HomeMy WebLinkAboutRES.1142.02-05-1996 i
BILL NO. 96-61 RESOLUTION NO. ,i ` r�
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE AN AGREEMENT FOR ENGINEERING SERVICES
WITH BLACK & VEATCH FOR THE TRANSPORTATION
IMPROVEMENTS PROGRAM
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU,
MISSOURI, AS FOLLOWS:
ARTICLE l. The City Manager, for and on behalf of the City of
Cape Girardeau, Missouri, is hereby authorized to execute an
Agreement for Engineering Services with Black and Veatch for the
Transportation Improvements Program. A copy of said Agreement is
attached to this Resolution and made a part hereof.
PASSED AND ADOPTED THIS ;?,t i( DAY OF _:,�. �Ci:i<c,t(�1F'ti_, 19 /�t'
�
A. M. Spradling, III, M
ATTEST:
��. , ;� (-'' ,, '
�
Gayle ; . Conrad
Deputy City Clerk
AGREEMENT FOR ENGINEERING SERVICES
FOR
CITY OF CAPE GIRARDEAU, MISSOURI
TRANSPORTATION IMPROVEMENTS PROGRAM
Owner: City of Cape Girardeau, Missouri
Project: Transportation Improvements Program
TABLE OF CONTENTS
Section pages
AGR$EMENT FOR ENGINEERING SERVICES 1 to 8
ATTACHMENT A - SCOPE OF SERVICES A-1 to A-30
PHASE 1 Initial Investigations and A-2
Preliminary Study
PHASE 2A Field Surveys and Property Surveys A-12
PHASE 2B Design, Construction Drawings, A-13
Specifications, and Bid Documents
PHASE 2C Rights-of-Way and Easements A-18
Negotiation and Acquisition
PHASE 3 Bidding Assistance, Construction Phase A-19
Services, and Resident Services
PHASE 4 Supplemental Services A-30
ATTACHMENT B - COMPENSATION B-1 to B-5
ATTACHMENT C - OWNER' S RESPONSIBILITIES C-1 to C-2
Cape Girardeau, Missouri -i- 01/24/96
Transportation Program
Agreement for Engineering
Services
AGREEMENT
• FOR
ENGINEERING SERVICES
THIS AGREEMENT, between the City of Cape Girardeau (Owner) and
Black & Veatch (Engineer) ;
W I T N E S S E T H :
WHEREAS, Owner intends to construct improvements to its system of
roads and streets as part of its 5-year Transportation
Improvements Program (the Project) ; and,
wHEREAS, Owner requires surveys, preliminary studies, design
engineering, public involvement, right-of-way and easement
acquisition, bidding assistance, construction phase services, and
resident engineering services in connection with the Project (the
Services) ; and,
WHEREAS, Engineer is prepared to provide the Services;
NOW THEREFORE, in consideration of the promises contained in this
Agreement, Owner and Engineer agree as follows :
ARTICLE 1 - EFFECTIVE DATE
The effective date of this Agreement shall be
ARTICLE 2 - GOVERNING LAW
This Agreement shall be governed by the laws of the state of
Missouri .
ARTICLE 3 - SERVICES TO BE PERFORMED BY ENGINEER
Engineer shall perform the Services described in Attachment A,
Scope of Services .
ARTICLE 4 - COMPENSATION
Owner shall pay Engineer in accordance with Attachment B,
Compensation.
Cape Girardeau, Missouri Page 1 of 8 01/22/96
Transportation Program
ARTICLE 5 - OWNER' S RESPONSIBILITIES
Owner shall be responsible for all matters described in
Attachment C, Owner' s Responsibilities .
ARTICLE 6 - STANDARD OF CARE
Engineer shall exercise the same degree of care, skill, and
diligence in the performance of the Services as is ordinarily
possessed and exercised by a professional engineer under similar
circumstances . No other warranty, express or implied, is
included in this Agreement or in any drawing, specification,
report, or opinion produced pursuant to this Agreement .
ARTICLE 7 - LIABILITY AND INDEMNIFICATION
7 . 1 General . Having considered the potential liabilities that
may exist during the performance of the Services, the benefits of
the Project, and the Engineer' s fee for the Services, and in
consideration of the promises contained in this Agreement, Owner
and Engineer agree to allocate and limit such liabilities in
accordance with this Article .
7 . 2 Indemnification. Engineer and Owner each agrees to defend,
indemnify, and hold harmless each other, its agents and
employees, from and against legal liability for all claims,
losses, damages, and expenses to the extent such claims, losses,
damages, or expenses are caused by its negligent acts, errors, or
omissions . In the event claims, losses, damages, or expenses
are caused by the joint or concurrent negligence of Engineer and
Owner, they shall be borne by each party in proportion to its own
negligence .
7 . 3 Emplovee Claims . Engineer shall indemnify Owner against
legal liability for damages arising out of claims by Engineer' s
employees . Owner shall indemnify Engineer against legal
liability for damages arising out of claims by Owner' s employees .
7 . 4 Consequential Damages . To the fullest extent permitted by
law, Engineer shall not be liable to Owner for any special,
indirect, or consequential damages resulting in any way from the
performance of the Services .
Cape Girardeau, Missouri Page 2 of 8 01/22/96
Transportation Program
7 .5 Survival . Upon completion of all Services, obligations, and
duties provided for in this Agreement, or if this Agreement is
terminated for any reason, the terms and conditions of this
Article shall survive.
ARTICLE 8 - INSURANCE
During the performance of the Services under this Agreement,
Engineer shall maintain the following insurance :
(1) General Liability Insurance, with a combined single limit of
$1, 000, 000 for each occurrence and $1, 000 , 000 in the
aggregate.
(2) Automobile Liability Insurance, with a combined single limit
of $1, 000, 000 for each person and $1, 000, 000 for each
accident .
(3) Workers' Compensation Insurance in accordance with statutory
requirements and Employers' Liability Insurance, with a
limit of $500, 000 for each occurrence .
(4) Professional Liability Insurance, with a limit of $1, 000, 000
annual aggregate .
Engineer shall, upon written request, furnish Owner certificates
of insurance which shall include a provision that such insurance
shall not be canceled without at least thirty days' written
notice to Owner. All Project contractors shall be required to
include Owner and Engineer as additional insureds on their
General Liability insurance policies, and shall be required to
indemnify Owner and Engineer to the same extent .
Engineer and Owner waive all rights against each other and their
directors, officers, partners, commissioners, officials, agents,
and employees for damages covered by property insurance during
and after the completion of the Services . If the Services result
in a construction phase of the project, a similar provision shall
be incorporated into all construction phase contracts entered
Cape Girardeau, Missouri Pdge 3 of 8 O1/22/96
Transportation Program
into by Owner and shall protect Owner and Engineer to the same
extent . .
ARTICLE 9 - LIMITATIONS OF RESPONSIBILITY
Engineer shall not be responsible for: (1) construction means,
methods, techniques, sequences, procedures, or safety precautions
and programs in connection with the Project; (2) the failure of
any contractor, subcontractor, vendor, or other Project
participant, not under contract to Engineer, to fulfill
contractual responsibilities to the Owner or to comply with
federal , state, or local laws, regulations, and codes; or (3)
procuring permits, certificates, and licenses required for any
construction unless such responsibilities are specifically
assigned to Engineer in Attachment A, Scope of Services .
ARTICLE 10 - OPINIONS OF COST AND SCHEDULE
Since Engineer has no control over the cost of labor, materials,
or equipment furnished by others, or over the resources provided
by others to meet Project schedules, Engineer' s opinion of
probable costs and of Project schedules shall be made on the
basis of experience and qualifications as a professional
engineer. Engineer does not guarantee that proposals, bids, or
actual Project costs will not vary from Engineer' s cost estimates
or that actual schedules will not vary from Engineer' s projected
schedules .
ARTICLE 11 - REUSE OF DOCUMENTS
All documents, including, but not limited to, drawings,
specifications, �nd computer software prepared by Engineer
pursuant to this Agreement are instruments of service in respect
to the Project . They are not intended or represented to be
suitable for reuse by Owner or others on extensions of the
Project or on any other project . Any reuse without prior written
verification or adaptation by Engineer for the specific purpose
intended will be at Owner' s sole risk and without liability or
legal exposure to Engineer. Owner shall defend, indemnify, and
hold harmless Engineer against all claims, losses, damages,
injuries, and expenses, including attorneys' fees, arising out of
or resulting from such reuse . Any verification or adaptation of
Cape Girardeau, Missouri Page 4 of 8 01/22/96
Transportation Program
documents will entitle Engineer to additional compensation at
rates to be agreed upon by Owner and Engineer.
ARTICLE 12- OWNERSHIP OF DOCUMENTS AND INTELLECTUAL PROPERTY
Except as otherwise provided herein, engineering documents,
drawings, and specifications prepared by Engineer as part of the
Services shall become the property of Owner, provided, however,
that Engineer shall have the unrestricted right to their use .
Engineer shall retain its rights in its standard drawing details,
specifications, data bases, computer software, and other
proprietary property. Rights to intellectual property developed,
utilized, or modified in the performance of the Services shall
remain the property of Engineer.
ARTICLE 13 - TERMINATION
This Agreement may be terminated by either party upon written
notice in the event of substantial failure by the other party to
perform in accordance with the terms of this Agreement . The
nonperforming party shall have fifteen calendar days from the
date of the termination notice to cure or to submit a plan for
cure acceptable to the other party.
Owrier may terminate or suspend performance of this Agreement for
Owner' s convenience upon written notice to Engineer. Engineer
shall terminate or suspend performance of the Services on a
schedule acceptable to Owner. If termination or suspension is
for Owner' s convenience, Owner shall pay Engineer for all the
Services performed and termination or suspension expenses . Upon
restart, an equitable adjustment shall be made to Engineer' s
compensation.
ARTICLE 14 - DELAY IN PERFORMANCE
Neither Owner nor Engineer shall be considered in default of this
Agreement for delays in performance caused by circumstances
beyond the reasonable control of the nonperforming party. For
purposes of this Agreement, such circumstances include, but are
not limited to, abnormal weather conditions ; floods; earthquakes;
fire; epidemics; war, riots, and other civil disturbances;
strikes, lockouts, work slowdowns, and other labor disturbances;
Cape Girardeau, Missouri Page 5 of 8 01/22/96
Transportation Program
sabotage; judicial restraint; and inability to procure permits,
licenses, or authorizations from any local, state, or
federal agency for any of the supplies, materials, accesses, or
services required to be provided by either Owner or Engineer
under this Agreement .
Should such circumstances occur, the nonperforming party shall ,
within a reasonable time of being prevented from performing, give
written notice to the other party describing the circumstances
preventing continued performance and the efforts being made to
resume performance of this Agreement .
ARTICLE 15 - COMMUNICATIONS
Any communication required by this Agreement shall be made in
writing to the address specified below:
Engineer: Steve Phillips
Black & Veatch
8400 Ward Parkway
P.O. Box 8405
Kansas City, Missouri 64114
Owner: Mike Miller
City Manager
City Hall
401 Independence Street
P.O. Box 617
Cape Girardeau, Missouri 63702
Nothing contained in this Article shall be construed to restrict
the transmission of routine communications between
representatives of Engineer and Owner.
ARTICLE 16 - WAIVER
A waiver by either Owner or Engineer of any breach of this
Agreement shall be in writing. Such a waiver shall not affect
the waiving party' s rights with respect to any other or further
breach.
ARTICLE 17 - SEVERABILITY
The invalidity, illegality, or unenforceability of any provision
of this Agreement or the occurrence of any event rendering any
portion or provision of this Agreement void shall in no way
affect the validity or enforceability of any other portion or
Cape Girardeau, Misso�ri Page 6 of 8 01/22/96
Transportation Program
provision of this Agreement . Any void provision shall be deemed
severed from this Agreement, and the balance of this Agreement
shall be construed and enforced as if this Agreement did not
contain the particular portion or provision held to be void. The
parties further agree to amend this Agreement to replace any
stricken provision with a valid provision that comes as close as
possible to the intent of the stricken provision. The provisions
o� this Article shall not prevent this entire Agreement from
being void should a provision which is of the essence of this
Agreement be determined void.
ARTICLE 18 - INTEGRATION
This Agreement represents the entire and integrated agreement
between Owner and Engineer. It supersedes all prior and
contemporaneous communications, representations, and agreements,
whether oral or written, relating to the subject matter of this
Agreement .
ARTICLE 19 - SUCCESSORS AND ASSIGNS
Owner and Engineer each binds itself and its directors, officers,
partners, successors, executors, administrators, assigns, and
legal representatives to the other party to this Agreement and to
the directors, officers, partners, successors, executors,
administrators, assigns, and legal representatives of such other
party in respect to all provisions of this Agreement .
ARTICLE 20 - ASSIGNMENT
Neither Owner nor Engineer shall assign any rights or duties
under this Agreement without the prior written consent of the
other party. Unless otherwise stated in the written consent to
an assignment, no assignment will release or discharge the
assignor from any obligation under this Agreement . Nothing
contained in this Article shall prevent Engineer from employing
independent consultants, associates, and subcontractors to assist
in the performance of the Services .
ARTICLE 21 - THIRD PARTY RIGHTS
Nothing in this Agreement shall be construed to give any rights
or benefits to anyone other than Owner and Engineer.
Cape Girardeau, Missouri Page 7 of 8 01/22/96
Transportation Program
IN WITNESS WHEREOF, Owner and Engineer have executed this
Agreement .
OWNER ENGINEER
City of Cape Girardeau, Missouri Black & Veatch
By gy
Mike Miller John R. McNitt
City Manager Partner
Date : Date :
Cape Girardeau, Missouri Page 8 of 8 01/22/96
Transportation Program
Attac h m e nt A
b1�Zy�7b 1�:�4 p �1v ��� G�c�� �Hr� ruc�i� wK�� r. bc
F�LE• �9. ]87 01 2Q '96 J5�09 1D�BLACK & VEATCH S1L 31A 532 1465 PAGE 2
A7'TACHMEN7.' A
TO
AOR�EMENT FOR fiNGIN�FtRINa 8L}tVTC�S
FOR
CITY OF CAP£ QIRARDEAU, Mx890URI
TRAN9PORTA�'ION 7hSPROVEMENTS PROGRAM
SCOPB OF SERVICEB
�°x� City ot Cape Glrardeau, Dtiseouri
ProjecC: Traneportatlon improvaments pzp9�-am
The scope of aerv�ces for thiE� project includes surveying,
preliminary studies, design engineering, puUlic involvement, right-
of-way and easEment acquisition, bidding aasistance, conetxuction
phaQe eervice�, and reeident enginEeii,ng service� for four
individual improvemente projecta :
• Perryville Rvad tl�mita of exiating concre�e north of
M�yer ns;lve r.o the Gity T.,imi t$)
� Broadway (deeign frorn Claxk Ave Go West End Slvd. ,
construccion from Clark Av� . to Perry Ave . )
• Bloomfield Raad (wesc �f Kingehighway �o Siemer.a Drive,
not lnclt�diny che I-55 bridge) .
• Traffic• Signal uNyrade (il intersec[ions alony 8roadwAy,
Spr.igg street , and Independancc St,z�eEtl
Thas ee�pe of services appliee iz� gener�l t,c, tl�e t;hree screei�.
improvemei�ce projecte and in certain areas to �he sigr�al upgrade
work. The pcope of. eervices is described in more decail herein,
under r.he fal].owing major pha�es :
1'HAS� 1 lnitial Inve6rigationa and Preliminary Study
PHASF 2A Field Survcy8 and Propexty Surveya
PHAS�: 28 Design, Construction Drawitiye, :ip6C� riCe�taonS, and
BfC3 D�c:umG)1Cb
P1�ASi: 2C Righce-of-Way And E&sements Kegotiat�,on and
AcquisiCion
PHASE 3 Bidding Aseistance, Cons�z�uceior� �11as� Serv�cee,
and Re�ider.t Services
Pt1ASB e Supplement4l Serva.cea
Cepa GirArdeau, M�c9oun
Trenepor[etion Proyram ��� 01�2d/9fi
PHASE l. INITIAL INVESTIGATIONS AND PRELIMINARY STUDY
Engineer will conduct a Preliminary Study for each of the four
projects . Final design and document preparation will not begin
until after the Preliminary Study is completed for a particular
project and Notice to Proceed issued by Owner.
Initial investigations include general reconnaissance work and
information gathering. Field surveys, property surveys, title
research, and utility locations are covered under Phase 2A.
A. Preliminary and General Items
1 . Consult with Owner to clarify and define Owner' s
requirements for each project and review pertinent
available data.
2 . Participate in informal meetings with the Owner to review
progress and exchange ideas and information. One meeting
per month is anticipated.
