HomeMy WebLinkAboutAirport.Agenda.11-05-1991AGENDA CAPE GIRARDEAU AIRPORT ADVISORY BOARD TUESDAY, NOVEMBER 5, 1991, 4:00 P.M. CAPE GIRARDEAU MUNICIPAL AIRPORT I. Call to order. II. Approval of minutes of August 7, 1991, meeting and September 19, 1991 special meeting. III. Review of Essential Air Service (EAS) situation. IV. Continued discussion of Marketing Program. V. Consideration of future Airport Improvement Program (AIP) projects. VI. Report on annual Federal Aviation Administration airport `.. inspection conducted on October 21, 1991. VII. Miscellaneous matters. VIII. Adjourn. The Airport Board of the City of Cape Girardeau, Missouri, may as a part of a study session or regular or special Airport Board meeting hold a closed session to discuss legal actions, causes of legal action or litigation, leasing, purchasing or sale of real estate, hiring, firing, promotion of personnel or employee labor relations. AIRPORT USAGE REPORT Date: Sept. 1991 r Enplanemeats VTD YTD 1991, 1991 1990 1990 THE 427 3710 595 4732 CCA 248 2147 460 2088 91 746 94 911 other totals 766 6603 1149 7731 NUMBER OF AIR CARRIER LANDINGS RELIABILITY FAC'T'ORS METRO -0- ON TIME 94.5% J-31 74 COMPLETION 93.6$ SAAB -0- v.. EMB�120 0--_ other -0- AIR TRAFFIC COUNT ITINERANT 1991' AIR TAXI GENERAL AVIATION MILITARY LOCAL CIVIL MILITARY INSTRUMENT OPERATIONS AIR TAXI GENERAL AVIATION 1990 0 AIRPORT USAGE REPORT Date: Oct 1991 Enplanements ITINERANT 1991' 1990 AIR. TAXI- -_- -- -' 208 147 VTD YTD MILITARY 13 1991, 1991 1990 1990 TWE 418 4128 646 5378 CCA 265 2412 - 202 2290 other—,-P&G 704 --Baja-_ 83 991 totals 787_ NUMBER OF AIR CARRIER LANDINGS RELIABILITY FACTORS METRO -- ON TIME -99% J-31 81 _ COMPLETION 94% SAAB EMB 120 other AIR TRAFFIC COUNT ITINERANT 1991' 1990 AIR. TAXI- -_- -- -' 208 147 GENERAL AVIATION 1576 2085 MILITARY 13 14 LOCAL CIVIL 692 788 MILITARY 0 16 INSTRUMENT OPERATION',- PERATIONuAIR AIRTAXI 160' 139 GENERAL AVIATION 393 327 . 5���'� ���li i ).Sf} . 5..u•' /: ffi\�'hY .', �: P l S :':4h�'�R.W4 .. �. �.i'.-.F y� 4s-�e.:W'. 'et .. `C T "OI; t APE GIRARDEAU�'-r: DEPARTMENT OF PUBLIC WORKS j6p1°� October 30, 1991 `"" ""°°`°O' MD. 63701 Ms. Linda Prete Department of Transportation office of Aviation Analysis Service Compensation Division P-54 400 7th Street Southwest Washington, DC 20590 Dear Ms. Prete: Subject: Cape Girardeau Municipal Airport Cape Girardeau, Missouri Essential Air Services On behalf of the citizens of Cape Girardeau and the surrounding community, I would like to submit to you their desires for airline services at the Cape Girardeau Municipal Airport. Air travel is a vital link in the inter -modal aspects of transportation for this region allowing for access by both business and personal travelers. On September 4, 1991, Trans States Airline, which operates as Trans World Express (TWE) through Cape Girardeau, issued a 90 day intent to terminate service in this market. Trans States Airline has operated in Cape Girardeau without EAS compensation since their acquisition of the route from Air Midwest Airline in February of 1991. Trans States has operated this route at a loss and feel they must receive the EAS subsidy to remain in the market. It is the desire of this community that air service to St. Louis be maintained. St. Louis is the designated EAS hub for Cape Girardeau, and the bulk of travelers in this area use St. Louis to access the national air service system. However, the need for additional destinations and availability is of extreme importance to travelers using this facility. In 14 CRF Section 398.2, it is indicated that there is a possibility of the community acquiring a dual hub designation if there is sufficient traffic and the community requests the designation. In response to a request for information from local business leaders as to the most desirable locations for additional services, several respondents indicated that Memphis, Tennessee, would be the �. first choice, followed by Nashville, Tennessee. There is also a Ms. Linda Prete Page 2 t October 30, 1991 very large demand for services to Chicago, 1llinois. Traffic statistics show that approximately 50 percent of the travelers in the area are going to Chicago for their business or connections to other destinations worldwide. It is the request of the City of Cape Girardeau that a dual hub designation be granted in this market. With this designation, the chances of attracting an additional air carrier will increase. upon securing an additional air carrier, the enplanements will increase, thereby decreasing the need for subsidies. We are looking forward to working with you on this issue. We thank you for your time and consideration. 1f you have any questions or comments, please advise me at your earliest convenience. sincerely, Mark J. Seesing Airport Manager 1` MJS:go rI REGIONAL COMMERCE RCGA®& GROWTH ASSOCIATION ]021 Kingsway - Suite 4t6 Cape Girardeau, \10 63701 ('M4)33-1-1142 City of Cape Girardeau P.O. Box 617 Cape Girardeau, MO 63701 Dear Mr. Seesing: In response to your request to comment on the type of service and to what destinations we would have interest, I would want to respond in a more general manner than possibly you require. The most of our concern as an economic development group that covers the entire Southeast Missouri Region, thus our comments by definition are more general in scope. The most important point I feel we want to make is that the Cape Municipal Airport is a vital link in the overall multi -modal transportation system for the region. We feel that a dual hub designation for this facility is extremely important for planning into the 21st century. The discussion seems to center generally around which comes first, the use or the designation. We contend that the designation would prompt eventual use. Thus, we would encourage both private and business use of this municipal airport that will in effect be providing regional service. I realize it is politically sensitive to refer to this facility as a regional airport, but with it's