HomeMy WebLinkAboutCityMgrForm.1411.01-03-1979 . � . . , � , � , CITY MANAGER FORP� ORDINANCE NO. r �/ � AN ORDINANCE APPROVING THE FORM OF AN AGREEMENT BET6VEEN THE CITY OF CAPE GIRARDEAU, MISSOURI, CAPE GIRARDEAU SCHOOL DISTRICT N0. 63, AND JACKSON EXCAVATING COMPANY, FOR CONSTRUCTION OF THE MUNICIPAL SWIIIMING POOL BATHHOUSE AND RELATED ITEMS, AUTHORIZING THE MAYOR TO EXECUTE, AUTHORIZING PAYMENT OF A SUM OF MONEY T�lHEREAS, the City of Cape Girardeau, Missouri and Cape Girardeau School District No. 63 are constructing a municipal swimming pool; and ' WHEREAS, there is a need for construction of a 4800 square foot bathhouse, general site work and grading, concrete pool deck, sidewalk, as�halt surface parking lot, utilities, and foundation and anchor placement for an air supported structure; and WHEREAS, Jackson Excavating Company desires to perform said work and the said parties desire to enter into an agreement for said construction; NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF CAFE GIRARDEAU, MISSOURI, AS FOLLOV�S: SECTION 1. The "Standard Form of Agreement Between Owner and Contractor On the Basis of a Stipulated Sum" , copy attached hereto marked Exhibit "A" , between the City of Cape Girardeau, � Missouri and Cape Girardeau School District No. 63 and Jackson Excavating Company is approved as to form. SECTION 2. The �Zayor of the City of Cape Girardeau, Missouri, is hereby authorized and directed to execute said agreement, copy attached hereto marked Exhibit '°A" , for and on behalf of the City of Cape Girardeau, Missouri. SECTION 3. Payment of a sum of money by the City of Cape Girardeau, Missouri, is hereby authorized to be made to Jackson Excavating Company for said construction work in accordance with the terms and provisions of said Agreement. SECTION 4. This ordinance shall be in full force and effect ;: �,� �'. � �, ,,�.. ,, � ', � „� �; : . ' . , , , ' . ten days after its passage and approval. a�� PASSED AND APPROVED THIS � — DAY OF f.LZtic.�.�c.t-L. , 197�. �� � ��--�' , Y� �- �.� T�lAYOR ATTEST: �� ����'�.'�--��� 't-�--�-e��c___� CITY CLERK 2. ' , PART I — AGREEMENT This documcnt has important legal conscquences; consultatiun with ao attorney is encouraged with respect to its completion or modification. . STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED SUM TH1S AGREEMEN? made as of the -•--- ---...---•-.- . --•--... day of -----.._....__.- .- ---•.------ in the yeat -•- - -- �..... ............ 19?_.. by and between ���-� � CITY OF CAPE GIRARDEAU, MISSOURI, AND CAPE GIRARDEp►U SCHOOL DISTRICT NO. 63, (hereinafter called OWNER) and _ J�,CKSON EXCI�VATING COMPANX (hereinafter called CONTRACTOR) WITNESSETH TH.4T OWNEIt and CONTRACTOR in concideration of the mutual cavenants hereinafter ut forth. agree as follows: ArNcle I. WORK. The C'ONTRAC'fORS shall perform all Work as spccified or indicated in the Contract Docu- ments for the compl�tion of the Project gencrally dcscribed as follow�s: Construction of a 4800 square ft. bathhouse, general site work and grading, concrete pool deck, sidewalk, asphalt surface parking lot, utilities, and foundation and anchor placement for an air supported structure. Article 2. ENGINEER. The Project has been designc� by DELTA ENGINEERING CONSULTANTS, I�1C. P. O. Box 759, 1812 Broadway Cape Girardeau, Missouri 63701 who will act as ENGINEER in connection with completion of the Project in accordance with the Contract Documents. Article 3. CONTRACT TIME. The Work will be complcted within ..... ...?10._. _ _ _..__._ days aher the date when the Contract Time commences to run as provided in paragraph 2.5 of the C�eneral Conditions. Liquidated damages shall be as specified in the Supplelnentary Conditions of the Contract Documents. /. � NSPE 1910-8-A-1 (1974 Edition) Repnnteo 1Dt3 SM � �'w• 'fhis dacument has been approved by the American Consultint � i� Engineen Council, and recommended for ux b ' � y �ts memben. !� 197l, National Society ot Professional En�ineers Page 1 of _. 