HomeMy WebLinkAboutRES.863.09-08-1993 �i '
BILL NO. 93-211 RESOLUTION NO. .�+��- �
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
ENTER II�ITO A CONTRACT WITH J. W. STRACK
CONSTRUCTION FOR DEMOLITION OF STRUCTURES ON
LAURA STREET
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU,
MISSOURI, AS FOLLOWS:
ARTICLE 1. The City Manager, for and on behalf of the City of
Cape Girardeau, Missouri, is hereby authorized to enter into a
Demolition Contract with J. W. Strack Construction for demolition
of dangerous buildings. A copy of said Contract is attached to
this Resolution and made a part hereof.
PASSED AND ADOPTED THIS ��( DAY OF , 19 `"I.� .
,
_� ` .,.
-��'"".
� Francis E. Rhodes, Mayor
ATTEST:
.�,, �,,
����� �
� �ayl L. Conrad, Deputy City Clerk
� �Y�
��;� `a�=„
. ... . � .J !.:; .
_ ..� r.. ...
wf
v,w
av'4 ±"^,
k<'
DEMOLTTION CONTRACT
This agreement, entered into this day of �
1993, by and between the City of Cape Girardeau, Missouri, a
Municipal Corporation, hereinafter referred to as "City" , and J. W.
Strack Construction, 2827 Perryville Road, Cape Girardeau, MO
63701, hereinafter referred to as "Contractor. "
In consideration of the mutual covenants contained herein and
other good and valuable consideration, City and Contractor agree as
follows:
1. Contractor shall totally demolish the following
structures:
1. 604 Laura Street. Lot 18 , Block 2 , Golladay
Addition.
Remove one (1) story wood frame residence with
concrete floor slab and attached garage. Remove
all concrete sidewalks, concrete slabs, and asphalt
driveway. Remove north and south fence back to the
property line, and the west fence. Remove all
rubbish and debris from the site.
2 . 610 Laura Street. Lot 17 , Block 2 , Golladay
Addition.
Remove one (1) story wood frame residence with
concrete floor slab. Remove sidewalk to street.
Remove concrete slabs, clothesline pole and all
rubbish and debris from the site.
3 . 642 Laura Street. Lot 10 , Block 2 , Golladay
Addition.
Remove one (1) story wood frame residence with
concrete floor slab. Remove detached garage and
concrete driveway. Remove sidewalk, clothesline
pole; lamp post, all rubbish and debris from site.
[SEE ATTACHMENT #1)
All debris and rubbish shall be removed from the demolition site
and deposited at a site satisfactory to the City. Al1 holes left
by removal of the foundations shall be filled with good dirt, free
of debris, and compacted to a density equal to the surrounding
ground. Dirt required for filling any holes shall be obtained at
a site satisfactory to the City Engineer. The sites shall be
seeded and strawed for future maintenance. Contractor will be
responsible for any damage done to the sidewalks, alleys or streets
adjoining the property. All utilities shall be disconnected prior
to demolition. Contractor shall take all necessary care to
protect nearby buildings, drives, motor vehicles, and all adjoining
property, and the Contractor is to leave same in condition equal to
that which now exists.
2 . Contractor shall provide all labor and materials, and
furnish and direct at its own expense, whatever equipment or work
may be necessary for the expeditious and proper execution of its
duties under this contract.
3 . Contractor shall secure, at its own expense, all permits,
licenses and consents required by law or necessary to perform this
work and will give all notices and pay all fees and otherwise
comply with applicable city, county and state laws, ordinances,
rules and regulations.
4 . Should Contractor at any time refuse or neglect to supply
adequate materials or equipment or a sufficient number of properly
skilled workmen, or fail in any respect to prosecute the work with
promptness and diligence, or fail to perform any of the agreements
of this contract, City may, at its election, immediately terminate
this agreement, giving notice to Contractor in writing of such
election, and enter on the premises and take possession for the
purpose of completing the work included under this agreement, and
may employ any other person or persons to finish the work and to
provide the materials therefor at the expense of Contractor.