location next to I-55, the Southeast Missouri Regional Port Authority, the Thebes Bridge and in a few short years, the coast to coast highway known as I-66, the role this airport can play is an inter -modal transportation system will be international in scope. As I mentioned, I do not have specific services in mind nor specific destinations, but I do have a whole -hearted support for the continued use of this airport as part of the transportation system for Southeast Missouri. HAAIR October B, 1991 Mr. Mark Seesing Airport Manager P. O. Box 617 Cape Girardeau, MO 63702-0617 Dear Mark: In regards to air service as it affects Blair industries, Scott City, St. Louis. While a good market, it did not seem to provide the reliable departures and on-time service that we enjoyed to Memphis via Northwest, four years ago. There are three major areas of flight usage for Blair Industries: 1. Customers and prospective customers 50 per year a. 2. Admin. and Operational Employees 50 per year 3. Sales Personnel _ 150 per year estimated.. 250 per year Hope this information is of value. Best regards ,,��-59 ��[[//JJ��// w �✓ Al William B. Dixon President WBD/elg PC to file GLAIR INDUSTRIES, INCORPORATED FO, Box 1147.116 E. Missouri St., Scott City, M063780,(314) 264-2146 -1-1300-6?4-31!0 • FAX: (314) 264-3730 F.?R FLEXR iLITY'WITN FL AFfi... PACKACYVG BY BL; P Health Services Corporation of America tiemi qg the ]:r;dihcare coil uuucity far more than ZO years October 22, 1991 Mr. Mark Seesing Airport Manager City of Cape Girardeau P. O. Box 617 Cape Girardeau, MO 63701 Dear Mark: This is to indicate to you our strong support for the designation of Cape Girardeau as a dual source hub for air services. Our firm uses TWE to St. Louis to interconnect primarily with TWA and Southwest Airlines out of the St. Louis -Lambert Field. However, we have a serious need for timely and appropriate air service to Nashville and the Southeastern United States. We will be happy to support and testify to the need for that kind of service on the part of our firm, as well as for the whole region. Please let me know when we may be needed to testify. EHN:crf Sincerely iyours, Earl H. Norman Chairman and Chief Executive Officer "Nnri unnl in sngn•. Prpinnrdly dirrrred... in murh." 840 S. \fount AuLu ru Rd, - P.O. 13os 1600 • Cape Girardeau, MO 6.3702-1689 • PL. 314/334-7711 - FAX: 311/335=1153 3221 McKelvey It d. - Suite 200 • r3rid geton. NO 33044 • P6. 3 14/291 2920 - F VX: 314/291-5135 The Resin Exchange A SPIARTM4 Company October 4, 1991 Mr. Mark J. Seesing Airport Manager City of Cape Girardeau PO Sox 617 Cape Girardeau, MO 63702-0617 Dear Mr. Seesing: Thank you for your October I letter explaining the service of Trans World Express. I travel extensively for our company, and there are eight other individuals here who travel less fre- quently, covering approximately one-half million miles annually out of both St. Louis and Memphis. We would welcome the opportunity to secure economical connections from Cape Girardeau to these cities for convenient connections to our ultimate destinations throughout the United States. Sincerely, / Dale R. Schumacher President dt P.O. Box 1719 • Cape Girardeau, Missouri 63 702-1 719 • (314) 334-3434 BioKyowa, Inc. Bax 1550 .•••• C0 G 370215 MO fi3702-1550 T'lme 314 3354849 314 335 BIOKYOWA October 81 1991 Mr. Mark S. Seesing Airport Manager City of Cape Girardeau P.O. Box 617 Cape Girardeau, MO 63702-0617 Dear Mr. Seesing, This letter is in reply to your request as described in your letter dated October 1, in which you explained the current situation of air service in this area. Type of service and destination: Cape Girardeau Chicago Cape Girardeau Memphis Atlanta Cape Girardeau Jefferson City Kansas City >r Set plane operation would make the trip shorter and more efficient. Approximate number of passengers: It is very difficult to predict this number. It will depend on the reliability of freight departure and arrival on schedule. More than ten passengers of our business colleagues are foreseen to use the service to the above destinations, but these service routes would also be useful for the community people if they operate in good reputation. I hope that my comments are in conformance with your requests. Sincerely yours, SSmio R fniI President SK:gr enzel Co,Esblu.�tion co„�,2� .�. GENERAL CONTRACTOR POST OFFICE BOX 330 JACKSON, MISSOURI FAX (314) 2433425 ZIP CODE 63755 October 3, 1991 Mr. Mark Seesing Airport Manager P.O. sox 617 Cape Girardeau, Missouri 63701 Dear Mark, TEL. (314) 243-8191 (314) 243-3526 This is in response of your letter of October 1, 1991. Our firm has a twin engine airplane that is stationed at the Cape Girardeau Airport. On trips that are outside the range of our plane we use a commuter service to utilize flights out of Lambert in St. Louis. I would estimate the times we would utilize this service to be 6 times per year. GP/cs i `E SKILL, INTEGRITY RESPONSIBILITv Very truly yours, PEN7EL CONSTRUCTIgDk COMPANY, INC. Gene Penzel, President AN EQUAL OPPORTUNITY EMPLOYER INDEPENDENT AUTHORIZED BUILDER VARCO•PRUDEN of BUILDINGS INTERNATIONAL Built On Superior Service CITY OF. CAPE GIRARDEAU FO. PG. a,] OFFICE OF T E CME MO 6iNlLfil] AIRMRT MANAGED - - "'- TEUPHONE 13141 4CW --_ - October 1, 1991 Mr. Darrell Long \) _ ]11 Wetterau, Inc. Distribution Center Scott City, MO 63780 i Dear Mr. Long: As-you—may or may not know, Trans World Express, the commuter airline operating from Cape Girardeau to St. Louis, has filed notice with the Department of Transportation to terminate service in this market. I have been advised from the management of TWE that the reason for this notification is an attempt to secure essential air service subsidy to continue supplying this service. For a bit of history, Cape Girardeau has for some time been considered as an essential air service market by the D.O.T. What this means is that any carrier desiring to service this area may apply for and receive compensation to operate the service at a