Loading...
HomeMy WebLinkAboutAirport.Agenda.05-1990.Joint Planning ConferenceL" 1. A. B. I1. A. B. III. A. B. TV. V. VI. CAPE GIRARDEAU MUNICIPAL JOINT PLANNING CONFERENCE AGENDA Introduction Participants Purpose of the Meeting Review Current Master Plan Projects completed and/or programmed Development recommendations Review current NPIAS 1-5 year development needs 6-10 year development needs Discuss AIP funding Discuss 5 -year CIP Ad ours tai C� C '. :,,. },moo-.. rte.-% �Cw� 1 o �• "�-„-.'7 �� w i 4 'Y ) . d n� MV[ CIRFNp[FU, Me. prc T WR FRRS n n w —...-- RFe u�Frxov 14 iMFxxixc) —.-.• -- FA AP --'---- pFLO Or RWA$g f0urR OLOG. Mars LOWNCF 009 17 <ra r�grc 84 MFF 741P / J9j !/ 3t tioE_ 0 JOq moo, SO9a AIN IN TfT D W U Cost cslimalcs were developed using bid tabs and construction estimating practices, and reflect reasonable estimates of project costs. A 30N contingency factor has been applied to the estimates to reflect engineering, Icgal fees, and unforseen circumstances which may increase project costs. All cost estimates are prepared in 1989-90 (present) dollars, and no attempt has been made to reflect the future impact of inflation on project costs. Consumer Price Indices provide a good means with which to adjust these cost estimates in the future. - _ _ 'I ABLE 6A I Uerelnpruent Schedule And ('osl Summary - S(agc-11990_1994 Local AIP' 'Total i y 199Q I. 'terminal building: Itcnovation of Existing Building' $329,000 S`198,1)00 $527,000 2. 1 nlrancc road re-alignment 3,900 35,100 39,000 3. Airfield signage 6,100 55,000 61,100 4. Non-precision marking - Runway 2 2,300 20,200 22,500 f- 5. General maintena nee3 25,000 25000 "Dotal 1990 $366,300 $308,300 $674,600 1991 6. Ramp expansion and laxiwa}' connecting to "Taxiway "C" $ 86,200 $776,200 $862,400 _ 7. "faxiwuv stubs for 2'I-hangars 7,400 66,600 74,000 8. 2 "1'-hangar structures (20 units) 300,000 -- 300,000 9. General maintenance 25.000 25,000 "Dotal 1991 $418,600 $842,800 $1,261,400 - 1992 10. Road extension to serve corporate parcels $39,000 $351,000 $390,000 IL General maintenance 25.000 25.000 - 'Total 1992 $64,000 $351,000 $415,000 f 1993 L. I 12. Elevated water storage (100,000 gal.) $30,000 $270,000 $300,000 13. Segmented circle/wind sock 3,500 -- 3,500 14. Drainage Sludy/Improvements 10,000 90,000 100,000 15. General maintenance 25.000 25.000 I "molal 1993 $68,500 $360,000 $428,500 1994 16. fuel firm Relocation $ 13,000 $117,000 $130,000 _.I 17. Sewer Extension 19,500 175,500 195,000 18. General maintenance 25,000 25000 Total 1994 $57,500 $292,500 $350,000 ! F.1 $974,900 $2,154,600 $3,129,500 ITOTAL-ST"AC 'IABLF. 6A (Conllnued) ` ,elopment Schedule And Cost Summary �_tggc II, lyy9-1999. Local Alp' ]� I. taxiway "D" extension Ind connecting taxiway $ 15,600 $ 320,000 $ 355,600 2. ARFF struC(urc 15,000 135,000 150,000 3. ARFF quick rc,P.a use vehicle 10.000 90,000 100,000 4. Pavement rehabilitation, 10 19) 563,200 5,068,800 5,632,000 5. General mnintenance (yearly cxp.) 1_51 _ ._ 125.000 101 A1, - S I"AGE (1 $748,900 $5,613,800 $6,362,600 5tagc 111 MO_20919 1 ' L 0v c lav I -a xi wav "A" (asphalt portion) $ 10,500 $ 94,§00 $ 105,000 2. Pavement rchabilitalion {tine+ort-tn) 144,500 1,300,500 1,445,000 3. "I axiway stubs for 'P -hangars 9,600 86,400 96,000 4, 2 T -hangar structures IN units) 300,000 -- 300,000 5. General maintenance iycnrly exp.) 750000 _..-_ 2 00 TO'PAL - S"FAGE 111 $714,600 $1,481,400 $2,196,000 '101 At, I)EVELOPMF.NF COSIS $2,438,300 $9,249,800 $11,688,100 s' Airport Improvement Program, administered by the Federal Aviation Administration. "1 he option to replace the existing structure is estimated to cost $1,300,000. General maintenance expenses intended to include pavement and building maintenance and equipment replacement. 