HomeMy WebLinkAboutRES.408.03-06-1989 BILL N0. 89-40 RESOLUTION N0. �
A RESOLUTION AUTHORIZING THE CITY MAP)AGER TO
EI�TER INTO Ard AGREEMENT 6aITH S . H . SMITH &
CO . , INC . , FOR ENGINEERING SERVICES FOR
LF'XINGTON STREET
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU ,
MISSOURI , AS FOLL04�S:
SECTION l . The City Manaqer , for and on behalf of the City of
Cape Girardeau, P�lissouri , is hereby authorized to enter into an
Aqreement caith S. H . Smith & Co. , Inc , for engineering services for
L,exington Street . A copy of said Agreement is attached to this
Resolution and made a part hereof .
PASSED AND ADOPTED THIS (Q� DAY OF � , 1989 .
Francis E. Rhodes , P9ayor
ATTEST:
E elyn G. eGrand , City Clerk
AGREEMENT BETWEEN OWNER AND ENGINEER
FOR
PROFESSIONAL SERVICES
THIS IS AN AGREEMErIT, made this day of March , 1989 , by and
between the City of Cape Girardeau, Missouri , hereinafter called
the OWNER, and S. H . Smith & Co. , Inc. , a Missouri Corporation
located at 901 Vine Street , Poplar Bluff, Missouri , hereinafter
called the ENGINEER.
WHEREAS, the OWNER intends to construct a segment ( station 30+50
to station 46+50 ) of the Lexington Street Arterial (hereinafter
called the Project ) and the ENGINEER agrees to perform the various
professional engineerinq services required for the design of the
Project .
OWNER and ENGINEER in consideration of their mutual covenants
herein agree in respect of the performance of professional
engineering services by ENGINEER and the payment for those
services by OWNER, as set forth below.
NOW, THEREFORE , THIS AGREEMENT WITNESSETH:
SECTION A - SCOPE OF ENGINEERING SERVICES:
That for and in consideration of the mutual covenants and promises
between the parties hereto , it is hereby agreed that the ENGINEER
shall perform professional services as hereinafter s'tated which
include normal civil , structural , and surveying services
incidental thereto .
After writ 'ten authorization to proceed, ENGINEER shall :
l . Utilize the criteria established by the preliminary
design prepared by the ENGINEER. Any changes in design
criteria shall be made only with the approval of the
OWNER.
2 . Prepare detailed plans and specifications necessary for
the construction of the project , including righ't-of-way
plats , if necessary.
3 . Correspond and meet with the OWNER as necessary during
the design process .
4 . Provide or obtain all necessary surveys, soil borings,
soil tests , specialized geologic , or other studies as may
be required to produce the detailed plans and
specifications .
5 . Conduct meetings with equipment manufacturers and
suppliers to determine the suitability of various
products which may be incorporated in the project .
6 . Prepare a Construction Contract , including a detailed
ENGINEER' s Estimate of Cost , Notice to Bidders,
Instruction to Bidders , Proposal Form, Contract Agreement
Form, Bidder ' s Qualifications Form, Waqe and Labor
Information, General Conditions , Bid Bond form, and
Performance and Payment Bond Forms ,
7 . Bind the Construction Contract items in a single book
along with the required indices and a set of the City of
Cape Girardeau "Standard Specifications for Street
Improvements" , including the General and Detail
Specifications required to suitably describe the methods
to be employed, the types and quality of the materials to
be used, the tests required, and the standards to be
achieved in the construction of the proposed projec't .
8 . Provide a set of plans which are of sufficient scale and
details as to meet the approval of the OWNER and to allow
construction to proceed with minimal stoppage due to
discrepancies or omissions ,
9 . Furnish five copies of the detailed Plans and
Specifications and the Construction Contract Documents to
the OWNER and present and review them in person with
OWNER. ENGINEER shall furnish such additional copies as
are required for the bidding and contracting process .
10 . Assist the OWNER during advertisemen't and awarding the
Construction Contract .
