HomeMy WebLinkAboutCityMgrForm.1477.08-15-1979CITY MANAGER FORM. ORDINANCE NO. l
AN ORDINANCE APPROVING THE FORM OF A CONTRACT BETWEEN THE CITY OF
CAPE GIRARDEAU, MISSOURI, AND RIVERSIDE WEST BUILDERS SUPPLY,
INC., AUTHORIZING THE MAYOR TO EXECUTE, AUTHORIZING THE PAYMENT
OF A SUM OF MONEY
WHEREAS, the City of Cape Girardeau, Missouri, is the owner
of its City Hall Building located at 401 Independence in the City
of Cape Girardeau, Missouri; and
WHEREAS, the roof on the said building, with the exception
of the new vault, needs to be replaced; and
WHEREAS, Riverside West Builders Supply, Inc., was the low
bidder for labor involved in replacing the roof; and
WHEREAS, the said parties desire to enter into an agreement
for the doing of said work;
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
CAPE GIRARDEAU, MISSOURI, AS FOLLOWS:
SECTION 1. The "Contract", copy attached hereto marked
Exhibit "A", between the City of Cape Girardeau, Missouri and
Riverside West Builders Supply, Inc., is approved as to form.
SECTION 2. The Mayor of the City of Cape Girardeau, Missouri,
is hereby authorized and directed to execute said Contract, copy
attached hereto marked Exhibit "A", for and on behalf of the City
of Cape Girardeau, Missouri.
SECTION 3. The payment of a sum of money by the City of
Cape Girardeau, Missouri to Riverside West Builders Supply, Inc.,
is hereby authorized to be made in accordance with the terms and
provisions of said Contract.
SECTION 4. This ordinance shall be in full force and effect
ten days after its passage and approval.
._ -r -
PASSED AND APPROVED THIS % � DAY OF �t j r��,L_ , 1979.
MAYOR
ATTEST:
CITY CLERK
l
CONTRACT
This agreement is made on
, 1979, by
and between the City of Cape Girardeau, Missouri, a Municipal
Corporation, hereinafter referred to as "Owner", and Riverside
Vest Builders Supply, Inc., 270 North Kingshighway, Cape Girardeau,
Missouri, 63701 hereinafter referred to as "Contractor".
In consideration of the mutual covenants contained herein
and other good and valuable consideration, Owner and Contractor
agree as follows:
SECTION 1. WORK TO BE DONE.
The Contractor shall perform the following work in a substan-
tial and workmanlike manner on the building at 401 Independence,
Cape Girardeau, Missouri:
1. Removal of existing roofing.
2. Deck repair.
3. New roofing.
4. Metal Flashing.
5. Caulking
6. Clean up.
SECTION 2. LABOR AND EQUIPMENT.
The City shall provide all materials. The Contractor shall
provide all labor and whatever equipment or works may be necessary
for the expeditious and proper execution of its duties hereunder;
with exception of the hot mop. The hot mop will be provided by
the City.
SECTION 3. OBTAINING PERMITS.
Contractor shall secure, at its own expense, all permits,
licenses, franchises, consents required by law or necessary to
perform its work and will give all notices and pay all fees and
otherwise comply with all applicable City, County and State laws,
ordinances; rules and regulations.
SECTION 4. TERMINA'T'ION BY DEFAULT.
Should Contractor at any time refuse or neglect to supply
adequate equipment or a sufficient number of properly skilled
E MfBIT -As
workmen, or fail in any respect to prosecute the work with
promptness.and diligence, or fail to perform any of the agreements
of this Contract, Owner may, at its election, immediately terminate
this agreement, giving notice to Contractor in writing of such
election, and enter on the premises and take possession, for the
purposes of completing the work included under this agreement, of
all the materials, tools and appliances belonging to Contractor,
and to employ any other person or persons to finish the work and
to provide the materials therefor at the expense of Contractor.
SECTION 5. INDEMNIFICATION.
Contractor shall indemnify owner from all claims, demands,
suits and actions of every name and description brought against
the Owner for or on account of any injuries or damages received
or sustained by any parties or party by or as a result of the
acts or omissions of said Contractor, his servants or agents, in
doing the work herein described, or by or as a result of any
negligence in guarding the same, or on account of any improper
equipment, other than the hot mop, utilized in performing said
work.
SECTION 6. INSURANCE.
Contractor hereby agrees to file with the Owner prior to
commencement of the work, a Certificate of Insurance, naming the
Owner as a co-insured, showing that the Contractor has obtained a
policy of General Liability Insurance for the period of this
contract insuring the Contractor and Owner against liability for
personal injuries or property damage arising out the Contract in
an amount of $100,000.00 for any one person and $300,000.00 for
any one incident.