break even level. This regulation then requires the carrier to supply the service with a certain type of equipment and a specific minimum amount of available passenger seats. For this market the carrier is required to use a twin engine aircraft with two crew members and to supply a minimum of at least 48 seats in each direction per day. TWE up until this time has operated between Cape Girardeau and St Louis at a loss electing not to participate in the EAS program. They now feel they can no longer operate this way and, therefore, the reason for filing the notification. According to EAS regulations, the D.O.T. must now petition other carriers to supply proposals stipulating their desires and costs to service this market. It is also the time the community can voice its concerns and requests with regard to the type of air service the community desires. The regulation does allow for a market to have two designated hubs to allow for adequate passenger availability. However, the D.O.T. has indicated to me that this may be very difficult to accomplish but not impossible. The requirements to have a dual hub designation would be to have: "HOME OF MISSOURI STATE FLAG" - 2 - 1. Strong commercial ties. 2. Close geographically. 3. Political needs. Showing a need for an additional destination citing these guidelines may influence the D.O.T. to allow for a dual hub designation for Cape Girardeau. What I am requesting from you is to submit in writing to me what type of service and to which destination would be best for your company. Also include an approximate number of passengers you may have travel on an annual basis. I will collate this information and submit it to the D.O.T. to establish this community's requests in this issue. The time frame for this process is a very short 90 day period. If you could take time from your schedules to reply, I would like to forward your comments to the D.O.T. by mid October. I thank you for taking time to read this and thank you in advance for your comments. If you require any further information, please let me know. I will try to answer all your questions Sincerely, //64�11'k���,Aier MJ;:gc i [ V/,./ /-_ 51 tIG Cu,? �nrNc e y tc cQo JJ /7e iti C/�-�P,. d /v7 02AQ_Gr'rn2'v/i I <. 4 Ljj -" oil f' 6 -CA -11 AU c� .�(•v" / �l `'/�/�^�LC_ Cost estimates were developed using bid tabs and construction estimating practices, ~ and reflect reasonable estimates of project costs. A 30`16 contingency factor has been applied to the estimates to reflect engineering, legal fees, and unforseen circumstances which may increase project TABLE 6A Development Schedule And Cost Summary Stage L 1990-1994 1090 L Terminal building: Renovation of Existing Building' 2. Entrance road re -alignment 3, Airfield signagc 4, Non -precision marking - Runway 2 5, General maintenance' Total 1990 1991 6 Ramp expansion and taxiway connecting to Taxiway "C" 7, Taxiway stubs for 2 T -hangars 8. 2 T -hangar structures (20 units) 9. General maintenance Total 1991 1992 10. Road extension to serve corporate parcels It. General maintenance Total 1992 19" 12. Elevated water storage (100,000 gal.) 13. Segmented circle/wind sock H. Drainage Study/Improvements 15. General maintenance Total 1993 1994 16 Fuel Farm Relocation 17, Sewer Extension 18. General maintenance Total 1994 TOTAL-STAGEI 6-4 1. costs. All cost estimates are prepared in - 1989 -90 (present) dollars, and no attempt has been made to reflect the future impact of inflation on project costs. Consumer Price Indices provide a good means with which to adjust these cost estimates in the future. Local ALP' Total - $329,000 $198,000 $527,000 3,900 35,100 39,000 6,100 55,000 61,100 2,300 20,200 22,500 25M0 1 00 $366,300 $308,300 $674,600 .$ 86,200 $776,200 $862,400 7,400 66,600 _ 74,000 300,000 -- 300,000 2-5002 - 2 00 $418,600 $842,800 $1,261,400 $39,000, $351,000 $390,000 25,000 _..� _210-0-0 $64,000 $351,000 $415,000 "- $30,000 $270,000 $300,000 3.500 -- 3,500 10,000 90,000 100,000 25 000 -L-000 $68,500 $360,000 $428,500 $ 13,000 $117,000 $130,000 19,500 17 5, 500 195,000 25,000 _._ 25000 ' $57,500 $292,500 $350,000 $974,900 92,154,600 $3,129,500 - fl C ' Airport Improvement Program, administered by the Federal Aviation Administration. .f 2 The option to replace the existing structure is estimated to cost $1,300,000. 3 Gencral maintenance expenses intended to include pavement and building maintenance and equipment replacement. ` Pavement rehabilitation projects should be preceded by pavement evaluation studies to determine proper priorities. The individual projects in Stage I have been further divided into year-by-ycar staging, although it is recognized that the City has accumulated $900,000 in entitlement monies in the AIP through fiscal year 1990, and intend to pursue several of the projects listed in Stage I concurrently. 'hhe year -by -year staging should assist the City and FAA with pre - applications which will be filed in the first few years of the pian. After the first five Years, priorities will be snore likely to change and the City will need to update the five-year program - The first project listed for 1990 is the terminal building, which has been costed as a renovation of the existing building or as 6-5 a total replacement. The replacement cost of $1,300,000 has been reflected in a footnote. A final decision on which option to pursue will require a more detailed evaluation of the existing structure by an engineerjarchitcet, which should help the City in making this decision. Airfield signage improvements are necessary to meet new FAA standards on signage at airports. This cost estimate reflects the assumption that approximately 19 new one-sided signs and 3 two-sided signs will be required. FAA will need to be consulted on this matter, since a new advisory circular on airport signage has not officially been released at this date, although Cape Girardeau Municipal will be '['ABLE 6A (Continued) _ Development Schedule And Cost Summary _I State II 1945-19')9 LocaI AIP' taI I. Taxiway "U" extension and ' connecting taxiway $ 35,600 $ 320,000 S 355,600 2. ARFF structure 15,000 135,000 150,000 3. ARFF quick response vehicle 10,000 90,000 100,000 4. Pavement rehabilitation ixunwaY 10-28) 563,200 5,068,800 5,632,000 5. General maintenance (yearly exp.) 125,17_0 12S 000 'TOTAL - STAC E II $748,800 $5,613,800 $6,362,600 State_ 111 2000-2009 1. Overlay Taxiway "A" (asphalt portion) S 10,500 $ 94,500 S 105,00(1 2 Pavement rehabilitation 22o) 144,500 1,300,500 1,445,000 3. Taxiway stubs for T -hangars 9,600 86,400 96,000 4. 