HomeMy WebLinkAboutRES.729.06-15-1992 BILL NO. 92-121 RESOLUTION NO. ��'�
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE AN AGREEMENT WITH EMERY SAPP AND SONS,
INC. FOR CONSTRUCTION OF THE UPPER CAPE LA
CROIX SEWER SYSTEM, PHASE IV, SECTION I
PROJECT
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU,
MISSOURI, AS FOLLOWS:
ARTICLE 1. The City Manager, for and on behalf of the City of
Cape Girardeau, Missouri, is hereby authorized to execute an
Agreement with Emery Sapp and Sons, Inc. for construction of the
Upper Cape LaCroix Sewer System, Phase IV, Section I Project. A
copy of said Agreement is attached to this Resolution and made a
part hereof.
I5� �� �9 9a�
r�SSE1 AN> P,1�rTE) THIS )P�Y •F ,
F'rancis E. Rhodes, Mayor
ATTEST:
r
,� ; �
Julie; . Dale, Deputy City Clerk
�� (The foZtozring standard form Taitl be used for preparation ofJ
(the Agreement, after ur�ard of Contract. 1
AGREEMENT FORM
THIS AGREEMENT, made the day of , 19 _,
by and between ,
referred to in these Contract Documents as "Owner", and
�
referred to in these Contract Documents as "Contractor":
WITNESSETH:
THAT WFiEREAS: in accordance with law, Owner has caused Contract Documents
to be prepared and an Invitation To Bid to be published, for and in con-
nection with
; and
_ WHEREAS, Contractor, in response to the Invitation To Bid, has submitted
to Owner, in the manner. and at the time specified, a sealed Bid in accor-
dance with Instructions To Bidders; and
WHEREAS, Owner, in the manner prescribed by law, has publicly opened,
examined, and canvassed the Bids submitted, and has determined Contractor _
to be the lowest and best Bidder for the Work and duly awarded to Contrac-
tor a contract therefor, for the sum or sums named in Contractor's Bid�.
NOW, THEREFORE, in consideration of the compensation to be paid to Con-
tractor and of the mutual agreements herein contained, the parties to
these presents have agreed and hereby agree, Owner for itself and its
successors, and Coatractor for itself, himself, or themselves, and its,
his, or their successors and assigns, and its, his, or their executors
and administrators, as follows:
ARTICLE I. Contractor shall perform alI Work, iacluding the assumption
of all obligations, duties and reponsibilities necessary to the success-
ful completion of the contract and the furaishing of aIl material� and
equipment required to be incorporated in and form a permanent part of
the Work; tools, equipment, supplies, transportation, facilities, labor,
superintendence and services required to perform the Work; and Bonds,
insurance and submittals; aII as indicated or specified in the Contract
� Documents to be pezformed or furnished by Contractor for the Work included
in and covered by Owner's official award of this Contract to Contractor,
such award being based on the acceptance by Owner of Contractor's Bid,
� or part thereof, as follows:
A-1
C-A : 3-77
�
ARTICLE II. That Owuer shall pay to Cantractor for pezformance of the Work
. embraced in this contract� and Contractor shall. accept a� full compensatioa
therefor, the sum (subject to adjustment as provided ia the Coatract Docu—
meats) of
Dcllars ($ )
for all Work covered by aad included in the contzact award and designated
in the foregoiag Article I; payment thereof to be made ia curreat funds
tn the manner providad ia the Contrac�t Documents.
, ARTICLE III. That Contractor shall substantially complete the Work wLthin
days, and shall complete a11 Wcrk withia days, after the
commeacemeat of Contract Time (as defiaed in General Conditions) .
ARTICLE ID. That the Cantract Doc�ents which camprise the contract between
Owner aad Contractor, attached hereto aad made a part hereof, consfst of the
documents listed in Tabl.e of Contants, and the documents identified belor.t.
Addeada n�bers •
Information submitted by Caatractor with the Bid:
Iafozmation submitted bp Coatractor grior to the tima Qwaer isszzs Notice of
Award:
�
C-A : 6-80 A-2
!
- - Notice of Awazd.
Notice to Proceed.
Aay Madifications (as defined in General Conditions) dulq delivered after
execution of this Agreemeat.
Drawings consisting of a cover sheet and sheets, numbezed
, with each sheet bearing the following geaeral title:
. t '
Anq Notice of Partial IItilization.
Notices of Substantial Completioa.
Notices of Final Completion and Acceptaace.
�
t
�
C-A : 2-79 A-3
( IN WITNESS WHEREOF, the parties hereto have executed this Agreement the
day and year first above written.
(Contractor)
(SEAL &)
By (ATTEST)
Tit1e
Date
- r
(Joint Venturer)
By ' (S�r1L &)
(ATTEST)
� Title
(Owner) � �
gy (S F.�L &)
(�TTEST)
Title
� Approved As to Form
Attorney for Owner
i
�.
