HomeMy WebLinkAboutAirport.Agenda.10-04-1990A G E N D A
CAPE GIRARDEAU AIRPORT BOARD MEETING
DECEMBER 4, 1990, 4:00 P.M.
CAPE GIRARDEAU MUNICIPAL AIRPORT
I. Call to order.
II. Approval of the Minutes of the November 7, 1990, meeting.
III. Consideration of the Terminal Building Project recommendation.
IV. Consideration of a report on the Airport Improvement Program
projects.
V. Report on the status of the T -Hanger Construction Project.
VI. Presentation of the Airport Use Report for November.
VII. Review of the 1991-92 Airport Improvement Program Conference.
`r.
VIII. Report on the Air Traffic Control Tower Contract.
IX. Miscellaneous matters.
X. Adjourn.
The Airport Board of the City of Cape Girardeau, Missouri, may
as a part of a study session or regular or special Airport Board
Meeting hold a closed session to discuss legal actions, causes of
legal action or litigation, leasing, purchasing or sale of real
estate, hiring, firing, promotion of personnel or employee labor
relations.
A I R P O R 'T U S A G E REPORT
Date: NOV. 19.90
Enplanements
vT8
YTI)
1990
1990
1989
1989
TWE _
499
5877
_525__
_6.246__
-
CCA
186
2476
197
1974..
other_
_$$
1082
136
1300
totals
767
9435
858
9520
NUMBER OF AIR CARRIER LANDINGS
RELIABILITY
FACTORS
METRO
_
ON TIME
49%
J-31
97_
COMPLE'T'ION
_ 984__
SAAB
EMB 120
1
other
AIR 'TRAFFIC COUNT
ITINERANT
1990
1989
AIR TAXI
,._138_._
152
GENERAL AVIATION
1969__.
2057
MILITARY
11
17
-
LOCAL
CIVIL
806
810
MILITARY
0
10
INSTRUMENT OPERATIONS
r- AIR TAXI
124
145
GENERAL AVIATION
341
392
y
CAPE GIRARDEAU MUNICIPAL AIRPORT
ENGINEER'S ESTIMATE
10 UNIT T -HANGAR
1r.
Unit
Description Quantity Unit Price
Amount
BASE BID:
Unclassified Excavation 1 L.S.
$12,000.00
10 Unit T -Hangar 1 EA.
118,450.00
Bituminous Pavement on
Aggregate Base (Exterior) 1 L.S.
1-5,00-0-00
TOTAL BASE BID
145,450.00
ALTERNATE: A:
Monolithic Concrete Floor -
& Foundation 1 L.S.
$52,000.00
ALTERNATE B: -- - - --
Bituminous Pavement Floor &
Pier Foundation 1 L.S.
21,000.00
ALTERNATE: --
-
Insulation Package
9,200.00
BASE BID + CONCRETE FLOOR + INSULATION PACKAGE _
$206,650.00
BASE BID + ASPHALT FLOOR + INSULATION PACKAGE _
$175,650.00
-
CONTRACTOR
If
CAPE GIRARDEAU T-HANGAR BID TABULATION
DATE: 11-19-90 TIME: 4:00 Ph1
- - -
BASE BID ALTERNATE ALTERNATE
ADDITIVE
ALTERNATIVE
ALTERNATE A
TOTAL
t
ALTERNATE B
TOTAL
MORRIL CONST.
