HomeMy WebLinkAboutRES.994.10-10-1994 � ?�
BILL NO. 94-272 RESOLUTION NO. C�`>`�
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE AN AGREEMENT FOR ENGINEERING SERVICES
WITH BLACK & VEATCH FOR WATER DISTRIBUTION
IMPROVEMENTS TO SERVE TWIN LAKES SUBDIVISION
AND THE GIBONEY WOODS DEVELOPMENT AND FOR
UPDATING THE WATER FACILITIES MASTER PLAN
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU,
MISSOURI, AS FOLLOWS:
ARTICLE 1. The City Manager, for and on behalf of the City of
Cape Girardeau, Missouri, is hereby authorized to execute an
Agreement for Engineering Services with Black and Veatch for water
distribution improvements to serve Twin Lakes Subdivision and the
Giboney Woods Development and for updating the Water Facilities
Master Plan. A copy of said Agreement is attached to this
Resolution and made a part hereof.
PASSED AND ADOPTED THIS i"; �r;� DAY OF ���t�E,�J�r:' , 19 �1�
A. M. Sp adling, II Mayor
ATTEST:
�� _
— ' .�C L r� ��) �Ll,I�: LC�GC
Gayle �-L. Conrad
Deputy City Clerk
4
�
AGREEMENT
FOR
ENGINEERING SERVICES
THIS AGREEMENT, between the City of Cape Girardeau, Missouri (Owner) and
Black & Veatch (Engineer) ;
W I T N E S S E T H :
WHEREAS, Owner intends to construct additions to the existing water
distribution system that will extend water service to the Twin Lakes
Subdivision and the Giboney Woods Development. Owner also intends to
update the existing Water Facilities Master Plan to include a new area
of development (the Project) ; and Owner further desires to retain the
Engineer to provide master planning, design, survey, geotechnical and
construction administration services for the construction of the water
distribution improvements and,
WHEREAS, Engineer is prepared to provide certain engineering services in
connection with the Project (the Services) ;
NOW THEREFORE, in consideration of the promises contained in this
Agreement, Owner and Engineer agree as follows:
ARTICLE 1 - EFFECTIVE DATE
The effective date of this Agreement shal l be i� - �� - `t =(
ARTICLE 2 - GOVERNING LAW
This Agreement shall be governed by the laws of the state of Missouri .
ARTICLE 3 - SERVICES TO BE PERFORMED BY ENGINEER
Engineer shall perform the Services described in Attachment A, Scope of
Services.
Cape Girardeau, MO
09/OS/94 '1'
ti
ARTICLE 4 - COMPENSATION
Owner shall pay Engineer in accordance with Attachment B, Compensation.
ARTICLE 5 - OWNER'S RESPONSIBILITIES
Owner shall be responsible for all matters described in Attachment C,
Owner' s Responsibilities.
ARTICLE 6 - STANDARD OF CARE
Engineer shall exercise the same degree of care, skill , and diligence in
the performance of the Services as is ordinarily possessed and exercised
by a professional engineer under similar circumstances. No other
warranty, express or implied, is included in this Agreement or in any
drawing, specification, report, or opinion produced pursuant to this
Agreement.
ARTICLE 7 - LIABILITY AND INDEMNIFICATION
7.1 General . Having considered the potential liabilities that may
exist during the performance of the Services, the benefits of the
Project, and the Engineer' s fee for the Services, and in consideration
of the promises contained in this Agreement, Owner and Engineer agree to
allocate and limit such liabilities in accordance with this Article.
7.2 Indemnification. Engineer and Owner each agrees to defend,
indemnify, and hold harmless each other, its agents and employees,
from and against legal liability for all claims, losses, damages, and
expenses to the extent such claims, losses, damages, or expenses are
caused by its negligent acts, errors, or omissions. In the event
claims, losses, damages , or expenses are caused by the joint or concur-
rent negligence of Engineer and Owner, they shall be borne by each party
in proportion to its own negligence.
7.3 Employee Claims. Engineer shall indemnify Owner against legal
liability for damages arising out of claims by Engineer' s employees.
Owner shall indemnify Engineer against legal liability for damages
arising out of claims by Owner' s employees.
Cape Girardeau, MO
09/08/94 -2-
ti
7.4 Consequential Damaqes. To the fullest extent permitted by law,
Engineer shall not be liable to Owner for any special , indirect, or
consequential damages resulting in any way from the performance of the
Services.
7.5 Survival . Upon completion of all Services, obligations, and duties
provided for in this Agreement, or if this Agreement is terminated for
any reason, the terms and conditions of this Article shall survive.
ARTICLE 8 - INSURANCE
During the performance of the Services under this Agreement, Engineer
shall maintain the following insurance:
(1) General Liability Insurance, with a combined single limit of
$1 ,000,000 for each occurrence and $1 ,000,000 in the aggregate.
(2) Automobile Liability Insurance, with a combined single limit of
$1 ,000,000 for each person and $1,000,000 for each accident.
(3) Workers ' Compensation Insurance in accordance with statutory
requirements and Employers' Liability Insurance, with a limit of
$500,000 for each occurrence.
