HomeMy WebLinkAboutOrd.675.03-06-1989BILL NO. 89-3 ORDINANCE NO. AN ORDINANCE ENACTING STORMWATER MANAGEMENT REGULATIONS BE IT ORDAINED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: SECTION 1. An ordinance enacting a new chapter to be known as Chapter 25A, entitled Stormwater Management Regulations, to read as follows: SECTION 2. PURPOSE: The purpose of this ordinance is to lessen or avoid hazards to persons and property caused by uncontrolled stormwater runoff or by obstructions to drainage and to lessen the degradation of the quality of surface runoff. SECTION 3. DEFINITIONS: Unless specifically defined, words or phrases shall be interpreted so as to give them the meaning they have in common usage and to give this ordinance its most reasonable application. The term "shall" is always mandatory and not discretionary; the word "may" is permissive. Administrative Officer: The duly appointed City Manager of the City of Cape Girardeau, or his designated representative. Adverse Impact: Any modifications, alterations, or effects on a feature or characteristic of surface waters including their quality, quantity, hydrodynamics, surface area, species composition, living resources, aesthetics or usefulness for human or natural uses which are or may potentially be harmful or injurious to human health, welfare, safety or property, to biological productivity, diversity, or stability, or which unreasonably interfere with the enjoyment of life or property, including outdoor recreation. The term includes secondary and cumulative, as well as direct impacts. Applicant: The record owner, or his authorized representative, of a tract of land that is the site of development, or development activity within the scope of this ordinance. Base Flood Elevation: The elevation at any location delineating high waters having a one -percent probability of being equaled or exceeded in any given year (also known as the 100 -year flood). Buildin Any structure built for the support, shelter or enclosure of persons, animals, chattels, or movable property of any kind. Capacity of a. Storm Drainage Facility: The maximum ability of a storm drainage facility to convey, detain or retain stormwater flows without causing substantial damage to public or private property, and in the case of a pipe, without surcharging. Channel: A natural or artificial open watercourse with definite bed and banks which periodically or continuously contains moving water or which forms a connecting link between two bodies of water. Com: The City of Cape Girardeau, Missouri. Conduit: Any channel, pipe, sewer or culvert used for the conveyance or movement of water, whether open or closed. Control Device: An element of a discharge structure which allows the gradual release of water under controlled conditions. Control Elevation: Design elevation of a discharge structure at which, or below which, water is contained behind the structure. Council: The City Council of Cape Girardeau, Missouri. Detention: The delay of storm runoff prior to discharge into receiving waters. Detention Basin: a facility constructed or modified to restrict the discharge of stormwater to a prescribed maximum rate, and to concurrently detain the excess waters that accumulate behind the outlet. A wet bottom detention basin is a structure designed to retain a permanent pool of water after having provided its planned detention of runoff during a storm event. A dry bottom detention basin is designed to be completely dewatered after having provided its planned detention of runoff during a storm event. Detention Storage: The temporary detaining or storage of stormwater in storage basins, or rooftops, in streets, parking lots, school yards, parks, open space, or other areas under predetermined and controlled conditions, with the rate of drainage therefrom regulated by appropriately installed devices. Detention Volume: The volume of water eaual to the difference between the control elevation of a discharge structure and the maximum level at which water can be accumulated prior to discharge times the average area of open surface storage (between the control elevation and maximum level) behind the discharge structure. Developer: Any individual, firm, corporation, association, partnership, or other entity involved in commencing proceedings under this ordinance to effect the development of land for himself or another. Development or Development Activity: Any man-made change to improved or unimproved land, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation, or drilling operation. Any subdivision of land as defined in the City's subdivision regulations, excluding minor subdivisions. Differential Runoff: The difference in rate and volume of stormwater runoff from a parcel or project in its undeveloped natural condition and its developed condition is known as the Differential Runoff. Discharge: The rate of outflow of water from detention storage. Discharge Structure: Structural device, usually of concrete, metal, timber, etc., through which water is discharged from a project to the receiving water. WA Drainage Area: The area from which water is carried off by a drainage system; a watershed or catchment area. Drainage Facility: An element in a drainage system which includes, but is not limited to any of the following: conduits and appurtenant features, canals, channels, detention basins, ditches, streams, culverts, streets and pumping stations. Drainage System: The surface or subsurface system which conveys water from or over the land including all watercourses, water bodies and wetlands (also referred to as the Stormwater Management System). Easement: a grant by a property owner to the public, a corporation, or a person of the use of land for a specific purpose. Elevation: Height in feet above mean sea level according to National Geodetic Vertical Datum( GVD). Emergency Spillway: Saddle or low point facility located around the rim of a dammed impoundment such as a detention or retention basin for providing an efficient and safe means of conveying the maximum design flood discharge through the impoundment, without overtopping the dam. Excess Stormwater Runoff: The volume and rate of flow of stormwater discharged from a drainage area which is or will be in excess of that volume and rate which is specified in this ordinance. Fifteen Year Storm: Rainstorms of varying duration and intensity having a 6.67 percent probability of being equaled or exceeded in any given year. Floodplain: The special flood hazard land adjoining a watercourse, the surface elevation of which is equal to or lower than the Base Flood Elevation (the 100 year flood), which is subject to periodic inundation during floods. Floodway: The channel of a watercourse and those portions of the adjoining floodplain which are reasonably required to carry and discharge the base flood. Flood Fringe: The higher portion of the floodplain, immediately adjacent to and on either side of the floodway, occupied by quiescent or slow moving waters during floods. High Water Elevation: The elevation of floodwaters of a flood of specified frequency or occurrence at any given point. Impervious Surface: A surface which has been compacted or covered with a layer of materials so that it is highly resistant to infiltration of water; the term includes most conventionally surfaced streets, roofs, sidewalks, parking lots and similar structures. Improvement: A structure on, or other alteration of land on a given site, including but not limited to grading, street paving, storm sewers, sanitary sewers and utilities. Off -Site Detention Basin: A feature or structure for temporarily storing excess stormwater originating at two or more sites having devices for controlling the rate of release of the stored water, and located downstream of all sites where the runoff originates. -3- On -Site Detention Basin: A feature or structure for temporarily storing excess stormwaters, having devices for controlling the rate of release of the stored waters, and located within the sites where the runoff originates. One Hundred -Year Storm: Rainstorm of varying duration and intensity having a one percent probability of recurring in any one year. Overflow Elevation: Design elevation of a discharge structure at which point, or above which point, water leaks out, or bleeds out, through a control device down to the control elevation. Peak Flow: The maximum rate of flow of water at a given point in a channel or conduit resulting from a predetermined storm or flood. Post -Development Conditions: Those conditions which are expected to exist, or do exist, after alteration, resulting from human activity, of the natural topography, vegetation and rate, volume or direction of surface or subsurface flow. Pre -Development Conditions:. Those conditions which existed at the time this ordinance becomes effective in terms of topography, vegetation and rate, volume or direction of surface or subsurface flow, as indicated by the best available historical data. Primary Drainage (Water Management) Systems: Includes major waterways and appurtenant structures or systems whose total tributary area from origin to outfall exceeds or equals 50 acres. Professional Engineer or Architect: An engineer or architect duly registered or otherwise authorized by the State of Missouri to practice engineering. Rational Method: An empirical formula for calculating peak rates of runoff resulting from rainfall. Expressed mathematically, the formula is: Q = CIA Where Q = peak flow in cubic feet per second (cfs) C = runoff coefficient, or fraction of runoff to rainfall, dependent on .type of surface cover and topography I = rainfall intensity, in inches per hour, for a specific storm and duration A = watershed area, in acres Receiving Bodies of Water: Any water body or stream into which surface waters flow. Site Plan: The plan, usually in map form, prepared pursuant to the governing body's zoning or other land development ordinances as a requirement for the development of property. Stormwater Runoff: The waters derived from rain falling or snow melting within a tributary drainage basin, flowing over the surface of the ground or collected in a stormwater drainage system, storm sewer, or water course. Subdivision: As defined in Chapter 25, Subdivisions, of the Code of Ordinances of the City of Cape Girardeau, Missouri. Twenty -Five Year Storm: Rainstorms of varying duration and intensities having a four percent probability of being equaled or exceeded in any given year. -4- Time of Concentration: The elapsed time for stormwater to flow from the most distant point in a drainage basin to the outlet or point in question. Watercourse: Any stream, creek, brook, branch, natural or artificial depression, slough, gulch, reservoir, lake, pond or natural or man-made drainageway in or into which stormwater runoff and flood waters flow either regularly or intermittently. SECTION 4. APPLICABILITY. Any person, firm, corporation or business or government entity within the municipality shall apply to the Administrative Officer for approval of a Stormwater Management Plan and obtain a permit before commencing any development or development activity as defined herein. A stormwater management plan shall be required of any platted subdivision for which no improvement plans have been submitted at the time this ordinance takes effect. Detention requirements are directly related to permitted land use in the Zoning Ordinance of the City of Cape Girardeau. The permitted densities and minimum lot areas are important factors in the anticipated runoff. Table I lists the Zoning Districts with the major permitted use category, minimum lot area and the corresponding percent of imperviousness. For permitted land uses other than those listed in Table I, such as schools, churches, fire stations, etc., the rate of imperviousness shall be determined by the same method as for commercial uses listed in Table I. For conditional land use in any zoning district, the same ratio determination criteria shall apply. TABLE I SECTION 5. EXEMPTIONS. Development within a subdivision shall not require approval of a Stormwater Management Plan if each of the following conditions have been met: -5- STORM WATER DATA BY ZONING DISTRICTS PERCENT OF IMPERVIOUS MAJOR PERMITTED MINIMUM AREA FOR DESIGN STANDARDS ZONE AREAS LOT AREA IN TABLE II MH -1 Residential 45 R-1 Residential 10,000 35 R-2 Residential 7,000 35 R-3 Residential 7,000 45 R-4 Residential 7,000 [ Determine ] [ Percentage ] C-1 Commercial [ of ] C-2 Commercial [ Impervious ] C-3 Commercial [ Area by ] C-4 Commercial ( Ratio of ] ( Impervious ] M-1 Industrial [ Surface ] M-2 Industrial [Area to Total ] [ Area ] SECTION 5. EXEMPTIONS. Development within a subdivision shall not require approval of a Stormwater Management Plan if each of the following conditions have been met: -5- A. Drainage provisions for the project were previously approved and remain valid as part of a final plat; B. The development is conducted in substantial accordance with the Stormwater Management provisions contained in the development plan submitted with the final plat as approved. Development on isolated lots of record for single-family and two-family dwelling purposes shall not require approval of a Stormwater Management Plan, nor a grading permit, unless the development involves altering, rerouting, deepening, widening, obstructing or changing in any way existing drainage facilities, degrades the quality of water, adversely affects any wetland or adversely affects any sinkhole, watercourse or waterbody. Stormwater Management Plans may be waived for building construction which will not increase the amount of impervious area on the site and will not adversely impact an existing drainage area or drainage on adjoining properties. Written notice of intent to commence development shall be delivered to the Administrative Officer prior to undertaking any development activity, whether exempt from plan provisions or not. Application for a building permit may constitute notice of intent. SECTION 6. STORMWATER MANAGEMENT PLAN APPLICATION. A. Purpose: The purpose of the Stormwater Management Plan review process is to provide an organized framework for evaluating and acting upon proposals for development as they relate to stormwater management issues. B. Required Information: It is the responsibility of an Applicant to include sufficient information in the Stormwater Management Plan to enable evaluation of the environmental quality of the affected area, the potential and predicted impacts of the proposed activity on affected waters, and the effectiveness and acceptability of the measures proposed by the Applicant for preventing or reducing adverse impacts. The applicant shall furnish the Administrative Officer with three (3) copies of the Stormwater Management Plan Application Form and Stormwater Management Plan, sealed by a Professional Engineer or Architect registered in the State of Missouri. C. The application form requires the following minimum information: 1. The name, address, and telephone number of the Applicant, and the Owner if different from the Applicant. 