$145,796
$40,642
$34,0811
$10,761
$186,438
$179,880
E.R. THOMPSON
154,000
34,800
_ 21,800
_ _ 9,800
188 800
175,800
KIEFNER BROTHERS
192,000
48,900
NO BID
- 6,000
240,900
NO BID
CA. WALKER
159,725
25,550
- - - 15,877
9,357
165,275
175,602
MERGINTILE
168,045
18,533-
15,877
10,292
- 186,578
183,922
PENZEL
173,500
42,000
- - NO BID -
_ 6,000
215,500
NO BID
KLAVS*
145,265
47,866-
- - -29,800
4,985
193,131
- 175,065
WEINLAND*
138,500
38,000
- _ 23,600
5,700
- 176,500
162,100
EL GRANDE
185,284
42,916
- -- 24,936
11,696
228,200
210,220
- - ARID 13 BASED ON ELECTRIC 51-FOLD DOORS
- - -
- - -
0
6
CENTRAL REGION CONFERENCE - AIRPOR1IMPROVEMENT PROGRAM
November 16, 1990
Embassy Suites, 220 W. 43rd Street, Kansas City„ Missouri
'7:30 a.m. . . . . . . . . . . . . . Registration
8:30 a.m. . . . . . . . . . . . . . . . . Welcomo - George A. Hendon
Managar, Airports Division
Opening Remarks - Stanley Rivers
Acting Regional Administrator
9:00 a.m. . . . . . . . . . . . . . . . . "AIP Outlook for 1991 and Beyond -
Leonard Griggs, Assistant Administrator
for ALreorts, Washington, L,c,
9:30 a.m.
. "Pro po:,ud Revisions to Part 17°
Hill G. Peacock, Manager, System
Managecent Branch, Air T_afflc UL vision
10:00 IL.m. . . . . . . . . . . . . . . . BREAK
10:15 41 . . . . . . . . . . . . . . . . .
12:00 p.m . . . . . . . . . . . . .
1:45 p.m . . . . . . . . . . . . . . .
Panel Discussion "The Block Grant Program"
Michael Audi.no, '.'.arra Director of Aviat Lon
Rol,ert Warner, Executive Vice -President, NASAO
Ksrk Solana, Block Grant Progreta !^onager,
FAA, Washl.ngton D.C.
Willard Plentl, Jr., Sorth Carol'ns
Director of Aviation
Ro&r Barcua, Chief of Bureau of Airport
Lnginoering, Illinois ➢OT
Jim Hrunskill, Supervisor of Planning t:iectton,
Airports Division
Lloyd Purr, Missourt Direutor of Aviation
LUNCH - :3paekar: Derry Lambert Harris
FAA Deputy Administrator
Concurront Breakout Sessions
3:15
p.m . . . .
.
. . . . . . . . . . . . BREAK
3:30
p.m . . . .
.
. . . . . . . . . . . . Conr.ur,o,,t
Breakout Sessions
5:00
p.m . . . .
.
. . . . . . . . . . .Conte ranee
Ends
BREAKOUT GROOP3
SESSION
1
- Understanding the ALP Procass and
'.:king it Work for 'You
SESSION
2
- Full. Scale Emergency Plan P.:xercise
and the Do's & Do Not'o
for Controlling Wildlife on the
Atrpogt
SESSION
3 -
Airport Design Standards
SESSION
4 -
Contracting Requirements Under the
AIP Program
SESSION
5 -
Acquisition of Land and Easements
FAA AIP CONFERENCE: Description or Breakout Croups
SESSION 1 - UNDERSTANDING THE ATP PROCESS AND MAKING IT WORK FOR YOU
Airports Division personnel willpresent an overview on how projects are selected for
funding by the FAA, Including a dismission of how priorities are estahlished, an update on
new assurances and requirements, and the timing of requests Cor funding from airport
sponsors. How to stay In compliance wl Lh FAA grouts to ensure that airport sponsors
remain eligible for ATP funds will also he dincusned, Including special emphasis on
recurring problems that we sun most often. Fbajor environmental Issues related to airport
development will he presented with spental emphasl.s on specific impact areas dost have the
most potential to delay or alter a proposed airport project. Questions on the Airport
Improvement Program are invited.
SESSION 2 - FULL SCALE EMERGENCY PLAN EXERCISE AND TUE I)0 IS AND
DO NOT'S FOR COMCROLt,TNG wTLDLTFE IIAZARDS Ott THE AIRPORT
These sessions wilt cover subjects of vital interest to all airport owners/operators.
