HomeMy WebLinkAboutRES.934.06-06-1994 _ � .
�� �
BILL NO. 94-132 RESOLUTION NO. �''��
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE AUTHORIZATION NO. 3 WITH BURNS &
MCDONNELL ENGINEERING COMPANY, INC. , FOR THE
CITY'S POTABLE WATER TREATMENT AND
DISTRIBUTION SYSTEM; AN ALLUVIAL WELL STUDY;
AND FOR WATER PLANT EXPANSION
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU,
MISSOURI, AS FOLLOWS:
ARTICLE l. The City Manager, for and on behalf of the City of
Cape Girardeau, Missouri, is hereby authorized to execute
Authorization No. 3 with Burns & McDonnell Engineering Company,
Inc. for the City's potable water treatment and distribution
system; an alluvial well study; and for water plant expansion. A
copy of said Authorization No. 3 is attached to this Resolution and
made a part hereof.
19 �A
PASSED AND ADOPTED THIS ✓(' �� DAY OF _�<�;_� ` i , �,`�-
.
A. . pradling, III, or
ATTEST:
r'
� 1 J
l� �� ,- "�r, 1 �!.
Gayl L. Conrad
Deputy City Clerk
� -
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AUTHORIZATION N0. 3
For
PROFESSIONAL ENGINEERING SERVICES
To
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES dated
March 21, 1994 between the City of Cape Girardeau, Missouri, (hereinafter
called OWNER) and Burns & McDonnell Engineering Company, Inc. (hereinafter
called ENGINEER) , OWNER hereby authorizes ENGINEER to proceed with the
following services:
I. SCOPE
.
This Authorization No. 3 covers services involved in providing an Alluvial
Well Field Supply Feasibility Study to improve the reliability of the water
supply to OWNER's existing Cape Rock Water Treatment Plant.
The detailed description of the anticipated scope of services is presented in
Attachment A.
II. TIME OF SERVICE
ENGINEER will proceed with providing the services set forth herein immediately
upon verbal notice to proceed from OWNER, and will complete Phase I of these
services within eight (8) weeks from start of work.
It is understood that such completion is contingent on the timely review by
OWNER of submittals from ENGINEER, as well as on any delays occasioned by
events beyond the control of the ENGINEER (such as adverse weather conditions,
regulatory agency actions, force majeure events, etc. ) .
Zt is further understood that Phase II work will not commence until a
separate, subsequent Authorization is developed by ENGINEER and approved by
OWNER covering such Phase II services.
1 of 2
�, .
III. RESPONSIBILITIES OF OWNER
For this Authorization No. 3 only, the OWNER shall be responsible for
providing the following:
1. Surveying necessary to locate the borings advanced by the drilling
subcontractor, with respect to the State plane coordinate system;
and to determine the top-of-ground elevation (USGS datum) at each
such boring.
2. Equipment to furnish reasonable assistance to the drilling
subcontractor in getting the drilling equipment into and out of
the proposed drilling site.
IV. COMPENSATION
1. OWNER shall compensate ENGINEER for providing the services set forth
herein in accordance with the terms of the existing agreement, based on a
cost reimbursable basis with a maximum (ceiling) amount. Details of the .
cost estimate and unit price adjustments are presented in Attachment B.
2. Total payment for the Phase I scope of services described in this
authorization shall not exceed the maximum of Sixty-Five Thousand Hundred
Dollars ($65,000.00) without prior written approval by OWNER.
AUTHORIZATION BY:
- -��. , •- ,� ,
��;. Ci'T�-{3��`CAPE GIRARDEAU, MISSOURI
�j.
� ,
. ? C
r /
, r ` ,-\
� �' By: �� � Attest: �'/ " �l/� i.��,
', : .
�, / .
L /
Date: � � - /- �`/
ACCEPTED BY:
BURNS & McDONN L G NE I COMPANY, INC.
By:
Dr. Rob�rt T. Berry P.E.
