HomeMy WebLinkAboutRES.1159.04-01-1996 w
/f 4��
BILL NO. 96-120 RESOLUTION NO. r=;J �
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE AMENDMENT NO. 2 WITH BURNS & McDONNELL
ENGINEERING COMPANY, INC. FOR THE LANDFILL
CLOSURE PROJECT
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU,
MISSOURI, AS FOLLOWS:
ARTICLE 1. The City Manager, for and on behalf of the City of
Cape Girardeau, Missouri, is hereby authorized to execute Amendment
No. 2 to an agreement dated February 18, 1993 , with Burns &
McDonnell Engineering Company, Inc. for the landfill closure
project. A copy of said Amendment No. 2 is attached to this
Resolution and made a part hereof.
PASSED AND ADOPTED THIS :,�'7� DAY OF C,(�I�Z< C , 19 ��' .
r � .1 ,� . ___
� ,
A. . pr dling, III ayor
ATTEST:
��f,':T�%`� �( �` r't CC
Gayle�L. Conrad
Deputy City Clerk
AMENDMENT NO. 2
To
AGREEMENT For PROFESSIONAL ENGINEERING SERVICES
Between
BURNS & McDONNELL WASTE CONSULTANTS, INC.
Overland Park, Kansas
And
CITY OF CAPE GIRARDEAU, MISSOURI
This Contract Amendment is made by and between Burns & McDonnell Engineering Company, Inc.,
(hereinafter ENGINEER) and City of Cape Girardeau, Missouri (hereinafter CLIENT) this dnd day of
Q ri I 1996•
Whereas, it is the mutual desire of the parties hereto to amend the Agreement for Professional
Engineering Services entered into on February 18, 1993 (hereinafter called the Existing Agreement). _
Therefore, it is hereby agreed that the Existing Agreement be amended as follows:
SCOPE OF SERVICES
The following is our understanding of the Scope of Services to be provided by the ENGINEER of
CLIENT, in connection with this Amendment No. 2:
This Amendment wili be deemed a part of, and be subject to, all terms and conditions of the Existing
Agreement. Except as modified below, the Existing Agreement will remain in full force and effect.
A. Review information furnished by the CLIENT concerning new property ownership, deeds, and
description for the Solid Waste Municipal Landfill. Prepare a 24" x 36" drawing showing the new
landfill property and adjoining properties.
B. Prepare closure certification documents for the CLIENT's Solid Waste Municipal Landfill and submit
same to CLIENT for approval, signature, and submittal to the Missouri Department of Natural
Resources.
RESPONSIBILITIES OF CLIENT
CLIENT will provide, in connection with this Amendment 2, information as specified in the Agreement for
Professional Engineering Services and as follows:
A. CLIENT to provide ENGINEER with a registered land surveyor's plat of the new landfill property
showing the revised property lines.
B. CLtENT to provide ENGINEER with current property deeds and descriptions of the Solid Waste
Municipal Landfill.
CAPEFILL.AM2
03/26/96 1
iisy
C. CLIENT to provide ENGINEER with the location of the new gas monitoring wells installed along the
new property lines and changes to the property access, perimeter fencing, and structures
remaining on the site.
PERIOD OF SERVICE
ENGINEER shall complete work within six (6) weeks following receipt of written notice from CLIENT that
CLIENT has approved this amendment and receipt of the information to be provided by CLtENT.
COMPENSATION
For the services performed, CLIENT shall pay ENGINEER the sum of amounts determine under the
COMPENSATION section of the Existing Agreement as amended. However, total payment for the Scope
of Services described herein is estimated to be One Thousand Five Hundred Fifty-Eight Dollars
($1,558.00). The maximum for the Scope of Services shall not exceed the estimated payment without
written approval of CLIENT.
' � CAPE GIRARDEAU,; ISSOURI
�
By
,
T� 1Yl��t�v�r�e! �'. M;11er C'Ifv �lo,�aP�
BURNS & McDONNELL WASTE CONSULTANTS, INC.
gY �
nt
CAPEFILL.AM2
03/26/96 2