HomeMy WebLinkAboutRES.116.10-17-1984 . • , ,
BILL NO. 84-108 RESOLUTION N0. /`f�
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
ENTER INTO A SOILS INVESTIGATION CONTRACT WITH
SOUTHEAST MISSOURI STATE UNIVERSITY AND SHANNON
AND WILSON, INC.
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE
GIRARDEAU, MISSOURI, AS FOLLOWS:
SECTION 1 . The City Manager on behalf of the City of Cape
Girardeau, Missouri , is hereby authorized to join Southeast
Missouri State University in entering into a contract with
Shannon and Wilson, Inc, for soils investigation work at the
Multi-Use Center site . A copy of this agreement is attached to
this resolution and made a part hereof .
PASSED AND ADOPTED THIS _1� DAY OF ,
1984.
� � � �
MAYOR
ATTEST
�
ITY CLERK
AGREEMENT
This agreement made and entered into this day
of , 1984, by and between Southeast Missouri
State University and the City of Cape Girardeau, hereinafter
referred to as "Owner" and Shannon and Wilson, Inc. ,
hereinafter referred to as "Engineer" .
WITNESSETH:
1 . DESCRIPTION OF WORK.
Engineer shall provide subsurface and seismic investigation
services for the Multi-Use Center to be located on the campus
of Southeast Missouri State University. Engineer shall
investigate conditions at the site by drilling ten ( 10) borings
down to bedrock and then coring into bedrock a distance of ten
( 10) feet in two to three of the ten (1 ) borings. Standard
penitration tests will be performed at five ( 5) foot intervals
in the over burden and representative samples of the material
obtained will be retained in glass jars for further
inspection . The underlying bedrock will be cored to determine
the competence of the bearing material . Borings will be made
with a truck-mounted rotary drill operated by a reputable
subcontractor . A geologists from engineer 's staff will provide
quality control during the drilling operations by observing the
work, obtaining samples and preparing descriptive field logs of
the borings . He will also make a geologic evaluation of the
site. The project surveyor will locate the borings in the
field. All soil samples and rock cores will be brought to
engineer ' s laboratory in appropriate containers for
classification and testing as may be necessary. A detailed
descriptive log of the soil, rock cores , and photographs of
selected rock samples will be included in the report as
documentation of the soil and rock conditions encountered in
the borings . The result of the field and laboratory
investigations will be analyzed by licensed geotechnical
engineers, and recommendations will be made relative to
alternative types of foundations , specific building locations ,
and possible grading problems. Engineer shall evaluate
significant fault zones and probable ground motion .
Recommendations will be given for the type of foundation that
would be appropriate for a large and heavy building located in
an active seismic zone. Engineer shall begin field work
within approximately one (1 ) week after notice to proceed.
Drilling operations will require approximately three ( 3) days .
The result of engineer 's field investigations, laboratory tests
and engineering and seismatic analyses will be submitted in a
written engineering report. Five ( 5) copies of the report will
be furnished and the final report will be issued three to four
weeks after completion of drilling. Prior to the completion of
the report, preliminary information will be transmitted
verbally as it becomes available .
2. PAYMENT.
Payment for engineer 's services shall be at the unit prices
set forth in engineer 's cost estimate which is attached to this
contract and made a part hereof. Engineer shall not exceed the
estimate cost without owner 's prior authorization.
3. REIMBURSEABLE EXP�NSES.
Expenses other than salary costs that are directly
attributable to engineer 's professional services shall be
invoiced at engineer ' s cost plus five per cent ( 5� ) . Examples
of these expenses include but are not limited to out of town
travel expenses, long distance telephone charges, use of
personal and rental cars, job related supplies such as
explosives on geophysical surveys, piezometers, and other
instruments', special fees and permits , premiums for additional
or special insurance when required. Engineer shall not exceed
the estimated cost without Owner 's prior authorization .