11 . Maintain all books , documents , papers, accounting
records , and other evidence pertainina to cost incurred
and make such ma'terials available at his office at all
reasonable times during the Contract period and for three
years from the date of final payment under this Contract ,
for inspection by the city, or its authorized
representatives , and copies thereof shall be furnished,
if requested.
12 . He shall coordinate and prepare necessary applications
required for the Corps of Engineers or the Department of
Natural Resources as needed. He shall also coordinace
any potential archaeoloqical matcers and shall coordinate
and prepare any necessary matters to ensure thac the job
conforms to the City ' s Stormwater Management Ordinance .
SECTION B - ADDITIONAL SERVICES OF ENGINEER:
The OWNER reserves the right to request additional work , and
changed or unforeseen conditions may require changes and work
beyond the scope of this contract . In this event , a supplement to
this aareement shall be executed and submitted for approval of the
OWNER prior to performinq the additional or changed work or
incurring any additional cost therefore . Any change in
compensation will be covered in the supplement .
-2-
SECTION C - RESPONSIBILITIES OF OWNER:
The OWNER shall :
1 . Provide full information as to his requirements for the
Project .
2 , t�lake available all information pertaining to the Project
which may be in the possession of the OWNER.
3 . Make provisions for the ENGINEER to enter upon property
at the project site for the performance of his duties .
4 . Examine all studies and layouts developed by the
ENGINEER, and render decisions thereon in a prompt manner
so as not to delay the ENGINEER.
5 . Designate a person in the OWNER ' s employ to act as
OWNER' s representative under this contract ; such person
'to have authority to transmit instructions , interpret the
OWNER' s policies and render decisions with respect to
ma'tters covered by this agreement .
SECTION D - TIME FOR PERFORMANCE:
The ENGINEER shall perform the tasks in Section A within a period
of sixty days. Time of performance shall be measured from the
date upon which the OWNER issues the Notice to Proceed with the
plans and specifications to the ENGINEER to the date upon which
the plans and specifica'tions are submitted to the OWNER. The
Contract shall have been completed at such time as the detailed
plans and specifications are anproved by the OwNER.
SECTION E - COMPENSATION FOR ENGINEERING SERVICES:
The OWDiER shall compensate the ENGINEER for the enaineering
services as listed in Section A. The total amount of said
compensation shall be a lump sum fee of $22 , 000 . 00 .
1 . Schedule of Payments:
The ENGINEER shall submit to the OWNER monthly invoices for
Basic and Additional services rendered. The invoices will be
based upon ENGINEER' s estimate of the proportion of the total
services actually completed at the time of billing. The Ob+TNER
shall make promp't monthly payments in response to the
ENGINEER 's monthly invoices .
2 . If the OWNER fails to make any payment due the ENGINEER for
services and expenses within sixty days after receipt of the
ENGINEER' s bill therefore , the amounts due ENGINEER shall
include a charge at the rate of l� per month from said
sixtieth day, and in addition, the ENGINEER may, after giving
seven days ' written notice to the OFINER, suspend services
-3-
under this Agreement until he has been paid in full all
amounts due him for services and expenses .
3 . If this Agreement is terminated by the OWNER, the ENGINEER
will be paid for services rendered to date of termination .
Payment will be made on the basis of payroll records and
hourly rates of charge ( Exhibit A) times a factor of 3. 01 for
services rendered by principals and employees assigned to the
Project . In the event of any termination, the ENGINEER will
be paid for all unpaid Additional Services and unpaid
reimbursable expenses ,
SECTION F - GENERAL CONSIDERATIONS :
l . TERMINATION
This Agreement may be terminated by either party upon seven
days ' written notice in the event of substantial failure by
the other party to perform in accordance with the terms hereof
through no fault of the terminating party.
2 . REUSE OF DOCUMENTS
All documents including Drawings and Specifications furnished
by the ENGINEER pursuant to this Agreement are instruments of
his services in respect of the Project . They are not intended
or represented to be suitable for reuse by the OWNER or others
on extensions of the Project or on any other project . Any
reuse without specific written verification or adaptation by
the ENGINEER will be at the OWNER' s sole risk and without
liability or legal exposure to the ENGINEER, and the OWNER
shall indemnify and hold harmless the ENGINEER from all
claims , damages , losses and expenses including attorney ' s fees
arising out of or resulting therefrom. Any such verification
or adaptation by the ENGINEER will entitle the ENGINEER to
further compensation at rates to be agreed upon by the OWNER
and the ENGINEER.