3 . Prepare and submit monthly progress reports to Owner.
Progress reports will be submitted by the 5th of each
month, in conjunction with periodic invoices .
4 . Prepare a Project Procedures memorandum to provide
general guidance regarding communications,
responsibilities, basic design parameters, and work flow
for Engineer' s team. Deliverable due dates and key
intermediate milestones will also be identified. Copies
will be provided to Owner for review and use .
B. Collect Existing Information
1 . Review existing reports and other information from
Owner' s files .
2 . Review records to determine past history of use as to
traffic flow, congestion problems, accident data, special
event usage, drainage problems, and other issues
experienced or projected to occur. Determine functional
classification of route.
3 . Consult with Owner and utility service providers to
establish a working dialogue at the outset of the
project . Coordinate special needs for facilities such as
Cape Girardeau, Missouri A-2 01/24/96
Transportation Program
gas and electric service to SE Missouri Hospital . Collect
relevant data about existing facilities, associated
traffic flows, and construction history.
C. Traffic Capacity Determinations
1 . Prepare arterial capacity and Level of Service (LOS)
calculations for the three street projects using existing
traffic data, with the Highway Capacity Software (HCS)
package .
2 . Develop traffic projections for a 20-year planning period
in consultation with Owner' s staff .
3 . Prepare HCS calculations to determine LOS for the
projected traffic loads .
4 . Summarize the results for use in pavement design and
traffic control planning, and for Owner' s use .
5 . For the Broadway project, these calculations will be made
for the purpose of general LOS information, pavement
design, and traffic control planning. More detailed work
for the signal upgrade and timing optimization is
specified under Phase 1, Item G.
6 . Identify general pedestrian traffic volumes and needs .
Consult with Owner to confirm and refine pedestrian
traffic data. Consult with Owner to determine need for
bikeways . Determine specific areas for increased
pedestrian traffic facilities .
7 . Develop proposed typical cross sections for the street
improvements . Submit proposed typical sections with a
summary of pros and cons, as appropriate, to Owner for
review and comment .
8 . Agree on final typical sections (geometric) to include
roadway, sidewalk (s) , landscaping border strips, utility
corridors, and similar elements .
Cape Girardeau, Missouri A-3 01/24/96
Transportation Program
D. Alignment and Profile Study
l . Determine needs and alternative solutions .
a. Study available topographic, property, and utility
maps and aerial photography within the corridor to
determine potential alternative alignments for
consideration. Existing City mapping (1"=200'
scale) and recent aerial photography will be used,
with additional information as available.
b. Conduct a field reconnaissance to review the
potential alignment alternatives within the
corridor and determine if there are additional
considerations not apparent from the available
mapping and records .
c. Identify design speed, sight distance requirements,
pedestrian needs, and roadside safety issues for
use in developing alternatives . Submit to Owner
for review, revision, and concurrence.
d. Prepare a sidewalk study for each project to
determine the limits of sidewalk to be
reconstructed and the most efficient and beneficial
areas to construct new sidewalks . Include a
pedestrian crossing study to evaluate advantageous
locations and marking requirements for new
crossings, and provide appropriate tie-ins to the
Cape Girardeau hiking and biking trail near
Bloomfield Road.
2 . Evaluate alternative alignments .
a. Summarize advantages and disadvantages of each
alternative alignment, considering geotechnical
conditions, urban development conditions,
hydrologic/hydraulic considerations, service and
maintenance requirements, construction
difficulties, and overall costs .
It is anticipated that horizontal alignments will
generally follow existing alignments except for
Perryville Road, where alternative alignments for
certain curves will be considered to improve sight
distances; and for Bloomfield Road, slight
Cape Girardeau, Missouri A-4 01124/96
Transportation Program
curvilinear alignment will be considered as an
alternative to the existing tangent alignment, with
the goal of preserving trees .
Similarly, for vertical alignment, alternatives
will be considered where needed to improve sight
distances over crests, side street and entrance
grades, and also drainage conditions . Otherwise,
the proposed improvements will generally follow
existing alignments .
b. Incorporate existing alignment and ground line data
from the field survey activities and establish a
digital terrain model to analyze alternatives .
c . Determine approximate construction limits and
earthwork volumes for the alternatives .
d. Evaluate solutions such as special slope treatments
or retaining walls where warranted to reduce
property impacts .
e . Determine approximate right-of-way and easement
requirements for the alternatives .
f . Prepare planning-level cost opinions for earthwork,
right-of-way, and easement .
E. Hydrology and Hydraulics Study
1 . Determine drainage areas and runoff characteristics for
cross road structures .
2 . In conjunction with Phase 2A-Field Surveys, conduct
property owner interviews to determine past experience
with surface flooding or underground springs, and whether
there are special issues that should be addressed in the
improvements project .
3 . Calculate design flow rates using a design storm and
procedure acceptable to Owner.
4 . Prepare hydraulics design for existing and proposed
culverts to determine sizes, headwater depths, and
outflow velocities . Hydraulic designs will include
consideration of downstream effects to the nearest
Cape Girardeau, Missouri A-5 O1/24/96
Transportation Program
floodway or tributary stream to the floodway (e .g. Walker
Branch and Cape la Croix Creek) .
5 . Evaluate existing cross road structures to determine if
extension is feasible or that reconstruction is required.
6 . Perform pavement drainage analysis and design, determine
sizes and spacing of inlets, sizes of connecting storm
sewers, and outfall locations . Special attention will be
given to drainage design on the Broadway Project . Areas
to be investigated include greatly expanding the curb
inlet system and increased storm sewer capacities, and
the most effective method to utilize the Capaha Park
lagoon as a stormwater management facility. Drainage
design is not a part of the Traffic Signal Upgrade
project in this scope of services .
7 . Determine outfall protection requirements for culverts
and storm sewers .
8 . Determine need for stormwater detention, and discuss with
Owner. Prepare preliminary design to include basin size
and location as needed.
9 . Prepare planning-level cost opinions for drainage
features .
F. Pavement Design
1 . Summarize traffic loadings and geotechnical
characteristics of subgrades for each street .
2 . Review City specifications, standard practices, and
related information.
3 . Design pavement systems using AASHTO or other appropriate
method. Both asphaltic concrete and portland cement
concrete pavement systems will be designed as structural
equivalents for alternative bidding by contractors .
Life-cycle cost estimating is not anticipated.
4 . Prepare planning level cost estimates for pavements,
driveways, sidewalks,and similar items .
Cape Girardeau, Missouri A-6 01/24/96
Transportation Program
G. Traffic Signal Upgrade
Each of the three street improvements projects will include
traffic engineering activities for signing, striping, and
traffic control plans . The signal upgrade project will
require specific traffic engineering services to optimize
signal timing for the 11 intersections along Broadway, Sprigg
Street, and Independence Street .
1 . Obtain record drawings and other available information
from Owner describing the current signal hardware systems
and interconnections, and all available traffic data.
2 . Acquire names of businesses and owners of record, and
existing right-of-way limits, for the parcels adjacent to
each intersection.
3 . Review current timing and phasing configurations and
develop an optimization methodology. The proposed
methodology will be submitted for Owner' s review before
proceeding. Engineer will recommend whether any
additional field traffic counts are justified.
Field traffic counting for turning movements, peak
volumes, and pedestrian traffic will be provided by Owner
or by Engineer as a supplemental service .
4 . Perform limited-scope field surveys to define the
intersection geometrics, locate existing signal hardware,
and coordinate with utilities to locate service lines .
Extensive survey activity for this item of work is not
anticipated (except for the intersections within the
limits of the Broadway improvements) nor included in this
scope of services . Field data will be used both to
develop intersection traffic capacities and to develop
installation plans and specifications .
5 . Design the upgrade for each installation according to the
Institute of Transportation Engineers (ITE) and/or the
Missouri Highway and Transportation Department (MHTD)
specifications . Upgrading to Type 170 controllers is
anticipated. The uniformity of existing signal features
will be reviewed for compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) . MUTCD
compliance review will include but not be limited to:
Cape Girardeau, Missouri A-7 01/24/96
Transportation Program
• Size, number, arrangement and design of signal
lenses
• Transverse location of signal posts, mast arms and
controller cabinets
• Use of vehicle detectors in roadway pavement
• Coordination of signals in interconnected network
• Applicability of specific actuated signal
controllers with detector loops to override pre-
timed phasing and better accommodate occasional
vehicle movements .
• Continuity of operation during construction
• Maintenance program for signals
6 . Perform system optimization using the SYNCHRO Pro traffic
signal timing program: Windows-based with graphical user
interfaces and the ability to generate AutoCAD drawings
from the Map Window. The SYNCHRO model will provide a
one-time data entry methodology and automatically create
input files for the TRANSYT-7F or PASSER II computer
models . Previous work done by OWNER using TRANSYT-7F
will be direct readable without re-entering data.
Digital files from this work will be submitted to Owner.
7 . Review initial findings with Owner, revise analysis as
needed for final optimization.
8 . Prepare detailed traffic signal phasing sheets for each
intersection. Submit to Owner for review.
9 . Develop a proposed list of signal controller
manufacturers and hardware system specifications . System
package specifications will include a suitable quantity
of spare parts and maintenance equipment, and on-site
training for Owner' s maintenance personnel .
10 . Review the need for street lighting to improve nighttime
intersection performance, and arterial performance for
Broadway. Submit recommendations to Owner. If desired
by Owner to include street lighting in certain areas,
layout and spacing for street lighting will follow the
recommendations of the Illuminating Engineering Society
and MHTD.
Cape Girardeau, Missouri A-8 01/24/96
Transportation Program
H. Public Involvement Program
Public Involvement activities will be facilitated by a public
involvement subconsultant to Engineer. The scope of services
for Public Involvement can be modified through Supplemental
Agreement or Change Order at any time that it is desirable to
Owner. The activities specified in this scope of services are
the minimum contemplated to achieve the project goals .
1 . Meet with Owner' s Public Involvement specialist to
jointly develop a project presentation philosophy,
alternatives discussion, and framework for the Public
Involvement program.
2 . Owner will be responsible for initial contacts to
specific agencies such as utility companies, school
districts, railroad companies, pipeline companies,
developers, commercial and industrial interests, and
others as appropriate to discuss impact of project on
their facilities . Engineer will make follow-up contacts
and coordinate as appropriate to complete engineering
activities .
Contacts to Union Electric and SE Missouri Regional
Hospital will be made to ensure that lifeline services
and special needs for emergency access off Broadway are
properly incorporated into the Public Involvement
process .
3 Conduct a public outreach program for property owners,
businesses, commercial establishments, and residents
along the proposed alignments who will be affected by the
proposed facilities or by construction activities .
Initial notification will be in the form of a newsletter
prepared by the Engineer and mailed to the parties by the
Owner. This initial mailing will be made by the Owner,
with the newsletter inserted in the utility bill to all
City residents and business, a total of approx. 14 , 000
addresses . Additional copies will be provided to Owner
for distribution through community groups .
This scope of services contemplates a printing of 15, 000
copies of this initial newsletter, to include information
on all four projects, and it will be printed on 8�"xl4"
(legal-size) stock, so that when folded, will fit into a
Cape Girardeau, Missouri A-9 01/24/96
Transportation Program
standard envelope. This newsletter will be produced and
mailed prior to the Public Meetings .
Engineer will draft newsletter text and graphics and
submit to Owner for review and comment .
4 . Lead three Public Meetings, one each for the Perryville
Road, Broadway, and Bloomfield Road projects . Each
Public Meeting will be held at an appropriate public
facility along each project . Information for the Signal
Upgrade Project will be provided in conjunction with the
Public Meeting for Broadway, and citizen input invited at
that time .
Engineer will actively coordinate the preparations for
these meetings with Owner.
Engineer will prepare the following exhibits and handouts
to facilitate each meeting:
• Meeting exhibits for use by Owner and Engineer and
examination by the citizens . Exhibits will include
enlarged copies of drawings and maps from the
Preliminary Study, aerial photo exhibits, a graphic
illustrating the proposed roadway compared to the
existing typical section, and traffic control
during construction. Planning for special events
will also be included in the exhibits .
• Handouts for the Public Meeting, to include project
information, contact people, project comment forms,
and a request for any special needs of residents
and businesses during construction. A total of 500
handouts for each Public Meeting is planned.
• Owner is encouraged to provide additional
information on the Five-Year Program and also
municipal services and departments in general .
Engineer will assist in incorporating such
information into the Public Meeting materials .
5 . Each Public Meeting will be preceded by direct-delivery
of a portion of the 500 handouts (see above) to addresses
along each route, within the scope of the project, but
not to include side streets . There are estimated to be
50 to 75 addresses along each project that will receive
Cape Girardeau, Missouri A-10 01/24/96
Transportation Program
direct-delivered copies . Engineer will cooperate with
Owner to determine other efficient ways to make the
handouts available to residents within the sphere of
influence for each project, prior to the Public Meeting.
6 . Document public input and submit to Owner for review and
comment. Engineer will cooperate with Owner to identify
a solution for each issue raised during the Public
Involvement process .
7 . Attend and participate in a pre-construction meeting for
each of the three street improvements projects . These
meetings will also include participation by the
construction contractor.
Exhibits from the Public Meetings will be updated and
used again to communicate at these meetings . A more
detailed scope of services for the pre-construction
meetings is included under Phase 3 .
Cape Girardeau, Missouri A-11 01/24/96
Transportation Program
PHASE 2A. FIELD SURVEYS AND PROPERTY SURVEYS
The following field survey and property survey activities apply to
the three street improvements projects . Limited field surveys for
the Signal Upgrade project is covered under Phase 1, Item G.
A. Preliminary and General Items
, 1 . Meet with Owner to discuss field work plan for surveying.
Visit the sites for a "job walk" with Owner personnel .
2 . Contact utilities for information on the location of
their facilities, availability of service, proposed
service extensions or improvements, and requirements for
connections and interfacing. Special attention will be
given to the service needs for SE Missouri Hospital .
3 . Contact local agencies concerning planned or proposed
improvements which would affect the project . Secure
available information concerning such improvements .
4 . Secure any available drawings or maps from the Owner, and
other sources typically used for survey research, which
would aid in the design and interfacing of the project .
B. Route Surveys and Property Surveys
1 . Provide the services of a registered land surveyor to set
horizontal and vertical controls and locate existing
street right-of-way and critical property corners along
route alignments, and to provide additional records on
right-of-way and property information as required.
2 . Conduct engineering surveys to gather topographic and
utility information along the alignments . Field surveys
will be designed and carried out to facilitate
construction of a digital terrain model for use in
design. The base mapping will be developed and plotted,
then checked in the field to ensure that existing
topography has been properly included. After computer
modeling verification and quality control checking, the
DTM files and survey notes will be submitted to Owner.
3 . Meet with Owner' s staff to review base mapping prior to
proceeding to subsequent design activities .
Cape Girardeau, Missouri A-12 01/24/96
Transportation Program
PHASE 2B. DESIGN, CONSTRUCTION DRAWINGS, SPECIFICATIONS, AND BID
DOCUMENTS
A. Preliminary and General Items
1 . Participate in informal meetings with the Owner
throughout the design phase to review progress and
exchange ideas and information. One meeting per month is
anticipated.
2 . Prepare and submit monthly progress reports to the Owner.
It is intended for the progress reports to be submitted
in conjunction with periodic invoices .
3 . Meet with Owner staff, emergency service departments,
utilities, and other appropriate entities, as needed to
determine requirements for public protection in the
contract documents .
B. Design Memorandum
The following activities will be repeated to produce a design
memorandum for each of the four individual improvements projects .
1 . Prepare a detailed design memorandum and preliminary
drawings as required to confirm agreement on technical
scope, design parameters, performance requirements, and
detailed design approach. This document will be directly
based on the preliminary study, and will represent
approximately the 20o stage of completion of final
design. Submit five copies to Owner for review.
2 . Meet with the Owner and secure the Owner' s comments on
the design memorandum and preliminary drawings . Resolve
any questions, revise documents if necessary, and
resubmit five copies to the Owner.
3 . Submit to other agencies as directed by Owner.
4 . Update and distribute the design memorandum if required
during the design phase .
C. Geotechnical Services
1 . Provide, through a subcontract, geotechnical engineering
services including exploratory work, laboratory and field
Cape Girardeau, Missouri A-13 01/24/96
Transportation Program
testing and professional guidance in tests to be made at
test locations based on preliminary drawings and designs
and including professional interpretations of exploratory
and test data.
