Loading...
HomeMy WebLinkAboutRes.3597.03-18-2024 BILL NO. 24-31 RESOLUTION NO. 359 A RESOLUTION ADOPTING THE 2024-2029 CAPITAL IMPROVEMENTS PROGRAM, IN THE CITY OF CAPE GIRARDEAU, MISSOURI BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1 . The City Council, for and on behalf of the City of Cape Girardeau, Missouri, hereby adopts the 2024-2029 Capital Improvements Program, in the City of Cape Girardeau. A copy of said Program is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THIS 'h-h DAY OF Moycjiii , 2024 . 1_4) Stacy Kind , Mayor ATTEST: Gayl6UL . Conrad, City Clerk 2024 CITY Of CAPE G I R A R D E A U CAPITAL IMPROVEMENTS PROGRAM ADOPTED FISCAL 2024-2029 1-1 v Adopted by the Cape Girardeau City Council in the State of Missouri on March 18, 2024. The program serves as a guideline for major one-time expenditures by the City. For standard, recurring expenses, please see the 2024-2025 Annual Budget. CITY CAPE G I R A R D E A U CIP SUMMARY FY 2024-2029 FY 2024-2029 Capital Improvement Program 10 Year Projection FY24-29 CIP Summary Recurring / Grant Revenue Projects FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-30 FY 30-31 FY 31-32 FY 32-33 FY 33-34 FY 29-34 CNT Total ADMINISTRATIVE SERVICES $ 197,000 $ 248,000 $ 137,000 $ 137,000 $ 137,000 $ 137,000 $ 218,000 $ 137,000 $ 77,000 $ 174,000 $ 743,000 $ 40,000 $ 1,639,000 CAPE GIRARDEAU REGIONAL AIRPORT $ 4,281,000 $ 12,400,000 $ 7,260,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 850,000 $ 100,000 $ 100,000 $ 1,250,000 $ 15,186,990 $ 40,577,990 FIRE DEPARTMENT $ 2,388,000 $ 718,500 $ 21,000 $ 515,000 $ 3,712,500 $ - $ - $ 12,500 $ - $ - $ 12,500 $ 1,113,000 $ 8,480,500 PARKS & RECREATION $ 273,278 $ - $ - $ 425,000 $ 400,000 $ - $ - $ - $ - $ - $ - $ 13,764,000 $ 14,862,278 POLICE DEPARTMENT $ 75,309 $ 607,273 $ 291,809 $ 291,809 $ - $ - $ - $ - $ - $ - $ - $ - $ 1,266,201 PUBLIC WORKS $ 6,500,000 $ 175,000 $ 3,000,000 $ 3,000,000 $ 3,000,000 $ - $ - $ - $ - $ - $ - $ - $ 15,675,000 Department Total by Fiscal Year $ 13,714,587 $ 14,148,773 $ 10,709,809 $ 4,468,809 $ 7,349,500 $ 237,000 $ 318,000 $ 999,500 $ 177,000 $ 274,000 $ 2,005,500 $ 30,103,990 $ 82,500,969 Tax Initiative Projects FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-30 FY 30-31 FY 31-32 FY 32-33 FY 33-34 FY 29-34 CNT Total CAPITAL IMPROVEMENT SALES TAX $ 7,380,000 $ 3,390,000 $ 14,675,000 $ 1,310,000 $ 8,615,000 $ 4,620,000 $ 29,440,000 $ 1,190,000 $ 1,190,000 $ 1,190,000 $ 37,630,000 $ 43,450,000 $ 116,450,000 PARKS & STORMWATER TAX $ 5,126,000 $ 3,580,000 $ 1,695,358 $ 2,080,000 $ 1,450,000 $ 2,300,000 $ 3,385,987 $ 300,000 $ 300,000 $ 300,000 $ 6,585,987 $ - $ 20,517,345 PUBLIC SAFETY TRUST FUND $ 170,000 $ 1,998,000 $ 2,428,000 $ - $ - $ - $ 230,000 $ - $ - $ - $ 230,000 $ 7,375,000 $ 12,201,000 TRANSPORTATION TRUST FUND $ 15,572,000 $ 6,015,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 21,587,000 Tax Initiative Total by Fiscal Year $ 28,248,000 $ 14,983,000 $ 18,798,358 $ 3,390,000 $ 10,065,000 $ 6,920,000 $ 33,055,987 $ 1,490,000 $ 1,490,000 $ 1,490,000 $ 44,445,987 $ 50,825,000 $ 170,755,345 CIP Project Total by Fiscal Year $ 41,962,587 1 $ 29,131,773 1 $ 29,508,167 1 $ 7,858,809 1 $ 17,414,500 1 $ 7,157,000 1 $ 33,373,987 1 $ 2,489,500 1 $ 1,667,000 1 $ 1,764,000 1 $ 46,451,487 1 $ 80,928,990 1 $ 253,256,314 FY24-29 CIP Summary CITY CAPE G I R A R D E A U ADMINISTRATIVE SERVICES FY 2024-2029 FY 2024-2029 Capital Improvement Program 10 Year Projection ADMINISTRATIVE SERVICES 2 Map ID # Capital Assets - Facilities Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total City Hall Basement Shelving JGeneral Fund Local Records Preservation Grant 1 (max. $20,000) Hi -density shelving for City Hall basement storage area for Development records. Project will include flooring track, single - sided end shelf, and four double -sided shelves. Will apply for the 2024-25 Local Records Preservation Grant, with maximum grant laward of $20,000. 1 $ 40,000 1 1 1 1 1 $ 1 1 $ 40,000 Capital Assets - Facilities Projects' Totals by Fiscal Year $ 40,000 $ $ $ $ $ $ $ 40,000 Map ID # Capital Assets - IT Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total Data backup storage General Fund Backup for server data (5 -yr upgrade schedule) $ 70,000 $ 70,000 $ 140,000 Storage Upgrade General Fund File server storage (5 -yr upgrade schedule) $ 67,000 $ 67,000 $ 134,000 Records Request Management Software Grant General Fund Program will (1) reduce workload by automatically deflecting, merging duplicate requests, and utilizing trending topics with auto - follow; (2) Work faster by automating repetitive tasks using custom -configured, best practice templates and workflows for notifications, escalations, tracking and reporting; (3) Gain control with pst. email extraction/de-duplication, redaction oops protection, and a defensible audit trail. $ 20,000 $ $ 20,000 Fiber Infrastructure General Fund Moving / running fiber to City facilities (5 -yr upgrade schedule) $ 100,000 $ 100,000 $ 200,000 Network Storage General Fund File storage / Nimble NAS (5 -yr upgrade schedule) $ 95,000 $ 40,000 $ 135,000 $ 270,000 Agenda and Advisory Board Management Software System General Fund Current agenda management system, NovusAgenda, is no longer supported or will receive upgrades or enhancements. $ 30,000 $ $ 30,000 Data Archiving General Fund Data backup (5 -yr upgrade schedule) $ 23,000 $ 23,000 $ 46,000 Exchanger Server Upgrade General Fund 5 -year upgrade schedule $ 100,000 $ 100,000 $ 200,000 Network Switch Replacement General Fund Upgrade network infrastructure (5 -yr upgrade schedule) $ 37,000 $ 37,000 $ 74,000 CISCO Phone Upgrade General Fund 5 -year upgrade schedule $ 97,000 $ 74,000 $ 171,000 Nimble Storage Upgrade General Fund Replace storage array (5 -yr upgrade schedule) $ 97,000 $ 97,000 $ 194,000 Upgrade Offsite VM server General Fund Disaster recovery (5 -yr upgrade schedule) $ 40,000 $ 40,000 $ 80,000 City Notification System JGeneral Fund JARPA Funds Emergency alert / text alert / citizen notification system to be used Ifor City-wide community notification. I I I I 1$ $ 40,000 $ 40,000 Capital Assets - IT Projects' Totals by Fiscal Year $ 157,000 $ 248,000 $ 137,000 $ 137,000 $ 137,000 $ 743,000 $ 40,000 $ 1,599,000 $ 197,000 1 $ 248,000 1 $ 137,000 $ 137,000 1 $ 137,000 $ 743,000 $ 40,000 $ 1,639,000 ADMINISTRATIVE SERVICES 2 �g e, �� J. CITYOrNIENIEr �CAPE ■ ., _• �� GI R A R D E A U J. 0 �■ i 1 CIP FY 2024-2029 7 - — ..,, „_.,.,,.,,..,..._.._,._.._ - Cape Girardeau 1 3 Regional Airport i 6 &4+ R 1 TakntaYF t N W S 6 Taxlwayq 5 •_ 2 412� �$ Run WvaY1p�28 r `, —----TaxiwayC ---�' N Ta 10 m xitla '`',`�•�•=�. 'kms A c.