HomeMy WebLinkAboutRES.286.10-05-1987 BILL N�O. 87-185 RESOLUTION N0. ����'
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
ENTER INTO A CONTRACT WITH L.C.O. ELECTRIC
INC. FOR CONSTRUCTING SEWERS IN GREATER CAPE
GIRARDEAU INDUSTRIAL PARK
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU,
MISSOURI , AS FOLLOWS:
SECTION l . The City Manager on behalf of the City of Cape
Girardeau, Missouri , is hereby authorized to enter into a contract
with L .C.O. Electric Inc. for constructing sewers located in the
Greater Cape Girardeau Industrial Park .
��
PASSED AND ADOPTED THIS S� DAY OF �il'" � � ��-tJ� , 1987 .
r
rancis E. Rhodes , Mayor
ATTEST:
��!��(� �
Alvin M. Stoverink , City Clerk
SEWER CONSTRUCTION CONTRACT
This ontract made and entered into this �v-� day
of , , 1987 , by and between the City of Cape
Girardeau, Missouri , a Municipal Corporation, acting by and
through its City Manager , as authorized by the City Council ,
hereinafter called the "City" , and LCO Electric, Inc . , a Missouri
Corporation, authorized to do business in Missouri , hereinafter
called the "Contractor" ;
WITNESSETH :
l . DESCRIPTION OF WORK .
Contractor , for and in consideration of the, payments to be
made as hereinafter provided , hereby agrees at his own expense, to
perform all of the labor and services , and to furnish all of the
materials and equipment necessary to complete this contract in
accordance with the terms , conditions and provisions thereof, and
the general and detailed specifications, all of which are included
in a volume entitled "Specifications and Contract Documents for
Sanitary Sewer Expansion Project Number 86-ED-10" and which is
incorporated herein by reference and made part hereof as though
fully set out herein . The work of the improvement to be made is
that necessary for the expansion of sewers located in the Greater
Cape Girardeau Industrial Park , consisting of installing 800 feet
of sewer line along Nash Road with necessary manholes , under the
proposal submitted under the Economic Development Grant for
General Sign Company, Project Number 86-ED-10 .
2 . PAYMENT.
Payment for said improvement shall be made at the price bid by
the Contractor , as set out in his proposal , whicl� is attached
hereto and made a part hereof , and shall be full compensation for
constructing said improvements, complete in place, including all
labor , equipment , materials , accessories and incidentals . The
estimated total payment is Sixteen Thousand Five Hundred
Forty-Four pollars (�16 ,544 . 00 ) .
Payment to the Contractor shall be made in accordance with the
provisions set out in the "Specifications and Contract Documents
for Sanitary Sewer Expansion Project Number 86-ED-10" .
It is hereby stipulated and agreed that the total amount to be
so paid to the Contractor shall be the total amount of the items
of work in place at the unit price bid per item.
3 , CONTRACT TIME-LIQUIDATED DAMAGES-EXTENSION OF TIME.
The Contractor hereby agrees to begin said work and
improvement not later than ten ( 10 ) days after the execution of
this contract and hereby agrees to complete the same not later
than sixty ( 60 ) working days from said date .
Time of completion is of the essence of this contract and
should the Contractor fail to complete the work within the number
of days as set out above, it is mutually understood and agreed
between the parties hereto that considerable damage will be
sustained by the City, but that it will be difficult , if not
impossible for the City to establish either the full extent or the
amount of damage under the ordinary rules of evidence .
It is tlzerefore understood and agreed by and between the
parties hereto that the payment b the Contractor to the City of
the sum of One Hundred Dollars (�100 .00) per day for every day,
except Sundays and holidays , the contractor fails to complete the
work to be done under this contract shall be paid to the City, as
liquidated damages which the City will suffer by reason of the,
default , and not by coay of a penalty.
