Loading...
HomeMy WebLinkAboutCIP2006-2011CAPITAL IMPROVEMENTS PROGRAM ADOPTED FISCAL 2006-2011 mm SEAL CITY OF CAPE GIRARDEAU MISSOURI BILL NO. 06-39 RESOLUTION NO. Q L— I A RESOLUTION ADOPTING THE FISCAL 2006 — 2011 CAPITAL IMPROVEMENTS PROGRAM WHEREAS, Article VI, Section 6.04 of the Charter of the City of Cape Girardeau requires a Capital Improvements Program; and WHEREAS, the City Manager has presented a proposed Capital Improvements Program to the City Council; and WHEREAS, proper notice has been published concerning the availability for inspection of the proposed Capital Improvements Program and the time and place for a public hearing on the Capital Improvements Program; and WHEREAS, the City Council has held a public hearing on the proposed Capital Improvements Program. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Council hereby adopts the five-year Capital Improvements Program for fiscal 2006-2011, copies of which are on file in the office of the City Clerk. ARTICLE 2. The City Clerk is instructed to attach an executed copy of this resolution to a copy of the Capital Improvements Program for fiscal 2006-2011 and to retain such copy with the permanent records of the City. PASSED AND ADOPTED THIS UL_tV\� DAY OF ftblchl , 2006 -.004 CJaY�. udtson, Mayor CITY OF CAPE GIRARDEAU Office of the City Manager Council Letter No. 38 Agenda February 21, 2006 The Honorable Mayor and Members of the City Council City of Cape Girardeau, Missouri RE: Public Hearing on 2006-2011 Capital Improvements Program Dear Mayor and Council Members: In accordance with requirements of the City Charter, a public hearing regarding the 2006- 2011 Capital Improvements Program has been set for Tuesday, February 21, 2006, at 7:00 P.M. The public notice of the hearing was published in the Southeast Missourian on Saturday, February 4, 2006. Unless otherwise directed, the staff will prepare a resolution for adoption of the proposed Capital Improvements Program, with any amendments the Council wishes to make, for the Council's agenda for Monday, March 6th. The City Charter requires that the Capital Improvements Program be adopted on or before April 1, 2001. The draft of the proposed Capital Improvements Program was submitted to the City Council on January 9, 2006, by Council Memorandum No. 5. The Council held a special work session on the Capital Improvements Program on January 30th. At the work session, the City Planner noted that one project needed to be added as noted below: North Park Trail — Parks and Recreation Section Added in 2006-07 Fiscal Year . The above change will be incorporated into the final Capital Improvements Program report, following the public. hearing on February 21St. The final report will also include any additional changes the Council wishes to make subsequent to the public hearing. Respectfully submitted, ent M. Bratton Director of Planning Services KMB/JRR/DKL/rlf 9'� (�, Rza� John R. Richbourg Finance Director Douglas K. Leslie City Manager CITY OF CAPE GHU"EAU, MISSOURI Office of the City Manager Council Letter No. 62 Agenda March 6, 2006 The Honorable Mayor and Members of the City Council City of Cape Girardeau, Missouri RE: Adoption of the Capital Improvements Program, Fiscal 2006-2011 Dear Mayor and Council Members: In accordance with the requirements of the City Charter, a public hearing regarding the 2006-2011 Capital Improvements Program was held on Tuesday, February 21, 2006, at 7:00 P.M, in the Council Chambers. The addition of the North Park Trail was recommended to the Council during a special study session on January 30, 2006, and submitted in the letter to the Council for the public hearing on the Capital Improvements Program. This amendment will be included in the adopted program report. The City Charter requires that the Capital Improvements Program be adopted on or before April 1, 2001. Attached for the Council's consideration is a resolution adopting the Capital Improvements Program. It is recommended that the City Council proceed with this action. Respectfully submitted, Douglas K. Leslie City Manager C V Q. Qx�t" John R. Richbourg Finance Director ent M. Bratton Director of Planning Services DKL/JRR/KMB/rlf TABLE OF CONTENTS ITEM Introduction: PAGE CityManager's Letter................................................................................. i Summaries: Revenue Funding Sources by Fiscal Year Graph ................................................ vii Summary of Funding Sources by Fiscal Year 2006-2011 .............. "' Summary of Funding Sources Graph............................................................... ix Summary of Recommended Program Expenditures 2006-2011 by Program Description and Source of Funds ..................................................... x Capital Improvements Budget by Program Area Graph ......................................... xi RevenueSources....................................................................................... xii Capital Improvements Program: Transportation and Public Works.................................................................. 1 Environment........................................................................................... 51 Parksand Recreation................................................................................109 Community Development.........................................................................131 Unfunded Needs List.................................................................................139 The Honorable Mayor and Members of the City Council City of Cape Girardeau Dear Mayor and Council Members: April 24, 2006 INTRODUCTION The City staff herewith presents the adopted Five -Year Capital Improvements Program. This program, for the period July 1, 2006, through June 30, 2011, is submitted in accordance with Article VI, Section 6.04 of the City Charter. On February 21, 2006, in accordance with the City Charter, the City Council held a public hearing for the Capital Improvements Program. Following public input, the City Council adopted the Capital Improvements Program by resolution at its March 6, 2006, meeting. While the projects included herein are attainable through available revenue sources, a number of these depend on the cooperation of property owners and other agencies, and further action by the City Council. Projects for which a funding source is not currently proposed are included under the Unfunded Needs Section. Each of the City's advisory boards involved in planning for capital improvements were given the opportunity to provide input, as well as those City departments involved in planning and implementation of such improvements. BACKGROUND The Capital Improvements Program should be considered as an investment in the future of the community. The selection and evaluation of capital projects is a difficult task that involves some speculation and the ability to make estimations which, to some extent, are based on historical perspectives. The City Council, in 1983, formally considered and adopted a long-range Capital Improvements Program for the first time under the current Charter requirement. This budget process should provide a relevant approach to identifying and implementing important community -wide and neighborhood projects. PROGRAM AND FINANCING DESCRIPTIONS The major program areas within which the various projects have been described include Transportation, Environment, Parks and Recreation, and Community Development. These major categories contain the following types of projects: i 1. Transportation. The projects in this category provide for the construction of the public streets within the City, and improvements at the Regional Airport. 2. Environment. These projects provide for the preservation, restoration, and care of the environmental resources of the City, including solid waste, water, wastewater, and stormwater services. 3. Parks and Recreation. The programs under this area provide the facilities for citizens to engage in organized and unorganized recreation and leisure time activities. 4. Community Development. Projects under this category include construction of general public facilities and community projects which have city-wide effects, and improvements to Public Works facilities other than utilities. The Capital Improvements Program includes several revenue sources recommended to finance the capital improvements proposed. The following is a brief description of the various revenue sources: A. General Fund Revenues. These revenues are available on an annual appropriation basis from the City's general fund, which includes the receipt of revenues from a number of sources. These funds are subject to the annual operating budgeting process. B. and C. Revenue/PFA Bonds. These bonds are issued for the financing of self-supporting and general public improvements. Revenue bonds are not included within the limitations of indebtedness of the City and are issued upon the authorization of a majority voter approval. These bonds are normally used for enterprise funds such as water, sewer, and solid waste utilities. PFA (Public Facility Authority) bonds are used upon City Council approval based on collateralized assets and annual lease/purchase appropriations. Cash flows for debt retirement come from existing revenue and from new receipts to be generated by the facilities' operations. Within the Capital Improvements Program, revenue/PFA bonds already issued or authorized by the electorate or City Council are denoted as "B". Those that are pending, i.e. will require subsequent approval of the electorate or Council, are denoted as "C". D. State Grants. The City is eligible to submit grant applications to the State of Missouri for funds that they may have available either from their own revenue sources or, in some cases, from revenue sources that they administer for various federal agencies. ii E. Motor Fuel Tax Receipts. This fund provides for the receipt and disbursement of revenues the City receives as its portion of the State Gasoline Tax, State Motor Vehicle Licensing Fees, and State Motor Vehicle Sales Tax. The revenues from this source can be used for capital improvements, as well as annual operating and maintenance expenses as they relate to improvements on the City's streets. F. Federal Grants. The City is eligible to receive various federal grants on a competitive basis from appropriate federal agencies. This could include the Environmental Protection Agency as it relates to wastewater improvements, the Federal Highway Administration which administers and distributes funds from the Federal Gasoline Tax through the Surface Transportation Program - Urban, or the Federal Aviation Administration for airport improvements. Most of these funds, however, are now administered by the State through related State agencies. G. Special Assessments. This category provides for the consideration of special assessments which are used for public improvements affecting specific areas. The total, or a portion of, the cost of an improvement is divided among property owners who benefit from the project. This type of funding can be used for diverse improvements including streets, water, stormwater, sanitary sewer or sidewalk improvements. It should be noted, however, that the "up front" cost of special assessment projects (i.e., the initial funding) must be borne by the City from available revenue sources, with the special assessment "costs" recovered afterwards, typically over a period of ten years through special tax bills paid by the benefiting property owners. H. Capital Improvements Sales Tax. A 1/a%, 3/8 %, or lh% Sales Tax can be issued by the City for various types of public improvements. Such a tax requires approval by the electorate with a simple majority. For example, in November, 1988, the voters of Cape Girardeau adopted a 1/4% sales tax effective January 1, 1990, restricted to flood control projects. On April 5, 1994, the voters of Cape Girardeau approved the extension of this tax for an additional twenty years to pay for improvements to the City's sewer system. In November of 1996, the voters adopted an additional 1/4% sales tax effective January 1, 1997, for expansion of the water treatment plant and various other water improvements. I. Other. This category denotes funds from donations, operating revenues from funds other than the General Fund, reserves, proceeds from the sale of fixed assets and other sources. J. General Obligation Bonds. These bonds are normally issued for the financing of general public improvements. General obligation bonds must be authorized by a 4/7th vote of the voters which also authorizes a tax levy to be used for debt retirement. Total outstanding general obligation bonds are limited by State statute to 20% of the City's total assessed valuation. iii K. Transportation Sales Tax. Pursuant to Sections 94.700 - 94.755 of the State statutes, the voters of the City of Cape Girardeau have approved a 1/z % sales tax for transportation purposes for a period of five (5) years three times. The current program was approved in August, 2005, and the tax went into effect on January 1, 2006. The tax will expire December 31, 2010. The revenues from this source will be placed into a separate Transportation Trust Fund and will be used for the specific projects approved. L. Fire Sales Tax. Pursuant to Section 321.242 of the State Statutes, the voters of the City of Cape Girardeau approved a 1/a % sales tax for operation of the Municipal Fire Department and for capital improvements related thereto on June 8, 2004. The tax went into effect on October 1, 2005. Half of the tax ('/s %) will expire on December 31, 2014. The other '/s % does not have an automatic expiration date and will continue on. PROPOSED IMPROVEMENTS The total Capital Improvements Program included herein includes a total of $92,294,050 in improvements for the five-year period 2006-2011 by fiscal year. Other Funding will provide the largest source of funds, with $52,469.950 projected for the program period. These funds, if available, will be used for improvements such as an addition to police headquarters and a new clubhouse at the golf course. The second largest category for funding proposed improvements is the Transportation Sales Tax. This includes $17,546,000 in funds for the program period. The third largest funding source is the Federal Grants and Loans. This includes $6,811,630 in funds for the program period. The fourth largest category for funding proposed improvements is Revenue/PFA Bonds: Issued. This provides for $5,462,800 in funding over this period. The largest program area is Environment ($38,457,500). Projects in this area include some of the sewer improvements funded by the April, 1994, bond election, and expansion of the water system's production/treatment/ distribution capacity, part of which will be funded by revenue bonds authorized November 5, 1996. The second largest program area is Transportation ($33,362,800). This amount is comprised of $27,114,000 for street and bridge projects ($17,546,000 of the projects are Transportation Trust Fund projects), and $6,248,800 for airport projects. The Parks and Recreation program area ($14,457,550) includes several park improvement projects and general park development. Also included is the expansion of the Riverfront Park and Riverfront Trail, the Perryville Road sidewalk system, and the North Park Trail. iv The CqMMuni ity Development program area ($6,016,200) includes improvements such as a regional fire training center, an addition to police headquarters, and installation of a City Hall elevator. CONCLUSION The capital improvements program proposed herein is a progressive program. The implementation of this program will allow for the creation of new job opportunities, an increase in revenue to private businesses, opportunities for new businesses, existing business expansions, increased tax revenues to all taxing jurisdictions, and the strengthening of the quality of life in Cape Girardeau and the surrounding area. It is hoped that this plan will focus attention on community goals, needs and capabilities; reduce scheduling problems and conflicting or overlapping projects; maintain a sound and stable financial program; enhance opportunities for