> LEGEND Numbers correspond to Map ID # on the CIP spreadsheet. Transportation Projects 7 Transportation Projects '�•�••�� 1� O Capital Assets , tai j Capital Assets Cape City Limits ■ 0 1,000 2,000 Feet Ward 1 Ward 4 I I I ) I I I ) 1:12,855 Created by: DevebpmeM Services Ward 2 Ward 5 Teresa HefFner,Alliame Water Resoumes L" , o—dby rhe Ctyof C"pe Oteraeeu ve robe uses for vk uel "N mly mG ere rot guaranr¢a ro be azwr"R. Date: 12/27/2023 mwe ■yas .re "orro bewm er my Data Source(s): °1B01BQ1"B O1 aB81�" _Pse. Ward 3 Ward 6 Cityof Cape Girardeau G—rnment, MO 3 Coordinate System: NAD 1983 State Plane Missouri East FIPS 2401 Feet CITY CAPE G I R A R D E A U FY 2024-2029 Capital Improvement Program 10 Year Projection CAPE GIRARDEAU REGIONAL AIRPORT 4 Map ID # Capital Assets - Facilities Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total 1 T -Hangars Construction - Associated Taxi Lanes CIST / BIL Construct set of 20 additional t -hangars and adjoining pavement $ 2,900,000 $ $ 2,900,000 Exterior painting of facility - Cape Aviation was rehabilitated in 2007 which included interior renovations and painting of the exterior. The paint has faded substantially over 16 years and is in need of repainting. Additionally, the metal roof should be have Cape Aviation - Exterior Painting & Roof maintenance performed as well. This facility handles the bulk of 2 Maintenance General Fund the airport's transient customers. $ 150,000 $ $ 150,000 T -Hangars Construction Consulting - Burns & 1 IMcDonnell CIST / BIL Other Funding Construction phase of 20 additional t -hangars $ 131,000 $ $ 131,000 4 Replace Airport Corporate Hangar General Fund Replace airport corporate hangar $ 500,000 $ $ 500,000 7 Airport Perimeter Fence Eligible for AIP Fencing around the entire perimeter $ 3,400,000 $ $ 3,400,000 Airport Improvement New maintenance facility and building to store airport ARFF and 8 ARFF / Snow Removal Equipment Storage Facility Program (AIP) General Fund snow removal equipment $ 2,500,000 $ $ 2,500,000 9 Aircraft Rescue Firefighting (ARFF) Access Road MoDOT Access road to airport ARFF facility $ 750,000 $ $ 750,000 Cape Girardeau Regional Airport - Replace Air Traffic 11 Control Tower TBD Air Traffic Control Tower Replacement $ $ 4,500,000 $ 4,500,000 2x 20,000 gallon tanks for airport / Cape Aviation would increase 12 Fuel Farm I TBD icapacity of both jet and 10OLL fuel $ $ 1,000,000 $ 1,000,000 Capital Assets - Facilities Projects' Totals by Fiscal Year $ 3,181,000 $ 500,000 $ 6,650,000 $ $ $ $ 5,500,000 $ 15,831,000 Capital Assets - Fleet Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total Replace AP -2 Unit 242 FAA Grant AIP Replace ARFF truck at end of its 20 -year life expectancy $ 750,000 $ 750,000 Currently using inadequate support for customers requesting Ground Tractors for their aircraft. Our fleet is out -dated and constantly have the same issues with engine start-up, whether or not gasoline or diesel, and sketchy brakes. They have been in PW repair on multiple occasions which seriously degradates our service capability. The Green tractor would require minor periodical maintenance, with no hazardous oils and fuels, while Green Ground Support Tractor TBD provide service at minimal cost. $ $ 69,995 $ 69,995 Currently using inadequate support for tenant customers requesting Ground Power Supply for their aircraft. Current system requires direct hookup with the hangar and cable stretched over the ramp to power up aircraft. When hooked up, it works but still gives false error codes on the aircraft avionics. This model is towable to the aircraft and supplies power via rechargeable battery power; not requiring diesel. It recharges using regular Green Ground Support Power Unit 1TBD power supply. I I I I I 1 1$ 58,995 1$ 58,995 Capital Assets - Fleet Requests' Totals by Fiscal Year $ $ $ $ $ $ 750,000 $ 128,990 $ 878,990 PID # Transportation Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total Air Service Marketing MoDOT (90%) General Fund (10%) Air service marketing $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000 $ 1,000,000 3 Taxiway Access to NW Quadrant AIP JTaxiway Access to NW Quadrant $ 1,000,000 1 1$ - 1$ 1,000,000 5 Taxiway Alpha Rehabilitation AIP JTaxiway Alpha Rehabilitation 1$ 7,700,000 1$ - 1$ 7,700,000 CAPE GIRARDEAU REGIONAL AIRPORT 4 CITY CAPE G I R A R D E A U FY 2024-2029 Capital Improvement Program 10 Year Projection 6 Taxiways Echo & Foxtrot Reconstruction and Lighting Upgrades AIP / BIL Taxiways Echo & Foxtrot reconstruction. $ 4,100,000 $ $ 4,100,000 10 Airfield Pavement Maintenance AIP Crack seal 75,000LF of airfield surfaces and general aviation ramp $ 510,000 $ $ 510,000 Airport Road Extension to Rte M MoDOT Airport Road Extension to Rte M $ $ 4,629,000 $ 4,629,000 Taxiway Delta Reconstruction AIP / BIL Reconstruct Taxiway D and replace associated lighting and signage. $ $ 3,100,000 $ 3,100,000 Access Road and Taxilane for NW State Funding General Fund Landside access road and airside taxilane for NW quad, parcels $ $ 1,323,000 $ 1,323,000 Land Acquisition for Runway 10 Extension MoDOT Land Acquisition for Runway 10 Extension $ $ 436,000 $ 436,000 Helicopter and Light Sport Aircraft Operations Area IMoDOT I I Helicopter and Light Sport Aircraft Operations Area I 1$ $ 70,000 1 $ 70,000 Transportation Projects' Totals by Fiscal Yearl 1,100,000 1 $ 11,900,000 1 $ 610,000 1$ 100,000 1 $ 100,000 1 $ 500,000 1$ 9,558,000 1 $ 23,868,000 CAPE GIRARDEAU REGIONAL AIRPORT 5 •4 ■ tee, CITY O�CAPE G I R A R D E A U CIP FY 2024-2029 Fire Dept. •� illi ■ T,_ A. - - i Cape City Limits MasaIl.11l.r Ward 1 Ward 4 Ward 2 Ward 5 Ward 3 Ward 6 0 1 2 Miles I f f f I f f f 1 1:72,300 Created by: Devebpment Services _ Teresa Heifner,Alliance Water Resources t.ey ,.,i&dbythe ky.f C., Overdeeu are to be used for vv uil eid mly end ere rot guere�teed to be ecwre R. Dale: 12/27/2023 ae eyes e<e mt m be �m br e„y Data Souroe(s): rnSmem^g or aesig� wrpose. Cly of Cape Girardeau Government, MO 6 Coordinate System: NAD 1983 State Plane Missouri East FIPS 2401 Feet CITY CAPE G I R A R D E A U 1CFIRE DEPARTMENT 1"124-2029 FY 2024-2029 Capital Improvement Program 10 Year Projection FIRE DEPARTMENT 7 Map ID # Capital Assets - Facilities Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total Fire Station Security Cameras General Fund This request would fund the purchase of security cameras at all fire department facilities. $ 60,000 $ $ 60,000 1 Fire Station #1 - IP Speakers and Alert Lighting TBD Addition of red alert lighting in FS #1 bunk rooms and IP overhead speakers throughout the stations. $ 30,000 $ $ 30,000 1 Fire Station #1 - Pave Parking Lot General Fund Improve parking area at FS #1 $ 25,000 $ $ 25,000 Fire Station #1 - Training Room Improvements TBD This request would fund the purchase of a new computers, speakers, HD projector, TVs, chairs, carpet, acoustic panels, and work station. This would also fund the cost new interior paint. $ $ 50,000 $ 50,000 Fire Station #1 - South Retaining Wall General Fund Retaining wall between the parking lot at FS #1 and the adjoining apartment building $ $ 25,000 $ 25,000 1 Fire Station #1- Northwest Addition / Remodel / Renovations TBD Northwest addition, renovations and repairs to FS #1: remodel bunk room, repair upstairs bathroom, replace windows, update electrical $ 500,000 $ 500,000 $ 3,700,000 $ $ 4,700,000 Fire Station Ramp Up Tones General Fund