Vice President
2 of 2
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AUTHORIZATION N0. 3
ATTACHMENT A
Detailed Scope of Services
Alluvial Well Field Supply Feasibility Study
Introduction
The City of Cape Girardeau is interested in expanding and finding alternate
water supply capabilities at its Cape Rock Water Treatment Plant north of the
City. Currently, this plant treats Mississippi River water; however, after
the 1993 flood, siltation in the existing surface water intake and the down-
river migration of the zebra mussels which clog surface water intakes have
prompted the consideration of a new water supply source. Groundwater from the
Mississippi River alluvium has been proposed as an alternate source. �
The primary site for groundwater development is 20 to 30 acres of alluvium
immediately downstream of Cape Rock on the Missouri (west) side of the
Mississippi River as shown on the attached Figure 1. The area is undeveloped,
and no source of potential contamination is readily apparent. If the geology
of this primary site proves to be inadequate, a secondary site may be
investigated upstream from Cape Rock.
Scope of Work
Burns & McDonnell will perform a two phase investigation to determine the
hydrogeologic characteristics of the proposed site and to provide a conceptual
design for planning purposes . Final well design will be provided when it is
authorized by the City. If during any phase of the investigation, unsuitable
conditions are found, Burns & McDonnell will consult with the City to mutually
decide on an alternate course of action.
Phase I - Data Review, Preliminary Test Drilling, Geophysical Logging, Water
Quality Sampling, and Letter Report
Data Review - Corps of Engineers drill logs from the area will be reviewed
to determine the feasibility of water supply development and to plan the
layout of the five preliminary Phase I borings, if the information can be
obtained from the COE.
Preliminary Test Drillin� - Up to five rotary-wash test borings will be
drilled to bedrock or to 150 feet to determine the nature of the alluvial
materials at the site. A Burns & McDonnell geologist will be on the site
1 of 3
�i/ • " �.V. �� •� ���•r-�- • - ycn _,. ,�, . .
I - � �• : >�..� � �\
��`'�:.•,. .. -.,;-- `^' �-" ��- T�..- "',',,� �S�` ! y�:._'.:\�����. �°� � c�" 1 \-'^\\^II ` ( ".. c,.C{!n�
. . �.. --- � m�-/. ��•i. '�� �• )../ �`G o1;�s-V} �� .\� \J � �ti••
- --- ., : i�:�- ^.�� , U �� \ ` •� _' '�
� „��,� . .\... .'.. e. ",':: .: �' _ ��r�,�o� �� '�� \ ` ...,
�; <..�,. �. '��� �� «' , . -/'+`�% �(�' `' � �; ��. -r� �.' �., ' �� %� ) �27�
;�� ., ; �.i l.. �.� . � u' �-, La� °' '' �' = / .
, . .o '� • �. � , : �J . ,.,��. o�� / .� s ,� __.. ^
�' .i j , /" �Il�: �� ��� .'•���� j f ��i(�'-C„``j,����f' i �i�� �r l
S�-'.. '/..
,f .. �- �� . ���� _)• � �� :',�� j�1�u(��,/ ���`�� `�'`..... � _ '/ % - ��
(! \• . ' ' 1 / � � ''�� �",--�'�C� �� G ,� �c�ca c a � .
`�r�1� :� m 1 '^c ��� .' 11 ; I ( '� ,�--c�� .; fi }. .:. , /
'� ' ''p / 1 - / . 4 � ��•� � Go4� �
�, �` v , - , 'I� � n . e. � �t` .�. �\\�� �5 __ O 'i
l ' ����
't,:���;-�I �' „ -y' :• �'rl . ��C��. - ,:': c,/
+ ' ,:� . /�' 7 - ^S��L .��� 1�- i �ti-.�w� �r,5, ` �, r5c•
'/" ,� � '�_ I`;' ;r,11�:•� `; '�' ^'`• y. � ��\^���I �� �� ��=.�� ' � _ '�� .
