Loading...
HomeMy WebLinkAboutRES.737.07-06-1992 BILL NO. 92-144 RESOLUTION NO. 7� � A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO AN AGREEMENT WITH MONROE PLUMBING & HEATING FOR CONSTRUCTION OF THE UPPER CAPE LA CROIX SEWER SYSTEM, PHASE IV, SECTION II BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to enter into an Agreement with Monroe Plumbing & Heating for construction of the Upper Cape LaCroix Sewer System, Phase IV, Section II. A copy of said Agreement is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THIS �.�L DAY OF __ '=�C���� 19 ;��: ✓ _� �' � /, �?!� Francis E. Rhodes, Mayor ATTEST: \ Jul'' A. Dale, Deputy City Clerk (The fo Z Zor,�ting s tandard form r,�i Z Z be used for preparation o f) �I (the Agreement, after au�ard of Contract. I AGREEMENT FORM THIS AGREEMENT, made the day of , 19 _, by and between �. referred to in these Contract Documents as "Owner", and . referred to in these Contract Documents as "Contractor": WITNESSETH: THAT WHEREAS: in accordance with Iaw, Owner has caused Contract Documents to be prepared and an Invitation To Bid to be published, for and in con- nection with � ; aad WHEREAS, Contractor, in response to the Invitation To Bid, has submitted to Qwner, in the manner and at the time specified, a sealed Bid in accor- (� dance with Instructions To Bidders; and WHEREAS, Owner, in the mannez prescribed by law, has publicly opened� examined, and canvassed the Bids submitted, and has determined Contractor to be the lowest and best Bidder for the Work and duly awarded to Contrac- tor a contract therefor, for the sum or sums named in Contracto�r's Bid. NOW, THEREFORE, ia consideration of the compensation to be paid to Con- tractor and of the mutual agreements hereia contained, the parties to these presents have agreed and hereby agree, Owner for itself and its . successors, and Coatractor for itself, himself, or themselves, and its, his, or their successors and assigns, and its, his, or their executors and administrators, as follows: ARTICLE I. Contractor shall perform all Work, including the assumption of all obligations, duties and reponsibilities aecessary to the success- ful completion of the contract and the furnishing of all material� and � equipment required to be incorporated in and form a permanent part of the Work; tools, equipment, supplies, transportation, facilities, labor, superintendence and services required to perform the Work; and Bonds, insurance and submittals; a11 as indicated or specified in the Contract Documents to be performed or furnished by Contractor for the Work included . in and covered by Owner's official award of this Contract to Contractor,. such award being based on the acceptance by Owaer of Contractor's Bid, or part thereof, as follows: �. A-1 C-A : 3-77 � ;- - ARTICLE II. That Oua�r shall paq to Contractor for performance of the Work embraced in this contract, and Contractor ahall accept aa full compensatioa therefor, the sum (subject to adjustmeat as provided ia the Caatract Docu- ments) of _ _ Dollars ($ ) for all Work covered by and included ia thn contract award and designated in the foregoiag Articln I; payment thereof to be made fa curreat funds ta the manaer provided in the Contracz Doc�ents. ARTICLE IIZ. That Ccntractor shall substantially com�Iete the Work withia days, and shall complete all Wcrk within days, after the ' commencement of Contract Time (as dafined in Geaeral Conditions). ARTICLE IV. That the Contract Documeats which comprise the contzact bets�een Owner and Contractor, attached hereto aad made a part hereof, consist of the documents listed in Table of Contants, and the doc�eats identified below. Addenda aumbers Information submitted by Coatractor with the Bid: - Informatioa submitted by Contractor prior to tha tima O�ner issr�s Notice of Award: � ' ( � C-A : 6-80 A-2 Notice of Award. � Notice to Proceed. Any Modificatioas (as defined in General Conditions) duly