HomeMy WebLinkAboutRES.933.06-06-1994 �� ' BILL NO. 94-131 RESOLUTION NO. �% `_ A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AUTHORIZATION NO. 2 WITH BURNS & MCDONNELL ENGINEERING COMPANY, INC. , FOR THE CITY'S POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM, AND FOR SEISMIC PROTECTION OF WATER SYSTEM BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE l. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute Authorization No. 2 with Burns & McDonnell Engineering Company, Inc. for the City's potable water treatment and distribution system, and for seismic protection of water system. A copy of said Authorization No. 2 is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THIS � DAY OF :��;,!;�< , 19 �` . � � A. M. Spra ing, III, M or ATTEST: -� .�,/f�.�?`' r%�t, � ^;�,/'�/ Gayle;,�-L. Conrad Deputy City Clerk CITY OF CAPE GIRARDEAU, MISSOURI POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM AUTHORIZATION NO. 2 - For PROFESSZONAL ENGINEERING SERVICES To BURNS & McDONNELL ENGINEERING COMPANY, INC. St. Louis, Missouri In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES dated March 21, 1994 between the City of Cape Girardeau, Missouri (hereinafter called OWNER) and Burns & McDonnell Engineering Company, Inc. (hereinafter called ENGINEER) , OWNER hereby authorizes ENGINEER to proceed with the following services: I. SCOPE This Authorization No. 2 covers services involved in providing the design of piping and valve actuating systems to protect the OWNER'S existing four major water storage tanks and the clearwells at the two water treatment plants ` during a seismic event. These systems are intended to prevent rupture of the connections to the distribution system at these tanks, and to isolate the storage tanks from the distribution system to minimize the loss of treated water and reduce the risk of crosa-contamination due to distribution system piping failures. Specifically, ENGINEER will prepare detailed plans and specifications required for the installation of flexible, expansion joint piping at the inlet and outlet of the Gordonville tanks (2) , College tank, Meadowbrook tank, and at the clearwells at each treatment plant. ENGINEER will prepare detailed plans and apecifications for a seismic actuation system to positively close isolation valves for each of the above-mentioned tanks. The detailed description of the anticipated scope of services is presented in Attachment "A". II. TIME OF SERVICE ENGINEER will proceed with providing the services set forth herein immediately upon verbal notice to proceed from OWNER, and will complete these services within six (6) weeks from work initiation. Zt is understood that such completion is contingent on the timely review by OWNER of submittals from ENGINEER, as well as on any delays occasioned by events beyond the control of the ENGINEER (such as adverse weather conditions, regulatory agency actions, force majeure events, etc. ) . 1 of 2 CITY OF CAPE GIRARDEAU, MISSOURI POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM AUTHORIZATION NO. 2 III. COMPENSATION 1. OWNER shall compensate ENGINEER for providing the services set forth herein in accordance with the terms of the existing Agreement, based on a lump sum basis. Total payment for the Scope of Services described in this Authorization shall be the lump sum amount of Eighteen Thousand Dollars ($18,000. ) . 2. ENGINEER shall invoice OWNER for one-half of this lump sum amount following submittal of preliminary plans and specifications. One-half of the remainder of this lump sum amount shall be invoiced following submittal of the completed final plans and specifications and ENGINEER'S Construction Cost Estimate. The final remainder of the lump sum amount shall be invoiced following submittal of the record drawings to oWNER. � AUTHORIZATION BY: ,i ` - CITY OF �APE ,GIRARDEAU, MISSOURI _ % .J r � By: - . J �L• Attest: ,�,��, ` ` Date: �.ii- 7-�}� ACCEPTED BY: BURNS & McDONNEI� E GINE RIN C PANY, INC. � ' � � % By: • Dr. Rober T. Berry, P.E. Vic President � 2 of 2 ATTACHME;NT "A" AUTHORIZATION NO. 2 DETAILED SCOPE OF SERVICES 1. Conduct a site visit to gather data on current storage tank conditions and to obtain clearer understanding of the nature and extent of OWNER- desired modifications. As presently understood, items to be addressed include: a. Design of flexible, expansion joint piping sections at the inlet and outlet of the Gordonville tanks (2) , College tank, Meadowbrook tank, and at both treatment plants' clearwell. b. Design control valves to isolate all storage tanks from the distribution system in the occurrence of a specified seismic event. c. Investigate alternatives to positively actuate closure of the isolation valves. Evaluate multiple seismic triggers/switches versus a single seismic trigger/switch and a SCADA system. d. Design selected seismic trigger/switch system to positively � actuate closure of isolation valves. 2. Briefly investigate the ramifications of water storage isolation in light of emergency planning considerations. 3. Prepare preliminary plans and specifications for each of the six specified storage tanks. 4. Submit preliminary plans and specifications to OWNER for review. 5. Incorporate OWNER review comments and finalize the detailed plans and specifications. 6. Submit final plans and specifications to MDNR for review and approval. 7. Incorporate MDNR comments and otherwise complete final plans and specifications. 8. Develop Engineer's Estimate of Construction Cost for OWNER'S use in evaluating construction bids. 9. Assist OWNER during the bidding process in responding to bidder questions on design intent. 10. Provide construction-phase engineering services consisting of: a. Shop drawing review. b. Response to field questions. c. Final inspection to confirm construction's conformance to design intent. d. Prepare record as-built drawings. 11. Administer/manage above tasks (including quality control activities) . By: Burns & McDonnell May 6, 1994 1 of 1