Loading...
HomeMy WebLinkAboutOrd.2146.04-21-1997BILL NO. 97-55 ORDINANCE NO. jq <"(_y AN ORDINANCE AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT NO. 1 TO AN AGREEMENT FOR ENGINEERING SERVICES WITH BLACK & VEATCH, FOR THE TRANSPORTATION IMPROVEMENTS PROGRAM BE IT ORDAINED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute Amendment No. 1 to an Agreement for Engineering Services dated February 15, 1996, with Black & Veatch, for the transportation improvements program. A copy of said Amendment No. 1 is attached to this Ordinance and made a part hereof. ARTICLE This ordinance shall be in full force and effect ten days after its passage and approval. PASSED AND APPROVED THIS ATTEST: Gayly L. Conrad Deputy City Clerk �2 DAY OF P/10 T�, 19 1 . A. M. Spradling, III, Oayor AMENDMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES FOR CITY OF CAPE GIRARDEAU, MISSOURI TRANSPORTATION IMPROVEMENTS PROGRAM WHEREAS, an Agreement for Engineering Services dated February 15, 1996, with Purchase Order No. 13896/ Notice to Proceed dated April 8, 1996 (the "Agreement") , now exists and is full force between the City of Cape Girardeau ("Owner") and Black & Veatch ("Engineer") ; and, WHEREAS, the scope of services for the project as described in Attachment A of the Agreement is being expanded to include additional field survey work, design engineering services, preparation of drawings and specifications, and consulting services as described in Attachment 1A, Scope of Services; and, WHEREAS, Engineer is prepared to provide the Services; and, WHEREAS, Owner agrees to pay Engineer for the additional services in accordance with Attachment 1B, Compensation; and, WHEREAS, Owner shall be responsible for all matters described in Attachment 1C, Owner's Responsibilities; NOW THEREFORE, in consideration of the promises contained in the Agreement and Amendment No. 1, Owner and Engineer agree to amend the Agreement as stipulated in this Amendment No. 1; IN WITNESS WHEREOF, Owner and Engineer have executed this Amendment No. 1 to the Agreement. 0 ENGINEER Cit of C: •e Girardeau Missouri Black & Veatch C By`/ By Michael Miller John R. McNitt City Manager Partner Date: A9-q--) Date : 211V, 7 Cape Girardeau, Missouri Page 1 Amendment No. 1 Transportation Program 02/07/97 ATTACHMENT IA TO AMENDMENT NO. 1 FOR CITY OF CAPE GIRARDEAU, MISSOURI TRANSPORTATION IMPROVEMENTS PROGRAM SCOPE OF SERVICES Owner: City of Cape Girardeau, Missouri Project: Transportation Improvements Program The authorized scope of services for this project includes surveying, preliminary studies, design engineering, public involvement, right-of-way and easement acquisition, and preparation of construction drawings, specifications, and bidding documents. Engineer shall provide the following additional services: PHASE 1. INITIAL INVESTIGATIONS AND PRELIMINARY STUDY A. Preliminary and General Items 1. Meet with Owner and review the routes of a new 12 -inch and 8 -inch diameter water main along Perryville Road, approximately 5,000 feet long. 2.. Review and incorporate the locations of. sanitary encasement pipe for future use by Owner. B. Collect Existing Information 1. Incorporate Owner's water distribution system standards. 2. Incorporate Owner's sewerage system standards. C. Traffic Capacity Determinations - no change D. Alignment and Profile study - no change E. Hydrology and Hydraulics Study 1. Prepare stormwater routing calculations and hydraulic design for four detention basins, two on Perryville Road, one on Bloomfield Road, and one on Broadway. Cape Girardeau, Missouri 1A-1 Amendment No. 7 Transportation Program 02/07/97 2. Prepare preliminary and final design for a new storm drainage outfall from the Broadway project south and.west along Helena and Clark Streets, to the existing system along Bessie Street draining to the Walker Branch flood control channel, a distance of 1000 to 1500 feet, depending on the final alignment. F. Pavement Design - no change G. Traffic Signal Upgrade 1. Based upon the results of the existing system review (original scope), provide field traffic counts for turning movements and peak lane volumes at the twelve intersections to be upgraded. 2. Prepare complete traffic signal design and phasing plan for a new signal at the intersection of Broadway and Clark Ave. H. Public Involvement Program 1. Provide additional services to incorporate the "Roads to Success" logo and color change in the newsletter. 