delivered after executioa of this Agreemeat. . Drauings consisting of a cover sheet and sheets, numbered - , With each sheet beariag the following geaeral title: Aay Notice of Partial Utilization. � � Notices of Substantial Completioa. . Notices of Final Completion and Acceptance. � _ t C-A : 2-79 A-3 IN WITNESS WHEREOF, the parties hereto have executed this Agreement the (`� . day and year first above written. . (Contractor) (SEAL 6) By (ATTEST) Title Date (Joint Venturer) By � (s�ai. &) (ATTEST) � Title (Owner) By ' (SF�L 6) (�TTEST) � Title Approved As to Form Attorney for Owner r, � C-A : 5-79 A-4 � � � _ . CAPE GIRARDEAU, MISSOURI SEWERAGE IMPROVEMENTS UPPER CAPE LA CROIX SEWER SYSTEM PHASE IV - SECTION II B&V PROJECT N0. 17467.420 SRF PROJECT N0. L00401W0 CNANGE ORDER N0. 6 FINAL CHANGE ORDER I . SCOPE This Final Change Order covers the revisions to the Contract Documents as described herein. This document shall be considered a vital part of the Construction Contract for the Cape Girardeau, Missouri , Upper Cape LaCroix Sewer System, Phase IV - Section II project that has been executed between the Owner, The City of Cape Girardeau, Missouri , and the Contractor, Monroe Plumbing & Neating Company of Cape Girardeau, Missouri . Following final execution, this document will become a part of the Contract. II . REASONS FOR CHANGE This Final Change Order covers changes in the scope of the Contract, and modifies the Bid Form in the Contract Documents to reflect the actual quantities used for construction of the Project. This Change Order also modifies the Contract Time to reflect all adjustments in time based on weather considerations. III . CHANGES TO THE CONTRACT A. CONTRACT SCOPE. 1 . UPPER CAPE LACROIX TRUNK SEWER. l . l Item l .l , 18-inch Gravity Sewer Pipe. The quantity shall be revised from 6,239 linear feet to 6,353.61 linear feet. The Item Total shall be revised from $262,786.68 to $267 ,614.05. 1 .2 Item 1 .2, 15-inch Gravity Sewer Pipe. The quantity shall be revised from 788 linear feet to 780.58 linear feet. The Item Total shall be revised from $29,337.24 to $29,060.99. (CAPE GIRARDEAU, MISSOURI ) (UPPER CAPE LA CROIX SEWER) (PHASE IV - SECTION II ) 17467.420 090893C06 C06-1 _ : . 1 .3 Item 1 .3, 8-inch Gravity Sewer Pipe. The quantity shall be revised from 139 linear feet to 133.45 linear feet. The Item Total shall be revised from �3,336.00 to $3,202.80. 1 .4 Item 2. 1 , Standard Manholes. The quantity shall be revised from 25 to 26. The Item Total shall be revised from $36,000.00 to $37,440.00. 1 .5 Item 2.2, Drop Manholes. The quantity shall be revised from 5 to 4. The Item Total shall be revised from $8,375.00 to $6,700.00. 1 .6 Item 2.3, Additional Depth. The quantity shall be revised from 246 vertical feet to 228.61 vertical feet. The Item Total shall be revised from �24,600.00 to $22,861 .00. 1 .7 Item 7.7 , Asphalt Driveway. The description shall be revised from "Asphalt Driveway, Station 127+08" to "Gravel Driveway, Station 127+08" . The Unit Price shall be revised from $68.60 per linear foot to $15.65 per linear foot. The Item Total shall be revised from $960.40 to $219. 10. 2. GOLF COURSE INTERCEPTOR SEWER 2.1 Item l . l , 8-inch Gravity Sewer Pipe. The quantity shall be revised from 766 linear feet to 752.55 linear feet. The Item Total shall be revised from $18,384.00 to $18,061 .20. 2.2 Item 2.3, Additional Depth. The quantity shall be revised from 12 vertical feet to 10 vertical feet. The Item Total shall be revised from $1 ,200.00 to $1 ,000.00. 2.3 A new line item number 2.4 shall be added. The new line item shall have a description "15" stubout at Station 128+55" , and shall have a lump sum value of $450.00. 3. HUMANE SOCIETY INTERCEPTOR SEWER 3. 1 Item 1 . 1 , 8-inch Gravity Sewer Pipe. The quantity shall be revised from 1 ,072 linear feet to 1 ,075.28 linear feet. The Item Total shall be revised from $25,728.00 to $25,806.72. 