2. Name and address of the Professional Engineer or Architect. 3. The legal description of the property. SECTION 7. STORMWATER MANAGEMENT PLAN. A stormwater management plan is designed to safely manage the stormwater runoff following the rainstorms which exceed the maximum allowable release rate and the capacity of the stormwater drainage system and/or the storm sewer system by detention of the excess stormwater runoff. The plan shall provide or be accompanied by maps at a minimum scale of 1" < 200' and other descriptive material, including the basis of computation, showing the following: A. Required Pre -Development Site Information (Map scales are minimums) 1. Detailed location sketch showing the parcel and major adjacent roads. M 2. Topographic map of the site at a scale of 1" < 200' with maximum five feet countour intervals, except in floodplains or other areas of low relief where a smaller interval may be required.. 3. Where percolation or exfiltration systems are proposed, information as to the location and type of vegetative cover and soil types and characteristics representative of the design condition mapped at a scale of 1" ,- 2001. 4. Location of streams and other flood water runoff channels, their normal channels, and the extent of the floodplains at the established high water elevations, and the limits of the floodway mapped at a scale of 1" < 2001. 5. Location of lakes, ponds, swamps and detention basins indicating their normal shorelines, floodplains and lines of inflow and outflow mapped at a scale of 1" < 2001. 6. Location of farm drains, inlets and outfalls, storm sanitary and combined sewers and outfalls, septic tank systems and outlets, if any, and seeps, springs and flowing and other wells mapped at a scale of 1" < 2001. 7. Location and description of nearby existing off-site water management facilities such as wells, lakes, drainage ways, etc., which are potentially directly affected by the proposed construction or development, mapped at a scale of 1" < 2001. B. For all existing drainage facilities which are to be maintained, altered, or enlarged as part of the stormwater management system; provide information as to their size, slopes, depths, outfalls, receiving waters, elevations, cross sections, profiles, construction materials and other design details as applicable. C. Location of all new drainage facilities, including detention basins, to be constructed. Provide design details on each facility as applicable. D. Location and extent of existing and proposed impervious surfaces (roads, parking lots, buildings, etc.) and their elevations. Provide grading and paving plans and specifications. E. Location and extent of rights-of-way and easements for the stormwater management system, including all areas to be dedicated for water management purposes. F. Identification and description of any special or required maintenance procedures to keep the project functioning as designed. G. Provide stormwater management system design calculations as follows: 1. Design storms used. 2. Calculated hydrographs of inflow and outflow of design storms runoff for the project site under natural and undeveloped conditions. 3. Hydrographs of the runoff from the design storm for the project site under developed conditions. 4. For all detention basins, a plot or tabulation of storage volumes with corresponding water surface elevations and of the basin outflow rates for those water surface elevations. 5. Acreages and percentage of property proposed as: impervious surfaces pervious surfaces (green areas) lakes, canals, detention areas, etc. bA total acreage of project other 6. Runoff routing calculation showing discharge, elevations, and volumes retained and/or detained during applicable storm event. 7. Calculations required for determination of minimum building floor and road elevations. H. Identify entity responsible for operation and maintenance of the system. I. The requirements for specific plan elements cited above may be waived by the Administrative Officer, upon written supportive recommendation of the City Engineer. The Stormwater Management Plan for minor development activities may consist of a certification from a professional engineer or architect that the differential run-off equals zero. J. The Administrative Officer will ascertain the completeness of the Stormwater Management Plan Application. The Administrative Officer will return incomplete applications to the Applicant for completion and resubmission. After determining that the application is complete, the Administrative Officer will distribute copies of the application for review and comment to other persons with special technical expertise as deemed appropriate by the City Manager. Within a reasonable period after submission of the completed Stormwater Management Plan Application by the Applicant, the Administrative Officer shall approve, approve with specified conditions, or deny the application and shall notify the Applicant accordingly. If the Stormwater Management Plan Application is denied or approved with conditions, the Administrative Officer shall state the reasons for denial or the specified conditions. If the Applicant feels aggrieved due to the denial or conditions, he may appeal the decision to the City Council. SECTION 8. PROJECT CLASSIFICATION AND FEES: For purposes of evaluation, projects will be classified in three categories according to acreage: Class Review Fee A. Less than 25 acres $ 25 B. 25 acres to 200 acres $ 50 C. Over 200 acres $100 The effective acreage for a project is not limited to a fractional part of the total concept, rather if a project is developed in phases or small plots, the total acreage of the conceptual project will be considered. The review fee shall be collected at the time the Stormwater Management Plan Application is submitted by the Applicant to the Administrative Officer, and will reflect the cost of the administration and management of the review process. These fees may be adjusted from time to time by the City Council to reflect actual costs of adminstration and review. SECTION 9. GENERAL DESIGN REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS. A. A stormwater management system shall be provided for protecting lots, roads, streets and buildings in the project area from the potential adverse impacts of stormwater