Fund a fire station alerting system feature that uses ramp up tones at all fire department facilities. $ 30,000 $ $ 30,000 2 Fire Station #2 - Renovations and Repair General Fund Renovations and repairs to FS #2: repair annex South wall, add annex floor drains, add annex building generator, annex parking area $ 100,000 $ 60,000 $ $ 160,000 3 Fire Station #3 - Renovations and Repair TBD Renovations and repairs to FS #3: roof replacement, remodel bunk room $ 175,000 $ $ 175,000 3 Fire Station #3 - Add Security Entry System General Fund Add a swipe card entry system to FS #3 / ECC / Communications $ 100,000 $ $ 100,000 Fire Station #3 - Radio Tower General Fund Replace temporary radio tower for Cape City Public Safety Communications $ $ 1,000,000 $ 1,000,000 Vehicle Maintenance Lift General Fund Vehicle lift for maintenance and repairs to be performed on fire apparatus $ $ 10,000 $ 10,000 Capital Assets - Facilities Projects' Totals by Fiscal Year $ 490,000 $ 590,000 $ $ 500,000 $ 3,700,000 $ $ 1,085,000 $ 6,365,000 Map ID # Capital Assets - Fleet Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total 4 Replace Ladder 4 Unit 268 Grant JTBD (50%) Replace the 2005 platform truck $ 1,800,000 $ $ 1,800,000 Capital Assets Fleet Requests' Totals by Fiscal Year $ 1,800,000 $ $ $ $ $ $ $ 1,800,000 Map ID # Capital Assets - IT Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total Marine 1 Technology Upgrade General Fund Fund a technology upgrade to Marine 1 $ 85,000 $ $ 85,000 Capital Assets - IT Projects' Totals by Fiscal Year $ - $ 85,000 $ $ $ $ $ $ 85,000 Map ID # Capital Assets - Non -fleet Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total Firefighter Bailout Kits Fire Sales Tax Addition of 66 bailout kits for all sworn personnel. $ 37,000 $ $ 37,000 Gym Equipment General Fund Replacement of gym equipment at 3 of the 4 stations. $ 15,000 $ 15,000 $ 15,000 $ $ 45,000 Tornado Siren Batteries General Fund Replacement batteries for tornado sirens - 3 -yr replacement schedule (x6 per siren) $ 12,500 $ 12,500 $ 12,500 $ 37,500 CPAT Equipment lGeneral Fund Addition of Candidate Physical Ability Testing equipment. $ - $ 28,000 $ 28,000 Technical Rescue Equipment (includes the 2 lines below - $39,000 total) Fire Sales Tax / Health Fund General Fund Purchase upgraded technical rescue equipment for outdoor search, dive emergencies, and patient evacuation (includes the 2 lines below - $39,000 total). $ $ - Replace Inflatable Swift Water Rescue Boats General Fund I This request would provide for the replacement of inflatable swift Iwater rescue boats. 1 $ 24,000 1 1 1 $ $ 24,000 Dive Equipment M Fire Sales Tax I lReplacement of dive equipment used by dive rescue team. I $ 15,000 1 1 1$ $ 15,000 FIRE DEPARTMENT 7 CITY CAPE G I R A R D E A U FY 2024-2029 Capital Improvement Program 10 Year Projection FIRE DEPARTMENT New bulletproof vests, suction devices, intubation equipment, and Medical Rescue Equipment (includes the 4 lines Fire Sales Tax / extrication tool batteries (includes the 4 lines below - $44,000 below - $44,000 total) Health Fund total). $ $ Replace Bulletproof Vests Fire Sales Tax Replacement of current bulletproof vest assigned to apparatus. $ 22,000 $ $ 22,000 Automatic CPR Device Batteries Health Fund Replacement of 10 automatic CPR device batteries. $ 10,000 $ $ 10,000 Medical Suction Units Health Fund Replacement of 5 medical suction units. $ 6,000 $ $ 6,000 Vehicle Extraction Batteries Fire Sales Tax Replacement of 10 vehicle extraction tool batteries. $ 6,000 1$ $ 6,000 Capital Assets - Non -fleet Projects' Totals by Fiscal Year $ 98,000 388,000 $ 43,500 $ 718,500 $ 21,000 $ 21,000 $ 15,000 1 It 515,000 $ 12,500 $ 12,500 $ 28,000 $ 3,712,500 $ 12,500 $ 1,113,000 $ 230,500 $ 8, FIRE DEPARTMENT 0 1 2 Miles �•��•� I f f f I f f f I 1:72,300 � r !� Created by:Devebpm enl Services _ r I Teresa Heifner,Alliance Water Resources t.e SegsP i&dbythe CdyofCe Over—are to be used fogvv Wei mly twos end— ­-- to be.—R. �4` Date: 12/27/2023 byas—t0be,aM6re�y Data Souroe(s): rn6memhgo. aesig� wrpose. 48 f, Cly of Cape Girardeau Government, MO 9 o ~�� Coordinate System: NAD 1983 State Plane Missouri East FIPS 2401 Feet CITY CAPE G I R A R D E A U PARKS AND RECREATION FY 2024-2029 FY 2024-2029 Capital Improvement Program 10 Year Projection PARKS AND RECREATION 10 Map ID # Capital Assets - Facilities Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total 1 Cape Splash - Refurbish Mat Racer and Drop Slides Cape Splash Improvement Fund The slides at Cape Splash need re -coated with a new layer of Gel - Coat. $ 253,278 $ $ 253,278 3 Osage Centre - Replace gym floor with wood flooring Restaurant Tax Replace the original tile floor in the gym $ 425,000 $ $ 425,000 4 Refurbish Slides at Cape Splash Cape Splash Improvement Fund The original small and medium slides at Cape Splash will need to be refurbished and gel coat applied. $ 400,000 $ $ 400,000 Expand the Sportsplex Facility to the Northwest Restaurant Tax Expansion of the Northwest side of the Sportsplex to include more playing fields/courts. This expansion will allow the facility to accomodate larger events and have a positive affect on the local economy. $ $ 6,000,000 $ 6,000,000 Shawnee Park Center - Generator TBD Grant Addition of a generator to the facility will provide access to City services during times of power outages and disaster $ $ 420,000 $ 420,000 Sportsplex Fields - Replace Artificial Turf Restaurant Tax The artificial turf at the Sportsplex will need replaced as a facility maintenance issue due to it's age and wear and tear from heavy usage. $ $ 310,000 $ 310,000 Jaycee Golf Course - Expansion and Renovation of the Pro Shop TBD The Golf Course Pro Shop is in need of a renovation and expanded office and concession area. $ $ 300,000 $ 300,000 Washington Park - Phased Improvements TBD Grant Phased improvements to Washington Park including ADA accessible shelter, walkways and playground $ $ 200,000 $ 200,000 Shawnee Park Sports Complex - Extend Concession Patio TBD 40' Extension off of West side of Concession Building A $ $ 192,000 $ 192,000 Missouri Park - Phased Improvements TBD Grant Phased improvements to Missouri Park $ $ 105,000 $ 105,000 Shawnee Park Center - Exterior Paint and Maintenance TBD Paint the exterior of the Shawnee Park Center. The facility is aging and will soon require exterior maintenance. $ $ 80,000 $ 80,000 Osage Centre - Upgrade the Digital Marquee Sign TBD Digital sign upgrade is needed on the digital display due to the age of the sign. $ $ 70,000 $ 70,000 Osage Centre - Upgrade Sound System TBD P & R Foundation Update sound system on main floor and meeting rooms $ $ 62,000 $ 62,000 Osage Centre - Gym Curtain / Divider TBD Replace the two (2) original 50' curtains / dividers in the gym $ $ 51,000 $ 51,000 Kiwanis Park Improvements TBD Grant Internal sidewalk system $ $ 50,000 $ 50,000 Cape Splash - Pirate Ship Play Area JTBD I Install soft surfacing and play features in the Pirate Ship play area. This will enhance the Pirate Ship play area at Cape