Loading...
HomeMy WebLinkAboutRES.771.11-16-1992 � �, BILL NO. 92-260 RESOLUTION NO. �� A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO AN ADDENDUM TO A PROFESSIONAL SERVICES AGREEMENT DATED MARCH 27 , 1991 WITH SMITH AND COMPANY FOR THE WALKER BRANCH BRIDGE REPLACEMENTS BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to enter into an Addendum to a Professional Services Agreement dated March 27, 1991 with Smith and Company for the Walker Branch Bridge Replacements. A copy of said Addendum is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THIS l �.(/ � DAY OF ; 19�. � � -- _ r` !� Francis E. Rhodes, Mayor ATTEST: Juli A. Dale, Deputy City Clerk r �,� . � � � . ,� ADDENDUM TO AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES DATED MARCH 27, 1991 1. This addendum, made on J�.�N'�%ir��='-`. ��;: , 1992 , is attached to and made a part of the Agreement between Owner and Engineer for Professional Services made on March 27, 1991, between the City of Cape Girardeau, Missouri (OWNER) and Smith and Company (ENGINEER) . The Basic Engineering Services and Other Services and compensation for those services, are amended or supplemented as indicated below. 2 . The following sentences shall be added to the second paragraph of Section A - Basic Services of Engineer: "The project shall also include design for expansion of the existing box culvert in Walker Branch at Independence Street. The culvert design shall be for HS-20 loading and for AASHTO seismic requirements. The culvert expansion shall be designed to carry full street, existing traffic lanes, or designated widths and shall be coordinated with Corps of Engineers and Missouri Highway and Transportation Department requirements. " 3 . The second paragraph of Section E - Time for Performance, shall be modified to read as follows: "The final completion date for all of the Design phase shall be December 15, 1992 . " 4 . The first paragraph of Section F - Compensation for Engineering Services, shall be modified to read as follows: "The OWNER shall compensate the ENGINEER for basic engineering services listed in Section A. If three, or less, separate prime contracts are awarded for construction, materials, and equipment for the Project, the total amount of said compensation shall be a lump sum fee of $94, 800. 00. 5. Exhibit A to the Agreement shall be replaced in its entirety with the attached revision to Exhibit A. ADDENDUM PAGE 1 ' i IN WITNESS WHEREOF, the parties hereto have made and executed this Addendum as of the day and year first above written. OWNER: ENGINEER: City of Cape Girardeau, Missouri Smith and Company ti+1 onald Fis er, City Manager Sa el H. Smit , President ATTEST: ATTEST: �� �c � � d� Juliei . Dale, City Clerk Lawrence B. Fisher, Secretary i (seal) (seal) - �. ' __ ` . ;; :., . , ADDENDUM PAGE 2 . �� - r EXHIBIT A HOURLY RATES OF CHARGE (Thru 12/31/92) . Principal of Firm-----------------$38. 46 � 25. 67 Pro�ect Manager------------------- . . Pro�ect Engineer------------------ 25. 67 � � 12 . 98 Design Engineer------------------- Senior Draftsman------------------ 13 . 22 Draftsman------------------------- 6. 55 Construction Manager-------------- 22 .84 Senior Construction Inspector----- 20. 00 Inspector-Technician-------------- 14 . 14 Geotechnical Engineer------------- 22 . 21 Chief Driller--------------------- 14 . 14 Testing Technician/Driller-------- 12 . 90 Chief Surveyor-------------------- 23 . 08 Surveyor-------------------------- 12 . 00 Survey Party Chief---------------- 12 . 00 Survey Instrumentman-------------- 6. 00 Survey Rodman--------------------- 5.25 Secretary------------------------- 5. 00 ADDENDUM PAGE 3