(4) Professional Liability Insurance, with a limit of $1 ,000,000
annual aggregate.
Engineer shall , upon written request, furnish Owner certificates of
insurance which shall include a provision that such insurance shall not
be canceled without at least thirty days' written notice to Owner. All
Project contractors shall be required to include Owner and Engineer as
� additional insureds on their General Liability insurance policies, and
shall be required to indemnify Owner and Engineer to the same extent.
Engineer and Owner waive all rights against each other and their
directors, officers, partners, commissioners, officials, agents, and
employees for damages covered by property insurance during and after the
completion of the Services. If the Services result in a construction
Cape Girardeau, MO
os/oa/9a '3'
t
phase of the project, a similar provision shall be incorporated into all
construction phase contracts entered into by Owner and shall protect
Owner and Engineer to the same extent.
ARTICLE 9 - LIMITATIONS OF RESPONSIBILITY
Engineer shall not be responsible for: (1) construction means, methods,
techniques, sequences , procedures, or safety precautions and programs in
connection with the Project; (2) the failure of any contractor, subcon-
tractor, vendor, or other Project participant, not under contract to
Engineer, to fulfill contractual responsibilities to the Owner or to
comply with federal , state, or local laws, regulations, and codes; or
(3) procuring permits, certificates, and licenses required for any
construction unless such responsibilities are specifically assigned to
Engineer in Attachment A, Scope of Services.
ARTICLE 10 - OPINIONS OF COST AND SCHEDULE
Since Engineer has no control over the cost of labor, materials, or
equipment furnished by others, or over the resources provided by others
to meet Project schedules , Engineer' s opinion of probable costs and of
Project schedules shall be made on the basis of experience and qualifi-
cations as a professional engineer. Engineer does not guarantee that
proposals, bids, or actual Project costs will not vary from Engineer' s
cost estimates or that actual schedules will not vary from Engineer' s
projected schedules.
ARTICLE 11 - REUSE OF DOCUMENTS
All documents, including, but not limited to, drawings, specifications,
and computer software prepared by Engineer pursuant to this Agreement
are instruments of service in respect to the Project. They are not
intended or represented to be suitable for reuse by Owner or others on
extensions of the Project or on any other project. Any reuse without
prior written verification or adaptation by Engineer for the specific
purpose intended will be at Owner' s sole risk and without liability or
legal exposure to Engineer. Owner shall defend, indemnify, and hold
harmless Engineer against all claims, losses, damages, injuries, and
expenses, including attorneys ' fees, arising out of or resulting from
Cape Girardeau, MO
o9/os/94 -4-
1
such reuse. Any verification or adaptation of documents will entitle
Engineer to additional compensation at rates to be agreed upon by Owner
and Engineer.
ARTICLE 12 - OWNERSHIP OF DOCUMENTS AND INTELLECTUAL PROPERTY
Except as otherwise provided herein, engineering documents, drawings,
and specifications prepared by Engineer as part of the Services shall
become the property of Owner, provided, however, that Engineer shall
have the unrestricted right to their use. Engineer shall retain its
rights in its standard drawing details, specifications, data bases,
computer software, and other proprietary property. Rights to
intellectual property developed, utilized, or modified in the
performance of the Services shall remain the property of Engineer.
ARTICLE 13 - TERMINATION
This Agreement may be terminated by either party upon written notice
in the event of substantial failure by the other party to perform in
accordance with the terms of this Agreement. The nonperforming party
shall have fifteen calendar days from the date of the termination notice
to cure or to submit a plan for cure acceptable to the other party.
Owner may terminate or suspend performance of this Agreement for Owner' s
convenience upon written notice to Engineer. Engineer shall terminate
or suspend performance of the Services on a schedule acceptable to
Owner. If termination or suspension is for Owner' s convenience, Owner
shall pay Engineer for all the Services performed and termination or
suspension expenses. Upon restart, an equitable adjustment shall be
made to Engineer' s compensation.
ARTICLE 14 - DELAY IN PERFORMANCE
Neither Owner nor Engineer shall be considered in default of this
Agreement for delays in performance caused by circumstances beyond the
reasonable control of the nonperforming party. For purposes of this
Agreement, such circumstances include, but are not limited to, abnormal
weather conditions; floods; earthquakes; fire; epidemics; war, riots,
and other civil disturbances; strikes, lockouts, work slowdowns, and
Cape Girardeau, MO
09/OS/94 'S'
�
other labor disturbances; sabotage; judicial restraint; and inability to
procure permits, licenses, or authorizations from any local , state, or
federal agency for any of the supplies, materials, accesses, or services
required to be provided by either Owner or Engineer under this
Agreement.
Should such circumstances occur, the nonperforming party shall , within a
reasonable time of being prevented from performing, give written notice
to the other party describing the circumstances preventing continued
performance and the efforts being made to resume performance of this
Agreement.
ARTICLE 15 - COMMUNICATIONS
Any communication required by this Agreement shall be made in writing
to the address specified below:
Engineer: Steve Phillips
Black & Veatch
8400 Ward Parkway
P. 0. Box 8405
Kansas City, Missouri 64114
Owner: Mr. J. Ronald Fischer
City Manager
City Hall
401 Independence Street
Cape Girardeau, Missouri 63702
Nothing contained in this Article shall be construed to restrict the
transmission of routine communications between representatives of
Engineer and Owner.