participation in federal or state funded programs; and achieve the highest public benefit from the expenditure of City revenue. The projects proposed in this document are the product of many hours of deliberative thought by a number of people within the community. The Charter requires an annual review and revision of the Capital Improvements Program which assures that the Program remains responsive to changing demands, priorities, and available revenues. The final plan should be regarded as a sound, fiscally responsible working document that can and will be implemented through the annual budget appropriation process of the City Council, support from the citizens of Cape Girardeau for appropriate revenue sources, and diligent action by the City staff. Respectfully submitted, Doug as K. Leslie City Manager DKL/KMB/JRR/rlf *Kent. Bratton Director of Planning Services c; (� kjj""� -.11; John R. Richbourg Finance Director 35,000,000 30,000,000 25,000,000 20,000,000 15,000,000 10,000;000 5,000,000 REVENUE FUNDING SOURCES BY FISCAL YEAR CAPITAL IMPROVEMENTS PROGRAM 2006-07 2007-08 2008-09 2009-10 2010-11 V11 Summary of Funding Sources by Fiscal Year Source of Funds 2006-07 2007-08 2008-09 2009-10 2010-11 Total General Fund Revenues (A) 173,380 294,180 317,190 97,550 50,870 933,17 Revenue/PFA Bonds: Issued (B) 4,446,600 491,200 325,000 100,000 100,000 5,462,80 Revenue/PFA Bonds: Pending (C) 200,000 200,00 State Grants/Loans (D) 317,600 1,079,500 318,200 170,560 624,000 2,509,86 Motor Fuel Tax (E) 537,000 418,400 404,600 1,965,240 1,727,200 5,052,44 Federal Grants/Loans (F) 1,193,720 1,514,720 1,198,710 938,250 1,966,230 6,811,63 Special Assessments (G) 247,600 263,500 197,900 709,00 Capital Improvement Sales Tax (H) 149,200 149,20 Other (1) 7,432,100 8,804,725 7,113,725 1,884,975 27,234,425 52,469,95 Gen. Obligation Bonds: Pending (J) Transportation Sales Tax (K) 2,824,000 4,567,000 4,114,000 3,923,000 2,118,000 17,546,00 Fire Sales Tax (L) 450,000 450,00 TOTALS 17,822,000 17,433,225 13,791,425 9,426,675 33,820,725 92,294,05 viii CAPITAL IMPROVEMENT BUDGET SUMMARY OF FUNDING SOURCES General Fund Revenues (A) 1% Fire Sales Tax (L) 0% Transportation Sales Tax (K) 19% Gen. Obligation Bonds: Pending (J) 0% Other (1) 58% 1X Revenue/PFA Bonds: Issued (B) 6% Revenue/PFA Bonds: Pending (C) 0% State Grants/Loans (D) 3% Motor Fuel Tax (E) 5% Federal Grants/Loans (F) 7% —Special Assessments (G) 1% Capital Improvement — Sales Tax (H) 0% Summary of Recommended Capital Improvement Program Expenditures 2006-2011 by Program Description and Source of Funds Source of Funds Program Descriptions Transportation Environment Parks & Recreation Community Development TOTAL General Funds Revenues (A) 658,370 100,000 174,800 933,17 Revenue/PFA Bonds: Issued (B) 5,462,800 5,462,80 Revenue/PFA Bonds: Pending (C) 200,000 200,00 State Grants/Loans (D) 1,397,700 1,112,160 2,509,86 Motor Fuel Tax (E) 4,686,300 366,140 5,052,44 Federal Grants/Loans (F) 5,854,430 957,200 6,811,63 Special Assessments (G) 709,000 709,00 Capital Improvement Sales Tax (H) 149,200 149,20 Other (I) 3,020,000 31,179,300 12;879,250 5,391,400 52,469,95 Gen. Obligation Bonds: Pending (J) Transportation Sales Tax (K) 17,546,000 17,546,00 Fire Sales Tax (L) 450,000 450,00 TOTALS 33,362,800 38,457,500 14,457,550 6,016,200 92,294,05 CAPITAL IMPROVEMENT BUDGET BY PROGRAM AREA Parks & Recreatio 16% Community Development 7% T----- -)rtation Environment 41% X1 A. B. C. D. E. F. REVENUE SOURCES General Revenue Fund G. Special Assessments Revenue/PFA Bonds: Issued H. Capital Improvement Sales Tax Revenue/PFA Bonds: Pending I. Other State Grants and Loans J. General Obligation Bonds Motor Fuel Tax K. Transportation Sales Tax Federal Grants and Loans L. Fire Sales Tax xii TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM 2006-2007 Fiscal 2007-2008 Fiscal 2008-2009 Fiscal 2009-2010 Fiscal 2010-2011 Fiscal Year Year Year Year Year TRANSPORTATION PROPOSED PROJECTS Project Improvement Item Total Cost 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Numbe Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 1 1 Existing Street Paving Program 4,015,000 E 215,000 E 200,000 E 200,000 E 200,000 E 200,000 E 1993 K 600,000 K 600,000 K 600,000 K 600.000 K 600.000 Street, Curb & Gutter Repair 1,875,000 K 375,000 K 375,000 K 375,000 K 375,000 K 375,000 1996 I3 Sidewalk Repair and Construction 750,000 K 150,000 K 150,000 K 150,000 K 150,000 K 150,000 1996 Mt. Auburn Road: Sections Between Independence and Kingshighway 1,699,000 K 1,699,000 K .. 2006 Sprigg St.: Shawnee Parkway to William St. 315,000 K 315,000 K 2006 LaSalle Ave.: I-55 at New Cape- 3,127,000 K 3,127,000 K ," Jackson Interchange to Route W 2006 Bloomfield Rd.: Stonebridge Dr. To and Including Benton Hill Rd. 1,089,000 K 1,089,000 K Intersection 2006 u Armstrong Dr.: Siemers Dr. at Armstrong Dr. to William St. (Route 1,900,000 K 1,900,000 K K) 2006 ~_ Big Bend Rd. - Mason St. - Main St.: -= Mill St. to Cape Rock Dr. 1,906,000 K 1,906,000 K 2006 Vantage Dr.: Kingshighway to 892,000 K 892,000 K Scenic Dr. (Ashland Court Sub.) 2006 „fir Kingshighway - Cape Rock Dr. - Broadview St. - Maria Louise Ln. 693,000 K 693,000 < :.Intersection a 2006 ter. Fountain St. Phase Il: Morgan Oak St. to William St. 300,000 K 300,000 f.: 2006 A General Revenue Fund B REV/PFA Bonds: Issued C REV/PFA Bonds: Pending D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans G Special Assessments H Capital Improvement Sales Tax I Other 1 Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax Projects included in Transportation Trust Fund Program, TTF-3, supported by a 1/2 % transportation sales tax for five years approved by vote on August 2, 2005. K TRANSPORTATION PROPOSED PROJECTS Project 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Improvement Item Total Cost Number Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Old Sprigg St. Road and Lexington 1-13 Ave: Extend Box Culvert 41,800E 41,800 E 1998 1-14 Lombardo Dr. Street Realignment 88,400 E 88,400 E 2001 1-15 West End Blvd: Bloomfield South to 663,500 D 663,500 D Shawnee Parkway (Route 74) 1998 West End Blvd: Repair and 1-16 Reconstruction: Rose St. to New 318,200 D 318,200 D Madrid St. 2002 1-17 Perryville Rd. Retaining Wall 180,100 E 180,100 E Replacement 2002 College St: Louis to West End Blvd. 1-18 with Sidewalk and Missouri Ave: 548,400 E 548,400 E College St. to Jefferson Ave. 1998 Walnut St: Sprigg St. to West End 1-19 Blvd: Reconstruction and Extension 729,000 E 729,000 E 2004 1-20 North Kingsway Dr. Curve 352,000 E 352,000 E Reconstruction 2005 1-21 North Main St. Reconstruction 759,200 E 759,200 E 2005 1-22 Technology Park Drive 3,900,000 F 1,000,000 F 2006 1 2,900,0001 Traffic Signal Power Backup: 1-23 Various Locations 62,400E 62,400 E 2003 Traffic Signal Projects Various 1-24 Locations 910,000 E 130,000 E 130,000 E 130,000 E 260,000 E 260,000 E 2003 -T SUBTOTAL - 27,114,000 3,273,200 5,648,900 4,762,200 5,840,500 7,589,200 STREET PROJECTS A General Revenue Fund B REV/PFA Bonds: Issued C REV/PFA Bonds: Pending D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans G Special Assessments H Capital Improvement Sales Tax I Other J Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax TRANSPORTATION PROPOSED PROJECTS Project Improvement Item Total Cost 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Number Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 1-25 FBO/GA Terminal Expansion & 530,000 A 33,000 A Renovation C 200,000 C 2004 F 297 OO F 1-26 Rehabilitate FBO Fuel Farm Ramp 70,000 A 7,000 A Pavement 2006 F 63,000 F 1-27 Improve Access Roadway to East 150,000 A 30,000 A Ramp Corporate Hangars 2006 1 120,000, Environmental Assessment for 1-28 Airport Layout Plan Update 67,600 A 3,380 A Development Items 2004 F 64.220 F 1-29 Land Acquisition (Northwest 250,000 A 25,000 A Quadrant - 126 Acres) 1999 225,000 F 1-30 Improve Terminal Security and 171,600 A 8,580 A Computerized Access Control 1999 F 163,020 F 1-31 Construct Airport T -Hangar 416,000 D 416,000 D 2003 1-32 Airport ARFF/Snow Removal 998,400 A 49,920 A Equipment Building 1994 F 948,480 F 1-33 T -Hanger Access Taxi Lane 20,800 A 1,040 A 2004 F 19,760 F 1-34 Terminal Rehabilitation Projects 26,000 A 26,000 A 2004 1-35 Airfield Pavement Rehabilitation 88,400 A 8,840 A 2004 F 79,560 F Construct Utilities and Entrance 1-36 Road to New Fire (ARFF) and Snow 356,700 A 17,670 A Removal Equipment Location 2000 F A General Revenue Fund B REV/PFA Bonds: Issued C REV/PFA Bonds: Pending D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans G Special Assessments H Capital Improvement Sales Tax I Other J Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax TRANSPORTATION PROPOSED PROJECTS Project 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Number Improvement Item Total Cost Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 1-37 Airport Sewage Package Treatment 260,000 A 260,000 A Plant 2003 1-38 Airfield Pavement Rehabilitation on 514,800 A 25,740 A South Ramp 2004 F 489,060 F 1-39 Taxiway Delta Rehabilitation 275,600 A 13,780 A 2004 F 261,820 F 1-40 Relocate Fuel Farm 270,400 F 270,400 F 2004 1-41 Self -Service Fueling Station 62,400 A 62,400 A 2003 1-42 Taxiway Alpha East Rehabilitation 703,000 A 35,150 A 2004 F 667,850 F 1-43 Land Acquisition for Runway 10 377,500 A 18,860 Extention 2004 D 358 640 F 1-44 Taxiway Echo Rehabilitation 134,200 A 6,750 2004 F 127,450 F 1-45 Taxiway Alpha West Rehabilitation 505,400 A 25,260 2004 F 4 14 F SUBTOTAL- 6,248,800 817,600 1,971,200 1,407,100 1,035,8001,017,100 AIRPORT PROJECTS TOTALS 33,362,800 4,090,800 7,620,100 6,169,300 6,876,300 8,606,300 A General Revenue Fund 658,370 73,380 119,380 317_,190 97,550 50,870 B REV/PFA Bonds: Issued C REV/PFA Bonds: Pending 200,000 200,000 D StateGrants/Loans 1,397,700 1,079,500 318,200 E Fuel Tax 4,686,30_0 449,200 418,400 w 330,000 1,917,500 1,571,200 _Motor F Federal Grants/Loans 5,854,430 424,220 1,435,820 1,089,910 938,250 1,966,230 G Special Assessments H Capital Improvement Sales Tax I Other3,020,000 _I_ . _Gen. 120,000 2,900,000 Obligation Bonds: Pending, KTransportation Sales Tax 17,546,000 2,824,000 - ._ 4 567 000 . ....._.. 4,114,000 _..,. 3,923,000 2,118,000 L Fire Sales Tax_.._ 5 TRANSPORTATION Project Number: 1-1 Project Title: Existing Street Paving Program Location: City -Wide Purpose: Provides for continuing primary street maintenance program, asphalt overlay of local and major streets, and surface existing residential gravel streets where necessary. Physical Description: Milling or using other surface profiling method and asphalt overlay, or minimum 20 -foot -wide, hot mix asphalt concrete source or up to 30 -foot concrete surface on existing gravel street base and drainage improvements as needed. Unit of Work: Design and construct. Justification: Cost effective maintenance to prevent need for future reconstruction of entire pavement, reduce gravel street maintenance costs and enhance neighborhood quality. Impact on Operating Timely paving will reduce maintenance costs and extend pavement life. Budget: Financing: $ 1,015,000 Motor Fuel Tax (E) $ 3,000,000 Transportation Sales Tax (K) Total: $ 4,015,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction, costs, and special assessment revenues returned will be credited to the Transportation Trust Fund. 187-7025-7311-1060101 M TRANSPORTATION Project Number: 1-2 Project Title: Street, Curb and Gutter Repair Location: Locations as needed. Purpose: Specific program to provide for reconstruction of curbs and gutters in I conjunction with expanded street repair or overlay projects. Physical Description: In general, complete removal and replacement of deteriorated sections of I existing curb and gutter. Unit of Work: Remove and construct. Justification: Improve life of existing streets and enhance neighborhood quality. Impact on Operating Cost effective maintenance to extend life of existing streets and reduce I Budget: maintenance costs. Financing: $ 1,875,000 Transportation Sales Tax (K) Total: $1,875,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund. 1187-7025-7311-1060102 7 TRANSPORTATION Project Number: 1-3 Project Title: Sidewalk Repair and Construction Location: Locations as needed. Purpose: Specific program to repair and reconstruct deteriorated sidewalks. Physical Description: Replace deteriorated sidewalks sections with new concrete sections. Unit of Work: Remove and construct. Justification: Repair deteriorated facilities and enhance neighborhood quality. Impact on Operating Will reduce maintenance costs for abutting property owners. Budget: Financing: $ 750,000 Transportation Sales Tax (K) Total: $ 750,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund. 187-7025-7311-1060103 TRANSPORTATION Project Number: 1-4 Project Title: Mount Auburn Road Location: Three sections between Independence Street and Kingshighway. Purpose: Widen streets at designated intersections to add left -turn lanes. Physical Description: Widen four -lane with center turn lane from Independence north to Themis area, from just south of Old Hopper Road to Chamber of Commerce area, from Kingshighway south to Kage Road. Install traffic signals at Hopper Road. Sidewalks where feasible. Unit of Work: Design, acquire right-of-way, and construct. Justification: Increasing traffic counts on Mount Auburn Road and intersecting streets warrant these improvements. Impact on Operating Additional street widths and traffic signals will add maintenance costs, Budget: unquantifiable at this time. Financing: $ 1,699,000 Transportation Sales Tax (K) Total: $ 1,699,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund: 187-7025-7311-1060104 6 TRANSPORTATION Project Number: 1-5 Project Title: Sprigg Street Location: Shawnee Parkway to William Street. Purpose: General improvements of existing major street to improve travel and traffic I conditions. Physical Description: Sectional widening, Jefferson Avenue to Morgan Oak, intersection improvements at Morgan Oak and William Street (turn lanes), with sidewalk repairs. Unit of Work: Design and construct. Justification: Existing street is functionally inadequate. Impact on Operating No significant impact. Budget: Financing: $ 315,000 Transportation Sales Tax (K) Total: $ 315,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund 187-7025-7311-1060105 10 TRANSPORTATION Project Number: 1-6 Project Title: LaSalle Avenue Location: Interstate 55 and New Cape Girardeau/Jackson Interchange to Route W. Purpose: To develop a new arterial access to the new interchange for Cape I Girardeau and Jackson along Interstate 55. Physical Description: Super two-lane arterial design, 12 -foot travel lanes with 10 -foot shoulders, I nominal 100 -foot right-of-way. Unit of Work: Design, acquire right-of-way, and construct. Justification: To provide access to the new 1-55 interchange for Cape Girardeau and I Jackson. Impact on Operating New street will add maintenance costs, not quantifiable at this time. Budget: Financing: $ 3,127,000 Transportation Sales Tax (K) Total: $ 3,127,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund 187-7025-7311-1060106 11 TRANSPORTATION Project Number: 1-7 Project Title: Bloomfield Road Location: Stonebridge Drive to and including Benton Hill Road intersection. Purpose: Widen existing street to current major street standards. Physical Description: Widen to collector design, 36 -foot curb and gutter, nominal 60 -foot right -of- I way, with sidewalk/trail. Unit of Work: Design, acquire right-of-way, and construct. Justification: Existing street is functionally inadequate. Impact on Operating New street will add maintenance costs, unquantifiable at this time. Budget: Financing: $ 1,089,000 Transportation Sales Tax (K) Total: $ 1,089,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund 187-7025-7311-1060107 12 TRANSPORTATION Project Number: 1-8 Project Title: Armstrong Drive Location: Siemers Drive at Armstrong Drive to William Street (Route K) Purpose: To develop a through street and provide additional access between William Street (Route K) and Bloomfield Road. Physical Description: Arterial street up Ramsey Branch watershed. Standard 48 -foot wide, four - lane design, with 12 -foot travel lanes. Unit of Work: Design, acquire right-of-way, and