SECTION 7. ASSIGNMENT OF RISK.
Contractor will bear all risk of damage to or failure of the
work it has done under this Contract until such work has been
completed and accepted by Owner.
SECTION 8. PAYMENT.
Upon satisfactory completion by the Contractor and final
acceptance of the work by the Owner, of the work to be performed
2.
under this contract, the Owner will pay the Contractor the entire
amount of the contract within thirty (30) days.
SECTION 9. CONTRACT TIME - LIQUIDATED DMAGES -
EXTENSION OF TIME.
The Contractor hereby agrees to begin said.work and improvement
not later than August 6, 1979 and hereby.agrees to complete the
same within forty-five (45) working.days, weather permitting.
Time of completion is of the essence ofthis contract and
should the Contractor fail to complete the work within the time
as set out above, it is mutually.understood and agreed between
the parties hereto that considerable damage will be sustained by
the Owner, but that it will be difficult, if not impossible, for
the Owner to establish either the full extent or the amount of
the damage under the ordinary rules of evidence.
It is therefore understood and agreed by andbetween the
parties hereto that the payment by the Contractor .to the Owner of
the sum of Fifty Dollars ($50.00) per day for every day, except
Sundays and holidays,. the Contractor fails to substantially
complete the work to be done under this contract shall be paid to
the Owner, as liquidated damages which the Owner will suffer by
reason of the default, and not by way of a penalty.
The time of completion as above set out shall determine the
date after which liquidated damages shall begin. In the event
the City Council should pass an ordinance extending the time in
which the work shall be completed, such extension of time shall
not void the provisions for the assessment of liquidated damages
above described. The City Council, may however, for good cause
shown, such as unfavorable weather, material shortages, strikes,
war, an Act of God, or similar cause, waive the provisions for
3.
liquidated damages and set a new date of completion, which date
shall govern the time when liquidated damages shall begin.
SECTION 10. APPROVAL OF THE WORK AND COMPLETION OF CONTRACT.
The Contractor, upon the completion of said.work and improve-
ment, shall notify the City Engineer of such fact. The City
Engineer and the City Manager shall thereupon inspect said work
and make a written report to the City Council, and the owner
hereby agrees that upon the approval of said report, and provided
said work is completed in accordance with the terms of this
Contract, it will make payment to the Contractor as hereinbefore
provided.
SECTION 11. CONTRACT DOCUMENTS.
The Contractor's Bid Proposal is incorporated herein and
made a part of this agreement as though fully set out herein.
SECTION 12. ASSIGNMENT AND SUBLETTING.
Contractor shall not assign or sublet this Contract or any
portion thereof without the prior written consent of Owner.
SECTION 13. NO WAIVER OF FUTURE BREACH.
The failure of Owner to insist, in any one or more instances,
on a strict performance of all of the terms.or the conditions of
this Contract, or to exercise any right herein contained, shall
not be construed as a future waiver or a relinquishment of the
provisions or rights, but the same shall continue and remain in
full force and effect. None of the terms or conditions of this
contract shall be altered, waived, modified or abandoned in any
manner except by written instrument executed.by both parties.
SECTION 14. GUARANTEE.
The contractor hereby provides a one (1) year written
guarantee on his work. Problems resulting within a one (1) year
period from the roofing being improperly installed shall be
4.
corrected by the Contractor at no cost to the Owner.
IN WITNESS WHEREOF, the parties have executed this agreement
at Cape Girardeau, Missouri, the day and year first above written.
CITY OF CAPE GIRARDEAU, MISSOURI
ATTEST:
Verna L. Landis, City Clerk
RIVERSIDE WEST BUILDERS SUPPLY, INC.
-10
ATTEST:
5.
U
RIVERSIDE - STE. GENEVIEVE
Builders Supply & dome Center
Cape °East',( Cape 'West' Ironton Viburnum Ste. Genevieve
e eve
334-2811 334-4415 ,:'` 546-7424 244-5291 883-5722
-PROPOSAL
Cite of Cape uirardeau (Omer2t3 Ig 79
40I Indeence, Gape
Dear Si r:
The undersigned proposes to furnish all labor
necessary to complete the following:
Fenno al of ex i _roofin . Install new roofing, s!Qcarps of
new roofing and 32 squares of flat roofing, metal flashing,
caulking, and haul off trash. If deck needs repair, this will be
extra to labor bid. Owner to furnish all. materials,
All of the above work to he completed in a substantial and workmanlike
spanner for the sum of ---------- - - - - - - - - - - - - - ($7,995.0o) ) dollars.
Payments to be made each as the work progresses to the value
of ninety (901) per cent of all wo^Y =t The entire amount of contract
to be paid within . r day; of ter compl et ion, nd receipt of final bill.