Mr. Dave Napoli, Assl.steant General Manager, Kansas City international Airport, will.
discuss the planning, conducting, and critique of n September 1990 emergency drill held at
the airport. Tn addition, he will discuss personal experiences encountered with wildlife
control on the nirport. Mr. Hapolt will he nsslsted by the Ce rtiftcatton and Safety
Section staff of the Airports Division. Emergency planning and wildlife control are both
high profile subjects of interest to airport owners/opera bDrs. Time will he provided far
questions and answers.
%SESSION 3 - AIRPORT DESIGN STANDARDS
FAA's Planning Section will moderate a panel discussion on ills, recently puhlisled Advisory
Circular. for Airport Design (AC 150/5500-13). 'There are a number of significant changes
which will be of Interest to airport sponsors and consultants. The .sessLon will include
representatives from aLrport sponsors, consulting engineers, and the FAA. 'Gime will be
provided for questions and answers.
SF SSrON Q - CONT'RACT'ING REQUIIIF:MEN'LS UNDER THN ArP psoCRAM
This workshop will highlight the procedures and policies Drat govern contracting for
professional services, contractors and equipm-nt under the ATP program. Cuidence will be
provided as to wluat stops should he Widened in order to be in compliance with applicable
federal regulations and guidelines. Presentations will be made by Mr. Glenn helm and
Mr. Doug Johnson of tie Safety and .Stondnrdn Rran:h, Airports Division. 'Gime will be
provided for questinns end answers.
SESSTION 5 - ACQUISI'TI:ON OF LAND AND EASEMENTS
Thin session will help the sponsors understand what information should be considered to
identify the sire, scop, and complexity of the acquisltton of lend and/or easements far
airport development. This presentntlon will. include how to estimate the costs of
acquiring the land and easements and all related costs; procedures for contracting for fee
appraisers and reviewers, negotiators, and relocation agents, when required; and whit
documentations must he motnta Lned to comply wlth Federal requirements. The presentation
11 he made by Mr, James E. Graham, Director of Right of Nay Department,
48peaddle-Garber Assoctotes, Ames, lows.
OFFICE OF THE y f CITY OF CAPE GIIt,A�RDE.4T,T L'.z,�'a'�o
1y� AIRPORTIAMAGEP
L�
November 15, 1990
Ms. Sharon M. Calabro, Contracting Officer
Federal Aviation Administration
U. S. Department of Transportation
Central Region
601 East Hall Street
Kansas City, NO 64106
Dear Ms. Calabro:
Subject: Solicitation for Services
DTFA 09-90-R-20053
Air Traffic Control Tower
Cape Girardeau Municipal Airport
V.G. Wx 617
CAPE GIMPGEW, W.702L0 7
TELEPHICI(314) AL eYA'J
FAX (]IL)] 7W
As requested by your office, the City of Cape Girardeau has
accepted bids for contracting air traffic control services for the
air traffic control facilitiy at the Cape Girardeau Municipal
Airport. On November 8, 1990, these bids were publicly opened at the
Cape Girardeau City Hall. The following is a summary of those bids
and a ranking of each bid according to the guidelines that were
included in the bid specifications.
These guidelines are:
Available Points
A. Low Bid 35% 1 - 3.5
B. Ability to Perform 35% 1 - 3.5
1. Financial
2. ACT Work Schedule
3. Prior Experience
4. Quality Assurance Plan
C. Responsive to Specifications Requirements 308 1 - 3
1. Forms Completed
2. Data Collection Procedure
3. Information Supplied
BIDDER NUMBER 1:
Midwest Air Traffic Control Service, Inc.
A. Low Bid: 2.75
Although this bid has the lowest life cycle cost, it does
reflect an increase of immediate costs for the first nine month
"HOME OF MISSOURI STATE FLAG"
Ms. Sharon M. Calabro
Page 2
November 15, 1990
contract period
and first option year of $7,133.19.
This bid
does
not reflect any
cost of living increases in
the
outlying
option
years.
B. Ability to Perform: 1.75
This bidder seems to have a firm financial base and has a good
work experience background. However, the work schedule presented in
the bid proposal is not satisfactory. The schedule presented does
not allow for any overlap during peak operation periods. This type
schedule will not allow for relief for the on shift controller and
has proven in the past to lead to a high personnel turnover rate
causing reliability problems.