4_.._ pages EXHIBIT N��� � PART I — AGREEMENT Article 4. CONTRACT PRICE. OWNER shall pay CONTRACTOR for performance of the Work in accordance with the Contract Documents in current funds as follows: . (here insert a lump som, unit prices or both, an aching exhibits il necessary) (use separau lorm for Cost-Plus Contracts) Exhibit "A" attachedo Article S. APPLICATIONS FOR PAY1►1ENT. CONTRACI'OR shall submit Applications for Paymcnt in accor- dance with Ar�icle 14 af thc Gcncral Canditirni�. Ap�+lications far Pa}'ment H�ill hc revica�cd hy ENGTNEER as provided � in the General Conditions. Article 6. PROGRESS AND F1NAL PAYh1L'NTS. OWNER shall m�ke pr�gress payments on account of the Con- tract Price on the basis of CONTRACTOR's Application� for Payment as approved by ENGINEER, on or about the ._._. .*.._. _ day of each month during construction as pr,pvided hclow. All progress payments will be on the ba�is of the progress of the Work mcasured by thc schcdulc of valucs provided for in paragraph 14.1 of �hc General Conditions. *See Supplementary Conditions 6.1. Prior to Substantial Completion progress pa}�ments will be in an amount equal to: _..........gp .. ..__% of the Work completed, and _ gp _. °1� o( matcrial and equipment not incorporated in the W�rk but delivered and suitably stored, less in each case the aggregate o( paymems previousty made. 6?. Upon Substantial Completion, OWNER shall pay an amount su�cient to increase total payments to CON- TRACTOR to 9870 of thc Contract Pricc, lcss rctainages as ENGINEER shall dctcrminc in accordancc with para- graph 14.7 of thc Gcncral C�nditions. 6.3. Upon final completion of the Wnrk and setticment of all claims, OWNER shall pay the remainder of the Contract Price. Article 7. CONTRACT DOCUMENTS. The Contract Documents which comprise the co�tract between OWNER and CONTkACTOR are attached heret� and made a part hereof and consist of the (nllowing: 7.1. 7�his Agrecmcnt (pages 1 to 4 . , inclusivc), 7.2. Exhibits to this Agrecment (pagcs 1 to 1 , inclusive), 7.3. CONTRACTOR's Bid and Bonds consistinF of pagcs, �7.4. Notice of Award, n/a 7.5. Instructions to Biddcrs. NSPE Ducumcnt 1910-12, 1974 edition (pagcs 3 to 4 , inclusivc), 7.6. General Canditions, NSPE Document 1910-8, 1974 edition (pages 1 to 27 . , inclusivel, 7.7. Supplcmemary Conditions (pages 1 to 7 inclusivc), 7.8. Specifications (pages . _. to inclusive), DIVISIONS 1,2,3,4,5,6,7,8,9,10,12,15, & 17. Pagc 2 0( 4 pagcs , . PAR'!' I — AGREEMENT 7.9. Drawings as listed on the attacMed exhibit .. "B'r , 7.10. Addenda numbers __.1_... to ....�...., inclusive, and 7.l l. Any Modifications, including Change Orders, duly delivered after ezecution of this Agreement. 7.12. y Article S. MISCELLANEOUS. 8.1. Terms uscd in this Agrcement which are dcfined in Articic 1 0( the General Conditions shall have the meanings indicated in the General Conditions. • 8.2. Neithcr OWNER nor CONTRACTOR shall, without the prior written consent of the other, assign or sublet in whole or in part his interest under any o! the Contrace Documents; and, specifically, CONTRACTOR shall not assign any moneys due or to become due without thc prior written consent of OWNER. 8.3. OWNER and CONTRACTOR each binds himself, his partners, successors, assigns and legal representatives to the other �arty hereto in respect to all covenants, agrecments and obligations comained in the Contract Documents. Pagc 3 of 4 pages , PART I — AGREEMENT 8.4. The Contract Documents constitute the entire agreement bctween OWNER and CONT'RACTOR and may only be altered, amended or repealed by a duly executed written instrument. Artick 9. OTHER PROVISIONS. IN WITNESS WHEREOF, the parties hereto have executed this Agreement ihe day and year first above written. OWNER City__.of_C�p�__������au_..&__�ape.._.______. CONTRACTOR _.�ar�csnn..Excavating--Compauy_._. Girardeau School District #63 aY--•----------------------------•-•----...