HomeMy WebLinkAbout05-10-1984OFF- 01 T111
CITY OF CAPE GIRARDEAU
May 10, 1984
To the Honorable Mayor and Council
of the City of Cape Girardeau, Missouri
Gentlemen:
C Ty IAL
'APE G1PAR111U 11
The Planning and Zoning Commission met Wednesday, May 9, 1984.
By majority vote, actual vote counted and in the file, we recommend
as follows:
1. That the request of Harry E. and Francis R. Rediger to rezone
Lots 232, 233, and 234 along Woodbine and Lots 218, 219, 220,
221, and 222 along Aspen Drive from R-1 Residential to R-3 Two
Family Residential be approved.
The Drury Development Corporation received postponement until the
June, 1984, meeting of their request to rezone the premises at 2942
Bloomfield Road from R-1 Residential to C-2 Commercial.
Mr. Thomas Tucker of the Southeast Missouri Regional Planning
Commission discussed the preliminary cost and time estimates for the
options available in updating the City's comprehensive plan. The
Commission voted to recommend that a complete revision of the
comprehensive plan be undertaken.
Respectf u,l ly submitted,
A. R. Mcycr�
Secretary
ARM:rlb
Present: Giles, Meyer, Tooke, Herbst, Cox, Robinson, Rubs, Lowes
"HOME OF MISSOURI STATE FLAG"
CAPE GIRARDEAU COMPREHENSIVE PLAN UPDATE
PRELIMINARY "BALLPARK" ESTIMATES
OF TIME AND COSTS
SOUTHEAST MISSOURI REGIONAL PLANNING COMMISSION
MAY 9, 1984
There are two basic options available in regard to updating the City's
comprehensive plan, with an obvious range of options in between.
The first is a more or less "bare -bones" approach in which the latest
land use data available for the "East End" would be used as is, with
cursory field checks. The remainder of the City would be field sur-
veyed to complete the necessary data. Following the field survey, the
existing City base maps (1" = 4001) would then be updated to reflect
existing conditions. These would then be photographically spliced and
reduced to produce 1" = 8001, 1" = 1,000" and/or 1" = 2,000' maps for
plan graphics. A plan report updating the population, existing land
use, major street plan, and future land use plan elements would then
be prepared for adoption.
The second basic option is a complete revision of the comprehensive
plan, including a complete new field survey of the entire City. Both
options assume that the new reassessment photos and parcel overlays
would be available for use. Under the second option, the reassess-
ment maps would be used for field work and the parcel overlays would
be used as a base for drafting a complete new set of 1" = 400' base
maps for the City. These would then be photographically spliced and
reduced to produce the base and graphic maps needed. The principal
advantage in preparing new base maps from the reassessment maps is
that existing problems with distortion and scale on the existing maps
could be corrected and the new maps would accurately reflect property
ownership over the entire City (as of that point in time).
The initial step in either effort would entail preparation of the field
survey maps and conducting the actual land use survey. It is esti-
mated that this will require from one year to 18 months, depending
upon the level of survey effort. A rough cost estimate is $25,000 to
$30,000, again depending upon the level of survey. The time estimate
given is for total elapsed time, taking some account of lost days due to
weather and other delays.
The second phase would be actual drafting of the base maps, in either
form, and revising the plan's data base and writing the necessary plan
document. It is estimated that this will require approximately six
months to one year in elapsed time and from around $25,000 to
$30,000. If a complete plan revision were undertaken, special empha-
sis would be placed on annexation factors, potential development of
coordinated commercial/ light industrial centers within the City limits,
and future sewer line extension needs.
Obviously, some of the map drafting and plan preparation work can
and will be done while the field survey work is in progress; therefore,
1
. A
it should be possible to more or less "dovetail" these efforts,
especial-
ly toward the latter end of the work.
Overall, updating
the plan
should require between 12
and 18 months,
providing no undue delays
are encountered. Again, a
rough estimate
of the total cost is
between
$50,000 and $60,000, again
providing no
particular problems
are en-
countered.
In terms of the planning effort, the work on the plan itself would
probably best be separated from work on the zoning ordinance and
subdivision regulations. To go through and revise these documents
will probably take in the vicinity of $5,000 to $10,000. The problem in
estimating the cost and time is that it is impossible to predict how
many planning commission meetings will be productive or how many full
agendas and other delays might be encountered. Also, without a
complete review of the ordinances, it is not known how many revisions
might be required. The figures given are more or less consistent with
what has been encountered in other cities in the area. The ordinance
work could begin as early as desired and could conceivably be com-
pleted before the plan update. Again, however, this work would be
considered separate from the plan work itself.
Substantial benefits could be gained in drafting new base maps from
the reassessment maps. For one, distortion and scale problems with
the existing base map could be corrected. Second, the maps could be
photographically spliced and reduced to produce any size and scale
maps desired by the various City departments. These could be on
permanent photostatic paper, mylar, or blueprint paper. These maps
would be very useful for a wide variety of purposes, including track-
ing, indexing, and maintaining reassessment and property change
records.
Inasmuch as the Southeast Missouri Regional Planning and Economic
Development Commission is a not-for-profit type agency, the Com-
mission's staff would be most willing to recommend that its membership
enter into a cost -reimbursable contract with the City of Cape Girar-
deau for the actual costs of the plan preparation. Such costs would
involve all the personnel time required for the field work to undertake
the mapping, staff time for drafting of the narrative document for the
plan update, travel costs, office supplies and overhead costs, and any
actual costs for printing of the final document. The Commission does
not make a profit from its member units of government. Thus, the
City of Cape Girardeau would only be paying the actual costs for
preparation of the plan. We do feel that we can provide very excel-
lent staff support to the City of Cape Girardeau if it chooses to move
ahead with preparation of an update to either parts of the Comprehen-
sive Plan or to the entire plan. The land use segment of the .plan,
while expensive, is deemed to be very essential with regards to the
issue of zoning.
If the Commission's staff may provide any additional information or a
more detailed scope of services, we will be most happy to provide this
at your convenience.
2