runoff. Streets, blocks, depths of lots, parks and other public grounds, and ultimate land usage shall be determined, located and laid out in such a manner as to reduce the velocity of overland 5:19 flow and allow the maximum opportunity for infiltration of stormwaters into the ground, and to preserve and utilize natural streams, channels and detention basins, and wherever possible, to include streams and floodplains within parks or other public grounds. B. The maximum allowable release rate of stormwater after development shall not exceed the before development rate based on a 15 year frequency storm. The total drainage area must be used in calculating the allowable release rate. The required storage volume will be based on the project area only, with extraneous flows from upland areas being bypassed or discharged via overflow spillway or other devices. C. The increased stormwater runoff resulting from the proposed development shall be detained on-site by appropriate detention basins; by storage on flat roofs, parking lots or streets; or by other acceptable techniques. The minimum volume of storage shall be sufficient to store the volume from a 25 year storm (under developed conditions). Control devices shall limit the discharge from storage to a rate no greater than that prescribed by this ordinance. Downstream property, watercourses, channels or conduits shall not receive stormwater runoff from proposed development at a higher peak flow rate than that which existed prior to the development. D. Generally acceptable locations of the stormwater runoff channels in the design of the project area may include the following: 1. In a depressed median of a double roadway, street or parkway, provided the median is wide enough to permit required roadway shoulders. 2. Centered on the rear lot lines in a block, or entirely within the rear yards of a single row of lots or parcels, provided that in either case the lots are deep enough to permit side slopes in the runoff channel and a building site of the elevation required by other sections of the ordinance. 3. In a depressed area along roadway, street or parkway, provided the area is wide enough to permit side slopes as required in other sections of this ordinance. 4. Alternative systems such as curb and gutter and storm sewers that discharge into an appropriate detention basin may be incorporated into the Stormwater Management Plan. 5. The smaller, uppermost reaches of drainage channels and swales forming the natural drainage system near a watershed divide may be relocated or eliminated and incorporated into the planned system of storm sewers and open channels designed consistent with the requirements of this ordinance. E. A continuous easement may be provided abutting rear lot lines as shown in the Stormwater Management Plan within which utility lines and open drainage facilities may be located and maintained, but on which no accessory buildings may be constructed. The utility -drainage easement shall be at least twenty (20) feet wide. Within the area so designed for the passage or storage of waters, no structure may be erected, no fences, shrubbery or trees planted, or changes made to the prescribed grades and contours of the specified flood water or stormwater runoff channels. F. All storm sewer outfalls shall be so designed, by reason of elevation of the invert, by a flap gate or by other features, that when the receiving stream is in full flood, the storm sewers will continue to drain the areas they are designed to serve unless the provision is made for sewer backups into planned storage locations. G. All sanitary sewer manholes constructed in a floodplain, in a street designed for detention, or in an area designed for the storage or passage of flood or stormwater, shall be provided W with either a. watertight bolted manhole cover, a watertight concealed pick -hole cover, or be constructed with a rim elevation at or above the high water elevation of the 100 year flood or the high water elevation of the design storm, whichever is applicable to the specific area. H. Projects that are to be developed in phases will normally require the submission of a master plan of the applicant's contiguous land holdings. Applications for individual project phases may be considered only when the phases are totally independent of, or make sufficient provisions for, adjacent lands. SECTION 10. HYDRAULIC DESIGN CONSIDERATIONS. A. Design Storms. Stormwater systems will be designed with sufficient hydraulic capacity as a minimum for the following frequencies and durations. TYPE OF FACILITY DESIGN FREQUENCY 1. Detention Basins 25 year 2. Primary Drainage Systems 25 year 3. Bridges 50 year 4. Secondary Drainage Systems, i.e., Crossdrains 15 year and Ditches for Internal Subdivision Drainage B. The Administrative Officer may require alternative designs or features to reduce the cost of long-term maintenance. C. In critical areas, the Administrative Officer may require additional hydraulic capacity above the minimums set forth above, up to the 100 year frequency design. SECTION 11. STORMWATER MANAGEMENT SYSTEM DESIGN REQUIREMENTS. A. Method of Evaluation - Differential runoff evaluation consists of the determination of rates of runoff before and after development, the determination of required volume of detention and verification of adequacy of discharge and control structures. B. Differential Runoff Rates - Differential runoff rates for all three size classes of projects shall be evaluated by the Rational Formula. The runoff coefficients in Table II shall be used. Differential Runoff rates shall be evaluated by equation: R = (Rd -Ru) [EQUATION 11 where R = Differential Runoff Rate Rd = C.I. factor for developed conditions Ru = C.I. factor for undeveloped conditions C. Volume Detention - Volumes of detention for the 3 classes of projects shall be evaluated according to the following methods: 1. Volume of detention for projects of less than 25 acres shall be evaluated by the "Simplified Volume Formula." 2. Volume of detention for projects of 25 acres or greater but less than 200 acres may be evaluated either by the "Simplified Volume Formula" or the "Modified Rational Hydrograph Method." 3. For projects larger than 200 acres the owners' Engineer shall submit his proposed method of evaluation for the sizing of the detention basin to the Administrative Officer. The method will be evaluated for professional acceptance, applicability and reliability. No detail review for projects larger than 200 acres will be rendered before the method of evaluation of the detention is approved. 