�,��)y���,._ / . �.•,l �` ,,.. _y„ /' �����...,�'. �.�-�; .rC� �
\�"- � <q�_. � ��i �� r •. ' • .-- lC \� ,�` . ,.�/.. _. '' ..� U
I (.� ...: � . ; I ,;1'� �+,,!. . •,>`�\. ���j.;i'�� �� � 4��
ro ��:�:^ ' ,: 8 � „ � ,,:. �\,�;'•<:• ` : � , n , .���
�_. u �'•-- _ � '^ i �
` i :;: �� ;" � ,�.-�.. �` I '�. i�, r _ i q
�.-.\\ ���_��� �, ��'�- �>�`,' •1� :r�i�����.. '` � J ` i� V � � .
�-- n � �. �•.���'"�� . j4/
� a� a � e ' '�� �� ��•,...: �. \�- • �i� �• y�, � Q'
�`�' � .�_ . - � ��.;1'" t� �� :.�\����/� l�'� .-..
,����� �c'"'.�; %1 I(..r ._. ;r 3155.-��+_� �'�s.,� ��i '"�.•• , 1�1C //� QW��,
:��� F.:��-� _ `7l1'J .� ��'.•,.y�,�y��T��c��.-�- � �y
� �� . " - , -.�i ,�•C, r ._...��_:- r/f�': ) ✓ � � /
�\ /,� � �, •i \ �... �
�`�"�\ fYt� rC• : ' I��� ��f' ��i I�. ' �i ( lr'^_� �...�
�'�'..J'. �:• ,� sz�.�,`_ '.f`�' � �`� ti'�1�i;>���r�`�' � r,' � '
�,=�- r � ���=.
��'�.ti',�I� ' _ :�/rj �:.{����1 / �`��i7�)�P, `y��I- �,"''j�1�`,�r" . .GD ' .1/ /
�= �ln. `�� .�� ti- �� y.��.l�1�� !,��`-�:.:� -�%, ,c,•7 ,-�' , po rEK r� —
1���� ;��".�=:• -�\�� -�� � ( � � .'% r `
l i ,.����,.l.�l�'i. ��i l J .'�_�( ,� �:�I � _..•�.P �/ ` W C�L I E L D � .''s �.
� ��:'`_ - t ,.IC :,j.
��`�r.:J � �f��� l �p.: 1 /'� .� �j�i p_� l� J,�: � ,/ �,.
`�. •c50\�;�i!��'� ; � �1J-,./�r � ��� •P• \ , �, _ '
�� ��/� ���';-`� ����' �,� ,L::` �'\��t� 6 .i� �/ �
-Ry� '+=' (�� (I�r�%���,,1)i��'�h��- '!� ,T;. !`�^�; .�;�:.� �� �i / �Ji� I/ t' 1
y==��� . I '" \�� �� / ��i
J4"�� ��i'. • '�J- I F� � �'�J,t• /� / � '-�/ /' GJ i/ / \�/ V,.; • :o �
��'` (�' �-- , , �/ � / f' ,� ..
=Jrn•�.�\��' , �'�.���=I`, ✓��„�^;�:_ •`.�,^\'^ ✓' ,7�..�� Muc ' /� � i :
�r � `;-__�p� r\ �T-� �� .�t.,�:�z—T�:� �3 � �/ . . �.I,:
J ��l�[i� r-.�='���v" � �y�%T,���i I� i-='7�-�_s'�.,r, O�� ' j � ��
! i��. ��, i b/r�_%" �I � � Y �'/ ��// � -i
',--�=-� ri���'�"����x� ic�Jr�/�--���n � �._ •s o , ` / ` _ .� --. . - _ ;
a aana .F i^ ���R'��-`~:.��� ��:r�,4;,1� ��^li/�Il.-11 I �' J�GO �/�' � �f , 1'� '��
a �� � o `� 67+� r,/ ' .:/ I���' �:
/„'� �'I�;��.�l;,tiU�.;I������'�rsei,)i'u� I�� � ;� ' �� / I:• ,.li.