The services will include :
a. Initial geotechnical exploratory work, such as soil
borings, penetration tests, soundings, subsurface
explorations, laboratory tests of soils, rock
formations, and other geophysical phenomena which
are required to provide information for design, and
all other field and laboratory tests and analyses
which are required to provide design information.
b. A geotechnical report by a qualified geologist or
geotechnical firm interpreting the data on the
exploratory work and testing and setting out the
site conditions that can be anticipated from this
initial exploratory work.
2 . Geotechnical exploratory work is primarily anticipated
for the Perryville Koad and Bloomfield Road projects .
Engineer' s proposed exploration program and boring
locations will be reviewed with Owner prior to any field
work.
D. Construction Drawings and Specifications
1 . Prepare detailed drawings and specifications for the
proposed construction work required. The documents shall
be prepared for construction by private contractors on a
competitive bid basis .
Engineering plans will prepared at a scale agreeable to
Owner and suitable to clearly show the work for each
particular project _ At present, the following scales are
anticipated for the construction plans :
Perryville Road 1" = 40'
Broadway 1" = 20'
Bloomfield Road 1" = 40'
Traffic Signal Upgrade 1" = 20'
2 . All construction work, including equipment purchase, will
be performed under one contract for each of the four projects . �
Cape Girardeau, Missouri A-14 01/24/96
Transportation Program
3 . Prepare an opinion of probable construction cost for the
proposed work covered by the drawings and specifications
for each contract .
4 . Provide five (5) sets of drawings and specifications to
the Owner for review at the following approximate stages :
Design Memorandum/Strip Map, R/W Plans, and Final Review.
Additional copies of the R/W Plans and Final Review
submittals will be made as discussed below.
5 . The Design Memorandum/Strip Map submittal will include:
• Typical Sections
• Plan and Profile Alignment
• Preliminary Cross Sections
• Construction Cost Opinion
After Engineer and Owner have agreed on the basic typical
sections and horizontal and vertical alignment, these
elements will be adhered to throughout detailed design.
6 . The R/W Plans submittal will be prepared in general
accordance with MHTD guidelines for R/W Plans . Complete
right-of-way and easement information will be developed
by this stage of design to enable property appraisals and
negotiations to begin. The R/w Plans submittal will also
be distributed to the utility companies for their review
and use. Engineer will coordinate with utility field
liaisons to begin development of adjustment and
relocation plans .
This submittal will include the following:
• Title Sheet
• Typical Sections
• Plan and Profile Drawings
� Culvert Profiles
• Driveway Profiles
• Major Drainage Design Features
• Basic Traffic Control Layouts
• Cross Sections and Construction Limits
• Construction Cost Opinion
7 . The R/W Plans review will also include a R/W Field Check
with Owner personnel to discuss and resolve key issues
before proceeding, such as :
Cape Girardeau, Missouri A-15 O1/24/96
Transportation Program
• Traffic control
• Drainage improvements
• Maintaining property access
• Limits of overlay vs . pavement reconstruction
• Specialty items as developed
• Coordination needs during construction for
Owner departments such as police and fire
departments, public works, utility services,
and community agencies .
At Owner' s discretion, utility companies and other
agencies will be invited to participate in the Field
Check for each project .
8 . The Final Review submittal is intended to be for office
review by Owner, utility companies, and others as
appropriate. This submittal will facilitate detailed
review of the design features and construction details
prior to bidding, and will include the following:
• Final Title Sheet
• Typical Sections
• Detailed Plan and Profile Drawings
• Major and Minor Drainage System Plans
• Detailed Drainage Structure Designs
• Traffic Signal Plans and Details (Broadway)
• Signing and Marking Plans and Details
• Construction Phasing and Traffic Control Plans
• Erosion Control Plans
• Landscaping Plan
• Cross Sections and Final Earthwork
• Contract Documents and Specifications
• Construction Cost Opinion
9 . Review Owner and other agency comments, and meet with the
Owner if needed to discuss review comments, specific
issues to be addressed, and resolve any questions .
10 . Submit review copies to Cape Girardeau County Special
Maintenance Road District, MHTD, and other agencies as
directed by Owner.
11 . After receipt of Owner' s review comments, revise as
necessary and hold one utility coordination meeting for
each project . The utility coordination meeting will
allow the utility companies to report their proposed
Cape Girardeau, Missouri A-16 01/24/96
Transportation Program
adjustment plans, schedules, and specific needs, to the
other utilities, as well as Owner and Engineer.
12 . Upon completion of each stage of the review of drawings
and specifications, update the opinion of probable
construction cost and revise and expand as required.
13 . Review the construction contract drawings and
specifications for completeness, bidability, and
constructability.
14 . Prepare bid forms and preliminary ��Invitation to Bid"
form.
15 . Provide digital files (AutoCAD Ver. 12) of the final
drawings to Owner.
Cape Girardeau, Missouri A-17 01/24/96
Transportation Program
PHASE 2C. RIGHTS-OF-WAY AND EASEMENTS NEGOTIATION AND ACQUISITION
A. Determine tentative permanent and temporary construction
easement needs along the alternative alignments . Review
these needs with Owner' s staff . Following completion of
the Preliminary Study and concurrence on the final
alignment, determine specific right-of-way and easement
requirements .
B. Provide the services of a title company to prepare title
reports on each parcel of property on which takings or
easements are required.
C. Provide the services of a registered land surveyor to
prepare plats and legal descriptions for actual acquiring
of the required right-of-way and easements .
D. Provide a qualified appraiser to appraise rights-of-way
and easements to be acquired by fee title.
E. Provide the services of a qualified R/W Negotiator to
meet and negotiate with the property owners involved.
F. Provide the services of a registered land surveyor to
prepare documentation on parcels for condemnation
proceedings, if required. Owner will be responsible for
completing the condemnation process on any parcels so
affected.
G. Relocation of families or businesses is not anticipated
for any of the projects, and services for relocation or
demolition of major structures are not included in the
scope of this contract .
Cape Girardeau, Missouri A-18 01;24/96
Transportation Program
PHASE 3 BIDDING ASSISTANCE SERVICES, CONSTRUCTION PHASE SERVICES,
AND RESIDENT SERVICES
A. Bidding Assistance Services
l . Coordinate bid letting date, time, and place with Owner
and prepare final Invitation to Bid.
2 . Assist and advise Owner in placing the advertisements of
the Invitation to Bid. Engineer will follow Owner' s DBE
Involvement Plan in developing and advertising the
Invitation to Bid.
3 . Identify potential contractors and suppliers, and
distribute copies of Invitation to Bid. Maintain a
record of prospective bidders and suppliers to whom
drawings or specifications have been issued.
4 . Provide Owner up to 30 sets of construction contract
drawings and specifications for bidding purposes _ Owner
to provide plan room services as follows :
• Distribute construction contract drawings and
specifications to prospective bidders .
• Distribute plan holders' list to recipients of
drawings and specifications prior to bid opening.
• Receive deposits for construction contract drawings
and specifications .
5 . Provide up to five (5) additional, complete sets of the
construction contract drawings and specifications to the
successful bidder.
6 . Conduct, at a date and time selected and a place provided
by the Owner, a prebid conference to:
a. Instruct prospective bidders and suppliers as to
the types of information required by the contract
documents and the format in which bids should be
presented.
b. Review special project requirements and contract
documents in general .
7 . Interpret construction drawings and specifications, and
provide written responses to questions from bidders
Cape Girardeau, Missouri A-19 01/24/96
Transportation Program
requiring clarification during the bidding period.
Prepare and issue addenda to the construction contract
documents when required. For budget purposes, it is
assumed that two (2) addenda will be prepared for each
construction contract .
8 . Assist Owner during bid opening. Answer questions during
bid opening, make preliminary tabulation of bids, and
review questionnaires and bids f_or completeness .
9 . Review and evaluate the qualifications of the apparent
successful bidder and the proposed major or specialty
subcontractors . The review and evaluation will include
such factors as work previously completed, whether
adequate equipment is available to complete the work
properly and expeditiously, financial resources, and
technical experience.
10 . Prepare and distribute formal bid tabulation sheets,
evaluate bids, and make written recommendations to the
Owner concerning contract award.
11 . Prepare and distribute conforming copies of the
construction contract documents . These services will
include review of contractor' s bonds, furnishing the
Contractor unsigned construction contract documents, and
transmitting the construction contract documents to the
Owner for signature and distribution.
B. Construction Phase Services
The Engineer will perform contract administration services
during the construction phase of each project . By performing
these services, the Engineer shall not have authority or
responsibility to supervise, direct, or control Contractor' s
work or Contractor' s means, methods, techniques, sequences, or
procedures of construction.
The Engineer shall not have authority or responsibility for
safety precautions and programs incident to Contractor' s work
or for any failure of Contractor to comply with laws,
regulations, rules, ordinances, codes or order applicable to
Contractor furnishing and performing the work. The Engineer
will immediately notify Contractor when a public safety issue
needs attention, Contractor shall be responsible to address
the matter.
Cape Girardeau, Missouri A-2 0 01/24/96
Transportation Program
Specific services to be performed by Engineer are as follows :
1 . Review Contractor' s insurance certificates and forward
the certificates to the Owner for acceptance by the
Owner' s legal counsel . The Engineer' s review of the
insurance certificates is only for the purpose of
determining if the Contractor maintains the general types
and amounts of insurance required by the specifications,
and is not a legal review to determine if the
Contractor' s insurance coverage complies with all
applicable requirements .
2 . As an extension of the public information program, set up
a public notification procedure relating to specific
construction activities . This work will consist of
notifying the public directly affected by the
construction activities of the proposed schedule and
special provisions in writing. (If provided, the
Resident Project Representative will assist in this
effort . )
Engineer will proactively partner with Contractor and
Owner to establish specific activities to minimize
inconvenience to citizens and businesses during
construction. A specific plan to maintain emergency
access to SE Missouri Hospital during construction will
be developed and implemented. This will also include
partnering with Owner' s police department to keep
officers informed of the work in progress and arrange for
police support in traffic management or special services
when needed.
3 . At a date and time selected by the Owner and at a
facility provided by the Owner, conduct a preconstruction
conference . Engineer shall prepare an agenda for the
conference and prepare and distribute minutes. The
preconstruction conference will include a discussion of
the Contractor' s tentative schedules, procedures for
transmittal and review of the Contractor' s submittals,
processing payment applications, critical work
sequencing, change orders, record documents, and
Contractor' s responsibilities for safety and first aid.
4 . Review and comment on the Contractor' s initial and
updated construction schedule and advise the Owner as to
acceptability.
Cape Girardeau, Missouri A-21 01/24/96
Transportation Program
5 . Review the Contractor' s initial and updated schedule of
estimated monthly payments and advise the Owner as to
acceptability.
6 . Make periodic visits to the construction site to observe
progress of the work and consult with the Owner and
Contractor concerning problems and/or progress of the
work. A total of 6 visits is anticipated for each
project .
7 . Review drawings and other data submitted by the
Contractor as required by the construction contract
documents . The Engineer' s review shall be for
general conformitv to the construction contract drawings
and specifications for the project and shall not relieve
the Contractor of any of his contractual responsi-
bilities . Such reviews shall not extend to means,
methods, techniques, sequences, or procedures of
construction or to safety precautions and programs
incident thereto.
8 . Receive and review guarantees, bonds, certificates of
inspection, tests, and approvals which are to be
assembled by the Contractor (s) in accordance with the
construction contract documents and transmit them to the
Owner.
9 . Interpret construction contract drawings when requested
by the Owner or Contractor. If authorized by the
Contractor, the Engineer may interpret construction
contract drawings and specifications upon request by
subcontractors and suppliers .
10 . Review and process the Contractor' s monthly payment
requests, and forward to the Owner if applicable . The
Engineer' s review shall be for the purpose of making a
full independent mathematical check of the Contractor' s
payment request . Unless otherwise requested, Owner is
responsible for verifying the quantities of work which
are the basis of the payment request .
11 . Provide documentation for the processing of change
orders . Owner to administer the processing of change
orders, including applications for extensions of
construction time, unless Engineer is authorized to do so
as a supplemental service.
Cape Girardeau, Missouri A-22 O1/24/96
Transportation Program
12 . Upon completion of the project, revise the construction
contract drawings to conform to the construction records .
Submit copies of the mylars and digital files to the
Owner.
13 . Act as initial arbiter on all claims of Owner and
Contractor relating to the acceptability of the work or
the interpretation of the requirements of the
construction contract documents pertaining to the
execution and progress of the work_
14 . Evaluate and report on tests and test analyses of
equipment and materials, including concrete, pipe, soil,
soil compaction tests, asphalt, and any other work items
that may be required by the specifications and good
construction practice. Testing laboratory to be provided
by Owner.
15 . Upon substantial completion, inspect the construction
work and prepare a listing of those items to be completed
or corrected before final completion of the project .
Submit results of the inspection to the Owner and
Contractor.
16 . Upon completion or correction of the items of work on the
punch list, conduct a final inspection to determine if
the work is completed. Provide written recommendations
concerning final payment to the Owner, including a list
of items, if any, to be completed prior to the making of
such payment .
C. Resident Services During Construction
As requested by Owner for each project, Engineer will furnish
a full-time or part-time Resident Project Representative as
may be required on the work. The Resident Project
Representative will observe the Contractor' s work and perform
the services listed below.
The Resident Project Representative shall not have
responsibility for the superintendence of construction site
conditions, safety, safe practices or unsafe practices or
conditions, operations, equipment, or personnel other than
employees of the Engineer. The Resident Project
Representative will immediately notify the Contractor when he
observes safety issues that need to be addressed; however,
Cape Girardeau, Missouri A-23 01/24/96
Transportation Program
this service will in no way relieve the Contractor of complete
supervision of the work or the Contractor' s obligation for
complete compliance with the drawings and specifications . The
Contractor shall have sole responsibility for safety and for
maintaining safe practices and avoiding unsafe practices or
conditions .
Specific services available to Owner that would be performed
by the Resident Project Representative are as follows :
1 . Site Observations and Liaison with Owner and
Contractor (s)
a. Conduct onsite observations of the general progress
of the work to assist the Engineer in determining
if the work is proceeding in accordance with the
construction contract documents .
b. Obtain photographs or video tapes of the
construction site prior to the start of the
construction to assist in defining the original
condition of existing physical features, including
but not limited to pavement, curb and gutter,
lawns, shrubs, trees, ditches, fences, sidewalks,
buildings, and structures that are located adjacent
to the limits of construction.
c. Serve as the Engineer' s liaison with the
Contractor, working principally through the
Contractor' s superintendent, and assist the
Engineer in providing interpretation of the
construction contract documents . Transmit the
Engineer' s clarifications and interpretations of
the construction contract documents to the
Contractor.
d. Assist the Engineer in serving as the Owner' s
liaison with Contractor when Contractor' s
operations affect Owner' s onsite operation.
e . As requested by the Engineer, assist in obtaining
from the Owner additional details or information
when required at the jobsite for proper execution
of the work.
f . Consult with the Owner and the Contractor, giving
Cape Girardeau, Missouri A-24 01/24/96
Transportation Program
opinions and suggestions based on his (Resident
Project Representative' s) observations regarding
defects or deficiencies in the Contractor' s work
and relating to compliance with drawings,
specifications, and design concepts .
g. Advise the Engineer and Contractor or its
superintendent immediately of the commencement of
any work requiring a shop drawing or sample
submission if the submission has not been accepted
by the Engineer.
h. Monitor changes of apparent integrity of the site
(such as subsurface conditions, existing
structures, and site-related utilities when such
utilities are exposed) resulting from construction
related activities .
i . Observe pertinent site conditions, when the
Contractor maintains that differing site conditions
have been encountered, and document actual site
conditions . Review and analysis of Contractor
claims for differing site conditions are
supplemental services .
j . Review Contractors' construction sequence and
traffic control plans .
k. Contact utilities in the general construction area
and advise them of the Contractor' s schedule .
Assist in coordinating scheduling of utility
activities so as to minimize conflicts with
construction progress .
l . Provide necessary surveying to re-establish precon-
struction grades and referencing and reestablishing
land surveying movements . In easement areas, mark
the easement limits .
m. Visually inspect materials, equipment, and supplies
delivered to the worksite. Reject materials,
equipment, and supplies which do not conform to the
construction contract documents .
n. Coordinate onsite materials testing services during
construction. Copies of testing results will be
Cape Girardeau, Missouri A-2 5 O1/24/96
Transportation Program
forwarded to the Owner for review and information.
o. Observe field tests of equipment, structures and
piping, and review the resulting reports,
commenting to the Owner as appropriate .
2 . Outside Liaison and Public Relations Services
. a. Accompany visiting inspectors representing public
or other agencies having jurisdiction over the
project . Record the results of these inspections
and report to the Engineer.
b. Provide personnel to maintain a phone or written
communication system for timely handling and
resolution of the construction related complaints
or inquiries .
c . Provide services in connection with the public
information program, carrying out notification
procedures during construction by contracting
individual property owners as appropriate.