The quality control program supplied by this bidder deals
directly with the Project Manager/Facility Chief duties and
guidelines for this individual's job functions. However, this
program does not reference the FAA 3140.4 entitled Air Traffic
Training for training of the controllers. We feel that 3140.4 is an
essential standard training program for operations of the control
tower.
C. Responsive to Specifications Requirement: 2
'► This bidder has demonstrated proper data collection procedures
and has supplied adequate information on their services. This bidder
has not completed Part IV, Section K, Representations, Certifica-
tions, and other Statements of Offers of the bid packet.
Overall Rating of Bidder Number 1:
A. 2.75
B. 1.75
C. 2.00
6.50
BIDDER NUMBER 2:
Air Traffic Limited, Inc.
A. Low Bid: 0
This bidder submitted the highest bid but also included
conflicting numbers in Part I, Section B, Services and Prices,
therefore eliminating this bid from any further evaluation.
Ms. Sharon M. Calabro
Page 3
November 15, 1990
r.
BIDDER NUMBER 3:
City of Cape Girardeau, Missouri
A. Low Bid: 2.50
The life cycle bid of the City is $10,000 higher than the lowest
life cycle bid. However, in the contract period of nine months, the
City shows a cost savings of $4,916.54 with additional savings of
$2,216.65 over the first option year for a total of $7,133.19. A
three percent cost of living increase is applied to the option years
resulting in the $10,000 difference in the bids.
B. Ability to Perform: 2.60
The City of Cape Girardeau has a very sound financial standing
as with the other bidder. However, the work experience is limited to
this one facility which has operated flawlessly for 11 months. The
City adheres strictly to the FAA 3140.4 Air Traffic Training Manual
for the initial training and recurrent training of all tower
employees. This program is the same program that the FAA uses to
train controllers. It is felt that this program is exemplary and
should be adhered to.
The current schedule being used allows for overlap of shifts to
facilitate proper peak hour coverage and also allows for relief of
controllers. This schedule is necessary during periods of vacation
or sickness to assure adequate coverage of the tower operations.
C. Responsive to Specification Requirements: 3.0
The City has completed all of the necessary forms and has
complied with all report procedures.
Overall Rating of Bidder Number 2:
A. 2.50
B. 2.60
C. 3.00
B.10
8.1 points out of a total of 10.
The City of Cape Girardeau has complied with your request to
obtain competitive bids for the control tower services. For the
above stated reasons of training and reliability of this service at a
competitive cost, the City requests that you reject the bids and
honor the option year one as referenced in Contract DTFA
L.
r..
Ms. Sharon M. Calabro
Page 4
November 15, 1990
09-90-E-20004. If the FAA desires, this service can be resubmitted
for bid upon completion of the renewal period as was done in this
situation.
The City would also request removal of the application of the
Federal Prevailing Wage for this service. This service involves
fewer than five employees and in using force account labor, the City
has not been required to pay prevailing wage.
We appreciate your consideration of this matter. If you have
any questions or need additional information, please do not hesitate
to contact me_
MS:gc
Attachment: Bid Summary Sheet
Sincerely,
Mark Seesing
Airport Manager
M
BILL EMERSON
•MEMBER OF CONGRESS
8TH DISTRICT, MISSOURI
HOUSE COMMITTEE ON Congregg of the Mniteb 6tateg
AGRICULTURE
HOUSE COMMITTEE ON
PUBLIC WORKS AND TRANSPORTATION A)ouf;e of Aepre>?ieutatibeg
SELECT COMMITTEE ON HUNGER Mag;bingtan, ;DC 20515
November 14, 1990
Mr. Douglas K. Leslie
Public Works Director
Department of Public Works
219 N. Kingshighway
Cape Girardeau, MO 63701
Dear Mr. Leslie:
OFF CES
SUITE 438
CANNON BUILDING
WASHINGTON. DC 20515
202/22Gr404
THE FEDERAL BUILDING
339 BROADWAY
CAPE GIRAR0EAU. NO 63701
314/335-0101
612 PINE
ROLIA. NO 65401
314/364-2455
I have received a reply from the Federal Aviation
Administration regarding my inquiry on behalf of the city
of Cape Girardeauls. Enclosed is a copy of the Acting
Regional Administrator's correspondence for your review.
