HomeMy WebLinkAboutAirport.Minutes.07-11-1990`. AIRPORT BOARD MEETING
Wednesday, July 11, 1990
City Council Chamber
Those present: Staff:
Board Members: J. Ronald Fischer
Jerry McClanahan, Chmn. Al Stoverink
Paul Brinkopf Doug Leslie
J. T. Seesing Mark Seesing
Jim Bowman, Secy.
Guests:
Tom Holshouser; Holshouser 5 Associates
Steve Waymire; Crawford, Murphy S Tilley, Inc.
The meeting was called to order at 9:06 P.M. by Chairman McClanahan.
The minutes of the previous meeting were approved unanimously by the
Board.
1. T -Hangar
The first
presented
estimates
discusson
( specifica
alternatives
item discussed was T -hangar alternatives. Mark Seesing
a summary of the various estimates he has received. The
covered a wide variety of possibilities. After some
it was decided that the Board needed to draw up
=ions on which bids could be based.
The following specifications were agreed upon:
a. building size: 52 ft. by 225 1/2 ft.;
b. that electricity for lights and hook-ups be provided;
C. doors would be manual bi-fold;
d. lead-in taxiways would be provided;
e. both asphalt and concrete floors and taxi -ways would be bid;
f. there would be no partition between hangar stalls;
g. the walls would be unpainted galvanized;
h. both insulated and non -insulated construction would be bid and an
R -value for insulation would be specified;
i. steel truss construction would be used.
Paul Brinkopf moved and J. T. Seesing seconded that the T -hangars be
put out for bids. The motion was approved unanimously.
2. Airport Board Ordinance
Chairman McClanahan noted that the City Council had passed the
Airport Ordinance that we recommended. Paul Brinkopf questioned
whether this ordinance made us "more consintent" with the other city
boards or not. Al Stoverink explained that "major boards", of which
the Airport is one, typically have more members than other boards.
3. Fly Cape Program
Mark Seesing said this program is covered financially until the end
of August. The results: the boardings are ahead of last year by
about 900 for the year-to-date. Larger planes seem to be helping and
there are fewer cancellations. It was agreed that airlines ought to
advertise their increased capacity, reliability and comfort.
�. Page 2. July 11, 1990 Airport Board Meeting
4. Terminal Building Study
Tom Holshouser described two possibilities for terminal building
improvements. Detailed descriptions will not be included in the
minutes since it was decided by the Board to ask for further
revisions. However, the following general statements can be made:
a. both plans included a canopy out front for weather protecton.
Electric door openers were included for the convenience of people
handling luggage;
b. a bar and lounge would be added adjacent to the existing
restaurant and kitchen;
C. a baggage area with carrousel would be added:
d. space for two airline check-in areas would be provided with the
possibility of adding a third (or an air -freight operation);
e. space for two car -rental agencies would be provided;
f. an airport managers office would be provided;
g. a conference to seat 12 to 14 people would be provided. This
could be used by companies such as Proctor & Gamble or Dana,
whose main headquarters are not located in Cape Girardeau, for
meetings with their local people. It could also be used for
press conferences by the Governor and other public officials. An
area in the restaurant which could be closed off from the public
would also be provided for this purpose;
h. both plans included landscaping;
i. the restrooms would remain essentially unchanged;
j. all the equipment would be gotten off the roof.
Tom Holshouser agreed to provide a revised plan incorporating the
Board's suggestions later this month.
5. Airport Master Plan
It was moved by Jim Bowman and seconded by Paul Brinkopf that the
Airport Master Plan be approved. The Board unanimoulsy approved.
This must now be approved by the Planning and Zoning Commission, the
City Council, and the FAA.
6. Driveway Easement
A driveway easement was requested so that the individuals farming
agort—land, could have access to their property without crossing
irport runways. It was moved by J. T. Seesing and seconded by Paul
Brinkopf that the easement be approved. The Board unanimously
agreed.
7. Control Tower Improvements
The FAA, using federal money, will be making some improvements to the
control tower. These were described briefly to the Board.
8. Funding of Airport Improvements
Al Stoverink said that the City, during the week of July 16, 1990
would be issuing municipal bonds to finance various city
improvements, including approximateley $1.8 million of airport
improvements. He asked for Airport Board approval of this action by
the City. Paul Brinkopf moved and J. T. Seesing seconded that we
approve. The motion was unanimously approved by the Board.