Any alteration, or deviation tr iE "t'FZS` ve specifications involving extra
cost or lower cost of material or labor will only be executed upon written
orders for same, and will become an extra charge or lower- charge of the sum
mentioned in this contract. Al! agreements must be made in :writing.
The Contractor agrees to carry Workmen's Compensation and Public Liability
Insurance, also to pay all Sales Taxes, Old Age Benefit and Unemployment- Com-
pensation Taxes upon the material and labor furnished under this contract, as
required by the United States Government and the State in which this work is
performed.
Please sig this copy and return, Respectfully submitted,
thank you. Riverside best Builders Supply, in^.
r, "entra tC1
3y Leo Boren
ACCEPTANE _ L:,
You are hereby authorized to furnish all � labor required
to complete the work mentioned in the above propos , or w,ich the undersignet
agrees to pay the amount mentioned in the said proposal, and according to the
4.
terms trereof, i father acknowledge Haat i have read the .provisions of Reg-
ulation °Z' and the State of Missouri Lien Law printed on the reverse side of
this document.
DATE
Owner
Owner
(Husband and 'Wife must both sign)
X
To
NOTICE I CUSTOMER REQUIRED BY FEDERAL LAW:
You have entered into d transaction on 19 which may result in d lien,
mortgage, or other security interest on your home. You have a legal right under federal law
to cancel this transaction, if you desire to d0 so, without any penalty or obligation within
three business days from the above date or any later date On which all material disclosures
required under the Truth in Lending Act have been given to you. if you 30 cancel the trans-
action, any lien, mortgage, or other security interest on your home arising from this trans-
action is automatically void. You are also entitled to receive a refund Of dnydOwnp8}nHent Or
other consideration if you cancel. if you decide to cancel this transaction, you may do 5o by
notifying, RIVERSIDE WEST BUILDERS SUPPLY, INC' HIGHWAY 61 at THEMIS STREET, [APE
GIRARDEAU, MISSOURI 63701, by mail or telegram Sent not later than midnight Of
lg . You may also use any other form of written notice identifying the trans-
action if it is delivered to the above address not later than that time. This notice may be
used for that purpose by dating and signing below.
DATE
I HEREBY CANCEL THIS TRANSACTION.
Customer's Signature
EFFECT OF RESCISSION. When a customer exercises his right to rescind under paragraph
/a\ Of this section, he is not liable for any finance or other charge, and any security fntereE
becomes V0ld upon such d rescission'. Within 10 days after rec2fpt of a notice of rescission,
the creditor shall return to the customer any money or property given as earnest money, down -
payment, or otherwise, and shall take any action necessary Or appropriate to reflect the
termination Of any security interest Created under the tr&DIdCtfoo' If the creditor has
delivered any property to the customer, the customer may retain possession Of it. Upon the
performance of the creditor's obligations under this section, the customer Shall tender the
property to the creditor, except that if return of the property in kind would be impracticable
or inequitable, the customer shall tender its reasonable value. Tender shall be made at the
location of the property Or at the residence of the customer, at the option of the customer.
If the creditor does not take possession of the property with -in 10 days after tender by the
customer, ownership of the property vests in the customer without obligation on his part to
pay for it.
NOTICE TO OWNER
FAILURE OF THIS CONTRACTOR TO PAY THOSE PERSONS SUPPLYING MATERIAL
OR SERVICES TO COMPLETE THIS CONTRACT CAN RESULT IN THE FILING OF
A MECHANIC'S LIEN ON THE PROPhY WHICH IS THE SUBJECT OF THIS
CONTRACT PURSUANT TO CHAPTER���^ R8MO^ TO AVOID THIS RESULT YOU
MAY ASK THIS CONTRACTOR FOR LIEN WAlVERS~ FROM ALL PERSONS SUPPLY-
ING MATERIAL OR SERVICES FOR THE WORK DESCRIBED IN THIS CONTRACT"
FAILURE TO SECURE LIEN WAIVERS MAY RESULT IN YOUR PAYING FOR LABOR
AND MATERIAL TWICE.
SPECIFICATIONS FOR REROOFING CITY HALL
CITY OF CAPE GIRARDEAU g MISSOURI
"A'aWbil
A. The City of Cape Girardeau (herein called the Owner) invites bids for the
reroofing of City Hall, 401 Independence Street, on the forms attached
hereto. FNds will be received at the Office of the City Manager, 401
Independence Street, Cape Girardeau, Missouri 63701, until 10:00 A.M.,
July 23 t 1979.
3. The City shall provide all materials. Bidders proposal shall be for
performance of work involved and shall include all City, State and Federal
Sales, Excise and similar taxes which may be lawfully 'assessed in
connection with his performance of work.