As you can see, Mr. Rivers points out that the city
needs to issue a solicitation based on the agency's
solicitation package. An evaluation of the prospective
subcontractors and the city's staff must also be
conducted. Those are requirements of the Competition in
Contracting Act of 1984.
I trust this information helps answer your questions
and if I can be of any further assistance, do not hesitate
to get back with me.
SE/gkg
Enclosure
Siinccc eerellyy,,,
re
BILL EMERSON
Member of Congress
US Qepertrnent
o/ ransportaten
Federal Aviation
Administration
M650un, linpm4a
NOV a 9 rsso
The Honorable Bill itnerson
Member, United States House of
Representatives, 8th District
339 llr dway
Cape Girardeau, Missouri 53701
Dear Mr. Emerson:
Thank you for your letter of October 19, 1990, concerning air traffic control
serricas at Cape Girardeau Municipal. Airport, Cape: Girardeau, Missouri on behalf
of your constituent, Douglas K. Leslie.
we understand the concern of the tower employees in not )mowing if the City of
Cape Girardeau will become the successful bidder under, this pro3ect. However,
under the Ccmpetition in Contracting Act of 1984, we are required to seek
competition for these services. Competition, under agency policy, sli all be
accomplished in the following manner. In order for the local government to
provide these services with their own employees, as the City of Cape Girardeau
desires to do, the city is required to demonstrate to the satisfaction of the
contracting officer that the cost of perfo� by their staff is not greater
than the cx:st of acs... lishing the work through a subcontract.
In alder to so demonstrate, it is necessary for the local govetnmant to issue a
solicitation based on the Federal Aviaticm Admini5traLion's (FAA) solicitation
package. if, after, receipt of proposals from the prospective subcontractors,
perferran, by local govern ant arployees is prop, the proposals of the
prospective subcontractors and the proposal of the local goverrurent must be
furnished to the contrac-tirg officer for evaluation.
rn surmia y, we are mandated to seek full and open: competition for these
services. The FAA's astablished procedure, a., stated above, fulfills this
requirement.
Identical response— have been sent to Senator John C. D nforth and Senator
Christrvpher S. Bond.
t•,
Miculd you have other questions or require additional details, a member of your
staff may contact Ms. Rita Cosier, Manager, Acquisition Management Branch, at
816-426-3401.
Sincerely,
ey Rivers
Acting Regional Administrator -
Enclosure
Transmitted Correspondence
cc: Washington Office
V.
CHR,,ISTOPHER S. BOND
' MISSOURI
United J$tatea 0$mate
WASHINGTON, DC 20610-2603
November 9, 1990
Mr. Douglas K. Leslie
Public Works Director
City of Cape Girardeau
219 N. Kingshighway
Cape Girardeau, Missouri 63701
Dear Mr. Leslie:
Thank you for contacting the office of Senators Bond and
Danforth.
We were pleased to contact the Federal Aviation
Administration on the City's behalf, to attempt to assist on the
traffic control. services contract. Enclosed you will find the
reply form the agency.
Please feel free to contact me at the Senators' office in
the future if we may be of help in matters of federal government.
4Since
District Office Director
for the Senators
JCD/CSS/tws
Enclosures
Y r�
US Ueparinlent
of transportation
Federal Aviation
Administration
r
Cenfml 2eglnn 601 E. 121M1 Sbe!tl
lown� Kansas, Kpnsas Ob, MNi—li 64106
Mi55our1, Vlfira2FD
IG� 22
'Phe Honorable Christopher S. Bond
Unitsd States Senator
Federal Office Building, Room 213
339 Br'c».dway
Cape Girardeau, Missouri 63701.
