Loading...
HomeMy WebLinkAboutAirport.Minutes.06-05-1991AIRPORT BOARD MEETING Wednesday, June 5, 1991 Those present: Board Members: Jerry McClanahan, Chairman John T. Seesing Alan Maki Bill Walker Guests: Steve Ricker Jay Eastlick Andie Summers Staff: Douglas K. Leslie Kevin T. MCMeel Mark J. Seesing Gayle Conrad The meeting was called to order at 4:10 p.m. by Chairman McClanahan. Alan Maki moved, seconded by Bill Walker that the minutes of the April 3, 1991, meeting be approved as mailed. The Board unanimously approved. Mark Seesing updated the Board on the status of the airport improvement program projects. The signage project is complete except for some grading and seeding. The t -hangars are complete and light fixtures have been installed for the taxiways. Concerning the taxiways, compaction is still needed before the concrete work can begin. The options are to wait until the land completely drys or to proceed with a change order under the contract with Girardeau Contractors. If FAA approves the change, it will cost approximately $45,000 to $50,000 and will be on a 90%/10% funding basis. The terminal building has been redesigned to facilitate FAA funding. The revised plans have been submitted to FAA and we are awaiting a response. Joe Reaky will be at the airport on 6/6/91 to review the condition of the paint on runway 2/20 and to make his recommendation on how to remedy the problem. This is still under contract and all repairs will be at their expense. The Airport Usage Reports for April and May were reviewed with the Board. There was an increase in completion reliability from April to May; however the "on time" figure seems to be high, but is misleading due to how the airline defines "on time." In addition, tower operations are off for the month due to the fact that general aviation has been reduced because of fuel prices. - 2 - Doug Leslie reported to the Board that Bill Walker, Bob Hendrix, Mark Seesing and himself net with officials of TWE in St. Louis on 5/26/91. The basic issues discussed were the plans for terminal renovation and the reliability problem with TWE flights. TWE indicated that it had no plans for expansion of its present services and that it was aware of the problems with reliability. Although they are working on this problem, Cape is not a priority city and therefore TWE does not put its focus on this area. It encouraged the city to look at bringing in other carriers. Mr. Leslie reminded the Board that TWE is at Cape Girardeau as a result of the Essential Air Service requirements, but is not receiving any subsidies for it. Another problem the airline is dealing with is its recent expansion. Bill Walker indicated that it was acquired by a smaller parent company expanding its previous 13 cities to 21 cities. He felt that the city shouldn't expect anything from TWE regarding their image or the city's image. Doug Leslie indicated that the results of the meeting are two- fold. If the city gets three months of solid reliability from TWE, it will coop on a promotional campaign for the airport and airline. Second, the city is free to proceed with bringing in other airlines. Several representatives are going to an airline in Texas next week to discuss this possibility. The Board then discussed the ways of enticing other airlines and industry to come to Cape Girardeau. Alan Maki brought to the Board's attention that he had received a notice from an airplane manufacturer that it is looking to Missouri and several other states to possibly build a new plant. He suggested that several groups need to get together to make personal contact with and send a letter of support to this company to entice it to locate here. Jerry McClanahan stated that if anyone was interested they could go out and inspect the new t -hanger building after the meeting. p.m There being no further business, the meeting adjourned at 5:15 Res ectfully submitted, �ir x Gayl Conrad