4. Other analytical methods of evaluation of volume of detention will be considered provided that reliability, professional acceptance and proper application are approved by the Administrative Officer. D. Any of the following methods may be used for calculating detention volume as applicable: 1. Simplified Volume Formula - Total volume of detention shall be computed by the equation: V = R x A x 30 (min) x 60 (sec/min) [EQUATION 21 where V = Total volume of detention R = Differential Runoff rate A = Area of project in acres 2. Graphic Representation - For purposes of further analysis the Simplified Volume Formula may be represented by a triangular synthetic hydrograph as shown in Figure III with the following elements: Tb = Base time of hydrograph for developed project without detention Tb 60 minutes Tp Time of peak runoff of developed project Tp = 20 minutes Qd = Total peak runoff of developed project in c.f.s. Qd A x Rd (See Equation 1) Qu = Total peak runoff of unimproved project in c.f.s Qu = A x RU (See Equation 1) A = Total area of project in acres To = Assumed time of peak differential for unimproved project Tq = Qu/Qd x 40 Tr Assumed recedence time differential for discharge at rates no greater than unimproved condition Tr (30 Qd/Qu) - 60 V = Volume of detention V = (Qd-Qu) x 30 (min) x 60 (sec/min) 3. Modified Rational Hydrograph Method. This is a modification of the UNIT HYDROGRAPH METHOD of hydrologic evaluation simplified to reflect features of present practice and some elements of topographic characteristics, concentration patterns and routing. Figure III illustrates the elements of the modified hydrograph. Steps to develop the hydrograph are as follows: a. Determine the time of concentration for the project by use of Chart IV or similar reference manual adopted by the City Engineer. Chart IV is based on Overland Flow Time from Seeley Data Book for Civil Engineers. Enter chart with overland travel distance, follow horizontally to slope curve then vertically down to C or P factor listed in Table II and obtain Tc. For analysis of large improved channels time of travel for overland flow and channel are to be analyzed to determine reasonable (Tc) time of concentration. b. Determine time of peaking by equation: Tp where Tp D D/2 + .6 Tc [EQUATION 31 Time of peak discharge of developed project in minutes 20 min = storm duration in minutes c. Determine the base time of the Hydrograph without detention, by equation: Tb = 2.67 Tp [EQUATION 41 d. Determine the base time of the Hydrograph with detention by equation: Tr = Tb �Q - 1) [EQUATION 51 where Tr = Additional time required for discharge at a rate no greater than that of the undeveloped condition Qd = Total peak runoff of improved project in c.f.s. Qd = A X Rd (See Equation 1) [EQUATION 61 Qu = Total runoff of unimproved project in c.f.s. Qu = A X Ru (See Equation 1) [EQUATION 71 e. Determine the required volume of detention by equation: V = 1/2 (Qd - Qu) Tb [EQUATION 81 E. Control Structures. Detention facilities shall be provided with obvious and effective control structures. Plan view and sections of the structure with adequate detail shall be included in plans. The design discharge (Q) for the low -flow weir shall not exceed the 15 year (frequency) with a duration equal to the time of concentration for the watershed, runoff from the tributary area for five percent (5%) imperviousness (1.7 c.f.s. per acre). The maximum discharge shall be designed to take place under total anticipated design -head conditions. Sizing of the low -flow weir shall be by the appropriate weir formulas. The overflow opening or spillway shall be designed to accept the total peak runoff of the improved tributary area. The low -flow channel invert through dry detention facilities on other than permanently flowing streams shall be paved. F. Detention Design Criteria - Detention in the overall system, including swales, lakes, canals, greenways, etc., shall be provided as follows: G. General 1. Storage Volumes: The minimum volume of storage provided in detention basins, together with such storage as may be authorized in other on-site facilities, shall be sufficient to store the volume from a 25 year storm (under developed conditions) with a discharge no greater than the rate of flow from a 15 year storm (under undeveloped conditions). 2. Outlet Control Structures: Outlet control structures shall be designed to operate simply and automatically. They will limit discharges into existing or planned downstream channels or conduits so as not to exceed predetermined maximum authorized peak flow rates. 3. Emergency Spillway: Emergency overflow facilities must be provided in all instances so that stored waters will not exceed the safe capacity of the basin. At a minimum, the emergency spillway must be able to pass without damage the 100 year storm. 4. Designs should result in aesthetically pleasing configurations which will enhance public acceptability. -12- H. Dry -Detention Facilities. 1. Perimeter maintenance easements of 15 feet (minimum) width at slopes no steeper than 3:1 (horizontal to vertical) shall be provided. 2. Side slopes of the facility shall not be steeper than 3:1 (horizontal to vertical). 3. Provisions must be incorporated to facilitate complete interior drainage to dry bottom basins, to include the provision of natural grades to outlet structures, longitudinal and transverse grades to perimeter drainage facilities, or the installation of subsurface drains. 4. Multipurpose features may be designed to serve secondary purposes for recreation, open space or other types of use which will not be adversely affected by occasional or intermittent flooding. 5. In no case shall the limits of maximum ponding elevation be closer than twenty-five (25) feet horizontally from any building and less than two (2) feet vertically below the lowest sill elevation. The entire reservoir area shall be seeded, fertilized and mulched, sodded or paved. I. Wet -Detention Facilities. 1. Perimeter maintenance and operation easements of 15 feet (minimum preferable) width at slopes no steeper than 3:1 (horizontal to vertical) shall be provided. 2. Control elevations should be no higher than 2.5 feet below the minimum road centerline elevation in the area served by the control device in order to protect the road subgrade when structures are constructed near roads. 3. Side slopes shall not be steeper than 3:1 (horizontal: vertical) out to a depth of two feet (21) below the control elevation, then as steep as soils stability will allow. 4. If fish are to be used to help keep the basin clean, at least one-quarter of an area of the permanent pool must be a minimum depth of 10 feet. 5. For emergency purposes, cleaning or shoreline maintenance, facilities shall be provided or plans prepared for the use of auxiliary equipment to permit emptying and drainage. 