C-A : 5-79 A-a
� aucKaven7cH BID TABULATlON SUMMARY Prol�awo.: t�se�
8400 WARO P/WKWAY CAPE l31RAADEAU, MISSOU RI Bib T�k�n aC Ap�dwidru,MbaouA
pp gpx pp,y� SEW ERAOE INPROVEMENTS Dae.: May t4,t�e2
�s►gqry,e,ussp�qi o��,• UPPERCAPELACROIXTRUNKSEWER 7abu+aador: RS►�
PHASE IV,SECTION 1 9A«t rro.t
��;�y����p_�p SRF PROJECTNO.100401W0
NAMEANOAOORESS 9�AEAYSIWP FR�M.LtJTFi ROBttSON ENGINEERS
Of BtODER Aro SONs,iwC. aaD SONs.INC. CONSTAUCTION CO. OPINICN Of
PROe�BIE
U nR ���T�
�uafltlt�/ fblumbla,MO SL Lauk,MO P�rryv11M,MO COST
DESCAIPTION
Acknowled ed Addendum No. 1 �g � �
eia secur' sx eoNo sx eoro sx aow
UNIT PFICE9 UNIT PFUC£9 UNfT PRICES UNfT PRICE9
1. SEWERS
1.1 27-inch t3ra Sewer Pi a 5187 Gn R 554.50 89.90 585.00 580.00
Z. 5 fT DIAMETER MANHOLES
21 Stendard Manholes 14 vert R 52 200.00 f2 105.00 52&12.00 52 000•00
2.2 Addftfonal De th 91 vert R 150.00 117.00 144.00 175.00
3. SiPHON CfiEEK CROSSINCiS
3.1 Inlet Structure fum eum 12 000.00 12 100.00 S15 11�.00 S19 200.00
POT STA 1+45.00
3.2 Outlet Swcture lum sum 19 500.00 i�8 800.00 S15 744.00 S15 200.00
POT STA O+t0.00
3.3 Si ho� Barrela 97 Gn R 5485.00 SJ20.00 5891.00 5400•OU
In-Place
STA 0+�4.00
3.t Inlet SUucture lum sum 515,000.00 520,200.00 522.776.00 518.000.00
PI STA 6+�0.31 8K
9.5 Outlet Structure lum sum S12 750.00 S12 800.00 S15 354.00 S14 000.00
Pf STA 5+52.18
3.6 Si hon Barrela B1 lin ft 525.00 2.00 S1 00�.00 5390•00
In-Place
STA�3+84.00
9.7 Inlet SVueture lum eum 1�000.00 S19 500.00 16 938.00 S14 885.00
PI STA J4+84.97
3.8 Outlet SWcturo ium eum St3 000.00 S14 S00•00 16�58.00 S14 065.00
POT STA 33+80.00
3.9 Si ho� Barrels 97 tln R 5465.00 5�24.00 5851.00 t40�•00
In-Place
STA 5+58.66
4. TUNNElEO HIGHWAY CROSSiNGS
4.1 27-Inch Sewx Pi e 7511nk 5825.00 5728.00 1 898.00 2600.OU
in 54-Inch
Otameter tunnel
Liner Plate STA 39+00
5. MISCELLANEOUS CONCRETE
5.1 Conerete EncasemerK 20 cu d 5250.00 5223.00 5300.00 St85.00
STA 8+50
5.2 Concrete Encasement 74 cu d 5250.00 5223.00 SJ00.00 i185.00
STA 24+87
5.3 Concreta Encaaement 23 cu d 5250.00 5223.00 5300.00 5785•00
STA 53+80
8. CONNECTION TO IXISTINf3 FACILITIES
8.1 Connection and lum eum S2 500.00 xI00.00 St 200.00 S2 700.00
Modfieationa to E�dstin
Man�ole POT STA 0+02.50
7. STUB-OUTS
7.1 18-Inch lum sum S1 000.00 5250.00 5360.00 5600.00
PI STA 54+57.58
7.2 8-Inch Lateral w/Plu 1 each S1 200.00 5250.00 5800.00 5750.00
Lan th = 15 Faet
STA 9+19.12
TOTAL PROJECT AMOUNT t59� 451.50 5749 223.30 5989 459.00 5707 OOO.OU
Deductive Amount N A S10 000.00 N A
. A�commended
Awerd
CITY OF CAPE GIRARDEAII, MISSOIIRI
Office of the City Manaqer
Council Letter No.
Agenda June 15, 1992
The Honorable Mayor
and
Members of the City Council
City of Cape Girardeau, Missouri
Dear Mayor and Council Members:
Subject: Authorization of Contract for the IIpper
Cape La Croix Sewer System, Section I
On May 14, 1992, sealed bids were received for the construction of the
Upper Cape La Croix Sewer System, Phase IV - Section I �project. The City
received three (3) bids on this project, ranginq from a high bid of
$969,459. 00 to the low bid of $594, 451. 50. The low bid was submitted by
Emery Sapp and Sons, Inc. , of Columbia Missouri, and is below the Engineer's
Estimate of cost. � �
Black & Veatch, Consulting Engineers for the City of Cape Girardeau on
this project, provide the following recommendation: " . . .Emery Sapp and Sons,
Inc. has contracted with the City on a previous sewer construction project,
and their work was complete and satisfactory. There were no major problems
with the project itself or working with the Contractor. In addition, Emery
Sapp and Sons, Inc. has completed many other projects designed by Black &
Veatch, and it is our opinion that this contractor has the capability and
necessary resources to complete the City's project in accordance with all
contract requirements. Therefore, Black & Veatch recommends that the City of
Cape Girardeau award a contract to Emery Sapp and Sons, Inc. in the amount of
$549,451. 50 for completion of the Upper Cape La Croix Sewer System, Phase IV
- Section I project. "
A resolution authorizing a Contract with Emery Sapp & Sons is presented
for Council consideration and action. Award of this contract will be subject
to Missouri Department of Natural Resources concurrence.
Attached is the tabulation of bids which includes the Engineer's
Estimate.
Respectfully submitted,
J. Kensey Russell, P.E.
City Engineer
J. Ronald Fischer
City Manager
JKR/JRF/dc