Splash by ladding play features and a soft surface testure. $ $ 50,000 $ 50,000 Osage Park Improvements TBD P & R Foundation Build sand volleyball courts at Osage Park $ $ 50,000 $ 50,000 Capital Assets - Facilities Projects' Totals by Fiscal Year $ 253,278 $ $ $ 425,000 $ 400,000 $ $ 7,940,000 $ 9,018,278 Map ID # Capital Assets - Non -fleet Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total 2 Shawnee Wellness Programing ARPA Funds Health / wellness programing for vulnerable populations $ 20,000 $ $ 20,000 Capital Assets - Non -fleet Projects' Totals by Fiscal Year $ 20,000 $ $ $ - $ - $ $ - $ 20,000 Map ID # Transportation Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total Sportsplex -Parking Lot TBD Expand and overlay the parking lot at the Sportsplex. $ $ 1,500,000 $ 1,500,000 Arena Park - Streets and Parking Lots TBD Overlay the internal streets and parking lots in Arena Park $ $ 750,000 $ 750,000 PARKS AND RECREATION 10 CITY CAPE G I R A R D E A U FY 2024-2029 Capital Improvement Program 10 Year Projection PARKS AND RECREATION 11 Osage Park - Overflow Parking Lot TBD Overlay the parking lot south of the Osage Centre that serves as overflow for Cape Splash and the Community Centre $ $ 500,000 $ 500,000 Arena Park - Fields #9 - #10 Roadway TBD Overlay the road between fields #9 and #10 and improve the storm water drainage $ $ 450,000 $ 450,000 Shawnee Park - Soccer Field Parking TBD Overlay the parking lots at the lower and West End Blvd soccer fields. $ $ 400,000 $ 400,000 Arena Park - Pave Maintenance Building Parking Lots TBD Pave the Arena Park maintenance building parking lots that are currently gravel $ $ 250,000 $ 250,000 Capaha Park - Upper Parking Lot TBD Overlay upper parking lot by the Baseball Stadium in Capaha Park $ $ 230,000 $ 230,000 Jaycee Municipal Golf Course Overlay TBD Repair and overlay approx. 65,000 SF of parking areas and road $ $ 230,000 $ 230,000 Cape Splash - Parking Lot TBD Overlay the primary parking lot servicing Cape Splash in Osage Park. $ $ 200,000 $ 200,000 Shawnee Park Center - Parking Lot TBD Overlay parking lot servicing the Shawnee Park Center and upper Shawnee Park Sports Complex fields $ $ 200,000 $ 200,000 Capaha Park - Roadways TBD Overlay the roads in Capaha Park $ $ 200,000 $ 200,000 Dennis Scivally Park - Parking Lot and Road TBD Overlay parking lot and road in Dennis Scivally Park $ $ 200,000 $ 200,000 Kiwanis Park - Roadway TBD Pave the road leading to Shelter #4 in Kiwanis Park that is currently gravel $ $ 200,000 $ 200,000 Arena Park Fields #11 - #14 Parking Lot TBD Fields #11- #14 new parking lot $ $ 180,000 $ 180,000 Bloomfield Trail Parking Lot TBD Parking Lot for Bloomfield Trail - Acquire Land $ $ 173,000 $ 173,000 Red House Parking Area TBD Improvement to parking area north of Red House $ $ 81,000 $ 81,000 Lorimier and Fairmount Cemeteries JTBD Resurface approx. 6,000 SF of driveways $ $ 80,000 $ 80,000 Transportation Projects' Totals by Fiscal Year $ $ I $ $ - $ - $ $ 5,824,000 $ 5,824,000 $ 273,278 1 $ $ $ 425,000 $ 400,000 $ $ 13,764,000 $ 14,862,278 PARKS AND RECREATION 11 CITY CAPE G I R A R D E A U FY 2024-2029 Capital Improvement Program 10 Year Projection POLICE DEPARTMENT 12 Map ID # Capital Assets - IT Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total Tablets for patrol vehicles were purchased appoximately 2 years Mobile Data Terminals (Getac Tablets) for Patrol ago. We anticipate them becoming outdated or breaking down Vehicles General Fund within the next 4 to 5 years. $ 176,700 $ $ 176,700 Capital Assets - IT Projects' Totals by Fiscal Year $ $ 176,700 $ $ $ $ $ $ 176,700 Map ID # Capital Assets - Non -fleet Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total Current Axon (Taser) devices are wearing down and need to be Axon (Taser) Replacement General Fund replaced. Current devices are over ten years old. $ 75,309 $ 75,309 $ 75,309 $ 75,309 $ $ 301,237 The Shot Spotter program was launched in April of 2022, and a three year subscription was paid for with ARPA funds. The program was expanded at the end of 2022 and was again paid with ARPA funding. After three years, the program fees will need to be Shot Spotter Renewal General Fund renewed. $ 142,500 $ 142,500 $ 142,500 $ $ 427,500 Software maintenance, warranties, and cloud storage will need to be extended and old cameras will be replaced in 2024. This will Body Worn Camera Project (Getac Video) General Fund cover the next two years through 2026. $ 138,764 $ $ 138,764 Flock provides automatic license plate reader technology and will implemented throughout the city. ARPA funding will provide the Flock Automatic License Plate and Video Detection first three years of service, but the program will need to be funded Technology lGeneral Fund I I after that. 1$ 74,000 1 $ 74,000 1 $ 74,000 1 1 1 $ 222,000 Capital Assets - Non -fleet Projects' Totals by Fiscal Year $ 75,309 1 $ 430,573 1 $ 291,809 1 $ 291,809 1 $ $ $ $ 1,089,501 POLICE DEPARTMENT 12 tee, CITY O�CAPE G I R A R d E A U CIP FY 2024-2029 Public Works Dept IN I ON 41� 1~I:.�tSPOf Mr,� ., ..� .�► Rif �. �� ' .•. on ..1 " ' IN i LEGEND • /Capital Assets Environmental Projects Environmental Projects i�Transportation Projects Cape City Limits Ward 2 Ward 5 1` — --Ward 3 Ward. fFRalasor. 0 1 2 Miles I f f f I f f f 1 1:72,300 Created by: Devebpment Services _ Teresa Heifner,Alliance Water Resources rayons ,—&dbythe C?yof C., O¢erdeeuare tobe used Porvv Dei mly end ere -g---.be .—W. Date: 12/27/2023 ae byes are -0 be �aM 6r evy Data Souroe(s): rngwemog or aesig� wrpose. Cly of Cape Girardeau Government, MO 13 Coordinate System: NAD 1983 State Plane Missouri East FIPS 2401 Feet CITY CAPE G I R A R D E A U PUBLIC WORKS FY 2024-2029 FY 2024-2029 Capital Improvement Program 10 Year Projection PUBLIC WORKS 14 Map ID # Capital Assets - Facilities Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total Pave an area that is currently gravel. This area is used daily by the 1 Recycling Center / Solid Waste Shed Paving Solid Waste Fund recycle center and the trash trucks. $ 200,000 $ $ 200,000 Capital Assets - Facilities Projects' Totals by Fiscal Year $ 200,000 $ - $ $ $ $ $ $ 200,000 Map ID # Environmental Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total 2 Modifications to Filter Gallery Piping Fund Balance Cape Rock Water Treatment Facility $ 1,970,000 $ $ 1,970,000 Construction of Influent Pump Station automatic screening 3 WWTP IPS Automatic Screen - Phase 2 Fund Balance equipment and replacement of mixers $ 3,500,000 $ $ 3,500,000 Replacement of 3 SBR Blowers. This equipment is under a service contract until April 2026. The manufacturer of our blowers was acquired by Atlas Copco shortly after we purchased them. Atlas Copco is reporting over 12 week lead times for parts to maintain functionality. Atlas Copco proposes giving us one of the blowers at no cost as consideration for purchasing before the end of our 4 1SBR Blower Replacement Sewer Fund current service contract. $ 460,000 $ $ 460,000 Utilize in-line pipe technology to