ARTICLE 16 - WAIVER
A waiver by either Owner or Engineer of any breach of this Agreement
shall be in writing. Such a waiver shall not affect the waiving party' s
rights with respect to any other or further breach.
Cape Girardeau, MO
09/08/94 -6-
<
ARTICLE 17 - SEVERABILITY
The invalidity, illegality, or unenforceability of any provision of this
Agreement or the occurrence of any event rendering any portion or provi-
sion of this Agreement void shall in no way affect the validity or
enforceability of any other portion or provision of this Agreement. Any
void provision shall be deemed severed from this Agreement, and the
balance of this Agreement shall be construed and enforced as if this
Agreement did not contain the particular portion or provision held to be
void. The parties further agree to amend this Agreement to replace any
stricken provision with a valid provision that comes as close as pos-
sible to the intent of the stricken provision. The provisions of this
Article shall not prevent this entire Agreement from being void should a
provision which is of the essence of this Agreement be determined void.
ARTICLE 18 - INTEGRATION
This Agreement represents the entire and integrated agreement between
Owner and Engineer. It supersedes all prior and contemporaneous com-
munications, representations, and agreements , whether oral or written,
relating to the subject matter of this Agreement.
ARTICLE 19 - SUCCESSORS AND ASSIGNS
Owner and Engineer each binds itself and its directors, officers ,
partners, successors , executors, administrators, assigns, and legal
representatives to the other party to this Agreement and to the
directors, officers, partners, successors, executors, administrators,
as5igns, and legal representatives of such other party in respect to all
provisions of this Agreement.
ARTICLE 20 - ASSIGNMENT
Neither Owner nor Engineer shall assign any rights or duties under this
� Agreement without the prior written consent of the other party. Unless
otherwise stated in the written consent to an assignment, no assignment
will release or discharge the assignor from any obligation under this
Agreement. Nothing contained in this Article shall prevent Engineer
from employing independent consultants, associates, and subcontractors
to assist in the performance of the Services.
Cape Girardeau, MO
09/OS/94 -�'
4,
ARTICLE 21 - THIRD PARTY RIGHTS
Nothing in this Agreement shall be construed to give any rights or
benefits to anyone other than Owner and Engineer.
IN WITNESS WHEREOF, Owner and Engineer have executed this Agreement.
City of Cape Girardeau , Missouri Blac� & Veatch
Owner Engin er
/l , . , ,, . R
��
By c/ - A`�'1�°��v -�" By '� ,� �,
Ronald Fischer ac{t . Keller
Title City Manaqer Title �cecutive Partner
Date �'/ i/ � Date ��,� �' �' -�s��
Cape Girardeau, MO
09l08/94 -8-
�
ATTACHMENT A
TO
CONTRACT FOR ENGINEERING SERVICES
FOR
CITY OF CAPE GIRARDEAU, MISSOURI
WATER SYSTEM IMPROVEMENTS
SCOPE OF SERVICES
. Owner: City of Cape Girardeau, Missouri
Project: Water Distribution System Improvement
This project consists of updating the existing Water System Master plan to
include one new planning area in the southwest area of the City; and design,
bid, preaward, and construction phase services for the construction of the
following water distribution system improvements:
• Twin Lakes. Approximately 14,000 feet of new water transmission
and distribution main that will be constructed throughout the
subdivision. The transmission main will cross Interstate 55.
• Gibonev Woods. Approximately 11 ,500 feet of new water
transmission and distribution main to serve a residential
development area. The new distribution piping will be constructed
throughout the development based on the proposed road layouts.
The planning and design work will be based on the following:
• "Water System Master Plan for Cape Girardeau , Missouri , " project
No. 19447; prepared by Black & Veatch, Kansas City, Missouri ;
1993.
• Preliminary development layout for Giboney Woods prepared by
Koehler Land Surveying; Cape Girardeau, Missouri ; April , 1994.
The Water System Master Plan Update will be completed independently of the
design tasks. The design work for the Twin Lakes Subdivision and Giboney
Woods Development are intended to be completed concurrently. It is understood
that the construction of the Twin Lakes and Giboney Woods improvements will
occur at different times. Therefore, the Preaward and Construction Phase
Services described herein will be provided for each project, and will not be
provided concurrently.
Cape Girardeau, MO
092694 A-1
PHASE 100. WATER SYSTEM MASTER PLAN UPDATE
Engineer shall provide master planning services to prepare an addendum to the
1993 master plan which will provide a 10 and 20 year program to provide
potable water to a new area in the southwest portion of the City. The area to
be studied is defined in Mr. Kensey Russell ' s letter dated August 18, 1994.
The area is located adjacent to the original Planning Area No. 15, and is
bordered on the north by County Road No. 203, on the east by Bloomfield Road,
and on the South by Highway No. 74.
A. Preliminary and General Work
1 . Conduct a project initiation meeting to clarify Owner' s
requirements for the project; review available data and project
organization and staffing.
B. Existing Facilities
l . Review existing facilities which will be impacted by the addition
of this new area.