2. Provide additional staffing to handle an anticipated larger attendance at the Broadway Public Meeting. PHASE 2A. FIELD SURVEYS AND PROPERTY SURVEYS A. Preliminary and General Items 1. Coordinate route and outfall location for Broadway stormwater outfall with Owner. 2. Obtain as -built records as needed from Owner and the Army Corps of Engineers. 3. Coordinate general location for the Bloomfield Road detention basin with Owner. B. Route Surveys and Property Surveys 1. Provide horizontal and vertical controls, topographic survey and mapping, and general property ownership and right-of-way information for the Broadway stormwater Cape Girardeau, Missouri IA -2 Amendment No, 1 Transportation Program 02/07/97 outfall. Location of the outfall within existing street right-of-way or City -owned easement is anticipated so that detailed plats and legal descriptions are not required. 2. Provide a topographic construction survey of the Bloomfield Road detention basin site, which extends approximately 500 feet upstream, beyond the limits of the roadway survey. PHASE 2B. DESIGN, CONSTRUCTION DRAWINGS, SPECIFICATIONS, AND BID DOCUMENTS A. Preliminary and General Items - no change B. Design Memorandum - no change C. Geotechnical Services - no change D. Construction Drawings and Specifications 1. Prepare additional construction drawings, details, and specifications for construction of a new water main along Perryville Road. 2. Prepare additional construction drawings, details, and specifications for construction of the stormwater detention basins. 3. Prepare additional construction drawings, details, and specifications for construction of a new signalized intersection at Broadway and Clark Ave. 4. Prepare additional construction drawings, details, and specifications for construction of a stormwater outfall from the Broadway project south and west along Helena and Clark Streets, to the existing system along Bessie Street leading to the. Walker Branch flood control channel. [End of Attachment 1A) Cape Girardeau, Missouri IA -3 Amendment No. 1 Transportation Program 02/07/97 ATTACHMENT 1B TO AMENDMENT NO. 1 FOR CITY OF CAPE GIRARDEAU, MISSOURI TRANSPORTATION IMPROVEMENTS PROGRAM COMPENSATION Owner: City of Cape Girardeau, Missouri Project: Transportation Improvements Program For the services covered by this Amendment No.l, the Owner agrees to pay the Engineer as follows: A. For Phase 1 Services (Initial Investigations), 2A Services (Field and Property Surveys), and 2B Services (Design, Construction Drawings and Bid Documents), an amount equal to the Engineer's salary costs times 2.95 plus reimbursable expenses at cost and plus subcontract billings times 1.05. B. Salary costs and expenses will be included with the original contract amounts and the billing limits increased as follows: _Street Improvements Design Services Original Contract $355,000 Amendment No. 1 46,800 Total $401,800 Traffic Signal Upgrade Design Services Original Contract $60,000 Amendment No. 1 15,000 Total $75,000 C. All agreements regarding compensation specified in Attachment B of the Agreement remain in place. The services provided by this Amendment will not need to be separated out from the original contract for periodic payments or other purposes. [End of Attachment B] Cape Girardeau, Missouri 1B-1 Amendment No. 1 Transportation Program 02/10/97 ATTACHMENT IC TO AMENDMENT NO. 1 FOR CITY OF CAPE GIRARDEAU, MISSOURI TRANSPORTATION IMPROVEMENTS PROGRAM OWNER'S. RESPONSIBILITIES Owner: City of Cape Girardeau, Missouri Project: Transportation Improvements Program The Owner will furnish, as required by the work and not at the expense of the Engineer, the following items: A. All maps, drawings, reports, records, and other data that are available in the files of the Owner and which may be useful in the work involved under this Amendment. B. Access to public and private property when required in performance of the Engineer's services. C. The services of at least one of the Owner's employees or staff who has the right of access to, and who has knowledge of, the existing streets and traffic signal equipment. D. Obtaining any needed permits or authorizations from the Army Corps of Engineers to construct the stormwater outfall or stormwater detention areas. E. All other items specified in Attachment C of the Agreement remain in effect. [End of Attachment C] Cape Girardeau, Missouri 1C-1 Amendment No.1 Transportation Program 02/07/97