study the Riverfront Forcemain to 5 Riverfront Forcemain Study Sewer Fund look for pipe wall defects and gas pockets. $ 150,000 $ $ 150,000 Rehab of sewer system piping and manholes to reduce the rain I&I Program - Cured -In -Place -Pipe Repairs Sewer Fund water intrusion into the sewer system. $ 3,000,000 $ 3,000,000 $ 3,000,000 $ $ 9,000,000 Environmental Projects' Totals by Fiscal Yearl $ 6,080,000 1 $ $ 3,000,000 $ 3,000,000 $ 3,000,000 $ $ $ 15,080,000 Map ID # Transportation Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total Pave the gravel drive to the Cape Rock sanitary sewer lift station 6 Pave Access to Cape Rock Sanitary Sewer Lift Station Sewer Fund off of E Cape Rock Drive $ 150,000 $ $ 150,000 Upgrade communication infrastructure and safety features on the Traffic Signal Upgrades Motor Fuel Tax General Fund City's 22 traffic signals. $ 70,000 $ 175,000 $ $ 245,000 Transportation Projects' Totals by Fiscal Year $ 220,000 1 $ 175,000 1 $ $ $ - $ $ $ 395,000 $ 6,500,000 1 $ 175,000 1 $ 3,000,000 1 $ 3,000,000 1 $ 3,000,000 $ $ $ 15,675,000 PUBLIC WORKS 14 Islas CITY 0fCAPE "tag C; I R A R D E A LJ CIP FY 2024-2029 16 Is Iloilo Capital Improvement Sales Tax 14 ww e' 4,21. N' 1 4P IL all, Zz 491 —% 411 bib oil OU WA ONO lo. dm a) • ERROR 11. M - R NN LEGEND Numbers correspond to Map ID on the CIP spreadsheet. CIST Project CIST project Cape City Limits Wa rd 1 Ward 4 Ward 2 Ward 5 Ward 3 Ward 6 0 1 2 Miles 1:72,300 Created by: Deye�Dpmemt Services Teresa Heffner,Alliame Water Resources Date: 12/27/2023 Data Sou r's (a) Cly of Cape Girardeau Government, MO 15 Coordinate System: NAD 1983 StatePlame Misso,ri East FIPS 2401 Feet CITY CAPE G I R A R D E A U CAPITAL IMPROVEMENT SALES TAX (CIST) FY 2024-2029 FY 2024-2029 Capital Improvement Program 10 Year Projection CAPITAL IMPROVEMENT SALES TAX 16 Map ID # CIST Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total 2" Line Replacement CIST Replace 2" lines with 6" water lines City-wide $ 130,000 $ 130,000 $ 130,000 $ 130,000 $ 130,000 $ 650,000 $ 1,300,000 Lead Service Line Inventory CIST In December 2021, a final ruling from the EPA was made official requiring water systems conduct a comprehensive inventory of water service lines from the main to the house. The inventory must be made available to the public and be completed by October 16, 2024. $ 250,000 $ - $ 250,000 Water Tank Asset Management Program CIST Annual SUEZ water tank asset management program $ 400,000 $ 400,000 $ 400,000 $ 400,000 $ 400,000 $ 1,520,000 $ 3,520,000 Annual CIST Street Repair CIST Annual CIST street maintenance and repair program $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 2,500,000 $ 5,000,000 1 1) Lime System Improvements CIST High -Density Lime/Cape Rock Water Treatment Facility $ 6,000,000 $ - $ 6,000,000 3 2) Addition of Primary SCU-4 & Secondary SSB -4 CIST Cape Rock Water Treatment Facility $ 1,350,000 $ 7,500,000 $ $ 8,850,000 a. Booster ump for Carbonic Acid CIST Cape Rock 125,000 125,000 4 to i ization Tank Addition CIST Cape Rock Water Treatment Facility 560,000 560,000 4 c. erator ypass Improvements CIST Cape Rock Water I reatment Facility 610,000 610,000 4 ew i ter Influent 2nd FeedCIST Cape Rock Water I reatment Facility 1,970,000 1,970,000 2 SCADA Improvements CIST Cape Rock Water Treatment Facility $ 100,000 $ 730,000 $ - $ 830,000 Lead Service Line Replacement Federal / State Grants CIST 7% replacement from main to house every year $ 280,000 $ 280,000 $ 280,000 $ 280,000 $ 1,400,000 $ 2,520,000 5 College Booster Pump Station CIST Replacement of existing $ 2,600,000 $ - $ 2,600,000 6 Gordonville Tank Booster Pump Station CIST Improvements to existing $ 2,000,000 $ $ 2,000,000 7 Meadowbrook Standpipe Booster Pump Station CIST Improvements to existing $ 1,600,000 $ $ 1,600,000 8 LaSalle Standpipe Booster Pump Station CIST Improvements to existing $ 1,500,000 $ $ 1,500,000 9 Conversion to Sodium Hypochlorite CIST Cape Rock Water Treatment Facility $ 1,420,000 $ - $ 1,420,000 10 Bertling Street 30" Water Main CIST 3,250' of 30" ductile iron to provide a redundant transmission line leaving the plant $ 500,000 $ 3,310,000 $ 3,810,000 11 New Maintenance Shop CIST Replacement of existing $ 285,000 $ - $ 285,000 High Priority Watermain Improvements CIST City-wide, per the 2022 WSFP $ 28,250,000 $ 28,250,000 Medium Priority Watermain Improvements CIST City-wide, per the 2022 WSFP $ - $ 42,450,000 $ 42,450,000 Plant 1 Residuals ICIST ISolids handling improvements at Plant 1 $ $ 1,000,000 1 $ 1,000,000 CIST Projects' Totals by Fiscal Yearl $ 7,380,000 1 $ 3,390,000 1 $ 14,675,000 1 $ 1,310,000 1 $ 8,615,000 1 $ 37,630,000 1 $ 43,450,000 1 $ 116,450,000 $ 7,380,000 1 $ 3,390,000 1 $ 14,675,000 1 $ 1,310,000 1 $ 8,615,000 1 $ 37,630,000 1 $ 43,450,000 1 $ 116,450,000 CAPITAL IMPROVEMENT SALES TAX 16 T CITY 0fCAPE a.. _�_. � �„• ��.o•� G I R A R DE ALM CIP FY 2024-2029 Parks & Stormwater Tax 2 ILOL 11 ■r - t 1' ■HIL ' ail RL WA lam ae � i r ;� all 211 US 0IM 10. 1. I� =Ili;' ■.� � • +�/i#/ ����1���� NP-1—Im—NANIA44 ��i�1��lj map d.Numbers LEGEND correspond to Map ID # on the CIP spreadsheet. t� ' Projects II� P R Projects ;1 .�Cape Ward . .. 2 Ward Ward 3 Ward. 00 Teresa Heffner,Alfiance Water Resources r,- ,­&dbyth­ky.fC­ .. , CITY CAPE G I R A R D E A U PARKS & STORMWATER TAX (PRS) FY 2024-2029 FY 2024-2029 Capital Improvement Program 10 Year Projection PARKS STORMWATER TAX 18 Map ID # PRS2 Projects - Parks Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total Private ($250,000) / A five (5) field Youth Sports Complex will be constructed to the 1 Youth Sports Complex PRS2 (4.5M) PRF West of the existing Shawnee Park Sports Complex. $ 2,000,000 $ 2,500,000 $ $ 4,500,000 The Cape LaCroix Recreation Trail will be repaired, overlayed and widened from Bloomfield Road to Shawnee Park. The City of Cape Girardeau has procured a grant from the MO Dept of Transportation in the amount of $481,000 for the project. The Cape LaCroix Recreation Trail Improvements and additional $200,000 needed for the project will come from PRS 2 Widening PRS2 Grant ($481,000) funds. $ 681,000 $ 600,000 $ 475,000 $ 1,756,000 Replace fencing fields #1 - #5, upgrade field lights to LED, install Shawnee Park Sports Complex Facility and Field bleacher canopies on fields #2 - #8, maintenance building addition, 8 Improvements PRS2 Grant ($250,000) installation of PA System $ 660,000 $ 860,358 $ - $ 1,520,358 The newly acquired Walker Park will be developed with available PRS funds. The development may include a shelter, playground, off street parking and a walking trail. We will be seeking grant 10 lWalker Park Development PRS2 Grant opportunities for the project. $ 250,000 $ $ 250,000 A permanent restroom will be placed at Dennis Scivally Park. This 11 Dennis Scivally Park Restroom PRS2 will be a prefabricated unit. $ 160,000 $ $ 160,000 Shawnee Park Sports Complex - Maintenance Pave the parking lot at the Maintenance Building at Shawnee Park 12 Building PRS2 Sports Complex $ 125,000 $ $ 125,000 Asphalt Overlay