HomeMy WebLinkAboutCIP2007-2012BILL NO. 07-50 RESOLUTION NO. _ ,,o,;�kO A RESOLUTION ADOPTING THE FISCAL 2007-2012 CAPITAL IMPROVEMENTS PROGRAM WHEREAS, Article VI, Section 6.04 of the Charter of the City of Cape Girardeau requires a Capital Improvements Program; and WHEREAS, the City Manager has presented a proposed Capital Improvements Program to the City Council; and WHEREAS, proper notice has been published concerning the availability for inspection of the proposed Capital Improvements Program and the time and place for a public hearing on the Capital Improvements Program; and WHEREAS, the City Council has held a public hearing on the proposed Capital Improvements Program. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Council hereby adopts the five-year Capital Improvements Program for fiscal 2007-2012, copies of which are on file in the office of the City Clerk. ARTICLE 2. The City Clerk is instructed to attach an executed copy of this resolution to a copy of the Capital Improvements Program for fiscal 2007-2012 and to retain such copy with the permanent records of the City. PASSED AND ADOPTED THIS_ QII +� DAY OF /�ar� �r�.. , 2007 City Clerk J B. dtson, Mayor CITY OF CAPE GIRARDEAU Office of the City Manager Council Letter No. 3 6 Agenda February 20, 2007 The Honorable Mayor and Members of the City Council City of Cape Girardeau, Missouri RE: Public Hearing on 2007-2012 Capital Improvements Program Dear Mayor and Council Members: hi accordance with requirements of the City Charter, a public hearing regarding the 2007- 2012 Capital Improvements Program has been set for Tuesday, February 20, 2007, at 7:00 P.M. The public notice of the hearing was published in the Southeast Missourian on Sunday, February 4, 2007. Unless otherwise directed, the staff will prepare a resolution for adoption of the proposed Capital Improvements Program, with any additional changes the Council wishes to make, for. the Council's agenda for Monday, March 5, or March 19, 2007. The City Charter requires that the Capital Improvements Program be adopted on or before April 1, 2007. The draft of the proposed Capital Improvements Program was submitted to the City Council on December 4, 2006, by Council, Memorandum No. 66. The Council held a special work session on the Capital Improvements Program on February 12, 2007. As per the Council's direction at the work session, the staff will develop a cost estimate for West End Boulevard north of New Madrid, probably in two sections (from New Madrid to Bertling and from Bertling to Lexington) and add it to the CIP. We will do the same for the Lexington-W-Kingsway intersection. We will also update the cost estimate for the Scott City interconnect and revise the outdoor warning siren item. Resp ctfully submitted, 11� f;6k Kent M. Bratton Director of Planning Services Douglas K. Leslie City Manager CITY OF CAPE GIRARDEAU Office of the City Manager 0juncil Letter No. 74 March 19, 2007 The Honorable Mayor and Members of the City Council City of Cape Girardeau, Missouri RE: Adoption of the 2007-2012 Capital Improvements Program Dear Mayor and Council Members: In accordance with the requirements of the City Charter, a public hearing regarding the 2007-2012 Capital Improvements Program was held on Tuesday, February 20, 2007, at 7:00 P.M., in the Council Chambers. The addition of West End Boulevard, from New Madrid north g Bertling, and the Lexington-W-Kingsway intersection was recommended by the Council /during a special study session February 12, 2007, and submitted in the letter to the Council for the public hearing on the Capital Improvements Program. These changes will be included in the adopted program report. Attached are the detail pages on these projects that will be inserted in the adopted copy. The project numbers are in brackets as they will be inserted within the program and subsequent projects will be renumbered. The City Charter requires that the Capital Improvements Program be adopted on or before April 1, 2007. Attached for the Council's consideration is a resolution adopting the Capital Improvements Program. It is recommended that the City Council proceed with this action. Resp tfully submi, tte Kent M. Bratton City Planner Douglas K. Leslie City Manager TABLE OF CONTENTS ITEM Introduction: PAGE CityManager's Letter................................................................................. i Summaries: Revenue Funding Sources by Fiscal Year Graph ................................................ vii Summary of Funding Sources by Fiscal Year 2007-2012 ..................................... viii Summary of Funding Sources Graph............................................................... ix Summary of Recommended Program Expenditures 2007-2012 by Program Description and Source of Funds ..................................................... x Capital Improvements Budget by Program Area Graph ......................................... xi RevenueSources....................................................................................... xii Capital Improvements Program: Transportation and Public Works.................................................................. 1 Environment........................................................................................... 53 Parksand Recreation................................................................................113 Community Development.........................................................................133 UnfundedNeeds List.................................................................................147 The Honorable Mayor and Members of the City Council City of Cape Girardeau Dear Mayor and Council Members: November 24, 2006 INTRODUCTION In compliance with Article VI, Section 6.04 of the City Charter, the City staff herewith submits a draft of the proposed Five -Year Capital Improvements Program. This program is for the period July 1, 2007, through June 30, 2012. In accordance with the City Charter, and with the Council's approval, the staff will schedule a public hearing on February 20, 2007, for the Capital Improvements Program. Following public input, and the Council's final approval, a resolution for adoption of the Capital Improvements Program should be placed on the Council's agenda for the meeting on March 5th or 19th. In accordance with the Charter, the Capital Improvements Program must be adopted on or before April 1St In reviewing this proposed program, the City Council should give particular emphasis to establishing priorities for projects and financing sources for implementation. Projects for which a defined funding source is not currently proposed or available are included under the Unfunded Needs Section. As is the case in any given year, the beginning point for preparing the Capital Improvements Program is that adopted for the prior year. In addition, the City's advisory boards involved in planning for capital improvements have been given the opportunity to provide input, as well as those City departments involved in planning and implementation of such improvements. BACKGROUND The Capital Improvements Program should be considered as an investment in the future of the community. The selection and evaluation of capital projects is a difficult task that involves some speculation and the ability to make estimations which, to some extent, are based on historical perspectives. The City Council, in 1983, formally considered and adopted a long-range Capital Improvements Program for the first time under the current Charter requirement. This budget process should provide a relevant approach to identifying and implementing important community -wide and neighborhood projects. I PROGRAM AND FINANCING DESCRIPTIONS The major program areas within which the various projects have been described include Transportation, Environment, Parks and Recreation, and Community Development. These major categories contain the following types of projects: 1. Transportation. The projects in this category provide for the construction of public streets within the City and improvements at the Regional Airport. 2. Environment. These projects provide for the preservation, restoration, and care of the physical facilities of the City, including water, wastewater, solid waste, and stormwater utilities. 3. Parks and Recreation. The programs under this area provide the facilities for citizens to participate in organized and unorganized recreation and leisure time activities. 4. Community Development. Projects under this category include construction of general public facilities and community projects which have city-wide impacts. The Capital Improvements Program includes types of revenue sources recommended as ways to finance the capital improvements proposed. The following is a brief discussion of what the various revenue sources include. A. General Fund Revenues. These revenues are available on an annual appropriation basis from the City's general fund, which includes the receipt of revenues from a number of sources. These funds are subject to the annual budgeting process. B. and C. Revenue/PFA Bonds. These bonds are issued for the financing of self-supporting and general public improvements. Revenue bonds are not included within the limitations of indebtedness of the City and are issued upon the authorization of a majority voter approval. These bonds are normally used for enterprise funds such as water, sewer, and solid waste utilities. PFA (Public Facility Authority) bonds are used upon City Council approval based on collateralized assets and annual lease/purchase appropriations. Cash flows for debt retirement come from existing revenue and from new receipts to be generated by the facilities' operations. Within the Capital Improvements Program, revenue/PFA bonds already issued or authorized by the electorate or City Council are denoted as "B". Those that are pending, i.e. will require subsequent approval of the electorate or Council, are denoted as "C". D. State Grants. The City is eligible to submit grant applications to the State of Missouri for funds that they may have available either from their own revenue sources or, in some cases, from revenue sources that they administer for various federal agencies. 11 E. Motor Fuel Tax Receipts. These receipts are from the City's portion of the State Gasoline Tax, State Motor Vehicle Licensing, and State Motor Vehicle Sales Tax. The revenues from this source can be used for capital improvements, as well as annual operating maintenance expenses as they relate to improvements on the City's streets. F. Federal Grants. The City is eligible to receive various federal grants on a competitive basis from appropriate federal agencies. This could include the Environmental Protection Agency as it relates to water and wastewater improvements, the Federal Highway Administration which administers and distributes funds from the Federal Gasoline Tax revenue through the Federal Transportation Program, or the Federal Aviation Administration for airport improvements. Most of these funds, however, are now administered by the State through related State agencies. G. Special Assessments. This category provides for the consideration of special assessments which are used for public improvements affecting specific areas. The total, or a portion of, the cost of an improvement is divided among property owners who benefit from the project. This type of funding can be used for diverse improvements including streets, water, stormwater, sanitary sewer or sidewalk improvements. However, it should be noted that the "up front" cost of special assessment projects (i.e., the initial funding) must be borne by the City from available revenue sources, with the special assessment "costs" recovered afterwards, typically over a period of ten years through special tax bills paid by the benefiting property owners. This may result in the issuance of bonds to be repaid from the special assessment receipts. H. Capital Improvements Sales Tax. A 1/4 %,3/8 %, or %z % sales tax can be issued by the City for various types of public improvements. Such a tax requires approval by the electorate with a simple majority. For example, in November, 1988, the voters of Cape Girardeau adopted a 1/4 % sales tax effective January 1, 1990, restricted to flood control projects. On April 5, 1994, the voters of Cape Girardeau approved the extension of this tax for an additional twenty years to pay for improvements to the City's sewer system. I. Other. This category denotes funds from donations, operating revenues from funds other than the General Fund, reserves, proceeds from the sale of fixed assets and other sources. These funds are subject to the annual budgeting process. J. General Obligation Bonds. These bonds are normally issued for the financing of general public improvements. General obligation bonds must be authorized by a 4/7t' vote of the voters, which also authorizes a tax levy to be used for debt retirement. Total outstanding general obligation bonds are limited by State statute to 20% of the City's total assessed valuation. The City at present has no outstanding general obligation bonds. iii K. Transportation Sales Tax. Pursuant to Sections 94.700 - 94.755 of the State statutes, the voters of the City of Cape Girardeau approved a %2 % sales tax for a number of specific street improvement projects on August 8, 1995, for a period of five (5) years. This tax went into effect on January 1, 1996. Revenues from this source were placed in a special Transportation Trust Fund to be used only for these purposes. This tax expired on December 31, 2000, but on August 8, 2000, the voters approved the extension of the 1/2% sales tax for additional specific street improvement projects for another period of five (5) years. This tax went into effect on January 1, 2001, and expired on December 31, 2005. However, on August 2, 2005, a third authorization of the %2 % sales tax was approved for another list of specific projects, with the tax becoming effective January 1, 2006. The revenues from this source will continue to be placed in the Transportation Trust Fund and will be used for the specific projects approved. L. Fire Sales Tax. Pursuant to Section 321.242 of the State Statutes, the voters of the City of Cape Girardeau approved a 1/a % sales tax for operation of the Municipal Fire Department and for capital improvements related thereto on June 8, 2004. The tax went into effect on October 1, 2005. Half of the tax (1/8 %) will expire on December 31, 2014. The other 1/8 % does not have an automatic expiration date and will continue on. PROPOSED IMPROVEMENTS The total Capital Improvements Program included herein includes a total of $122,916,346 in improvements for the five-year period 2007-2012 by fiscal year. Other Funding will provide the largest source of funds, with $80,284,000 projected for the program period. These funds, if available, will be used for improvements such as an addition to police headquarters, improvements and a new clubhouse at the golf course, and improvements at City parks, including a family aquatic center. The second largest category for funding proposed improvements is the Transportation Sales Tax. This includes $19,388,500 in funds for the program period. The third largest funding source is the Federal Grants and Loans. This includes $7,197,995 in funds for the program period. The fourth largest category for funding proposed improvements is Revenue/PFA Bonds: Issued. This provides for $5,497,200 in funding over this period. The largest program area is Environment ($40,557,100). Projects in this area include some of the sewer improvements funded by the April, 1994, bond election, and expansion of the water system's production/treatment/ distribution capacity, part of which will be funded by revenue bonds authorized November 5, 1996. ry The Transportation program area is second largest ($34,691,246). This amount is comprised of $29,114,000 for street and bridge projects ($19,388,500 of the projects are Transportation Trust Fund projects), and $5,576,906 for airport projects. The third largest program area is Parks and Recreation ($33,767,000), which includes several park improvement projects and general park development, including a family aquatic center. It also provides for improvements at the golf course. Also included is the expansion of the Riverfront Park and Riverfront Trail, and the North Park Trail connection to North County Park. The Community Development program area ($13,901,000) includes improvements such as a regional fire training center, an addition to police headquarters, and a City Hall elevator and archive center. CONCLUSION The capital improvements program proposed herein is a progressive program. The implementation of this program will allow for the creation of new job opportunities, an increase in revenue to private businesses, opportunities for new businesses, existing business expansions, and the strengthening of the quality of life in Cape Girardeau and the surrounding area. It is hoped that this plan will focus attention on community goals, needs and capabilities; reduce scheduling problems and conflicting or