertain the best choice of carrier for service at
Cape Girazdeau. The Airport Advisory Boazd interviewed all five carriers proposing �
service from Cape Girardeau at various interview sessions. Summary notes from those
meetings are included with this letter for Council review.
The result of those interview meetings culminated with the Advisory Board voting
unanimously to recommend Hyannis Air Service, Inc. d1b/a Cape Air(Cape Air),based
on the criteria that they feel the catrier will allow Cape Girardeau the best opportunity to
re-establish air service and renew our air passenger traffic growth.
A variety of key issues factored into their decision. The airline proposes low fares(an
average of$48 each way) in the Cessna 402, a smaller, nine-seat aircraft, but with a
higher frequency of four daily round-trips. The airline brings twenty years of well-
established experience, with a global distribution and reservations system that will make
it easy for travelers to find Cape Girazdeau when they want to fly into our community.
Additionally, Cape Air has a proven track record of increasing passenger boardings in
other communities where they have taken over service from an airline providing service
with the lazger 19-seat aircraft. In summary,the Airport Advisory Board clearly felt this
carrier could perform on all of their promises.
After considering all of the pros and cons associated with each of the airline proposals,
the Airport Advisory Board's final recommendations aze:
1.) to recommend to the United States Department of Transportation to award the �
Essential Air Service two-year contract Hyannis Air Service, Inc. d/b/a Cape Air to
provide scheduled air service between Cape Girazdeau and St. Louis Lambert,and
2.) to recommend to the United States Department of Transportation to awazd such
contract to Hyannis Air Service, Inc. d/b/a Cape Air utilizing the four daily roundtrip
schedule proposed by the airline.
It is recommended that the City Council approve a resolution authorizing the City
Manager to submit comments to the United States Department of Transportation in favor
of awarding the Essential Air Service two-year contract to Hyannis Air Service, Inc. d/b/a
Cape Air for scheduled air service between Cape Girardeau and St. Louis Lambert
Airport.
Res ctfully submitted,
ruce W. Loy
Airport anager
Scott . Meye �
City Manager
BILL NO. 09-152 RESOLUTION NO.
�
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CAPE GIR.ARDEAU, MISSOURI, DIRECTING THE
CITY M�NAGER TO MAKE RECOMMENDATIONS TO THE
UNITED STATES DEPARTMENT OF TR.ANSPORTATION
FOR CARRIER SELECTION PERTAINING TO
ESSENTIAL AIR SERVICE AT THE CAPE GIRARDEAU
REGIONAL AIRPORT
WHEREAS, on July 9, 2009, the United States Department of
Transportation (US DOT) requested proposals from air carriers
interested in providing Essential Air Service to six
communities, including Cape Girardeau, for a two-year contract;
and
WHEREAS, in selecting a carrier to provide subsidized
essential air service, the US DOT considers the following
factors : 1) service reliability; 2) contractual and marketing
arrangements the applicant has made with a larger carrier to
ensure service beyond the hub airport; 3) interline arrangements
� with a larger carrier at the hub; 4) costs to provide the
service; and 5) community views; and
WHEREAS, the US DOT received five proposals for the above-
mentioned service from Multi-Aero, Inc . , d/b/a Air Choice One,
Gulfstream International Airlines, Alaska Juneau Aeronautics,
Inc . , d/b/a Seaport Airlines, Hyannis Air Service, Inc . , d/b/a
Cape Air, and Locair, Inc . ; and
WHEREAS, over the past month, the Airport Staff and the
Airport Advisory Board have researched these proposals and
interviewed the five contenders for the service to ascertain the
best choice of carrier for service at Cape Girardeau; and
WHEREAS, after considering each of the airline proposals,
the final recommendations of the Airport Advisory Board are: 1)
to recommend to the United States Department of Transportation
to award the Essential Air Service two-year contract to Hyannis
Air Service, Inc . , d/b/a Cape Air, to provide scheduled air
service between Cape Girardeau and St. Louis Lambert Airport,
and 2) to recommend to the United States Department of
Transportation to award such contract to Hyannis Air Service,
Inc . , d/b/a Cape Air, utilizing the four daily roundtrip
� 1
schedules to St. Louis Lambert Airport as contained in the
proposal submitted by Hyannis Air Service, Inc. , d/b/a Cape Air. �
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY
OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS:
SECTION 1 . The City Council hereby accepts the final
recommendations of the Airport Advisory Board pertaining to
carrier selection for Essential Air Service at the Cape
Girardeau Regional Airport, and directs the City Manager 1) to
recommend to the United States Department of Transportation to
award the Essential Air Service two-year contract to Hyannis Air
Service, Inc. , d/b/a Cape Air, to provide scheduled air service
between Cape Girardeau and St. Louis Lambert Airport, and 2) to
recommend to the United States Department of Transportation to
award such contract to Hyannis Air Service, Inc . , d/b/a Cape Air
Corporation, utilizing the four daily roundtrip schedules to St.