of Osage Centre and Shawnee Park Overlay the main parking lots at the Osage Centre and the 13 Sports Complex Parking Lots PRS2 Shawnee Park Sports Complex $ 1,000,000 $ $ 1,000,000 The Cape Jaycee Golf Course scheduled replacement / renovation 14 Golf Course Enhancements PRS2 of the cart and maintenance shop. $ 350,000 $ $ 350,000 Improvements to New Lorimier and Fairmount Cemeteries include 15 City Cemeteries PRS2 construction of a maintenance building and overlay of roadways $ 250,000 $ $ 250,000 16 Shawnee Park Center Addition PRS2 Expand Shawnee Park Center on the North East side of the facility. $ 100,000 $ 550,000 $ $ 650,000 New restroom facilities at Osage Volleyball Courts / Arena Tennis 17 New Park Restrooms PRS2 Courts $ 80,000 $ - $ 80,000 Phase 3 of Cape Splash includes "Splash Reef' a new themed shallow water area, deck space, restroom / concession building Cape Splash - Phase 3 PRS2 and small stage area for parties / events movies $ 2,000,000 $ 2,000,000 The Red Star Neighborhood Park will be a phased new park adjacent and part of flood buyout property on the north side of the City adjacent to the Red Star Boat Ramp with connections to the River Flood Wall Trail. Improvements include walking trails, picnic/pavilion areas and playgrounds with the potential for an RV Red Star Development PRS2 Casino Campground adjacent to the Casino. $ 500,000 $ 500,000 A neighborhood park will be constructed on the southside of Hwy Southside Neighborhood Park PRS2 74 $ 365,349 $ 365,349 Improve ADA accessibility to the park, improved parking, lighting Cape Rock Park Improvements PRS2 Grant and historic representation of the park property. $ 250,000 $ 250,000 PARKS STORMWATER TAX 18 CITY CAPE G I R A R D E A U FY 2024-2029 Capital Improvement Program 10 Year Projection PARKS STORMWATER TAX 19 The Arena Park Phased Master Plan will include an updated survey, ADA accessible event space, upgrades in electric, lighting, trails, a new SEMO Fair Barn / Offices and other park amentities Arena Park Master Plan PRS2 and renovations. $ 1,495,638 $ 1,495,638 A permanent restroom will be placed at the newly constructed Shawnee Park Sports Complex - Restroom Facility at football / soccer fields at Shawnee Park. This will be a Soccer / Football Fields ITBD Iprefabricated unit. I I I I I$ - $ 150,000 $ 150,000 PRS2 Projects - Parks Totals by Fiscal Year $ 2,681,000 $ 3,160,000 $ 1,395,358 $ 1,780,000 $ 1,150,000 $ 5,085,987 $ 150,000 $ 15,402,345 Map ID # PRS2 Projects - Stormwater Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total Sewer Manhole Rehab PRS2 Repair and rehab of sanitary sewer manholes by contract $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 1,500,000 $ 3,000,000 Lisa Branch Watershed Drainage Improvements - 3 Phase 3 ARPA PRS2 Upgrade street crossings on Glenridge and on Melrose near Randol $ 955,000 $ - $ 955,000 Lisa Branch Watershed Drainage Improvements - 4 Phase 4 ARPA PRS2 Upgrade street crossing on Lisa near Randol $ 420,000 $ $ 420,000 Scivally Branch Watershed Drainage Improvements - 5 Phase 1 ARPA PRS2 Upgrade street crossing at Perryville near Sherwood $ 408,000 $ $ 408,000 Lisa Branch Watershed Drainage Improvements - 6 Phase 2 ARPA PRS2 Upgrade street crossing at Westwood near Sherwood $ 297,000 $ $ 297,000 7 Airport Stormwater Drainage Improvements JPRS2 JMoDOT I Improvements to the stormwater drainage system $ 65,000 1 1 1 1 1 $ $ 65,000 9 JTrail Creek Bank Improvements - Phase 2 JPRS2 Stabilize Cape LaCroix Trail Creek Bank at Walden Park $ 120,000 $ - $ 120,000 PRS2 Projects - Stormwater Totals by Fiscal Year $ 2,445,000 $ 420,000 $ 300,000 $ 300,000 $ 300,000 $ 1,500,000 $ - $ 5,265,000 $ 5,126,000 1 $ 3,580,000 1 $ 1,695,358 $ 2,080,000 1 $ 1,450,000 1 $ 6,585,987 $ 150,000 $ 20,667,345 PARKS STORMWATER TAX 19 I.1I■ J ~E.1 i _mIll.11111111l RI.IImar �M L IL A so 1h:� - 51 25111 ■ - - � �__E: � �rwg I L i 1:0 1 ■ a�.jr U110 ! i LEGEND Ire ` CIP spreadsheet. ?V111011tar WIN ■ ■Il.tf� 1 O PSTF Project ■ ■- 3 ■ � tl'�t f CITY Q�CAPE Gi 1 R A R D E A U */e C I P FY 2024-2029 Public Safety Trust Fund 01 2 Miles I t t t I t t t 1 1:72,300 Created by: Development services _ Teresa Heifner,Allianoe Water Resources Is�eraprovided by rM1e Clry of Cape Gbarhmr me to be uaW fa visual aid Doty end ere rot guerenR W b be e¢ur&c Date: 1/30/2024 Tnae byes ere mt b be need fereny Data Source(.): rng.e r,,d.q;rp.,po .. Cityof Cape Girardeau Government, MO 20 Coordinate System: NAD 1983 St lePlane Missouri EastF IPS 2401 Feet ! i LEGEND Numbers correspond to Map ID # on the ` CIP spreadsheet. ?V111011tar O PSTF Project ■- Cape City Limits Ward 1 Ward 4 Ward 2 Ward 5 Ward 3 Ward 6 01 2 Miles I t t t I t t t 1 1:72,300 Created by: Development services _ Teresa Heifner,Allianoe Water Resources Is�eraprovided by rM1e Clry of Cape Gbarhmr me to be uaW fa visual aid Doty end ere rot guerenR W b be e¢ur&c Date: 1/30/2024 Tnae byes ere mt b be need fereny Data Source(.): rng.e r,,d.q;rp.,po .. Cityof Cape Girardeau Government, MO 20 Coordinate System: NAD 1983 St lePlane Missouri EastF IPS 2401 Feet CITY CAPE G I R A R D E A U PUBLIC SAFETY TRUST FUND (PSTF) FY 2024-2029 FY 2024-2029 Capital Improvement Program 10 Year Projection PUBLIC SAFETY TRUST FUND 21 Map ID # PSTF Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total This request would fund the purchase of a firefighting foam trailer with associated foam nozzles, fittings, and hose. This would also Firefighting Foam Trailer PSTF replace the foam with the non PFAS foam. $ 80,000 $ $ 80,000 Replace the 1999 Chevy 3500 diesel work truck with a crew cab diesel truck that would serve as a tow vehicle for technical rescue Replace Squad 2 Unit 147 PSTF General Fund and hazardous materials responses $ 60,000 $ $ 60,000 Replace the current obsolete outboard motors used in swift water Replace Outboard Motors PSTF rescues $ 15,000 $ 15,000 $ $ 30,000 Add Digital Vehicle Repeater System PSTF General Fund Add a digital vehicle repeater system to the Battalion Chief vehicle $ 15,000 $ $ 15,000 Replace the 2017 pumper at the end of its life cycle for front line 1 Replace Engine 4 Unit 257 PSTF service $ 669,000 $ $ 669,000 Replace the 2017 pumper at the end of its life cycle for front line Replace Rescue 2 Unit 266 PSTF service $ 699,000 $ $ 699,000 Replace the 2006 Boston Whaler fire boat used for fire Replace Marine 1 Unit 952 PSTF suppression and rescue operations on the Mississippi River $ 320,000 $ $ 320,000 Add ARFF Command Vehicle to be used for travel to and from the airport for flight standbys as well as a command post vehicle with 2 JAdd ARFF Command Vehicle PSTF AIP specially equipped aircraft communications equipment $ 65,000 $ $ 65,000 Replace the 2017 pumper at the end of its life cycle for front line 4 Replace Engine 1 Unit 260 PSTF service $ 669,000 $ $ 669,000 Replace the 2017 pumper at the end of its life cycle for front line 5 Replace Engine 3 Unit 262 PSTF service $ 669,000 $ $ 669,000 Replace the 2017 ladder truck at the end of its life cycle for front 6 