3 . Meetings, Reports, and Documents Review and Maintenance
a. Attend the preconstruction conference, and assist
the Engineer in explaining administrative
procedures which will be followed during
construction.
b. Prepare for and attend monthly progress meetings,
and other meetings when necessary, with the Owner
and Contractor to review and discuss construction
procedures and progress scheduling, engineering
management procedures, and other matters concerning
the project .
c. Submit to the Owner weekly construction progress
reports containing a summary of the Contractor' s
progress, general conditions of the work, problems,
and resolutions or proposed resolutions of
problems .
d. Review the progress schedule, schedule of shop
drawings submissions, and schedule of values
prepared by Contractor and consult with the
Cape Girardeau, Missouri A-26 01/24/96
Transportation Program
Engineer concerning their acceptability.
e. Report to the Engineer whenever work is known to be
defective, or does not meet the requirements of any
inspections, tests or approval required to be made
or has been damaged prior to tests or approval
required to be made or has been damaged prior to
final payment, and advise the Engineer when the
work should be corrected or rejected or should be
uncovered for observation, or required special
testing, inspection, or approval .
f . Review applications for payment with the Contractor
for compliance with the established procedure for
their submission and forward them with
recommendations to the Engineer, noting particu-
larly their relation to the schedule of values,
work completed, and materials and equipment
delivered to the site but not incorporated into the
work.
g. Receive and record date of receipt of shop drawings
and samples which are furnished at the site by the
Contractor, and notify the Engineer of their
availability for examination.
h. During course of the work, verify that certificates
and other data required to be assembled and
furnished by the Contractor are applicable to the
items actually installed; and deliver this material
to the Engineer for his review and forwarding to
the Owner prior to final acceptance of the work.
i . Receive and review all certified payrolls submitted
by Contractors and submit payrolls to the Owner.
j . Maintain a marked set of record drawings and
specifications at the jobsite based on data
provided by the Contractor. This information will
be combined with information maintained by the
Contractor and a master set of record documents
produced.
k. Review certificates of inspections, test reports,
and related approvals, submitted by the Contractor
in compliance with required by laws, rules,
Cape Girardeau, Missouri A-27 01/24/96
Transportation Program
regulations, ordinances, codes, orders, or the
contract documents (but only to determine that
their content complies with the requirements of,
and the results certified indicate compliance with
the construction contract documents) . This service
is limited to a review of items submitted by the
Contractor and does not extend to a determination
of whether the Contractor has complied with all
legal requirements .
l . Maintain the following documents at the jobsite.
l . ) Correspondence files .
2 . ) Reports of job conferences, meetings and
discussions among the Engineer, Owner, and
Contractor.
3 . ) Shop drawings and samples submissions .
4 . ) Reproductions of original construction
contract documents .
5 . ) Addenda.
6 . ) Change orders .
7 . ) Field orders .
8 . ) Additional drawings issued subsequent to
execution of the construction contract
documents .
9 . ) Engineer' s clarifications and interpretations
of the construction contract documents .
10 . ) Progress reports .
11 . ) Names, addresses, and telephone numbers of all
contractors, subcontractors, and major
suppliers of materials and equipment .
m. Maintain a daily diary or log book of events
occurring at the jobsite, including the following
information:
1 . ) Contractor' s hours on the jobsite .
2 . ) Contractor and subcontractor personnel on the
jobsite.
3 . ) Construction equipment on the jobsite and
hours of use .
4 . ) Observed delays and causes .
5 . ) Weather conditions .
6 . ) Data relative to questions of extras or
deductions .
7 . ) List of visitors .
Cape Girardeau, Missouri A-28 01/24/96
Transportation Program
8 . ) Daily activities .
9 . ) Decisions .
10 . ) Observations connected with the progress of
the work.
11 . ) Materials received on the jobsite .
The diary or log book shall remain the property of
the Engineer.
4 . Assistance in Certification of Substantial Completion
a. Before the Engineer issues a Certificate of
Substantial Completion, submit to the Contractor a
list of observed items requiring completion or
correction.
b. Assist the Engineer in conducting final inspection
in the company of the Owner and Contractor, and
prepare a final list of items to be completed or
corrected.
c. Verify that all items on the final list have been
completed or corrected and make recommendations to
the Engineer concerning acceptance.
d. Obtain photographs or videotapes of the
construction site after completion of construction.
Cape Girardeau, Missouri A-29 01/24/96
Transportation Program
,
PHASE 4 . SUPPLEMENTAL SERVICES
Any work requested by the Owner that is not included in one of the
items listed in another phase will be classified as supplemental
services . Supplemental services include but are not limited to:
A. Additional meetings with local, state or federal agencies
to discuss the project .
B . Additional appearances at public hearings or before
special boards .
C. Supplemental engineering work required to meet the
requirements of regulatory or funding agencies that
become effective subsequent to the date of this
agreement .
D. Special consultants or independent professional
associates requested or authorized by Owner.
E. Assistance with bid protests and rebidding, preparation
for litigation, arbitration or other legal or
administrative proceedings, and appearances in court or
at arbitration sessions .
F. Additions to an engineering report to update or revise
original, accepted, recommendations .
G. Providing engineering assistance to the Owner in
condemnation proceedings beyond that identified.
H. Provision of an environmental assessment report or
environmental impact statement as requested by the Owner
or required by review agencies.
I . Provision, through a subcontract, of an archaeological
study and report on the construction site (s) .
J. Provision, through a subcontract, of archaeological
consultations regarding artifacts that may be uncovered
during construction.
K. Provision, through a subcontract, of laboratory and field
testing required during construction and any special
reports or studies on materials and equipment requested
by the Owner.
Cape Girardeau, Missouri A-30 01/24/96
Transportation Program
L. Provision of support services in connection with
additional public involvement activity beyond that
defined in Phases 1 and 3 .
M. Assistance in the closing of any financial or related
transaction for the project .
N. Where field conditions are encountered which differ from
the conditions shown on the construction contract
documents or soil borings, or as otherwise required,
preparation of sketches of construction work for approval
by the Owner, to supplement the drawings and
specifications as may be required. Provide redesign or
relocation information if requested by underground
obstruction, utilities or other conditions .
O. Services resulting from significant delays, changes or
price increases occurring as a direct or indirect result
of material, equipment or energy shortages .
P. Additional or extended services during construction made
necessary by (1) work damaged during construction, (2) a
significant amount of defective or neglected work of any
Contractor, (3) acceleration of the process schedule
involving service beyond normal working hours, (4)
default by any Contractor and (5) failure of the
Contractor to complete the work within the contract time .
Q. Evaluation of unusually complex claims or an unreasonable
or extensive number of claims submitted by Contractor or
others in connection with the work.
R. Changes in the general scope, extent or character of the
project or its design including, but not limited to,
changes in size, complexity, Owner' s schedule, character
of construction or method of financing; and revising
previously accepted studies, reports, design documents or
construction contract documents when such revisions are
required by changes in laws, rules, regulations,
ordinances, codes or orders enacted subsequent to the
preparation of such studies, reports or documents or
designs, or are due to any other causes beyond the
Engineer' s control .
[End of Attachment A)
Cape Girardeau, Missouri A-31 01/24/96
Transportation Program
Attachment B
ATTACHMENT B
TO
AGREEMENT FOR ENGINEERING SERVICES
FOR
CITY OF CAPE GIRARDEAU, MISSOURI
TRANSPORTATION IMPROVEMENTS PROGRAM
COMPENSATION
Owner: City of Cape Girardeau, Missouri
Project: Transportation Improvements Program
For the services covered by this Agreement, the Owner agrees to
pay the Engineer as follows :
A. For Phase 1 Services (Initial Investigations and Preliminary
Study) , 2A Services (Field Surveys and Property Surveys) , and 2B
Services (Design, Construction Drawings, Specifications, and Bid
Documents) , an amount equal to the Engineer' s salary costs times
2 . 95 plus reimbursable expenses at cost and plus subcontract
billings times 1 . 05 . The maximum amount to be billed for these
services shall not exceed $355, 000 . 00 without further
authorization.
B. For Phase 1, 2A, and 2B Services pertaining solely to the
Traffic Signal Upgrade Project (not to include street
improvements covered under the Broadway Project) , an amount equal
to the Engineer' s salary costs times 2 . 95 plus reimbursable
expenses at cost and plus subcontract billings times 1 . 05 . The
maximum amount to be billed for these services shall not exceed
$60, 000 . 00 without further authorization.
C. For Phase 2C Services (Rights-of-Way and Easement
Negotiation and Acquisition) , an amount equal to $750 . 00 per
parcel for easement negotiation and acquisition and $1, 350 . 00 per
parcel for new right-of-way negotiation and acquisition. For
budgeting purposes, it is estimated that a total of 66 easement
parcels and 30 right-of-way parcels will be required for the
total project, as currently defined, resulting in a total
estimated amount of $90, 000 . 00 .
D. For Phase 3 Services (Bidding Assistance, Construction Phase
Services, and Resident Services) , an amount to be determined
after the scope of the work is better defined for each project .
Cape Girardeau, Missouri B-1 O1/22l96
Transportation Program
E. For Phase 4 Services (Supplemental Services) , an amount
equal to the Engineer' s salary costs times 2 . 95 plus reimbursable
expenses at cost and plus subcontract billings times 1 . 05 . Each
item of Supplemental Services shall be specifically authorized by
the Owner, and a maximum billing limit shall be established
before the work is started. The amount billed for each item of
Supplemental Services shall not exceed the amount established for
it without further authorization.
F. The following expenses are reimbursable under salary
multiplier work items :
1 . Travel, subsistence, and incidental costs .
2 . Use of motor vehicles on a monthly rental basis for
assigned vehicles and on a mileage basis for vehicles
uses for short periods . Mileage basis shall be 30 cents
per mile.
3 . Moving costs to project for full-time onsite personnel .
4 . Long distance telephone costs and project "onsite"
telephone costs .
5 . Reproduction of reports, drawings, and specifications .
6 . Postage and shipping charges for project-related
materials .
7 . CAD-related expenses . (Note : Computer-related expenses
other than CAD are specifically excluded. )
8 . Rental charges for use of equipment, including equipment
owned by the Engineer.
9 . Cost of acquiring any other materials or services
specifically for and applicable to only this project .
10 . Subcontract costs including those for soils and
geotechnical investigations and reports, testing
laboratory services, surveying and mapping services,
assistant engineers, public involvement specialists,
right-of-way negotiators, and other subcontract services
as may be required for the project .
11 . Charges for special consultants requested or authorized
by the Owner.
12 . Special insurance coverage required by the Owner,
including the cost of naming the Owner as an additional
insured.
Cape Girardeau, Missouri B-2 01/22/96
Transportation Program
13 . Local taxes or fees applicable to the engineering work
or payments therefor.
14 . Charges for review of drawings and specifications by
government agencies, if any.
G. Periodic payments shall be made to the Engineer by the Owner
based on the Engineer' s statement . The statement shall be
itemized to indicate the amount of work performed and the
associated reimbursable expenses and subcontract costs .
H. The entire amount of each statement shall be due and payable
upon receipt by the Owner. Carrying charges of 1-1/2 percent per
month from the billing date, shall be due for accounts which are
not paid within 60 days after the billing date .
I . It is understood and agreed that the maximum billing amount
for the Phase 1, 2A and 2B Services is based on the start of
those services being authorized not later than March 1, 1996 .
J. It is understood and agreed that if the project, after being
started in any phase, is stopped in that phase for the Owner' s
convenience for more than 60 calendar days, Engineer may reassign
project team members to other work. If the team is disbanded and
the work is restarted at a later date, then the Owner will pay
the Engineer a restart fee equal to 10 percent of the original
maximum billing limit for that phase. All payments for project
suspension and restart will be in addition to the original
maximum billing limit .
K. It is understood and agreed that the Engineer shall start
the performance of Phase 1, 2A, 2B and 2C Services within ten
calendar days of receipt of Notice to Proceed. It is understood
that Notice to Proceed for Phase 2B will be issued upon
completion of Phases 1 and 2A, and Notice to Proceed for Phase 2C
will be issued upon completion of the R/W Plans (within Phase
2B) . The services provided under this contract will be completed
within the following number of calendar days following Notice to
Proceed for a particular phase .
The times for Phase 1 exclude the actual convening of the Public
Meetings, which will be scheduled for a mutually agreeable time
with Owner.
Cape Girardeau, Missouri B-3 01/22/96
Transportation Program
Owner and Engineer agree that formal review periods for Owner and
other agencies shall not count toward the contract times
indicated below for Phase 2B Services . Moreover, condemnation
proceedings, if necessary, are not considered in the times
indicated below for Phase 2C Services .
The completion schedule for Phase 3 Services is to be mutually
agreed upon by Owner and Engineer prior to beginning services
under that phase.
Completion
Perrvville Road Schedule�l'
Phase 1 - Initial Investigations 60 days
and Preliminary Study
Phase 2A - Field Surveys and Property Surveys 60 days
Phase 2B - Design, Drawings and Documents 150 days
Phase 2C - Rights-of-Way and Easements 210 days
Negotiation and Acquisition
Target Date for Bid Advertisement : August 1, 1996�z�
Broadwav
(Survey and design Clark Ave. to West End Blvd. ; R/W and
construction from Clark Ave. to Perry Ave . )
Phase 1 - Initial Investigations 75 days
and Preliminary Study
Phase 2A - Field Surveys and Property Surveys 90 days
Phase 2B - Design, Drawings and Documents 180 days
(Clark Ave. to West End Blvd. )
Phase 2C - Rights-of-Way and Easements 300 days
Negotiation and Acquisition
(Clark Ave. to Perry Ave. )
Target Date for Bid Advertisement : January 15, 1997�Z�
Bloomfield Road
Phase 1 - Initial Investigations 60 days
and Preliminary Study
Phase 2A - Field Surveys and Property Surveys 60 days
Phase 2B - Design, Drawings and Documents 150 days
Phase 2C - Rights-of-Way and Easements 210 days
Negotiation and Acquisition
Target Date for Bid Advertisement : October l, 1996�2�
Cape Girardeau, Missouri B-4 01/22/96
Transportation Program
Traffic SiQnal U�qrade
Phase 1 - Initial Investigations 75 days
and Preliminary Study
Phase 2A - Field Surveys and Property Surveys 60 days
Phase 2B - Design, Drawings and Documents 90 days
Phase 2C - Rights-of-Way and Easements n/a
Negotiation and Acquisition
Target Date for Bid Advertisement : August 15, 1996'2'
�1' Number of calendar days following Notice to Proceed for each
phase of the work.
�2� Assuming Project Notice to Proceed is given the week of
February 5, 1996 .
L. Engineer shall keep records of costs and expenses on the
basis of generally accepted accounting practices. Those records
shall be available for inspection at Engineer' s headquarters
during normal business hours .
[End of Attachment B]
Cape Girardeau, Missouri B-5 01/22/96
Transportation Program
Attac h m e n t C
Attac h m e n t C
ATTACHMENT C
TO
AGREEMENT FOR ENGINEERING SERVICES
FOR
CITY OF CAPE GIRARDEAU, MISSOURI
TRANSPORTATION IMPROVEMENTS PROGRAM
OWNER'S RESPONSIBILITIES
Owner: City of Cape Girardeau, Missouri
Project: Transportation Improvements Program
The Owner will furnish, as required by the work and not at the
expense of the Engineer, the following items :
A. All maps, drawings, reports, records, audits, annual
reports, and other data that are available in the files of the
Owner and which may be useful in the work involved under this
contract .
B. Access to public and private property when required in
performance of the Engineer' s services .
C. The services of at least one of the Owner' s employees or
staff who has the right of access to, and who has knowledge of,
the existing streets and traffic signal equipment .
D. Releases to the news media concerning public hearings,
prebid conferences, preconstruction conferences, and the time and
location of anticipated street closings or partial closings .
E. Hall or auditorium space for public hearings, prebid
conferences, and preconstruction conferences and the audio
equipment and projection equipment required for such hearings and
conferences .
F. Legal advertisement of project letting or bid date and such
other publications of the "Invitation to Bid" as desired by the
Owner.
G. Royalties and fees for patented processes used in the work,
except those required to be paid by construction contractors as
part of the construction contract.
Cape Girardeau, Missouri C-1 01/22/96
Transportation Program
H. Shop, mill, or laboratory inspection of materials,
laboratory and field testing, and field sampling services .