2 T -hangar structures (20 units) 300,000--- 300,000 5. General maintenance (yearly exp.) 50 2,U0 _ 250.00Q TOTAL - STAGE I11 $714,600 $1,481,400 $2,196,000 - TOTAL DEV£LOPbIENT COSTS $2,438,300 $9,249,800 $11,688,100 fl C ' Airport Improvement Program, administered by the Federal Aviation Administration. .f 2 The option to replace the existing structure is estimated to cost $1,300,000. 3 Gencral maintenance expenses intended to include pavement and building maintenance and equipment replacement. ` Pavement rehabilitation projects should be preceded by pavement evaluation studies to determine proper priorities. The individual projects in Stage I have been further divided into year-by-ycar staging, although it is recognized that the City has accumulated $900,000 in entitlement monies in the AIP through fiscal year 1990, and intend to pursue several of the projects listed in Stage I concurrently. 'hhe year -by -year staging should assist the City and FAA with pre - applications which will be filed in the first few years of the pian. After the first five Years, priorities will be snore likely to change and the City will need to update the five-year program - The first project listed for 1990 is the terminal building, which has been costed as a renovation of the existing building or as 6-5 a total replacement. The replacement cost of $1,300,000 has been reflected in a footnote. A final decision on which option to pursue will require a more detailed evaluation of the existing structure by an engineerjarchitcet, which should help the City in making this decision. Airfield signage improvements are necessary to meet new FAA standards on signage at airports. This cost estimate reflects the assumption that approximately 19 new one-sided signs and 3 two-sided signs will be required. FAA will need to be consulted on this matter, since a new advisory circular on airport signage has not officially been released at this date, although Cape Girardeau Municipal will be TRANSPORTATION PROPOSED PROJECTS IPROJECTI Airport Vater 1 1 1991-92 I 1992-93 1993-94 1994-95 199596 (NUMBER I IMPROVEMENT ITEM TOTAL COST FISCAL YEAR I FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR sever 1 S 195,000 S 195,000 I Extension I I A, D,F I I 11-24 I Hangars I s 300,000 I I s 300,000 I I I I 1 I A,D,F I I G I I I G I I I I I 1-25 Ramp and I E 862,400 A,F A,F E 431,200 E 431,200 S 3DG,000 1 I Taxiv.y A,D,F I I I A,D,F I A,D,F I I I 1 1-26 I Airport Lard I S 175,000 1 I 1 1 1 5 1]5,000 I I I Acquisition A,F I 1 I 1 I I 1 I I A,F 1 I I Airport I E 914,600 S 523,100 $ 622,770 1 G 1-27 I Terminal I $ 1,076,899 E 1,076,899 E 892,500 E1,219,450 $1,102,450 8 Building I C,F C,F 1 E 1,236,170 1 I-28 Airport Vater I S I I 350,000 -S 350,000 I I I I 82,521,200 I I system $2,519,810 I I I I A,F I A,F I I Airport I I I 1 1-29 sever 1 S 195,000 S 195,000 I Extension I I A, D,F I I A,D,F I I I I I 1 1-30 I Airport Road I $ 390,000 I I I E 390,000 I I 1 I Extension I I A,D,F I I A,D,F I I I I 1-31 I fire and E 150,000 S 150,000 Rescue A,F A,F I I TOTALS I I I I $15,813,944 S4,817,7-74 I I $3,748,710 I I 82,521,200 I I $2,206,450 I I $2,519,810 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I A GENERAL FUND S 310,900 E 66,500 E 25,000 $ 75,800 E 93,600 S 50,000 B GEN. OBL. FUNDS C REV/PFA BONDS I S 845,451 S 545,451 S 3DG,000 D STATE GRANTS, LOANSI S 353,850 1 S 281,500 1 S 50,800 S 21,550 E E MOTOR FUEL TAX I S 4,214,760 $ 778,880 E 1,755,040 E 587,500 S 348,750 $ 744,590 F FED. GRANTS, LOANS I S 4,225,898 S 2,165,428 E 914,600 S 523,100 $ 622,770 1 G SPEC. ASSESSMENTS I E 4,506,690 I E 859,790 E 432,500 E 892,500 E1,219,450 $1,102,450 8 CAP. IMP. SALES TAXI E 1,356,395 1 S 120,225 1 E 1,236,170 1 TRANSPOA TATION .) p —3— PROPOSED PROJECTS 1991-92 1992-93 I 1993-94 1 1994-95 1995-96 PRDJECTI I I [NUMBER IMPROVEMENT ITEM I TOTAL COST FISCAL YEAR FISCAL YEAR I FISCAL YEAR FISCAI YEAR FISCAL YEAR 1 1-13 Whitener St. 1 s 24,790 1 5 24,790 I I I I I I G I I G I I I I I I I I I I 1 1-14 1 Good Nope 1 s 38,720 1 $ 38,7zo 1 I I I I I Bridge 1 I E 1 I E I I I I I 1 1-15 1 Morgan Oak I 1 E 32,540 1 I E 32,540 I I I I I I Bridge 1 I E 1 I I E I I I I 1-16 North Main 8 53,300 E 53,300 I I I Widening 1 I E I E I I I I I I 1 1-17 1 Blomfield 1 E 31,200 I I S 31,200 I I I I I I 1 I I Widening I E 1 I E I I I I I I I 1-18 S. West End s 665,000 I s 63,000 5 602,000 ! I I Boulevard 1 I E,G I I I I E E,G I I 1-19 Sitleuatks and % 250,000 E 50,ODD E 50,000 E 50,000 8 50,000 3 50,000 I I Curbs I A,G I A,G I A,G A•G I I A,G A,G I I 1-20 Mn AUWrn E 387,000 % 30,000 E 176,300 I I E 180,700 I Extension 1 G 1 I G G G 1 1-21 I Lor;mier I $ 200,350 1 I 1 s 20,000 I 1 s 7e,600 1 a 101,750 r 1 1 I Extension I G I I G I I G G I I 1-22 Flood Project S 1,356,395 E 120,225 E1,235,170 I Bridges x 1 x 1 x 1 I I 1 1-23 1 Ai rpor[ 1 4 130,000 I E 130,000 I I I I I Fuel Depot A,D,F I A,D,F .) p —3— i. PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: IANSPORTATI,ON 1 .._ _ FUEL DEPOT CAPE GIRARDEAU MUNICIPAL AIRPORT TO UPDATE AND SECURE FUELING PIT BUILD NEW FUEI, STORAGE AREA AND FUEL, FLOW MONITORING. DESIGN, CONSTRUCT TO BECOME FUEL DISTRIBUTING POINT FOR ALL AIRPORT USERS AND SURROUNDING COMMUNITY AIRPORTS; IMPROVE THE SAFETY OF THIS FACILITY. INCREASE REVENUES TO AIRPORT OPERATING FUND. $117,000 FEDERAL GRANTS (F) $ 6,500 STATE GRANTS (D) $ 6,500 GENERAL FUND REVENUES (A) -27- PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: HANGARS CAPE GIRARDEAU MUNICIPAL AIRPORT TO ADD STORAGE FACILITIES AND OFFICE SPACE. CONSTRUCT ONE (1) CORPORATE HANGAR WITH ASSOCIATED OFFICE SPACE FOR RENTAL. DESIGN, CONSTRUCT FOR EVENTUAL REVENUES DERIVED FROM RENTALS AND TO ATTRACT ADDITIONAL BASED AIRCRAFT AND RELATED BUSINESS FOR THE AIPORT. INCREASE REVENUES TO AIRPORT OPERATING FUND. $300,000 REVENUE/PFA BONDS (C) TRANSPORTATION PROJECT TITLE: RAMP AND TAXIWAY CONSTRUCTION LOCATION: CAPE GIRARDEAU MUNICIPAL AIRPORT PURPOSE: INCREASE PARKING SPACE FOR AIRCRAFT - BETTER TRAFFIC FLOW. PHYSICAL DESCRIPTION: INCREASE GENERAL AVIATION RAMP SOUTH BY APPROXIMATELY 150'; INSTALL TAXIWAY CONNECTING RAMP TO TAXIWAY C. UNIT OF WORK: DESIGN, CONSTRUCT JUSTIFICATION: TO ADD MORE EASE AND SAFETY IN HANDLING OF AIRCRAFT ON THE GROUND. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $776,200 FEDERAL GRANTS (F) $ 43,100 STATE GRANTS (D) $ 43,100 GENERAL FUND REVENUES (A) -29- PROJECT TITLE: LAND ACQUISITION LOCATION: CAPE GIRARDEAU MUNICIPAL AIRPORT PURPOSE: FOR AIRPORT INDUSTRIAL PARK, FUTURE TERMINAL AREA AND LAND USE CONTROLS PHYSICAL DESCRIPTION: PURCHASE OF APPROXIMATELY 115 ACRES OF LAND UNIT OF WORK: ACQUIRE LAND JUSTIFICATION: TO HAVE AMPLE AREA FOR AIRPORT IMPROVEMENTS AND AIRPORT DEVELOPMENT AS WELL AS PROVIDE A MEANS OF CONTROLLING DEVELOPMENT IN ADJACENT AREAS TO INSURE COMPATIBILITY WITH AVIATION ACTIVITY IMPACT ON OPERATING BUDGET: INCREASE REVENUE TO AIRPORT OPERATING FUND. FINANCING: $ 150,000 FEDERAL GRANTS (F) 25,000 GENERAL FOND (A) -30- i TRAN$PORTATION PROJECT TITLE: RENOVATE TERMINAL BUILDING LOCATION: CAPE GIRARDEAU MUNICIPAL AIRPORT _ PURPOSE: TO BETTER USE EXISTING SPACE AND TO MAKE, i THE FACILITY MORE EYE APPEALING AND MIKE ECONOMICALLY SOUND PHYSICAL DESCRIP`T'ION: RENOVATE BUILDING TO FACILITATE TWO OR THREE AIRLINES; EXPAND THE RESTAURANT AND CREATE MEETING AND EXECUTIVE LOUNGES. UNIT OF WORK: DESIGN AND CONSTRUCT. JUSTIFICATION: ONGOING PUBLIC USE OF BUILDING WILL NECESSITATE ITS RENOVATION TO BECOME MORE ACCESSIBLE. IMPACT ON OPERATING BUDGET: REDUCE UTILITIES AND BUILDING MAINTENANCE; INCREASE REVENUES TO AIRPORT OPERATING FUND. FINANCING: $545,451 REVENUE/PFA BONDS (C) $531,448 FEDERAL GRANTS (F) MIKE PROJECT TITLE: WATER SYSTEM LOCATION: CAPE GIRARDEAU MUNICIPAL AIRPORT PURPOSE: TO FACILITATE FIRE PROTECTION CAPABILITIES AND INCREASE POTABLE WATER ACCESS FOR FUTURE INDUSTRIAL DEVELOPMENT PHYSICAL DESCRIPTION: CONSTRUCTION OF A 100,000 GALLON WATER STORAGE FACILITY AND INSTALLATION OF MAINS, HYDRANTS, AND WELL CHLORINATION. UNIT OF WORK: DESIGN AND CONSTRUCT. JUSTIFICATION: TO INSURE PROPERTY FIRE PROTECTION FOR AIRPORT AND SURROUNDING INDUSTRIAL DEVELOPMENTS IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $315,000 FEDERAL GRANTS (F) $ 35,000 GENERAL FUND (A) -32- I PROJECT TITLE: SEWER EXTENSION LOCATION: AIRPORT PURPOSE: SUPPLY SEWER FACILITIES TO ENTIRE AIRPORT PHYSICAL DESCRIPTION: DESIGN OF ENTIRE AIRPORT SEWER SYSTEM FOR - AIRPORT AND AIRPORT INDUSTRIAL SITES. UNIT OF WORK: DESIGN, LAYOUT, CONSTRUCT JUSTIFICATION: ALLOW FOR COMPLETE SEWAGE DISPOSAL r IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $175,500 FEDERAL GRANTS (F) $ 9,750 GENERAL FUND REVENUES (A) $ 9,750 STATE GRANTS (D) ■, -33- PROJECT TITLE: ROAD EXTENSION TO SERVE CORPORATE PARCELS LOCATION: AIRPORT PURPOSE: TO SERVE AS ACCESS TO SOUTHSIDE OF RAMP PHYSICAL DESCRIPTION: EXTEND AIRPORT ACCESS ROAD AROUND EAST END OF RAMP. LEVEL AND DRAINAGE, FENCING UNIT OF WORK: DESIGN, CONSTRUCT JUSTIFICATION: TO ALLOW FOR ACCESS TO CORPORATE TRACTS ON SOUTH SIDE OF RAMP IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $351,000 FEDERAL GRANTS (F) $ 19,500 GENERAL FUND REVENUES (A) $ 19,500 STATE GRANTS (D) -34- PROJECT TITLE: FIRE AND RESCUE LOCATION: MUNICIPAL AIRPORT PURPOSE: TO PROVIDE FACILITY FOR FIRE FIGHTING AND RESCUE OPERATIONS PHYSICAL DESCRIPTION: CONSTRUCT DOUBLE BAY BUILDING WITH OFFICE AND STORAGE SPACE. UNIT OF WORK: - DESIGN AND CONSTRUCT. JUSTIFICATION: FIRE PROTECTION AND RESCUE FACILITIES FOR EMERGENCY RESPONSE IN CASE OF AN ACCIDENT CURRENTLY DO NOT EXIST ON THE AIRPORT PROPERTY IMPACT ON OPERATING BUDGET: INCREASED BUILDING MAINTENANCE AND ADDITIONAL PERSONNEL TRAINING, EQUIPMENT, ETC. WILL BE REQUIRED. FINANCING: $ 135,000 FEDERAL GRANTS (F) $ 15,000 GENERAL FUND REVENUES (A) r -35- 40) US. Department cen,,aI 11o, 11 oal L. 12th street Io olTranspalauon MWe naNc�,asMe keO5d5llry,Mrsmwi6110! Federal Aviation �55„�� Administration OCT 0 4 TO: AIRPORT SPONSORS AND CONSULTANTS STATE AVIATION DIRECTORS SUBJECT: Central Region Airport Improvement Program Conference Friday, November 22, 1991 in Kansas City, Missouri You are cordially invited to attend the 1992 Airport Improvement Program Conference on Friday, November 22, 1991, at the Holiday Inn Crowne Plaza, 4445 Main Street, Kansas City, Missouri. I am very pleased to announce that Admiral James B. Busey, the Federal Aviation Administration's Administrator, will be the featured speaker at the conference luncheon this year and I know many of you are looking forward to meeting him. During the morning general session the keynote presentation will be given by Mr. Leonard L. Griggs, Assistant Administrator for Airports. His subject will be the Airport Improvement Program 1992 and Beyond. Next, there will be a presentation on Disadvantaged Business Enterprise (DBE.); this will provide you with the current requirements of the DBE program. There will also be an overview of the Passenger Facility Charges, including the possible effects on large and small airport funding. For the concurrent sessions following the morning break, we have an excellent variety for everyone's interests. The new signing Advisory Circular (AC) and changes to the marking AC will be discussed. Change 1 to the AC on Airport Design Standards will also be discussed and a session will concentrate on compliance requirements. There will be a breakout session on Airport Pavement Maintenence and additional sessions will cover Construction Management Plans, Storm Water Drainage Permits, the