overlapping projects; maintain a sound and stable financial program; enhance opportunities for participation in federal or state funded programs; and achieve the highest public benefit from the expenditure of City revenue. The final plan should be regarded as a working document to be implemented through the annual budget appropriation process of the City Council, support from the citizens of Cape Girardeau for appropriate revenue sources, and action by the City staff. Respectfully submitted, Douglas K. Leslie City Manager DKL/KMB/JRR/rlf 4. Kent M. Bratton Director of Planning Services R John R. Richbourg Finance Director 45,000,000 40,000,000 35,000,000 30,000,000 25,000,000 20,000,000 15,000,000 10,000,000 5,000,000 REVENUE FUNDING SOURCES BY FISCAL YEAR CAPITAL IMPROVEMENTS PROGRAM 2007-08 2008-09 2009-10 2010-11 2011-12 Vll Summary of Funding Sources by Fiscal Year Source of Funds 2007-08 2008-09 2009-10 2010-11 2011-12 Total General Fund Revenues (A) 77,211 350,960 317,190 35,150 32,010 812,521 Revenue/PFA Bonds: Issued (B) 4,079,400 883,800 328,000 103,000 103,000 5,497,200 Revenue/PFA Bonds: Pending (C) State Grants/Loans (D) 1,985,340 983,640 327,800 170,560 127,450 3,594,790 Motor Fuel Tax (E) 783,300 430,000 1,155,500 1,664,440 822,600 4,855,840 Federal Grants/Loans (F) 2,312,155 2,265,540 1,201,910 938,250 480,140 7,197,995 Special Assessments (G) 247,600 271,400 203,800 722,800 Capital Improvement Sales Tax (H) 153,700 153,700 Other (I) 18,684,875 8,480,575 4,484,425 8,280,125 42,063,000 81,993,000 Gen. Obligation Bonds: Pending (J) - Transportation Sales Tax (K) 9,355,100 3,406,500 5,128,700 1,498,200 19,388,500 Fire Sales Tax (L) 409,000 1 1 409,000 TOTALS 38,087,681 17,072,415 12,943,525 12,893,525 1 43,628,200 124,625,346 CAPITAL IMPROVEMENT BUDGET SUMMARY OF FUNDING SOURCES Revenue/PFA Bonds: General Fund Revenues Issued (B) (A) 4% 1% Revenue/PFA Bonds: Pending (C) 0% Fire Sales Tax (L) State Grants/Loans (D) 0% 3% Motor Fuel Tax (E) 4% Federal Grants/Loans (F) Transportation Sales Tax 6% (K) Special Assessments (G) 16% 1% Capital Improvement Sales Tax (H) 0% Gen. Obligation Bonds: Pending (J) 0% Other (1) 65% 1X Summary of Recommended Capital Improvement Program Expenditures 2007-2012 by Program Description and Source of Funds Program Descriptions Transportation Environment Parks & Community TOTAL Source of Funds Recreation Development General Funds Revenues (A) 562,521 250,000 812,521 Revenue/PFA Bonds: Issued (B) 5,497,200 5,497,200 Revenue/PFA Bonds: Pending (C) - State Grants/Loans (D) 1,997,530 1,597,260 3,594,790 Motor Fuel Tax (E) 4,314,400 541,440 4,855,840 Federal Grants/Loans (F) 6,608,295 589,700 7,197,995 Special Assessments (G) 722,800 722,800 Capital Improvement Sales Tax (H) 153,700 153,700 Other (I) 3,873,300 33,294,400 31,628,300 13,242,000 82,038,000 Gen. Obligation Bonds: Pending (J - Transportation Sales Tax (K) 19,388,500 19,388,500 Fire Sales Tax (L) 409,000 409,000 TOTALS 36,744,546 40,257,800 33,767,000 13,901,000 124,670,346 CAPITAL IMPROVEMENT BUDGET Parks & Recreation 27% BY PROGRAM AREA Community Development 11% X1 33% ation REVENUE SOURCES A. General Revenue Fund G. Special Assessments B. Revenue/PFA Bonds: Issued H. Capital Improvement Sales Tax C. Revenue/PFA Bonds: Pending I. Other D. State Grants and Loans J. General Obligation Bonds E. Motor Fuel Tax K. Transportation Sales Tax F. Federal Grants and Loans L. Fire Sales Tax xii TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM 1 TRANSPORTATION PROPOSED PROJECTS Project 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 Improvement Item Total Cost Number Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Existing Street Paving Program 3,250,000 E 200,000 E 200,000 E 200,000 E 200,000 E 200,000 E 1993 K 600,000 K 600,000 K 600 000 K 450 000 K 3 Street, Curb & Gutter Repair 1,405,000 K 375,000 K 375,000 K 375,000 K 280,000 K F, 1996 Sidewalk Repair and Construction 565,000 K 150,000 K 150,000 K 150,000 K 115,000 K 1996 Mt. Auburn Road: Sections Between 0 Independence and Kingshighway O EM 1,750,000 K 1,750,000 K 2006 Independence Street Widening - 2,600,000 x 2,600,000 K .. Phase I 2001 Independence Street - Phase II 359,300 K 359,300 K 2 2001 LaSalle Ave.: 1-55 at New 3,220,800 K 3,220,800 K Interchange 102 to Route W .: 2006 1-8 Fountain Street - Phase II 800,000 D 500,000 D Q 2006 K 300,000 K � Sprigg St.: Shawnee Parkway toSt.: Shawnee Parkway to r 324,500 K 324,500 K William Street ;,-- - 2006 Armstrong Drive 1,957,000 K 1,957,000 K y, 2006 Bloomfield Road - Phase IV 1,121,700 K 1,121,700 K 2006 Big Bend Rd. - Mason St. - Main St.: 1,963,200 K 1,963,200 K Mill St. to Cape Rock Dr. 2006 Vantage Dr.: Kingshighway to I i = 918,800 K 918,800 K Ashland Court Subdivision A General Revenue Fund B REV/PFA Bonds: Issued C REV/PFA Bonds: Pending D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans G Special Assessments H Capital Improvement Sales Tax I Other J Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax Projects included in Transportation Trust Fund Programs, TTF-2 and TTF-3, supported by a 1/2 % transportation sales tax for five years approved by votes on August 8, 2000 and August 2, 2005. N TRANSPORTATION PROPOSED PROJECTS Project 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 Number Improvement Item Total Cost Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Kingshighway - Cape Rock Dr. - Broadview St. - Maria Louise Ln. 653,200 K 653,200 K Intersections 2006 Old Sprigg St. Road and Lexington 1-15 Ave: Extend Box Culvert 43,100 E 43,100 E 1998 1-16 Lombardo Drive Realignment 91,100 E 91,100 E 2001 1-17 Lewis & Clark Parkway: La Salle 3,900,000 F 1,200,000 F 1,000,000 F Avenue to Limbaugh Lane 2006 1 1,200,0001 500,0001 1-18 West End Blvd.: Bloomfield South 683,400 D 683,400 D to Shawnee Parkway 1998 1-19 Lexington -Rt. W. Signals/Tum Lane 182,6001 182,6001 2007 West End Blvd.: Repair and 1-20 Reconstruction: Rose Street to New 327,800 D 327,800 D Madrid Street 2002 1-21 Walnut St: Reconstruction and 750,900 E 750,900 E Extension 2004 1-22 Perryville Road Retaining Wall 185,500 E 185,500 E Replacement 2002 1-23 North Main St. Reconstruction 782,000 E 782,000 E 2005 1-24 Bertling Street Reconstruction 189,200 E 189,200 E 2007 1-25 North Kingsway Dr., Curve 362,600 E 362,600 E Reconstruction 2005 A General Revenue Fund B REV/PFA Bonds:, Issued C REV/PFA Bonds: Pending D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans G Special Assessments H Capital Improvement Sales Tax I Other J Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax Projects included in Transportation Trust Fund Program, TTF-3, supported by a 1/2 % transportation sales tax for five years approved by vote on August 2, 2005. 3 TRANSPORTATION PROPOSED PROJECTS Project 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 Improvement Item Total Cost Number Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 1-26 West End Blvd.: New Madrid to 1,870,7001 1,870,7001 Bertling 2007 Traffic Signal Projects Various 1-27 910,000 E 130,000 E 130,000 E 130,000 E 260,000 E 260,000 E Locations 2003 SUBTOTAL- 31,167,400 12,719,300 6,102,500 6,537,400 3,114,900 2,693,300 STREET PROJECTS 1-28 Construct Airport T -Hangar 416,000 A 7,500 A 2003 D 408,500 D 1-29 Airfield Pavement Rehabilitation 88,906 A 8,891 A 2004 F 80,015 F 1-30 Improve Terminal Security and 171,600 A 8,580 A Computerized Access Control 1999 F 163,020 F Improve Access Roadway to East 1-31 150,000 A 30,000 A Ramp Corporate Hangars 2006 J 120 000 i Environmental Assessment for 1-32 Airport Layout Plan Update 67,600 A 3,380 A Development Items 2004 F 64.220 F 1-33 Land Acquisition (Northwest 240,000 A 24,000 A Quadrant - 60 Acres) 1999 216,000 F Airport A"F/Snow Removal 1-34 998,400 A 49,920 A Equipment Building 1994 F 948,480 F 1-35 T -Hanger Access Taxi Lane 20,800 A 1,040 A 2004 F 19 760 F 1-36 Terminal Rehabilitation Projects 26,000 A 26,000 A 2004 Construct Utilities and Entrance 1-37 Road to New Fire (ARFF) and Snow 356,700 A 17,670 A Removal Equipment Location 2000 1 339,030 F A General Revenue Fund B REV/PFA Bonds: Issued C REV/PFA Bonds: Pending D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans G Special Assessments H Capital Improvement Sales Tax I Other J Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax 4 TRANSPORTATION PROPOSED PROJECTS Project2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 Improvement Item Total Cost Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Number 1-38 Airport Sewage Package Treatment 260,000 A 260,000 A Plant 2003 1-39 Airfield Pavement Rehabilitation on 514,800 A 25,740 A South Ramp 2004 F 489 060 F 1-40 Taxiway Delta Rehabilitation 275,600 A 13,780 A 2004 F 261,820 F 1-41 Relocate Fuel Farm 270,400 F 270,400 F 2004 1-42 Taxiway Alpha East Rehabilitation 703,000 A 35,150 A 2004 F 667,850 F 1-43 Land Acquisition for Runway 10 377,500 A 18,860 A Extention 2004 D 358,640 D 1-44 Taxiway Echo Rehabilitation 134,200 A 6,750 A 2004 F 127 450 D 1-45 Taxiway Alpha West Rehabilitation 505,400 A 25,260 2004 F 4 0 14 F SUBTOTAL- 5,576,906 1,271,606 1,285,200 1,407,100 973,400 639,600 AIRPORT PROJECTS TOTALS 36,744,306 13,990,906 7,387,700 7,944,500 4,088,300 3,332,900 A General Revenue Fund 562,521 77,211 100,960 317,190 35,150 32,010 B REV/PFA Bonds: Issued C REV/PFA Bonds Pending D State Grants/Loans 1,977,270 858,640 683,640 327,800 127,450 E Motor Fuel Tax 4,314,400 464,200 330,000 1,080,900 1 616,700 822,600 F Federal Grants/Loans 6,608,295 1,915,755 2,184,240 1 089 910 938,250 480 140 G Special Assessments * Capital Improvement Sales Tax I Other 3,873,300 1,320,000 682,600 1,870,700 J GenObltg4l-0 Bonds Pending IC Transportation Sales Tax 19,388,500 9,35 100 3 406 500 5 128 700 1 498 200 L Fire Sales Tax TRANSPORTATION Project Number: 1-1 Project Title: Existing Street Paving Program Location: City -Wide Purpose: Provides for continuing primary street maintenance program, asphalt overlay of local and major streets, and surface existing residential gravel streets where necessary. Physical Description: Milling or using other surface profiling method and asphalt overlay, or minimum 20 -foot -wide, hot mix asphalt concrete source or up to 30 -foot concrete surface on existing gravel street base and drainage improvements as needed. Unit of Work: Design and construct. Justification: Cost effective maintenance to prevent need for future reconstruction of entire pavement, reduce gravel street maintenance costs and enhance neighborhood quality. Impact on Operating Timely paving will reduce maintenance costs and extend pavement life. Budget: Financing: $ 1,000,000 Motor Fuel Tax (E) $ 2,250,000 Transportation Sales Tax (K) Total: $ 3,250,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund. 187-7025-7311-1070101 ro TRANSPORTATION Project Number: 1-2 Project Title: Street, Curb and Gutter Repair Location: Locations as needed. Purpose: Specific program to provide for reconstruction of curbs and gutters in I conjunction with expanded street repair or overlay projects. Physical Description: In general, complete removal and replacement of deteriorated sections of existing curb and gutter. Unit of Work: Remove and construct. Justification: Improve life of existing streets and enhance neighborhood quality. Impact on Operating Cost effective maintenance to extend life of existing streets and reduce I Budget: maintenance costs. Financing: $ 1,405,000 Transportation Sales Tax (K) Total: $ 1,405,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund. 187-7025-7311-1070102 7 TRANSPORTATION Project Number: 1-3 Project Title: Sidewalk Repair and Construction Location: Locations as needed. Purpose: Specific program to repair and reconstruct deteriorated sidewalks. Physical Description: Replace deteriorated sidewalk sections with new concrete sections. Unit of Work: Remove and construct. Justification: Repair deteriorated facilities and enhance neighborhood quality. Impact on Operating Will reduce maintenance costs for abutting property owners. Budget: Financing: $ 565,000 Transportation Sales Tax (K) Total: $ 565,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund. 187-7025-7311-1070103 TRANSPORTATION Project Number: 1-4 Project Title: Mount Auburn Road: Sections between Independence Street and Kingshighway Location: Three sections, in general from north of Independence Street to Themis Street, from Hopper Road north to Breckenridge Drive, and from Kage Road north to Lexington Avenue. Purpose: Widen streets in sections and at designated intersections to add left -turn lanes, and provide sidewalks where feasible. Physical Description: Widen four -lane with 11 -foot center -turn lane in sections and provide left turn lanes where warranted. Install traffic signals at Hopper Road. Sidewalks where feasible. Unit of Work: Design, acquire right-of-way, and construct. Justification: Increasing traffic counts on Mount Auburn Road and intersecting streets warrant these improvements. Impact on Operating Additional street widths and traffic signals will add maintenance costs, Budget: unquantifiable at this time. Financing: $ 1,750,000 Transportation Sales Tax (K) Total: $ 1,750,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund: 187-7025-7311-1060104 6 TRANSPORTATION Project Number: 1-5 Project Title: Independence Street Widening — Phase I Location: Kingshighway to Pacific Street. Purpose: Widen and upgrade this section of street to current major street standards. Physical Description: Improvement and widening of approximately 6,160 lineal feet of roadway, including the replacement of pavement and curb and gutter, associated storm drainage work, sidewalk improvements, intersection improvements and all necessary appurtenances. Unit of Work: Design, acquire right-of-way, and construct. Justification: Existing street in functionally inadequate. Impact on Operating New street will add maintenance costs, unquantifiable at this time. Budget: Financing: $ 2,600,000 Transportation Sales Tax (K) Total: $ 2,600,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund: 184-7025-7311-1040106 10 TRANSPORTATION Project Number: 1-6 Project Title: Independence Street — Phase II Location: Sprigg Street to Water Street Purpose: General improvements of existing street to improve travel and traffic conditions. Physical Description: Improvement of approximately 2,450 lineal feet of pavement including the replacement of PCC pavement and curb and gutter, intersection improvements, the overlay of the existing street with two (2) inches of asphaltic concrete, and associated storm drainage work and sidewalk improvements. Unit of Work: Design, acquire right-of-way, and construct. Justification: Existing street is functionally inadequate. Impact on Operating No significant impact. Budget: Financing: $ 359,300 Transportation Sales Tax (K) Total: $ 359,300 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund: 184-7025-7311-1040109 11 TRANSPORTATION Project Number: 1-7 Project Title: LaSalle Avenue: 1-55 at New Interchange 102 to Route W. Location: Interstate 55 Interchange 102 to Route W, North of County Road 618. Purpose: To develop a new arterial access to the new interchange for Cape Girardeau and Jackson along Interstate 55. Physical Description: Boulevard design near interchange, super -two-lane arterial design to Route W, 12 -foot travel lanes with 10 -foot shoulders, nominal 100 -foot right-of- way. Unit of Work: Design, acquire right-of-way, and construct. Justification: To provide access from new 1-55 Interchange 102 to for Cape Girardeau. Impact on Operating New street will add maintenance costs, not quantifiable at this time. Budget: Financing: $ 3,220,800 Transportation Sales Tax (K) Total: $ 3,220,800 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund 187-7025-7311-1060106 12 TRANSPORTATION Project Number: 1-8 Project Title: Fountain Street — Phase II Location: Morgan Oak Street to William Street, along Fountain Street right-of-way. Purpose: Provide a connection between Shawnee Parkway and the River Campus to I the downtown business district. Physical Description: Boulevard design with a roundabout at Morgan Oak Street. Unit of Work: Design, acquire right-of-way, and construct. Justification: To continue to connection of Fountain Street to the downtown area. Impact on Operating New street will add maintenance costs, unquantifiable at this time. Budget: Financing: $ 500,000 State Grants/Loans (D) 300,000 Transportation Sales Tax (K) Total: $ 800,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund 187-7025-7311-1060112 13 TRANSPORTATION Project Number: 1-9 Project Title: Sprigg Street: Shawnee Parkway to William Street Location: Shawnee Parkway to Morgan Oak Street and at William Street. Purpose: General improvements of existing major street to improve travel and traffic I conditions. Physical Description: Sectional widening, Jefferson Avenue to Morgan Oak, intersection improvements at Morgan Oak and William Street (turn lanes), with sidewalk repairs. Unit of Work: Design and construct. Justification: Existing street is functionally inadequate. Impact on Operating No significant impact. Budget: Financing: $ 324,500 Transportation