5. Contractor shall indemnify City from all claims, demands,
suits and actions of every name and description brought against the
City for or on account of any injuries or damages received or
sustained by any parties by or as a result of the acts or omission
of Contractor, his servants or agents, in doing the work herein
described, or by or as a result of any negligence in guarding the
same, or on account of any improper equipment or materials utilized
in performing the work.
6. Contractor shall prior to commencing work furnish to City
a certified check or a surety bond, the form of the bond and surety
company to be approved by the City, in the amount of Eight Thousand
One Hundred Dollars ($8 , 100. 00) , conditioned on the performance by
Contractor of all its duties hereunder.
7 . Contractor agrees to file with the City prior to
commencement of work, a certificate of insurance naming the City as
coinsured and showing that the Contractor has in force for a period
equal to the period of the contract a policy of general liability
insurance insuring Contractor against liability for personal
injuries and property damage arising out of the contract in a
minimum amount of $100, 000. 00 for injury or damage to any one
person and $1, 000, 000 . 00 for injuries or damages received in any
- 2 -
one accident or occurrence. Contractor agrees to provide and
maintain during the entire term of the contract and until final
acceptance of the work by the City, workers compensation insurance
for all of its employees at the site of the work.
8 . Upon satisfactory performance by Contractor of its duties
under this contract, and acceptance of said work by the City
Engineer, City will pay Contractor the sum of Eight Thousand One
Hundred Dollars ($8 , 100. 00) .
9 . Time is of the essence of this agreement and Contractor
agrees to begin working within ten (10) days after the date of this
contract and to complete the work within forty-five (45) days, and
in case the contract is not completed within this length of time,
excepting extensions granted to the Contractor for delays caused by
conditions beyond his control, Contractor will pay the City for
damages the sum of Fifty Dollars ($50. 00) per day for each day over
forty-five (45) days it is required to complete the work covered
under this contract.
10. Contractor shall not assign or sublet this contract or
any portion thereof without the prior written consent of the City.
11. Failure of the City to insist in any one or more instance
on a strict performance of all of the terms or conditions of this
contract, or to exercise any right herein contained, shall not be
construed as a future waiver or a relinquishment of the provisions
or rights, but the same shall continue and remain in full force and
effect. None of the terms or conditions of this contract shall be
altered, waived, modified or abandoned in any manner except by
written instrument executed by both parties.
- 3 -
IN WITNESS WHEREOF, the parties have executed this agreement
at Cape Girardeau, Missouri, the day and year first above written.
CITY OF CAPE GIRARDEAU, MISSOURI
J. Ronald Fischer, City Manager
ATTEST:
Gayle L. Conrad
Deputy City Clerk
J. W. STRACK CONSTRUCTION
Jo Wayne Strack
- 4 -
= , '. " � �
. � `
� L `�.��'- �:
. � � '�� �,
�
�f�/��rn������� �� � .
������e��������� .�
��t u�0��u���� •
■�������■������� �� , -
■■■■ ■�■■■u■■■■ � � �
�■a�■�■■■■■■■■ ;S �� � '�, y!t
g ..�.�......... �
. .��........ � �, . �
. .C=:0........ �1� * �, ��, ,� �: �
. ■,�.■.■■■■.■ # /� •
'� i'���ii=iiii �/ # �� *
i= i=� ��iii -. # + ' �.
�� ��� �� �� ■
� - ,) , � ..
:� i� :: u:: �► '; `'�, ' � -
� ` �� ►� � �t
i�n vi i'ii � � `' �
���u A� �� ■ _ �� i
��� �� ■�_� _ ►ti �' , 1'�:
��:� :: �:: � �► � # ., � _ �,� � � _
, ; ��-.
i i� i����;ui � # �• � � #
,
� � i� �iiiiii � . � . �� + �
��iiii��iiu i '- � ' I� ��.. , - •
��■� �u�� � " - .