removal of Underground Storage Tanks, and current use of the Profilograph Specification for Pavement Smoothness. The banquet facilities at the Holiday Inn Crowne Plaza are exceptional. We are expecting a large response and if you are interested in hearing Admiral Busey speak, please fill out the enclosed form and return it to us with your check in the enclosed envelope. Because of hotel requirements for this lunch, your check must be received by October 30, 1991, and cannot be refunded after that date. A block of rooms has been reserved for Wednesday through Saturday, November 20 through 23, and these will be held until November 10. The rate for each room is $67.00 plus tax for up to three persons in a room. For your convenience, we have enclosed a reservation form to be returned directly to the Holiday Inn Crowne Plaza. Since most of you have attended one or more of our previous conferences, you are aware of the benefits provided by this opportunity to learn more about the Airports Program, as well as to meet your counterparts in aviation. comments received from the last conference were very favorable. I personally invite your continued attendance and participation. If you are planning to attend, please fill out the enclosed form and return it in the enclosed envelope no later than October 30, 1991. Be sure to indicate the breakout sessions you plan to attend so that we can assure enough sessions and adequate room sizes to accommodate your interest. Hotel parking is available and will be validated at the registration desk. So plan now to join me at this event and I -ll see you in Kansas City. Sincerely, l ' )S;, nd fiver1 al Administrator Enclosure rM „L' CENTRAL REGION CONFERENCE - AIRPORT IMPROVEMENT PROGRAM November 22, 1991 Holiday Inn Crowne Plaza 4445 Main Street, Kansas City, Missouri 7:00 am . . . . . . . . . . . . . . . . Registration 8:00 am . . . . . . . . . . . . . . . . Welcome - George A. Rendon Manager, Airports Division Opening Remarks - Stanley Rivers Regional Administrator 8:30 am . . . . . . . . . . . . . . . . Airport Improvement Program, 1992 and Beyond, Leonard L. Griggs, Assistant Administrator for Airports, Washington, D.C. 9:00 am . . . . . . . . . . . . . . . . Disadvantaged Business Enterprise (DBE), Lu Carradine, Manager, Civil Rights Staff 9:30 am . . . . . . . . . . . . . . . . Passenger Facility Charges (PFC) Ellis Ohnstad, Manager, Program Guidance Branch, Washington, D.C. 10:00 am . . . . . . . . . . . . . . . BREAK 10:30 am . . . . . . . . . . . . . . . Concurrent Breakout Sessions 11:45 am . . . . . . . . . . . . . . . LUNCH Speaker: Admiral James B. Busey FAA Administrator 1:30 pm . . . . . . . . . . . . . . . . Concurrent Breakout Sessions 2:30 pm . . . . . . . . . . . . . . . . BREAK 3:00 pm . . . . . . . . . . . . . . . . Concurrent Breakout Sessions 4:00 pm . . . . . . . . . . . . . . . . Conference Ends BREAKOUT SESSIONS New Airport Sign Standards Airport Pavement Maintenance Construction Management Services, Certified Testing Labs, and Safety Plans Airport Design Standards National Pollution Discharge Elimination System (NPDES) Permits Underground Storage Tank (UST) Removal Airport -Owner Compliance obligations Pavement Surface Smoothness 1992 AIRPORT IMPROVEMENT PROGRAM (AIP) CONFERENCE AIRPORT OR ORGANIZATION Names of people Please indicate the number of participants for each session listed below (3 sessions per person). A description of the sessions is attached. New Airport Sign Standards Airport Pavement Maintenance Construction Management Services, Certified Testing Labs, and Safety Plans Airport Design Standards National Pollution Discharge Elimination System (NPDES) '�► permits Underground Storage Tank (UST) Removal Airport -Owner Compliance Obligations Pavement Surface Smoothness Please indicate the names of participants who will be attending the luncheon ($15.00 per person). The luncheon speaker will be Admiral James B. Busey, FAA Administrator. Enclosed is $ (NOTE: This is non-refundable) Please make checks payable to "AIP Conference-- PLEASE onference" PLEASE RETURN BY OCTOBER 30, 1991 TO FEDERAL AVIATION ADMINISTRATION IN ENVELOPE PROVIDED C'! cm LUNCHEON MENU CENTRAL REGION AIRPORT IMPROVEMENT PROGRAM November 22, 1991 Holiday Inn Crowne Plaza 4445 Main Street, Kansas City, Missouri EXECUTIVE DELI PLATE Soup Du Jour Rolls of Deli Sliced Ham, Roast Turkey Breast, Roast Top Round Beef, and Sliced Salami Slices of Swiss and American Cheeses Rye Bread and Kaiser Roll Potato Salad Raspberry Torte Beverage $15.00 per person To reserve a space for this luncheon, return the enclosed form with your check payable to "AIP Conference" in the envelope provided. Special diet plates available with reservation. FEDERAL AVIATION ADMINISTRATION NOVEMBER 20 - 24, 1991 Reservations must be made by November 10, 1991 to guarantee availability of accommodations and convention rate. Reservations made after this date will be accepted on a first come first serve basis at the nearest available rate. If you do not honor your reservation on the day of arrival or the reservation is not cancelled before 4:00 p.m. on that day, the room will be billed for one night and reservation will be cancelled. Name Address Will Arrive On Will Depart On Sharing Room Telephone Signature Time _Handicap Access Room Requests* _Non -Smoking Room Requested* *Space Available Basis Only Accommodations RATE Single - 1 person, 1 bed $67.00 Double - 2 people, 1 bed $67.00 Twin - 2 people, 2 dbl. beds $67.00 Triple - 3 people, 2 beds $67.00 Check-out time is noon. Guests rooms will be available after 4:00 p.m. Please include credit card information if room is to be held for guaranteed late arrival. (American Express, Master Card, Visa, Diners Club, Carte Blanche and the Discover Card are accepted.) Card No. Exp. Date First Night's deposit will also guarantee your reservation. Make check or money order payable to Holiday Inn Crowne Plaza Hotel. PLEASE DO NOT SEND CURRENCY. Holiday Inn Crowne Plaza 4445 Main Street Kansas City, Missouri 64111 (816) 531-3000 1-800-552-6727 Kansas City Area Full Service 4pUay el)r m CROWNE PLAZA' MO (Six / 605 weds Glaypome Park I Lee's Summit I From 1-29 South (and Kansas City International Airport) Eeaw rod or b]O East or West, take 1-35 It then ext onto am 5o Southwest Traftioway (lett lane exit). Turn left onto i 43rd Street, right onto Main Street, go two blocks. From 1 35 North, take Southwest BoulevardMtission GUardrew Road exit. Bear right onto Mission Road, left onto 43rd Street, right onto Main Street, go two Olmks. 