2. Review existing reports and other information from Owner' s files
to confirm design capacity and characteristics of affected
facilities.
3. Review water use records to determine history of water demands in
the impacted areas.
C. Facilities Capacity Requirements
1 . Assist City with projecting future growth, determining flows from
the additional area, and demands on the water utility including
distribution facilities as a result of the addition of the new
area. Projections shall be based on data provided by the City
Planning Department.
2. Establish the required distribution system and transmission system
capacities to serve the new area, including phased expansion
requirements.
3. Review the adequacy of the existing treatment facilities and water
mains that will supply this area. The analysis will based on the
design conditions determined above.
D. Pipeline Corridor Study
l . Determine alternative routes and gather available topographic,
property, and utility maps within the corridor to determine
potential alternative alignments for transmission mains to deliver
service to the study area.
Cape Girardeau, MO
092694 A-2
2. Evaluate alternative alignments.
3. Summarize advantages and disadvantages of each alternative
alignment, considering geotechnical conditions, urban development
service requirements, construction difficulties, environmental
factors, and overall costs.
E. Pipeline Design Criteria
l . Establish proposed pipeline sizes and materials for improvements
which will be needed to deliver water to the study area.
2. Prepare a preliminary system pressure profile.
3. Establish valve types and locations based on current City
standards.
F. Costs
1 . Prepare opinions of probable construction cost for the alternative
systems to serve the area, and perform a cost-effectiveness
analysis of the alternatives based on the opinions of probable
construction costs, operating and maintenance costs , and other
project costs.
G. Report
l . Prepare a draft report that can be inserted into the existing
Water System Facilities Plan which includes a recommended plan of
improvements and opinions of probable construction cost for that
plan. Submit five copies to Owner for review and comment.
2. After Owner has reviewed and commented, make any necessary
modification and submit five copies of revised draft report to
State agency and five copies to Owner for review and comment.
3. After receipt of comments, revise report and submit five copies of
final draft to Owner and State agency.
PHASE 200. FIELD SURVEYS - TWIN LAKES AND GIBONEY WOODS.
A. Preliminary
1 . Meet with Owner and select the pipeline routes to be surveyed.
2. Contact utilities and gather information on location of their
facilities, availability of service for proposed project, utility
requirements for connections and interfacing, and any planned or
proposed improvements which would affect the project.
Cape Girardeau, MO
os2ssa A-3
3. Obtain available drawings or maps from Owner which will aid in the
design and interfacing of the project.
B. Route Surveys - Twin Lakes Subdivision
1. Assist Owner in utilizing the City' s survey crew to conduct
alignment surveys to gather topographic and utility information
along the pipeline alignment(s) , set horizontal and vertical
controls and locate existing street right-of-way and critical
property corners along pipeline alignment, and to provide
additional records on right-of-way and property information as
required. .
2. Conduct a review meeting with Owner' s staff upon completion of
detailed surveys to obtain approval of final alignment.
3. Determine the needs for permanent and temporary construction
easements along the pipeline alignment. Review these needs with
Owner' s staff.
C. Route Surveys Giboney Woods Development
The survey and plan sheets for the Giboney Woods improvements will be based on
the contour maps developed from aerial survey completed by Walker and
Associates.
1. Acquire the existing contour maps developed from aerial surveys of
the proposed alignment.
2. Provide, through a subcontract, the services of a land surveyor to
set horizontal and vertical controls and critical property corners
along pipeline alignment, and to provide additional records on
right-of-way and property information as required.
3. Conduct a review meeting with Owner' s staff to obtain approval of
final alignment.
4. Determine the needs for permanent and temporary construction
easements along the pipeline alignment. Review these needs with
Owner' s staff.
PHASE 300. DESIGN, CONSTRUCTION CONTRACT DOCUMENTS, BID, AND PRECONSTRUCTION
SERVICES
� The services provided in this phase of the project apply to both the Twin
Lakes and Giboney Woods improvements unless specifically stated otherwise. It
is anticipated the work will proceed concurrently on both projects.
A. Preliminary and General Items
Cape Girardeau, MO
os2ssa A-4
l . Meet with Owner to clarify understanding of scope and parameters
of the project.
2. Obtain and review Owner-furnished standard specifications and
standard details, and resolve any comments.
3. Arrange for and participate in informal meetings with Owner
throughout the design phase to review progress and exchange ideas
and information. One meeting per month is anticipated.
4. Meet with Owner' s personnel and representatives of utilities ,
government agencies, highway departments, railroad companies, and
schools to obtain requirements for public protection to be
included in contract documents.
5. Prepare a design memorandum to establish agreement on scope,
parameters, performance requirements, and project approach.
Submit three copies to Owner.
B. Water main planning - Giboney Woods Development only.
1. Project ultimate flows and demands created by the proposed
development.
2. Establish the required distribution system capacity and pressure
to the area, and determine any improvements that are required to
the existing system to meet the required demands and pressures.
3. Determine the pipeline route for the transmission main which will
connect the development to the existing water distribution system,
considering existing utilities, geotechnical conditions, roadway
layouts , and the service ares.