Louis Lambert Airport as contained in the proposal submitted by
Hyannis Air Service, Inc . , d/b/a Cape Air.
PASSED AND ADOPTED THIS DAY OF , 20
�
Jay B. Knudtson, Mayor
ATTEST:
Gayle L. Conrad, City Clerk
2 �
O O O O O
� +, O O O O O
0 o ri ►ri �o � cv
� U
bA
� �
�
�6
� v �, O O O O O
Y N M M N ct tf1
v O
� U
� tn O O �O N d'
� O ►t] N �O N O
l� O� �O l� � �
(_„ N d' N l� 11� l�
� �--� N l� � O l�
d e--i �--1' �—i e-�1' �p
N �
O
v >, rl C� �C l� d' h
� ;� T �D O �0 in L�
Q � Q� N O �O �D N
O Q� 11i d' 00 d'
ci d" r-1 00 rl 11� M
� �D 00 CO l� N e-1
� rl r-I e-� r-I � e�
� {f} bR f!3 6i4 d4 b4
O O O O 1� O
� � O O O O t11 O
— � � �t M �t O �Y
�co Gp
� LL
y O O tn N O O
pp u'1 u1 N O �n O
� 1� I� lD 01 N tn
� � U'1 � '� [� I�
N
>
a
�
� � O O �f1 N O O
� O O N O v� O
C
n- �p�p � u'1 �O 01 N u1
N = lD lD �t � [� 1�
.x
V
H
O O u1 N O O
O O N O �n O
3 O O l0 O1 N �Ii
O V1 � �t � I� I�
�
�
:�
3-+
Q�.+
Y�
�
�
•��r �
� �
C� �
i � y � U ^
i, 0 � '� � �
U V V Q � V
i ..-. ..r
a U U � � �
o �
� � �+ v O
cC ,
� .� � � �
'C3 'b � � �
�. �
� Q � � Q �
a� � � �
�., ..,
'� '� � � '� �
� � �
� � C7 x .� �
AIRLINE INTERVIEW CHECKLIST
AIR CHOICE ONE �
HUB OPTIONS MEMPHIS AND/OR ST. LOUIS
CODE SHARE AGREEMENTS DOES NOT HAVE ONE CURRENTLY
BAGGAGE INTERLINE AGREEMENTS NO iNTERLINE AGREEMENTS/ WILL
HAVE BY NOV. IOTH
AIRCRAFT AVAILABILITY PLANNING TO PURCHASE CESSNA
CARAVAN
GDS/RESERVATIONS AIR CHOICE, SABRE, AND EXPEDIA
E-TICKETING CAPACITY
TICKET PRICING/DISCOUNTS FOR $65/ONE WAY (CARAVAN)
MULTIPLE TICKETS $45/ONE WAY (NAVAJO)
SCHEDULE AND FREQUENCY 2 FLIGHTS MEM, 2 FLIGHTS STL (1
OPTION), 4 FLIGHTS STL (2ND
OPTION), 4 FLIGHTS MEM (3RD
OPTION)
MARKETING FUNDS LAMBERT AIRPORT OFFERING
PROMOTIONAL SUPPORT/
ALLOCATING MONEY 1N EAS BID
SECURITY (STERILE/NON STERILE) STERILE
OTHER COMMUNITIES SERVED KIRKSVILLE, MO
AIRLINE HISTORY BASED OUT OF FARMINGTON,
LOCAL COMPANY �
AIRCRAFT MAINTENANCE MAINTENANCE BASE STL, POSSIBLY
CAPE AIRPORT
OVERNIGHT AIRCRAFT HANGAR WILL OVERNIGHT PLANE HERE
SPACE NEEDED