C. The following is a list of work to be performed:
1. Removal of existing roofing.
2. Deck repair.
3. New roofing.
4. Metal flashing.
5. Caulking.
(,. Clean up.
D. 3--f6re submitting proposals, each bidder shall carefully study specifications
and visit site of work and fully inform himself as to all existing
conditions, facilities, restrictions and other matters which can affect the
work or cost thereof.
E. The contractor shall provide Public Liability and Property Damage in limits
as follows:
Personal Injury — $ 100,000/$ 300,000
Property Damage — $ 100,000/$ 300,000
Certificates of insurance acceptable to the City Manager shall be filed
with the Owner prior to the commencement of the work,
F. The contractor shall provide a one year written guarantee on his work.
Problems resulting within a one year period from the roofing being
improperly installed shall be corrected by the contractor at no cost to the
Owner.
G. All work must be done with awareness of public accessibility to the
building.
H. Weather permitting, work shall be started by August 6#1979, and completed
within forty—five (45) working days.
Page 2 — Specifications for Reroofing City Hall
SPECIFICATIONS
1. REMOVAL OF EXISTING ROOFING
Remove existing asphalt and slake shingles and asphalt felts down to wood
roof deck.
All gutters, awnings and stairwell covers to be protected during work and
cleaned after work is none.
2. DECK REPAIR
If after removing the existing roofing it is found that the deck needs to
be replaced in certain places, the contractor will be given a change order
at a rate of $ 1.50 per square foot of deck replaced. The contractor
shall advise the City Manager of amount before proceeding with the
replacement.
3. NEW R00FITM
(A) Material
Shingles — Class "All Underwriters Laboratory labeled, Fire Rated
Fire Guard "SelfSealing " Type, Min. 325 lbs. weight per 100 square
feet, will be provided by the Owner. The shingle manufacturer will
provide a written 25 year warranty that they will replace any shingles
which do not remain weather tight. Replacement costs will be
proportional to the years of use.
Underlaymert Felt ®- 30 lb. asphalt felts will be provided by the
Owner.
(D) Installations
Apply felts to roof deck lapping minimum 4 inches at end laps and 2
inches at top. Starting at lowest edge of roof, apply starter course
top edge down. Then apply first course of shingles on top of base
course. Continue to ridge and hips showing 5 inches to the weather.
Use ridge shingles at ridges and hips. Use minimiLm of 4 galvanized
roofing type nails per shingle. Length of nails shall be 1 inch.
The nails will be provided by the Leer.
b,_ --used. -. The hot mop -- :ll --be ors 4 er.
4. METAL FLASHING i S� � � �e �. ��� u_ 8 ,
The City will provide 24 gauge galvanized metal flashing. The contractor
shall install the flashing at all valleys with western hip type galley;
and, at Junctions with side walls and roof.
5.CAULJ G
The contractor shall caulk around any flue and vent pipe. The cawing
-will be provided by the Owner.
6. CLF: AN tip
The contractor shall keep site clean each day and be responsible for
disposing of all debris. At the completion of all work, the contractor
shall provide general clean up.
All access to the building shall be kept open and safe for the public at
all times during the work period.
Contractor:
Mailing Address
Page 3 ® Specifications for Reroofing City Hall
PIRDPOSAL FOR RMMF-T.qG CITY HALL
TO: The City of Cape Girardeau
State of Missouri Date:
Gentlemen.-
' i (We) propose to furnish all labor and equipment necessary to perform
and/or install all work, as specified, for your building in accordance with the
Alas and specifications, for the following sum:
BY
Owner (President, if Corp.)
Bid:
BY
(Secretary, if Corp.)
Seal: (If Corp.)
N
July 17, 1-979
ADDENDUM NO. 1 -- To the specifications for labor involved in
reroofing City Hall, 401 Independence Street,
on which bids will be opened at 10 A.M. on
July 23, 1979 at the City Manager's Office in
City Hall.
This addendum is issued by the City of Cape Girardeau to amend and
supplement the specifications as follows:
SPECIFICATION MODIFICATIONS
Under No. 3, New Roofing
(B) Installation ('Second Paragraph)
Hot tar mop will be used.
by the owner.
SUBSTITUTE THE FOLLOWING:
The hot mop will be provided
(B) Installation (Second Paragraph)
Three (3) lavers of 30 -pound felt will be placed on any
flat areas of the roof (excepting the new vault.) The
first layer of felt will be nailed down with nails provided
by the owner as stated in above paragraph. A layer of hot
mix will be applied after the first layer of felt is nailed
down. The additional two (2) layers of felt will also be
hot mopped.
The hot tar and hot tar mops will be provided by the owner.