4. Establish pipeline sizes and materials.
5. Establish valve locations.
6. Prepare a pressure profile for the development area.
C. Geotechnical Services
1. Provide, through a subcontract, geotechnical engineering services
including exploratory work , laboratory and field testing, and
professional guidance in tests to be made at test locations based
on preliminary drawings and designs and including professional
� interpretations of exploratory and test data.
The services will include:
a. Initial geotechnical exploratory work , such as soil borings,
penetration tests, soundings, subsurface explorations,
Cape Girardeau, MO
os2ssa A-5
laboratory tests of soils, rock formations, and other geo-
physical phenomena which are required to provide information
for design, and other field and laboratory tests and
analyses which are required to provide design information.
b. A geotechn��al report by a qualified geologist or
geotechnical firm interpreting the data on the exploratory
work and testing and setting out the site conditions that
can be ant�cipated from this exploratory work.
D. Construction Contract �cuments
1 . Prepare drawings and specifications and other contract documents
for the proposed construction work and for the materials and
equipment requir��.
The documents sh�1l be prepared for selection of private
construction con�ractors on a competitive bid basis.
2. Prepare two cons�ruction contracts as follows:
a, Twin Lakes Subdivision - Based on a preliminary pipeline
layout dev��oped by the City staff, modified as required
based on t�e results of the design memorandum prepared in
Phase 300, Section A
b. Giboney Wo�ds Development - Based on alignment and
preliminary design developed in Phase 300, Section B.
3. Prepare an opini�a of probable construction cost for the proposed
work covered by �he contract documents.
4. Review the contr�ct documents for completeness, bidability, and
constructability.
5. Provide three se�s of the contract documents to Owner for review
at the 90 percen� project completion.
6. Meet with Owner �fter documents have been reviewed to discuss them
and to resolve a�y questions.
7. After the confer�ce with Owner, make any necessary modifications
and submit three sets of revised contract documents to State
agency for revie� and two sets to Owner for record.
. 8. Attend one meeti�g in Cape Girardeau, Missouri to discuss the
documents with r�ulatory agency officials.
9. After receipt of agency review comments and Owner' s comments on
final documents, revise if necessary and resubmit, if necessary,
three sets to st��e agency and two sets to Owner.
Cape Girardeau, MO
os2ssa A-6
,
10. Upon completion of the review of the contract documents, review
the opinion of probable construction cost and revise and expand as
required.
11. Attend one public hearing in Cape Girardeau , Missouri to assist
Owner in presenting the project to the public, to answer
questions , and to advise Owner as necessary.
12. Prepare Bidding Requirements, Bid Forms, Contract Forms, and
Conditions of Contract for the contract documents, and preliminary
Invitation to Bid form.
E. Permits Acquisition
1 . Provide in the specifications a list of the permits which must be
obtained by the construction contractor(s) . It is understood the
construction contractors must obtain the following permits for
this project:
Missouri State Sales Tax Exemption
2. Provide assistance to Owner in securing the following permits from
State agencies and from utility and pipeline companies:
Construction Permit from Missouri Department of Natural
Resources
Construction Permit from Missouri Department of Highway and
Transportation
Assistance will include:
a. Preparation of applications, exhibits, drawings and
specifications as necessary for Owner' s execution and
submittal .
b. Furnishing additional information about the project design.
PHASE 400. PREAWARD SERVICES
l . Coordinate bid letting date, time, and place with Owner and
prepare final Invitation to Bid.
2. Assist and advise Owner in placing the advertisements of the
Invitation to Bid.
� 3. Identify potential contractors and suppliers, and distribute
copies of Invitation to Bid. Maintain a record of prospective
bidders and suppliers to whom contract documents have been issued.
4. Distribute construction contract documents to prospective bidders.
Cape Girardeau, MO
092694 A��
a
5. Distribute plan holders list to recipients of contract documents
prior to bid opening.
6. Receive deposits for construction contract documents. Process
refunds to unsuccessful bidders. To reduce reproduction and
mailing expenses, Engineer shall retain any portion of the deposit
which is not refundable.
7. Distribute 10 sets of the construction contract documents to the
successful bidder.
8. Interpret construction contract documents. Prepare and issue
addenda to the construction contract documents when required.
9. Conduct bid opening. Answer questions during bid opening, make
preliminary tabulation of bids, and review questionnaires and bid5
for completeness.
10. Review and evaluate the qualifications of the apparent successful
bidder and the proposed major or specialty subcontractors. The
review and evaluation will include such factors as work completed,
equipment that is available for the work, financial resources,
technical experience, and responses from references.
11 . Prepare and distribute formal bid tabulation sheets, evaluate
bids, and make written recommendations to Owner concerning
contract award.
12. Prepare and distribute conforming copies of the construction
contract documents. These services will include review of
contractor' s bonds, furnishing the Contractor unsigned con-
struction contract documents, and transmitting the construction
contract documents to Owner for signature and distribution.
PHASE 500. CONSTRUCTION PHASE SERVICES
The following services will be provided for the improvements to both the Twin
Lakes Subdivision and the Giboney Woods Development. Costs for these services
have been developed assuming the construction of these improvements is
completed at different times.