IReplace Ladder 1 Unit 243 PSTF line service $ 1,090,000 $ $ 1,090,000 Renovations and repairs to FS #4: enclose gear storage, remodel Fire Station #4 - Renovations and Repair General Fund PSTF bunk room $ $ 81,000 $ 81,000 Replace the 2010 crew cab F-550 light rescue truck at the end of Replace Squad 1 Unit 166 PSTF General Fund its life cycle $ $ 85,000 $ 85,000 Training Site PSTF Water, electric, lighting, drainage, and doors, windows, and steps $ $ 110,000 $ 110,000 Replace front line cardiac monitors / defibrillators at the end of Replace Front Line Cardiac Monitor / Defibrillators PSTF General Fund their life cycle $ $ 200,000 $ 200,000 AFG Grant/ General Replace front line self contained breathing apparatus (SCBA) and Replace Front Line SCBA and Spare Bottles PSTF Fund spare bottles $ $ 500,000 $ 500,000 Replace the 2017 heavy rescue truck at the end of its life cycle of Replace Rescue 1 Unit 233 PSTF 20 years $ $ 750,000 $ 750,000 Regional Training Center Future PSTF Training tower and burn building $ $ 1,339,000 $ 1,339,000 New FS #5 in north or south Cape, dependent upon future growth Fire Station #5 Future PSTF trends $ - $ 4,000,000 $ 4,000,000 PSTF Projects - Fire Department Totals by Fiscal Year $ 170,000 $ 1,768,000 $ 2,428,000 $ $ $ $ 7,065,000 $ 11,431,000 Map ID # PSTF Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total Replace existing Police Department tablets (x 58) (5 -yr 3 Replace Tablets and Mobile Data Terminals PSTF replacement schedule) $ 230,000 $ 230,000 $ 460,000 PUBLIC SAFETY TRUST FUND 21 CITY CAPE G I R A R D E A U FY 2024-2029 Capital Improvement Program 10 Year Projection To build a firearms range suitable for pistols and rifles. The range will be used for ongoing training, as well as required annual certification. The range can also be used by other regional law Firearms Range Grants / Donations Future PSTF enforcement agencies. $ - $ 310,000 $ 310,000 PSTF Projects - Police Department Totals by Fiscal Year $ - $ 230,000 $ - $ $ $ 230,000 $ 310,000 $ 770,000 $ 170,000 1 $ 1,998,000 $ 2,428,000 $ $ $ 230,000 1 $ 7,375,000 1 $ 12,201,000 PUBLIC SAFETY TRUST FUND 22 6 tanNOd, e Islas ;` � tag� �� CITY QCAPE i " � � � � �� � 1 1? A Ft d E A lJ I . s ox.o CIP FY 2024-2029 r 'tt17 } Transportation Trust Fund ^t in ■ G 7 15 8- I N, I aV- ■ ■ %1/.11 11 11gal11� Jll.lr ,1 013.... f w� ■�� 11'�t f 4,s, S.QQ y�e 2 .♦ N J♦ .♦♦s W E ���♦♦ S Illinois LEGEND Numbers correspond to Map ID # on the CIP spreadsheet. TTF-5 Tax TTF-6 Tax 41.11.11�� ■ Cape City Limits 11.11.11 i Ward 1 Ward 4 Ward 2 Ward 5 Ward 3 Ward 6 0 1 2 Miles I I I I I I I 1 1 1:72,300 Created by: Devebpment Services Teresa Heifner,Alliance Water Resources rayonsP ,&dbytne C?yofCepe O¢erdeeu are tobe usedforvv Dei mly end ere rot guere�teed to be ecwre R. Dale: 12/27/2023 ae eyes e<e mt m be Data Souroe(s ): rnSmem^g or aesig� wrpose. Cly of Cape Girardeau Government, MO 23 Coordinate System: NAD 1983 State Plane Missouri East FIPS 2401 Feet CITY CAPE G I R A R D E A U TRANSPORTATION TRUST FUND (TTF) FY 2024-2029 FY 2024-2029 Capital Improvement Program 10 Year Projection TRANSPORTATION TRUST FUND 24 Map ID # TTF5 Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total 1 Independence - E Rodney to Caruthers TTF5 Construct recommendations from traffic study to address congestion and traffic safety $ 4,780,000 $ $ 4,780,000 2 Main Street - Roberts to East Cape Rock TTF5 Reconstruction, curb and gutter, sidewalks, and streetlights $ 1,700,000 $ $ 1,700,000 Street Lights TTF5 Maintenance, repair, and replacement of traditional bulbs to LEDs $ 200,000 $ $ 200,000 3 ITerminal Parking Lot Crack Seal ITTF5 Extra I Crack Seal and seal coat of current terminal parking lot. The new terminal parking area and long term parking will be upgraded upon completion of the new facility. This does not include the parking areas directly in front of the current terminal and Cape Aviation. This area should be rehabilitated to extend the life of the parking lot while also extending the aesthetics of the new parking area across the entire parking lot. $ 200,000 $ $ 200,000 TTF5 Projects' Totals by Fiscal Year $ 6,880,000 $ $ $ $ $ $ $ 6,880,000 Map ID # TTF6 Projects Funding Source 1 Funding Source 2 Description FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29 FY 29-34 CNT Total 4 Sprigg - Shawnee Parkway / Route 74 to Southern Expressway TTF6 Remove and replace curb and gutter and sidewalks; mill and overlay $ 2,942,000 $ $ 2,942,000 Concrete Street Repair TTF6 Annual concrete street repair program $ 1,800,000 $ 1,920,000 $ $ 3,720,000 5 Lexington - West Cape Rock to Sprigg TTF6 Remove and replace concrete pavement sections, curb and gutter, and sidewalks; overlay $ 1,500,000 $ $ 1,500,000 6 Lexington - Carolina to Sherwood TTF6 Remove and replace concrete pavement sections, curb and gutter, and sidewalks; overlay $ 1,000,000 $ $ 1,000,000 Asphalt Overlay Program TTF6 Annual asphalt overlay program $ 600,000 $ 640,000 $ $ 1,240,000 7 Route K School Corridor Safety Improvements TTF6 Intersection improvements, in cooperation with others, contribution toward total project cost $ 500,000 $ $ 500,000 Sidewalk Repair Program TTF6 Sidewalk point repair program $ 350,000 $ $ 350,000 8 Veterans Memorial Drive Phase 6 - Hopper to Vantage (Grading) TTF6 Grading only $ 1,955,000 $ $ 1,955,000 9 Bertling - Perryville to Big Bend TTF6 Concrete repair $ 1,000,000 $ $ 1,000,000 10 lAsphalt Overlay of Rush Limbaugh Drive TTF6 Asphalt overlay of Rush Limbaugh Drive, front entrace road of the Cape Girardeau Regional Airport $ 500,000 $ $ 500,000 TTF6 Projects' Totals by Fiscal Year $ 8,692,000 $6,015,000 $ $ $ $ $ $ 14,707,000 $ !1!5,572,000 $ 6,015,000 $ $ $ $ $ $ 21,587,000 TRANSPORTATION TRUST FUND 24 CITY CAPE G 1 R A R D E A U COMPLETED PROJECTS FY 2023-2024 FY 2023-2024 Capital Improvement Program 10 Year Projection Completed Projects Project Cost COMPLETED PROJECTS 25 Capital Assets - Facilities Projects Funding Source 1 Funding Source 2 Description FY 23-24 Training Site Security General Fund Fencing for training site at South Sprigg Street and La Cruz $ 50,000 A.C. Brase Arena - Exterior Painting Casino Fund Paint the exterior of the A.C. Brase Arena building $ 50,000 Training Site Improvements General Fund Stack and permanently secure the shipping containers used for firefighter training $ 50,000 City Hall Vault Shelving General Fund Local Records Preservation Grant (max. $15,000) Hi -density shelving for City Hall vault area. Project will include flooring track, single -sided end shelf, and three double -sided shelves. $ 16,800 Fire Station #2 - Renovations and Repair General Fund PSTF Replace air conditioner $ 15,000 Fire Station Painting Casino Fund Materials to repaint both interior and exterior of Fire Stations #3 and #4 $ 9,000 Capital Assets - Facilities Projects Completed $ 190,800 Capital Assets - Fleet Projects Fleet # VIN # Description FY 23-24 Replace Marine 3 Unit MWP ARPA Replace 1995 Jon Boat used for Mississippi River and tributary responses $ 