The time of completion as above set out shall determine the
date after which liquidated damages shall begin . In the event the
City Council should pass a resolution extending the time in which
the work shall be completed, such extension of time shall not void
the provisions for the assessment of liquidated damages above
described . The City Council , may however , for good cause shown,
such as unfavorable weather , material shortages, strikes, war, an
Act of God, or similar cause , waive the provisions for liquidated
damages and set a new date of completion, which date shall govern
the time when liquidated damages shall begin.
4 . APPROVAL OF THE WORK AND COMPI�ETION OF CONTRACT.
The Contractor , upon the completion of said work and
improvement , shall notify tY�e City Engineer of such fact . The
City Engineer and the City Manager shall thereupon inspect said
work and make a written report to the City Council , and the City
hereby agrees that upon the approval of said report, and provided '
said work is completed in accordance with the terms of this
contract , it will make payment to the Contractor as hereinbefore
provided .
5 . CONTRACT DOCUMENTS .
It is agreed between the Parties to this contract that the
plans, specifications, both general and detailed, the standard
specifications approved and adopted by the City Council and on
file in the Office of the City Clerk , and all resolutions and
ordinances and proceedings by the City Council pertaining in any
detail whatsoever to the work included under this contract ,
including the proposal submitted by the Contractor to the City
Council shall be and constitute integral parts of this contract as
though set out in words and figures herein .
6 . IPIDEMNITY TO CITY.
Contractor agrees to file with the City prior to the
commencement of the work , a certificate of insurance naming the
-2-
City as a co-insured , showing that the Contractor has in force for
a period equal to the period of this contract a policy of general
liability insurance insuring the Contractor against liability for
personal injuries arising out of the contract in a minimum amount
of $100 , 000 . 00 for injury to any one person and $800 ,000 . 00 for
injuries received in any one accident and for property damage
arising out of the contract in the minimum amount of $100 ,000 . 00; '
and the Contractor hereby binds himself to indemnify and save
harmless the City of Cape Girardeau from all claims, damages ,
suits and actions of every name and description brought against
the said City for or on account of any injuries or damages
received or sustained by any parties or party by or from the acts
of the Contractor , or his servants or agents , in doing the work
herein contracted for , or by or in consequence of any negligence
in guarding the same, or on account of any improper materials
being used in construction , or by or on account of any act or
omission of the Contractor , or his servants or agents .
7 . CONTRACTOR ' S SURETY.
The Contractor agrees to file with the City a bond with
corporate surety for the faithful performance of this contract in
an amount equal to the total contract price, and with such surety
as will be satisfactory to the City.
8 . PR EVAILING WAG ES .
Contractor hereby agrees that he will pay all workmen
performing under this Contract an hourly rate of wages which is
not less than the Prevailing Hourly Rate of Wages as determined by
the Department of Labor and Industrial Relations and by the U. S .
Department of Labor as attached hereto and incorporated by
reference as a part of this Contract . Contractor agrees that he
will comply with the provisions of the Prevailing Wage Law .
The Contractor hereby agrees that he will forfeit to the City
as penalty, the sum of Ten Dollars (�10 . 00) for each workman
employed , for each calendar day, or a portion thereof , for which
such workman is paid less than the stipulated rates as determined
by the Department of Labor and Industrial Relations in the wage
determination for any work done under this contract , by him, or
any subcontractor under him.
The Contractor agrees that he will not contract with any
Subcontractor who is prohibited by the provisions of the
Prevailing Wage Law from working on a Public Works contract .
The Contractor hereby agrees that the City can withhold
payments under the terms of this Contract for any sums and amounts
due arld owing as a result of any violation of the Prevailing S�age
Law .
9 . NO WAIVER OF FUTURE BREACH.
The failure of either Party to insist , in any one or more
-3-
instances , on a strict performance of any of the terms or the
conditions of this agreement, or to exercise any right herein
contained, shall not be construed as a future waiver or a
relinquishment of said rights , terms or conditions , but the same
shall continue and remain in full force and effect . None of the
terms or conditions of this Agreement shall be altered, waived,
modified or abandoned in any manner except by written instrument
executed by both parties .