A. Project Administration
Engineer will perform project administration services during the
construction phase of the project. By performing these services, Engi-
� neer shall not have authority or responsibility to supervise, direct, or
control the Contractor' s work or the Contractor' s means, methods,
techniques , sequences , or procedures of construction. Engineer shall
not have authority or responsibility for safety precautions and programs
incident to the Contractor' s work or for any failure of the Contractor
to comply with laws , regulations , rules, ordinances, codes, or orders
Cape Girardeau, MO
092694 A-8
4
♦
applicable to the Contractor furnishing and performing the work.
Specific services to be performed by Engineer are as follows:
1 . Review the Contractor' s insurance certificates and forward the
certificates to Owner for acceptance by Owner' s legal counsel .
Engineer' s review of the insurance certificates is only for the
purpose of determining if the Contractor maintains the general
types and amounts of insurance required by the contract documents,
and is not a legal review to determine if the Contractor' s
insurance coverage complies with all applicable requirements.
2. Assist the City with developing public information program to set
up a public notification procedure relating to specific
construction activities. This work will consist of sending
written notice regarding the proposed schedule and special
provisions to members of the public directly affected by the
construction activities.
3. At a date and time selected by Owner and at a facility provided by
Owner, conduct a preconstruction conference. Engineer shall
prepare an agenda for the conference, and prepare and distribute
minutes. The preconstruction conference shall include a
discussion of the Contractor' s tentative schedules, procedures for
transmittal and review of the Contractor' s submittals, processing
payment applications, critical work sequencing, change orders,
record documents, and the Contractor' s responsibilities for safety
and first aid.
4. Review and comment on the Contractor' s initial and updated
construction schedule and advise Owner as to acceptability.
5. Analyze the Contractor' s construction schedule, activity sequence,
and construction procedures as applicable to Owner' s ability to
keep existing facilities in operation.
6. Review the Contractor' s initial and updated schedule of estimated
monthly payments and advise Owner as to acceptability.
7. Make periodic visits to the construction site to observe progress
of the work , and consult with the Owner and the Contractor
concerning problems and progress of the work. A total of
six visits between both projects is anticipated.
8. Review drawings and other data submitted by the Contractor as
required by the construction contract documents. Engineer' s
� review shall be for general conformity to the construction
contract documents and shall not relieve the Contractor of any of
his contractual responsibilities. Such reviews shall not extend
to means, methods, techniques, sequences, or procedures of
construction, or to safety precautions and programs incident
thereto.
Cape Girardeau, MO
os2ssa A-9
�
�
Costs contained in this document are for review of the initial
submittal , and one resubmittal per subject. If more that one
resubmission is required because of the failure of Contractor to
provide all previously requested data, Owner shall reimburse
Engineer for the charges incurred for review of the additional
submittal with funds obtained from the Contractor as defined in
the Contract Documents.
9. Receive and review guarantees, bonds , and certificates of inspec-
tion, and tests and approvals which are to be assembled by the
Contractor in accordance with the construction contract documents
and transmit them to Owner.
10. Interpret construction contract documents when requested by Owner
or the Contractor.
11 . Provide documentation and administer the processing of change
orders, including applications for extension of construction time.
Evaluate the cost and scheduling aspects of all change orders and,
where necessary, negotiate with the Contractor to obtain a fair
price for the work. Said negotiation shall be subject to the
approval of Owner.
Work related to unusually complex or unreasonably numerous claims
is covered in Supplemental Services.
12. Upon completion of the project, revise the construction contract
drawings to conform to the construction records. Submit one copy
of the prints and one copy of reproducibles.
13. Act on claims of Owner and the Contractor relating to the
acceptability of the work or the interpretation of the
requirements of the construction contract documents.
14. Analyze data from performance testing of equipment by the
Contractor or supplier when the construction contract documents
require the equipment to be tested after installation. Submit
conclusions to Owner.
15. Upon substantial completion, inspect the construction work and
prepare a punch-list of those items to be completed or corrected
before final completion of the project. Submit results of the
inspection to Owner and the Contractor.
16. Upon completion or correction of the items of work on the punch-
. list, conduct a final inspection to determine if the work is
completed. Provide written recommendations concerning final
payment to Owner, including a list of items, if any, to be
completed prior to making such payment.
17. Apply for consent of surety to final payment.
Cape Girardeau, MO
092694 A'1�
+ �,
ATTACHMENT B
TO
CONTRACT FOR ENGINEERING SERVICES
FOR
CITY OF CAPE GIRARDEAU, MISSOURI
WATER SYSTEM IMPROVEMENTS
COMPENSATION
Owner: City of Cape Girardeau, Missouri
Project: Water Distribution Improvements
For the services covered by this Contract, the Owner agrees to pay the
Engineer as follows:
A. For the Master Planning Services planning, design, and bid
services; an amount equal to the Engineer' s salary costs times
2.80 plus reimbursable expenses at cost and plus subcontract
billings times 1 .05. The maximum billed for these services shall
not exceed $16,500 without further authorization. �
B. For survey, design, and preaward services; an amount equal to the
Engineer' s salary cost times 2.80 plus reimbursable expenses at
cost and plus subcontract billings times 1 .05. The maximum billed
for these services shall not exceed the following amounts without
further authorization.