Sales Tax (K) Total: $ 324,500 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund 1 187-7025-7311-1070109 14 TRANSPORTATION Project Number: 1-10 Project Title: Armstrong Drive Location: Siemers Drive at Armstrong Drive to William Street (Route K) at County Road 203 intersection. Purpose: To develop a through arterial street and provide additional access between William Street (Route K) and Bloomfield Road. Physical Description: Arterial street up Ramsey Branch watershed. Standard 48 -foot wide, four - lane design, with 12 -foot travel lanes, and turn lanes at designated intersections. Unit of Work: Design, acquire right-of-way, and construct. Justification: To provide additional access between William Street (Route K) and Bloomfield Road, and alleviate traffic congestion along Siemers Drive. Impact on Operating New street will add maintenance costs, unquantifiable at this time. Budget: Financing: $ 1,957,000 Transportation Sales Tax (K) Total: $ 1,957,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund 187-7025-7311-1060108 15 TRANSPORTATION Project Number: 1-11 Project Title: Bloomfield Road — Phase IV Location: Stonebridge Drive to and including Benton Hill Road intersection. Purpose: Widen existing street to acceptable standards. Physical Description: Widen to collector design, 32 to 36 -foot with curb and gutter, nominal 60 - foot right-of-way, with sidewalk/trail. Unit of Work: Design, acquire right-of-way, and construct. Justification: Existing street is functionally inadequate. Impact on Operating New street will add maintenance costs, unquantifiable at this time. Budget: Financing: $ 1,121,700 Transportation Sales Tax (K) Total: $1,121,700 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund 187-7025-7311-1070111 16 TRANSPORTATION Project Number: 1-12 Project Title: Big Bend Road — Mason Street — Main Street Mill Street to Cape Rock Drive Location: Various locations along Big Bend Road, Mason Street, and Main Street, between Mill Street and Cape Rock Drive. Purpose: General improvements of existing major street to improve travel and traffic conditions. Physical Description: Widen Main Street from Mill to Mason, intersection improvements at Main/Mason and Mason/Big Bend Road, improvements to Mason Street, improvements to Sloan Creek Bridge, curb and sidewalk sections on east side of Big Bend Road, north side of Mason Street, and on Main Street from Mason Street to bridge, improve Bertling hill with right -turn lane on Bertling Street, realignment of Cape Rock Drive intersection, drainage improvements. Unit of Work: Design, acquire right-of-way, and construct. Justification: Existing street is functionally inadequate. Impact on Operating No significant impact. Budget: Financing: $ 1,963,200 Transportation Sales Tax (K) Total: $ 1,963,200 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund: 187-7025-7311-1060109 17 TRANSPORTATION Project Number: 1-13 Project Title: Vantage Drive: Kingshighway to Ashland Court Subdivision Location: From Kingshighway at west Boulder Crest Drive intersection south to Scenic Drive in Ashland Court. Purpose: Provide the initial phase of a new "outer road" collector street on the east side of 1-55 from Kingshighway south to Farrar Drive. Physical Description: Collector street, 36 -feet wide with curb and gutter, nominal 60 -foot right-of- way, with sidewalks. Unit of Work: Design, acquire right-of-way, and construct. Justification: Increasing development in the northwest quadrant of the City and subdivisions with limited access warrant a new collector street to improve access and traffic flow. Impact on Operating New street will add maintenance costs, unquantifiable at this time. Budget: Financing: $ 918,800 Transportation Sales Tax (K) Total: $ 918,800 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund 187-7025-7311-1060110 TRANSPORTATION Project Number: 1-14 Project Title: Kingshighway — Cape Rock — Broadview — Maria Louise Intersections Location: Intersections of Kingshighway — Cape Rock — Broadview — Maria Louise Purpose: General improvements of existing intersections to improve travel and traffic conditions. Physical Description: The northbound right -turn lane on Kingshighway was completed in 2006 under a cooperative project with MoDOT. The remaining project will relocate the Broadview and Maria Louise intersection with Kiwanis Drive to the west. Unit of Work: Design and construct. Justification: Existing intersection is functionally inadequate. Impact on Operating No significant impact. Budget: Financing: $ 653,200 Transportation Sales Tax (K) Total: $ 653,200 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund 187-7025-7311-1070114 19 TRANSPORTATION Project Number: 1-15 Project Title: Old Sprigg Street Road and Lexington Avenue, Extend Box Culvert Location: On Old Sprigg Street Road, just south of Lexington Avenue. Purpose: Extend box culvert to widen approach to Lexington Avenue intersection. Physical Description: Wide 10 -foot by 8 -foot culvert to 30 lineal feet. Unit of Work: Design and construct. Justification: Current box culvert is many years old and not constructed to current standards, resulting in a narrow approach to the intersection with no shoulders and insufficient left -turn lane stacking. Impact on Operating Budget: Financing: Total: 302-7010-7315-1980131 No significant impact. $ 43,100 Motor Fuel Tax (E) $ 43,100 20 TRANSPORTATION Project Number: 1-16 Project Title: Lombardo Drive Realignment Location: From Clark Avenue to Walker Branch. Purpose: To ensure improved traffic safety by elimination of the center -line offset in Lombardo between the box culvert and Clark Avenue, and to improve the Clark -Lombardo intersection. Physical Description: Realign Lombardo Drive at the Walker Branch channel and reconfigure the I Clark -Lombardo intersection. Unit of Work: Design, acquire right-of-way if necessary, and construct. Justification: The center line offset in Lombardo has historically contributed to traffic accidents, many of which have involved a single vehicle, and the Clark - Lombardo intersection does not meet standards. Impact on Operating No significant impact. Budget: Financing: $ 91,100 Motor Fuel Tax (E) Total: $ 91,100 302-7010-7315-1030120 21 TRANSPORTATION Project Number: 1-17 Project Title: Lewis & Clark Parkway Location: LaSalle Avenue east of new 1-55 Interchange 102 to Limbaugh Lane and Kingshighway Purpose: To develop an additional arterial access to new 1-55 Interchange 102 for Cape Girardeau. Physical Description: Construct approximately 2.7 miles of arterial street, 40 -feet wide on a 60 - foot right-of-way with stormwater piping, curb and gutter sections, and all necessary appurtenances. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 330-7070-7315-1060122 Design, acquire right-of-way, and construct. To provide additional access to new 1-55 Interchange 102 for Cape Girardeau. New street will add maintenance costs, unquantifiable at this time. $ 2,200,000 Federal Grants/Loans (F) $ 1,700,000 Other (1) $ 3,900,000 22 TRANSPORTATION Project Number: 1-18 Project Title: West End Boulevard: Bloomfield Street South to Shawnee Parkway Location: West End Boulevard, Bloomfield Street south to Shawnee Parkway. Purpose: Widen and reconstruct narrow section of West End Boulevard to improve access from Shawnee Parkway to William Street. Physical Description: Widen approximately 1,400 lineal feet of street from 36 -feet to 44 -feet, construct 6 -foot to 10 -foot parkway where feasible. Unit of Work: Design and construct. Justification: West End Boulevard is the only access point from new Highway 74 into the east -central part of the city, a principal access route to the University and Southeast Hospital, and needs to be improved to handle increased traffic load. Impact on Operating Budget: Financing: Total: 170-7010-7315-1070118 No significant impact. $ 683,400 State Grants/Loans (D) $ 683,400 23 TRANSPORTATION Project Number: 1-19 Project Title: Lexington -Route W Intersection Traffic Signals/Turn Lane Location: Intersection of Lexington Avenue, Kingsway Drive, and Route W (Cape La I Croix Road). Purpose: Improve traffic flow during high -traffic periods. Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing Total: 170-7010-7315-1070119 Installation of traffic signals and controls and a southbound right -turn lane I on Route W. Design and construct. Traffic through this intersection, particularly on Route W, frequently backs up during high -traffic periods. Signals will add maintenance costs, unquantifiable at this time. $ 182,600 Other (1) $ 182,600 24 TRANSPORTATION Project Number: 1-20 Project Title: West End Boulevard — Repair and Reconstruction Location: West End Boulevard, from existing PCC Pavement near Rose Street to I New Madrid Street. Purpose: Widen and upgrade this section of street to current major street standards. Physical Description: Improvements and widening from 24 -feet wide to 36 -feet wide of approximately 1,100 lineal feet of roadway, including the overlay of existing pavement with a new asphalt surface and the placement of full depth asphalt widening strips, curbs, gutters, and all necessary appurtenances. Unit of Work: Design and construct. Justification: Existing street is functionally inadequate. Impact on Operating The improved street may reduce stormwater maintenance costs. Budget: Unquantifiable at this time. Financing: Total: 1302-7010-7315-1070120 $ 327,800 State Grants/Loans (D) $ 327,800 25 TRANSPORTATION Project Number: 1-21 Project Title: Walnut Street — Reconstruction and Extension Location: Reconstruct from Sprigg Street to Beaudean Lane, and extend from Beaudean Lane to West End Boulevard. Purpose: Provide an additional east -west link in the South Cape Neighborhood. Physical Description: Reconstruction of approximately 1,100 lineal feet of 30 -foot wide pavement, and construct approximately 1,320 lineal feet of new 30 -foot wide pavement. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 302-7010-7315-1050119 Design, acquire right-of-way, and construct. Additional east -west access will allow the South Cape Neighborhood to utilize West End Boulevard for north -south access. New street will add maintenance costs, unquantifiable at this time. $ 750,900 Motor Fuel Tax (E) $ 750,900 26 TRANSPORTATION Project Number: 1-22 Project Title: Perryville Road Retaining Wall Replacement Location: 1800 Block of Perryville Road, on West Side, across from Kiwanis Park. Purpose: Replace existing retaining wall with new modular retaining wall. Physical Description: Existing wooden tie retaining wall is 500 feet long and 10 feet high (on average), located 7 feet from the west edge of Perryville Road. Replace with new modular block wall with same dimensions, including necessary drainage and fencing. Unit of Work: Design and construct. Justification: Existing wall is 28 years old and showing significant deterioration, making this a safety concern. A new modular block wall with geogrid ties would not only provide the necessary support for the embankment, it would also be more aesthetic to the surrounding neighborhood. Impact on Operating Budget: Financing: Total: 170-7010-7315-1070122 No significant impact. $ 185,500 Motor Fuel Tax (E) $ 185,500 27 TRANSPORTATION Project Number: 1-23 Project Title: North Main Street Reconstruction Location: North Main Street, from Roberts Street to Cape Rock Drive. Purpose: Widen asphalt section of North Main to improve traffic flow and drainage. Physical Description: Widen approximately 2,100 lineal feet of street to 36 -foot wide collector I standard, with storm water piping, curb and gutter sections and sidewalks. Unit of Work: Design and construct. Justification: This section of North Main serves as a collector street, but was not constructed to collector standards and the street needs stormwater control facilities. Impact on Operating No significant impact. Budget: Financing: $ 782,000 Motor Fuel Tax (E) Total: $ 782,000 1170-7010-7315-1070123 WV TRANSPORTATION Project Number: 1-24 Project Title: Bertling Street Reconstruction Location: From Sprigg Street to Perryville Road. Purpose: Improve concrete pavement. Physical Description: Remove and replace 9,000 square feet of concrete pavement, repair base, install 1,380 linear feet of storm sewer in open ditch and fill ditch in order to keep base to pavement stabilized. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 170-7010-7315-1070124 Design and construct. Large sections of the street have broken and displaced slabs due to old concrete and possible sluffing of foreslope of road ditch, causing base of street to fail. No significant impact. $ 189,200 Motor Fuel Tax (E) $ 189,200 Im TRANSPORTATION Project Number: 1-25 Project Title: North Kingsway Drive Curve Reconstruction Location: Kingsway Drive, west of Jessica Drive and south of Paul Revere Drive. Purpose: Correct reverse curve to improve site distance and traffic safety. Physical Description: Correct reverse curve at the old Route W-Kingshighway intersection and expand trail parking lot to 27 spaces with pull-through access lanes and a footpath to the trail head. Unit of Work: Design and construct. Justification: When Lexington Avenue was constructed, the Kingsway connection to Kingshighway (formerly Route W) was removed, which resulted in a reverse banked curve at this location and reduced sight distance. Impact on Operating Budget: Financing Total: 170-7010-7315-1070125 No significant impact. $ 362,600 Motor Fuel Tax (E) $ 362,600 9 TRANSPORTATION Project Number: 1-26 Project Title: West End Boulevard — Repair and Reconstruction Location: West End Boulevard, from New Madrid Street north to Bertling Street. Purpose: Widen and upgrade this section of street to current major street standards. Physical Description: Improvements and widening from 24 -feet wide to 36 -feet wide of approximately 3,400 lineal feet of roadway, including the overlay of existing pavement with a new asphalt surface and the placement of full depth asphalt widening strips, curbs, gutters, sidewalks, and all necessary appurtenances. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 170-7010-7315-1070126 Design and construct. Existing street is functionally inadequate. The improved street may reduce stormwater maintenance costs. Unquantifiable at this time. $ 1,870,700 Other (1) $ 1,870,700 31 TRANSPORTATION Project Number: 1-27 Project Title: Traffic Signal Projects Location: Silver Springs at Bloomfield, Independence at East Rodney/Gordonville, Cape Rock at Perryville Road, and two as yet unidentified intersections. Purpose: Improve traffic management and safety. Physical Description: Traffic signal controllers communication equipment, video detectors, mast arms, signal heads, and all necessary appurtenances. Unit of Work: Design and install. Justification: Install at intersections that meet MUTCD criteria for traffic signals and improve operation of existing signals. Impact on Operating Increased street maintenance and operating costs. Budget: Financing: $ 910,000 Motor Fuel Tax (E) Total: $ 910,000 170-7010-7315-1040125 32 TRANSPORTATION Project Number: 1-28 Project Title: Construct Airport T -Hangar Location: Regional Airport Purpose: To meet a need for additional hangar space at the airport. Physical Description: All metal, 10 -unit, 48 -foot wide stalls, double nested T -hangar structure, I with overhead bi-fold doors and electrically operated winch openers. Unit of Work: Design and construct. Justification: All available hangar space is filled, with a waiting list of potential users. Additional hangar space will attract more aircraft to base at the airport. Impact on Operating Increased operating and maintenance costs offset by revenue generated by I Budget: unit rental. Financing: $ 7,500 General Revenue Fund (A) 408.500 State Grants/Loans (D) Total: $ 416,000 300-7000-7317-1070128 33 TRANSPORTATION Project Number: 1-29 Project Title: Airfield Pavement Rehabilitation Location: Regional Airport Purpose: To provide crack sealing and partial depth patching of Portland cement I concrete ramp area. Physical Description: Concrete patching and sealing of ramp area south of the fixed base operation facility. Unit of Work: Design and construct. Justification: Necessary to repair aging concrete ramp area. Impact on Operating No significant impact. Budget: Financing: $ 8,891 General Revenue Fund (A) 80,015 Federal Grants/Loans (F) Total: $ 88,906 1300-7040-7317-1070129 34 TRANSPORTATION Project Number: 1-30 Project Title: Improve Terminal Security and Computerized Access Control Location: Regional Airport Purpose: Replace current magnetic card system for access control to the aircraft operations area (AOA) with a more advanced computerized system for increased security and tracking purposes. Physical Description: Install computerized access system. Unit of Work: Purchase and install. Justification: Terminal and general aviation areas currently utilize magnetic card system. This system does not allow the airport to remove cards from the inventory once they are issued unless the entire card set is replaced. A computerized access control system would increase security and prevent the system from being compromised by giving the airport flexibility in issuing access control media and would allow the airport to remove lost or stolen media from the system, control access more precisely, and to maintain records of access to the airport. Approximately 10 access gates to the terminal and general aviation areas could be controlled by the system once operational. Impact on Operating Minor increase in operational costs for repair and maintenance. Budget: Financing: $ 8,580 General Revenue Fund (A) 163,020 Federal Grants/Loans (F) Total: $ 171,600 300-7040-7317-1070130 35 TRANSPORTATION Project Number: 1-31 Project Title: Improve Access Roadway to East Ramp Corporate Hangars Location: Regional Airport Purpose: To provide asphalt surface to access roadway to east ramp corporate I hangars. Physical Description: Apply asphalt pavement surface on top of gravel access road. Unit of Work: Design and construct. Justification: To provide asphalt surface for car and truck traffic requiring access to east I ramp corporate hangars. Impact on Operating Operations budget will need to include additional preventative I Budget: maintenance. Financing: $ 30,000 General Revenue Fund (A) 120,000 Other (1) Total: $ 150,000 1300-7040-7317-1070131 36 TRANSPORTATION Project Number: 1-32 Project Title: Environmental Assessment for Airport Layout Plan Update Development Items Location: Regional Airport Purpose: To provide environmental review for acquisition of lands to the northwest of the airport property, as well as other projects listed in the airport layout plan, where required by FAA. Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 102-1040-6390 Approximately 126 acres of property contiguous to the airport. Study and provide recommendations for environmental concerns. Necessary to meet federal guidelines to receive funding for purchase of property, or projects affecting areas of environmental concern. No significant impact. $ 3,380 General Revenue Fund (A) 64,220 Federal Grants/Loans (F) $ 67,600 37 TRANSPORTATION Project Number: 1-33 Project Title: Land Acquisition (Northwest Quadrant — 60 Acres) Location: Regional Airport Purpose: To purchase property, in accordance with the airport's marketing plan, necessary to provide airport commercial and industrial parking facilities, including property necessary for ingress and egress from airport road. Physical Description: Approximately 60 acres of property contiguous to the airport. Unit of Work: Purchase property. Justification: There is a need for commercial and industrial property with infrastructure and facilities to entice aviation related businesses to locate on airport property. Impact on Operating Budget: Financing: Total: 300-7040-7317-1070133 The additional impact on operational expenses for mowing and upkeep should be well offset in the long term agricultural and industrial leasing revenues. $ 24,000 General Revenue Fund (A) 216,000 Federal Grants/Loans (F) $ 240,000 79 TRANSPORTATION Project Number: 1-34 Project Title: Airport ARFF/Snow Removal Equipment Building Location: Regional Airport Purpose: Provide on-site location for housing of aircraft rescue and fire fighting vehicle and storage of snow removal equipment. Physical Description: Construct facility to house ARFF vehicle and support crews, as well as snow removal equipment. Unit of Work: Design and construct. Justification: Provide adequate fire fighting/emergency response capabilities at the airport. Projected increase in aircraft passenger loads and aircraft type will require upgrading for FAA mandated response times and location of fire fighting equipment. Provide heated storage space for snow removal equipment. Impact on Operating Budget: Financing: Total: 300-7040-7317-1070134 Increased operating and maintenance costs. $ 49,920 General Revenue Fund (A) 948,480 Federal Grants/Loans (F) $ 998,400 39 TRANSPORTATION Project Number: 1-35 Project Title: T -Hangar Access Taxi Lane Location: Regional Airport Purpose: The access lane between the terminal ramp and the general aviation (GA) T -hangar ramp was not included in the GA ramp reconstruction project and needs to be reconstructed. Physical Description: Construct 5 -inch asphalt overlay of the T -hangar access lane. Unit of Work: Design and construct. Justification: This small stretch of taxi lane is deteriorating and was not reconstructed in the most recent ramp project. It provided a rough transition from one surface to the other. Impact on Operating This project should have little if any effect on the budget, however, it should Budget: have a positive effect due to a decrease in preventive maintenance once the rehabilitation is complete. Financing: Total: 300-7040-7317-1070135 $ 1,040 General Revenue Fund (A) 19,760 Federal Grants/Loans (F) $ 20,800 .X TRANSPORTATION Project Number: 1-36 Project Title: Terminal Rehabilitation Projects Location: Regional Airport Purpose: To provide enhancements to the passenger terminal, including restroom I and flooring updates. Physical Description: Rehabilitate the men's restroom and repair the terminal flooring and exterior siding. Unit of Work: Design and construct. Justification: The men's restroom was never updated when the passenger terminal was I remodeled. The the floor and exterior need to be repaired. Impact on Operating No significant impact. Budget: Financing: $ 26,000 General Revenue Fund (A) Total: $ 26,000 102-1040-6420 41 TRANSPORTATION Project Number: 1-37 Project Title: Construct Utilities and Entrance Road to New Fire (ARFF) and Snow I Removal Equipment Location (SNE) Location: Regional Airport Purpose: To provide utilities and vehicle access to proposed ARFF/SRE building. Physical Description: Construct approximately 1,800 lineal feet of access road and provide utilities to proposed ARFF/SRE building site. Unit of Work: Design and construct. Justification: Impact on Operating Budget: Financing: Total: 1300-7040-7317-1070137 The utilities and entrance road will be necessary to provide access to the proposed ARFF/SRE facility. Currently there is no access to this site. Increased operating and maintenance costs. $ 17,670 General Revenue Fund (A) 339,030 Federal Grants/Loans (F) $ 356,700 42 TRANSPORTATION Project Number: 1-38 Project Title: Airport Sewage Package Treatment Plant Location: Regional Airport Purpose: To provide improved wastewater treatment at the airport. Physical Description: Install sewage package treatment plant and all necessary appurtenances to treat and dispose of sewage at the airport. The plant would service a minimum of 150 people with the possibility of expansion to 500 people. This project would also include removal of the current lagoon. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 300-7000-7317-1070138 Design and construct. Increase capability of airport waste -disposal and replace sewage lagoon. Increased operating and maintenance costs. $ 260,000 General Revenue Fund (A) $ 260,000 43 TRANSPORTATION Project Number: 1-39 Project Title: Airfield Pavement Rehabilitation on South Ramp Location: Regional Airport Purpose: The existing concrete pavement is in extremely poor shape with a large number of cracked and shattered panels. Physical Description: Removal and replacement with concrete pavement to the same grades as the existing apron. Unit of Work: Design and construct. Justification: The current surface deterioration of the concrete panels produces a large amount of debris, causing potential damage to aircraft using the apron. These surfaces are at or near their designed service life. Impact on Operating Rehabilitation should have a positive effect on the operations budget by I Budget: decreasing the need for surface maintenance and repairs. Financing: Total: 300-7040-7317-1070139 $ 25,740 General Revenue Fund (A) 489,060 Federal Grants/Loans (F) $ 514,800 44 TRANSPORTATION Project Number: 1-40 Project Title: Taxiway Delta Rehabilitation Location: Regional Airport Purpose: The pavement on Taxiway D is in poor condition with an increasing amount of cracking and will soon need rehabilitation. Physical Description: A 5 -inch asphalt overlay on Taxiway Delta, south of Runway 10/28. Remove and replace concrete on Taxiway D between Runway 10/2 and Taxiway Alpha. Unit of Work: Design and construct. Justification: The combined effects of the deterioration create high foreign object debris (FOD) potential along Taxiway D. Maintenance of the pavement will increase beyond reasonable expense without rehabilitation. Impact on Operating Budget: Financing: Total: 300-7040-7317-1070140 Operations. budget should decrease with the completion of the surface rehabilitation due to the decrease in surface patching and crack fill. $ 13,780 General Revenue Fund (A) 261,820 Federal Grants/Loans (F) $ 275,600 45 TRANSPORTATION Project Number: 1-41 Project Title: Relocate Fuel Farm Location: Regional Airport Purpose: To provide better and safer access to the fuel farm facility and allow better I airfield space opportunity. Physical Description: Remove and relocate fuel farm facilities. Unit of Work: Design and construct. Justification: To provide space for airfield expansion while improving better access to the I fuel farm facility for on -loading and off-loading fuel. Impact on Operating Operations budget would not change due to relocation of the fuel farm I Budget: facility. Financing: Total: 1300-7040-7317-1070141 $ 270,400 Federal Grants/Loans (F) $ 270,400 me TRANSPORTATION Project Number: 1-42 Project Title: Taxiway Alpha East Rehabilitation Location: Regional Airport Purpose: The pavement on Taxiway A, east of Taxiway B (Alpha East) is beginning to deteriorate with an increasing amount of cracking and spalling. Physical Description: Remove asphalt and reconstruct with concrete on Taxiway A East. Unit of Work: Design and construct. Justification: The effects of deterioration create a high FOD potential along Taxiway A East. This FOD can harm aircraft. Maintenance of the pavement will increase beyond reasonable expense without rehabilitation. Impact on Operating Operations budget should decrease with the completion of the surface Budget: rehabilitation due to the decrease in surface maintenance expense. Financing: Total: 300-7040-7317-1070142 $ 35,150 General Revenue Fund (A) 667,850 Federal Grants/Loans (F) $ 703,000 47 TRANSPORTATION Project Number: 1-43 Project Title: Land Acquisition for Runway 10 Extension Location: Regional Airport Purpose: To purchase property in order to provide land necessary to extend Runway 10-28 500 feet. This would provide for a total length of 7,000 feet. Physical Description: Acquire 66 acres of property to the west of the current Airport boundary. Unit of Work: Justification: Impact on Operating Budget: Financing: Total 300-7040-7317-1070143 Purchase property. To allow faster and/or larger types of aircraft to land and take off at the Airport, and assist in increasing the Airport operations and revenues. The impact on operational expense for mowing and upkeep should be offset in the long term benefits derived from the additional usage of the airfield. $ 18,860 General Revenue Fund (A) 358,640 State Grants/Loans (D) $ 377,500 Mi TRANSPORTATION Project Number: 1-44 Project Title: Taxiway Echo Rehabilitation Location: Regional Airport Purpose: The pavement on Taxiway Echo is beginning to deteriorate with an increasing amount of cracking and spalling. Physical Description: 5 -inch asphalt overlay on Taxiway Echo. Unit of Work: Design and construct. Justification: The effects of deterioration create a high FOD potential along Taxiway' Echo. This FOD can harm aircraft. Maintenance of the pavement will increase beyond reasonable expense without rehabilitation. Impact on Operating Budget: Financing: Total: 300-7040-7317-1070144 Operations budget should decrease with the completion of the surface rehabilitation due to the decrease in surface maintenance expense. $ 6,750 General Revenue Fund (A) 127,450 Federal Grants/Loans (F) $ 134,200 TRANSPORTATION Project Number: 1-45 Project Title: Taxiway Alpha West Rehabilitation Location: Regional Airport Purpose: The pavement on Taxiway Alpha, west of Taxiway A (Alpha West) is beginning to deteriorate with an increasing amount of cracking and spalling. Physical Description: 5 -inch asphalt overlay on Taxiway Alpha West. Remove and reconstruct concrete on Taxiway A, one stub. Unit of Work: Design and construct. Justification: The effects of deterioration create a high FOD potential along Taxiway Alpha West. This FOD can harm aircraft. Maintenance of the pavement will increase beyond reasonable expense without rehabilitation. Impact on Operating Budget: Financing: Total: 300-7040-7317-1070145 Operations budget should decrease with the completion of the surface rehabilitation, due to the decrease in surface maintenance expense. $ 25,260 General Revenue Fund (A) 480,140 Federal Grants/Loans (F) $ 505,400 50 This page intentionally left blank. . 1 51 ENVIRONMENT CAPITAL IMPROVEMENTS PROGRAM 2007-2008 Fiscal 2008-2009 Fiscal 2009-2010 Fiscal 2010-2011 Fiscal 2011-2012 Fiscal Year Year Year Year Year 53 ENVIRONMENT PROPOSED PROJECTS Project 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 Number Improvement Item Total Cost Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 2-1 Lakeshore Sewer District 247,600 G 247,600 G (pre 1993) 2-2 Sanitary Sewer Rehabilitation of Red 336,100 F 142,800 F 81,300 F 112,000 F Star Area 1998 2-3 Sanitary Sewer Rehabilitation and 117,600 F 117,600 F Relining 1998 2-4 Sherwood Sewer Project 750,000 1 750,000 1 2007 2-5 Sloan Creek Trunk Sewer Extension 384,600 B 384,600 B 2000 2-6 Meadowbrook Sewer District 113,400 G 113,400 G 1995 2-7 South Kingshighway Sewer District 158,000 G 158,000 G (pre 1993) 2-8 Timon Way Sewer District 203,800 G 203,800 G 2004 SUBTOTAL- 2,311,100 1,258,000 737,300 112,000 203,800 SEWER PROJECTS 2-9 Transfer Station Entrance Scale 112,100 1 112,100" 2000 SUBTOTAL- 112,100 112,100 SOLID WASTE PROJECTS Water Distribution Improvement 375,000 1 75,000 1 75,000 1 75,000 1 75,000 1 75,000 1 Program 1993 Water Development/Main 500,000 1 100,000 1 100,000 1 100,000 1 100,000 1 100,000Extensions Ll 1993Two-Inch Water Main/Service 875,000 1 175,000 1 175,000 1 175,000 1 175,000 1 175,000 Replacement Program 1993 A General Revenue Fund B REV/PFA Bonds: Issued C REV/PFA Bonds: Pending D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans G Special Assessments H Capital Improvement Sales Tax I Other I Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax Projects totally or partially included in Water Revenue Bond Issue supported by a'/4 % capital improvement sales tax extention for 20 years approved by vote on November 5, 1996 54 ENVIRONMENT PROPOSED PROJECTS Proj ect 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 Number Improvement Item Total Cost Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Two -Inch Water Main/Service 1,125,000 B 225,000 B 225,000 B 225,000 B 225,000 1 225,000 1 Replacement (Contract Program) 1997 I Fire Hydrant Replacement 515,000 B 103,000 B 103,000 B 103,000 B 103,000 B 103,000 1994 Water Storage Tank Rehabilitation 314,100 1 46,300 1 82,400 1 185,400 1 1994 Water System Seismic Protection 422,300 1 211,150 1 211,150 1 1995 Water Pumping Station/Vault 111,400 B 111,400 B Retrofit 1994 Elevated Water Storage Tank 1,993,000 1 1,993,000 1 1996 Water Plant No. 2 Sludge System 171,200 B 171,200 B 1996 2-20 Water Meter Replacement Program 1,000,000 1 200,000 1 200,000 1 200,000 1 200,000 1 200,000 1 1993 2-21 Water Plant No. 2 Filter Valve 573,700 1 143,425 1 143,425 1 143,425 1 143,425 1 Replacement 2001 2-22 Water Plant No. 2 Clarifier Building 17,000 1 17,000 1 Improvements 2001 2-23 Mam Well Field and Transmission 3,640,000 B 3,640,000 B 2005 Electrical Equipment and Storage 2-24 Building at Gordonville Road Tank 103,200 1 103,200 1 Site 2001 2-25 12 -Inch Water Main - Downtown: 100,000 F 100,000 F Mill Street to River Campus 2000 A General Revenue Fund B REV/PFA Bonds: Issued C REV/PFA Bonds: Pending D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans G Special Assessments H Capital Improvement Sales Tax I Other J Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax Projects totally or partially included in Water Revenue Bond Issue supported by a '/< % capital improvement sales tax extention for 20 years approved by vote on November 5, 1996 55 ENVIRONMENT PROPOSED PROJECTS Project 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 Number Improvement Item Total Cost Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 2-26 North Kingshighway Booster Pump 27,500 1 27,500 1 Station Rehabilitation 2002 Rebuild Existing Filters at Cape 2-27 Rock Water Treatment Plant/Exterior 971,800 1 971,800 1 Basin Covers 2000 2-28 Gordonville Booster Pump Station 97,800 1 97,800 1 Rehabilitation 2003 2-29 College & Meadowbrook Pressure 250,000 1 250,000 1 Zones Consolidation 2007 2-30 Cape Girardeau - Scott City Water 150,000 1 150,000 1 System Interconnection zooa 2-31 West Cape Booster Station Upgrade 87,500 1 87,500 1 2006 2-32 Water Plant No. 2 Expansion 14,822,200 1 971,600 1 13,850,600 1 2003 2-33 Residual Storage & Disposal