;-=��i;`�'��-�'��� �1���, - ,/,�., ,,lo .�,,o /� • �
`= ���.�i !�; - :`t-'— —� �' '� / G' �G' ; . -' .I�
, � �
�;,I�� �r 4���'�1�.i����a-.� c��T.,�j;� C� .;�; 1 . � , I�
�`7 '��^".r':.�'-�— �,..-�i.�:j,s���^ �, � ��� �l� � , � i;
:hkltn` li h ������_ :�ll�!— ,�J V ` =�_'`,� I _'�� � i . O/� . �% li
:i � ,.��_ �� �l �'� }.� r�11, / 'I , -
I�a� ���_�--_==�[:✓[��L,��_ o ��.4. �� / i'� �✓� �
i'�tii�' � ,. � .aJ;,.�I�Y �I'� �� ��
_ ��I��i Ig i � �'��o+e*- ^Rad��7w;er�J �-.L � I��. !f =�,..� „� -_-_
to log the borings and to direct the drilling operations. Soil samples
will be collected from these borings and analyzed for grain size.
It is understood that the City will negotiate access rights with affected
property owners for test drilling, including option for possible future
installation/operation of permanent wells. Burns & McDonnell will furnish
City with typical language/format for such agreements for use by the City.
Burns & McDonnell will also furnish City with map denoting proposed
locations for test holes.
Geophysical Logging - Because little is known of the subsurface materials,
geophysical logging including electrical resistivity, spontaneous
potential and gamma logging will be used to better define the alluvial
geology.
Water Quality Samplin� - Each boring will be completed with a 2-inch PVC
monitoring well. After completion, each monitoring well will be purged,
and a water sample will be collected for inorganic chemical analysis. Two
of the proposed five samples will be tested for a partial list of
constituents or parameters contained in the current Safe Drinking Water �
Act amendments. The analysis to be performed includes regular inorganic
chemistry, heavy metals, pesticides, herbicides, radionuclides, volatile
organic chemicals, synthetic organic chemicals, total organic carbon, and
trihalomethane precursor potential. Throughout the hydrogeological
investigation, the monitoring wells will also be used to observe the
effects of changes in river stage on the groundwater elevation.
Letter Report - For the City's review, Burns & McDonnell will prepare a
brief letter report on the findings of the preliminary test drilling.
This report will also include detailed design and cost estimates for the
Phase II test well as well as other recommendations for the Phase II
drilling and aquifer testing.
Phase II - Test Well Construction, Piezometer Installation, Aquifer Pumping
Test, Analysis and Evaluation, and Hydrogeological Report
After receiving notice to proceed with Phase II from the City, Burns &
McDonnell will complete Phase II of the investigation - an aquifer testing
program consisting of the following elements:
Test Well Construction - Burns & McDonnell will design and contract for
the construction of a test well at the proposed site. It is anticipated
that the well will be designed as a permanent installation for later
operation. Final sizing of the test well will depend on geologic
conditions at the site and on the City's anticipated groundwater needs
(number and size of wells) .
Piezometer Installation - Approximately four to six additional piezometers
will be installed to collect the groundwater drawdown data needed for the
aquifer analysis. The final number of piezometers will depend on the
location of the test well in relation to the original monitoring wells
2 of 3
installed during Phase I. It is anticipated that all or part of these
additional piezometers will be abandoned after the aquifer pumping test is
complete.
Aquifer Pumping Test - An aquifer pumping test will be conducted on the
test well. This pumping test will include a preliminary step-drawdown
test and a 72-hour constant rate test. It is anticipated that the pumping
rate will range from 2,000 to 2,500 gpm (depending on geology) . Following
this pumping period will be a 24-hour recovery period. During the pumping
test, automated data-collection equipment and manual measurements will
record groundwater levels, pumping rate, river level, and water quality
information. As part of the aquifer pumping test, water samples will also
be collected for inorganic laboratory analysis. One of the samples
collected during the pumping test will be tested for a partial list of
constituents or parameters of the current Safe Drinking Water Act
amendments. The laboratory testing will include regular inorganic
chemistry, heavy metals, pesticides, herbicides, radionuclides, volatile
organic chemicals, synthetic organic chemicals, total organic carbon, and
trihalomethane precursor potential.