-----------------•-�-•----------•--------•-----• BY --••----- -----------..._.. [COitPORATE SEAL) [CORPORATE SEAL] Attest ------------------•-----------------•------•.._....------•----------•-------------- Attest --•--------------�---------- -•-••---------------------------....--•--•--------•-- Page 4 of ..._4_... pages. , PART I - AGREEMENT � Exhibit "A", Base Price: All labor, materials, services, and equipment necessary for completion of the Work except for "Alternates" and "Unit Price" item listed below, the sum of: Four hund�ed ninety-five thousand eiqht hundred thirtv-six & OQ/100 dollars ($495,836.00) Alternate Ntanber 1; . If t3ae Owner elects the construction of an asphalt surface parking lot and perimeter sidewalk, add to the Base Bid the amount of: Z�aentv-three thousand five hundred sixtv-two and 00/100-------- dollars (S 23,562.00) Alternate Number 2: . ' If export or import of soil is required, add to the Base Bid the unit price per cubic yard, the amount of: Two dollars and 75/100------------------------------------------- dollars (S 2 75) � PART I - AGREEMENT ' . Exhibit "B". - Page 1 LIST OF DRAWINGS 1. Cover 2. Index to Drawings 3. Existing Contours 4. Suzvey Control 5. •Site Plan 6. Cross Sections 7. Pool Deck Plan 8. Air Structure Foundation and Anchor Plan 9. Bathhouse Foundation 10. Bathhouse Plan 11. Bathhouse North and South Elevations 12. Bathhouse East and West Elevations 13. Bathhouse Roof Framing Plan 14. Bathhouse Ceiling Plan 15. Bathhouse Wall Sections 16. Bathhouse Wall Sections 17. Bathhouse Wall Sections 18. Bathhouse Wall Sections 19. Bathhouse Room Finish, Windaw, and Door Schedule 20. Mechanical -- I,.P. Gas Storage 21. Mechanical -- Bathhouse Plumbing -- Water and Gas 22. Mechanical -- Bathhouse Plumbing -- Sanitary and Storm 23. Mechanical -- Poo1 Deck and Building Storm Drains 24. Mechanical -- Bathhouse Heating and Ventilation 25. Mechanical and Electrical -- Utilities ' , PART I - AGREEMENT . Exhibit. "B"� - Page 2 26. Electrical -- Pawer Distribution Schedule 27. Electrical -- Exterior and Pool Lighting and Power Distribution 28. Electrical -- Bathhouse 51SP Pool Basin and Elevation ' 54SP Pool Accessories SSSP Pool Accessories ' ADDF.NDUM NUN�ER ONE � P�ojec> MO/7U0/ December 7, 1978 � . Page 1 City of Cape Girardeau, Missouri Municipal Swi�ning Pool ADDENDUM NUMBER ONE The proposed Contract Documents for this .Work are modified as follows: 1. PROJECT MANUAL: A. Unit 02200 - Excavating, Gradinci and Filling: Delete the following fro�n subparagraph 3.06 -{A) (2� , on page 5: "pool basin structure" � • � B. Unit 03301 - Standardweight Concrete: Delete the following fro�► subparagraph 2.02 (1) on page 4: . "If #14 or #18 bars meeting these specifications are to be bent, they shall also be capable of being bent, 90 deg, at a minimum temperature • of 60F, around a ten-bar-diameter pin without cracking transverse to the axis of the bar." . Delete Paragraph 3.15 CONCRETE SEALER on page 8 anc3 substitute: All concrete floors, concrete pool deck, _and sidewalks shall receive � concrete curing material Masterseal (roller applied) by Master Builders Company or approved equal. The bathhouse concrete floors and concrete pool deck shall receive floor hardner material Samseal by Master Builders Company. Application of curing and hardner materials shall be according to manufacturer's recommendations. C. Unit 03305 - Liahtweiqht Concrete: Delete the following from Paragraph 2.02 SLOTTED INSULATION BOARD on page 2: "and 1" for the south air structure entry." D. Unit 04200 - Unit Masonry: � Add the following to Paragraph 2.09 BEARING PLATE on page 3: "Bearing plates shall be furnished by structural steel subcontractor and installed by unit masonry subcontractor. E. Unit 05100 - Structural Steel: . Add the following to subparagraph 1001 (A) (4) on page 1: • De/!o Enginee�ing Consu/Jonls, /nc. Cope 6i�aideau, Mo. � ADDENDUM NUMBER ONE � P�o�ect ly0/7U0/ Decembe,r 7, 1978 Page 2 City of Cape Girardeau, Mis,souri Municipal Swimming Pool "Bearing plates shall be