Cape 4,849,300 1 4,849,300 1 Rock Water Plant No. 1 1999 FTSUBTOTAL - WATER 33,092,000 9,562,175 11723,675 1,206,825 1,021,425 19,577,900 PROJECTS 2-34 Merriwether Drainage Tunnel 87,900 1 87,900 1 Repairs 2003 2-35 Arena Creek Relief Channel 868,800 1 868,800 1 2001 2-36 Howell Street Box Culvert 698,300 1 698,300 1 Replacement 2001 Cape Rock Drive Culvert 2-37 Replacement, Storm Inlets, New 300,100 1 300,100 1 Drains at Dennis Scivally Park zooz A General Revenue Fund B REV/PFABonds: Issued C REV/PFA Bonds: Pending D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans G Special Assessments H Capital Improvement Sales Tax I Other J Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax 56 ENVIRONMENT PROPOSED PROJECTS Project 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 Number Improvement Item Total Cost Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 2-38 Breckenridge Branch Bank 206,000 1 206,000 1 Stabilization 2006 2-39 Beavercreek Detention Basin 103,000 1 103,000 1 Construction 2006 2-40 Melrose Drainage Area 549,000 1 549,000 1 2002 2-41 Themis Street Improvement 307,200 1 307,200 1 2002 2-42 Aquamsi Street Drainage Project 105,300 F 36,000 F 2002 1 69,300 1 2-43 Margaret and Janet Drainage 329,400 1 329,400 1 2002 2-44 Grandview and Carolina Drainage 137,300 1 137,300 1 ea 2002 2-45 Detention Basin Flood Monitor 153,700 11 153,700 11 2004 2-46 Kingsway and Kingsbury Drainage 55,000 1 55,000 1 2002 2-47 Cape La Croix Bank Stabilization 56,000 1 56,000 1 2002 2-48 Shawnee Park/Arena Park Bank 22,500 1 22,500 1 Stabilization 2001 2-49 Whitener and Silver Springs 65,900 1 65,900 1 Drainage Area 2003 2-50 Amblewood Drainage System 27,300 1 27,300 1 2003 2-51 Bloomfield and Broadview Drainage 27,500 1 27,500 1 Area 20031 1 2-52 Cape West Business Park Area 391,400 1 391,400 1 Flood Control Project 2006 A General Revenue Fund B REV/PFA Bonds: Issued C REV/PFABonds: Pending D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans G Special Assessments H Capital Improvement Sales Tax I Other J Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax 57 ENVIRONMENT PROPOSED PROJECTS Project 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 Improvement Item Total Cost Number Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 2-53 Dorothy Street Stormwater 206,000 I 206,000 t Improvements 2007 SUBTOTAL - STORM 4,697,600 259,000 2,264,100 856,200 466,700 851,600 WATER PROJECTS TOTALS 40,212,800 1 11,191,275 1 4,725,075 2,175,025 1 1,691,925 20,429,500 A _--General Revenue Fund_ B REV/PFA Bonds: Issued 5,497,200 4,079,400 883,800 328,000 103,000 103,000 C REV/PFA Bonds Pending D State Grants/Loans �� l E Motor Fuel Tax F Federal Grants/Loans 589,700 396,400 81,300 112,000 G Special Assessments 722,800 247,600 271,400 203,800 H Capital Improvement Sales Tax 153,700 153,700 I Other 33,249,400 6,314,175 3,488,575 1,735,025 1,385,125 20,326,500 J Gen Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax ENVIRONMENT Project Number 2-1 Project Title: Lakeshore Sewer District Location: Lakeshore Drive Purpose: To provide sewer service to previously unserved area. Physical Description: Approximately 3,000 feet of sanitary sewer and necessary appurtenances. Unit of Work: Design, acquire easements, and construct. Justification: Replacement of deteriorating septic systems in a residential area. Impact on Operating Increased depreciation and operational expense. Budget: Financing: $ 247,600 Special Assessments (G) Total: $ 247,600 610-4062-7333-1950213 UJ ENVIRONMENT Project Number: 2-2 Project Title: Sanitary Sewer Rehabilitation of Red Star Area Location: Red Star District Purpose: To prevent inflow and infiltration into the sanitary sewer system during flood conditions. Physical Description: Relining sewers, relining manholes, installing above -flood -elevation vents, sealing manhole lids, lateral line valves to shut off flow during flood events. Unit of Work: Project identification, implementation, and rehabilitation. Justification: To enhance and protect the sanitary collection system, and prevent excess flow at the wastewater treatment plant. Impact on Operating Decreased operating and maintenance costs. Budget: Financing: $ 336,100 Federal Grants/Loans (F) Total: $ 336,100 610-4062-7333-1990215 •1 ENVIRONMENT Project Number: 2-3 Project Title: Sanitary Sewer Rehabilitation and Relining Location: Six locations in City — total of 1,810 feet of 8 -inch line. Purpose: Reduce inflow as well as outflow of the sanitary sewers. Physical Description: Reline 1,810 feet if 8 -inch pipe with insituform or like system. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 610-4062-7333-1990216 Design and construct. Help prevent surcharging of sanitary sewer lines. Decreased operating and maintenance costs. $ 117,600 Federal Grants/Loans (F) $ 117,600 61 ENVIRONMENT Project Number: 2-4 Project Title: Sherwood Sewer Project Location: Howell Street to Greenbrier Drive Purpose: To replace, improve, or upgrade existing sewer line. Physical Description: Line improvement or replacement. Unit of Work: Design and construct. Justification: Reduce inflow/infiltration and eliminate sewer backups into residential property. Impact on Operating No significant impact. Budget: Financing: $ 750,000 Other (1) Total: $ 750,000 610-4062-7333-1070204 62 ENVIRONMENT Project Number: 2-5 Project Title: Sloan Creek Trunk Sewer Extension Location: Sloan Creek in Old Sprigg Street Road area. Purpose: Extend trunk sewer service farther north in Sloan Creek watershed. Physical Description: Approximately 1,220 lineal feet of 12 -inch trunk sewer, and all necessary I appurtenances. Unit of Work: Design, acquire construction easements, and construct. Justification: When Sloan Creek trunk sewer was constructed in 2000-2002, the upper section was deleted in order to construct the Ranchito project. Extending the trunk sewer service in this watershed is still needed. Impact on Operating Increased depreciation and operational expense. Budget: Financing: $ 384,600 Revenue/PFA Bonds: Issued (B) Total: $ 384,600 610-4062-7333-1070205 63 ENVIRONMENT Project Number: 2-6 Project Title: Meadowbrook Sewer District Location: Highway 74 and Meadowbrook Lane area. Purpose: To provide sewer service to Meadowbrook area. Physical Description: Lateral sanitary sewer lines and district lift station. Unit of Work: Design, acquire easements, and construct. Justification: Area currently on private septic systems. Impact on Operating Increased depreciation and operational expense. Budget: Financing: $ 113,400 Special Assessments (G) Total: $ 113,400 610-4062-7333-1950217 M ENVIRONMENT Project Number: 2-7 Project Title: South Kingshighway Sewer District Location: South Kingshighway-Southern Expressway area. Purpose: Provide sewer service to previously unserved area and eliminate one lift I station. Physical Description: Approximately 1,620 feet of sanitary sewer and appurtenances. Unit of Work: Design, acquire easements, and construct. Justification: Replacement of septic systems in commercial/industrial areas. Impact on Operating Decreased operational and maintenance costs from elimination of lift I Budget: station. Financing: $ 158,000 Special Assessments (G) Total: $ 158,000 610-4062-7333-1950211 65 ENVIRONMENT Project Number: 2-8 Project Title: Timon Way Sewer District Location: Big Bend Road, Timon Way, and Mechaw Drive Purpose: To provide sewer service to previously unserved area. Physical Description: Approximately 2,320 feet of sanitary sewer and necessary appurtenances. Unit of Work: Design, acquire easements, and construct. Justification: Replacement of deteriorating septic systems in a residential area. Impact on Operating Increased depreciation and operational expense. Budget: Financing: $ 203,800 Special Assessments (G) Total: $ 203,800 610-4062-7333-1070208 ENVIRONMENT Project Number: 2-9 Project Title: Transfer Station Entrance Scale Location: Transfer Station Purpose: To better serve the customers at the transfer station and backup the existing scale. Physical Description: 70 -foot long above ground scale that is tied into the transfer station computer system. Unit of Work: Design and install scales, design and install computer software and hardware. Justification: This would allow for better traffic flow, easier for the customers, and also provide back-up for the existing scales. Impact on Operating Increased depreciation expense. Budget: Financing: $ 112,100 Other (1) Total: $ 112,100 630-4080-7150 67 ENVIRONMENT Project Number: 2-10 Project Title: Water Distribution Improvement Program Location: Distribution mains — City wide. Purpose: Install new main pipes connecting existing mains so that fire flows, pressure, and water quality are improved. Also replace existing pipes and hydrants as required other than routine repairs. This includes relocating facilities for state projects where necessary. Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 1381-7022-7335-1000222 Install piping as required depending on existing locations and conditions. I Approximately 16,200 feet in three years — 5,400 feet per year. Design, acquire easements (if necessary), and construct. Growth is accelerating and the need for system improvements versus previous estimates. Possible lower energy costs, increased depreciation expense. $ 375,000 Other (1) $ 375,000 M ENVIRONMENT Project Number: 2-11 Project Title: Water Development/Main Extensions Location: Various locations. Purpose: Extension of water service to developing areas previously unserved. Physical Description: City participation in development main installations, i.e. oversizing, hydrants, valves, tapping sleeves, etc. and other items as directed. Unit of Work: Design and construct. Justification: Extension of water mains is essential infrastructure element needed to enable growth. Impact on Operating Increased depreciation expense. Budget: Financing: $ 500,000 Other (1) Total: $ 500,000 381-7022-7335-1950224 z ENVIRONMENT Project Number: 2-12 Project Title: Two -Inch Water Main/Service Replacement Program Location: City wide. Purpose: Replacement of substandard, high failure/repair sections of the water distribution system with new 6 -inch main minimum to improve service, increase fire flows and reduce maintenance costs. Physical Description: Replace existing main with new 6 -inch main, and replace existing services to new line. Unit of Work: Design, acquire easements (if necessary), and construct. Justification: Costs of two-inch replacement are higher than expected (primarily pavement repair). Additional funding will prevent reduction of annual footage targets. Impact on Operating Maintenance costs due to main leaks on these lines will decrease as Budget: replacement progresses. Increased depreciation costs. Financing: $ 875,000 Other (1) Total: $ 875,000 381-7022-7335-1930225 70 ENVIRONMENT Project Number: 2-13 Project Title: Two -Inch Water Main/Service Replacement (Contract Program) Location: City wide. Purpose: Replacement of substandard, high failure/repair sections of the water distribution system with new 6 -inch main minimum to improve service, increase fire flows and reduce maintenance costs. Contract program designed to accelerate normal program of replacement by Alliance Water Resources on an annual basis. Physical Description: Replace existing main with new 6 -inch main, and replace existing services to new line. Unit of Work: Design, acquire easements (if necessary), and construct. Justification: The remaining two-inch mains in the system are primarily galvanized, badly corroded and fail frequently. Additionally, minimal fire flows are possible in these mains. Replacement of services will remove lead source in oldest services. Impact on Operating Budget: Financing: Total: 381-7022-7335-1030218 Maintenance cost due to main leaks on these lines will decrease as replacement progresses. Increased depreciation cost. $ 675,000 Revenue/PFA Bonds: Issued (B) $ 450,000 Other (1) $ 1,125,000 71 ENVIRONMENT Project Number: 2-14 Project Title: Fire Hydrant Replacement Location: City wide. Purpose: Fire protection flow increase. Physical Description: 798 —4 '/2 inch hydrants replaced with 5'/4 inch hydrants. Unit of Work: Install Justification: Impact on Operating Budget: Financing: Total: 381-7022-7335-1970247 Hydrants outdated — low flow capacities. Do not meet current design I specifications. Increased depreciation cost. $ 515,000 Revenue/PFA Bonds: Issued (B) $ 515,000 72 ENVIRONMENT Project Number: 2-15 Project Title: Water Storage Tank Rehabilitation (Three Tanks) Location: To be determined by selection criteria based on inspection. Purpose: Prolong tank life and ensure water quality. Physical Description: Re -coat storage tanks, perform necessary maintenance. Unit of Work: Inspect and rehabilitate. Justification: Programmed preventive maintenance. Impact on Operating No significant impact. Budget: Financing: $ 314,100 Other (1) Total: $ 314,100 381-7022-7335-1990228 73 ENVIRONMENT Project Number: 2-16 Project Title: Water System Seismic Protection Location: Treatment plants and storage tanks. Purpose: Minimize damage and water loss in the event of seismic activity. Physical Description: Automatic isolation valves and flexible connections at influent and effluent piping to tanks and clear wells. Unit of Work: Design and construct. Justification: Maintain integrity of drinking water supply in the event of seismic activity. Impact on Operating No significant impact. Budget: Financing: $ 422,300 Other (1) Total: $ 422,300 381-7022-7335-1980234 74 ENVIRONMENT Project Number: 2-17 Project Title: Water Pumping Station/Vault Retrofit Location: Various locations. Purpose: Retrofit confined -space pumping stations/vaults with forced air ventilation and lightweight access hatches. Additional pumping station for west or northwest area per water system master plan. Physical Description: Install blowers, switches, wiring and retrofit hatches with lightweight materials. Add motor operated valve at College for pumping control. Pumping station design and installation. Unit of Work: Justification: Impact on Operating Budget: Financing: Total 381-7022-7335-1950232 Design and construct/retrofit. Employee safety and stricter confined -space entry requirements. No significant impact. $ 111,400 Revenue/PFA Bonds: Issued (B) $ 111,400 75 ENVIRONMENT Project Number: 2-18 Project Title: Elevated Water Storage Tank Location: Area adjacent to 1-55, north of Route K. Purpose: Provide storage capacity to meet peak hour demands in developing areas. Physical Description: Elevated storage tank. Unit of Work: Design, site identification, construct, and equip. Justification: Growth and development. Impact on Operating Additional costs will be incurred for operation and maintenance at Budget: approximately $2,000 annually. 