3 . DECISIONS UNDER THIS CONTRACT
All claims , counterclaims , disputes and other matters in
question between the parties hereto arising out of or relating
to this Agreement or the breach thereof will be decided by
arbitration in accordance with the Construction Industry
Arbitration Rules of the American Arbitration Association then
obtaining , unless the parties mutually agree otherwise .
Notice of demand for arbitration must be filed in writing with
the other parties to this Agreement and with the American
Arbitration Association, The demand must be made within a
reasonable time after the claim, dispute or other matter in
question has arisen . In no event may the demand for
arbitration be made after the time when institution of legal
or equitable proceedings based on such claim, dispute or other
-4-
matter in question would be barred by the applicable statute
of limitations .
It is agreed by and between the parties that the parties
reserve to themselves their right to legal or equitable
remedies under the law and that nothing contained herein shall
alter the rights of the parties to resort to legal action
pursuant to Missouri law.
4 . PROFESSIONAL ENDORSEMENT
Al1 plans , specifications , and other documents shall be
endorsed by the ENGINEER and shall reflect the name and seal
of the Professional ENGINEER endorsing the work .
5 . RETENTION OF RECORDS
The ENGINEER shall maintain all records , survey notes , design
documents , cos� and accounting records , construction records
and other records pertainina to this contract and to the
Project covered by this contract , for a period of not less
chan three years followina final payment by OWNER . Said
records shall be made available for inspection by authorized
representatives of the OPJNER during regular working hours at
the ENGINEER ' s place of business .
6 . COMPLIANCE WITH LAWS
The ENGINEER shall comply with all federal , s'tate , and local
laws , ordinances , and regulations applicable to the work .
7 . RESPONSIBILITY FOR CLAIMS AND LIABILITY
The EPIGINEER agrees to save harmless the OWNER from all claims
and liability due to his negligent acts or the negligent acts
of his employees , agencs or subcontractors .
8 . SUCCESSORS AND ASSIGNS
OWNER and ENGINEER each binds himself and his partners ,
successors, executors , administrators and assigns to the other
party of this Agreement and to the partners, successors,
executors , administrators and assigns of such other party, in
respect to all covenants of this aareement ; except as above ,
neither OWNER nor ENGINEER shall assign, sublet , or transfer
his interest in this Agreemen't without the written consent of
the other . Nothinq herein shall be construed as creating any
personal liability on the part of any officer or agent of any
public body which may be a party hereto, nor shall it be
construed as giving any rights or benefits hereunder to anyone
other than OWNER and ENGINEER .
-5-
9 . ATTACHMENTS
The following exhibits are attached hereto and are hereby made
part of this contract :
Attachment A - Hourly Rates of Charge
IN WITNESS WHEREOF, the parties hereto have executed this
Agreement on the day and year first above written .
OWNER ENGINEER
City of Cape Girardeau, Missouri S . H . SMITH & CO. , INC .
J . Ronald Fischer , City Manager Samuel H . Smith , President
ATTEST: ATTEST:
Evelyn G. LeGrand , City Clerk Alan W, McSpadden, Secretary
[SEAL ] [SEAL ]
-6-
EXHIBIT A
HODRLY RATES OF CHARGE
Principal of Firm--------------------$35 . 00
Chief Engineer----------------------- 24 .00
Project Engineer--------------------- 22. 00
Design Engineer---------------------- 20 . 00
Draftsman---------------------------- 10 . 00
Inspector-Technician----------------- 12. 00
Chief Driller------------------------ 10 . 00
Testing Technician------------------- 12. 00
Chief Surveyor----------------------- 22. 00
Survey Party Chief------------------- 11 . 00
Survey Instrumentman----------------- 8 . 00
Survey Technician-------------------- 8 . 00
Survey Rodman------------------------ 5 . 00
Secretary---------------------------- 5 . 00
-7-