• Twin Lakes Improvements $57,500
• Giboney Woods Improvements $25,500
C. For construction phase services, an amount equal to the Engineer' s
salary costs times 2.80 plus reimbursable expenses at cost and
plus subcontract billings times 1 .05. The maximum billed for
these services shall not exceed the following amounts without
further authorization.
• Twin Lakes Improvements $30,000
• Giboney Woods Improvements $25,000
D. For supplemental services, an amount equal to the Engineer' s
salary costs times 2.80 plus reimbursable expenses at cost and
� plus subcontract billings times 1 .05. Each item of supplemental
services shall be specifically authorized by the Owner, and a
maximum billing limit shall be established before the work is
started. The amount billed for each item of supplemental services
shall not exceed the amount established for it without further
authorization.
Cape Girardeau, MO
092794 B'1
,
E. The following expenses are reimbursable under salary multiplier
work items:
1 . Travel , subsistence, and incidental costs.
2. Use of motor vehicles on a monthly rental basis for assigned
vehicles and on a mileage basis or rental cost basis for
vehicles used for short periods. Mileage basis shall be 29
cents per mile.
3. Telegraph costs , long distance telephone costs and project
"onsite" telephone costs. •
4. Reproduction of reports, drawings, and specifications.
5. Postage and shipping charges for project-related materials.
6. Computer time charges including program use charges.
7. Rental charges for use of equipment, including equipment
owned by the Engineer.
8. Cost of acquiring any other materials or services
specifically for and applicable to only this project.
9. Subcontract costs including those for soils and geotechnical
investigations and reports, testing laboratory services,
surveying and mapping services, assistant engineers, other
subcontract services.
10. Charges of special consultants requested or authorized by the
Owner.
11 . Special insurance coverage required by the Owner, including
the cost of naming the Owner as an additional insured.
12. Local taxes or fees applicable to the engineering work or
payments therefor.
13. Charges for review of drawings and specifications by
government agencies, if any.
14. Cost of acquiring any other materials or services
specifically for and applicable to only this project.
F. The Engineer agrees to use its best efforts to perform the
services within the billing limits stated above and in accordance
with the agreed upon performance schedules. If, at any time, the
Engineer has reason to believe that the cost of the services will
be greater or substantially less than the billing limits, the
Engineer shall promptly notify the Owner to that effect, giving a
revised billing limit for performance of the services.
Cape Girardeau, MO
o��9a B-2
�
G. Periodic payments shall be made to the Engineer by the Owner based
on the Engineer' s statement. The statement shall be itemized to
indicate the amount of work performed and the associated
reimbursable expenses and subcontract costs.
H. The entire amount of each statement shall be due and payable upon
receipt by the Owner. Carrying charges of 1-1/2 percent per month
from the billing date, shall be due for accounts which are not
paid within 60 days after the billing date.
I . It is understood and agreed that the maximum billings of each of
the above items are based on the start of the services being
authorized not later than the dates given �below. If start of
services is not authorized by dates given, it is understood and
agreed that the fixed fees and total costs will be adjusted
accordingly by a supplement to this Agreement. The authorization
dates are as follows:
• Planning, Design, and PreAward November 15, 1994
• Construction Phase Services May 15, 1995
J. It is understood and agreed that if the project, after being
started in any phase, is stopped in that phase for the Owner' s
convenience for more than 60 calendar days, Engineer may reassign
project team members to other work. If the team is disbanded and
the work is restarted at a later date, then the Owner will pay the
Engineer a restart fee equal to 10 percent of the original maximum
billing limit for that phase. Al1 payments for project suspension
and restart will be in addition to the original maximum billing
limit.
K. It is understood and agreed:
That the Engineer shall start the performance of the services
listed below within ten calendar days of receipt of the notice to
proceed and shall complete the design services within one hundred
eighty calendar days of receipt of notice to proceed, pending
review and coordination with the State regulatory agencies.
Completion of services during the construction phase of the
contract is dependent on the construction contractor' s completion.
Construction Phase Services will be completed in the following
time periods after completion and acceptance by the Owner of the
construction work:
� Calendar Days for Completion
Af ter
Service Acceptance by Owner
• Construction Phase Services 62
Cape Girardeau, MO
092794 B—3
ti
r-
L. That the Engineer shall keep records on the basis of generally
accepted accounting practice of costs and expenses and which
records shall be available to inspection at reasonable times.
Cape Girardeau, MO
o��9a B-4
�,
�
.
ATTACHMENT C
TO
CONTRACT FOR ENGINEERING SERVICES
FOR
CITY OF CAPE 6IRARDEAU, MISSOURI
WATER SYSTEM IMPROVEMENTS
OWNER'S RESPONSIBILITIES
Owner: City of Cape Girardeau, Missouri
Project: Water Distribution Improvements
The Owner will furnish, as required by the work and not at the expense of the
Engineer, the following items:
1. All maps, drawings, reports, records, audits, annual reports, and other
data that are available in the files of the Owner and which may be
useful in the work involved under this contract. Data and records
required include but are not limited to:
2. Access to public and private property when required in performance of
the Engineer' s services.