10 -year repainting scheduled in year 2016 at approximately $100,000. Increased depreciation cost. Possible combining of pressure zones, lowering operating and maintenance costs. Financing: Total: 381-7022-7335-1970244 $ 1,993,000 Other (1) $ 1,993,000 Wo ENVIRONMENT Project Number: 2-19 Project Title: Water Plant No. 2 Sludge System Location: Water Plant No. 2 Purpose: Sludge disposal to sewer rather than lagoon holding. Physical Description: Design and construct sewer lift station and lateral to dispose of process I sludge (when trunk is available). Unit of Work: Design and construct. Justification: Reduce sludge disposal costs, lagoon maintenance and benefit sewer I treatment process (coagulant). Impact on Operating Sludge lagoon cleaning costs are approximately $50,000 and on a three (3) Budget: year interval. As Plant No. 2 use increases, this will shorten interval. The sewer treatment disposal option is much more cost effective and would safe approximately $300,000 over the next 15 years. Financing: Total: 381-7022-7335-1960246 $ 171,200 Revenue/PFA Bonds: Issued (B) $ 171,200 77 ENVIRONMENT Project Number: 2-20 Project Title: Water Meter Replacement Program Location: Various locations throughout the City — service installations. Purpose: To replace aged, inaccurate meters with new meters so that water billings reflect actual usage. Physical Description: Replacement of all direct read meters with radio read meters. Unit of Work: Replace older meters in system first, then eventually all meters in system. Justification: To replace old meters with radio read meters. Can reduce work force by 2 employees and 2 vehicles. Impact on Operating Will increase revenue by ensuring meter accuracy. Will reduce work force Budget: by 2 employees and 2 vehicles when completely implemented. Financing: $ 1,000,000 Other (1) Total: $ 1,000,000 620-4030-6961 ig ENVIRONMENT Project Number: 2-21 Project Title: Water Plant No. 2 Filter Valve Replacement Location: Water Plant No. 2 Purpose: Upgrade valves and actuators from electric to pneumatic. Physical Description: Replace filter valves and actuators from electric to pneumatic, install air I compressor, lines and wiring. Unit of Work: Design and construct. Justification: Replacement parts are not currently available for current valves. Replacement is necessary for continued operation of these filters. Cape Rock water plant increased capacity will allow time to phase construction. Impact on Operating Budget: Financing: Total: 620-4030-7335-1070221 Lower operation and maintenance costs. $ 573,700 Other (1) $ 573,700 rM ENVIRONMENT Project Number: 2-22 Project Title: Water Plant No. 2 Clarifier Building Improvements Location: Water Plant No. 2 Purpose: To provide additional storage for chemicals. Physical Description: Pour and finish concrete floor in clarifier building and replace existing chemical feed lines. Unit of Work: Construct. Justification: Concrete floor would provide additional storage space; existing chemical feed lines would need to be moved from underground to overhead to provide access. Impact on Operating No significant impact. Budget: Financing: $ 17,000 Other (1) Total: $ 17,000 620-4030-7335-1070222 ENVIRONMENT Project Number: 2-23 Project Title: South Well Field and Transmission Main Location: Black Land Bottoms between cement plant and SEMO Port and transmission main to Water Plant No. 1. Purpose: Bring Water Plant No. 1 up to its full future capacity of 10.5 million gallons per day. Physical Description: Drill three to five high-capacity wells and construct approximately five miles of 24 -inch and 20 -inch transmission main. Unit of Work: Design, acquire easements, and construct. Justification: Future growth in and near the City will demand an increase in the City's water supply system. Water Plant No. 1 has been designed to provide the treatment capacity required. Proposed system will also supply process water for industries in the area. Impact on Operating Increased depreciation and operational expense. Budget: Financing: $ 3,640,000 Revenue/PFA Bonds: Issued (B) Total: $ 3,640,000 381-7022-7335-1050224 N. ENVIRONMENT Project Number: 2-24 Project Title: Electrical Equipment and Storage Building at Gordonville Road Tank Site Location: Gordonville Road water tank site. Purpose: Provide adequate building for electrical equipment, generators, radio equipment and maintenance supplies. Physical Description: Construct building approximately 30 feet by 40 feet with slab floor and overhead doors. Unit of Work: Design and construct. Justification: Existing building does not meet existing electrical equipment requirements. Impact on Operating No significant impact. Budget: Financing: $ 103,200 Other (1) Total: $ 103,200 1620-4030-7335-1070224 ENVIRONMENT Project Number: 2-25 Project Title: 12 -Inch Water Main — Downtown Location: Mill Street to Broadway. Purpose: Increase fire flow to downtown area. Pull 10,000 feet of 12 -inch water line through abandoned 18 -inch force main and connect to downtown system. Physical Description: Install 12 -inch main inside existing abandoned 18 -inch force main. Unit of Work: Design and construct. Justification: Downtown area and River Campus area lack major north -south water main loop for fire flow or high demand. Existing 18 -inch force main could be used as conduit with minimal excavation. Impact on Operating No significant impact. Budget: Financing: $ 100,000 Federal Grants/Loans (F) Total: $100,000 620-4030-7335-1040224 RN ENVIRONMENT Project Number: 2-26 Project Title: North Kingshighway Booster Pump Station Rehabilitation Location: North Kingshighway Booster Pump Station Purpose: Provide adequate water flow to County Park tank. Physical Description: Modify suction and discharge headers, install 150 amp. Electrical service I and 400 gallon per minute pump. Unit of Work: Design and construct. Justification: Impact on Operating Budget: Financing: Total: 620-4030-7335-1070226 Water demand from County Park tank pressure zone is increasing, current I booster pump is unable to provide adequate flow. No significant impact. $ 27,500 Other (1) $ 27,500 FI -VI ENVIRONMENT Project Number: 2-27 Project Title: Rebuild Existing Filters at Cape Rock Water Treatment Plant/Exterior Basin Covers Location: Cape Rock Water Treatment Plant Purpose: Replace filter media, under drains, valves and piping, and covers exposed basin to prevent contamination. Physical Description: Remove and replace existing media, under drains, valves and piping. . Install removable coverings of either metal or concrete. Unit of Work: Design and construct/retrofit. Justification: This project was cut from the plant renovation when the original bid was over budget. Phased rebuilding of the existing 1930's hardware is necessary for continued operation of these filters. New filter capacity allows time to phase construction. Coverings prevent easy access to water. Impact on Operating Budget: Financing: Total: 620-4030-7335-1070227 No significant impact. $ 971,800 Other (1) $ 971,800 EY. ENVIRONMENT Project Number: 2-28 Project Title: Gordonville Booster Pump Station Rehabilitation Location: Gordonville Road tank site. Purpose: Provide adequate flows to western areas of distribution system. Physical Description: Replace existing duplex 50 horsepower pump station with duplex 100 horsepower pump station. Existing "can" is too small to accommodate larger pumps. Unit of Work: Design and install pre-engineered pump station. Justification: Pump station installed over 20 years ago has reached capacity and has required increased maintenance. Hospital and many commercial businesses are dependent on the pump station. Impact on Operating Lower maintenance costs. Increased electrical costs, overall $500 increase Budget: with current electrical rates. Financing: $ 97,800 Other (1) Total: $ 97,800 620-4030-7335-1070228 :i ENVIRONMENT Project Number: 2-29 Project Title: College and Meadowbrook Pressure Zones Consolidation Location: Henderson Avenue and College Street to Bertling Street and Henderson Avenue. Purpose: Improve pressure and fire flows in north -central and north sections of the City. Physical Description: Installation of 6,000 feet of 127inch main. Unit of Work: Design and construct. Justification: Better utilization of 1.6 million gallon storage tank at College Street. Redundancy of feed to ever growing Meadowbrook pressure zone. More flexibility in Water Plant operations. Impact on Operating Budget: Financing: Total: 620-4030-7335-1070229 $ 250,000 Other (1) $ 250,000 ENVIRONMENT Project Number: 2-30 Project Title: Cape Girardeau — Scott City Water System Interconnection Location: Interconnection between Airport Main (Cape) and 1-55 new water plant (Scott City) Purpose: To interconnect the municipal water systems of Cape Girardeau and Scott I City for mutual support purposes. Physical Description: Install approximately 1,000 lineal feet of 12 -inch water line with appurtenances, with one highway bore (1-55). Unit of Work: Design and construct. Justification: The cities of Cape Girardeau and Scott City have grown together, with a common boundary along Interstate 55 and their water systems are virtually adjoining as well. Interconnection will allow the two systems to mutually support each other in times of water emergencies in either city. Impact on Operating Budget: Financing: Total: 620-4030-7335-1070230 No significant impact. $ 150,000 Other (1) $ 150,000 W ENVIRONMENT Project Number: 2-31 Project Title: West Cape Booster Station Upgrade Location: West Cape Rock Drive at Perryville Road. Purpose: Install larger pumps and piping at existing booster station. Physical Description: Change out existing 10 horsepower and 20 horsepower pumps with two (2) 25 horsepower pumps. Unit of Work: Design and install. Justification: Increase pressure in developing areas on North Perryville Road. Impact on Operating Minor increase in operational costs. Budget: Financing: $ 87,500 Other (1) Total: $ 87,500 620-4030-7335-1070231 ENVIRONMENT Project Number: 2-32 Project Title: Water Plant No. 2 Expansion Location: Water Plant No. 2 Purpose: Meet growing water supply needs. Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 620-4030-7335-1070232 Purchase land, construct additional treatment facilities, and construct additional storage tank. Design and construct. Continued growth of system and large water users added to the south (Nash Road and future Prestwick). Additional chemical, labor and electrical costs. $ 14,822,200 Other (1) $ 14,822,200 ENVIRONMENT Project Number: 2-33 Project Title: Residual Storage and Disposal Location: Cape Rock Water Plant No. 1 Purpose: Provide for disposal of treatment -process -residue by storage, transfer and I land applications versus return to river. Physical Description: Pumping facilities, storage tanks, loading station, tanker trucks. Unit of Work: Design, construct, and equip for residual storage and disposal. Justification: Regulatory requirement for permitting construction and operation (DNR). Impact on Operating Operation and maintenance costs will change. Unquantifiable at this time. Budget: Financing: $ 4,849,300 Other (1) Total: $ 4,849,300 620-4030-7335-1070233 91 ENVIRONMENT Project Number: 2-34 Project Title: Merriwether Drainage Tunnel Repairs Location: Merriwether Street pumping station and west. Purpose: To prevent further damage to the 54 -inch brick -lined tunnel. Physical Description: To make repairs to the brick -lined tunnel that is over 100 years old. Unit of Work: Rehabilitation of tunnel to standards acceptable by the Corps of Engineers. Justification: Failure of this tunnel during a significant flood event will cause downtown Cape Girardeau to flood from within. This would cause the level on the inside of the flood wall to be the same as the flooding river. Impact on Operating Budget: Financing: Total: 180-7020-7339-1030236 Will reduce ongoing maintenance costs. $ 87,900 Other (1) $ 87,900 92 ENVIRONMENT Project Number: 2-35 Project Title: Arena Creek Relief Channel Location: Arena Park Purpose: Prevent flooding in Arena Park. Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 180-7020-7339-1030239 Construct a shallow swale through Arena Park parallel to Optimist Drive. Design and construct. To prevent flooding in Arena Park. This is a project that is recommended in I the storm water master plan. No significant impact. $ 868,800 Other (1) $ 868,800 93 ENVIRONMENT Project Number: 2-36 Project Title: Howell Street Box Culvert Replacement Location: 1400 Block of Howell Street at Scivally Branch of Walker Creek. Purpose: Increase the capacity of the existing drainage structure to reduce flood damage to property improvements located upstream. Physical Description: Replace the existing structure to accommodate high flows generated by heavy rain events in the Scivally Branch watershed, and improve approximately 60 feet of creek channel downstream of the structure to the Walker Branch Flood Control Project (Corps of Engineers). Unit of Work: Design, acquire right-of-way and construct. Justification: Capacity of the existing structure is less than that of a 10 -year rain event and contributes to flood damage to property and further threatens the life and safety of citizens at times of high flows when very swift storm water overtops the street at this location. Impact on Operating Will eliminate the need to barricade the street during heavy rain storms. Budget: Financing: $ 698,300 Other (1) Total: $ 698,300 180-7020-7339-1070236 E ENVIRONMENT Project Number: 2-37 Project Title: Cape Rock Drive Culvert Replacement, Storm Inlets, New Drains at Dennis I Scivally Park Location: Cape Rock Drive at Dennis Scivally Park. Purpose: Improve storm water drainage. Physical Description: Install new culvert, storm inlets, and storm drains. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 180-7020-7339-1070237 Culvert replacement. Improve storm water drainage. This is a recommended project in the storm I water master plan. No significant impact. $ 300,100 Other (1) $ 300,100 MA ENVIRONMENT Project Number: 2-38 Project Title: Breckenridge Branch Bank Stabilization Location: Breckenridge Branch west of Mount Auburn Road. Purpose: To stabilize the banks and secure commercial building parking lot. Physical Description: Install riprap and gabion baskets. Unit of Work: Install riprap and gabion baskets. Justification: To stabilize the banks to prevent further damage. Impact on Operating No significant impact. Budget: Financing: $ 206,000 Other (1) Total: $ 206,000 180-7020-7339-1070238 ENVIRONMENT Project Number: 2-39 Project Title: Beavercreek Detention Basin Construction Location: Breckenridge Branch drainage area. Purpose: Replace smaller basin that was damaged beyond repair and is inadequate for the drainage area. Physical Description: Earthen dam with piping and concrete pilot channel. Unit of Work: Design, acquire easement, and construct. Justification: Replace basin and release storm water at a proper rate of discharge to prevent downstream erosion and possibly flooding. Impact on Operating No significant impact. Budget: Financing: $ 103,000 Other (1) Total: $ 103,000 180-7020-7339-1070239 97 ENVIRONMENT Project Number: 2-40 Project Title: Melrose Drainage Area Location: 2400 Block of Melrose Avenue. Purpose: To prevent street flooding and property damage. Physical Description: Storm drainage system. Unit of Work: Design and construct. Justification: To prevent flooding and property damage. Impact on Operating No significant impact. Budget: Financing: $ 549,000 Other (1) Total: $ 549,000 180-7020-7339-1070240 M ENVIRONMENT Project Number: 2-41 Project Title: Themis Street Improvement Location: Themis Street and Silver Springs Road Purpose: To prevent street flooding. Physical Description: Install a 5 -foot high by 12 -foot wide box culvert. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 180-7020-7339-1050239 Design and install. Prevent flooding of the Themis Street and Silver Springs Road area. This I is a recommended project in the storm water master plan. Decrease emergency response needed during flooding of the street. $ 307,200 Other (1) $ 307,200 r, ENVIRONMENT Project Number: 2-42 Project Title: Aquamsi Street Drainage Project Location: Aquamsi Street beside the River Campus and Missouri Dry Dock. Purpose: To allow for proper drainage of Aquamsi Street. Physical Description: Install 42 -inch reinforced concrete pipe from west of Aquamsi Street to the I east, approximately 550 feet. Unit of Work: Design and install a storm water drainage line. Justification: This will prevent the flooding of Aquamsi Street during moderate and heavy I rain events. Impact on Operating Decrease emergency response needed during flooding of the street. Budget: Financing: $ 36,000 Federal Grants/Loans (F) 69,300 Other (1) Total: $105,300 180-7020-7339-1060242 100 ENVIRONMENT Project Number: 2-43 Project Title: Margaret and Janet Drainage Location: Margaret Street and Janet Drive. Purpose: To properly drain the area. Physical Description: Install a drainage system. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 180-7020-7339-1070243 Design and construct. To prevent street flooding. This is a recommended project in the storm I water master plan. No significant impact. $ 329,400 Other (1) $ 329,400 101 ENVIRONMENT Project Number: 2-44 Project Title: Grandview and Carolina Drainage Area Location: Grandview Drive and Carolina Lane area. Purpose: To properly drain the area. Physical Description: Design and construct a storm drainage system in the neighborhood. Unit of Work: Design and construct. Justification: Reduce flooding and property damage in the neighborhood. Impact on Operating No significant impact. Budget: Financing: $ 137,300 Other (1) Total: $ 137,300 180-7020-7339-1070244 102 ENVIRONMENT Project Number: 2-45 Project Title: Detention Basin Flood Monitor Location: LaSalle Branch detention basin site. Purpose: To be able to monitor increases in the detention basin level. Help prevent I downstream property damage. Physical Description: Ultrasonic flow monitoring and reporting via the wastewater plant and public works service center SCADA system. Also will have the capacity for the police, fire and planning to monitor with the appropriate equipment. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 180-7020-7339-1070245 Design and construct. Monitor flow to help prepare and prevent downstream damage. No significant impact. $ 153,700 Capital Improvement Sales Tax (H) $ 153,700 103 ENVIRONMENT Project Number: 2-46 Project Title: Kingsway and Kingsbury Drainage Location: Kingsway Drive and Kingsbury Drive. Purpose: To properly drain the area. Physical Description: Install a storm drainage system. Unit of Work: Design and construct. Justification: To prevent street flooding. This is a recommended project in the storm I water master plan. Impact on Operating No significant impact. Budget: Financing: $ 55,000 Other (1) Total: $ 55,000 1180-7020-7339-1070246 104 ENVIRONMENT Project Number: 2-47 Project Title: Cape La Croix Bank Stabilization Location: South side of Arena Park. Purpose: To stabilize the bank and secure hike and biking trail. Physical Description: Install riprap and gabion baskets. Unit of Work: Install riprap and gabion baskets. Justification: To stabilize the banks to prevent further damage. Impact on Operating No significant impact. Budget: Financing: $ 56,000 Other (1) Total: $ 56,000 180-7020-7339-1070247 105 Project Number: Project Title: Location: Purpose: Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 180-7020-7339-1010253 ENVIRONMENT Shawnee Park/Arena Park Bank Stabilization Shawnee Park and Arena Park on Cape La Croix Creek. To stabilize the banks to prevent the collapse of the recreation trail, ball fields, soccer fields and park land. Lay broken concrete and riprap stone on the banks to prevent erosion. Deposit concrete and stone, rent equipment, work to be done by city crews. Prevent the collapse of the recreation trail, ball fields, soccer fields, and park land. No significant impact. $ 22,500 Other (1) $ 22,500 106 ENVIRONMENT Project Number: 2-49 Project Title: Whitener and Silver Springs Drainage Area Location: Whitener Street and Silver Springs Road area. Purpose: To prevent street flooding and property damage. Physical Description: Improve the drainage system. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 180-7020-7339-1050247 Design and construct. To prevent flooding and property damage. No significant impact. $ 65,900 Other (1) $ 65,900 107 ENVIRONMENT Project Number: 2-50 Project Title: Amblewood Drainage System Location: 1500 Block of Amblewood Drive. Purpose: To properly drain the area. Physical Description: Install a storm drainage system. Unit of Work: Design and construct. Justification: To prevent street flooding. Impact on Operating No significant impact. Budget: Financing: $ 27,300 Other (1) Total: $ 27,300 180-7020-7339-1070250 ENVIRONMENT Project Number: 2-51 Project Title: Bloomfield and Broadview Drainage Area Location: Ditches along Bloomfield Road and Broadview Street intersection. Purpose: To allow for proper drainage. Physical Description: Clean out drainage ditch and install a concrete pilot channel. Unit of Work: Clean, design, and construct. Justification: To allow for proper drainage. Impact on Operating No significant impact. Budget: Financing: $ 27,500 Other (1) Total: $ 27,500 180-7020-7339-1070251 109 Project Number: Project Title: Location: Purpose: Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 180-7020-7339-1070252 ENVIRONMENT 2-52 Cape West Business Park Area Flood Control Proiect In the general area of Siemers Drive — Mount Auburn Road and William Street — Bloomfield Road. Area -wide detention plan to reduce stormwater impacts on major streets and general area. Combination of channel work and detention facilities, not designed at this time. Design, acquire sites, and construct. Major storms result in periodic flooding of Siemers Drive, 1-55, Mount Auburn and Bloomfield Roads. Some increased maintenance costs, undetermined at this time. $ 391,400 Other (1) $ 391,400 110 ENVIRONMENT Project Number: 2-53 Project Title: Dorothy Street Stormwater Improvements Location: Arena Creek near Huckstep Property to West Mount Drive. Purpose: Ditch improvements to minimize additional property damage. Physical Description: Improvements to ditches. Unit of Work: Design and construct. Justification: To prevent street flooding and bank erosion from Dorothy Street on to the south. Impact on Operating No significant impact. Budget: Financing: $ 206,000 Other (1) Total: $ 206,000 180-7020-7339-1070253 111 This page intentionally left blank. 112 PARKS AND RECREATION CAPITAL IMPROVEMENTS PROGRAM 2007-2008 Fiscal 2008-2009 Fiscal 2009-2010 Fiscal 2010-2011 Fiscal 2011-2012 Fiscal Year Year Year Year Year 113 PARKS AND RECREATION PROPOSED PROJECTS Project 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 Improvement Item Total Cost Number Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 3-1 General Park Improvements 5,585,000, 1,585,000, 1,000,0001 1,000,0001 1,000,000, 1,000,0001 1995 3-2 Shawnee Park Sports Complex 3,510,0001 1,510,0001 500,0001 500,0001 500,0001 500,0001 Improvements 2000 3-3 Arena Park Athletic Field 1,113,0001 500,0001 200,0001 200,0001 213,0001 Improvements 2001 3-4 A. C. Brase Arena Improvements 1,390,0001 500,0001 500,000, 390,000 1 2002 3-5 Family Aquatic Center and Spray 6,000,0001 6,000,0001 Pads 2002 3-6 Golf Course Improvements 2,250,0001 500,0001 1,750,0001 1996 3-7 Capaha Baseball Field 721,0001 200,0001 521,0001 Improvements 2007 3-8 Trail Development and 1,030,0001 500,0001 530,0001 Improvement (Cape La Croix Trail) 2007 3-9 Osage Community Centre 4,025,0001 4,025,0001 Improvements 2007 3-10 Central Municipal Pool 5,975,0001 5,975,0001 Improvements 2007 3-11 Riverwalk Phase III 491,400 D 393,000 D 2007 E 98 400 E 3-12 North Park Trail 487,700 D 383,700 D 2006 E 104,000 E 3-13 Riverwalk Phase IV and Riverfront g66,700 D 350,000 D 300,000 D Park Expansion 2000 E 116,700 E 100,000 E 3-14 Bloomfield -Silver Springs Trace74,600E 74,600 E 20us A General Revenue Fund B REV/PFA Bonds: Issued C REV/PFA Bonds: Pending D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans G Special Assessments H Capital Improvement Sales Tax I Other J Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax 114 PARKS AND RECREATION PROPOSED PROJECTS Project 2007-2008 2008-2009 2009-2010 2010-2011 .2011-2012 Improvement Item Total Cost Number Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 3-15 Perryville Sidewalk 218,300 D 170,560 D 20021 E I I I I 47 740 $ 3-16 IFI,,dwall Mural Lighting 29,300 I 29,300 I zuu TOTALS 33,767,000 12,070,100 1 4,550,000 1 2,664,600 1 6,477,300 1 8,005,000 A General Revenue Fund g REV/PFA Bonds: Issued C REV/PFA Bonds: Pending D State Grants/Loans-� 1597,260 1,126,700 300,000 � 170,560 •� ..m�_..., E Motor Fuel Tax 541,440 319,100 100,000 74,600 47,740 F Federal Grants/Loans H Capital Improvement Sales Tax I Other 31,628,300 10,624,300 4,150,000 2,590,000 6,259,000 8,005,000 J Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax 115 PARKS AND RECREATION Project Number: 3-1 Project Title: General Park Improvements Location: Arena Park, Kiwanis Park, Indian Park, Dennis Scivally Park, Capaha Park, Groves Park, Choctaw Park, Missouri Park, Cape Rock Park, Twin Trees Park, Delaware Park Purpose: To provide additional and improved park amenities and improvements. I Physical Description: Replace and add picnic shelters, playgrounds, restrooms, and other park I site amenities. Unit of Work: Design and construct. Justification: Existing shelters, playgrounds and restrooms are in need of replacement, I and additional amenities are needed in all parks listed. Impact on Operating Minor impact on operating budget. Budget: Financing: $ 5,585,000 Other (1) Total: $ 5,585,000 1307-7000-7350-1070301 116 PARKS AND RECREATION Project Number: 3-2 Project Title: Shawnee Park Sports Complex Improvements Location: Shawnee Park Purpose: To provide improvements to existing facilities and additions to facilities. Physical Description: Improvements to existing sports fields, construct additional softball, soccer and football fields. Replace existing soccer restroom/concession, pave parking and roadway areas, expansion of existing maintenance building. Unit of Work: Justification: Impact on Operating Budget: Financing Total: 660-5080-7350-1070302 Design and construct. Existing facilities are well used and additional fields are needed. Existing I restroom/concession is inadequate for soccer field use. Additional maintenance and utility costs. $ 3,510,000 Other (1) $ 3,510,000 117 PARKS AND RECREATION Project Number: 3-3 Project Title: Arena Park Athletic Field Improvements Location: Arena Park. Purpose: To provide better facilities for youth baseball and softball, and improved maintenance facilities. Physical Description: Replace existing backstops, fencing and lights on baseball and softball fields. Build a metal maintenance building for field maintenance equipment and supplies. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 1307-7000-7352-1070303 Design and construct. Fencing is in poor condition on most fields and lighting needs to be replaced or added on all fields. Minor impact on utility costs. $ 1,113,000 Other (1) $ 1,113,000 118 PARKS AND RECREATION Project Number: 3-4 Project Title: A. C. Brase Arena Improvements Location: Arena Park. Purpose: To provide necessary repairs and improvements to the 70 year old I community and event building. Physical Description: Roofing replacement, HVAC replacement, electrical upgrade, exterior I surfacing, south parking lot construction, storage and office additions. Unit of Work: Design and construct. Justification: The building has a high rate of community event use, particularly not for I profit events, as well as commercial and recreational usage. Impact on Operating Overall maintenance and utility costs should be no greater than current with I Budget: these improvements. Financing: $ 1,390,000 Other (1) Total: $ 1,390,000 307-7000-7350-1070304 119 PARKS AND RECREATION Project Number: 3-5 Project Title: Family Aquatic Center and Spray Pools Location: Osage Park, Capaha Park, and Indian Park Purpose: To provide a variety of aquatic recreation and wet play elements, both active and passive, that appeal to a full spectrum of age groups and families. Physical Description: Development and construction of an aquatic facility featuring a leisure pool, playpool, water slides, lazy river, zero depth entry, various aquatic play structures. Unit of Work: Design and construct. Justification: Public desire for this type of facility that would provide a level of aquatic recreation currently unavailable, and included in the Park and Recreation Master Plan. Impact on Operating According to the future facility needs study by Horner & Shifrin, Inc., this Budget: facility should be largely or entirely self-supporting providing that a realistic fee structure is established with property scheduled fee adjustments followed. The spray pads would not require additional staffing, maintenance would be normal for this type of facility. Financing: Total: 307-7000-7350-1070305 $ 6,000,000 Other (1) $ 6,000,000 120 PARKS AND RECREATION Project Number: 3-6 Project Title: Golf Course Improvements Location: Jaycee Municipal Golf Course Purpose: To improve the overall quality of play and general public enjoyment of the facility. Physical Description: Replace existing irrigation system, rebuild and install bent grass greens, construct new pro shop and maintenance building, rebuild and upgrade some tees. Unit of Work: Design and construct. Justification: This course has the highest level of rounds in the area. The existing irrigation system has many leaks, bent grass is the preferable greens by golfers, the existing pro shop and maintenance buildings are inadequate to meet the current needs of the operation. Impact on Operating The addition of bent grass greens.will require some increases in the Budget: operational budget. Financing: $,2,250,000 Other (1) Total: $ 2,250,000 640-5070-7350-1070306 121 PARKS AND RECREATION Project Number: 3-7 Project Title: Capaha Baseball Field Improvements Location: Capaha Park Purpose: To provide a better playing field for user teams. Physical Description: Improve various areas of field to provide a better quality of playing surface. Unit of Work: Design and construct. Justification: Capaha Field is the only baseball field in the area suitable for collegiate and upper level baseball teams. Impact on Operating No impact on the budget. Budget: Financing: $ 721,000 Other (1) Total: $ 721,000 307-7000-7350-1070307 122 PARKS AND RECREATION Project Number: 3-8 Project Title: Trail Development and Improvement (Cape La Croix Trail) Location: Cape La Croix Recreational Trail. Purpose: Expand the existing trail system and installation of emergency call boxes and trail amenities. Physical Description: Expand the existing recreational trail system. Install emergency call boxes at various trail locations and improve site amenities. Unit of Work: Design and construct. Justification: The existing recreation trail is highly used and enjoyed by a diverse recreation population. Impact on Operating Increased maintenance costs would be necessary. Budget: Financing: $ 1,030,000 Other (1) Total: $ 1,030,000 307-7000-7350-1070308 123 PARKS AND RECREATION Project Number: 3-9 Project Title: Osage Community Centre Improvements Location: Osage Park Purpose: To provide additional recreational areas, storage areas and meeting rooms I to enhance public use of the facility. Physical Description: Construct an elevated walking track, additional storage and meeting rooms. Build locker and shower rooms and additional parking. Unit of Work: Design and construct. Justification: The community centre use has steadily increased since opening. The expansion will meet the increased demands for these additions. Impact on Operating Increases in utilities and maintenance costs. Additional revenues can I Budget: offset some of the increases. Financing: $ 4,025,000 Other (1) Total: $ 4,025,000 1307-7000-7350-1070309 124 PARKS AND RECREATION Project Number: 3-10 Project Title: Central Municipal Pool Improvements Location: Central Municipal Pool Purpose: To provide a permanent year round enclosure and improve the bathhouse I and concession areas. Physical Description: Replace existing air support structure with a permanent enclosure. Update and expand the bathhouse and concession building. Update fixtures and equipment. Unit of Work: Design and construct. Justification: The existing air support structure has a limited life span and the bath house I and concession areas are inadequate for current needs. Impact on Operating The impact on the budget would be minor with possibly some savings with I Budget: a permanent structure. Financing: Total: 307-7000-7350-1070310 $ 5,975,000 Other (1) $ 5,975,000 125 PARKS AND RECREATION Project Number: 3-11 Project Title: Riverwalk Phase III Location: Mississippi River frontage, end of Phase II to just south of Sloan Creek. Purpose: To provide expanded walking trail facilities, recreational and interpretational opportunities along the Mississippi River. Physical Description: Construct 2,531 lineal feet of 12 -foot walkway north of the existing Riverwalk. Unit of Work: Design, engineer and construct. Justification: Recreational and interpretational opportunities along the Mississippi River need to be expanded to take full advantage of this outstanding physical, cultural and tourist attraction. Impact on Operating Increased operation and maintenance costs, undetermined at this time. Budget: Financing: $ 393,000 State Grants/Loans (D) 98,400 Motor Fuel Tax (E) Total: $ 491,400 307-7000-7350-1070311 126 PARKS AND RECREATION Project Number: 3-12 Project Title: North Park Trail Location: Lexington Avenue to North County Park. Purpose: To extend the current trail system to connect with the North County Park I and the Department of Conservation's Nature Center. Physical Description: Construct approximately 1.2 miles of 6 to 8 foot walkway northwest from the end of the existing trail system at Lexington Avenue/Route W to connect with the White Oak Trace in North County Park. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 307-7000-7350-1060319 Design, engineer and construct. Provide linkage between existing trails and parks to other park land and other recreational facilities. Increased operational and maintenance costs, undetermined at this time. $ 383,700 State Grants/Loans (D) 104,000 Motor Fuel Tax (E) $ 487,700 127 PARKS AND RECREATION Project Number: 3-13 Project Title: Riverwalk Phase IV and Riverfront Park Expansion Location: Mississippi River frontage, connection of Riverwalk Phase III to Red Star Access boat ramp, and expansion of docking facilities and seating on the river side of Riverfront Park. Purpose: To provide expanded walking trail facilities, recreational and interpretational opportunities along the Mississippi River. Physical Description: Construct approximately 500 feet of 12 -foot walkway north of Riverwalk Phase III, including a pedestrian bridge over Sloan Creek, and expand the original Riverfront Park. This project will need to be constructed in two phases. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 307-7000-7350-1070313 Design, engineer and construct. Recreational and interpretational opportunities along the Mississippi River need to be expanded to take full advantage of this outstanding physical, cultural and tourist attraction. Increased operational and maintenance costs, undetermined at this time. $ 650,000 State Grants/Loans (D) 216,700 Motor Fuel Tax (E) $ 866,700 128 PARKS AND RECREATION Project Number: 3-14 Project Title: Bloomfield -Silver Springs Trace Location: From Cape La Croix Trail near Tanner Drive along Cape Centre Drive, Broadview Street, Bloomfield Road, and South Silver Springs Road to Cape Central High School. Purpose: To provide a hike/bike trail connection. Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 307-7000-7350-1070314 Combination of new street -marked bike paths and sidewalks totaling approximately 4,800 lineal feet and existing sidewalks. Design and construct. Will extend the City's trail system and provide hike/bike connection I between Cape La Croix Trail and the high school complex. Will increase maintenance costs. $ 74,600 Motor Fuel Tax (E) . $ 74,600 129 Project Number: Project Title: Location: Purpose: Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 307-7000-7350-1070315 PARKS AND RECREATION 3-15 Perryville Sidewalk Perryville Road, between Cape Rock Drive and Perry Avenue. To provide a pedestrian connection between Capaha Park, Kiwanis Park, and the Cape La Croix Recreational Trail. Four -foot wide concrete sidewalk along Perryville Road. Design and construct. To allow the removal of pedestrian traffic from a heavily traveled street, providing pedestrian access to city parks. No significant impact. $ 170,560 State Grants/Loans (D) 47,740 Motor Fuel Tax (E) $ 218,300 130 PARKS AND RECREATION Project Number: 3-16 Project Title: Floodwall Mural Lighting Location: Water Street/Riverfront Purpose: To provide better lighting to highlight the feature panels of "The Mississippi Tales" mural. Physical Description: Install 29 ground mounted spot light fixtures with all wiring, controllers, and other necessary appurtenances. Unit of Work: Design and install. Justification: To improve the lighting of the already very popular Water Street mural and add more aesthetic value to that project. Impact on Operating Some increased operational costs. Budget: Financing: $ 29,300 Other (1) Total: $ 29,300 307-7000-7350-1060317 131 Th-ispage intentionally left blank. 132 120000 100000 800001 60000( 40000C 200000 COMMUNITY DEVELOPMENT CAPITAL IMPROVEMENTS PROGRAM zuut-zuuu riscai 2uut3-2009 Fiscal 2009-2010 Fiscal 2010-2011 Fiscal 2011-2012 Fiscal Year Year Year Year Year 133 COMMUNITY DEVELOPMENT PROPOSED PROJECTS Project 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 Number Improvement Item Total Cost Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 4-1 Police Department Annex 5,446,000 1 476,600, 4,969,4001 1998 4-2 Renovation of Fire Station No. 1 309,000 L 309,000 L 1996 4-3 Fire Station No. 2 Roof Replace/ 100,000 L 100,000 L Renovate & Building Repair 2004 4-4 Relocate Fire Station # 4 1,785,6001 1,785,6001 2007 4-5 Fire Station # 5 1,563,0001 1,563,0001 2007 4-6 Fire Station # 6 1,860,0001 1,860,0001 2007 4-7 Fire Station # 7 1,563,0001 1,563,0001 2007 4 8 Regional Public Safety Training 600,0001 200,0001 100,0001 100,0001 100,0001 100,0001 Center 2007 4-9 City Hall Elevator and Archive 250,000 A 250,000 A Center 1994 4-10 Land Acquisition - Public Works 167,0001 167,0001 2007 4-11 Outdoor Warning Sirens 257,400 1 59,400 1 59,400, 59,4001 59,400 1 19,8001 2004 TOTALS 13,901,000 835,400 409,400 .159,400 636,000 11,860,800 A General Revenue Fund 250,000 250,000 B REV/PFA Bonds: Issued C REV/PFA Bonds Pending A .....9 w .. D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans G Special Assessments H Capital Improvement Sales Tax 1 Other 13,242 000 426,400 159,400 159,400 636,000 11 860,800 J Gen. Obligation Bonds. Pending _,-._ •- -•,-- --•— ---- -- K Transportation Sales Tax -- L Fire Sales Tax 409"000 409,000 134 COMMUNITY DEVELOPMENT Project Number: 4-1 Project Title: Police Department Annex Location: Police Headquarters, South Sprigg Street. Purpose: Construct annex to existing headquarters to provide additional space for an emergency operations center, court room, additional office space, interview suites, and locker facilities for public safety personnel. Renovate and upgrade existing structure. Physical Description: Two-story, 16,000 square foot addition to the north and east sides of the existing facility. Acquisition of additional parcels of land east of the existing building; demolition, excavation and construction of a secure parking facility. Renovation of existing structure. Unit of Work: Construction of building, acquisition of additional property, renovation/ upgrade of existing building. Justification: Construction and renovation would enhance earthquake mitigation efforts for emergency response personnel and provide a full service police facility, including court room access. Impact on Operating Some increase in equipment, personnel and operating budget anticipated, Budget: unquantifiable at this time. Increased depreciation expense. Financing: $ 5,446,000 Other (1) Total: $ 5,446,000 300-7000-7371-1040402 135 COMMUNITY DEVELOPMENT Project Number: 4-2 Project Title: Renovation of Fire Station No. 1 Location: 1 South Sprigg Street Purpose: To provide additional office and storage areas that will meet the needs of the Fire Department for the next 10 — 15 years, including the relocation of the emergency generator, the construction of an addition on the south side of the fire station to provide storage space, the conversion of existing storage areas to offices, and the renovation of the heating and air conditioning systems. Physical Description: Construction of an addition for increased storage and office space. Unit of Work: Design and construct. Justification: Current area is poorly designed and incapable of meeting the expanding needs of a growing organization. Impact on Operating No significant impact. Budget: Financing: $ 309,000 Fire Sales Tax (L) Total: $ 309,000 1186-3030-7371-1050403 136 COMMUNITY DEVELOPMENT Project Number: 4-3 Project Title: Fire Station No. 2 Roof Replacement/Renovation and Building Repair Location: 378 South Mount Auburn Road Purpose: Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 186-3030-7371-1040407 To provide funding necessary for replacement of the roof, repair damaged I ceiling and walls, and building renovation. Replace present flat roof with pitched metal roof, renovation of building, and moving emergency generator from basement to exterior. Design and construct. Roof leaks causing significant water damage. There are no female I restroom facilities. No significant impact. $ 100,000 Fire Sales Tax (L) $ 100,000 137 COMMUNITY DEVELOPMENT Project Number: 4-4 Project Title: Relocate Fire Station # 4 Location: 3000 Block of Lexington Avenue Purpose: To Replace aging Fire Station # 4 and relocate it onto Lexington Avenue. Physical Description: This station would be an approximately 12,000 square foot, single story station with three apparatus bays and living quarters for six on duty personnel. Unit of Work: Design and construct. Justification: Current Fire Station # 4 was built in 1974, and we are outgrowing its usefulness. The station was partially remodeled in 2005, in an attempt to extend its usefulness another 10 years. A replacement station on land already purchased could be built to meet future needs of the City, especially if this area becomes more of the geographical center of our borders. Impact on Operating There would be a minimal impact on operating costs, as this would be a Budget: replacement station. Personnel and apparatus would simply be relocated from the current station. Utility cost would increase slightly due to increased square footage. Additional staffing and apparatus may become necessary if city borders and population shift results in this area becoming more of the geographical center of the City. Financing: Total: 186-3030-7371-1070404 $ 1,785,600 Other (1) $ 1,785,600 138 COMMUNITY DEVELOPMENT Project Number: 4-5 Project Title: Fire Station # 5 Location: Cape La Croix Road near Whispering Oaks Purpose: To place a fire station in the northwest section of the City to serve newly annexed properties, as well as possible future development in this area. Physical Description: This station would be an approximately 10,000 square foot, single story station with two apparatus bays and living quarters for six on duty personnel. (A police substation could be added if desired.) Unit of Work: Design and construct. Justification: The additional land and property annexed into the northwest section of the City will require a fire station to deliver effective and efficient services to this area, and maintain acceptable response times and insurance ratings within the City limits. Impact on Operating Any new fire station will require at least one additional fire engine, at least Budget: nine additional firefighters, and on-going operating/maintenance costs of running the station. Financing: Total: 186-3030-7371-1070405 $ 1,563,000 Other (1) $ 1,563,000 139 COMMUNITY DEVELOPMENT Project Number: 4-6 Project Title: Fire Station # 6 Location: To be determined. Purpose: To place a fire station in the south to southwest section of the City to serve future annexed properties and industrial development, as well as better serve the Cape Girardeau Regional Airport. Physical Description: This station would be an approximately 12,000 square foot, single story station with three apparatus bays and living quarters for six on duty personnel. Unit of Work: Design and construct. Justification: The possibility of annexation of property, and the desire for future industrial development to the south and southwest of the City will require a fire station to deliver effective and efficient services to this area, and maintain acceptable response times and insurance ratings within the City limits. Also, upcoming changes in FAA requirements for Aircraft Rescue and Fire Fighting responses will require the placement of the ARFF truck closer to, if not on, the airport. Impact on Operating A new fire station will require at least one additional fire engine, at least Budget: nine additional firefighters, and on-going operating/maintenance costs of running the station. Financing: Total: 186-3030-7371-1070406 $ 1,860,000 Other (1) $ 1,860,000 140 COMMUNITY DEVELOPMENT Project Number: 4-7 Project Title: Fire Station # 7 Location: Route K, Near Notre Dame High School Purpose: To place a fire station in the west section of the City to serve future growth areas. Physical Description: This station would be an approximately 10,000 square foot, single story station with two apparatus bays and living quarters for six on duty personnel. (A police substation could be added if desired.) Unit of Work: Design and construct. Justification: As the City continues to grow towards the west, a fire station will eventually be required to deliver effective and efficient services to this area, and maintain acceptable response times and insurance ratings within the City. Impact on Operating Any new fire station will require at least one additional fire engine, at least Budget: nine additional firefighters, and on-going operating/maintenance costs of running the station. Financing: Total: 186-3030-7371-1070407 $ 1,563,000 Other (1) $ 1,563,000 141 COMMUNITY DEVELOPMENT Project Number: 4-8 Project Title: Regional Public Safety Training Center Location: South Sprigg Street at La Cruz Street Purpose: To construct a training facility to conduct hands-on, practical training for public safety purposes including firefighting, technical rescue, hazardous materials, CERT, and police special operations. Physical Description: This training facility would incorporate City property currently being used by the police and fire departments for training. The property needs grade work, concrete and fencing. Development of the site would then consist of constructing various training props and modules. Unit of Work: Design and construct. Justification: There are no such training facilities in the region other than a small facility in Jackson. Practical, hands-on training is essential to develop and maintain the skills required for our public safety personnel to perform effectively, efficiently, safely, and professionally. Such a facility could be open for use by other agencies in the region, contributing to our position as a leader in the region, and helping with the on-going maintenance of the facility. We have reduced the scope of this project in relation to the original proposal in the 2000 Future Facilities Plan in hopes to improve the chances of something being done. Impact on Operating There would be minimal costs to operate and maintain a training facility. Budget: There may be a slight increase in liability insurance coverage. However, if we open the facility to use by other agencies in the region, this could help recover a portion of these costs. Financing: Total 186-3030-7371-1070408 $ 600,000 Other (1) $ 600,000 142 COMMUNITY DEVELOPMENT Project Number: 4-9 Project Title: City Hall Elevator and Archive Center Location: 401 Independence Street Purpose: Permit access, including access for mobility -impaired persons, to all three levels for services offered, and to provide modern, climate controlled storage for archiving City documents in accordance with standards of the Secretary of State's Office. Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 300-7000-7375-1950409 Elevator meeting handicapped -accessibility requirements interconnecting I all three floors of City Hall, and an addition for an archive center. Design and construct. Convenience and safety of the public and staff, and proper storage of City I records required to be retained. Additional operating and maintenance costs. $ 250,000 General Revenue Funds (A) $ 250,000 143 f�: COMMUNITY DEVELOPMENT Project Number: 4-10 Project Title: Land Acquisition for Public Works Facility Location: 2007 Southern Expressway Purpose: To expand the Public Works facility storage area. Physical Description: Acquire 3.4 acres of property on the south side of Southern Expressway. Unit of Work: Acquire site and install fencing and storage areas. Justification: The Public Works facility needs room to store equipment, such as salt spreaders, snow plows, permanent salt storage building and maintenance equipment. Impact on Operating Budget: Financing: Total: 001-4010-7110 No significant impact. $ 167,000 Other (1) $ 167,000 144 COMMUNITY DEVELOPMENT Project Number: 4-11 Project Title: Outdoor Warning Sirens Location: Mt. Auburn at Mall entrance, Cape Central and Notre Dame High Schools, Cape Rock/Country Club area, between Fire Station No. 1 and the River Campus. Purpose: To provide a severe weather or other emergency warning system for strategic locations within the City of Cape Girardeau. Physical Description: Outdoor warning sirens of suitable type for the location and its terrain, electric powered with battery back-up. Unit of Work: Install. Justification: The City is in an area affected frequently by severe storms. The five sirens planned at the locations noted above, in conjunction with the existing sirens on the University main campus, will provide maximum coverage at minimal cost. Eight additional sirens will be needed to complete coverage of the city. Impact on Operating Budget: Financing: Total: 001-3030-7150 No significant impact. $ 257,400 Other (1) $ 257,400 145 This page intentionally left blank. 146 LONG-RANGE CAPITAL IMPROVEMENT PROGRAM Unfunded Needs List The following list of Capital Improvement Program Needs consists of those projects which have been identified as major long-range facility improvements for which funding is currently not available. These projects are not listed in any order of priority. TRANSPORTATION 1) Additional streets per Major Street Plan 2) Airport — additional airport improvement projects per Airport Master Plan 3) Airport — corporate parcel and utility road extensions 4) Airport — development of an Airport Industrial Park 5) Big Bend Road — Cape Rock Drive to Lexington Avenue (and short distance north) — widening, storm drainage and sidewalks (parts) 6) Bloomfield Road —Benton Hill Road to Route 74 7) Broadview from Independence to Arena Park 8) Edgewood Drive — Gordonville Road to Bloomfield Road — widening and general improvements 9) Gordonville Road — Independence to the west — widening with curb and gutter 10) I-55/Bloomfield Road Overpass — widening 11) Independence Street extension to Armstrong Drive and I-55 overpass 12) Kage Road — Mount Auburn to Hopper Road — widening with curb and gutter 13) Lexington Avenue — Route W — Kingsway intersection improvements 14) New Bloomfield Road/I-55 overpass 15) New Hopper Road/1-55 overpass 16) New Madrid Street — extension from Clark to Kingshighway at Hopper/Kingsway intersection with traffic signals at Kingshighway intersection 17) New Madrid Street — Perry Avenue to Clark — widening with curb and gutter, storm drainage 18) North Sprigg Street — extension to West Cape Rock Drive (County Road 643) 19) Old Hopper Road — Mount Auburn to Kage — widening with curb and gutter 20) Street lighting improvements — beyond TTF-2 21) Vantage Drive — Independence Street to Ashland Court Subdivision 22) West End Boulevard — Southern Expressway to Shawnee Parkway and Bloomfield to Bertling and extended to Lexington — general upgrade and extension ENVIRONMENT 1) Fire protection upgrade (Kingshighway) 2) Highland Drive -Oakland Street -Engram Street trunk sewer 3) I-55 and William Street 14 -inch upgrade 4) Land acquisition for sludge program 5) Sewer improvement projects per Sewer Master Plan 6) Stormwater detention basins/major stormwater channel projects 147 7) Water Plant No. 1, Phase III expansion 8) 4 -inch main replacement (City wide) 9) 8 -inch main extension (Mount Auburn and Hopper Road) 10) 12 -inch main extension (Highway 177) 11) 12 -inch main extension (Kingshighway) PARKS AND RECREATION 1) Additional facilities as per Park Master Plan. 2) Additional trail facilities. 3) Ice hockey rink. 4) Park land acquisition. 5) Youth softball complex. COMMUNITY DEVELOPMENT 1) City Hall standby power system 2) Historic preservation 3) Neighborhood and downtown redevelopments RM