I . All legal and other related activities to carry out
condemnation proceedings on any parcels that must be condemned_
J. Fees, expenses, negotiated settlements, and other costs
associated with the actual closing of an agreement and
compensation to a property owner for the purchase of right-of-way
or easements .
K. Securing all necessary permits except for those specifically
identified to be secured by the construction contractor.
L. Initial contacts with specific agencies such as utility
companies, SE Missouri Hospital, school district, railroad
companies, pipeline companies, developers, commercial and
industrial interests, and other as appropriate to discuss the
impact of the project on their facilities, as part of the Public
Involvement Program. (Note: Engineer will make follow-up
contacts and coordinate additional activities, as appropriate. )
M. Distribution of documents, as appropriate, to all reviewing
or regulatory agencies for the purpose of acquiring approvals or ,
permits .
[End of Attachment C]
Cape Girardeau, Missouri C-2 01/22/96
Transportation Program
�
•
f
AGREEMENT FOR ENGINEERING SERVICES
FOR
CITY OF CAPE GIRARDEAU, MISSOURI
TRANSPORTATION IMPROVEMENTS PROGRAM
Owner: City of Cape Girardeau, Missouri
Project: Transportation Improvements Program
TABLE OF CONTENTS
Section paqes
AGREEMENT FOR ENGINEERING SERVICES 1 to 8
ATTACHMENT A - SCOPE OF SERVICES A-1 to A-31
PHASE 1 Initial Investigations and A-2
Preliminary Study
PHASE 2A Field Surveys and Property Surveys A-12
PHASE 2B Design, Construction Drawings, A-13
Specifications, and Bid Documents
PHASE 2C Rights-of-Way and Easements A-18
Negotiation and Acquisition
PHASE 3 Bidding Assistance, Construction Phase A-19
Services, and Resident Services
PHASE 4 Supplemental Services A-30
ATTACHMENT B - COMPENSATION B-1 to B-5
ATTACHMENT C - OWNER' S RESPONSIBILITIES C-1 to C-2
Cape Girardeau, Missouri -i- 01/24l96
Transportation Program
,
t
AGREEMENT
' FOR
ENGINEERING SERVICES
THIS AGREEMENT, between the City of Cape Girardeau (Owner) and
Black & Veatch (Engineer) ;
W I T N E S S E T H :
WHEREAS, Owner intends to construct improvements to its system of
roads and streets as part of its 5-year Transportation
Improvements Program (the Project) ; and,
WHEREAS, Owner requires surveys, preliminary studies, design
engineering, public involvement, right-of-way and easement
acquisition, bidding assistance, construction phase services, and
resident engineering services in connection with the Project (the
Services) ; and,
WHEREAS, Engineer is prepared to provide the Services;
NOW THEREFORE, in consideration of the promises contained in this
Agreement, Owner and Engineer agree as follows :
ARTICLE 1 - EFFECTIVE DATE
The effective date of this Agreement shall be �
ARTICLE 2 - GOVERNING LAW
This Agreement shall be governed by the laws of the state of
Missouri.
ARTICLE 3 - SERVICES TO BE PERFORMED BY ENGINEER
Engineer shall perform the Services described in Attachment A,
Scope of Services.
ARTICLE 4 - COMPENSATION
Owner shall pay Engineer in accordance with Attachment B,
Compensation.
Cape Girardeau, Missouri Page 1 of 8 O1/22/96
Transportation Program
.
�
RRTICLE 5 - OWNER'S RESPONSIBILITIES
Owner • shall be responsible for all matters described in
Attachment C, Owner' s Responsibilities .
ARTICLE 6 - STANDARD OF CARE
Engineer shall exercise the same degree of care, skill, and
diligence in the performance of the Services as is ordinarily
possessed and exercised by a professional engineer under similar
circumstances. No other warranty, express or implied, is
included in this Agreement or in any drawing, specification,
report, or opinion produced pursuant to this Agreement.
ARTICLE 7 - LIABILITY AND INDEMNIFICATION
7 . 1 General. Having considered the potential liabilities that
may exist during the performance of the Services, the benefits of
the Project, and the Engineer's fee for the Services, and in
consideration of the promises contained in this Agreement, Owner
and Engineer agree to allocate and limit such liabilities in
accordance with this Article.
7 .2 Indemnification. Engineer and Owner each agrees to defend,
indemnify, and hold harmless each other, its agents and
employees, from and against legal liability for all claims,
losses, damages, and expenses to the extent such claims, losses,
damages, or expenses are caused by its negligent acts, errors, or
omissions. In the event claims, losses, damages, or expenses
are caused by the joint or concurrent negligence of Engineer and
Owner, they shall be borne by each party in proportion to its own
negligence.
7 .3 Emplovee Claims . Engineer shall indemnify Owner against
legal liability for damages arising out of claims by Engineer' s
employees. Owner shall indemnify Engineer against legal
liability for damages arising out of claims by Owner' s employees.
7 .4 Conseauential Damaqes. To the fullest extent permitted by
law, Engineer shall not be liable to Owner for any special,
indirect, or consequential damages resulting in any way from the
performance of the Services .
Cape Girardeau, Missouri Pdge 2 of 8 01/22/96
Transportation Program
.
,
7 .5 Survival. Upon completion of all Services, obligations, and
duties provided for in this Agreement, or if this Agreement is
terminated for any reason, the terms and conditions of this
Article shall survive.
ARTICLE 8 - INSURANCE
During the performance of the Services under this Agreement,
Engineer shall maintain the following insurance:
( 1) General Liability Insurance, with a combined single limit of
$1, 000, 000 for each occurrence and $1 , 000, 000 in the
aggregate.
(2 ) Automobile Liability Insurance, with a combined single limit
of $1, 000, 000 for each person and $1, 000, 000 for each
accident.
(3 ) Workers' Compensation Insurance in accordance with statutory
requirements and Employers ' Liability Insurance, with a
limit of $500, 000 for each occurrence.
(4 ) Professional Liability Insurance, with a limit of $1, 000, 000
annual aggregate.
Engineer shall, upon written request, furnish Owner certificates
of insurance which shall include a provision that such insurance
shall not be canceled without at least thirty days ' written
notice to Owner. All Project contractors shall be required to
include Owner and Engineer as additional insureds on their
General Liability insurance policies, and shall be required to
indemnify Owner and Engineer to the same extent.
Engineer and Owner waive all rights against each other and their
directors, officers, partners, commissioners, officials, agents,
and employees for damages covered by property insurance durinq
and after the completion of the Services. If the Services result
in a construction phase of the project, a similar provision shall
be incorporated into all construction phase contracts entered
Cape Girardeau, Missouri Page 3 of 8 01/22/96
Transportation Program
1
into by Owner and shall protect Owner and Engineer to the same
extent.
ARTICLE 9 - LIMITATIONS OF RESPONSIBILITY
Engineer shall not be responsible for: ( 1 ) construction means,
methods, techniques, sequences, procedures, or safety precautions
and programs in connection with the Project; (2 ) the failure of
any contractor, subcontractor, vendor, or other Project
participant, not under contract to Engineer, to fulfill
contractual responsibilities to the Owner or to comply with
federal, state, or local laws, regulations, and codes; or (3 )
procuring permits, certificates, and licenses required for any
construction unless such responsibilities are specifically
assigned to Engineer in Attachment A, Scope of Services .
ARTICLE 10 - OPINIONS OF COST AND SCHEDULE
Since Engineer has no control over the cost of labor, materials,
or equipment furnished by others, or over the resources provided
by others to meet Project schedules, Engineer' s opinion of
probable costs and of Project schedules shall be made on the
basis of experience and qualifications as a professional
engineer. Engineer does not guarantee that proposals, bids, or
actual Project costs will not vary from Engineer' s cost estimates
or that actual schedules will not vary from Engineer' s projected
schedules .
ARTICLE 11 - REUSE OF DOCUMENTS
All documents, including, but not limited to, drawings,
specifications, and computer software prepared by Enqineer
pursuant to this Agreement are instruments of service in respect
to the Project. They are not intended or represented to be
suitable for reuse by Owner or others on extensions of the
Project or on any other project. Any reuse without prior written
verification or adaptation by Engineer for the specific purpose
intended will be at Owner' s sole risk and without liability or
legal exposure to Engineer. Owner shall defend, indemnify, and
hold harmless Engineer against all claims, losses, damages,
injuries, and expenses, including attorneys ' fees, arising out of
or resulting from such reuse. Any verification or adaptation of
Cape Girardeau, Missouri Page 4 of 8 01/22/96
Transportation Program
documents will entitle Engineer to additional compensation at
rates .to be agreed upon by Owner and Engineer.
ARTICLE 12- OWNERSHIP OF DOCUMENTS AND INTELLECTUAL PROPERTY
Except as otherwise provided herein, engineering documents,
drawings, and specifications prepared by Engineer as part of the
Services shall become the property of Owner, provided, however,
that Engineer shall have the unrestricted right to their use.
Engineer shall retain its rights in its standard drawing details,
specifications, data bases, computer software, and other
proprietary property. Rights to intellectual property developed,
utilized, or modified in the performance of the Services shall
remain the property of Engineer.
ARTICLE 13 - TERMINATION
This Agreement may be terminated by either party upon written
notice in the event of substantial failure by the other party to
perform in accordance with the terms of this Agreement. The
nonperforming party shall have fifteen calendar days from the
date of the termination notice to cure or to submit a plan for
cure acceptable to the other party.
Owner may terminate or suspend performance of this Agreement for
Owner's convenience upon written notice to Engineer. Engineer
shall terminate or suspend performance of the Services on a
schedule acceptable to Owner. If termination or suspension is
for Owner's convenience, Owner shall pay Engineer for all the
Services performed and termination or suspension expenses . Upon
restart, an equitable adjustment shall be made to Engineer's
compensation.
ARTICLE 14 - DELAY IN PERFORMANCE
Neither Owner nor Engineer shall be considered in default of this
Agreement for delays in performance caused by circumstances
beyond the reasonable control of the nonperforming party. For
purposes of this Agreement, such circumstances include, but are
not limited to, abnormal weather conditions; floods; earthquakes;
fire; epidemics; war, riots, and other civil disturbances;
strikes, lockouts, work slowdowns, and other labor disturbances;
Cape Girardeau, Missouri Page 5 of 8 01/22/96
Transportation Program
,
sabotage; judicial restraint; and inability to procure permits,
licenses, or authorizations from any local, state, or
federal agency for any of the supplies, materials, accesses, or
services required to be provided by either Owner or Engineer
under this Agreement.
Should such circumstances occur, the nonperforming party shall,
within a reasonable time of being prevented from performing, give
written notice to the other party describing the circumstances
preventing continued performance and the efforts being made to
resume performance of this Agreement.
ARTICLE 15 - COMMUNICATIONS
Any communication required by this Agreement shall be made in
writing to the address specified below:
Engineer: Steve Phillips
Black & Veatch
8400 ward Parkway
P.O. Box 8405
Kansas City, Missouri 64114
Owner: Mike Miller
City Manager
City Hall
401 Independence Street
P.O. Box 617
Cape Girardeau, Missouri 63702
Nothing contained in this Article shall be construed to restrict
the transmission of routine communications between
representatives of Engineer and Owner.
ARTICLE 16 - WAIVER
A waiver by either Owner or Engineer of any breach of this
Agreement shall be in writing. Such a waiver shall not affect
the waiving party' s rights with respect to any other or further
breach.
ARTICLE 17 - SEVERABILITY
The invalidity, illegality, or unenforceability of any provision
of this Agreement or the occurrence of any event rendering any
portion or provision of this Agreement void shall in no way
affect the validity or enforceability of any other portion or
Cape Girardeau, Missouri Page 6 of 8 01/22/96
Transportation Program
,
provision of this Agreement. Any void provision shall be deemed
severed from this Agreement, and the balance of this Agreement
shall be construed and enforced as if this Agreement did not
contain the particular portion or provision held to be void. The
parties further agree to amend this Agreement to replace any
stricken provision with a valid provision that comes as close as
possible to the intent of the stricken provision. The provisions
of this Article shall not prevent this entire Agreement from
being void should a provision which is of the essence of this
Agreement be determined void.
ARTICLE 18 — INTEGRATION
This Agreement represents the entire and integrated agreement
between Owner and Engineer. It supersedes all prior and
contemporaneous communications, representations, and agreements,
whether oral or written, relating to the subject matter of this
Agreement.
ARTICLE 19 - SUCCESSORS AND ASSIGNS
Owner and Engineer each binds itself and its directors, officers,
partners, successors, executors, administrators, assigns, and
legal representatives to the other party to this Agreement and to
the directors, officers, partners, successors, executors,
administrators, assigns, and legal representatives of such other
party in respect to all provisions of this Agreement.
ARTICLE 20 - ASSIGNMENT
Neither Owner nor Engineer shall assign any rights or duties
under this Agreement without the prior written consent of the
other party. Unless otherwise stated in the written consent to
an assignment, no assignment will release or discharge the
assignor from any obligation under this Agreement. Nothing
contained in this Article shall prevent Engineer from employing
independent consultants, associates, and subcontractors to assist
in the performance of the Services .
ARTICLE 21 - THIRD PARTY RIGHTS
Nothing in this Agreement shall be construed to give any rights
or benefits to anyone other than Owner and Engineer.
Cape Girardeau, Missouri Page 7 of 8 01/22/96
Transportation Program
,
IN WITNESS WHEREOF, Owner and Engineer have executed this
Agreement.
�NER ENGINEER
/
City of'Cape Girardeau, uri B1ack & Veatch
-
r �
� _ �
B - gy � / r
_ Y
� Mike Miller John R. McNitt
City Manager Partner
,/' � ,
` �� / �
Date: � ������� Date:
Cape Girardeau, Missouri Page 8 of 8 O1/22/96
Transportation Program
�
ATTACHMENT A
' TO
AGREEMENT FOR ENGINEERING SERVICES
FOR
CITY OF CAPE GIRARDEAU, MISSOURI
TRANSPORTATION IMPROVEMENTS PROGRAM
SCOPE OF SERVICES
Owner: City of Cape Girardeau, Missouri
Project: Transportation Improvements Program
The scope of services for this project includes surveying,
preliminary studies, design engineering, public involvement, right-
of-way and easement acquisition, bidding assistance, construction
phase services, and resident engineering services for four
individual improvements projects:
• Perryville Road ( limits of existing concrete north of
Meyer Drive to the City Limits)
• Broadway (design from Clark Ave to West End Blvd. ,
construction from Clark Ave. to Perry Ave. )
• Bloomfield Road (west of Kingshighway to Siemers Drive,
not including the I-55 bridge) .
• Traffic Signal Upgrade ( 11 intersections along Broadway,
Sprigg Street, and Independence Street)
This scope of services applies in general to the three street
improvements projects and in certain areas to the signal upgrade
work. The scope of services is described in more detail herein,
under the following major phases:
PHASE 1 Initial Investigations and Preliminary Study
PHASE 2A Field Surveys and Property Surveys
PHASE 2B Design, Construction Drawings, Specifications, and
Bid Documents
PHASE 2C Rights-of-Way and Easements Negotiation and
Acquisition
PHASE 3 Bidding Assistance, Construction Phase Services,
and Resident Services
PHASE 4 Supplemental Services
Cape Girardeau, Missouri A-1 01/24/96
Transportation Program
PHASE 1 . INITIAL INVESTIGATIONS AND PRELIMINARY STUDY
Engineer will conduct a Preliminary Study for each of the four
projects. Final design and document preparation will not begin
until after the Preliminary Study is completed for a particular
project and Notice to Proceed issued by Owner.
Initial investigations include general reconnaissance work and
information gathering. Field surveys, property surveys, title
research, and utility locations are covered under Phase 2A.
A. Preliminary and General Items
1 . Consult with Owner to clarify and define Owner' s
requirements for each project and review pertinent
available data.
2 . Participate in informal meetings with the Owner to review
progress and exchange ideas and information. One meeting
per month is anticipated.
3 . Prepare and submit monthly progress reports to Owner.
Progress reports will be submitted by the 5th of each
month, in conjunction with periodic invoices.
4 . Prepare a Project Procedures memorandum to provide
general guidance regarding communications,
responsibilities, basic design parameters, and work flow
for Engineer's team. Deliverable due dates and key
intermediate milestones will also be identified. Copies
will be provided to Owner for review and use.
B. Collect Existing Information
1 . Review existing reports and other information from
Owner' s files.
2 . Review records to determine past history of use as to
traffic flow, congestion problems, accident data, special
event usage, drainage problems, and other issues
experienced or projected to occur. Determine functional
classification of route.
3 . Consult with Owner and utility service providers to
establish a working dialogue at the outset of the
project. Coordinate special needs for facilities such as
Cape Girardeau, Missouri
A_2 01/24/96
Transportation Program
,
�
gas and electric service to SE Missouri Hospital. Collect
. relevant data about existing facilities, associated
traffic flows, and construction history.