4 Pavement rehabilitation projects should be picccded by pavement evaluation studies to determine proper priorities. [he individual projects in Stage I have been further divided into year -by -year staging, although it is recognized that the City has accumulated $900,000 in entitlement monies in the AIP through fiscal year 1990, and intend to pursue several of the projects listed in Stage I concurrently. The ycar-by-year staging should assist the City and PAA with pre - applications which will be filed in the first few years of the plan. After the first five years, priorities will be more likely to change and the City will need to update the five-year program. The first project listed for 1990 is the minal building, which has been costed as 'IF-rcnovation of the existing building or is 65 a total replacement. The replacement cost of $1,300,000 has been reflected in a footnote. A final decision on which option to pursue will require a more detailed evaluation of the existing structure by an engineer/architect, which should help lire City in making this decision. Airfield signage improvements are necessary to meet new FAA standards on siRnage at airports. This cost estimate reflects the assumption that approximately 19 new one-sided signs and 3 two-sided signs will be required. FAA will need to be consulted on this mailer, since a new advisory circular on airport signage has not officially been released at this date, although Capc Girardeau Municipal will be 0 'r P m f A oa mn ase aoe Imam wu wl\IIJwwnu Nw ywcJ1w W I) lJ (.IGWLIU �U�W �LY1t.'1\I f 1 mm' m'mwmwS NS0mO10 0 j'- �0�0 UroiONN�n iO �O .O .Ow Ni �0 N(; uUI u1N NNU -IN✓�. A A 0 I>�2 i L w - 2 w n N -lor Iy:Uuonru •m-+-iuur I INm A I is J V� Ntnm �loesuudlnma(nNes a i z moo mmmaemmmm mmmamm -I I i I I I I ro N 1r�n I IAr �z �z4z Xz�z.G z' z ilii rI r•�1'1�1'll "�1r 1�1'1•r L1 " LI LI Y L; 1 LI LI LI Y w L LI LI w 1I IO It�r 1n1.I 11r.�.�11 .I �.� i ua I � I (]r rpjr Yr rr rr 1 1I Mil i i Verelan 2.1 FF DE RAL AVIATION AO MIN IS T RA T ION Pepe: of Region: CE REGIONAL GRANTS MANAGEMENT SYSTEM WORK I I E M SEL ECI ION LIST — PLenni ng LOC:CGI rtRPORT:CAPE GIRARDEAU MUNICIPAL SITE NU MBER:11605. A NPIAS:29-0013 CITY:CAPE GIRARDEAU STATE:MO TYPE:P SPO N S 0 R: CI TY OP CAPE G I R A R D E AU WORK DESCRIPTION/ PREAP/ PRIORITY FUNDS REG./ FUNDING C 0 0 E REMARKS MULTI FAA LOCAL CURRENT FY TYPES STAT • NO WORK ITEMS EXIST • FOR I H I S SITE • IN PLANNING F1 Add Item 9F1 Funding PLEASE SELECT DESIRED FUNCTION F 1 5 Pr e icu9 Screen S F 1 5 Return to Mein SF7 Help SCFi Screen Tr ensfer 3-29-0013-0287-86-1 REPORTING PERIOD AIRPORT DEVELOPMENT PROJECT NO CT STAT�I P R 3-29-b0i3-02 IY o R D+ P a A a++ A I NAME OF7[IRP�RT- Ca a Ciia Edeau Mun ic3 a `�� OCape Girardeau MO 5 6 PROJECT DESCRIPTION Overlay apron (16,000 s.y.) and rehabilitate drainage; reconstruct Taxiway F (765 x 35); install MITL Taxiway A (2,400 l.f.); replace rotating beacon. _ SPECIAL PONDITIONS O ICRIPTION CLL AXW 0. D[tCRN TION GEARED 0% Payment - Exhibit A - -87 IIr aym�nt - Title opinion 1 8-4-87 _ 1 L TRANSAGTIONS - _ ALL O CA TI ON$ ANDD BRANTI PATNCNTI A.A.111- a.. .1 'C 1..N0 EundP A*.4 }. + Ve 4 C.C.- A+AI. As..ANN X.NU C C.. I., -- T/A 7-21-86 428,972 11-4-87 11-10-87 64,825.35 GO - - 10-14-88 250, GA 5-26-87 456 it 4-27-8 - 255,206M _ g. 1- rf 154 6 1 5, - 5 S- - 2405 I AN 7 ANS ONS _ t..t A. YM APPr.I.W. bvl}Rd ' Tr wt N.. „ Rr.M4 Alb 4+4nu C..I tiHaAAnI _ E.tnt..me AND CON TR if 04TKI DAre Co"Act,.0 cawrRAcr CANEA RwrR APPROVED 11/4 86 RAnM.r [n .n..r+. APP 11/4/!L6 DanMnan M1wt DoI}n W Ibn AP rodt t11, 4. .N .ME XP.bd aH D In Katt DT GA.In.I PYtlP. T. YR D..". Gwr..+:. i fin.l A,-G.R. ft A ...t C.wtY4 9-17- 7 ZO/87 _ _ (.-�G_ .A_a� AUDIT PROACT COVILETM+ REPORT IRANI nlylxjY EtEO COMMENTS MBE Plan Approved 12/15/86. Consultant Contract Approved 11/4/86 MBE/WBE approved for project 4/16/87 Preconstructi.on conf. 5/27/87 01/88 - 40% of the overlay has separated from the existing concrete. Engineer is presently working with contractor to correct the problem. Ct FORM Eleo.Ea IEns) ENCLOSURE 1 JOINT PLANNING CONFERENCE DISCUSSION ITEMS: 1, Primary Runway (Parallel and connecting taxiways and holding aprons) Land Paving Grooving Lighting Approach Aids Approach Procedures 2. Crosswind Runway (Parallel and connecting taxiway and holding aprons) Land Paving Grooving Lighting Approach Aids Approach Procedures 3. Terminal Area Land Apron (G.A. and A/C) Lighting Security Fencing CFR and Snow Removal Equipment Buildings - Terminal, CFR and Snow Removal Equipment T -hangar Taxiways 4. _Other Access Road Internal Service Roads Approach Aids - Rotating Beacon, Segmented Circle, Wind Cones, NDB, VOR, WAVE, Standby Power, Runway Temperature Sensors, etc. Perimeter Fencing obstruction Removal V