3. Office desk space for the Engineer' s personnel as required.
4. The services of at least one of the Owner' s employees or staff who has
the right of entry to, and who has knowledge of the existing water
system, transmission and distribution mains and general overall
facilities operation.
5. Property, boundary, easement, right-of-way, topographic, and utility
surveys and property descriptions.
6. Releases to the news media concerning public hearings prebid conferences
preconstruction conferences study and inspection operations by the
Engineer' s forces and their time and location time and location of
anticipated service interruptions time and location of anticipated
street closing or partial closing.
7. Hall or auditorium space for public hearings prebid conferences
� preconstruction conferences and the audio equipment and projection
equipment required for such hearings and/or conferences.
8. Legal advertisement of project letting or bid date and such other
publications of the "Invitation To Bid" as desired by the Owner.
Cape Girardeau, MO
092794 C-1
r �
9. Royalties and fees for patented processes used in the work, except those
required to be paid by construction contractors as part of the
construction contract.
10. Shop, mill , or laboratory inspection of materials, laboratory and field
testing, as required in the contract documents, field sampling services.
11. Updated data file for Cybernet program.
12. All water sales data for the system.
13. All surveying work required for the design of the system improvements in
the Twin Lakes Subdivision.
14. Preparation of title reports and legal descriptions on each parcel of
property to be acquired.
15. Qualified appraisals of all rights-of-way and easements to be acquired.
16. An experienced staff inember that is knowledgeable with the system to
serve as the resident project representative on both projects.
Cape Girardeau,MO
092794 �-2
-.,'u`Y� �" �J4�'. � r : � • " .� ' . .
,9 .r ;.. � _ .
- " SUPPLEMENT NO.2
TO
�ONTRACT rOR ENGINEERING SERVICCS
FOR
CITY OF CAPE GIRARDEAU, NIISSOURI
WATER SYSTEM IMPROVCMENTS
The purpose of this Supplement No. 2 is to define additional engineering services which Black&
Veatch�,��, hereinafter called the Engineer, has provided to the City of Cape Girardeau, Missouri,
hereinafter called the City. This agreemeut is a supplement to the Contract for Engineering
Services for the City of Cape Girardeau, Missouri, Water System Improvements, dated October
� 11, 1994 as amended by SuPplement No. 1 dated July 3, 1995.
Section I—Scope of Services
In the process of completing the Twin Lakes Water System Improvements project and at the
request of the City, the Engineer performed engineering services beyond the scope of services
described in the Contract for Engineeri��g Services and Supplement No. 1. Under the terms of
this Supplemental Agreement No. 2, the City agrees to pay the Engineer for the following
engineering services:
Phase 300—Design, Construction Contract Documents, and Preconstruction Services
A. Preliminary and General Items
1. Remobilize for project including recovering documents from storage and redefining
project scope.
2. Meet with Owner's personnel to discuss project modifications.
B. Field Surveys
l. Provide through a subcontract,the services of a land surveyor to survey the revised
alignment.
C. Construction Contract Documents
1. Modify and append the original specifications and drawings to include the revised
alignment.
2. Add taps to homes within the Twin Lakes Subdivision. Revise drawings and
specifications.
D. Permit Acquisition
1. Revise and resubmit permits to include the additional and revised waterline.
Phase 400- Preaward Services
There will be no further work required for preaward services due to the nature of this
project.
1
mn4.1.99
Phase 500- Construction Phase Services
A. Project Administration
Engineer will perform project administration services during the construction phase of the
• project for the additional waterline and taps in addition to those services specified in the
Twin Lakes Water System Improvements Contract.
1. Review of drawings and other data submitted by the Contractor will be expanded to
include the waterline taps and additional waterline.
Section II—Compensation
As compensation for the services described by this Supplemental Agreement No. 2, the City
agrees to pay the Engineer an amount equal to the Engineer's salary cost times 2.80 plus
reimbursable expenses at costs up to the following:
Item Original Suppl. Suppl. Revised
Value No. 1 No. 2 Total
Twin Lakes $87,500 $21,500 $27,000 $136,000
Billing procedures and all other items pertaining to compensation not specifically addressed by
this Supplemental Agreement shall remain as described in Attachment B of the original
agreement.
Section III—Other Matters
It is mutually agreed and understood that all terms of the original contract not specifically revised
by this Supplemental Agreement No. 2 shall remain unchanged and in full force.
IN WITNESS WHEREOF, the parties have executed this Sup�mental Agreement No. 2 on this
- ��`rr�, day of ���..�.. , 1999.
�
�
BLACK & VEATCH��P CITY OF CAPE GIRARDEAU
CONSULTANT CIT _._ ____>
, ,. ,
;�f Y,,),, . , _-_..
E , �.
. _.,�..�.
�.., ., �,_J{ � (,. �;,,,, ��-�-_____..�
Title: Pa� � Title: Cit r
ATTEST: ATTEST: � �`'
�� �_ �
r_, , ' �-- , � ; , /
,z._ � �.� ��' l �x i
Title: Project Engineer Title: City Cl k '
2 " ..... ...��� ,'
m n4.1.99 '`�4�
�,..,:� ,�.