6. The limits of maximum ponding elevations are to be no closer than twenty-five (25) feet horizontally from any building and no less than two (2) feet below the lowest sill elevation of any building. J. Impervious Areas: Paved parking lots may be designed to provide detention storage of stormwaters on all or a portion of their surfaces. Outlets will be designed so as to slowly empty the stored waters, and depths of storage must be limited to a maximum depth of 12 inches so as to prevent damage to parked vehicles. Ponding should be relegated to those positions of the parking lots farthest from the area served. K. Rooftop Storage: Detention storage requirements may be met in total or in part by detention on flat roofs. Details of such designs to be included in the Stormwater Management Plan Application shall include the depth and volume of storage, details of outlet devices and down -drains, elevations of overflow scuppers, design loadings for the roof structure and emergency overflow provisions. L. Underground Storage: All or a portion of the detention storage may also be provided for in underground facilities, as long as all applicable requirements of this ordinance are met. Details of such designs are to include type of facility, depth and volume of storage, details of inlet and outlet devices and locations, emergency overflow provisions, and measures to be used for surface and groundwater pollution control. -13- M. Design Alternatives: The above listing of design criteria is not intended to preclude the use of other known state -of -the art methods and available best management practices and should not be construed as a mechanism to discourage innovative design concepts. N. Developments Adjoining a Floodplain - where a development adjoins or encompasses a portion of a floodplain for a 100 year flood, the following shall apply: 1. The Applicant shall show the floodplain and floodway on the Stormwater Management Plan. 2. The Applicant shall include in the Stormwater Management Plan all other plans, plats, specifications, etc., reauired by federal, state, county and/or municipal law or regulations detailing such provisions or restrictions as are necessary to comply with the following: a. All applicable zoning and subdivision requirements. b. All applicable building code reeuirements. c. All reeuirements of other federal, state or local agencies exercising jurisdiction over the area.. O. The Applicant shall not alter any channel in such a way that would prohibit any section of the channel from conveying, in its post -development state, the same amount of flow at the same or lower maximum water elevation, that it conveyed in its pre -development state. P. The Applicant shall furnish, for the Administrative Officer's review and approval the following information pertaining to proposed channel modifications: 1. Typical cross-sections of the existing and proposed channel. 2. Plan view of the channel showing the location of existing constrictions, obstructions and other non -typical areas. 3. Hydrographs and/or Flood Routing Calculations and Backwater Curve Profiles of the proposed waterway corresponding to a storm recurrence interval of 100 years. 4. Engineering evaluation of all potential increases in flood hazards to the adjacent upstream or downstream private or public lands and facilities located thereon, showing provisions for eliminating any and all adverse impacts on said land and facilities at no public cost. 5. Minimum finished floor elevations which shall be set at or above the maximum water surface elevation as determined by either or both of the following: "Flood Insurance Rate Map" published by the Federal Emergency Management Agency. Backwater Curve Profiles of the proposed waterway due to a. 100 year storm recurrence interval. 6. Designation on the final Plan of all areas reserved for flood routing, detention or storage, together with the required wording pertaining to restrictions, dedications and maintenance responsibilities of such areas. Q. If detention storage is provided within a floodplain, only the net increase in storage volume above that which naturally existed on the floodplain shall be credited to the development. No credit will be granted for volumes below the elevation of the regulatory flood at that location unless compensatory storage is also provided. R. Verification of Adeouacy. Analysis of all elements of design is to be verified by the engineer of record submitting the plan. The following outline is provided to ascertain that -14- certain critical elements are in workable compliance with the aims of this ordinance. For projects less than 50 acres in area there is no need for submittal of routing calculations or tabulated proof of adequacy of tributary runoff for detention; however, it is recommended that verification be made of: 1. volume of detention for the total project 2. tributary (Q) peak runoff to basin 3. balanced maximum outflow rate from the low -flow structure 4. ratios of inflow to outflow rates 5. sizing of the overflow facilities 6. stability of detention dikes 7. safety features 8. maintenance features For projects of 50 acres or greater but less than 200, routing calculations shall be submitted in legible tabulated form. Proof of adequacy of volume of detention and sizing computations for low -flow structure shall also be submitted. Features of stability and safety may also need to be documented if the scope of the project reouires special attention in this area of design. Projects over 200 acres in area shall provide documented verification of adequacy according to scope and complexity of design. Rainfall 4.60 5.40 5.90 6.40 From U.S. Weather Bureau Technical Paper No. 40: "Rainfall Freauency Atlas of the United States for durations from 30 minutes to 24 hours and Return Periods from 1 to 100 Years." -15- TABLE 11 AVERAGE C.I. (P.I.) FACTORS IN C.F.S. PER ACRE 20 Min. INLET TIME % Impervious Area C or P (Factor) 15 Yr. 25 Yr. 50 Yr. 100 Yr. 5 .37 1.7 2.00 2.18 2.37 10 .39 1.79 2.11 2.30 2.50 15 .41 1.89 2.21 2.42 2.62 20 .435 2.0 2.35 2.57 2.78 25 .455 2.09 2.46 2.68 2.91 30 .475 2.10 2.57 2.80 3.04 35 .495 2.28 2.68 2.92 3.17 40 .52 2.39 2.81 3.07 3.33 45 .54 2.48 2.92 3.19 3.46 50 .56 2.58 3.02 3.30 3.58 55 .58 2.68 3.13 3.42 3.71 60 .60 2.76 3.24 3.54 3.84 65 .625 2.88 3.38 3.69 4.00 70 .645 2.97 3.48 3.81 4.13 75 .665 3.06 3.59 3.92 4.26 80 .685 3.15 3.70 4.04 4.38 85 .705 3.24 3.81 4.16 4.51 90 .73 3.36 3.94 4.31 4.67 95 .75 3.45 4.05 4.43 4.80 100 .77 3.54 4.16 4.54 4.93 Rainfall 4.60 5.40 5.90 6.40 From U.S. Weather Bureau Technical Paper No. 40: "Rainfall Freauency Atlas of the United States for durations from 30 minutes to 24 hours and Return Periods from 1 to 100 Years." -15- S. Installation of Stormwater Runoff Control Measures: Positive stormwater runoff control shall be provided for during development. Stormwater Management Plans shall include a schedule for the installation, construction or modification of all drainage facilities. Erosion control measures and a schedule for their installation shall be shown on the Stormwater Management Plan. Installation of drainage facilities and erosion control measures shall proceed as scheduled in the approved Stormwater Management Plan. SECTION 12. RIGHTS-OF-WAY AND EASEMENTS. A. All stormwater management facilities shall be constructed within an easement or right-of-way dedicated for stormwater management use and connected to a public road or other location from which operation and maintenance is legally available. Minimum rights-of-way and maintenance easements shall be provided by instrument or plat dedication for all waterways used to convey or detain runoff. Where permanent maintenance will be provided by the property owner, maintenance easements or rights-of-way may not be required. The minimum widths of rights-of-way and easements shall be as follows: Facility Open Drainage Channel or Facility Greenways Pipes and Culverts Detention Areas Connecting Access Maintenance Access Width 30 