C. Traffic Capacity Determinations
1 . Prepare arterial capacity and Level of Service (LOS)
calculations for the three street projects using existing
traffic data, with the Highway Capacity Software (HCS)
package.
2 . Develop traffic projections for a 20-year planning period
in consultation with Owner's staff.
3 . Prepare HCS calculations to determine LOS for the
projected traffic loads.
4 . Summarize the results for use in pavement design and
traffic control planning, and for Owner' s use.
5 . For the Broadway project, these calculations will be made
for the purpose of general LOS information, pavement
design, and traffic control planning. More detailed work
for the signal upgrade and timing optimization is
specified under Phase 1, Item G.
6 . Identify general pedestrian traffic volumes and needs.
Consult with Owner to confirm and refine pedestrian
traffic data. Consult with Owner to determine need for
bikeways. Determine specific areas for increased
pedestrian traffic facilities.
7 . Develop proposed typical cross sections for the street
improvements . Submit proposed typical sections with a
summary of pros and cons, as appropriate, to Owner for
review and comment.
8 . Agree on final typical sections (geometric) to include
roadway, sidewalk(s) , landscaping border strips, utility
corridors, and similar elements.
Cape Girardeau, Missouri A-3 01/24/96
Transportation Program
D. Alignment and Profile Study
1 . Determine needs and alternative solutions.
a. Study available topographic, property, and utility
maps and aerial photography within the corridor to
determine potential alternative alignments for
consideration. Existing City mapping ( 1"=200 '
scale) and recent aerial photography will be used,
with additional information as available.
b. Conduct a field reconnaissance to review the
potential alignment alternatives within the
corridor and determine if there are additional
considerations not apparent from the available
mapping and records.
c. Identify design speed, sight distance requirements,
pedestrian needs, and roadside safety issues for
use in developing alternatives. Submit to Owner
for review, revision, and concurrence.
d. Prepare a sidewalk study for each project to
determine the limits of sidewalk to be
reconstructed and the most efficient and beneficial
areas to construct new sidewalks . Include a
pedestrian crossing study to evaluate advantageous
locations and marking requirements for new
crossings, and provide appropriate tie-ins to the
Cape Girardeau hiking and biking trail near
Bloomfield Road.
2 . Evaluate alternative alignments.
a. Summarize advantages and disadvantages of each
alternative alignment, considering geotechnical
conditions, urban development conditions,
hydrologic/hydraulic considerations, service and
maintenance requirements, construction
difficulties, and overall costs.
It is anticipated that horizontal alignments will
generally follow existing alignments except for
Perryville Road, where alternative alignments for
certain curves will be considered to improve sight
distances; and for Bloomfield Road, slight
Cape Girardeau, Missouri A-4 01/24/96
Transportation Program
.
curvilinear alignment will be considered as an
. alternative to the existing tangent alignment, with
the goal of preserving trees .
Similarly, for vertical alignment, alternatives
will be considered where needed to improve sight
distances over crests, side street and entrance
grades, and also drainage conditions. Otherwise,
the proposed improvements will generally follow
existing alignments.
b. Incorporate existing alignment and ground line data
from the field survey activities and establish a
digital terrain model to analyze alternatives .
c. Determine approximate construction limits and
earthwork volumes for the alternatives .
d. Evaluate solutions such as special slope treatments
or retaining walls where warranted to reduce
property impacts.
e. Determine approximate right-of-way and easement
requirements for the alternatives.
f. Prepare planning-level cost opinions for earthwork,
right-of-way, and easement.
E. Hydrology and Hydraulics Study
1 . Determine drainage areas and runoff characteristics for
cross road structures.
2 . In conjunction with Phase 2A-Field Surveys, conduct
property owner interviews to determine past experience
with surface flooding or underground springs, and whether
there are special issues that should be addressed in the
improvements project.
3 . Calculate design flow rates using a design storm and
procedure acceptable to Owner.
4 . Prepare hydraulics design for existing and proposed
culverts to determine sizes, headwater depths, and
outflow velocities. Hydraulic designs will include
consideration of downstream effects to the nearest
Cape Girardeau, Missouri A-5 01/24/96
Transportation Program
floodway or tributary stream to the floodway (e.g. Walker
, Branch and Cape la Croix Creek) .
5 . Evaluate existing cross road structures to determine if
extension is feasible or that reconstruction is required.
6 . Perform pavement drainage analysis and design, determine
sizes and spacing of inlets, sizes of connecting storm
sewers, and outfall locations. Special attention will be
given to drainage design on the Broadway Project. Areas
to be investigated include greatly expanding the curb
inlet system and increased storm sewer capacities, and
the most effective method to utilize the Capaha Park
lagoon as a stormwater management facility. Drainage
design is not a part of the Traffic Signal Upgrade
project in this scope of services .
7 . Determine outfall protection requirements for culverts
and storm sewers.
8 . Determine need for stormwater detention,and discuss with
Owner. Prepare preliminary design to include basin size
and location as needed.
9 . Prepare planning-level cost opinions for drainage
features.
F. Pavement Design
1 . Summarize traffic loadings and geotechnical
characteristics of subgrades for each street.
2 . Review City specifications, standard practices, and
related information.
3 . Design pavement systems using AASHTO or other appropriate
method. Both asphaltic concrete and portland cement
concrete pavement systems will be designed as structural
equivalents for alternative bidding by contractors.
Life-cycle cost estimating is not anticipated.
4 . Prepare planning level cost estimates for pavements,
driveways, sidewalks,and similar items.
Cape Girardeau, Missouri A-6 01/24/96
Transportation Program
�
G. Traffic Signal Upgrade
Each of the three street improvements projects will include
traffic engineering activities for signing, striping, and
traffic control plans. The signal upgrade project will
require specific traffic engineering services to optimize
signal timing for the 11 intersections along Broadway, Sprigg
Street, and Independence Street.
1 . Obtain record drawings and other available information
from Owner describing the current signal hardware systems
and interconnections, and all available traffic data.
2 , Acquire names of businesses and owners of record, and
existing right-of-way limits, for the parcels adjacent to
each intersection.
3 . Review current timing and phasing configurations and
develop an optimization methodology. The proposed
methodology will be submitted for Owner' s review before
proceeding. Engineer will recommend whether any
additional field traffic counts are justified.
Field traffic counting for turning movements, peak
volumes, and pedestrian traffic will be provided by Owner
or by Engineer as a supplemental service.
4 . Perform limited-scope field surveys to define the
intersection geometrics, locate existing siqnal hardware,
and coordinate with utilities to locate service lines .
Extensive survey activity for this item of work is not
anticipated (except for the intersections within the
limits of the Broadway improvements) nor included in this
scope of services . Field data will be used both to
develop intersection traffic capacities and to develop
installation plans and specifications.
5 . Design the upgrade for each installation according to the
Institute of Transportation Engineers ( ITE) and/or the
Missouri Highway and Transportation Department (MHTD)
specifications . Upgrading to Type 170 controllers is
anticipated. The uniformity of existing signal features
will be reviewed for compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) . MUTCD
compliance review will include but not be limited to:
Cape Girardeau, Missouri A-7 01/24/96
Transportation Program
�
• Size, number, arrangement and design of signal
. lenses
� Transverse location of signal posts, mast arms and
controller cabinets
• Use of vehicle detectors in roadway pavement
• Coordination of signals in interconnected network
. • Applicability of specific actuated signal
controllers with detector loops to override pre-
timed phasing and better accommodate occasional
vehicle movements.
• Continuity of operation during construction
• Maintenance program for signals
6 . Perform system optimization using the SYNCHRO Pro traffic
signal timing program: Windows-based with graphical user
interfaces and the ability to generate AutoCAD drawings
from the Map Window. The SYNCHRO model will provide a
one-time data entry methodoloqy and automatically create
input files for the TRANSYT-7F or PASSER II computer
models. Previous work done by OWNER using TRANSYT-7F
will be direct readable without re-entering data.
Digital files from this work will be submitted to Owner.
7 . Review initial findings with Owner, revise analysis as
needed for final optimization.
8 . Prepare detailed traffic signal phasing sheets for each
intersection. Submit to Owner for review.
9 . Develop a proposed list of signal controller
manufacturers and hardware system specifications . System
package specifications will include a suitable quantity
of spare parts and maintenance equipment, and on-site
training for Owner's maintenance personnel.
10 . Review the need for street lighting to improve nighttime
intersection performance, and arterial performance for
Broadway. Submit recommendations to Owner. If desired
by Owner to include street lighting in certain areas,
layout and spacing for street lighting will follow the
recommendations of the Illuminating Engineering Society
and MHTD.
Cape Girardeau, Missouri A-8 01/24/96
Transportation Program
H. Public Involvement Program
Public Involvement activities will be facilitated by a public
involvement subconsultant to Engineer. The scope of services
for Public Involvement can be modified through Supplemental
Agreement or Change Order at any time that it is desirable to
Owner. The activities specified in this scope of services are
the minimum contemplated to achieve the project goals .
1 . Meet with Owner's Public Involvement specialist to
jointly develop a project presentation philosophy,
alternatives discussion, and framework for the Public
Involvement proqram.
2 . Owner will be responsible for initial contacts to
specific agencies such as utility companies, school
districts, railroad companies, pipeline companies,
developers, commercial and industrial interests, and
others as appropriate to discuss impact of project on
their facilities. Engineer will make follow-up contacts
and coordinate as appropriate to complete engineering
activities.
Contacts to Union Electric and SE Missouri Regional
Hospital will be made to ensure that lifeline services
and special needs for emergency access off Broadway are
properly incorporated into the Public Involvement
process .
3 Conduct a public outreach program for property owners,
businesses, commercial establishments, and residents
along the proposed alignments who will be affected by the
proposed facilities or by construction activities.
Initial notification will be in the form of a newsletter
prepared by the Engineer and mailed to the parties by the
Owner. This initial mailing will be made by the Owner,
with the newsletter inserted in the utility bill to all
City residents and business, a total of approx. 14, 000
addresses . Additional copies will be provided to Owner
for distribution through community groups.
This scope of services contemplates a printing of 15, 000
copies of this initial newsletter, to include information
on all four projects, and it wi11 be printed on 8�"x14"
( legal-size) stock, so that when folded, will fit into a
Cape Girardeau, Missouri A-9 01/24/96
Transportation Program
standard envelope. This newsletter will be produced and
. mailed prior to the Public Meetings.
Engineer will draft newsletter text and graphics and
submit to Owner for review and comment.
4 . Lead three Public Meetings, one each for the Perryville
Road, Broadway, and Bloomfield Road projects. Each
Public Meeting will be held at an appropriate public
facility along each project. Information for the Signal
Upgrade Project will be provided in conjunction with the
Public Meeting for Broadway, and citizen input invited at
that time.
Engineer will actively coordinate the preparations for
these meetings with Owner.
Engineer will prepare the following exhibits and handouts
to facilitate each meeting:
• Meeting exhibits for use by Owner and Engineer and
examination by the citizens . Exhibits will include
enlarged copies of drawings and maps from the
Preliminary Study, aerial photo exhibits, a graphic
illustrating the proposed roadway compared to the
existing typical section, and traffic control
during construction. Planning for special events
will also be included in the exhibits.
• Handouts for the Public Meeting, to include project
information, contact people, project comment forms,
and a request for any special needs of residents
and businesses during construction. A total of 500
handouts for each Public Meeting is planned.
• Owner is encouraged to provide additional
information on the Five-Year Program and also
municipal services and departments in general.
Engineer will assist in incorporating such
information into the Public Meeting materials .
5 . Each Public Meeting will be preceded by direct-delivery
of a portion of the 500 handouts (see above) to addresses
along each route, within the scope of the project, but
not to include side streets. There are estimated to be
50 to 75 addresses along each project that will receive
Cape Girardeau, Missouri A-10 01/24/96
Transportation Program
direct-delivered copies. Engineer will cooperate with
Owner to determine other efficient ways to make the
handouts available to residents within the sphere of
influence for each project, prior to the Public Meeting.
6 . Document public input and submit to Owner for review and
comment. Engineer will cooperate with Owner to identify
a solution for each issue raised during the Public
Involvement process .
7 . Attend and participate in a pre-construction meeting for
each of the three street improvements projects . These
meetings will also include participation by the
construction contractor.
Exhibits from the Public Meetings will be updated and
used again to communicate at these meetings . A more
detailed scope of services for the pre-construction
meetings is included under Phase 3 .
Cape Girardeau, Missouri A-11 01/24/96
Transportation Program
PHASE 2A. FIELD SURVEYS AND PROPERTY SURVEYS
The following field survey and property survey activities apply to
the three street improvements projects . Limited field surveys for
the Signal Upgrade project is covered under Phase 1, Item G.
A. Preliminary and General Items
1 . Meet with Owner to discuss field work plan for surveying.
Visit the sites for a "job walk" with Owner personnel.
2 . Contact utilities for information on the location of
their facilities, availability of service, proposed
service extensions or improvements, and requirements for
connections and interfacing. Special attention will be
given to the service needs for SE Missouri Hospital.
3 . Contact local agencies concerning planned or proposed
improvements which would affect the project. Secure
available information concerning such improvements .
4 . Secure any available drawings or maps from the Owner, and
other sources typically used for survey research, which
would aid in the design and interfacing of the project.
B. Route Surveys and Property Surveys
1 . Provide the services of a registered land surveyor to set
horizontal and vertical controls and locate existing
street right-of-way and critical property corners along
route alignments, and to provide additional records on
right-of-way and property information as required.
2 . Conduct engineering surveys to gather topographic and
utility information along the alignments. Field surveys
will be designed and carried out to facilitate
construction of a digital terrain model for use in
design. The base mapping will be developed and plotted,
then checked in the field to ensure that existing
topography has been properly included. After computer
modeling verification and quality control checking, the
DTM files and survey notes will be submitted to Owner.
3 . Meet with Owner' s staff to review base mapping prior to
proceeding to subsequent design activities .
Cape Girardeau, Missouri A-12 01/24/96
Transportation Program
a
PHASE 2B. DESIGN, CONSTRUCTION DRAWINGS, SPECIFICATIONS, AND BID
DOCUMENTS
A. Preliminary and General Items
1 . Participate in informal meetings with the Owner
throughout the design phase to review progress and
exchange ideas and information. One meeting per month is
anticipated.
2 . Prepare and submit monthly progress reports to the Owner.
It is intended for the progress reports to be submitted
in conjunction with periodic invoices .
3 . Meet with Owner staff, emergency service departments,
utilities, and other appropriate entities, as needed to
determine requirements for public protection in the
contract documents.
B. Design Memorandum
The following activities will be repeated to produce a design
memorandum for each of the four individual improvements projects.
1 . Prepare a detailed design memorandum and preliminary
drawings as required to confirm agreement on technical
scope, design parameters, performance requirements, and
detailed design approach. This document will be directly
based on the preliminary study, and will represent
approximately the 20g stage of completion of final
design. Submit five copies to Owner for review.
2 . Meet with the Owner and secure the Owner' s comments on
the design memorandum and preliminary drawings . Resolve
any questions, revise documents if necessary, and
resubmit five copies to the Owner.
3 . Submit to other agencies as directed by Owner.
4 . Update and distribute the design memorandum if required
during the design phase.
C. Geotechnical Services
l . Provide, through a subcontract, qeotechnical engineerinq
services including exploratory work, laboratory and field
Cape Girardeau, Missouri A-13 01/24/96
Transportation Program
1
testing and professional guidance in tests to be made at
test locations based on preliminary drawings and designs
and including professional interpretations of exploratory
and test data.
The services will include:
a, Initial geotechnical exploratory work, such as soil
borings, penetration tests, soundings, subsurface
explorations, laboratory tests of soils, rock
formations, and other geophysical phenomena which
are required to provide information for design, and
all other field and laboratory tests and analyses
which are required to provide design information.
b. A qeotechnical report by a qualified geologist or
geotechnical firm interpreting the data on the
exploratory work and testing and setting out the
site conditions that can be anticipated from this
initial exploratory work.
2 . Geotechnical exploratory work is primarily anticipated
for the Perryville Road and Bloomfield Road projects.
Engineer' s proposed exploration program and boring
locations will be reviewed with Owner prior to any field
work.
D. Construction Drawings and Specifications
1 . Prepare detailed drawings and specifications for the
proposed construction work required. The documents shall
be prepared for construction by private contractors on a
competitive bid basis.