FUEL NEEDS WILL PURCHASE SOME FUEL FROM
CAPE AVIATION
STAFFING DEPENDS ON FLIGHT SCHEDULE
�
AIRLINE 1NTERVIEW CHECKLIST
� GULFSTREAM AIRLINES
HUB OPTIONS ST. LOUIS OR POSSIBLY CHICAGO
CODE SHARE AGREEMENTS POTENTIAL FOR AMERICAN OR
UNITED
BAGGAGE INTERLINE AGREEMENTS YES
AIRCRAFT AVAILABILITY WILL USE 4 1N HOUSE BEECH 1900
GDS/RESERVATIONS YES THROUGH CONTINENTAL
E-TICKETING CAPACITY
TICKET PRICING/DISCOUNTS FOR $50 EACH WAY
MULTIPLE TICKETS NO MULTIPLES
SCHEDULE AND FREQUENCY 3 FLIGHTS DAILY
MARKETING FUNDS YES, BUT UNKNOWN HOW MUCH
SECURITY (STERILE/NON STERILE) STERILE
OTHER COMMUNITIES SERVED FLORIDA
AIRLINE HISTORY
AIRCRAFT MAINTENANCE MARION OR QUINCY BASED
OVERNIGHT AIRCR.AFT HANGAR NOT INTIALLY, BUT NEW
SPACE NEEDED INFORMATION INDICATES IT MAY
BE REQUIRED
FUEL NEEDS ?
STAFFING STATION MGR AND 4 FULL TIME
�
�
AIRLINE INTERVIEW CHECKLIST
CAPE AIR "1,�
HUB OPTIONS ST. LOUIS
CODE SHARE AGREEMENTS WITH JET BLUE AND CONTINENTAL
BAGGAGE INTERLINE DOES HAVE INTERLINE
AGREEMENTS AGREEMENTS WITH NEARLY ALL
EXCEPT SOUTHWEST AIRLINES
AIRCRAFT AVAILABILITY CESSNA C402
GDS/RESERVATIONS PARTICIPATES IN GDS, HAS E-
E-TICKETING CAPACITY TICKETING WITH ARRANGEMENT
WITH AMERICAN AND
CONTINENTAL
TICKET PRICING/DISCOUNTS FOR AVERAGE FARE $48.00
MULTIPLE TICKETS OFFER COMMUTER BOOK OF
TICKETS AT DISCOUNTED PRICING
SCHEDULE AND FREQUENCY 4 FLIGHTS STL
MARKETING FUND5 $43,800 BUDGETED FOR MARKETING
SECURITY (STERILE/NON STERILE STERILE/WILL NEED TSA
OTHER COMMUNITIES SERVED MID-ATLANTIC, FLORIDA,
CARRIBEAN, MICRONESIA
AIRLINE HISTORY BASED OUT OF HYANNIS, MA
2ND LARGEST CONSUMER OF AVGAS
LARGEST OPERATOR OF CESSNA �
402'S
AIRCRAFT MAINTENANCE MAINTENANCE BASE STL
OVERNIGHT AIRCRAFT HANGAR WILL OVERNIGHT PLANE HERE
SPACE NEEDED
FUEL NEEDS WILL PURCHASE SOME FUEL
STAFFING 3 FULL-TIME STAFF, 4 PILOTS (1
PERSON ON DUTY ALL HOURS OF
OPERATION)
�
AIRLINE INTERVIEW CHECKLIST
� LOCAIR
HUB OPTIONS CINCINATTI, KANSAS CITY,
BRANSON, ATLANTA, NASHVILLE
CODE SHARE AGREEMENTS DOES NOT HAVE ONE CURRENTLY.