feet, 15 feet each side Width of Greenway 15 feet, centered 15 feet continuous around total area 15 feet B. Easements must include the "top of the bank width" and the maintenance access width. C. The maintenance access width begins at the point of the bank or slope of the facility. D. Additional maintenance access width may be required by the Administrative. Officer in special circumstances where more width on one or both sides is necessary for maintenance purposes. SECTION 13. MAINTENANCE RESPONSIBILITIES FOR STORMWATER MANAGEMENT FACILITIES. A. Purpose: The purpose of this section is to establish maintenance standards to ensure that after stormwater management facilities have been properly designed and constructed, they continue to function properly. Continued proper functioning is highly dependent upon the proper maintenance of the facilities. B. Design of Facilities: Maintenance costs over a period of years will generally surpass the costs of initially constructing water management facilities. The Applicant and the Administrative Officer should utilize all appropriate methods, approaches and techniques to design and construct these facilities in such a manner that fulfills the requirements of this ordinance, facilitates their inspection, and minimizes future maintenance costs. C. Maintenance Responsibilities: The growth of noxious weeds, the creation of conditions which support the growth of mosquitoes and other insects, and the decrease in available storage by accumulated sediments shall be controlled. The cleanup of accumulated debris, flotsam and other materials after runoff events have subsided shall be assured. -16- Detention facilities, when mandatory, are to be built in conjunction with the storm sewer installation and/or grading. Since these facilities are intended to control increased runoff, they must be partially or fully operational soon after the clearing of the vegetation. Silt and debris connected with early construction shall be removed periodically from the detention area and control structure in order to maintain close to full storage capacity. The responsibility for maintenance of stormwater management facilities in single -lot development projects shall remain with the owner, developer and general contractor until final inspection of the development is performed and approved, and a legal occupancy permit, where applicable, is issued. After legal occupancy of the project, the maintenance of stormwater management facilities shall be vested with the owner of the project. The responsibility for maintenance of stormwater management facilities in subdivision projects shall remain with the developer until such time as responsibility is transferred, under appropriate legal arrangements, to the private individual owners in the subdivision, the trustees of the subdivision, the City of Cape Girardeau or such other maintenance entity or authority as may be proposed and approved by the City Council. If responsibility is to be transferred to the private individual owners in the subdivision, the developer shall assure perpetual maintenance of the drainage management facilities, including detention systems, if any are included, through the adoption of maintenance agreements or covenants for any facilities that remain in private ownership. Such agreements or covenants shall be subject to the approval of the Administrative Officer. If the responsibility is to be transferred to the trustees of the subdivision, the developer shall establish a suitable indenture of trust. Upon release of escrows required for the subdivision development, the responsibility for maintenance shall be vested in the trustees of the subdivision by virtue of the trust indenture. The indenture of trust shall clearly indicate resident responsibility for maintenance and shall be subject to the approval of the Administrative Officer. If responsibility for maintenance is to be transferred to the City of Cape Girardeau, the system(s) to be maintained by the City shall have adequate easements, dedicated to the public for stormwater management use, to permit the City to inspect and enter upon the property, as necessary, to maintain the system(s). D. Performance and maintenance security: Security against defects in workmanship shall be required for any portion of the drainage management facilities dedicated to the public. The terms of the performance security shall apply to any repairs needed and maintenance needed during the two-year period following completion. Inspection and repair of defects shall be required as a condition of release of the posted security. SECTION 14. PLAN ADHERENCE. The Applicant shall be required to adhere strictly to the Stormwater Management Plan as approved. Any changes or amendments to the Plan must be approved by the Administrative Officer in accordance with the procedures set forth in this ordinance for obtaining Stormwater Management Plan approval. Enforcement officials shall be, and are herein, granted inspection rights and right -of -entry privileges in order to ensure compliance with the requirements of this ordinance. -17- SECTION 15. ENFORCEMENT. A. Approved Projects: The Administrative Officer or his designated representative shall carry out periodic inspections of the project site to insure the Applicant's compliance with this ordinance. If it is determined that the project is not being carried out in accordance with the approved Stormwater Management Plan, the Administrative Officer is authorized to: 1. Written Notice: Issue written notice to the Applicant or owner, specifying the nature and location of the alleged noncompliance, with a description of the remedial actions necessary to bring the project into compliance within a reasonable specified time. 2. Stop -Work Order: Issue a stop -work order directing the applicant or owner, to cease and desist all or any portion of the work which violates the provisions of this ordinance, if the remedial work identified in the "written notice" is not completed within the specified time. 3. Revocation of Approval: Should the Applicant or owner, not bring the project into compliance with the written notice and stop -work order, he shall then be subject to immediate revocation of his Stormwater Management Plan approval and to the penalties described in Section 16. 4. Appeal: Any notice, order or revocation issued pursuant to subparagraphs A(1), A(2) or AN above shall become final unless the person or persons named therein requests, in writing, no later than ten (10) days after the date such notice, order or revocation is served, a hearing before the City Council. B. Unapproved Projects: With respect to any development or development activity determined by the Administrative Officer or his designated representative to be subject to this ordinance, and being carried out without approval, the Administrative Officer is authorized to: I. Written Notice: issue written notice to the owner specifying the nature and location of the alleged noncompliance, with a description of the remedial actions necessary to bring the project into compliance within a reasonable specified time. 2. Stop -Work Order: Issue a stop -work order directing the owner to cease and desist all or any portion of the work which violates the provisions of this ordinance, if the remedial work identified in the "written notice" is not completed within the specified time. 3. Non -Compliance With Stop -Work Order: Should the owner not bring the project into compliance with the written notice and stop -work order he shall then be subject to the penalties described in Section 16. 