Engineering plans will prepared at a scale agreeable to
Owner and suitable to clearly show the work for each
particular project. At present, the following scales are
anticipated for the construction plans :
Perryville Road 1" = 40 '
Broadway 1" = 20 '
Bloomfield Road 1" = 40 '
Traffic Signal Upgrade 1" = 20 '
2 . Al1 construction work, including equipment purchase, will
be performed under one contract for each of the four projects .
Cape Girardeau, Missouri A-14 01/24/96
Transportation Program
3 . Prepare an opinion of probable construction cost for the
, proposed work covered by the drawings and specifications
for each contract.
4 . Provide five (5 ) sets of drawings and specifications to
the Owner for review at the following approximate stages :
Design Memorandum/Strip Map, R/W Plans, and Final Review.
Additional copies of the R/W Plans and Final Review
submittals will be made as discussed below.
5 . The Design Memorandum/Strip Map submittal will include:
• Typical Sections
• Plan and Profile Alignment
• Preliminary Cross Sections
• Construction Cost Opinion
After Engineer and Owner have agreed on the basic typical
sections and horizontal and vertical alignment, these
elements will be adhered to throughout detailed design.
6 . The R/W Plans submittal will be prepared in general
accordance with MHTD guidelines for R/W Plans . Complete
right-of-way and easement information will be developed
by this stage of design to enable property appraisals and
negotiations to begin. The R/W Plans submittal will also
be distributed to the utility companies for their review
and use. Engineer will coordinate with utility field
liaisons to begin development of adjustment and
relocation plans.
This submittal will include the following:
� Title Sheet
• Typical Sections
• Plan and Profile Drawings
• Culvert Profiles
• Driveway Profiles
� Major Drainage Design Features
• Basic Traffic Control Layouts
• Cross Sections and Construction Limits
• Construction Cost Opinion
7 . The R/W Plans review will also include a R/W Field Check
with Owner personnel to discuss and resolve key issues
before proceeding, such as:
Cape Girardeau, Missouri A-15 01/24/96
Transportation Program
• Traffic control
• Drainage improvements
• Maintaining property access
• Limits of overlay vs . pavement reconstruction
• Specialty items as developed
� Coordination needs during construction for
Owner departments such as police and fire
departments, public works, utility services,
and community agencies .
At Owner' s discretion, utility companies and other
agencies will be invited to participate in the Field
Check for each project.
8 . The Final Review submittal is intended to be for office
review by Owner, utility companies, and others as
appropriate. This submittal will facilitate detailed
review of the design features and construction details
prior to bidding, and will include the following:
• Final Title Sheet
• Typical Sections
• Detailed Plan and Profile Drawings
• Major and Minor Drainage System Plans
• Detailed Drainage Structure Designs
� Traffic Signal Plans and Details (Broadway)
• Signing and Marking Plans and Details
� Construction Phasing and Traffic Control Plans
• Erosion Control Plans
• Landscaping Plan
• Cross Sections and Final Earthwork
• Contract Documents and Specifications
• Construction Cost Opinion
9 . Review Owner and other agency comments, and meet with the
Owner if needed to discuss review comments, specific
issues to be addressed, and resolve any questions.
10 . Submit review copies to Cape Girardeau County Special
Maintenance Road District, MHTD, and other agencies as
directed by Owner.
11 . After receipt of Owner' s review comments, revise as
necessary and hold one utility coordination meeting for
each project. The utility coordination meeting will
allow the utility companies to report their proposed
Cape Girardeau, Missouri A-16 01/24/96
Transportation Program
adjustment plans, schedules, and specific needs, to the
other utilities, as well as Owner and Engineer.
12 . Upon completion of each stage of the review of drawings
and specifications, update the opinion of probable
construction cost and revise and expand as required.
13 . Review the construction contract drawings and
specifications for completeness, bidability, and
constructability.
14 . Prepare bid forms and preliminary "Invitation to Bid"
form.
15 . Provide digital files (AutoCAD Ver. 12 ) of the final
drawings to Owner.
Cape Girardeau, Missouri A-17 01/24/96
Transportation Program
PHASE 2C. RIGHTS-OF-WAY AND EASEMENTS NEGOTIATION AND ACQUISITION
A. Determine tentative permanent and temporary construction
easement needs along the alternative alignments . Review
these needs with Owner' s staff . Following completion of
the Preliminary Study and concurrence on the final
alignment, determine specific right-of-way and easement
requirements .
B. Provide the services of a title company to prepare title
reports on each parcel of property on which takings or
easements are required.
C. Provide the services of a registered land surveyor to
prepare plats and legal descriptions for actual acquiring
of the required right-of-way and easements.
D. Provide a qualified appraiser to appraise rights-of-way
and easements to be acquired by fee title.
E. Provide the services of a qualified R/W Negotiator to
meet and negotiate with the property owners involved.
F. Provide the services of a registered land surveyor to
prepare documentation on parcels for condemnation
proceedings, if required. Owner will be responsible for
completing the condemnation process on any parcels so
affected.
G. Relocation of families or businesses is not anticipated
for any of the projects, and services for relocation or
demolition of major structures are not included in the
scope of this contract.
Cape Girardeau, Missouri A-18 01/24/96
Transportation Program
PHASE 3 BIDDING ASSISTANCE SERVICES, CONSTRUCTION PHASE SERVICES,
AND RESIDENT SERVICES
A. Bidding Assistance Services
1 . Coordinate bid letting date, time, and place with Owner
and prepare final Invitation to Bid.
2 . Assist and advise Owner in placing the advertisements of
the Invitation to Bid. Engineer will follow Owner' s DBE
Involvement Plan in developing and advertising the
Invitation to Bid.
3 . Identify potential contractors and suppliers, and
distribute copies of Invitation to Bid. Maintain a
record of prospective bidders and suppliers to whom
drawings or specifications have been issued.
4 . Provide Owner up to 30 sets of construction contract
drawings and specifications for bidding purposes . Owner
to provide plan room services as follows:
• Distribute construction contract drawings and
specifications to prospective bidders.
• Distribute plan holders ' list to recipients of
drawings and specifications prior to bid opening.
� Receive deposits for construction contract drawings
and specifications .
5 . Provide up to five (5) additional, complete sets of the
construction contract drawings and specifications to the
successful bidder.
6 . Conduct, at a date and time selected and a place provided
by the Owner, a prebid conference to:
a. Instruct prospective bidders and suppliers as to
the types of information required by the contract
documents and the format in which bids should be
presented.
b. Review special project requirements and contract
documents in general.
7 . Interpret construction drawings and specifications, and
provide written responses to questions from bidders
Cape Girardeau, Missouri
A-19 01/24/96
Transportation Program
requiring clarification during the bidding period.
. Prepare and issue addenda to the construction contract
documents when required. For budget purposes, it is
assumed that two (2 ) addenda will be prepared for each
construction contract.
8 . Assist Owner during bid opening. Answer questions during
bid opening, make preliminary tabulation of bids, and
review questionnaires and bids for completeness.
9 . Review and evaluate the qualifications of the apparent
successful bidder and the proposed major or specialty
subcontractors. The review and evaluation will include
such factors as work previously completed, whether
adequate equipment is available to complete the work
properly and expeditiously, financial resources, and
technical experience.
10 . Prepare and distribute formal bid tabulation sheets,
evaluate bids, and make written recommendations to the
Owner concerning contract award.
11 . Prepare and distribute conforming copies of the
construction contract documents. These services will
include review of contractor's bonds, furnishing the
Contractor unsigned construction contract documents, and
transmitting the construction contract documents to the
Owner for signature and distribution.
B. Construction Phase Services
The Engineer will perform contract administration services
during the construction phase of each project. By performing
these services, the Engineer shall not have authority or
responsibility to supervise, direct, or control Contractor' s
work or Contractor' s means, methods, techniques, sequences, or
procedures of construction.
The Engineer shall not have authority or responsibility for
safety precautions and programs incident to Contractor' s work
or for any failure of Contractor to comply with laws,
regulations, rules, ordinances, codes or order applicable to
Contractor furnishing and performing the work. The Engineer
will immediately notify Contractor when a public safety issue
needs attention, Contractor shall be responsible to address
the matter.
Cape Girardeau, Missouri A-20 01/24/96
Transportation Program
Specific services to be performed by Engineer are as follows :
1 . Review Contractor's insurance certificates and forward
the certificates to the Owner for acceptance by the
Owner's legal counsel. The Engineer's review of the
insurance certificates is only for the purpose of
determining if the Contractor maintains the general types
and amounts of insurance required by the specifications,
and is not a legal review to determine if the
Contractor ' s insurance coverage complies with all
applicable requirements .
2 . As an extension of the public information program, set up
a public notification procedure relating to specific
construction activities. This work will consist of
notifying the public directly affected by the
construction activities of the proposed schedule and
special provisions in writing. ( If provided, the
Resident Project Representative will assist in this
effort. )
Engineer will proactively partner with Contractor and
Owner to establish specific activities to minimize
inconvenience to citizens and businesses during
construction. A specific plan to maintain emergency
access to SE Missouri Hospital during construction will
be developed and implemented. This will also include
partnering with Owner's police department to keep
officers informed of the work in progress and arrange for
police support in traffic management or special services
when needed.
3 . At a date and time selected by the Owner and at a •
facility provided by the Owner, conduct a preconstruction
conference. Engineer shall prepare an agenda for the
conference and prepare and distribute minutes. The
preconstruction conference will include a discussion of
the Contractor' s tentative schedules, procedures for
transmittal and review of the Contractor' s submittals,
processing payment applications, critical work
sequencing, change orders, record documents, and
Contractor' s responsibilities for safety and first aid.
4 . Review and comment on the Contractor's initial and
updated construction schedule and advise the Owner as to
acceptability.
Cape Girardeau, Missouri A-21 Ot/24/96
Transportation Program
5 . Review the Contractor's initial and updated schedule of
estimated monthly payments and advise the Owner as to
acceptability.
6 . Make periodic visits to the construction site to observe
progress of the work and consult with the Owner and
Contractor concerning problems and/or progress of the
work. A total of 6 visits is anticipated for each
project.
7 . Review drawings and other data submitted by the
Contractor as required by the construction contract
documents . The Engineer' s review shall be for
general conformitv to the construction contract drawings
and specifications for the project and shall not relieve
the Contractor of any of his contractual responsi-
bilities . Such reviews shall not extend to means,
methods, techniques, sequences, or procedures of
construction or to safety precautions and programs
incident thereto.
8 . Receive and review guarantees, bonds, certificates of
inspection, tests, and approvals which are to be
assembled by the Contractor(s) in accordance with the
construction contract documents and transmit them to the
Owner.
9 . Interpret construction contract drawings when requested
by the �wner or Contractor. If authorized by the
Contractor, the Engineer may interpret construction
contract drawings and specifications upon request by
subcontractors and suppliers.
10 . Review and process the Contractor' s monthly payment
requests, and forward to the Owner if applicable. The
Engineer's review shall be for the purpose of making a
full independent mathematical check of the Contractor' s
payment request. Unless otherwise requested, Owner is
responsible for verifying the quantities of work which
are the basis of the payment request.
11 . Provide documentation for the processing of change
orders . Owner to administer the processing of change
orders, including applications for extensions of
construction time, unless Engineer is authorized to do so
as a supplemental service.
Cape Girardeau, Missouri A-22 Ot/24/96
Transportation Program
12 . Upon completion of the project, revise the construction
contract drawings to conform to the construction records.
Submit copies of the mylars and digital files to the
Owner.
13 . Act as initial arbiter on all claims of Owner and
Contractor relating to the acceptability of the work or
the interpretation of the requirements of the
construction contract documents pertaining to the
execution and progress of the work.
14 . Evaluate and report on tests and test analyses of
equipment and materials, including concrete, pipe, soil,
soil compaction tests, asphalt, and any other work items
that may be required by the specifications and good
construction practice. Testing laboratory to be provided
by Owner.
15 . Upon substantial completion, inspect the construction
work and prepare a listing of those items to be completed
or corrected before final completion of the project.
Submit results of the inspection to the Owner and
Contractor.
16 . Upon completion or correction of the items of work on the
punch list, conduct a final inspection to determine if
the work is completed. Provide written recommendations
concerning final payment to the Owner, including a list
of items, if any, to be completed prior to the making of
such payment.
C. Resident Services During Construction
As requested by Owner for each project, Engineer will furnish
a full-time or part-time Resident Project Representative as
may be required on the work. The Resident Project
Representative will observe the Contractor' s work and perform
the services listed below.
The Resident Project Representative shall not have
responsibility for the superintendence of construction site
conditions, safety, safe practices or unsafe practices or
conditions, operations, equipment, or personnel other than
employees of the Engineer. The Resident Project
Representative will immediately notify the Contractor when he
observes safety issues that need to be addressed; however,
Cape Girardeau, Missouri A-23 01/24/96
Transportation Program
this service will in no way relieve the Contractor of complete
supervision of the work or the Contractor' s obligation for
complete compliance with the drawings and specifications . The
Contractor shall have sole responsibility for safety and for
maintaining safe practices and avoiding unsafe practices or
conditions .
Specific services available to Owner that would be performed
by the Resident Project Representative are as follows :
1 . Site Observations and Liaison with Owner and
Contractor(s)
a. Conduct onsite observations of the general progress
of the work to assist the Engineer in determining
if the work is proceeding in accordance with the
construction contract documents .
b. Obtain photographs or video tapes of the
construction site prior to the start of the
construction to assist in defining the original
condition of existing physical features, including
but not limited to pavement, curb and gutter,
lawns, shrubs, trees, ditches, fences, sidewalks,
buildings, and structures that are located adjacent
to the limits of construction.
c. Serve as the Engineer' s liaison with the
Contractor, working principally through the
Contractor's superintendent, and assist the
Engineer in providing interpretation of the
construction contract documents. Transmit the
Engineer' s clarifications and interpretations of
the construction contract documents to the
Contractor.
d. Assist the Engineer in serving as the Owner' s
liaison with Contractor when Contractor' s
operations affect Owner' s onsite operation.
e. As requested by the Engineer, assist in obtaining
from the Owner additional details or information
when required at the jobsite for proper execution
of the work.
f. Consult with the Owner and the Contractor, giving
Cape Girardeau, Missouri
A—Z 4 01/24/96
Transportation Program
opinions and suggestions based on his (Resident
, Project Representative ' s) observations regarding
defects or deficiencies in the Contractor' s work
and relating to compliance with drawings,
specifications, and design concepts.
g. Advise the Engineer and Contractor or its
superintendent immediately of the commencement of
any work requiring a shop drawing or sample
submission if the submission has not been accepted
by the Engineer.
h. Monitor changes of apparent integrity of the site
(such as subsurface conditions, existing
structures, and site-related utilities when such
utilities are exposed) resulting from construction
related activities .
i. Observe pertinent site conditions, when the
Contractor maintains that differing site conditions
have been encountered, and document actual site
conditions . Review and analysis of Contractor
claims for differing site conditions are
supplemental services .
j . Review Contractors ' construction sequence and
traffic control plans .
k. Contact utilities in the general construction area
and advise them of the Contractor's schedule.
Assist in coordinating scheduling of utility
activities so as to minimize conflicts with
construction progress .
1. Provide necessary surveying to re-establish precon-
struction grades and referencing and reestablishing
land surveying movements . In easement areas, mark
the easement limits.
m. Visually inspect materials, equipment, and supplies
delivered to the worksite. Reject materials,
equipment, and supplies which do not conform to the
construction contract documents.
n. Coordinate onsite materials testing services during
construction. Copies of testing results will be
Cape Girardeau, Missouri
A-25 01/24/96
Transportation Program
forwarded to the Owner for review and information.
o. Observe field tests of equipment, structures and
piping, and review the resulting reports,
commenting to the Owner as appropriate.
2 . Outside Liaison and Public Relations Services
a. Accompany visiting inspectors representing public
or other agencies having jurisdiction over the
project. Record the results of these inspections
and report to the Engineer.
b. Provide personnel to maintain a phone or written
communication system for timely handling and
resolution of the construction related complaints
or inquiries .
c. Provide services in connection with the public
information program, carrying out notification
procedures during construction by contracting
individual property owners as appropriate.