35IfansafGiiy,M InOepmEence ..,at, Mn fig I ae C,mn<Hva9 Imu.uu 0�ny m ftmm Cip 4o Forilrano Pro wain. issawar ngk p ] w Fan,vay 4Om w. Mei Shaw , Mszinn,va"ns � 435 n ' Mrswan TST Pin Hills In M Rarown N 10 coinnn rin, O aye m �> 69 Vi n no i.^169rs 1tAN5A511 MISSOURI a]5 Park I Lee's Summit I From 1-29 South (and Kansas City International Airport) Eeaw rod or b]O East or West, take 1-35 It then ext onto am 5o Southwest Traftioway (lett lane exit). Turn left onto i 43rd Street, right onto Main Street, go two blocks. From 1 35 North, take Southwest BoulevardMtission GUardrew Road exit. Bear right onto Mission Road, left onto 43rd Street, right onto Main Street, go two Olmks. CROWNE PLAZA k`7SR5 CIE' 4445 SaAIN STREET = R,RNSAS.OTY. MO 6411 I =16161511[00 ..,at, Mn C,mn<Hva9 Imu.uu ftmm Cip E ] w 4Om rSiE $�rtel - 3 -ft—ax In M 47101 coinnn rin, O aye m �> p n� �OUAIL�I, ��• CROWNE PLAZA k`7SR5 CIE' 4445 SaAIN STREET = R,RNSAS.OTY. MO 6411 I =16161511[00 C" 7 AIP CONFERENCE Description of Breakout Sessions NEW AIRPORT SIGN STANDARDS This session will highlight the new sign standards and address actions airport operators will need to initiate to meet the new standards. Advisory Circular (AC) 150/5340-18C, Standards for Airport Sign Systems, became effective July 31, 1991 and will impact airports certificated under Federal Aviation Regulation Part 139. Change 1 to AC 150/5340-1F, Marking of Paved Areas on Airports, will also be discussed. The presentation will be conducted by personnel of the Airport Certification and Safety Section, Safety and Standards Branch, Airports Division. AIRPORT PAVEMENT MAINTENANCE Poor maintenance of airport pavements is the result of a variety of causes, among which are lack of funds, untrained personnel, and lack of adequate information. This session will address specific types of pavement distress, their probable causes, inspection guidelines, and recommended methods of repair. Typical examples of pavement distress found within the Central Region will be presented and, standard and innovative repair methods will be discussed. The presentation will be made by Rodney Joel, Central Region Paving Engineer. CONSTRUCTION MANAGEMENT SERVICES. CERTIFIED TESTING LABS, AND SAFETY PLANS This session will describe the minimum qualifications for personnel, equipment, and facilities responsible for construction management services. The discussion will include examples of what the consulting engineer should include in the construction management program (CMP). Since certified testing labs are required as part of the CMP, the presentation will include what it takes for a testing lab to become certified. The necessary elements of a safety plan will be discussed including specific examples. Presentations will be made by Glenn Helm and Doug Johnson of the Safety and Standards Branch, Airports Division. AIRPORT DESIGN STANDARDS The Planning Section will conduct a presentation on Change 1 to the Advisory Circular (AC) 150/5300-13, Airport Design. Change 1 was approved on June 5, 1991. There are a number of significant revisions which will be of interest to airport sponsors and especially consultants. The session will include representatives from FAA headquarters who are responsible for preparing the original AC as well as the change. They will discuss the reasons for Change and what additional revisions are being contemplated for the future. Discussion of problems that are encountered in applying the Design Standards `� are welcomed. %� NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) PERMITS This session will provide a summary of the latest requirements of the HIDES permitting process as well as discuss when and what you need to file a permit. This session will be presented by Mr. Clark Gunion and staff from Law Environmental Group. UNDERGROUND STORAGE TANK (UST) REMOVAL A presentation will be made concerning the process to be followed in the removal of underground storage tanks in order to comply with the applicable current rules and regulations. Problems that can happen in this process will also be addressed. This session will be presented by Mr. Clark Gunion and staff from Law Environmental Group. AIRPORT -OWNER COMPLIANCE OBLIGATIONS This session will provide airport sponsors with information relative to the FAA's airport Compliance Program. Sponsor education as a means of achieving voluntary compliance and surveillance methods utilized to identify problem areas will be discussed. Those obligations which most often require clarification and/or additional guidance will be identified and discussed. This presentation is being coordinated by Ellie Anderson, Planning and Programming Branch, Airports Division. PAVEMENT SURFACE SMOOTHNESS This session will provide both an engineer's and contractor's view of how a profilograph specification can be used to assure a smooth pavement surface. Things that the field engineer should and should not do in order to ensure a smooth pavement surface will be pointed out. In addition, actions that the contractor can and should take to produce a smooth pavement will be identified. The presentation will be made by Mick Halter, Kansas Department of Transportation Metro Engineer, and Wayne Van Meter, General Manager Paving, Clarkson Construction Company. A NEW TWIST TO HANDS-ON INFORMATION During the breakout sessions, Luigi Iori, from FAA headquarters, will be here to discuss with individuals or small groups (2 to 4 persons) the computer program for Airport Design (Version 2.2). He is working on Version 2.3 which may be completed by conference time. This opportunity should be of benefit to participants that have questions or have experienced problems with the program. These discussions will run continuously during the breakout sessions, providing ample time for one-on-one problem solving. �1 GS Department Cern ,a,a,��kr,5,� ew,E. 17,v. Ms o ac.,m6 � of Tror:s(xx'o"on avo���. soe.a+.a Federal Avlotlon Adminisimtion OCT 2 3 1991 File Number 91.CE800034 Mr. Mark J. Seesing Airport Manager Cape Girardeau Municipal Airport. 