10 . PARTIES BOUPdD.
This contract is binding upon the Parties hereto and their
successors and assigns .
IN WITNESS WHEREOF, the City of Cape Girardeau , Missouri , has
caused this agreement to be signed by its City Manager and
attested by its City Clerk , with the corporate seal of the City
and LOC Electric, Inc. has hereto by and through its authorized
representative, affixed its name the day and year first above
written .
CITY OF CAPE GIRARDFAU, MISSOURI
� �1, fl
,� C.�,L.Z.. �� � ,t. �`��-
ATTEST: Gary A. Eide City Manager
/
,'��� ,���� �
1,�' /•r-r"'��1�
A1 in M. Stove ink , City Clerk
LCO E ECTRIC, INC.
Edward M. Spicer , Pr sident
ATTEST:
Typed Name & Title of Signer ]
-4-
PRUPOSAL
(Community Development Economic Grant Program)
Cape Girardeau, Missouri
October 4 , 1987
PROPOSAL FOR THE EXPANSION OF SEWERS LOCATED IN THE GREATER CAPE
GIRARDEAU INDUSTRIAL PARK, CONSISTING OF INSTALLiNG 800 FEFT OF SEWER
LINE ALONG NASH ROAD WITH NECESSARY MANHOLES, UNDER THE ECONOMIC ,
OEVELOPMENT GRANT FOR GENERAL SIGN COMPANY , PROJECT NUMBER 86- 10-ED
To the Honorable Mayor and Council
of the City of Cape Girardeau, Missouri
Gentlemen :
In response to the advertisement of your City Clerk, published in
the Southeast Missourian. calling for bids for the installation of 800
Feer. of sewer line along Nash Road with necessary manholes, Greater
Cape Girardeau Development Corporation. Project Number 86-ED- 10,
tt�e undersign�d hereby proposes to furnish all labor , material , and
equipment and all else necessary to begin work within ten ( 10) �iays
after the aw�rd of the contract , and to complete the work in 60
working days , and in accordance with the laws and ordinances pertaining
to the w�rk . for the following unit prices :
Unit
Unit Cost Cost
1 . Class B excavation for sewer
lines and manhole 0 - 10 feet
depth. 805 L .F . $ _7.00 $ 5,635.00
2 . 48 inch standard m�nholes
�nd concrete bottoms ,
compiete in place . 20 L . F . $ 70. ].0 $ _1 ,402.00
3 . Cast iron lids and frames
cr,mr�1 ete and i n p 1 ace. 2 Each g� 250.00 $ �00.00
4 . 12 inch VCP with couplings ,
complete and in place. 800 L .F . $ ]0.73 $ 8,58�•00
5 . 6 i nch wyes on 1 2 i nch VCP. 1 Each $ 150.00 g ?=�0.00
�. Connection to existing sewer
1 i nes , comp 1 ete i n p 1 ace . l Each $ 100.00 $ 100.00
7 . Seed i ng and mu 1 ch. L . S. $ 173.00 $ _ 173.00
TOTAL $ 16,5�1�1.00
PROPOSAL
Generai Sign �
Page 2
Attached hnreto is an affidavit. in proof that the undersigned has
not entered into any collusion with any person in respect to this
proposal or any other proposal or the submitting of proposals for the
contract for which the proposal is submitted.
Bidder understands that the City reserves the right to reject any
or all bids and to waive any informalities in the bidding.
ihe Bidder agrees that this bid shall be goo� and may not be
withdrawn for a period of 60 calendar days after the scheduled closing
r_ ime for receiving bids .
Enclosed herewith is a bid bond in the amount of five percent (57.)
of the amount of the bid as a guarantee that the bidder will , if
awaraea the contract , in ten ( 10) days enter into contract and execute
a bond as provided for in the contract.
,J .
�� � / �• �--C-� ��,
LCO Electric, Inc.