construct. Justification: To provide additional access between William Street (Route K) and Bloomfield Road, and alleviate traffic congestion along Siemers Drive. Impact on Operating New street will add maintenance costs, unquantifiable at this time. Budget: Financing: $ 1,900,000 Transportation Sales Tax (K) Total: $ 1,900,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund 187-7025-7311-1060108 13 TRANSPORTATION Project Number: 1-9 Project Title: Big Bend Road — Mason Street — Main Street Mill Street to Cape Rock Drive Location: Various locations along Big Bend Road, Mason Street, and Main Street, between Mill Street and Cape Rock Drive. Purpose: General improvements of existing major street to improve travel and traffic conditions. Physical Description: Widen Main Street from Mill to Mason, intersection improvements at Main/Mason and Mason/Big Bend Road, improvements to Mason Street, improvements to Sloan Creek Bridge, curb and sidewalks sections on east side of Big Bend Road, north side of Mason Street, and on Main Street from Mason Street to bridge, improve Bertling hill with right turn lane on Bertling Street, realignment of Cape Rock Drive intersection, drainage improvements. Unit of Work: Design, acquire right-of-way, and construct. Justification: Existing street is functionally inadequate. Impact on Operating No significant impact. Budget: Financing: $ 1,906,000 Transportation Sales Tax (K) Total: $ 1,906,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund: 187-7025-7311-1060109 14 TRANSPORTATION Project Number: 1-10 Project Title: Vantage Drive Location: Kingshighway to Scenic Drive (Ashland Court Subdivision) Purpose: Provide the initial phase of a new "outer road" collector street on the east side of 1-55 from Kingshighway south to Farrar Drive. Physical Description: Collector street, 36 -feet wide with curb and gutter, nominal 60 -foot right-of- way, with sidewalks. Unit of Work: Design, acquire right-of-way, and construct. Justification: Increasing development in the northwest quadrant of the City and subdivisions with limited access warrant a new collector street to improve access and traffic flow. Impact on Operating New street will add maintenance costs, unquantifiable at this time. Budget: Financing: $ 892,000 Transportation Sales Tax (K) Total: $ 892,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund 187-7025-7311-1060110 15 TRANSPORTATION Project Number: 1-11 Project Title: Kingshighway — Cape Rock — Broadview — Maria Louise Intersections Location: Intersections of Kingshighway — Cape Rock — Broadview — Maria Louise Purpose: General improvements of existing intersection to improve travel and traffic conditions. Physical Description: Northbound right turn lane on Kingshighway, southbound left turn lane on Cape Rock, relocate Broadview and Maria Louise to the west. Unit of Work: Design, acquire right-of-way, and construct. Justification: Existing intersection is functionally inadequate. Impact on Operating No significant impact. Budget: Financing: $ 693,000 Transportation Sales Tax (K) Total: $ 693,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund 187-7025-7311-1060111 16 TRANSPORTATION Project Number: 1-12 Project Title: Fountain Street — Phase II Location: Morgan Oak Street to William Street. Purpose: Provide a connection between Shawnee Parkway and the downtown I business district and the River Campus. Physical Description: Design not determined. Allocation of matching funds for potential grant- I funded project. Unit of Work: Design, acquire right-of-way, and construct. Justification: To continue to connection of Fountain Street to the downtown area. Impact on Operating New street will add maintenance costs, unquantifiable at this time. Budget: Financing: $ 300,000 Transportation Sales Tax (K) Total: $ 300,000 Note: If any special assessments are levied for this project, sales tax funds will be used to pay for the engineering, right-of-way and construction costs, and special assessment revenues returned will be credited to the Transportation Trust Fund 1 187-7025-7311-1060112 17 TRANSPORTATION Project Number: 1-13 Project Title: Old Sprigg Street Road and Lexington Avenue, Extend Box Culvert Location: On Old Sprigg Street Road, just south of Lexington Avenue. Purpose: Extend box culvert to widen approach to Lexington Avenue intersection. Physical Description: Wide 10 -foot by 8 -foot culvert to 30 lineal feet. Unit of Work: Design and construct. Justification: Current box culvert is many years old and not constructed to current standards, resulting in a narrow approach to the intersection with no shoulders and insufficient left -turn lane stacking. Impact on Operating Budget: Financing: Total: 302-7010-7315-1980131 No significant impact. $ 41,800 Motor Fuel Tax (E) $ 41,800 IV TRANSPORTATION Project Number: 1-14 Project Title: Lombardo Drive Street Realignment Location: From Clark Avenue to Walker Branch. Purpose: To ensure improved traffic safety by elimination of the center line offset in Lombardo between the box culvert and Clark Avenue. Physical Description: Add a double reinforced concrete box culvert. Realign the Walker channel and configure the Clark Avenue -Lombardo intersection if feasible. Unit of Work: Design, acquire right-of-way if necessary, and construct. Justification: The center line offset in Lombardo has historically contributed to traffic accidents, many of which have involved a single vehicle. Impact on Operating No significant impact. Budget: Financing: $ 88,400 Motor Fuel Tax (E) Total: $ 88,400 302-7010-7315-1030120 19 TRANSPORTATION Project Number: 1-15 Project Title: West End Boulevard, Bloomfield Street South to Shawnee Parkway Location: West End Boulevard, Bloomfield Street south to Shawnee Parkway. Purpose: Widen and reconstruct narrow section of West End Boulevard to improve access from Shawnee Parkway to William Street. Physical Description: Widen approximately 1,400 lineal feet of street from 36 -feet to 44-feetin width, construct 6 -foot to 10 -foot parkway where feasible. Unit of Work: Design and construct. Justification: West End Boulevard is the only access point from new Highway 74 into the east -central part of the city, a principal access route to the University, and needs to be improved to handle increased traffic load. Impact on Operating Budget: Financing: Total: 302-7010-7315-1060115 No significant impact. $ 663,500 State Grants/Loans (D) $ 663,500 20 TRANSPORTATION Project Number: 1-16 Project Title: West End Boulevard — Repair and Reconstruction Location: West End Boulevard, from existing PCC Pavement near Rose Street to New Madrid Street. Purpose: Widen and upgrade this section of street to the current major street I standards. Physical Description: Improvements and widening from 24 -feet wide to 36 -feet wide of approximately 1,100 lineal feet of roadway, including the overlay of existing pavement with a new asphalt surface and the placement of full depth asphalt widening strips, curbs, gutters, and all necessary appurtenances. Unit of Work: Design and construct. Justification: Existing street is functionally inadequate. Impact on Operating The improved street may reduce storm water maintenance costs. Budget: Unquantifiable at this time. Financing: Total: 302-7010-7315-1060116 $ 318,200. State Grants/Loans (D) $ 318,200 21 TRANSPORTATION Project Number: 1-17 Project Title: Perryville Road Retaining Wall Replacement Location: 1800 Block of Perryville Road, on West Side, across from Kiwanis Park. Purpose: Replace existing retaining wall with new modular retaining wall. Physical Description: Existing wooden tie retaining wall is 500 feet long and 10 feet high (on average), located 7 feet from the west edge of Perryville Road. Replace with new modular block wall with same dimensions, including necessary drainage and fencing. Unit of Work: Design and construct. Justification: Existing wall is 28 years old and showing significant deterioration, making this a safety concern. A new modular block wall with geogrid ties would not only provide the necessary support for the embankment, it would also be more aesthetic to the surrounding neighborhood. Impact on Operating Budget: Financing: Total: 302-7010-7315-1060117 No significant impact. $ 180,100 Motor Fuel Tax (E) $ 180,100 22 TRANSPORTATION Project Number: 1-18 Project Title: College Street, Louis Street to West End Boulevard with Sidewalks. Missouri Avenue, College Street to Jefferson Avenue with Sidewalk. Location: College Street — from Louis Street east to West End Boulevard, and Missouri Avenue — from College Street to Jefferson Avenue. Purpose: To develop a through street to provide access from the neighborhood to the west and Jefferson School to West End Boulevard near the Highway 74 intersection. Physical Description: Construct approximately 1,700 lineal feet of new street to standard 30400t width with curbs, gutters, ancillary storm water facilities and sidewalk. Unit of Work: Design and construct (right-of-way exists). Justification: Completion of Highway 74 and the signalized intersection at West End Boulevard provides an opportunity to improve access for the area west of West End Boulevard, and north of Highway 74 and for Jefferson School. The street will also provide access to the part of Shawnee Park north of Highway 74 allowing its development in the near future. Impact on Operating New street will add maintenance costs, unquantifiable at this time. Budget: Financing: $ 548,400 Motor Fuel Tax (E) Total: $ 548,400 302-7010-7315-1990122 23 TRANSPORTATION Project Number: 1-19 Project Title: Walnut Street — Reconstruction and Extension Location: Reconstruct from Sprigg Street to Benton Street, and extend from I Beaudean Lane to West End Boulevard. Purpose: Provide an additional east -west link in the South Cape Neighborhood. Physical Description: Reconstruction of approximately 1,100 lineal feet of 30 -foot wide pavement, and construct approximately 1,320 lineal feet of new 30 -foot wide pavement. Unit of Work: Design, acquire right-of-way, and construct. Justification: Additional east -west access will allow the South Cape Neighborhood to I utilize West End Boulevard for north -south access. Impact on Operating New street will add maintenance costs, unquantifiable at this time. Budget: Financing: $ 729,000 Motor Fuel Tax (E) Total: $ 729,000 302-7010-7315-1050119 24 TRANSPORTATION Project Number: 1-20 Project Title: North Kingsway Drive Curve Reconstruction Location: Kingsway Drive, west of Jessica Drive and south of Paul Revere Drive. Purpose: Correct reverse curve to improve site distance and traffic safety. Physical Description: Correct reverse curve at the old Route W-Kingshighway intersection and expand trail parking lot to 27 spaces with pull-through access lanes and a footpath to the trail head. Unit of Work: Design and construct. Justification: When Lexington Avenue was constructed, the Kingsway connection to Kingshighway (formerly Route W) was removed, which resulted in a reverse banked curve at this location and reduced sight distance. Impact on Operating Budget: Financing: Total: 302-7010-7315-1060120 No significant impact. $ 352,000 Motor Fuel Tax (E) $ 352,000 25 TRANSPORTATION Project Number: 1-21 Project Title: North Main Street Reconstruction Location: North Main Street, from Roberts Street to Cape Rock. Drive. Purpose: Widen asphalt section of North Main to improve traffic flow and drainage. Physical Description: Widen approximately 2,100 lineal feet of street to 36 -foot wide collector I standard, with storm water piping, curb and gutter sections and sidewalks. Unit of Work: Design and construct. Justification: This section of North Main serves as a collector street but was not constructed to collector standards, and the street needs storm water control facilities. Impact on Operating No significant impact. Budget: Financing: $ 759,200 Motor Fuel Tax (E) Total: $ 759,200 302-7010-7315-1060121 26 TRANSPORTATION Project Number: 1-22 Project Title: Technology Park Drive Location: New 1-55 Interchange (102) to Center Junction Purpose: To develop an additional arterial access to the new interchange for Cape Girardeau and Jackson along Interstate 55.. Physical Description: Construct approximately 2.71 miles of arterial street, 40 -feet wide on a 60 - foot right-of-way with stormwater piping, curb and gutter sections, and all necessary appurtenances. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 1330-7070-7315-1060122 Design (being done by MoDOT), acquire right-of-way, and construct. To provide additional access to the new 1-55 interchange for Cape Girardeau and Jackson. New street will add maintenance costs, unquantifiable at this time. $ 1,000,000 Federal Grants/Loans (F) $ 2,900,000 Other (1) $ 3,900,000 27 TRANSPORTATION Project Number: 1-23 Project Title: Traffic Signal Power Backup Location: Intersections of Clark and Broadway, Caruthers and Broadway, Perry and Broadway, West End and Broadway, Pacific and Broadway, Sprigg and Broadway, Sprigg and Independence, Pacific and Independence, West End and Independence, Caruthers and Independence, West End and William, Sprigg and William, Sprigg and Morgan Oak, and Sprigg and Normal. Purpose: Provide uninterrupted power for traffic signals. Physical Description: Uninterruptible power supply equipment for each traffic signal. Unit of Work: Design and install. Justification: Provide uninterruptible power backup for the traffic signals to remain fully operational during power outages, eliminating the need for police officers or maintenance personnel response. Impact on Operating Occasional maintenance of power supply equipment and replacement of Budget: batteries. Financing: $ 62,400 Motor Fuel Tax (E) Total: $ 62,400 170-7010-7315-1060123 TRANSPORTATION Project Number: 1-24 Project Title: Traffic Signal Protects Location: Siemers at Lambert, Mount Auburn at Bloomfield, Silver Springs at Bloomfield, Independence at East Rodney/Gordonville, and Cape Rock at Perryville Road. Purpose: Improve traffic management and safety. Physical Description: Traffic signal controllers communication equipment, video detectors, mast arms, signal heads, and all necessary appurtenances. Unit of Work: Design and install. Justification: Install at intersections that meet MUTCD criteria for traffic signals and improve operation of existing signals. Impact on Operating Increased street maintenance and operating costs. Budget: Financing: $ 910,000 Motor Fuel Tax (E) Total: $ 910,000 170-7010-7315-1040125 1 TRANSPORTATION Project Number: 1-25 Project Title: Fixed Base Operations/General Aviation (FBO/GA) Terminal Expansion and Renovation Location: Regional Airport Purpose: To provide new and updated facilities for General Aviation pilots and passengers utilizing the Cape Aviation FBO Services. Physical Description: New approximately 2,500 square foot FBO Terminal Facility providing General Aviation Services. Also, rehabilitating the current FBO hangar area and public access areas. Unit of Work: Design and construct. Justification: The current FBO facility is aging terribly and does not provide the modern amenities necessary to attract corporate aviation. Impact on Operating Additional building maintenance expense expected to be offset by improved Budget: revenue from fuel and pilot supply sales. Financing: $ 33,000 General Revenue Fund (A) $ 200,000 Revenue/PFA Bonds: Pending (C) 297,000 Federal Grants/Loans (F) Total: $ 530,000 102-1042-7120-1060125 30 TRANSPORTATION Project Number: 1-26 Project Title: Rehabilitate Fuel Farm Ramp Pavement Location: Regional Airport Purpose: To repair broken concrete pavement at fuel farm facility and allow better I and safer fuel truck access. Physical Description: Remove and replace concrete pavement. Unit of Work: Design and construct. Justification: To allow better and safer access to the fuel farm facility for on -loading and I off-loading fuel. Impact on Operating Operations budget should improve due to less maintenance cost of fuel I Budget: farm ramp pavement. Financing: Total: 102-1042-7150-1060126 $ 7,000 General Revenue Fund (A) 63,000 Federal Grants/Loans (F) $ 70,000 31 TRANSPORTATION Project Number: 1-27 Project Title: Improve Access Roadway to East Ramp Corporate Hangars Location: Regional Airport Purpose: To provide asphalt surface to access roadway to east ramp corporate I hangars. Physical Description: Apply asphalt pavement surface on top of gravel access road. Unit of Work: Design and construct. Justification: To provide asphalt surface for car and truck traffic requiring access to east I ramp corporate hangars. Impact on Operating Operations budget will need to include additional preventative Budget: maintenance. Financing: $ 30,000 General Revenue Fund (A) 120,000 Other (1) Total: $ 150,000 300-7040-7317-10106127 32 TRANSPORTATION Project Number: 1-28 Project Title: Environmental Assessment for Airport Layout Plan Update Development Items Location: Regional Airport Purpose: To provide environmental review for acquisition of lands to the northwest of the airport property, as well as other projects listed in the airport layout plan, where required by FAA. Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 102-1040-6390 Approximately 126 acres of property contiguous to the airport. Study and provide recommendations for environmental concerns. Necessary to meet federal guidelines to receive funding for purchase of property, or projects affecting areas of environmental concern. No significant impact. $ 3,380 General Revenue Fund (A) 64,220 Federal Grants/Loans (F) $ 67,600 33 TRANSPORTATION Project Number: 1-29 Project Title: Land Acquisition (Northwest Quadrant — 62 Acres) Location: Regional Airport Purpose: To purchase property, in accordance with the airport's marketing plan, necessary to provide airport commercial and industrial parking facilities, including property necessary for ingress and egress from airport road. Physical Description: Approximately 62acres of property contiguous to the airport. Unit of Work: Purchase property. Justification: There is a need for commercial and industrial property with infrastructure and facilities to entice aviation related businesses to locate on airport property. Impact on Operating Budget: Financing: Total: 300-7040-7317-1060129 The additional impact on operational expenses for mowing and upkeep should be well offset in the long term agricultural and industrial leasing revenues. $ 25,000 General Revenue Fund (A) 225,000 Federal Grants/Loans (F) $ 250,000 34 TRANSPORTATION Project Number: 1-30 Project Title: Improve Terminal Security and Computerized Access Control Location: Regional Airport Purpose: Replace current magnetic card system for access control to the aircraft operations area (AOA) with a more advanced computerized system for increased security and tracking purposes. Physical Description: Install computerized access system. Unit of Work: Purchase and install. Justification: Terminal and general aviation areas currently utilize magnetic card system. This system does not allow the airport to remove cards from the inventory once they are issued unless the entire card set is replaced. A computerized access control system would increase security and prevent the system from being compromised by giving the airport flexibility in issuing access control media and would allow the airport to remove lost or stolen media from the system, control access more precisely, and to maintain records of access to the airport. Approximately 10 access gates to the terminal and general aviation areas could be controlled by the system once operational. Impact on Operating Minor increase in operational costs for repair and maintenance. Budget: Financing: $ 8,580 General Revenue Fund (A) 163,020 Federal Grants/Loans (F) Total: $ 171,600 300-7040-7317-1060130 W TRANSPORTATION Project Number: 1-31 Project Title: Construct Airport T -Hangar Location: Regional Airport Purpose: To meet a need for additional hangar space at the airport. Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 300-7000-7317-1060131 All metal, 10 -unit, 48 -foot wide stalls, double nested T -hangar structure, I with overhead bi-fold doors and electrically operated winch openers. Designand construct. All available hangar space is filled, with a waiting list of potential users. Additional hangar space will attract more aircraft to base at the airport. Increased operating and maintenance costs offset by revenue generated by I unit rental. $ 416,000 State Grants/Loans (D) $ 416,000 36 TRANSPORTATION Project Number: 1-32 Project Title: Airport ARFF/Snow Removal Equipment Building Location: Regional Airport Purpose: Provide on-site location for housing of aircraft rescue and fire fighting vehicle and storage of snow removal equipment. Physical Description: Construct facility to house ARFF vehicle and support crews, as well as snow removal equipment. Unit of Work: Design and construct. Justification: Provide adequate fire fighting/emergency response capabilities at the airport. Projected increase in aircraft passenger loads and aircraft type will require upgrading for FAA mandated response times and location of fire fighting equipment. Provide heated storage space for snow removal equipment. Impact on Operating Budget: Financing: Total: 300-7040-7317-1060132 Increased operating and maintenance costs. $ 49,920 General Revenue Fund (A) 948,480 Federal Grants/Loans (F) $ 998,400 37 TRANSPORTATION Project Number: 1-33 Project Title: T -Hangar Access Taxi Lane Location: Regional Airport Purpose: The access lane between the terminal ramp and the general aviation (GA) T -hangar ramp was not included in the GA ramp reconstruction project and needs to be reconstructed. Physical Description: Construct 5 -inch asphalt overlay of the T -hangar access lane. Unit of Work: Design and construct. Justification: This small stretch of taxi lane is deteriorating and was not reconstructed in the most recent ramp project. It provided a rough transition from one surface to the other. Impact on Operating This project should have little if any effect on the budget, however, it should Budget: have a positive effect due to a decrease in preventive maintenance once the rehabilitation is complete. Financing: Total: 300-7040-7317-1060133 $ 1,040 General Revenue Fund (A) 19,760 Federal Grants/Loans (F) $ 20,800 TRANSPORTATION Project Number: 1-34 Project Title: Terminal Rehabilitation Proiects Location: Regional Airport Purpose: To provide enhancements to the passenger terminal, including restroom and flooring updates. Physical Description: Rehabilitate the men's restroom and repair the terminal flooring and exterior siding. Unit of Work: Design and construct. Justification: The men's restroom was never updated when the passenger terminal was remodeled. The tile floor and exterior need to be repaired. Impact on Operating No significant impact. Budget: Financing: $ 26,000 General Revenue Fund (A) Total: $ 26,000 102-1040-6420 39 TRANSPORTATION Project Number: 1-35 ,Project Title: Airfield Pavement Rehabilitation Location: Regional Airport Purpose: To provide crack sealing and partial depth patching of Portland cement concrete ramp area. Physical Description: Concrete patching and sealing of ramp area south of the fixed base operation facility. Unit of Work: Design and construct Justification: Necessary to repair aging concrete ramp area. Impact on Operating No significant impact. Budget: Financing: $ 8,840 General Revenue Fund (A) 79,560 Federal Grants/Loans (F) Total: $ 88,400 300-7040-7317-1060135 EM TRANSPORTATION Project Number: 1-36 Project Title: Construct Utilities and Entrance Road to New Fire (ARFF) and Snow Removal Equipment Location (SNE) Location: Regional Airport Purpose: To provide utilities and vehicle access to proposed ARFF/SRE building. Physical Description: Construct approximately 1,800 lineal feet of access road and provide utilities to proposed ARFF/SRE building site. Unit of Work: Design and construct. Justification: The utilities and entrance road will be necessary to provide access to the proposed ARFF/SRE facility. Currently there is no access to this site. Impact on Operating Increased operating and maintenance costs. Budget: Financing: $ 17,670 General Revenue Fund (A) 339,030 Federal Grants/Loans (F) Total: $ 356,700 300-7040-7317-1060136 41 TRANSPORTATION Project Number: 1-37 Project Title: Airport Sewage Package Treatment Plant Location: Regional Airport Purpose: To provide improved wastewater treatment at the airport. Physical Description: Install sewage package treatment plant and all necessary appurtenances to treat and dispose of sewage at the airport. The plant would service a minimum of 150 people with the possibility of expansion to 500 people. This project would also include removal of the current lagoon. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 300-7000-7317-1060137 Design and construct. Increase capability of airport waste disposal and replace sewage lagoon. Increased operating and maintenance costs. $ 260,000 General Revenue Fund (A) $ 260,000 42 TRANSPORTATION Project Number: 1-38 Project Title: Airfield Pavement Rehabilitation on South Ramp Location: Regional Airport Purpose: The existing concrete pavement is in extremely poor shape with a large number of cracked and shattered panels. Physical Description: Removal and replacement with concrete pavement to the same grades as the existing apron. Unit of Work: Design and construct. Justification: The current surface deterioration of the concrete panels produces a large amount of debris, causing potential damage to aircraft using the apron. These surfaces are at or near their designed service life. Impact on Operating Budget: Financing: Total: 300-7040-7317-1060138 Rehabilitation should have a positive effect on the operations budget by decreasing the need for surface maintenance and repairs. $ 25,740 General Revenue Fund (A) 489,060 Federal Grants/Loans (F) $ 514,800 43 TRANSPORTATION Project Number: 1-39 Project Title: Taxiway Delta Rehabilitation Location: Regional Airport Purpose: The pavement on Taxiway D is in poor condition with an increasing amount of cracking and will soon need rehabilitation. Physical Description: A 5 -inch asphalt overlay on Taxiway Delta, south of Runway 10/28. Remove and replace concrete on Taxiway D between Runway 10/2 and Taxiway Alpha. Unit of Work: Design and construct. Justification: The combined effects of the deterioration create high foreign object debris (FOD) potential along Taxiway D. Maintenance of the pavement will increase beyond reasonable expense without rehabilitation. Impact on Operating Budget: Financing: Total: 300-7040-7317-1060139 Operations budget should decrease with the completion of the surface rehabilitation due to the decrease in surface patching and crack fill. $ 13,780 General Revenue Fund (A) 261,820 Federal Grants/Loans (F) $ 275,600 44 TRANSPORTATION Project Number: 1-40 Project Title: Relocate Fuel Farm Location: Regional Airport Purpose: To provide better and safer access to the fuel farm facility and allow better airfield space opportunity. Physical Description: Remove and relocate fuel farm facilities. Unit of Work: Design and construct. Justification: To provide space for airfield expansion while improving better access to the fuel farm facility for on -loading and off-loading fuel. Impact on Operating Operations budget would not change due to relocation of the fuel farm Budget: facility. Financing: $ 270,400 Federal Grants/Loans (F) Total: $ 270,400 300-7040-7317-1060140 45 TRANSPORTATION Project Number: 1-41 Project Title: Self -Service Fueling Station Location: Regional Airport Purpose: To provide unattended 24-hour service for the fixed base operator. Physical Description: Connect automated credit card fueling system to the existing jet A and I avgas storage tanks at the Cape Aviation fuel farm. Unit of Work: Design and construct. Justification: Provide better service and increase revenue to Cape Aviation. Impact on Operating Increased revenue by generating sales and decrease operator overtime I Budget: that would otherwise be used. Financing: $ 62,400 General Revenue Fund (A) Total: $ 62,400 300-7000-7317-1060141 .t TRANSPORTATION Project Number: 1-42 Project Title: Taxiway Alpha East Rehabilitation Location: Regional Airport Purpose: The pavement on Taxiway A, east of Taxiway B (Alpha East) is beginning to deteriorate with an increasing amount of cracking and spalling. Physical Description: Remove asphalt and reconstruct with concrete on Taxiway A East. Unit of Work: Design and construct. Justification: The effects of deterioration create a high FOD potential along Taxiway A East. This FOD can harm aircraft. Maintenance of the pavement will increase beyond reasonable expense without rehabilitation. Impact on Operating Operations budget should decrease with the completion of the surface I Budget: rehabilitation due to the decrease in surface maintenance expense. Financing: Total: 300-7040-7317-1060142 $ 35,150 General Revenue Fund (A) 667,850 Federal Grants/Loans (F) $ 703,000 47 TRANSPORTATION Project Number: 1-43 Project Title: Land Acquisition for Runway 10 Extension Location: Regional Airport Purpose: To purchase property in order to provide land necessary to extend Runway I 10-28 500 feet. This would provide for a total length of 7,000 feet. Physical Description: Acquire 66 acres of property to the west of the current Airport boundary. Unit of Work: Purchase property. Justification: To allow faster and/or larger types of aircraft to land and take off at the Airport, and assist in increasing the Airport operations and revenues. Impact on Operating The impact on operational expense for mowing and upkeep should be Budget: offset in the long term benefits derived from the additional usage of the airfield. Financing: $ 18,860 General Revenue Fund (A) 358,640 Federal Grants/Loans (F) Total: $ 377,500 300-7040-7317-1060143 M TRANSPORTATION Project Number: 1-44 Project Title: Taxiway Echo Rehabilitation Location: Regional Airport Purpose: The pavement on Taxiway Echo is beginning to deteriorate with an increasing amount of cracking and spalling. Physical Description: 5 -inch asphalt overlay on Taxiway Echo. Unit of Work: Design and construct. Justification: The effects of deterioration create a high FOD potential along Taxiway Echo. This FOD can harm aircraft. Maintenance of the pavement will increase beyond reasonable expense without rehabilitation. Impact on Operating Budget: Financing: Total: 300-7040-7317-1060144 Operations budget should decrease with the completion of the surface rehabilitation due to the decrease in surface maintenance expense. $ 6,750 General Revenue Fund (A) 127,450 Federal Grants/Loans (F) $ 134,200 .o TRANSPORTATION Project Number: 1-45 Project Title: Taxiway Alpha West Rehabilitation Location: Regional Airport Purpose: The pavement on Taxiway Alpha, west of Taxiway A (Alpha West) is beginning to deteriorate with an increasing amount of cracking and spalling. Physical Description: 5 -inch asphalt overlay on Taxiway Alpha West. Remove and reconstruct concrete on Taxiway A, one stub. Unit of Work: Design and construct. Justification: The effects of deterioration create a high FOD potential along Taxiway Alpha West. This FOD can harm aircraft. Maintenance of the pavement will increase beyond reasonable expense without rehabilitation. Impact on Operating Budget: Financing: Total: 300-7040-7317-1060145 Operations budget should decrease with the completion of the surface rehabilitation, due to the decrease in surface maintenance expense. $ 25,260 General Revenue Fund (A) 480,140 Federal Grants/Loans (F) $ 505,400 50 ENVIRONMENT CAPITAL IMPROVEMENTS PROGRAM 2006-2007 Fiscal 2007-2008 Fiscal 2008-2009 Fiscal 2009-2010 Fiscal 2010-2011 Fiscal Year Year Year Year Year 51 ENVIRONMENT PROPOSED PROJECTS Project Improvement Item Total Cost 2006-2007 2007-2008 2008-2009 2009-2010 2010 - 2011 Number Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 2-1 Lakeshore Sewer District 247,600 G 247,600 G (pre 1993) 2-2 Sanitary Sewer Rehabilitation of Red 326,300 F 138,600 F 78,900 F 108,800 F Star Area 1998 2-3 Sanitary Sewer Rehabilitation and 114,200 F 114,200 F Relining 1998 2-4 Replacement of Sludge Thickener 56,500 1 56,500 1 Turntable 1999 2-5 Sloan Creek Trunk Sewer Extension 3739400 B 373,400 B 2-6 Ramsey Branch Lift Station & Force 280,000 1 280,000 1 Main (Stonebridge) 2006 2-7 Meadowbrook Sewer District 110,100 G 110,100 G 1995 2-8 South Kingshighway Sewer District 153,400 G 153,400 G - (pre 1993) 2-9 Timon Way Sewer District 197,900 G 197,900 G 2004 SUBTOTAL- SEWER PROJECTS 1,859,400 1,210,300 342,400 108,800 197,900 2-10 Transfer Station Entrance Scale 108,800 1 1089800 1 z000 SUBTOTAL- 108,800 108,800 SOLID WASTE PROJECTS 4 - XWater Distribution Improvement 375,000 1 75,000 1 759000 1 75,000 1 75,000 1 75,000 1 1 Program 1993 Water Development/Main 500,000 1 100,000 1 100,000 1 100,000 1 100,000 1 100,000 1 Extensions 1993 A General Revenue Fund B REV/PFA Bonds: Issued C REV/PFA Bonds: Pending D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans G Special Assessments H Capital Improvement Sales Tax I Other J Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax J, Projects totally or partially included in Water Revenue Bond Issue supported by a '/< %capital improvement sales tax extention for 20 years approved by vote on November 5, 1996 52 ENVIRONMENT PROPOSED PROJECTS Project B 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Improvement Item Number Total Cost Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Two -Inch Water Main/Service 875,000 1 175,000 1 175,000 1 175,000 1 175,000 1 175,000 1 Replacement Program M" Fire Sales Tax s - 1993 Two -Inch Water Main/Service 1,125,000 B 225,000 B 225,000 B 225,000 B 225,000 1 225,000 1 Replacement (Contract Program) 1997 1 Water Storage Tank Rehabilitation 305,000 1 45,000 1 80,000 1 180,000 1 1994 Nrri Fire Hydrant Replacement 500,000 B 100,000 B 100,000 B 100,000 B 100,000 B 100,000 1994 Water System Seismic Protection 410,000 1 205,000 1 205,000 1 ,,. 