401 Independence Cape Girardeau, MO 63701 Dear Mr. Sensing: Cape Girardeau Municipal Airport Cape Girardeau, Missouri Letter of Correction The annual certification inspection of Cape Girardeau Municipal Airport was conducted October 21, 1991, to determine compliance with Federal Aviation Regulation (FAR) Part 1.39, the Airport Certification Specifications, and the Limited Airport Operating Certificate. The inspection revealed that the airport was riot in compliance with all of the requirements of FAR Part 1..39. The following discrepancy to FAR Part 139 was found and should he corrected by the date indicated: a. 139.37.ILa)S_D_- Harkiny S LLfehting_ Marking on Runway 10-28 does not meet the specifications for the authorized approach. The last two pairs of touchdown zone markings on each end, are within 900 feet of the midpoint of the noway. Thegn markings need to be removed to meet standards in Advisory Circular 150/5340-1F, Markin¢ of Paved Areas on Air➢oats. Correction bate: April 30, 1992 The aircraft rescue and firefighting (ARFF) training program could not be evaluated during the inspect:fon because training records, documenting training conducted in the past year, were not. available for review during the inspection. As discussed during, the inspection, written documentation on airport related training conducted in the past:'. 12 months, is to be provided to the FAA for review. Tnis portion of the inspection is considered open. We have given consideration to all available facts and cont .ude that this matter does not warrant legal enforcement. In lieu of such action we arc issuing this letter which will be made a matter of record. We will expect your future compliance with the regulations, Please advise in writing when the discrepancy is corrected, within 15 days of the correction date. Sincerely�,7 // /'n At� Michael E. Mullen Airport Certification & Safety Specialist Attachment `` i 2 ti.. ti RECOMMENDATIONS/COMMENTS ANNUAL CERTIFICATION INSPECTION, CAPE CIRARDEAU MUNICIPAL AIRPORT OCTOBER 21, 1991 Marking and IAEhting - plans should be initiated to repaint the taxiway centerlines. The centerlines are becoming marginal. Nark in¢ and i,ightinng - Change 1 to Advisory Circular {AC) 150/5340-1F, Marking of Paved Areas on Airports, became effective August 16, 1991. The existing marking will be acceptable to the FAA until October 1, 1992. The fo1_owing items of marking will need to be corrected to meet the new standards addressed in Change 1: 1. On light: colored pavement, outline hold position markings in black to increase ch. contrast of the marking. 2. Coordinate with the Air Traffic Control Tower to determine if t:her,- is an operational need for taxiway intersection markings !St any of the taxiway/taxiway intersections. If there is an operational need for taxiway intersection markings, there markings also need to be installed prior to 10-L-92. These markings, if needed, are to be installed in accordance with clearance requirements in Table 2 of Change 1 to AC 150/5340-1F. Aircraft Reacue & Firefighting - The fire fighting systems on the AR.FF vehicle have not been activated in the past year. An operational test should be conducted on the fire fighting systems at, least annually. It also appears that the agent tanks are past due for hydrostatic testing. The City of Cape Girardeau shou:id in•rostig;ito, the feasibility of replacing the ARIF v"'-d,•l T'h.•. 1975 F4:. i .,. _ testing and practical training with the etre, lighting systems. The recommended type ARFF vehicle for Cape Girardeau Municipal Airport would be a 500 gallon/500 lb dry chemical twin agent.truck equipped with a pump and roof turret. Airfield Signage - AC 1.50/5340-18C, Standards for Airport Sign Systems, became effective July 31, 1991. Airport operators will be expected to achieve compliance. with the new signage standards by January 1, 1994. The sign system . Cape Girardeau Municipal Airport is in accordance with standards in 150/5340-1EB, however, these signs will be acceptable to the FAA during the interim period. Several action items aro necossary by airport operators to achieve compliance with the new sign standards; by January 1, 1991. These items are as follows: 1. Develop a Draft Sign Plan. Someone will need to be assigned the task of becoming familiar with the new sign standards and preparing; a Draft Sign Plan, A Draft Sign Flan is the first step in developing a Sign Plan and is necessary for a preapplication for ATP funding. The t 2 ATGT should be involved in this process to identify the taxiing routes. The Draft Sign Plan should show the modifications to the existing sign system in addition to the new signs needed. The Draft Sign Plan should be submitted to the Airports Division for review prior to preparing a preapplication for ATP funding. 2. Submit a preapplication for AIP funding. The Draft Sign Plan is used to determine the amount of funding needed to meet the requirements of Part 139.311(a)(3). 3. Organize a Sign Plan Committee to develop the Sign Plan. The committee should include representatives from City Engineering or the consultant, ATCT, airport operations, a local pilot, and FAA Airports Division staff. The Sign Platt will he required to be approved by the FAA and inc2.uded in the Airport Certification Specifications. 4. Plans and specifications need to be prepared after FAA approval of the Sign Plan and notice of tentative allocation. `~ Michael E. Mullen