3 . Meetings, Reports, and Documents Review and Maintenance
a. Attend the preconstruction conference, and assist
the Engineer in explaining administrative
procedures which will be followed during
construction.
b. Prepare for and attend monthly progress meetings,
and other meetings when necessary, with the Owner
and Contractor to review and discuss construction
procedures and progress scheduling, engineering
management procedures, and other matters concerning
the project.
c. Submit to the Owner weekly construction progress
reports containing a summary of the Contractor' s
progress, general conditions of the work, problems,
and resolutions or proposed resolutions of
problems.
d. Review the progress schedule, schedule of shop
drawings submissions, and schedule of values
prepared by Contractor and consult with the
Cape Girardeau, Missouri A-26 01/24/96
Transportation Program
Engineer concerning their acceptability.
e. Report to the Engineer whenever work is known to be
defective, or does not meet the requirements of any
inspections, tests or approval required to be made
or has been damaged prior to tests or approval
required to be made or has been damaged prior to
final payment, and advise the Engineer when the
work should be corrected or rejected or should be
uncovered for observation, or required special
testing, inspection, or approval.
f. Review applications for payment with the Contractor
for compliance with the established procedure for
their submission and forward them with
recommendations to the Engineer, noting particu-
larly their relation to the schedule of values,
work completed, and materials and equipment
delivered to the site but not incorporated into the
work.
g. Receive and record date of receipt of shop drawings
and samples which are furnished at the site by the
Contractor, and notify the Engineer of their
availability for examination.
h. During course of the work, verify that certificates
and other data required to be assembled and
furnished by the Contractor are applicable to the
items actually installed; and deliver this material
to the Engineer for his review and forwarding to
the Owner prior to final acceptance of the work.
i. Receive and review all certified payrolls submitted
by Contractors and submit payrolls to the Owner.
j . Maintain a marked set of record drawings and
specifications at the jobsite based on data
provided by the Contractor. This information will
be combined with information maintained by the
Contractor and a master set of record documents
produced.
k. Review certificates of inspections, test reports,
and related approvals submitted by the Contractor
in compliance with required by laws, rules,
Cape Girardeau, Missouri A-27 01/24/96
Transportation Program
regulations, ordinances, codes, orders, or the
. contract documents (but only to determine that
their content complies with the requirements of,
and the results certified indicate compliance with
the construction contract documents) . This service
is limited to a review of items submitted by the
Contractor and does not extend to a determination
of whether the Contractor has complied with all
legal requirements .
1. Maintain the following documents at the jobsite.
1 . ) Correspondence files .
2 . ) Reports of job conferences, meetings and
discussions among the Engineer, Owner, and
Contractor.
3 . ) Shop drawings and samples submissions .
4 . ) Reproductions of original construction
contract documents.
5 . ) Addenda.
6 . ) Change orders.
7 . ) Field orders .
8 . ) Additional drawings issued subsequent to
execution of the construction contract
documents .
9 . ) Engineer's clarifications and interpretations
of the construction contract documents .
10 . ) Progress reports .
11 . ) Names, addresses, and telephone numbers of all
contractors, subcontractors, and major
suppliers of materials and equipment.
m. Maintain a daily diary or log book of events
occurring at the jobsite, including the following
information:
1 . ) Contractor' s hours on the jobsite.
2 . ) Contractor and subcontractor personnel on the
jobsite.
3 . ) Construction equipment on the jobsite and
hours of use.
4 . ) Observed delays and causes .
5 . ) Weather conditions.
6 . ) Data relative to questions of extras or
deductions.
7 . ) List of visitors .
Cape Girardeau, Missouri A-28 01/24/96
Transportation Program
8 . ) Daily activities.
, 9 . ) Decisions .
10 . ) Observations connected with the progress of
the work.
11 . ) Materials received on the jobsite.
The diary or log book shall remain the property of
the Engineer.
4 . Assistance in Certification of Substantial Completion
a. Before the Engineer issues a Certificate of
Substantial Completion, submit to the Contractor a
list of observed items requiring completion or
correction.
b. Assist the Engineer in conducting final inspection
in the company of the Owner and Contractor, and
prepare a final list of items to be completed or
corrected.
c. Verify that all items on the final list have been
completed or corrected and make recommendations to
the Engineer concerning acceptance.
d. Obtain photographs or videotapes of the
construction site after completion of construction.
Cape Girardeau, Missouri A-29 01/24/96
Transportation Program
PHASE 4 . SUPPLEMENTAL SERVICES
Any work requested by the Owner that is not included in one of the
items listed in another phase will be classified as supplemental
services . Supplemental services include but are not limited to:
A. Additional meetings with local, state or federal agencies
to discuss the project.
B. Additional appearances at public hearings or before
special boards.
C. Supplemental engineering work required to meet the
requirements of regulatory or funding agencies that
become effective subsequent to the date of this
agreement.
D. Special consultants or independent professional
associates requested or authorized by Owner.
E. Assistance with bid protests and rebiddinq, preparation
for litigation, arbitration or other legal or
administrative proceedings, and appearances in court or
at arbitration sessions .
F. Additions to an engineering report to update or revise
original, accepted, recommendations .
G. Providing engineering assistance to the Owner in
condemnation proceedings beyond that identified.
H. Provision of an environmental assessment report or
environmental impact statement as requested by the Owner
or required by review agencies.
I . Provision, through a subcontract, of an archaeological
study and report on the construction site(s) .
J. Provision, through a subcontract, of archaeological
consultations regarding artifacts that may be uncovered
during construction.
K. Provision, through a subcontract, of laboratory and field
testing required during construction and any special
reports or studies on materials and equipment requested
by the Owner.
Cape Girardeau, Missouri
A-30 01/24/96
Transportation Program
L. Provision of support services in connection with
. additional public involvement activity beyond that
defined in Phases 1 and 3 .
M. Assistance in the closing of any financial or related
transaction for the project.
N. Where field conditions are encountered which differ from
the conditions shown on the construction contract
documents or soil borings, or as otherwise required,
preparation of sketches of construction work for approval
by the Owner, to supplement the drawings and
specifications as may be required. Provide redesign or
relocation information if requested by underground
obstruction, utilities or other conditions .
0. Services resulting from significant delays, changes or
price increases occurring as a direct or indirect result
of material, equipment or energy shortages .
P. Additional or extended services during construction made
necessary by ( 1) work damaged during construction, (2 ) a
significant amount of defective or neglected work of any
Contractor, ( 3 ) acceleration of the process schedule
involving service beyond normal working hours, (4)
default by any Contractor and (5) failure of the
Contractor to complete the work within the contract time.
Q. Evaluation of unusually complex claims or an unreasonable
or extensive number of claims submitted by Contractor or
others in connection with the work.
R. Changes in the general scope, extent or character of the
project or its design including, but not limited to,
changes in size, complexity, Owner' s schedule, character
of construction or method of financing; and revising
previously accepted studies, reports, design documents or
construction contract documents when such revisions are
required by changes in laws, rules, regulations,
ordinances, codes or orders enacted subsequent to the
preparation of such studies, reports or documents or
designs, or are due to any other causes beyond the
Engineer' s control.
[End of Attachment A]
Cape Girardeau, Missouri
A—31 01/24/96
Transportation Program
�
ATTACHMENT B
TO
AGREEMENT FOR ENGINEERING SERVICES
FOR
CITY OF CAPE GIRARDEAU, MISSOURI
TRANSPORTATION ZMPROVEMENTS PROGRAM
COMPENSATION
Owner: City of Cape Girardeau, Missouri
Project: Transportation Improvements Program
For the services covered by this Agreement, the Owner agrees to
pay the Engineer as follows:
A. For Phase 1 Services ( Initial Investigations and Preliminary
Study) , 2A Services (Field Surveys and Property Surveys) , and 2B
Services (Design, Construction Drawings, Specifications, and Bid
Documents) , an amount equal to the Engineer' s salary costs times
2 .95 plus reimbursable expenses at cost and plus subcontract
billings times 1 .05 . The maximum amount to be billed for these
services shall not exceed $355, 000 .00 without further
authorization.
B. For Phase 1, 2A, and 2B Services pertaining solely to the
Traffic Signal Upgrade Project (not to include street
improvements covered under the Broadway Project) , an amount equal
to the Engineer's salary costs times 2 .95 plus reimbursable
expenses at cost and plus subcontract billings times 1 .05 . The
maximum amount to be billed for these services shall not exceed
$60, 000 .00 without further authorization.
C. For Phase 2C Services (Rights-of-Way and Easement
Negotiation and Acquisition) , an amount equal to $750 .00 per
parcel for easement negotiation and acquisition and $1,350 .00 per
parcel for new right-of-way negotiation and acquisition. For
budgeting purposes, it is estimated that a total of 66 easement
parcels and 30 right-of-way parcels will be required for the
total project, as currently defined, resulting in a total
estimated amount of $90, 000 .00 .
D. For Phase 3 Services (Bidding Assistance, Construction Phase
Services, and Resident Services) , an amount to be determined
after the scope of the work is better defined for each project.
Cape Girardeau, Missouri B-1 01/22/96
Transportation Program
E. For Phase 4 Services (Supplemental Services) , an amount
equal. to the Engineer' s salary costs times 2 .95 plus reimbursable
expenses at cost and plus subcontract billings times 1 .05 . Each
item of Supplemental Services shall be specifically authorized by
the Owner, and a maximum billing limit shall be established
before the work is started. The amount billed for each item of
Supplemental Services shall not exceed the amount established for
it without further authorization.
F. The following expenses are reimbursable under salary
multiplier work items :
1 . Travel, subsistence, and incidental costs .
2 . Use of motor vehicles on a monthly rental basis for
assigned vehicles and on a mileage basis for vehicles
uses for short periods. Mileage basis shall be 30 cents
per mile.
3 . Moving costs to project for full-time onsite personnel.
4 . Long distance telephone costs and project "onsite"
telephone costs.
5 . Reproduction of reports, drawings, and specifications.
6 . Postage and shipping charges for project-related
materials .
7 . CAD-related expenses. (Note: Computer-related expenses
other than CAD are specifically excluded. )
8 . Rental charges for use of equipment, including equipment
owned by the Engineer.
9 . Cost of acquiring any other materials or services
specifically for and applicable to only this project.
10 . Subcontract costs including those for soils and
geotechnical investigations and reports, testing
laboratory services, surveying and mapping services,
assistant engineers, public involvement specialists,
right-of-way negotiators, and other subcontract services
as may be required for the project.
11 . Charges for special consultants requested or authorized
by the Owner.
12 . Special insurance coverage required by the Owner,
including the cost of naming the Owner as an additional
insured.
Cape Girardeau, Missouri B-2 01/22/96
Transportation Program
13 . Local taxes or fees applicable to the engineering work
, or payments therefor.
14 . Charges for review of drawings and specifications by
government agencies, if any.
G. Periodic payments shall be made to the Engineer by the Owner
based on the Engineer' s statement. The statement shall be
itemized to indicate the amount of work performed and the
associated reimbursable expenses and subcontract costs.
H. The entire amount of each statement shall be due and payable
upon receipt by the Owner. Carrying charges of 1-1/2 percent per
month from the billing date, shall be due for accounts which are
not paid within 60 days after the billing date.
I. It is understood and agreed that the maximum billing amount
for the Phase 1, 2A and 2B Services is based on the start of
those services being authorized not later than March 1, 1996 .
J. It is understood and agreed that if the project, after being
started in any phase, is stopped in that phase for the Owner' s
convenience for more than 60 calendar days, Engineer may reassign
project team members to other work. If the team is disbanded and
the work is restarted at a later date, then the Owner will pay
the Engineer a restart fee equal to 10 percent of the original
maximum billing limit for that phase. All payments for project
suspension and restart will be in addition to the original
maximum billing limit.
K. It is understood and agreed that the Engineer shall start
the performance of Phase 1, 2A, 2B and 2C Services within ten
calendar days of receipt of Notice to Proceed. It is understood
that Notice to Proceed for Phase 2B will be issued upon
completion of Phases 1 and 2A, and Notice to Proceed for Phase 2C
will be issued upon completion of the R/W Plans (within Phase
2B) . The services provided under this contract will be completed
within the following number of calendar days following Notice to
Proceed for a particular phase.
The times for Phase 1 exclude the actual convening of the Public
Meetings, which will be scheduled for a mutually agreeable time
with Owner.
Cape Girardeau, Missouri B-3 01/22/96
Transportation Program
,
r
Owner and Engineer agree that formal review periods for Owner and
other• agencies shall not count toward the contract times
indicated below for Phase 2B Services . Moreover, condemnation
proceedings, if necessary, are not considered in the times
indicated below for Phase 2C Services .
The completion schedule for Phase 3 Services is to be mutually
agreed upon by Owner and Engineer prior to beginning services
under that phase.
Completion
Perryville Road Schedule'1'
Phase 1 - Initial Investigations 60 days
and Preliminary Study
Phase 2A - Field Surveys and Property Surveys 60 days
Phase 2B - Design, Drawings and Documents 150 days
Phase 2C - Rights-of-Way and Easements 210 days
Negotiation and Acquisition
Target Date for Bid Advertisement: August 1, 1996�Z�
Broadwav
(Survey and design Clark Ave. to West End Blvd. ; R/W and
construction from Clark Ave. to Perry Ave. )
Phase 1 - Initial Investigations 75 days
and Preliminary Study
Phase 2A - Field Surveys and Property Surveys 90 days
Phase 2B - Design, Drawings and Documents 180 days
(Clark Ave. to West End Blvd. )
Phase 2C - Rights-of-Way and Easements 300 days
Negotiation and Acquisition
(Clark Ave. to Perry Ave. )
Target Date for Bid Advertisement: January 15, 1997�2'
Bloomfield Road
Phase 1 - Initial Investigations 60 days
and Preliminary Study
Phase 2A - Field Surveys and Property Surveys 60 days
Phase 2B - Design, Drawings and Documents 150 days
Phase 2C - Rights-of-Way and Easements 210 days
Negotiation and Acquisition
Target Date for Bid Advertisement: October l, 1996�Z�
Cape Girardeau, Missouri B-4 01/22/96
Transportation Program
,
Traffic Siqnal Uparade
Phase' 1 - Initial Investigations 75 days
and Preliminary Study
Phase 2A - Field Surveys and Property Surveys 60 days
Phase 2B - Design, Drawings and Documents 90 days
Phase 2C - Rights-of-Way and Easements n/a
Negotiation and Acquisition
Target Date for Bid Advertisement: August 15, 1996�2�
�" Number of calendar days following Notice to Proceed for each
phase of the work.
'2' Assuming Project Notice to Proceed is given the week of
February 5, 1996 .
L. Engineer shall keep records of costs and expenses on the
basis of generally accepted accounting practices. Those records
shall be available for inspection at Engineer' s headquarters
during normal business hours.
[End of Attachment B]
Cape Girardeau, Missouri
B-5 01/22/96
Transportation Program
y
!
ATTACHMENT C
TO
AGREEMENT FOR ENGINEERING SERVICES
FOR
CITY OF CAPE GIRARDEAU, MISSOURI
TRANSPORTATION IMPROVEMENTS PROGRAM
OWNER'S RESPONSIBILITIES
Owner: City of Cape Girardeau, Missouri
Project: Transportation Improvements Program
The Owner will furnish, as required by the work and not at the
expense of the Engineer, the following items :
A. All maps, drawings, reports, records, audits, annual
reports, and other data that are available in the files of the
Owner and which may be useful in the work involved under this
contract.
B. Access to public and private property when required in
performance of the Engineer's services .
C. The services of at least one of the Owner' s employees or
staff who has the right of access to, and who has knowledge of,
the existing streets and traffic signal equipment.
D. Releases to the news media concerning public hearings,
prebid conferences, preconstruction conferences, and the time and
location of anticipated street closings or partial closings .
E. Hall or auditorium space for public hearings, prebid
conferences, and preconstruction conferences and the audio
equipment and projection equipment required for such hearinqs and
conferences .
F. Legal advertisement of project letting or bid date and such
other publications of the "Invitation to Bid" as desired by the
Owner.
G. Royalties and fees for patented processes used in the work,
except those required to be paid by construction contractors as
part of the construction contract.
Cape Girardeau, Missouri C-1 01/22/96
Transportation Program
J
H. Shop, mill, or laboratory inspection of materials,
laboratory and field testing, and field sampling services.
I . Al1 legal and other related activities to carry out
condemnation proceedings on any parcels that must be condemned.
J. Fees, expenses, negotiated settlements, and other costs
associated with the actual closing of an agreement and
compensation to a property owner for the purchase of right-of-way
or easements .
K. Securing all necessary permits except for those specifically
identified to be secured by the construction contractor.
L. Initial contacts with specific agencies such as utility
companies, SE Missouri Hospital, school district, railroad
companies, pipeline companies, developers, commercial and
industrial interests, and other as appropriate to discuss the
impact of the project on their facilities, as part of the Public
Involvement Program. (Note: Engineer will make follow-up
contacts and coordinate additional activities, as appropriate. )
M. Distribution of documents, as appropriate, to all reviewing
or regulatory agencies for the purpose of acquiring approvals or
permits.
[End of Attachment C]
Cape Girardeau, Missouri C-2 O1/22/96
Transportation Program