4. SERVICES BY OTHERS.
When considered necessary, other firms or consultants may
be utilized with Owner 's approval . The cost of services of
other consultants or firms will be marked up five per cent
( 5$ ) . Payment for the drilling subcontractor shall be made at
the unit price set forth in the cost estimate plus the twelve
per cent ( 12$ ) indicated in the cost estimate. Engineer shall
not exceed the estimated cost without Owner 's prior
authorization.
5. LABORATORY TESTS.
Payment for laboratory tests shall be made on the basis of
employees ' salaries charged to the project plus twenty-nine per
cent ( 29$) . Engineer shall not exceed the estimated cost
without Owner 's prior authorization.
6. RIGHT OF ENTRY.
Unless otherwise agreed, Owner will furnish Engineer right
of entry on the land and be responsible for the propriety of
-2-
the time, place and manner of Engineer 's entry upon the land
where Engineer is to make borings, surveys and other
explorations . Engineer will take reasonable precautions to
minimize damage to the land from use of equipment, but has not
included in its fee the cost of restoration of the land.
7. BURIED UTILITIES.
If there are buried utilities on the land, Owner will
provide Engineer with the location plan showing existing
utilities on the site where exploration is to be made .
Engineer and its subcontractors will use reasonable care and
diligence to avoid contact with utilities as shown . Owner will
hold Engineer and its subcontractors harmless from any loss
resulting from inaccuracy of the plans , or lack of plans,
relating to the location of underground utilities .
8. SAMPLES.
All samples of soil and rock will be discarded thirty ( 30)
days after submission of Engineer 's final report unless Owner
advises Engineer to deliver the samples to Owner, charges
collect, or to store them for an agreed storage charge.
9. GENERAL LIABILITY.
Engineer agrees to hold Owner harmless and to indemnify and
defend Owner on account of any liability due to bodily injury
or property damage arising out of Engineer 's negligent
operational acts .
10. MISCELLANEOUS.
Neither party shall hold the other responsible for damages
or delay in performance caused by Acts of God, strike,
lockouts , accidents, or other events beyond the control of the
other or the other 's employees and agents.
One or more waivers by either party of any provision, term,
condition, or covenant shall not be construed by the other
party as a waiver of a subsequent breach of the same by the
other party.
It is understood and agreed that Engineer has not been
retained or compensated to provide design and construction
review services relating to the safety precautions of any
-3-
contractor or subcontractor who may work on the project and
that Engineer will not be providing such services .
Where tests are performed within a borehole (such as bore
hole logger , Goodman jack, seismic compression and shear
waive) , it is possible that damage to or loss of the borehole
may occur . In such event, Owner agrees to release Engineer
from all liability for loss of borehole from any cause while or
after Engineer ' s services are performed. Engineer agrees to
accept the risk of loss or damage to its equipment while
inserted in a borehole.
OWNER ENGINEER
SOUTHEAST MISSOURI STATE UNIVERSITY SHANNON AND WILSON, INC.
By By
ATTEST: ATTEST:
CITY OF CAPE GIRARDEAU, MO
ATTEST:
-2-
COST ESTIMATE
. PHASE I
SUBSURFACE AND SEISMIC INVESTIGATION
FOR PROPOSED PERFORMING ARTS/ATHLETIC FACILITY
. SOUTHEAST MISSOURI STATE UNIVERSITY
CAPE GIRARDEAU, MISSOURI
Field Exploration
Shannon & Wilson
Geologist 5 days @ S hrs/day @ $30/hr $1,080
Expenses 4 days @ $50/day 200
Vehicle 4 days @ $35/day 140
$1,420
Drilling Subcontractor
Mobilization/Demobilization $600
�Drilling 3 days @ 8 hrs/day @ �90/hr 2,160
Miscellaneous Materials 100
$2,860
Markup @ 128 343
$3,203
Laboratory
Laboratory Services $400
.
$400
Analyses & Report �
Principal 5 hrs @ $80/hr $400
Associate 30 hrs @ $55/hr 1,650
Seismic Eng. 10 hrs @ $55/hr 550
Drafting 20 hrs @ $30/hr 600
Typing 10 hrs @ $20/hr 200
$3, 400
Total $8,423
ESTIMATED PROJECT TOTAL $8,900 to$9,000