Dear Senator Bond:
Thank you for your letter of October 19, 1990, concerning air traffic control
services at Cape Girardeau Municipal Airport, Cape Girardeau, Missouri on behalf
of your constituent, Douglas K. Leslie.
We understand the concern of the tower e ployees in not knowing if the City of
Cape Girardeau will become the successful bidder under this project. However,
under the Competition in Contracting Act of 1984, we are required to seek
conTetition for these services. ccarpetition, under agency policy, shall be
accoirplished in the following manner. In order for the local gavermmnt to
provide these services with their own employees, as the City of Cape Girardeau
desires to do, the city is required to demonstrate to the satisfaction of the
oontractire officer that the cost of performance by their staff is not greater
than the cost of accaplishing the work through a subcontract.
In order to sn demonstrate, it is necessary for the local govermnent to issue a
solicitation based on the Federal Aviation Administration's (FAA) solicitation
package. If, after receipt of proposals frau the prospective subcontractors,
performance by local govermnent employees is proposed, the proposals of the
prospective silbccntractors and the proposal of the local government mist be
furnished to the contracting officer for evaluation.
In slmmiary, we are mandated to seek full and open =npatition for these
services. The FAA's established procedure, as stated above, fulfills th:[s
requirement.
Identical responses have been sent to Senator John Danforth and Congressman Bill
lig e son.
Shouldou have other
y questions or require additional details, a member of your
staff may contact Ms. Rita Cosner, Manager, Acquisition Management Branch, at
816-426-3401.
Sincerely,
Stanley Rivets
Acting Regional Actuinistrator
Enclosure
Transmitted Correspondence
cc: Washington Office
v�.
FY90 APPROPRIATION LIMITATION
ENTITLEMENTS
AIP APPROPRIATION
MILLIONS
$84.3
NATIONAL
CENTRA
PRIMARY PASSENGER ENTITLEMENTS
611.1
29.1
CARGO ENTITLEMENTS
36.6
1.3
ALASKA SUPPLEMENTAL
12.0
- -0-
STATE APPORTIONMENT
155.0
10.1
INSULAR
1.6
-0-
TOTAL ENTITLEMENTS
$816.3
$40.5
DISCRETIONARY
NOISE
136.3
8.0
`.
RELIEVERS
147.8
11.1
COMMERCIAL SERVICE
43.8
8.5
SYSTEM PLANNING
7.3
.4
CAPACITY, SAFETY 6 SECURITY
207.5
7.2
PURE DISCRETIONARY
66.1
8,6
TOTAL DISCRETIONARY
$609.0
$43.8
TOTAL FY90
AIP APPROPRIATION
$1,425.0
$84.3
CEILING ON
REUSE OF RECOVERIES
40.0
1.3
GRAND TOTAL -
$1,825.0
$85.8*
*May not add due to internal rounding
FY 1991 AIP FUNDING - NATIONAL LEVEL
APPROPRIATION LIMITATION $1,800,000,000
PRIMARY AIRPORTS
608,996,894
CARGO
50,000,000
ALASKA SUPPLEMENTAL
10,481,121
STATES
216,000,000
SUBTOTAL ENTITLEMENTS 885,478,015
NOISE
180,000,000
RELIEVERS
180,000,000
COMMERCIAL SERVICE
45,000,000
SYSTEM PLANNING
9,000,000
MILITARY AIRPORTS
27,000,000
CARRYOVER ENTITLEMENTS
155,984,363
CAPACITY/SAFETY/SECURITY/NOISE
238,153,217
REMAINING DISCRETIONARY
79,384,406
SUBTOTAL DISCRETIONARY 914,521,985
GRAND TOTAL $1,800,000,000
ASSUMES: $608,996,894 FULL FORMULA ENTITLEMENTS
$155,984,363 CARRYOVER
