HomeMy WebLinkAboutAirport.Minutes.08-01-1990AIRPORT BOARD MEETING
WEDNESDAY, AUGUST 1, 1990
CITY COUNCIL CHAMBER
THOSE PRESENT:
Board Members: Staff:
Paul Brinkopf, Vice Chairman Al Stoverink
J.T. Seesing Doug Leslie
Alan Maki Mark Seesing
Jim Bowman, Secy.
GUESTS:
Tom Holshouser, Holshouser and Associates
The meeting was called to order at 4:07 PM by Vice Chairman Brinkopf.
At the request of Paul Brinkopf, Jim Bowman read the minutes of the
meeting of July 11, 1990. It was pointed out by Al Stoverink that the
airport improvements mentioned in these minutes should have been quoted
at $1.2 M, not $1.8 as shown in the minutes. Otherwise, the minutes were
approved as read.
`
Taul Brinkopf recalled that Harold Belzer had recommended at our special
meeting at the airport that we recommend to the Council that the FAA
grant be accepted. J.T. Seesing moved, seconded by Jim Bowman, that we
make this recommendation. The motion was unanimously approved by the
board.
Tom Holshouser presented bound copies of his "Feasibility Study for the
Airport Terminal Building". This report showed a proposed new terminal
site plan and plans for a renovated terminal building, both of which had
been discussed at previous board meetings.
Al Stoverink indicated that planning was underway for a meeting of city
staff with the FAA, possibly as early as next week, to explain our plans
in detail and get their reaction. After this, a joint meeting of the
airport board and city council would be held wherein we could present our
plans to the council, answer questions, and consider revisions if
appropriate. No objections to this plan were expressed.
PAGE 2. Airport Board Meeting
*ob Niederkorn of Scott City, who leases some of the airport land for
farming, reported that something needed to be done about the drainage
ditches since they would not drain and some crops were under water. Doug
Leslie indicated that city crews would be working on the ditches within
a month which would solve some of the problem. Solving the total problem
he said would depend on a study costing $100,000.00 and scheduled to be
completed in 1993 as part of the master plan. Board members indicated
their support for getting the drainage problems solved.
There being no further business, it was moved by J.T. Seesing and
seconded by Jim Bowman that the meeting be adjourned. The motion was
approved unanimously by the Board at 5:45 PM. -
Respectfully submitted,
Jim Bowman
Secetary