4. Appeal: Any notice, order or revocation issued pursuant to subparagraphs B(l), B(2) or B(3) above shall become final unless the person or persons named therein requests, in writing, no later than ten (10) days after the date such notice, order or revocation is served, a hearing before the City Council. M SECTION 16. PENALTIES FOR VIOLATION. A. General: Violation of the provisions of this ordinance or failure to comply with any of its requirements, including conditions and safeguards established in connection with variances or special use permits, shall constitute a misdemeanor. Any person who violates this ordinance or fails to comply with any of its requirements shall upon conviction thereof be fined not more than Five Hundred Dollars ($500.00) or imprisoned for not more than three (3) months, or both, and in addition, shall pay all costs and expenses involved in the case. Each day such violation continues shall be considered a separate offense. B. Corrective Actions: Nothing herein contained shall prevent the City of Cape Girardeau from taking such other lawful action as is necessary to prevent or remedy any violation. All such costs connected therewith shall accrue to the person or persons responsible. SECTION 17. VESTED RIGHTS. This ordinance shall not in any way limit or modify the vested rights of any person to complete any development or improvements to lands based upon prior law, where a previous permit or authorization has been granted or applied for and where such previous permit or authorization remains in effect. The City may acknowledge vested rights in other circumstances where it is equitable and just. SECTION 18. CONFLICT WITH OTHER ORDINANCES AND CODES. In case of conflicts within this ordinance or any part thereof, and the whole or part of any other existing or future ordinance or code of the City of Cape Girardeau, the most restrictive in each case shall apply. SECTION 19. OTHER PERMITS. Before starting any work regulated by this ordinance, an applicant shall comply with the requirements set forth in all other applicable ordinances with respect to the submission and approval of preliminary and final subdivision plats, site plans for construction and rezoning improvement plans, and building, grading and zoning permits, along with those set forth in this ordinance and as may be required by State statutes and the regulations of any department of the State of Missouri. SECTION 20. INTERPRETATION. In the interpretation and application of this ordinance, the provisions expressed herein shall be held to be the minimum requirements and shall be liberally construed in favor of the City of Cape Girardeau and shall not be deemed a limitation or repeal of any other powers granted by State statutes. SECTION 21. SAVINGS CLAUSES. A. Separability: If 'any part of this ordinance is held to be unconstitutional, it shall be construed to have been the legislative intent to pass this ordinance without such unconstitutional part and the remainder of this ordinance, as to the exclusion of such part, shall be deemed and held to be valid as if such part had not been included herein. If this owls ordinance or any provision hereof is held to be inapplicable to any persons, group of persons, property, kind of property, circumstances or set of circumstances, such holding shall not affect the applicability hereof to any other person, property or circumstances. B. Abrogation and Greater Restrictions: It is not intended by this ordinance to repeal, abrogate or impair any existing easements, covenants or deed restrictions. However, where this ordinance imposes greater restrictions, the provision of this ordinance shall prevail. SECTION 22. LIABILITY DISCLAIMER. The performance standards and design criteria set forth herein establish minimum requirements which must be implemented with good engineering practice and workmanship. Use of the requirements contained herein shall not constitute a representation, guarantee, or warranty of any kind by the municipality or its officers and employees of the adequacy or safety of any drainage management structure or use of land. Nor shall the approval of a Stormwater Management Plan and the issuance of a permit imply that land uses permitted will be free from damages caused by stormwater runoff. The degree of protection required by these regulations is considered reasonable for regulatory purposes and is based on historical records, engineering and scientific methods of study. Larger storms may occur or stormwater runoff heights may be increased by man-made or natural causes. Enforcement of these provisions, therefore, shall not create liability on the part of the municipality or any officer of the municipality with respect to any legislative or administrative decision lawfully made hereunder, nor shall compliance relieve an owner, developer, and/or permittee from responsibility under any circumstances where liability would otherwise exist. SECTION 23. It is the intention of the governing body and it is hereby ordained that the provisions of this ordinance shall become and be made a part of the Code of Ordinances of the City of Cape Girardeau, Missouri, and the sections of this Code may be renumbered to accomplish such intention. SECTION 24. This ordinance shall be in full force/and effect ten days after its passage and approval. PASSED AND APPROVED THIS (O(�fc , DAY OF , 1989. Francis I-. Rhodes, Evelyn , City Clerk ATTESTED AND FILED in my office this `tri. day of �� ���-'� �,�'L/ , 1989, and published as provided by law this day of (,��t ���' , 1989. � 7 velyn G eGrand, City Clerk -20- STORMWATER MANAGEMENT PLAN APPLICATION FORM Project Name Date of Submission Date of Return Date of Approval _ Signature of Administrative Officer APPLICANT: Name: Firm: Address: Phone Number: PROFESSIONAL ENGINEER: Name: Firm: Address: Phone Number: LEGAL DESCRIPTION OF PROPERTY: OWNER (if different): Name: Firm: Address: Phone Number: [Attached] OVERLAND FLOW TIME FROM SEELEY'S DATA BOOK FOR CIVIL ENGINEERS 100 900 35 800 700 600 30- 500 .80- 400 2 N z 300 w_ U_ U- U- _ N w w o• z. 20' F— a 200 .50 J z w w L- W O j O• z z z � 5 a °- w ~ 0,5 I- 0. I5 z 0 N 100 140 I.0 o W 0 90 80 2.0— .0 z z w .y 70 60i \ \.. 5.0 w w z o U Z to C 50 20- 0 40 40 10- 30 s 9 . 8 20 7 10 6 FROM SEELEY'S DATA BOOK FOR CIVIL ENGINEERS zzz s�n�za H n PO no •s••0 uz j3Oun8 d II C O _ N ' W 0 G G fD (D G (D O O y M D n � M (D O 0 o m x ro 7 C O (D a � W m G G fD (D G (D O O y M D M (D 0 o m x ro � x a G a o 0 0 W rn M C a 1 ro P. G fy 0 rOn r'' PV o rn m � N [ o 7 C O a � m G G fD (D G � ' O O M b M (D a x � x a G n o 0 0 W rn M a 1 ro x G E � M• o rt M O M O G x rt K a � n m o rt w 0 n � rt ro �• o a E r+ c� rt m p rt P. 0 p