BAGGAGE INTERLINE NONE
AGREEMENTS
AIRCRAFT AVAILABILITY HAVE PLANES AVAILABLE- 19 SEAT
AIRCRAFT OR 9 SEAT AIRCRAFT
CAN ACQUIRE PLANES QUICKLY
GDS/RESERVATIONS NO. PURCHASE TICKETS ON
E-TICKETING CAPACITY WEBSITE. ONLINE CHECK-IN
TICKET PRICING/DISCOUNTS FOR $99-200 IN THE WASHINGTON
MULTIPLE TICKETS MARKET
SCHEDULE AND FREQUENCY 4 FLIGHTS DAILY/ SCHEDULE
DEPENDS ON OTHER BID (DECATUR)
MARKETING FUNDS HEAVY MARKETING-RADIO, TV,
UNIVERSITY, SCHOOLS,NEWS,
DONATE TICKETS TO THE CHAMBER
FOR GIVE AWAYS
SECURITY STERILE/NON STERILE DOESN'T REQUIRE TSA OR PART 139
OTHER COMMUNITIES SERVED BALTIMORE AREA, SUMMERSET, VA
� AIRLINE HISTORY STARTED IN 1993 W/ CESSNA 402'S
AIRCRAFT MAINTENANCE UNSURE WHERE MAINTENANCE
WILL BE BASED
OVERNIGHT AIRCRAFT HANGAR WILL OVERNIGHT ONE PLANE
SPACE NEEDED
FUEL NEEDS WILL PURCHASE SOME FUEL FROM
CAPE AVIATION
STAFFING WILL NEED SOMEONE FULL-TIME
EVERDAY
�
AIRLINE INTERVIEW CHECKLIST
SEAPORT AIRLINES {�
HUB OPTIONS MEMPHIS FBO (FORMERLY
SIGNATURE) TO TERMINAL
CODE SHARE AGREEMENTS DOES NOT HAVE ONE CURRENTLY.
BAGGAGE INTERLINE NO 1NTERLINE AGREEMENTS
AGREEMENTS
AIRCRAFT AVAILABILITY HAVE FOUR AIRCRAFT AVAILABLE
FOR USE (PILATUS PC-12)
GDS/RESERVATIONS NO. PURCHASE TICKETS ON
E-TICKETING CAPACITY WEBSITE. ONLINE CHECK-IN
TICKET PRICING/DISCOUNTS FOR $120.00/AVERAGE EACH WAY.
MULTIPLE TICKETS COULD DECREASE AS PASSENGERS
iNCREASE.
SCHEDULE AND FREQUENCY 4 FLIGHTS DAILY/ SCHEDULE
MARKETING FUNDS APPROX. $10,000/MONTHLY FOR
FIVE MARKETS
SECURITY STERILE/NON STERILE NON-STERILE
OTHER COMMUNITIES SERVED WILL SERVE HARRISON,
JONESBORO, HOT SPRINGS, AND EL
DORADO IN ARKANSAS
AIRLINE HISTORY STARTED IN 1982 IN ALASKA
AIRCRAFT MAINTENANCE MAINTENANCE BASE IN MEMPHIS �
OVERNIGHT AIRCRAFT HANGAR WILL NOT OVERNIGHT PLANE HERE
SPACE NEEDED
FUEL NEEDS WILL PURCHASE SOME FUEL FROM
CAPE AVIATION
STAFFING 3 FULL TIME, SOME PART TIME
��../