1995 Water Pumping Station/Vault 108,200 B 108,200 B Retrofit 1994 Water Plant No. 2 Sludge System 166,200 B 166,200 B 1996 -�„� Elevated Water Storage Tank 1,935,000 1 1,935,000 1 1996 2-21 Water Meter Replacement Program 270,000 1 50,000 1 55,000 1 55,000 1 55,000 1 55,000 1 1993 2-22 Water Plant No. 2 Filter Valve 557,000 1 139,250 1 139,250 1 139,250 1 139,250 1 Replacement 2001 2-23 Water Plant No. 2 Clarifier Building 16,500 1 16,500 1 Improvements 2001 2-24 South Well Field and Transmission 3,640,000 B 3,640,000 B Main 2005 Electrical Equipment and Storage 2-25 Building at Gordonville Road Tank 100,200 1 100,200 1 Site 2001 A General Revenue Fund B REV/PFA Bonds: Issued C REV/PFA Bonds: Pending D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans G Special Assessments H Capital Improvement Sales Tax I Other J Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax Projects totally or partially included in Water Revenue Bond Issue supported by a %4 % capital improvement sales tax extention for 20 years approved by vote on November 5, 1996 53 ENVIRONMENT PROPOSED PROJECTS Project 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Improvement Item Total Cost Number Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 2-26 12 -Inch Water Main - Downtown: 516,700 F 516,700 F Mill Street to River Campus 2000 2-27 North Kingshighway Booster Pump 26,700 1 26,700 1 Station Rehabilitation 2002 Rebuild Existing Filters at Cape 2-28 Rock Water Treatment Plant/Exterior 943,500 1 943,500 1 Basin Covers 2000 2-29 Gordonville Booster Pump Station 95,000 1 95,000 1 Rehabilitation 2003 2-30 Cape Girardeau - Scott City Water 479,900 1 479,900 1 System Interconnection 2004 2-31 West Cape Booster Station Upgrade 85,000 1 85,000 1 2006 2-32 Water Plant No. 2 Expansion 14,390,500 1 9433300 1 13,447,200 1 2003 2-33 Residual Storage & Disposal Cape 4,708,100 1 4,708,100 1 Rock Water Plant No. 1 19991 1 SUBTOTAL -WATER PROJECTS 32,128,500 9,439,350 1,885,350 1,049,250 869,250 18,885,300 2-34 Merriwether Drainage Tunnel 85,300 1 85,300 r Repairs 2003 2-35 Arena Creek Relief Channel 843,500 1 843,500 1 2001 Howell Street Box Culvert 2-36 Replacement 678,000 1 678,000 1 2001 Cape Rock Drive Culvert 2-37 Replacement, Storm Inlets, New 291,400 1 291,400 1 Drains at Dennis Scivally Park 2002 A General Revenue Fund B REV/PFA Bonds: Issued C REV/PFA Bonds: Pending D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans G Special Assessments H Capital Improvement Sales Tax I Other i Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax 54 ENVIRONMENT PROPOSED PROJECTS Project 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Improvement Item Total Cost Number Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 2-38 Breckenridge Branch Bank 200,000 1 200,000 1 Stabilization 2006 Beavercreek Detention Basin 2-39 100,000 1 100,000 1 Construction 2006 2-40 Melrose Drainage Area 533,000 1 533,000 1 2002 2-41 Themis Street Improvement 298,300 1 298,300 1 2002 2-42 Aquamsi Street Drainage Project 102,200 1 102,200 1 2002 2-43 Margaret and Janet Drainage 319,800 1 319,800 1 2002 2-44 Grandview and Carolina Drainage 133,300 1 133,300 1 Area 2002 2-45 Detention Basin Flood Monitor 149,200 a 149,200 B 2004 2-46 Kingsway and Kingsbury Drainage 53,400 1 53,400 1 2002 2-47 Cape La Croix Bank Stabilization 54,400 1 54,400 1 2002 2-48 Shawnee Park/Arena Park Bank 21,800 1 21,800 1 Stabilization 2001 2-49 Whitener and Silver Springs 64,000 1 64,000 1 Drainage Area 2003 2-50 Amblewood Drainage System 26,500 1 26,500 1 2003 Bloomfield and Broadview Drainage 2-51 Area 26,700 1 26,7JO] 2003 A General Revenue Fund B REV/PFA Bonds: Issued C REV/PFA Bonds: Pending D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans G Special Assessments H Capital Improvement Sales Tax I Other J Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax 55 ENVIRONMENT PROPOSED PROJECTS Project 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 Improvement Item Total Cost Number Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 2-52 Cape West Business Park Area 380,000 t 380,000 I Flood Control Project 2006 SUBTOTAL - STORM 4,360,800 85,300 2,112,900 831,300 704,500 626,800 WATER PROJECTS TOTALS 38,457,500 10,843,750 1 4,340,650 1,989,350 1,771,650 19,512,100 A General Revenue Fund B REV/PFA Bonds: Issued 5,462,800 4,446,600 491,200 325,000 100,000 100,000 C REV/PFA Bonds: Pending D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans 957,200 769,500 78,900 108,800 G Special Assessments 709,000 247,600 263,500 197,900 H Capital Improvement Sales Tax 149,200 149,200 I Other 31,179,300 5,380,050 3,507,050 1,555,550 1,324,550 19,412,100 d J Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax 56 ENVIRONMENT Project Number 2-1 Project Title: Lakeshore Sewer District Location: Lakeshore Drive Purpose: To provide sewer service to previously unserved area. Physical Description: Approximately 3,000 feet of sanitary sewer and necessary appurtenances. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 610-4062-7333-1950213 Design, acquire easements, and construct. Replacement of deteriorating septic systems in a residential area. Increased depreciation and operational expense. $ 247,600 Special Assessments (G) $ 247,600 57 ENVIRONMENT Project Number: 2-2 Project Title: Sanitary Sewer Rehabilitation of Red Star Area Location: Red Star District Purpose: To prevent inflow and infiltration into the sanitary sewer system during flood conditions. Physical Description: Relining sewers, relining manholes, installing above -flood -elevation vents, sealing manhole lids, lateral line valves to shut off flow during flood events. Unit of Work: Project identification, implementation, and rehabilitation. Justification: To enhance and protect the sanitary collection system, and prevent excess flow at the wastewater treatment plant. Impact on Operating Decreased operating and maintenance costs. Budget: Financing: $ 326,300 Federal Grants/Loans (F) Total: $ 326,300 610-4062-7333-1990215 W ENVIRONMENT Project Number: 2-3 Project Title: Sanitary Sewer Rehabilitation and Relining Location: Six locations in City — total of 1,810 feet of 8 -inch line. Purpose: Reduce inflow as well as outflow of the sanitary sewers. Physical Description: Reline 1,810 feet if 8 -inch pipe with insituform or like system. Unit of Work: Design and construct. Justification: Help prevent surcharging of sanitary sewer lines. Impact on Operating Decreased operating and maintenance costs. Budget: Financing: $ 114,200 Federal Grants/Loans (F) Total: $ 114,200 610-4062-7333-1990216 59 ENVIRONMENT Project Number: 2-4 Project Title: Replacement of Sludge Thickener Turntable Location: Wastewater Treatment Plant. Purpose: To replace 26 year old turntable that has had two major mechanical I failures. Physical Description: Turntable assembly, bearings and hardware. This assembly operates I continuously. Unit of Work: Removal and replacement of assembly. Justification: Turntable assembly is 26 years old with two mechanical failures. When the I last failure occurred, the unit was down for 6 months. Impact on Operating No significant impact. Budget: Financing: $ 56,500 Other (1) Total: $ 56,500 610-4062-7333-1040205 ENVIRONMENT Project Number: 2-5 Project Title: Sloan Creek Trunk Sewer Extension Location: Sloan Creek in Old Sprigg Street Road area. Purpose: Extend trunk sewer service farther north in Sloan Creek watershed. Physical Description: Approximately 1,220 lineal feet of 12 -inch trunk sewer, and all necessary I appurtenances. Unit of Work: Design, acquire construction easements, and construct. Justification: When Sloan Creek trunk sewer was constructed in 2000-2002, the upper section was deleted in order to construct the Ranchito project. Extending the trunk sewer service in this watershed is still needed. Impact on Operating Increased depreciation and operational expense. Budget: Financing: $ 373,400 Revenue/PFA Bonds: Issued (B) Total: $ 373,400 610-4062-7333-1060205 61 ENVIRONMENT Project Number: 2-6 Project Title: Ramsey Branch Lift Station and Force Main (Stonebridge) Location: Bloomfield Road at Ramsey Branch. Purpose: Replace existing Stonebridge lift station and force main. Physical Description: Install a 20 -foot deep, 8 -inch diameter wet well with all needed equipment, 650 feet of 6 -inch force main, 300 feet of 8 -inch gravity sewer, and all necessary appurtenances to produce a functioning lift station. Unit of Work: Design and construct. Justification: The existing Stonebridge lift station is fast becoming undersized as more subdivisions develop west of the Stonebridge Subdivision (currently Dalhousie Subdivision, and Emerald Forest Phase I and II), and annexations of existing subdivisions. Impact on Operating Some increased operational costs, undetermined at this time. Budget: Financing: $ 280,000 Other (1) Total: $ 280,000 610-4062-7333-1060206 62 ENVIRONMENT Project Number: 2-7 Project Title: Meadowbrook Sewer District Location: Highway 74 and Meadowbrook Lane area. Purpose: To provide sewer service to Meadowbrook area. Physical Description: Lateral sanitary sewer lines and district lift station. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 1610-4062-7333-1950217 Design, acquire easements, and construct. Area currently on private septic systems. Increased depreciation and operational expense. $ 110,100 Special Assessments (G) $ 110,100 63 ENVIRONMENT Project Number: 2-8 Project Title: South Kingshighway Sewer District Location: South Kingshighway-Southern Expressway area. Purpose: Provide sewer service to previously unserved area and eliminate one lift station. Physical Description: Approximately 1,620 feet of sanitary sewer and appurtenances. Unit of Work: Design, acquire easements, and construct. Justification: Replacement of septic systems in commercial/industrial areas. Impact on Operating Decreased operational and maintenance costs from elimination of lift Budget: station. Financing: $ 153,400 Special Assessments (G) Total: $153,400 610-4062-7333-1950211 z ENVIRONMENT Project Number: 2-9 Project Title: Timon Way Sewer District Location: Big Bend Road, Timon Way, and Mechaw Drive Purpose: To provide sewer service to previously unserved area. Physical Description: Approximately 2,320 feet of sanitary sewer and necessary appurtenances. Unit of Work: Design, acquire easements, and construct. Justification: Replacement of deteriorating septic systems in a residential area. Impact on Operating Increased depreciation and operational expense. Budget: Financing: $ 197,900 Special Assessments (G) Total: $ 197,900 610-4062-7333-1060209 M ENVIRONMENT Project Number: 2-10 Project Title: Transfer Station Entrance Scale Location: Transfer Station Purpose: To better serve the customers at the transfer station and backup the existing scale. Physical Description: 70 -foot long above ground scale that is tied into the transfer station computer system. Unit of Work: Design and install scales, design and install computer software and hardware. Justification: This would allow for better traffic flow, easier for the customers, and also provide back-up for the existing scales. Impact on Operating Increased depreciation expense. Budget: Financing: $ 108,800 Other (1) Total: $ 108,800 630-4080-7150 •l ENVIRONMENT Project Number: 2-11 Project Title: Water Distribution Improvement Program Location: Distribution mains — City wide. Purpose: Install new main pipes connecting existing mains so that fire flows, pressure, and water quality are improved. Also replace existing pipes and hydrants as required other than routine repairs. This includes relocating facilities for state projects where necessary. Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 381-7022-7335-1000222 Install piping as required depending on existing locations and conditions. Approximately 16,200 feet in three years — 5,400 feet per year. Design, acquire easements (if necessary), and construct. Growth is accelerating and the need for system improvements versus previous estimates. Possible lower energy costs, increased depreciation expense. $ 375,000 Other (1) $ 375,000 67 ENVIRONMENT Project Number: 2-12 Project Title: Water Development/Main Extensions Location: Various locations. Purpose: Extension of water service to developing areas previously unserved. Physical Description: City participation in development main installations, i.e. oversizing, hydrants, valves, tapping sleeves, etc. and other items as directed. Unit of Work: Design and construct. Justification: Extension of water mains is essential infrastructure element needed to enable growth. Impact on Operating Increased depreciation expense. Budget: Financing: $ 500,000 Other (1) Total: $ 500,000 381-7022-7335-1950224 M ENVIRONMENT Project Number: 2-13 Project Title: Two -Inch Water Main/Service Replacement Program Location: City wide. Purpose: Replacement of substandard, high failure/repair sections of the water distribution system with new 6 -inch main minimum to improve service, increase fire flows and reduce maintenance costs. Physical Description: Replace existing main with new 6 -inch main, and replace existing services to new line. Unit of Work: Design, acquire easements (if necessary), and construct. Justification: Costs of two-inch replacement are higher than expected (primarily pavement repair). Additional funding will prevent reduction of annual footage targets. Impact on Operating Maintenance costs due to main leaks on these lines will decrease as Budget: replacement progresses. Increased depreciation costs. Financing: Total: 1381-7022-7335-1930225 $ 875,000 Other (1) $ 875,000 M• ENVIRONMENT Project Number: 2-14 Project Title: Two -Inch Water Main/Service Replacement (Contract Program) Location: City wide. Purpose: Replacement of substandard, high failure/repair sections of the water distribution system with new 6 -inch main minimum to improve service, increase fire flows and reduce maintenance costs. Contract program designed to accelerate normal program of replacement by Alliance Water Resources on an annual basis. Physical Description: Replace existing main with new 6 -inch main, and replace existing services to new line. Unit of Work: Design, acquire easements (if necessary), and construct. Justification: The remaining two-inch mains in the system are primarily galvanized, badly corroded and fail frequently. Additionally, minimal fire flows are possible in these mains. Replacement of services will remove lead source in oldest services. Impact on Operating Budget: Financing: Total: 381-7022-7335-1030218 Maintenance cost due to main leaks on these lines will decrease as replacement progresses. Increased depreciation cost. $ 675,000 Revenue/PFA Bonds: Issued (B) $ 450,000 Other (1) $ 1,125,000 70 ENVIRONMENT Project Number: 2-15 Project Title: Water Storage Tank Rehabilitation (Three Tanks) Location: To be determined by selection criteria based on inspection. Purpose: Prolong tank life and ensure water quality. Physical Description: Re -coat storage tanks, perform necessary maintenance. Unit of Work: Inspect and rehabilitate. Justification: Programmed preventive maintenance. Impact on Operating No significant impact. Budget: Financing: $ 305,000 Other (1) Total: $ 305,000 381-7022-7335-1990228 71 ENVIRONMENT Project Number: 2-16 Project Title: Fire Hydrant Replacement Location: City wide. Purpose: Fire protection flow increase. Physical Description: 798 — 4 %2 inch hydrants replaced with 5'/4 inch hydrants. Unit of Work: Install Justification: Impact on Operating Budget: Financing: Total: 381-7022-7335-1970247 Hydrants outdated — low flow capacities. Do not meet current design I specifications. Increased depreciation cost. $ 500,000 Revenue/PFA Bonds: Issued (B) $ 500,000 72 ENVIRONMENT Project Number: 2-17 Project Title: Water System Seismic Protection Location: Treatment plants and storage tanks. Purpose: Minimize damage and water loss in the event of seismic activity. Physical Description: Automatic isolation valves and flexible connections at influent and effluent piping to tanks and clear wells. Unit of Work: Design and construct. Justification: Maintain integrity of drinking water supply in the event of seismic activity. Impact on Operating No significant impact. Budget: Financing: $ 410,000 Other (i) Total: $ 410,000 381-7022-7335-1980234 73 ENVIRONMENT Project Number: 2-18 Project Title: Water Pumping Station/Vault Retrofit Location: Various locations. Purpose: Retrofit confined -space pumping stations/vaults with forced air ventilation and lightweight access hatches. Additional pumping station for west or northwest area per water system master plan. Physical Description: Install blowers, switches, wiring and retrofit hatches with lightweight materials. Add motor operated valve at College for pumping control. Pumping station design and installation. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 381-7022-7335-1950232 Design and construct/retrofit. Employee safety and stricter confined -space entry requirements. No significant impact. $ 108,200 Revenue/PFA Bonds: Issued (B) $ 108,200 74 ENVIRONMENT Project Number: 2-19 Project Title: Water Plant No. 2 Sludge System Location: Water Plant No. 2 Purpose: Sludge disposal to sewer rather than lagoon holding. Physical Description: Design and construct sewer lift station and lateral to dispose of process sludge (when trunk is available). Unit of Work: Design and construct. Justification: Reduce sludge disposal costs, lagoon maintenance and benefit sewer I treatment process (coagulant). Impact on Operating Sludge lagoon cleaning costs are approximately $50,000 and on a three (3) Budget: year interval. As Plant No. 2 use increases, this will shorten interval. The sewer treatment disposal option is much more cost effective and would safe approximately $300,000 over the next 15 years. Financing: Total 381-7022-7335-1960246 $ 166,200 Revenue/PFA Bonds: Issued (B) $ 166,200 75 ENVIRONMENT Project Number: 2-20 Project Title: Elevated Water Storage Tank Location: Area adjacent to 1-55, north of Route K. Purpose: Provide storage capacity to meet peak hour demands in developing areas. Physical Description: Elevated storage tank. Unit of Work: Design, site identification, construct, and equip. Justification: Growth and development. Impact on Operating Additional costs will be incurred for operation and maintenance at Budget: approximately $2,000 annually, 10 -year repainting scheduled in year 2016 at approximately $100,000. Increased depreciation cost. Possible combining of pressure zones, lowering operating and maintenance costs. Financing: Total: 381-7022-7335-1970244 $ 1,935,000 Other (1) $ 1,935,000 76 ENVIRONMENT Project Number: 2-21 Project Title: Water Meter Replacement Program Location: Various locations throughout the City — service installations. Purpose: To replace aged, inaccurate meters with new meters so that water billings I reflect actual usage. Physical Description: Implement 10 -year, meter test program replacing meters outside AWWA I acceptance standards for accuracy. Unit of Work: Replace meters, each based on last test or installation date. Justification: Meters typically register less than the quantity actually consumed as they I age and mechanical wear occurs. This results in lost water accountability. Impact on Operating Will increase revenue by ensuring meter accuracy (meters over 10 years Budget: old typically under -register by approximately 5%). Financing: $ 270,000 Other (1) Total: $ 270,000 620-4030-6961 77 ENVIRONMENT Project Number: 2-22 Project Title: Water Plant No. 2 Filter Valve Replacement Location: Water Plant No. 2 Purpose: Upgrade valves and actuators from electric to pneumatic. Physical Description: Replace filter valves and actuators from electric to pneumatic, install air compressor, lines and wiring. Unit of Work: Design and construct. Justification: Replacement parts are not currently available for current valves. Replacement is necessary for continued operation of these filters. Cape Rock water plant increased capacity will allow time to phase construction. Impact on Operating Budget: Financing: Total: 620-4030-7335-1060222 Lower operation and maintenance costs. $ 557,000 Other (1) $ 557,000 F -1.j ENVIRONMENT Project Number: 2-23 Project Title: Water Plant No. 2 Clarifier Building Improvements Location: Water Plant No. 2 Purpose: To provide additional storage for chemicals. Physical Description: Pour and finish concrete floor in clarifier building and replace existing I chemical feed lines. Unit of Work: Construct. Justification: Concrete floor would provide additional storage space; existing chemical feed lines would need to be moved from underground to overhead to provide access. Impact on Operating Budget: Financing: Total: 620-4030-7335-1060223 No significant impact. $ 16,500 Other (1) $ 16,500 79 ENVIRONMENT Project Number: 2-24 Project Title: South Well Field and Transmission Main Location: Black Land Bottoms between cement plant and SEMO Port and transmission main to Water Plant No. 1. Purpose: Bring Water Plant No. 1 up to its full future capacity of 10.5 million gallons I per day. Physical Description: Drill three to five high-capacity wells and construct approximately five miles I of 24 -inch and 20 -inch transmission main. Unit of Work: Design, acquire easements, and construct. Justification: Future growth in and near the City will demand an increase in the City's water supply system. Water Plant No. 1 has been designed to provide the treatment capacity required. Proposed system will also supply process water for industries in the area. Impact on Operating Increased depreciation and operational expense. Budget: Financing: $ 3,640,000 Revenue/PFA Bonds: Issued (B) Total: $ 3,640,000 381-7022-7335-1050224 :1 ENVIRONMENT Project Number: 2-25 Project Title: Electrical Equipment and Storage Building at Gordonville Road Tank Site Location: Gordonville Road water tank site. Purpose: Provide adequate building for electrical equipment, generators, radio I equipment and maintenance supplies. Physical Description: Construct building approximately 30 feet by 40 feet with slab floor and overhead doors. Unit of Work: Design and construct. Justification: Existing building does not meet existing electrical equipment requirements. Impact on Operating No significant impact. Budget: Financing: $ 100,200 Other (1) Total: $ 100,200 620-4030-7335-1060225 ENVIRONMENT Project Number: 2-26 Project Title: 12 -Inch Water Main — Downtown Location: Downtown area — Mill Street to River Campus. Purpose: Increase fire flow to downtown area. Pull 10,000 feet of 12 -inch water line through abandoned 18 -inch force main and connect to downtown system. Physical Description: Install 12 -inch main inside existing abandoned 18 -inch force main. Unit of Work: Design and construct. Justification: Downtown area and River Campus area lack major north -south water main loop for fire flow or high demand. Existing 18 -inch force main could be used as conduit with minimal excavation. Impact on Operating No significant impact. Budget: Financing: $ 516,700 Federal Grants/Loans (F) Total: $ 516,700 620-4030-7335-1040224 W, ENVIRONMENT Project Number: 2-27 Project Title: North Kingshighway Booster Pump Station Rehabilitation Location: North Kingshighway Booster Pump Station Purpose: Provide adequate water flow to County Park tank. Physical Description: Modify suction and discharge headers, install 150 amp. Electrical service and 400 gallon per minute pump. Unit of Work: Design and construct. Justification: Water demand from County Park tank pressure zone is increasing, current booster pump is unable to provide adequate flow. Impact on Operating No significant impact. Budget: Financing: $ 26,700 Other (1) Total: $ 26,700 620-4030-7335-1060227 ENVIRONMENT Project Number: 2-28 Project Title: Rebuild Existing Filters at Cape Rock Water Treatment Plant/Exterior Basin Covers Location: Cape Rock Water Treatment Plant Purpose: Replace filter media, under drains, valves and piping, and covers exposed basin to prevent contamination. Physical Description: Remove and replace existing media, under drains, valves and piping. Install removable coverings of either metal or concrete. Unit of Work: Design and construct/retrofit. Justification: This project was cut from the plant renovation when the original bid was over budget. Phased rebuilding of the existing 1930's hardware is necessary for continued operation of these filters. New filter capacity allows time to phase construction. Coverings prevent easy access to water. Impact on Operating Budget: Financing: Total: 620-4030-7335-1060228 No significant impact. $ 943,500 Other (1) $ 943,500 ENVIRONMENT Project Number: 2-29 Project Title: Gordonville Booster Pump Station Rehabilitation Location: Gordonville Road tank site. Purpose: Provide adequate flows to western areas of distribution system. Physical Description: Replace existing duplex 50 horsepower pump station with duplex 100 horsepower pump station. Existing "can" is too small to accommodate larger pumps. Unit of Work: Design and install pre-engineered pump station. Justification: Pump station installed over 20 years ago has reached capacity and has required increased maintenance. Hospital and many commercial businesses are dependent on the pump station. Impact on Operating Lower maintenance costs. Increased electrical costs, overall $500 increase Budget: with current electrical rates. Financing: $ 95,000 Other (1) Total: $ 95,000 620-4030-7335-1060229 ENVIRONMENT Project Number: 2-30 Project Title: Cape Girardeau — Scott City Water System Interconnection Location: Interconnection between Airport Main (Cape) and 1-55 new water plant I (Scott City) Purpose: To interconnect the municipal water systems of Cape Girardeau and Scott I City for mutual support purposes. Physical Description: Install approximately 1,000 lineal feet of 12 -inch water line with appurtenances, with one highway bore (1-55). Unit of Work: Design and construct. Justification: The cities of Cape Girardeau and Scott City have grown together, with a common boundary along Interstate 55 and their water systems are virtually adjoining as well. Interconnection will allow the two systems to mutually support each other in times of water emergencies in either city. Impact on Operating Budget: Financing: Total: 620-4030-7335-1060230 No significant impact. $ 479,900 Other (1) $ 479,900 :• ENVIRONMENT Project Number: 2-31 Project Title: West Cape Booster Station Upgrade Location: West Cape Rock Drive at Perryville Road. Purpose: Install larger pumps and piping at existing booster station. Physical Description: Change out existing 10 horsepower and 20 horsepower pumps with two (2) 25 horsepower pumps. Unit of Work: Design and install. Justification: Increase pressure in developing areas on North Perryville Road. Impact on Operating Minor increase in operational costs. Budget: Financing: $ 85,000 Other (1) Total: $ 85,000 620-4030-7335-1060231 ENVIRONMENT Project Number: 2-32 Project Title: Water Plant No. 2 Expansion Location: Water Plant No. 2 Purpose: Meet growing water supply needs. Physical Description: Purchase land, construct additional treatment facilities, and construct additional storage tank. Unit of Work: Design and construct. Justification: Continued growth of system and large water users added to the south (Nash Road and future Prestwick). Impact on Operating Additional chemical, labor and electrical costs. Budget: Financing: $ 14,390,500 Other (1) Total: $ 14,390,500 620-4030-7335-1060232 :.j ENVIRONMENT Project Number: 2-33 Project Title: Residual Storage and Disposal Location: Cape Rock Water Plant No. 1 Purpose: Provide for disposal of treatment -process -residue by storage, transfer and land applications versus return to river. Physical Description: Pumping facilities, storage tanks, loading station, tanker trucks. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 1 620-4030-7335-1060233 Design, construct, and equip for residual storage and disposal. Regulatory requirement for permitting construction and operation (DNR). Operation and maintenance costs will change. Unquantifiable at this time. $ 4,708,100 Other (1) $ 4,708,100 :• ENVIRONMENT Project Number: 2-34 Project Title: Merriwether Drainage Tunnel Repairs Location: Merriwether Street pumping station and west. Purpose: To prevent further damage to the 54 -inch brick -lined tunnel. Physical Description: To make repairs to the brick -lined tunnel that is over 100 years old. Unit of Work: Rehabilitation of tunnel to standards acceptable by the Corps of Engineers. Justification: Failure of this tunnel during a significant flood event will cause downtown Cape Girardeau to flood from within. This would cause the level on the inside of the flood wall to be the same as the flooding river. Impact on Operating Budget: Financing: Total: 1180-7020-7339-1030236 Will reduce ongoing maintenance costs. $ 85,300 Other (1) $ 85,300 ENVIRONMENT Project Number: 2-35 Project Title: Arena Creek Relief Channel Location: Arena Park Purpose: Prevent flooding in Arena Park. Physical Description: Construct a shallow swale through Arena Park parallel to Optimist Drive. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 180-7020-7339-1030239 Design and construct. To prevent flooding in Arena Park. This is a project that is recommended in the storm water master plan. I No significant impact. $ 843,500 Other (1) $ 843,500 91 ENVIRONMENT Project Number: 2-36 Project Title: Howell Street Box Culvert Replacement Location: 1400 Block of Howell Street at Scivally Branch of Walker Creek. Purpose: Increase the capacity of the existing drainage structure to reduce flood damage to property improvements located upstream. Physical Description: Replace the existing structure to accommodate high flows generated by heavy rain events in the Scivally Branch watershed, and improve approximately 60 feet of creek channel downstream of the structure to the Walker Branch Flood Control Project (Corps of Engineers). Unit of Work: Design, acquire right-of-way and construct. Justification: Capacity of the existing structure is less than that of a 10 -year rain event and contributes to flood damage to property and further threatens the life and safety of citizens at times of high flows when very swift storm water overtops the street at this location. Impact on Operating Will eliminate the need to barricade the street during heavy rain storms. Budget: Financing: $ 678,000 Other (1) Total: $ 678,000 180-7020-7339-1060236 92 ENVIRONMENT Project Number: 2-37 Project Title: Cape Rock Drive Culvert Replacement, Storm Inlets New Drains at Dennis I Scivally Park Location: Cape Rock Drive at Dennis Scivally Park. Purpose: Improve storm water drainage. Physical Description: Install new culvert, storm inlets, and storm drains. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 180-7020-7339-1060237 Culvert replacement. Improve storm water drainage. This is a recommended project in the storm I water master plan. No significant impact. $ 291,400 Other (1) $ 291,400 93 ENVIRONMENT Project Number: 2-38 Project Title: Breckenridge Branch Bank Stabilization Location: Breckenridge Branch west of Mount Auburn Road. Purpose: To stabilize the banks and secure commercial building parking lot. Physical Description: Install riprap and gabion baskets. Unit of Work: Install riprap and gabion baskets. Justification: To stabilize the banks to prevent further damage. Impact on Operating Budget: Financing: Total: 180-7020-7339-1060238 No significant impact. $ 200,000 Other (1) $ 200,000 94 ENVIRONMENT Project Number: 2-39 Project Title: Beavercreek Detention Basin Construction Location: Breckenridge Branch drainage area. Purpose: Replace smaller basin that was damaged beyond repair and is inadequate for the drainage area. Physical Description: Earthen dam with piping and concrete pilot channel. Unit of Work: Design, acquire easement, and construct. Justification: Replace basin and release storm water at a proper rate of discharge to prevent downstream erosion and possibly flooding. Impact on Operating No significant impact. Budget: Financing: $ 100,000 Other (1) Total: $ 100,000 180-7020-7339-1060239 95 ENVIRONMENT Project Number: 2-40 Project Title: Melrose Drainage Area Location: 2400 Block of Melrose Avenue. Purpose: To prevent street flooding and property damage. Physical Description: Storm drainage system. Unit of Work: Design and construct. Justification: To prevent flooding and property damage. Impact on Operating No significant impact. Budget: Financing: $ 533,000 Other (1) Total: $ 533,000 180-7020-7339-1060240 M ENVIRONMENT Project Number: 2-41 Project Title: Themis Street Improvement Location: Themis Street and Silver Springs Road. Purpose: To prevent street flooding. Physical Description: Install a 5 -foot high by 12 -foot wide box culvert. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 180-7020-7339-1050239 Design and install. Prevent flooding of the Themis Street and Silver Springs Road area. This I is a recommended project in the storm water master plan. Decrease emergency response needed during flooding of the street. $ 298,300 Other (1) $ 298,300 ENVIRONMENT Project Number: 2-42 Project Title: Aquamsi Street Drainage Prosect Location: Aquamsi Street beside the River Campus and Missouri Dry Dock. Purpose: To allow for proper drainage of Aquamsi Street. Physical Description: Install 42 -inch reinforced concrete pipe from west of Aquamsi Street to the east, approximately 550 feet. Unit of Work: Design and install a storm water drainage line. Justification: This will prevent the flooding of Aquamsi Street during moderate and heavy rain events. Impact on Operating Decrease emergency response needed during flooding of the street. Budget: Financing: $ 102,200 Other (1) Total: $ 102,200 180-7020-7339-1060242 M ENVIRONMENT Project Number: 2-43 Project Title: Margaret and Janet Drainage Location: Margaret Street and Janet Drive. Purpose: To properly drain the area. Physical Description: Install a drainage system. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 180-7020-7339-1060243 Design and construct. To prevent street flooding. water master plan. No significant impact. $ 319,800 Other (1) $ 319,800 This is a recommended project in the storm i ENVIRONMENT Project Number: 2-44 Project Title: Grandview and Carolina Drainage Area Location:. Grandview Drive and Carolina Lane area. Purpose: To properly drain the area. Physical Description: Design and construct a storm drainage system in the neighborhood. Unit of Work: Design and construct. Justification: Reduce flooding and property damage in the neighborhood. Impact on Operating No significant impact. Budget: Financing: $ 133,300 Other (1) Total: $ 133,300 180-7020-7339-1060244 100 ENVIRONMENT Project Number: 2-45 Project Title: Detention Basin Flood Monitor Location: LaSalle Branch detention basin site. Purpose: To be able to monitor increases in the detention basin level. Help prevent I downstream property damage. Physical Description: Ultrasonic flow monitoring and reporting via the wastewater plant and public works service center SCADA system. Also will have the capacity for the police, fire and planning to monitor with the appropriate equipment. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 180-7020-7339-1060245 Design and construct. Monitor flow to help prepare and prevent downstream damage. No significant impact. $ 149,200 Capital Improvement Sales Tax (H) $ 149,200 101 ENVIRONMENT Project Number: 2-46 Project Title: Kingsway and Kingsbury Drainage Location: Kingsway Drive and Kingsbury Drive. Purpose: To properly drain the area. Physical Description: Install a storm drainage system. Unit of Work: Design and construct. Justification: Impact on Operating Budget: Financing: Total: 1180-7020-7339-1060246 To prevent street flooding. This is a recommended project in the storm I water master plan. No significant impact. $ 53,400 Other (1) $ 53,400 102 ENVIRONMENT Project Number: 2-47 Project Title: Cape La Croix Bank Stabilization Location: South side of Arena Park. Purpose: To stabilize the bank and secure hike and biking trail. Physical Description: Install riprap and gabion baskets. Unit of Work: Install riprap and gabion baskets. Justification: To stabilize the banks to prevent further damage. Impact on Operating No significant impact. Budget: Financing: $ 54,400 Other (1) d Total: $ 54,400 180-7020-7339-1060247 103 ENVIRONMENT Project Number: 2-48 Project Title: Shawnee Park/Arena Park Bank Stabilization Location: Shawnee Park and Arena Park on Cape La Croix Creek. Purpose: To stabilize the banks to prevent the collapse of the recreation trail, ball fields, soccer fields and park land. Physical Description: Lay broken concrete and riprap stone on the banks to prevent erosion. Unit of Work: Deposit concrete and stone, rent equipment, work to be done by city crews. Justification: Prevent the collapse of the recreation trail, ball fields, soccer fields, and I park land. Impact on Operating No significant impact. Budget: Financing: $ 21,800 Other (1) Total: $ 21,800 180-7020-7339-1060248 104 ENVIRONMENT Project Number: 2-49 Project Title: Whitener and Silver Springs Drainage Area Location: Whitener Street and Silver Springs Road area. Purpose: To prevent street flooding and property damage. Physical Description: Improve the drainage system. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 180-7020-7339-1050247 Design and construct. To prevent flooding and property damage. No significant impact. $ 64,000 Other (1) $ 64,000 105 ENVIRONMENT Project Number: 2-50 Project Title: Amblewood Drainage System Location: 1500 Block of Amblewood Drive. Purpose: To properly drain the area. Physical Description: Install a storm drainage system. Unit of Work: Design and construct. Justification: To prevent street flooding. Impact on Operating No significant impact. Budget: Financing: $ 26,500 Other (1) Total: $ 26,500 180-7020-7339-1060250 106 ENVIRONMENT Project Number: 2-51 Project Title: Bloomfield and Broadview Drainage Area Location: Ditches along Bloomfield Road and Broadview Street intersection. Purpose: To allow for proper drainage. Physical Description: Clean out drainage ditch and install a concrete pilot channel. Unit of Work: Clean, design, and construct. Justification: To allow for proper drainage. Impact on Operating No significant impact. Budget: Financing: $ 26,700 Other (1) Total: $ 26,700 180-7020-7339-1060251 107 ENVIRONMENT Project Number: 2-52 Project Title: Cape West Business Park Area Flood Control Proiect Location: In the general area of Siemers Drive — Mount Auburn Road and William Street — Bloomfield Road. Purpose: Area -wide detention plan to reduce stormwater impacts on major streets and general area. Physical Description: Combination of channel work and detention facilities, not designed at this time. Unit of Work: Design, acquire sites, and construct. Justification: Major storms result in periodic flooding of Siemers Drive, 1-55, Mount Auburn and Bloomfield Roads. Impact on Operating Some increased maintenance costs, undetermined at this time. Budget: Financing: $ 380,000 Other (1) Total: $ 380,000 180-7020-7339-1060252 1: 600000( 5000000 400000C 3000000 2000000 1000000 PARKS AND RECREATION CAPITAL IMPROVEMENTS PROGRAM 2006-2007 Fiscal 2007-2008 Fiscal 2008-2009 Fiscal 2009-2010 Fiscal 2010-2011 Fiscal Year Year Year Year Year 109 PARKS AND RECREATION PROPOSED PROJECTS Project 2006-2007 2007-2008 2008-2009 2009-2010 2010 - 2011 Improvement Item Total Cost Number Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 3-1 General Park Development 358,7501 51,2501 76,875 1 76,875 1 76,875 1 76,875 1 1995 3-2 Parking Lot Paving 23,4001 23,4001 2000 3-3 Capaha Park Shelter Replacement 15,6001 15,6001 200 3-4 Arena Park Shelter Replacement 16,400, 16,4001 (pre 1993) 3-5 Shawnee Park Soccer/Football 208,0001 208,0001 Fields 2000 3-6 Arena Park Parking Lot 93,600, 93,6001 2002 3-7 Washington Park Basketball Court 15,6001 15,6001 1998 3-8 Golf Course Irrigation 728,0001 728,0001 2004 3-9 Golf Course Club House 520,0001 520,0001 1996 3-10 Youth Baseball Field Improvements 210,1001 210,1001 2001 3-11 Shawnee Park Soccer Field Parking 100,000 A 100,000 A Lots 2006 3-12 Family Aquatic Center 5,200,0001 5,200,0001 2002 3-13 General Park, Golf Course, and 5,460,5001 5,460,5001 Recreation Facility Improvements 2002 3-14 Hopper Road Trail System 8,400E 8,400 E 2000 A General Revenue Fund B REV/PFA Bonds: Issued C REV/PFA Bonds: Pending D State Grants/Loans E Motor Fuel Tax F Federal Grants/Loans G Special Assessments H Capital Improvement Sales Tax I Other J Gen. Obligation Bonds: Pending K Transportation Sales Tax L Fire Sales Tax 110 PARKS AND RECREATION PROPOSED PROJECTS Project 2006-2007 2007-2008 2008-2009 2009-2010 2010 - 2011 Improvement Item Total Cost Number - Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 3-15 Bloomfield -Silver Springs Trace 74,600 E 74,600 E 2003 3-16 Perryville Sidewalk 218,300 D 170,560 D 2002 $ 47,740 E 3-17 Floodwall Mural Lighting 29,3001 29,300 1 2006 3-18 Riverwalk Expansion and Riverfront Park Renovation 780,000 D 624,000 D 2000 E 156,000 E 3-19 North Park Trail 397,000 D 317,600 D -T 200 E 79,400 E TOTALS 14,457,550 2,416,650 5,276,875 5,611,975 295,175 856,875 AGeneral Revenue Fund _B 100,000 100,000 REV/PFA Bonds: Issued C REV/PFA Bonds: Pending D State Grants/Loans 1112,160 317,600 170,560 624,000 E Motor Fuel Tax366,140 w.�F. ,.. _ _ _ _ a - .a _ 366 140 - w �_- 87,800 ,., - _ 74,600 47,740 156,000 Federal Grants/Loans ww �.., �_- � ,._ G Special Assessments H Capital Improvement Sales Tax I Other 12,879,250 1,911,250 _.� 5 276,875 5,537,375 76,875 76,875 J Gen. Obligation Bonds. Pending m _ w K Transportation Sales Tax L Fire Sales Tax _.,.,,.,... 111 PARKS AND RECREATION Project Number: 3-1 Project Title: General Park Development Location: Various parks. Purpose: To provide various park and recreation amenities and equipment. Physical Description: Construction of park amenities, recreational and other facilities. Unit of Work: Design and construct. Justification: Various parks have unanticipated needs each year. Impact on Operating Minor increases in operating and maintenance expenses, depending on I Budget: facilities constructed. Financing: $ 358,750 Other (1) Total: $ 358,750 Note: These funds could also be used for matching donations from civic groups or individual park improvements. 307-7000-7350-1060301 112 PARKS AND RECREATION Project Number: 3-2 Project Title: Parking Lot Paving Location: Arena Park, Washington Park, Ranney Park. Purpose: To pave existing gravel parking lots. Physical Description: Approximately 20,800 square feet of paving. Unit of Work: Design and construct. Justification: Stabilization of high use gravel parking areas. Impact on Operating No significant impact. Budget: Financing: $ 23,400 Other (1) Total: $ 23,400 307-70007350-1060302 113 PARKS AND RECREATION Project Number: 3-3 Project Title: Capaha Park Shelter Replacement Location: Capaha Park Purpose: To replace old shelter. Physical Description: Replacement of shelter #3 on the east side of the park. Unit of Work: Remove existing shelter completely and install a new shelter with tables, grill, fountain, and electricity. Justification: Old shelter is deteriorated. Impact on Operating No significant impact. Budget: Financing: $ 15,600 Other (1) Total: $ 15,600 307-7000-7350-1060303 114 PARKS AND RECREATION Project Number: 3-4 Project Title: Arena Park Shelter Replacement Location: Arena Park Purpose: Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 307-7000-7350-1060304 Provide additional picnic facilities and replace old shelter. To replace shelter #5 located in the northern portion of Arena Park. To remove existing shelter completely and install a new shelter with tables, grill, fountain, and electricity. Old shelter is deteriorated. Need to improve picnic facilities adjacent to I playground unit. No significant impact. $ 16,400 Other (1) $ 16,400 115 PARKS AND RECREATION Project Number: 3-5 Project Title: Shawnee Park Soccer/Football Fields Location: Shawnee Park Sports Complex Purpose: To provide a permanent youth tackle football field and additional soccer fields. Physical Description: Construction of four fields for soccer and youth tackle football. Unit of Work: Design and construct. Justification: Current fields are inadequate for the number of soccer users, and football users need permanent fields. Impact on Operating No significant impact. Budget: Financing: $ 208,000 Other (1) Total: $ 208,000 307-7000-7350-1060305 116 PARKS AND RECREATION Project Number: 3-6 Project Title: Arena Park Parking Lot Location: Arena Park Purpose: To provide additional parking for events and general usage. Physical Description: 300 foot by 250 foot parking lot on the south side of the Arena Building. Unit of Work: Construct. Justification: To provide additional parking space needed for increased events and/or general park usage. Impact on Operating No significant impact. Budget: Financing: $ 93,600 Other (i) Total: $ 93,600 307-7000-7350-1060306 117 PARKS AND RECREATION Project Number: 3-7 Project Title: Washington Park Basketball Court Location: Washington Park Purpose: To provide regulation size basketball court for recreational activities. Physical Description: 120 foot by 70 foot basketball court, 2 posts, 2 backboards, and 2 rims with nets. Unit of Work: Design and construct. Justification: To provide basketball court for neighborhood youth. Impact on Operating No significant impact. Budget: Financing: $ 15,600 Other (1) Total: $ 15,600 307-7000-7350-1060307 118 PARKS AND RECREATION Project Number: 3-8 Project Title: Golf Course Irrigation Location: Cape Jaycee Municipal Golf Course Purpose: Replacement of 18 year old underground system. Physical Description: Underground irrigation system for fairways, tees, and greens. Unit of Work: Design and install. Justification: Present irrigation system has numerous yearly leaks. Impact on Operating Improvement of irrigation system would reduce operating costs for repair Budget: materials and would reduce man hours used for repairs that could be better allocated for other maintenance and improvement activities. Financing: Total: 307-7000-7350-1060308 $ 728,000 Other (1) $ 728,000 119 PARKS AND RECREATION Project Number: 3-9 Project Title: Golf Course Club House Location: Cape Jaycee Municipal Golf Course Purpose: To provide needed storage space, customer use area, and merchandise I sales and display area. Physical Description: Construction of new 3,000 square foot pro shop located at the site of the I present shop. Unit of Work: Design and construct. Justification: The present pro shop size of 1,300 square feet is inadequate for the needs of customer space, merchandise storage and sales area. Increasing golf course usage and revenues justify this project. Impact on Operating Minor increase in operating expenses anticipated. Increased depreciation Budget: expense. Financing: $ 520,000 Other (1) Total: $ 520,000 1307-7000-7350-1060309 120 PARKS AND RECREATION Project Number: 3-10 Project Title: Youth Baseball Field Improvements Location: Arena Park Sports Complex Purpose: To provide better facilities for youth baseball teams that use the fields. Physical Description: Replace backstops, fencing and dugouts for two (2) fields. Install irrigation systems, portable outfield fence, scoreboards, new lighting, and storage buildings. Unit of Work: Construct. Justification: Impact on Operating Budget: Financing: Total: 307-7000-7350-1060310 Current facilities are old and need replacing. No significant impact. $ 210,100 Other (1) $ 210,100 121 PARKS AND RECREATION Project Number: 3-11 Project Title: Shawnee Park Soccer Field Parking Lots Location: Shawnee Park Sports Complex Purpose: Improve parking surface for park users. Physical Description: Asphalt overlay of two existing gravel parking lots, including striping. Unit of Work: Design and construct. Justification: Parking lots are used by hundreds of players and parents each weekend during the spring and fall, as well as hosting four major soccer tournaments. Impact on Operating Budget: Financing: Total: 307-7000-7350-1060311 No significant impact. $ 100,000 General Revenue Fund (A) $100,000 122 PARKS AND RECREATION Project Number: 3-12 Project Title: Family Aquatic Center Location: Osage Park Purpose: To provide a variety of aquatic recreation and wet play elements, both active and passive that appeal to a full spectrum of age groups and families. Physical Description: Development and construction of an aquatic facility featuring a leisure pool, play pool, water slides, lazy river, zero depth entry, and various aquatic play structures. Unit of Work: Design and construct. Justification: Public desire for this type of facility that would provide a level of aquatic recreation currently unavailable, and included in the park and recreation master plan. Impact on Operating According to the future facility needs study by Horner and Shifrin, Inc., this Budget: facility should be largely or entirely self supporting providing that a realistic fee structure is established with properly scheduled fee adjustments followed. Financing: Total: 307-7000-7350-1060312 $ 5,200,000 Other (1) $ 5,200,000 123 PARKS AND RECREATION Project Number: 3-13 Project Title: General Park Golf Course, and Recreation Facility Improvements Location: Various parks, golf course, and recreation facilities. Purpose: To provide various park, golf course, and recreation facility improvements. Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 1307-7000-7350-1060313 Development and construction of various parks, golf course, and recreation facility improvements and additions. Design and construct. Deterioration of existing facilities and public interest in additional facilities and improvements based on public survey and park and recreation survey. Some increase in personnel, equipment and operating expenses anticipated. Unquantifiable at this time. $ 5,460,500 Other (1) $ 5,460,500 124 Project Number: Project Title: Location: Purpose: Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 307-7000-7350-1040313 PARKS AND RECREATION 3-14 Hopper Road Trail System From Cape La Croix Trail along Hopper Road and various city streets to County Park South. To provide a trail system using city streets and sidewalks connecting the Cape La Croix Recreational Trail to County Park South. Designate various city streets as a part of the trail system, and construct trail connections between Rosewood Drive and Prospect Drive, and Hunter's Lane and South County Park Drive. Design, acquire right-of-way, and construct. Provide linkage between existing trails and streets to park land. Trail connections will add some maintenance costs. $ 8,400 Motor Fuel Tax (E) $ 8,400 125 PARKS AND RECREATION Project Number: 3-15 Project Title: Bloomfield -Silver Springs Trace Location: From Cape La Croix Trail near Tanner Drive along Cape Centre Drive, Broadview Street, Bloomfield Road, and South Silver Springs Road to Cape Central High School. Purpose: To provide a hike/bike trail connection. Physical Description: Combination of new street -marked bike paths and sidewalks totaling approximately 4,800 lineal feet and existing sidewalks. Unit of Work: Design and construct. Justification: Will extend the City's trail system and provide hike/bike connection between Cape La Croix Trail and the high school complex. Impact on Operating Will increase maintenance costs. Budget: Financing: $ 74,600 Motor Fuel Tax (E) Total: $ 74,600 307-7000-7350-1060315 126 PARKS AND RECREATION Project Number: 3-16 Project Title: Perryville Sidewalk Location: Perryville Road, between Cape Rock Drive and Perry Avenue. Purpose: To provide a pedestrian connection between Capaha Park, Kiwanis Park, and the Cape La Croix Recreational Trail. Physical Description: Four -foot wide concrete sidewalk along Perryville Road. Unit of Work: Design and construct. Justification: To allow the removal of pedestrian traffic from a heavily traveled street, providing pedestrian access to city parks. Impact on Operating No significant impact. Budget: Financing: $ 170,560 State Grants/Loans (D) 47,740 Motor Fuel Tax (E) Total: $ 218,300 307-7000-7350-1060316 127 PARKS AND RECREATION Project Number: 3-17 Project Title: Floodwall Mural Lighting Location: Water Street/Riverfront Purpose: To provide better lighting to highlight the feature panels of "The Mississippi Tales" mural. Physical Description: Install 29 ground mounted spot light fixtures with all wiring, controllers, and other necessary appurtenances. Unit of Work: Design and install. Justification: To improve the lighting of the already very popular Water Street mural and add more aesthetic value to that project. Impact on Operating Some increased operational costs. Budget: Financing: $ 29,300 Other (1) Total: $ 29,300 307-7000-7350-1060317 128 PARKS AND RECREATION Project Number: 3-18 Project Title: Riverwalk Expansion and Riverfront Park Renovation Location: Mississippi River frontage, Red Star area (First Street), south to River Campus site. Purpose: To provide expanded walking trail facilities, recreational and interpretational opportunities along the Mississippi River. Physical Description: Construct approximately 4,400 feet of 10 to 12 -foot walkway north and south of the existing river walks, construct a pedestrian bridge over Sloan Creek, and renovate the original riverfront park. This project will need to be constructed in phases over several years. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 307-7000-7350-1060318 Design, engineer and construct. Recreational and interpretational opportunities along the Mississippi River need to be expanded to take full advantage of this outstanding physical, cultural and tourist attraction. Increased operational and maintenance costs, undetermined at this time. $ 624,000 State Grants/Loans (D) 156,000 Motor Fuel Tax (E) $ 780,000 129 PARKS AND RECREATION Project Number: 3-19 Project Title: North Park Trail Location: Lexington Avenue to North County Park. Purpose: To extend the current trail system to connect with the North County Park and the Department of Conservation's Nature Center. Physical Description: Construct approximately 6,500 lineal feet of 8 to 10 -foot walkway northwest from the end of the existing trail system at Lexington Avenue/ Route W to the North County Park. Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 307-7000-7350-1060319 Design, engineer and construct. Provide linkage between existing trails and parks to other park land and other recreational facilities. Increased operational and maintenance costs, undetermined at this time. $ 317,600 State Grants/Loans (D) 79,400 Motor Fuel Tax (E) $397,000 130 COMMUNITY DEVELOPMENT CAPITAL IMPROVEMENTS PROGRAM Luub-z001 rascal 2007-2008 Fiscal 2008-2009 Fiscal 2009-2010 Fiscal 2010-2011 Fiscal Year Year Year Year Year 131 COMMUNITY DEVELOPMENT PROPOSED PROJECTS 2006- 2007- 2008- 2009- 2010 - Project Total Improvement Item 2007 2008 2009 2010 2011 Number Cost Fiscal Fiscal Fiscal Fiscal Fiscal 4-1 Police Department Annex 5,287,400 1 462,750, 4,824,650, 1998 4-2 Renovation of Fire Station No. 1 300,0001- 300,000 L 1996 4-3 Fire Station No. 2 Roof Replace/ 150,000 L 150,000 L Renovate & Building Repair 2004 4-4 City Hall Elevator 174,800 A 174,800 A 1994 4-5 Outdoor Warning Sirens 104,000, 20,800, 20,800, 20,800, 20,800, 20,800, 2004 TOTALS 6,016,200 470,800 195,600 20,800 483,550 4,845,450 0 132 20,800 1 483,550 1 4,845,450 11 COMMUNITY DEVELOPMENT Project Number: 4-1 Project Title: Police Department Annex Location: Police Headquarters, South Sprigg Street. Purpose: Construct annex to existing headquarters to provide additional space for an emergency operations center, court room, additional office space, interview suites, and locker facilities for public safety personnel. Renovate and upgrade existing structure. Physical Description: Two-story, 16,000 square foot addition to the north and east sides of the existing facility. Acquisition of additional parcels of land east of the existing building; demolition, excavation and construction of a secure parking facility. Renovation of existing structure. Unit of Work: Construction of building, acquisition of additional property, renovation/upgrade of existing building. Justification: Construction and renovation would enhance earthquake mitigation efforts for emergency response personnel and provide a full service police facility, including court room access. Impact on Operating Some increase in equipment, personnel and operating budget anticipated, Budget: unquantifiable at this time. Increased depreciation expense. Financing: $ 5,287,400 Other (1) Total: $ 5,287,400 300-7000-7371-1040402 133 COMMUNITY DEVELOPMENT Project Number: 4-2 Project Title: Renovation of Fire Station No. 1 Location: 1 South Sprigg Street Purpose: To provide additional office and storage areas that will meet the needs of the Fire Department for the next 10 — 15 years, including the relocation of the emergency generator, the construction of an addition on the south side of the fire station to provide storage space, the conversion of existing storage areas to offices, and the renovation of the heating and air conditioning systems. Physical Description: Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 186-3030-7371-1050403 Construction of an addition for increased storage and office space. Design and construct. Current area is poorly designed and incapable of meeting the expanding needs of a growing organization. No significant impact. $ 300,000 Fire Sales Tax (L) $ 300,000 134 COMMUNITY DEVELOPMENT Project Number: 4-3 Project Title: Fire Station No. 2 Roof Replacement/Renovation and Building Repair Location: 378 South Mount Auburn Road Purpose: Physical Description Unit of Work: Justification: Impact on Operating Budget: Financing: Total: 186-3030-7371-1040407 To provide funding necessary for replacement of the roof, repair damaged ceiling and walls, and building renovation. Replace present flat roof with pitched metal roof, renovation of building, and I moving emergency generator from basement to exterior. Design and construct. Roof leaks causing significant water damage restroom facilities. No significant impact. $ 150,000 Fire Sales Tax (L) $ 150,000 135 There are no female COMMUNITY DEVELOPMENT Project Number: 4-4 Project Title: City Hall Elevator Location: 401 Independence Street Purpose: Permit access, including access for mobility -impaired persons, to all three levels for services offered. To be in compliance with Americans with Disabilities Act. Physical Description: Elevator meeting all handicapped -accessibility requirements I interconnecting all three floors of City Hall. Unit of Work: Design and construct. Justification: Convenience and safety of public, and compliance with Americans with I Disabilities Act. Impact on Operating Additional operating and maintenance costs. Budget: Financing: $ 174,800 General Revenue Funds (A) Total: $ 174,800 1300-7000-7375-1950409 136 COMMUNITY DEVELOPMENT Project Number: 4-5 Project Title: Outdoor Warning Sirens Location: Arena Park, Shawnee Park off West End Boulevard, Kiwanis Park, Fire Station No. 2, and the River Campus. Purpose: To provide a severe weather or other emergency warning system for strategic locations within the City of Cape Girardeau. Physical Description: Outdoor warning sirens of suitable type for the location and its terrain, electric powered with battery back-up. Unit of Work: Install. Justification: The City is in an area affected frequently by severe storms. The five sirens planned at the locations noted, in conjunction with the existing sirens on the University main campus, will provide maximum coverage at minimal cost. Impact on Operating Budget: Financing: Total: 001-3030-7150 No significant impact. $ 104,000 Other (1) $ 104,000 137 dJ PTY page intentionally left blank. 138 LONG-RANGE CAPITAL IMPROVEMENT PROGRAM Unfunded Needs List The following list of Capital Improvement Program Needs consists of those projects which have been identified as major long-range facility improvements for which funding is currently not available. These projects are not listed in any order of priority. TRANSPORTATION 1) Bloomfield Road —Benton Hill Road to Route 74 2) Broadview from Independence to North Kingshighway (at Maria Louise Lane) 3) Broadway — Houck Place to Main Street (general improvements) 4) Cape Rock Drive — Big Bend Road to Cape Rock Park — widening with curb and gutter 5) Edgewood Drive — Gordonville Road to Bloomfield Road — widening and general improvements 6) Gordonville Road — Independence to the west — widening with curb and gutter 7) Old Hopper Road — Mount Auburn to Kage — widening with curb and gutter 8) Kage Road — Mount Auburn to Hopper Road — widening with curb and gutter 9) Big Bend Road — Mason Street to Lexington Avenue (and short distance north) — widening, storm drainage and sidewalks (parts) 10) Mount Auburn Widening — Independence to Kingshighway 11) New Madrid Street — Perry Avenue to Clark — widening with curb and gutter, storm drainage 12) Sprigg Street — New Madrid to Southern Expressway — general improvements and/or widening 13) Vantage Drive — Percy Drive to Kingshighway at Boulder Crest (west) 14) West End Boulevard — Southern Expressway to Shawnee Parkway and Bloomfield to Bertling and extended to Lexington — general upgrade and extension 15) I-55/Bloomfield Road Overpass — widening 16) North Sprigg Street — extension to West Cape Rock Drive (County Road 643) 17) Main Street Widening — Mill Street to Mason Street 18) New Bloomfield Road/1-55 overpass 19) New Hopper Road/I-55 overpass 20) Street lighting improvements — beyond TTF-2 21) Public Transportation — expanded taxi coupon system and/or small bus system 22) Additional streets per Major Street Plan 23) Airport — additional airport improvement projects per Airport Master Plan 24) Airport — corporate parcel and utility road extensions 25) Airport — development of an Airport Industrial Park ENVIRONMENT 1) Highland Drive -Oakland Street -Engram Street trunk sewer 2) Sewer improvement projects per Sewer Master Plan 139 3) Land acquisition for sludge program 4) Stormwater detention basins/major stormwater channel projects 5) Water Plant No. 1, Phase III expansion 6) I-55 and William Street 14 -inch upgrade 7) 12 -inch main extension (Kingshighway) 8) 12 -inch main extension (Highway 177) 9) 8 -inch main extension (Mount Auburn and Hopper Road) 10) 4 -inch main replacement (City wide) 11) Fire protection upgrade (Kingshighway) PARKS AND RECREATION 1) Capaha Park basketball court (lighted, fenced, regulation court). 2) Arena Park — paving off street parking lots #5, #10, and #11. 3) Arena Park — ballfield spectator paving, tennis court parking paving. 4) Arena Park — road paving by fields #12, #13, #14, and #15. 5) Tennis court renovation (lights, fence, windscreen color coating). 6) New bandshell restroom. 7) Additional parking for Osage Community Center. 8) In-line hockey/skateboard facility. 9) Bent grass greens at golf course. 10) Driving range. 11) Additional trail facilities. 12) Additional facilities as per Park Master Plan. COMMUNITY DEVELOPMENT 1) Fire Station No. 5 — new site 2) Regional fire training center 3) City Hall standby power system 4) Neighborhood and downtown redevelopments 5) Historic preservation 140