90,000 Replace Brush 3 (1987 Ford F350) Unit 167 AFG Replace 1987 Ford F350 brush firefighting vehicle with a new quad cab diesel 4x4 truck $ 90,000 Replace Technical Rescue Tool Trailer General Fund Replace the technical rescue tool trailer bought in the mid 1990s $ 30,000 Capital Assets - Fleet Projects Completed $ 210,000 Capital Assets - IT Projects Funding Source 1 Funding Source 2 Description FY 23-24 Nimble Storage Upgrade General Fund Replace storage array (5 -yr upgrade schedule) $ 97,000 Upgrade Offsite VM server General Fund Disaster recovery (5 -yr upgrade schedule) $ 40,000 Add Warning Siren Software ARPA Add an interoperability package to our existing and future sirens $ 30,000 Add EOC Video Wall General Fund Add a video wall to EOC for monitoring City security cameras, local news, and state emergency $ 25,000 Laserfishce Weblink Public Portal General Fund User Fees Weblink Public Portal will allow public to access / research records. This would reduce the amopunt of time spent by staff on records request research. $ 9,895 Laserfische Server Move - SELF -HOSTED General Fund Current operating system / server is Windows 2008, is outdated, no longer supported or receives Windows updates, and is beyond life. Due to addition of PD, server is at 93% capacity (10% HR / CMO, 83% PD). Includes move / upgrade, installation and training. $ 5,140 Capital Assets - IT Projects Completed $ 207,035 Capital Assets - Non -fleet Projects Funding Source 1 Funding Source 2 Description FY 23-24 Body Worn Camera Project (Getac Video) General Fund Software maintenance, warranties, and cloud storage will need to be extended and old cameras will be replaced in 2024. This will cover the next two years through 2026. $ 138,764 Tornado Sirens ARPA Hopper Road / Dalhousie and Bloomfield / Whispering Oaks / Ston Crest $ 120,000 Axon (laser) Replacement General Fund Current Axon (laser) devices are wearing down and need to be replaced. Current devices are over ten years old. $ 75,309 Replace Vehicle Extrication Set General Fund Fund the replacement of a vehicle extrication set to our heavy rescue truck. $ 49,500 GPS Data Collector General Fund New data collector to be used by Engineering / Surveying Technician $ 35,000 Add EOC Communications Equipment General Fund Add communications equipment to work stations in the EOC $ 23,000 Stair Chair Replacement Health Fund Provide a stair chair for each fire apparatus. $ 15,000 Tornado Siren Batteries General Fund Replacement batteries for tornado sirens - 3 -yr replacement schedule (x6 per siren) $ 12,500 Repair Diesel Exhaust Removal Systems General Fund Repair the Diesel Exhaust Removal Systems $ 10,000 Replace GPS Units General Fund Replacement of 12 GPS units for outdoor search and rescue. $ 6,000 Capital Assets - Non -fleet Projects Completed $ 485,073 CIST Projects Funding Source 1 Funding Source 2 Description FY 23-24 Replace Airport Terminal Building CARES Act CIST Airport Terminal Replacement (20,100 Squ. Ft.) $ 12,016,053 COMPLETED PROJECTS 25 CITY CAPE G 1 R A R D E A U FY 2023-2024 Capital Improvement Program 10 Year Projection Completed Projects Annual CIST Street Repair CIST Annual CIST street maintenance and repair program $ 500,000 Water Tank Asset Management Program CIST Annual SUEZ water tank asset management program $ 400,000 Lead Service Line Inventory CIST In December 2021, a final ruling from the EPA was made official requiring water systems conduct a comprehensive inventory of water service lines from the main to the house. The inventory must be made available to the public and be completed by October 16, 2024. $ 250,000 T -Hangars Consulting - Burns & McDonnell CIST / BIL Design phase of 20 additional t -hangars $ 190,000 CIST Projects Completed $ 13,356,053 Environmental Projects Funding Source 1 Funding Source 2 Description FY 23-24 I&I Program - Cured -In -Place -Pipe Repairs ARPA Sewer Fund Rehab of sewer system piping and manholes to reduce the rain water intrusion into the sewer system. $ 2,950,000 Riverfront Forcemain Railroad Crossing Sewer Fund Replace the sewer forcemain crossing the BNSF railroad at Elm and Fountain Streets. $ 300,000 WWTP Odor Contral Media and Lift Station Sewer Fund Change out odor control media WWTP and one lift station to keep odors to a minimum. To be changed every three years. $ 175,000 Environmental Projects Completed $ 3,425,000 PRS Projects Funding Source 1 Funding Source 2 Description FY 23-24 Indoor Aquatic Facility PRS2 Renovations to Central Municipal Pool Phase 1 will procure a design / build consultant with construction occuring in FY 23-24 / FY 24-25 - City Council / Cape Public School District Partnership Project $ 6,000,000 Lisa Branch Watershed Drainage Improvements - Phase 1 PRS2 ARPA Upgrade street crossing on Brookwood at Masters, and on Sherwood at Westwood $ 675,000 Sewer Manhole Rehab PRS2 Repair and rehab of sanitary sewer manholes by contract $ 300,000 Scivally Branch Watershed Drainage Improvements - Phase 2 PRS2 Upgrade street crossing at Lexington near Steven $ 215,000 PRS Projects Completed $ 7,190,000 PSTF Projects Funding Source 1 Funding Source 2 Description FY 23-24 AVL (Automatic Vehicle Location) Dispatching Software / Equipment / Tablets PSTF Purchase AVL dispatching software that integrates with our new computer aided dispatch (CAD) system implemented in March 2020. The project also included laptops/tablets for all front line apparatus and staff cars assigned to chief officers. $ 107,000 Add Digital Vehicle Repeater System PSTF General Fund Add a digital vehicle repeater system to the heavy rescue vehicle $ 10,000 Add Vehicle Extrication Ram PSTF General Fund Add vehicle extrication ram to the rescue truck $ 6,750 Replace Scene Lights PSTF General Fund Replace scene lights on E13 and E12 $ 5,900 PSTF Projects Completed $ 129,650 Transportation Projects Funding Source 1 Funding Source 2 Description FY 23-24 Air Service Marketing MoDOT (90%) General Fund (10%) Air service marketing $ 100,000 Transportation Projects Completed $ 100,000 TTF Projects Funding Source 1 Funding Source 2 Description FY 23-24 Concrete Street Repair TTF6 Annual concrete street repair program $ 1,500,000 Lexington - West Cape Rock to Sprigg TTF6 Remove and replace concrete pavement sections, curb and gutter, and sidewalks; overlay $ 1,000,000 Lexington - Carolina to Sherwood TTF6 Remove and replace concrete pavement sections, curb and gutter, and sidewalks; overlay $ 900,000 Asphalt Overlay Program TTF6 Annual asphalt overlay program $ 500,000 Veterans Memorial Drive Phase 6 - Hopper to Vantage (Design & Acquisition) TTF6 Design and acquisition complete $ 345,000 Safety Projects TTF5 TAP Pedestrian Improvements at US61 - Kingshighway & N Cape Rock - Maria Louise $ 350,000 Sidewalk Repair Program TTF6 Sidewalk point repair program $ 200,000 Nash Road Railroad Tie Repair TTF5 MFT Repair degrading railroad ties for the railroad spur that services businesses along Nash Road $ 135,000 TTF Projects Completedl $4,930,000 $ 30,223,611 COMPLETED PROJECTS 26