,� �.
��� ■ �� ■ � , '. �,
a.�� .0 . . # _ . - �. . 1=�� �,
���..�� �._■ �-_ �� � ; � ;
, i
�=���i �iaiii ' � _ . •, �.:
■ ���� n����� *'-
���. �.� � �\ .
�_ a� ii��'i #� ��. • � ' ..
.�`�,:■�.■■■- _■ ,
�����M.■.� � �
� ��u��r_����� �s
■ �ia�. . �_���� , � _ , -_
�in��,•.�� � ��� -� �� . � t � ,.
�ii�� i�iii� �
.
����t� ����� ' - �r. f ��
��Ilh�� .: � ���
fi■1 �� � _ -���� ' •� �
��11 �I�t�' E7 J�■� ' ' } 1
�I��el������� ��� � 1 �
�IIE.��i.li������ ��
��11�\ltl������� . � �i� ,
��11���� ������ ��`� � .
� �. -
�lII ■�L• �� �� ;
/��11��1lM ����� - ,
���11�� �■ �� , ; .-�
■��11�� ����� . � � ��
� �11��� ����� � �-� ,� ���� ��' � �
���u� �u��u -
�����n����� `�
��ni■������u - � , : �
�..�����i■ r■�� �� ■ �y,�� �\� . , � - �
:��...C.. . * ;,��� :_:; .��
..�� � ��� .•���� - ��
� ,
����I�� ����� ■ � F�.ri�� • .��i��\ti �
����1�� E���� ■ ■ f_. . �_J�:�..._.� .I
• ;. � _ � .�_����il��- , �
...�i.. �...C. . * � �►,�, .�:� , � � .
����►�� � �� ■ � . �����►:�;t'' .
■�ulu ■��■ ■ ���—'',�•� ���_ .// _ �
■ ��I�� � �� ■ ■ * � � :��� _ ;I' ;II�
�� ■ ■ ■ . ':�� . ' '�I�.
����1 ■ ��� ■ ■ _ , j��l •
��ll�� 1�J� �� � — �:11\
����= i�u�� ■ � :
PROPOSAL
The City of Cape Girardeau will receive proposals at the Office of the City Manager, City Hall, 401
Independence Street, Cape Girardeau, Missouri 63701,unti12:30 P.M. on September 1, 1993, for the demolition
and clean up of three (3) residential structures. Proposal will be for a lump sum cost.
Utilities(gas, water, and eIectric) for all three (3)structures have been disconnected. The Contractor will
be responsible for having all sewers disconnected, for acquiring all necessary pemuts, and for demolishing the
structures in accordance with all applicable City of Cape Girardeau codes and ordinances.
The City of Cape Girardeau reserves the right to reject any or all bids.
Following are descriptions of the structures to be demolished:
1. 604 Laura Street
Remove one (1) story wood frame residence with concrete floor slab and attached garage. Remove all
concrete sidewalks, concrete slabs, and asphalt driveway. Remove north and south fence back to the
property line, and the west fence. Remove all rubbish and debris from the site.
2. 610 Laura Streeet
Remove one (1) story wood frame residence with concrete floor slab. Remove sidewalk to street.
Remove concrete slabs, clothesline pole and all rubbish and debris from the site.
3. 642 Laura Street
Remove one (1) story wood frame residence with concrete floor slab. Remove detached garage and
concrete drive. Remove sidewalk, clothesline pole, lamp post, aall rubbis and debris from site.
00
LUMP SUM BID $ ���{� ,. �
All work to be completed in accordance with requirements and specifications set forth herein and in the
"Information for Bidders" attached hereto.
,c� ,��/�
� ntractor
l/ ---�-� "
uthoriz , epresentative
c�� � o{ �3
Date�—