furnished by structural steel subcontractor and installed by unit masonry subcontractor." Delete the following from subpara,graph 1.01 (B) (1) ; "special costing" . F. Unit 07510 - Built-up Bituminous Roofing: Add the follwoing to subparagraph 2.03 PERIMETER FLASHING on page 3: "This flashing material shall also be applied around all roof drains." Add the following Paragraph 3.04 PITCH PANS on page 4: "Each individual trade shall provide pitch pans as required for piping and duct work. The roofer shall fill the pitch pans with pitch." G. Unit 08120 - Aluminum Doors and Related Items: Delete the following from subparagraph 2.01 •"C": "Hardware Set "D", opening 30"E" (entire set) Add the following subparagraph to 2.01 ALUMINUM DOORS AND FRAMES on � page 2: "Kickplates shall be mounted on each side of 16 inch bottoan rail with countersunk screws. Kickplates shall be fir.ished same as doors." H. Unit 08520 - Aluminum Window; Delete PART 2.00 PRODUCT on page 1 and substitute: "Provide an aluminum bronze frame sliding slider window unit with screens, as manufactured by Fisher Linsley Series 325-HS-A2 Thermal Barrier Rolling Window. Three or four individual units with mullions shall be used to form a unit approximately 14' wide by 4' high. Glass to be 5/8" irisulated tempered plate, bronze". I. Unit 08710 - Finish Hardware: ' Add the following to Paragraph 2.01 HARDWARE SCHEDULE Hardware Set 3: "door closer P.A. 1603 Aluminum Norton J. Unit 09100 - Lath, Plaster and Special Coatings: Delete all reference to: • "Special Coating" . _ . De/!o Enginee�ing Consu/lan/s, /nc. Cope Gi�ordeou, Mo. � �� P�o 'ect MO/7UOI ADDENDUM NUMBER ONE � December 7, 1978 �` Page 3 • . City of Cape Girardeau, Miss,ouri Municipal Swimming Pool K, Unit 09900 - Painting: Paragraph 2.01 (A) (2) on page 3: Delete: "each coat shall product a uniform coating" . and substitute: • "Each coat shall produce a unifotm coating" � L. DIVISION X - SPECIALTIES: Paragraph 2.09, page 3: Delete: Panels shall be one inch �hick made of two sheets of #20 gauge gal- vanized-boriderized stretched leveled steel, assembled with care of sound deadening insulation board- Pilasters shall be made of No. 20 gauge galvanized-bonderized steel, 1 1/4" thic}c and 3" in width, and shall be installed according to manufacturer's reco�nnendations. and substitute: • Panels shall be of the "Melamate" construction. These units shall be installed according to manufacturer's recommendations. M. DIVISION XV - MECHANICAL: SECTION 1, PLUMBING: Paragraph 2.04, paragraph No. 4, page 5: a. Delete: Insulate piping continuously with � Armoflex. Paragraph 2.06, page 6: a. General, paragraph No. 3 Delete: Set all floor drains, etc. , carefully, using a sprit level. Confirm final floor elevations with consideration for ceramic tile levels. and snbstitute: Set all floor drains, etc. , cazefully using a sprit level. Confirm floor elevations before concrete floor is placed. De/Jo Engineering Consu//onls, /nc. Cope Gi�aideou, Mo. • `� !'�o�ect Monua/ ADDENDUM NUMBER ONE , • . . Decembex 7, 1978 Page 4 ' City of Cape Girardeau, Missouri Municipal SwirrIIning Pool b. Materials: Delete: entire Materials paragraph and substitute: All soil, waste, and vent lines buried below floor slab to a point 5' - 0" outside building shall be service weight cast iron soil pipe - with bell and spigot compression joints. All soil, waste, and vent lines above the floor slab shall be service weight cast iron soil pipe with NO-HUB joints, conforc�ing to the � Cast Iron Soil Pipe Institute Standard No. 301-78. Vent lines above the floor slab may be of copper instead of NO-HUB cast iron. Paragraph 2.07, page 7: a. Materials: Delete: entire Materials paragraph _ � and substitute: � All exterior sanitary sewer lines shall be of standard strength NO-BEL vitrified clay sewer pipe, or service weight cast iron soil pipe with bell and spigot campression joints. Each line shall be of like material. Paragraph 2.08, page 8: a. Delete: All piping