1
Analvsis and Evaluation - The aquifer pumping test data will be evaluated
to determine the effective transmissivity and river infiltration values.
Preliminary estimates of the number of wells, the well design criteria,
and the well spacing will be developed during this analysis. In the event
that difficult geologic conditions are encountered, groundwater modeling
(not included in this proposal) may be required to determine a
satisfactory well placement.
Hydrogeologic Report - At the conclusion of the Phase II work, Burns &
McDonnell will submit to the City a report detailing the activities,
findings, analysis and results of the Phase I and Phase II investigations.
This report will also include cost estimates for future well field
development.
3 of 3
CITY OF CAPE GIRA.RDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AUTHORIZATION N0. 3
ATTACHMENT B
Cost Estimate and Unit Price Adjustments
Alluvial Well Field Supply Feasibility Study
Phase I
The total payment for the Phase I scope of services described in this
Authorization includes the following elements:
• Engineering
- 88 hours of field coordination and geologist supervision of the
drilling operations and expenses.
- 98 hours for data evaluation, analysis, recommendations for Phase �
II, report preparation, and meetings with the City to present the
Phase I results and expenses.
• Drilling
- Mobilization.
- Drilling five borings to 150 feet (total 750 lin. ft. ) .
- Collect 15 split spoon samples.
- Monitoring well construction five wells each 150 feet (total 750
lin. ft ) .
� Installation of protective covers.
� Development and sampling.
• Geophysical Logging
- Natural gamma ray.
- Spontaneous Potential (SP) .
- 16" SN 64" LN Resistivity.
• Water Quality Analysis
- Five samples for standard inorganic analyses.
- Two samples for analyses of the Safe Drinking Water Act parameters
as listed in Exhibit I, attached.
• Survey Monitoring Locations
- Survey location and elevation of the five monitoring wells .
(by OWNER)
1 of 2
ERRIBIT I
vATER QUALITY PARAHETEAS
POR ANALYSIS
pH Total Coliforms
Specific Conductance Fecal Colifoc�s
Hardness (mg/1 as CaCO3) Total Count�
Total TOC
Calcium Pes�icides
TDS Herbicides
Chloride Cyanide
Sulfate ?hallium
Calcium SOCs .,
Magnesium Radionuclides
Iron VOGS
Sodium Ranadium
Ammonia as N Holybdenium
Nitrata as N Strontium
Nitrite as N THM Formation (Precursor) Potencial
:4lkalinity (mg/1 as CaCO3)
Total
Bicarbonate
Manganese
Fluozide
Potassium
Silica
Phosphates
Turbidity
Hetals:
. Arsenic
Boron
Cadmiwn
Chromium
Lead
Mercury
Copper
Zinc
Barium
Silver
Selenium
Antimony
Beryllium
Nickel
Aluminum
The Phase I base price will have unit price adjustments according to the
following schedule:
Item Unit Price \
1. Drilling $17.25 per lin. ft.
2. Monitoring Wells $18.40 per lin. ft.
3. Water Quality Analysis I $660 per sample
(basic inorganics)
4. Water Quality Analysis II $3,775 per sample
(Safe Drinking Water Act
parameters as listed)
Phase II
The estimated budgetary cost for Phase II is currently believed to be within
the range of $100,000 to $150,000 which includes engineering and construction �
of a 150-foot deep test well, which may or may not be designed as a permanent
installation to be incorporated in to the final well field system. Also
included is the installation of additional piezometers needed for the pumping
test, water quality sampling and analysis, and a detailed report.
This estimate is based on information from a single well contractor. The cost
estimates will be refined at the end of Phase I based on aquifer conditions
and will be reduced by use of competitive bids for the well construction.
2 of 2