MAY NOT ADD DUE TO INTERNAL ROUNDING
COMPETITION FOR FY91 AIP FUNDS
GENERAL AVIATION
MILLIONS
IOWA
PREAPPLICATIONS ON HAND
$ 13.6
EST. FUNDING AVAILABLE
3.0
KANSAS
PREAPPLICATIONS ON NAND
36.5
EST. FUNDING AVAILABLE
4.0
NEBRASKA
PREAPPLICATION$ ON HAND
24.0
EST. FUNDING AVAILABLE
3.0
MISSOURI
COVERED BY BLOCK GRANT PROGRAM
t
COMUIERCIAL SERVICE (NON -PRIMARY)
RELIEVER
PREAPPLICATIONS ON HAND 6.0
EST. FUNDING AVAILABLE 4.0
PREAPPLICATIONS ON BAND 11.3
EST. FUNDING AVAILABLE * 2.0
ESTIMATES BASED ON AMOUNT OF FUNDS MADE AVAILABLE IN FY90
*DOES NOT INCLUDE MISSOURI BLOCK GRANT FUNDING FOR RELIEVER AIRPORTS
t
FY 1991
i44�9 KANSAS MISSOURI NEBRASKA
MMERCIAL SERVICE (Publicly owned airports which enplane 2,500 or more passengers annually and receive scheduled
NONPRIMARY Ft Dodge (FOD) Dodge City (DDC) Kirksville (IRK) Kearney (EAR)
Spencer (SPW) Garden City (GCK)
(Commercial Service Hays (HYS)
airports which enplane at Liberal (LBL) -
least 2,500 but less than
10,000)
RELIEVER Council Bluffs (CBF)
service)
(3AU)
Kansas City (MKC) Omaha (MLE)
Davenport (DVN)
PRIMARY
Burlington (BBL)
Manhattan (MNK)
Cape Girardeau (CGI)
Grand Island (GRI)
(GJC)
Cedar Rapids (CID)
Topeka (FOE)
Columbia (COU)
Lincoln (INK)
(Commercial Service Des Moines (DSM)
Wichita (ICT)
Joplin (JLN)
North Platte (LBP)
.i.rports which
enplane Dubuque (DBQ)
Salina (SLN)
Kansas City, (MCI)
Omaha (OMA)
10,000 or more
passengers Mason City (MCW)
Springfield (SGF)
Scottsbluff (BFF)
annually)
Sioux City (SUX)
St Louis (STL)
Waterloo (AIA)
NONPRIMARY Ft Dodge (FOD) Dodge City (DDC) Kirksville (IRK) Kearney (EAR)
Spencer (SPW) Garden City (GCK)
(Commercial Service Hays (HYS)
airports which enplane at Liberal (LBL) -
least 2,500 but less than
10,000)
RELIEVER Council Bluffs (CBF)
Augusta
(3AU)
Kansas City (MKC) Omaha (MLE)
Davenport (DVN)
Newton
(EWK)
Kansas City (GW) Plattsmouth (PKV)
(Airports that relieve
Olathe
(GJC)
Lee's Summit (K84)
congestion at Commercial
Olathe
(IXD)
St Charles (35Z)
Service airports)
Wichita
(3KM)
St Louis (SUS)
NOTE: The Airport Categories were prepared usinz the Final- DOT/TSC Enplanement Data for CY-1989.
h'cCUM 19 1990
November 16, 1990
Mr. J. Ronald Fischer
City Manager
City of Cape Girardeau
401 Independence
Cape Girardeau, Missouri 63701
Dear Mr. Fischer:
Per our conversation last night I would like to offer my
resignation from the Cape Girardeau Airport Board effective
immediately.
It has been a real pleasure working with you, Al Stoverink,
Doug Leslie, Mark Seesing and the members of the Airport
`�. Board. I especially appreciate the time, and education that
Al has provided to me relating to the business of City
Government.
It is with regret that I make this decision as I consider
the airport a key facility to the continued progress and
growth of our city. However, I feel much has been
accomplished, and I am convinced that with a full time
Airport Manager, we will continue to improve our facility.
Thank you for giving me the opportunity to serve
Best Regards,
�a0inkopf
P. O. BOX 1342 - CAPE GIRARDEAU, MO 63)02-1342 314-334-6024