buried below grade shall be PVC meeting ASTM D3034 and �shall be bell-ring �(Ethyl Corporation .or egual) . W'here called for, exterior sewers shall be extra heavy cast iron soil pipe, same as interior sewers. and substitute: • All exterior buried storm water lines shall be of standard strength NO-BEL vitrified clay sewer pipe, conforming to ASTM C-700, schedule 40 PVC sewer pipe, or service weight cast iron soil pipe with bell and spigot compression joints. Each line shall be of like material. Paragraph 2.23, page 13: a. Add the following paragraph: PITCH PANS: . De//o Enginee�iny Consu/1anJs, /nc_ . Cope Gi�o�deou, Mo. • � ADDENDUM NUMBER ONE ` P�ojeci Mo�7uo/ D�c��ex �, i9�s City of Cape Girardeau, Mis�souri Page 5 � Municipal Swinaning Pool This contractor shall provide and install all pitch pans for work in this section. The roofing contractor shall fill the pitch pans with pitch. N. DiVISION XV - MECHANICAL: SECTION 2, HEATING AND VENTILATION: • Paragraph 2.02, paragraph No. 1, page 2: a. Delete: • Ducts supplying these units shall be insulated altaninum duct. , Paragraph 2.09, page 4 a. Add the following paragraph: PITCH PANS: This contractor shall provide and install all pitch pans for work in this section. The roofing contractor shall_fill the pitch pans with pitch. 2. DRAWINGS: A. All Plates: a. Masonry opening dimensions for doors E1, E2, B15, E16, E39, and B40 shall be changed as follows: E1 and E2 - change 6'-4 1/2" to 6'-4" B15 - change 3'-4 1/2" to 3'-4" . E16 - change 3'-10 1/2" to 3'-10" E39 - change 3'-4 1/4" to 3'-4" B40 - change 6'-4 1/4" to 6'-4" . b. All 6" x 6" - W4/W4 W.W.F, shall be changed to 6" x 6" - 10-10 W.W.F. � for all floor slabs and flat concrete work. c. Masonry openings for F17, F18, and G19 Air Structure doors may vaxy from dimensions shawn on plates. Masonry Contractor shall obtain exact masonry opening requirements from the Air Structure Manufacturer. B. Plate 5: All the following note: 1. An ornamental iron handrail shall be provided and installed on each side of the concrete steps. De//o Enginee�ing Consu//on/s, /nc. � Cope Girordeou, Mo. � � �� P�oject MOrlUOI ADDENDUM NUMBER ONE ,t ' , Decembez 7. 1978 , Page 6 C. Plate 10 , a. Add the following note: . Basket racks in center of basket room and in front of the equipment room • shall include sheetmetal between the racks to prevent site from one side to the other side. b. Add the following note: The four work station shelves in the basket ro�► shall be constructed of 3/4" plywood top with 3/4" x 1 � " edge, plastic laminated top and edge. Bolt 2" x 6" stud to wall and brace for support. - c. Add the following note: � The finished wood headers above the equipment room doors shall be constructed of 2" x 4" studs with a �" plywood beam and a �" finished plywood exterior. D. Plate 11 (Add the following note) a. Details for connecting the air structure to -the air lock shall be furnished and installed by the air structure contractor. The Bathhouse and Site Work Contractor shall coordinate with the Air Structure Contractor and allow clearance for the mounting of the required attachment details. ' E. Plate 13 a. Delete the following: � Note: See specifications for roof vents � � • F. Plate 15 a. Wall Section 2/15 Add the following notes: The header above the doors shall be one 4" header or .two 2" headers. . Rake out joint in masonry along base of glass area and caulk. G. Plate 19 . a. Detail 17/19 Change the following note: Change "Cont premolded regular control join�' to "Cont premolded wide-flange control joint". H. Plate 26 a. Add the following notes: . Panelboard "E" shall be raintight De/lo Engineering Consu/lonls, /nc. � Cope Gi�ordeou, Mo. � r' , � ADDENDUM NUMBER ONE _ -� P�oject MOrJUO/ December 7, 1978 � pa�e� j • , Enclosure "F" shall contain all lighting contactors. I. Plate 28: Delete-the word "TIME" in the legend 'and substitute the word "TIMER" END OF ADDENDUM NUMBER ONE , De//a Enginee�ing Consu/!on/s, /nc. � Cope Girordeou, Mo. �