3.2 Item 2.2, Additional Depth. The quantity shall be revised from 10 vertical feet to 8 vertical feet. The Item Total shall be revised from $1 ,000.00 to $800.00. (CAPE GIRARDEAU, MISSOURI ) (UPPER CAPE LA CROIX SEWER) (PHASE IV - SECTION II ) 17467.420 090893C06 C06-2 s . 4. SAN DANGARO INTERCEPTOR SEWER 4. 1 Item 1 . 1 , 12-inch Gravity Sewer Pipe. The quantity shall be revised from 229 linear feet to 229.98 linear feet. The Item Total shall be revised from $8,067.67 to $8, 102.20. 4.2 Item 1 .2, 10-inch Gravity Sewer Pipe. The quantity shall be revised from 1 ,371 linear feet to 1 ,375.40 linear feet. The Item Total shall be revised from $46,655. 13 to $46,804.86. 4.3 Item 1 .3, 8-inch Gravity Sewer Pipe. The quantity shall be revised from 305 linear feet to 324.79 linear feet. The Item Total shall be revised from $7,320.00 to $7 ,794.96. 4.4 Item 2. 1 , Standard Manholes. The quantity shall be revised from 8 to 7. The Item Total shall be revised from $11 ,520.00 to $10,080.00. 4.5 Item 2.2, Drop Manholes. The quantity shall be revised from 1 to 2. The Item Total shall be revised from $1 ,675.00 to $3,350.00. 4.6 Item 2.3, Additional Depth. The quantity shall be revised from 24 vertical feet to 29.74 vertical feet. The Item Total shall be revised from $2,400.00 to $2,974.00. 4.7 A new line item number 10. 1 shall be added. The new line item shall have a description "New manhole invert for stubout at Station 6+16" , and shall have a lump sum value of $390.00. 4.8 A new line item number 10.2 shall be added. The new line item shall have a description "Open Cut at El Rio Drive, Station 19+92" , and shall have a lump sum value of $2,920.00. 4.9 A new line item number 10.3 shall be added. The new line item shall have a description "Flap valve at Station 17+50" , and shall have a lump sum value of $240.00. 4. 10 A new line item number 10.4 shall be added. The new line item shall have a description "Excavate storm sewers at Station 19+92" , and shall have a lump sum value of $205.00. 4. 11 A new line item number 10.5 shall be added. The new line item shall have a description "Survey Roth Property at Station 19+92" , and shall have a lump sum value of �195.00. (CAPE GIRARDEAU, MISSOURI ) (UPPER CAPE LA CROIX SEWER) (PHASE IV - SECTION II ) 17467.420 090893C06 C06-3 . k . 4.12 A new line item number 10.6 shall be added. The new line item shall have a description "Connect Roth Sewer at Station 19+92" , and shall have a lump sum value of $730.07. B. CONTRACT TIME. The required time to complete all Work shall be extended by 46 calendar days as a result of this Final Change Order. Therefore, the required time to achieve Substantial Completion shall be revised from 330 days to 376 days, and the required time to achieve Final Completion shall be revised from 365 days to 411 days. IV. CONTRACT PROVISIONS A. CONTRACT PRICE. The total Contract Price shall be increased by a total of $5,595.00 as a result of this Final Change Order. The revised Contract Price shall be Six Hundred Forty Five Thousand, Nine Hundred Seventy Eight and 70/100 ($645,978.70) . B. CONTRACT TIME. The time required to achieve Substantial Completion and Final Completion shall be increased by a total of 46 days as a result of this Final Change Order. The revised time to achieve Substantial Completion shall be 376 days, and the revised time to achieve Final Completion shall be 411 days. All other provisions of this Contract are unchanged and shall remain in effect. Agreed to this /$'� day of , 1993. ATTESTED: CITY OF CAPE GIRARDEAU, MISSOURI : Owner �, � ( B v� � � By: z� 'c� y� � it Clerk onald Fis her ity Manager BLACK & VEATCH: Monroe Plumbing and Heating Engineer Company: Contractor B �. , , . B • !` i - , �. , . y. , � • ` i ._k_l._ , � . . , . � Ro rkvicka Daniel H. Monroe Assi tant Project Manager President (CAPE GIRARDEAU, MISSOURI ) (UPPER CAPE LA CROIX SEWER) (PHASE IV - SECTION II ) 17467.420 090893C06 C06-4