Loading...
HomeMy WebLinkAboutCIP2001-2006BILL NO. 2001-49 RESOLUTION NO. KOU A RESOLUTION ADOPTING THE FISCAL 2001 - 2006 CAPITAL IMPROVEMENTS PROGRAM WHEREAS, Article VI, Section 6.04 of the Charter of the City of Cape Girardeau requires a Capital Improvements Program; and WHEREAS, the City Manager has presented a proposed Capital Improvements Program to the City Council; and WHEREAS, proper notice has been published concerning the availability for inspection of the proposed Capital Improvements Program and the time and place for a public hearing on the Capital Improvements Program; and WHEREAS, the City Council has held a public hearing on the proposed Capital Improvements Program. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Council hereby adopts the five-year Capital Improvements Program for fiscal 2001-2006, copies of which are on file in the office of the City Clerk. ARTICLE 2. The City Clerk is instructed to attach an executed copy of this resolution to.a copy of the Capital Improvements Program for fiscal 2001-2006 and to retain such copy with the permanent records of the City. PASSED AND ADOPTED THIS � DAY OF , 20 0 I A.'M. Spradling, III, Ma ATTEST: - 9i'l, P t) a� 65�A� Gayl L. Conrad City Clerk CITY OF CAPE GIRARDEAU Office of the City Manager Council Letter No. Agenda February 20, 2001 The Honorable Mayor and Members of the City Council City of Cape Girardeau, Missouri RE. Public Hearing on 2001-2006 Capital Improvements Program Dear Mayor and Council Members: In accordance with requirements of the City Charter, a public hearing regarding the 2001- 2006 Capital Improvements Program has been set for Tuesday, February 20, 2001, at 7:00 P.M. The public notice of the hearing was published in the Southeast Missourian on Monday, February 5, 2001. Unless otherwise directed, the staff will prepare a resolution for adoption of the proposed Capital Improvements Program, with any amendments the Council wishes to make, for the Council's agenda for Monday, March 5t'. The City Charter requires that the Capital Improvements Program be adopted on or before April 1, 2001. The draft of the proposed Capital Improvements Program was submitted to the City Council on January 22, 2001, by Council Memorandum No. 5. The Council held a special work session on the Capital Improvements Program on January 29th. Respectfully submitted, Kent M. Bratton Director of Planning Services KMB/JRR/MGM/rlf John R. Richbourg Michael G. Miller Finance Director City Manager CITY OF CAPE GIRARDEAU, MISSOURI Office of the City Manager Council Letter No. 63 Agenda March 5, 2001 The Honorable Mayor and Members of the City Council City of Cape Girardeau, Missouri Subject: Adoption of the Capital Improvements Program, Fiscal 2001-2006 Dear Mayor and Council Members: In accordance with the requirements of the City Charter, a public hearing regarding the 2001-2006 Capital Improvements Program was held on Tuesday, February 20, 2001, at 7:00 P.M, in the Council Chambers. The City Charter requires that the Capital Improvements Program be adopted on or before April 1, 2001. Attached for the Council's consideration is a resolution adopting the Capital Improvements program. It is recommended that the City-Cttacil proceed with this action. Respectfully submitted, Michael G. Miller City Manager John R. Richbourg Finance Director yen 0t M. Bratton Director of Planning Services MGM/JRR/KMB/rlf TABLE OF CONTENTS I-IDIM Introduction: PAGE CityManager's Letter.......................................................................................................... Summaries: Revenue Funding Sources by Fiscal Year Graph.................................................................. vii Summary of Funding Sources by Fiscal Year 2001-2006 .................................................... viii Summary of Recommended Capital Improvements Program Expenditures 2001-2006 by Program Description and Source of Funds ix ........................................................................................................................ Summary of Funding Sources Graph....................................................................................... x Capital Improvements Budget by Program Area Graph ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, xi RevenueSources.................................................................................................................... xii Capital Improvements Program: Transportation and Public Works Environment.......................................................................................................................... 45 Parksand Recreation............................................................................................................105 Community Development...................................................................................................121 UnfundedNeeds List.............................................................................................................141 The Honorable Mayor and Members of the City Council City of Cape Girardeau Dear Mayor and Council Members: March 28, 2001 INTRODUCTION The City staff herewith presents the adopted Five -Year Capital Improvements Program. This program, for the period July 1, 2001, through June 30, 2006, is submitted in accordance with Article VI, Section 6.04 of the City Charter. On February 20, 2001, in accordance with the City Charter, the City Council held a public hearing for the Capital Improvements Program. Following public input, the City Council adopted the Capital Improvements Program by resolution at its March 5, 2001, meeting. While the projects included herein are attainable through available revenue sources, a number of these depend on the cooperation of property owners and other agencies, and further action by the City Council. Projects for which a funding source is not currently proposed are included under the Unfunded Needs Section. Each of the City's advisory boards involved in planning for capital improvements were given the opportunity to provide input, as well as those City departments involved in planning and implementation of such improvements. BACKGROUND The Capital Improvements Program should be considered as an investment in the future of the community. The selection and evaluation of capital projects is a difficult task that involves some speculation and the ability to make estimations which, to some extent, are based on historical perspectives. The City Council, in 1983, formally considered and adopted a long-range Capital Improvements Program for the first time under the current Charter requirement. This budget process should provide a relevant approach to identifying and implementing important community -wide and neighborhood projects. PROGRAM AND FINANCING DESCRIPTIONS The major program areas within which the various projects have been described include Transportation, Environment, Parks and Recreation, and Community Development. These major categories contain the following types of projects: i 1. Transportation. The projects in this category provide for the construction of the public streets within the City, and improvements at the Regional Airport. 2. Environment. These projects provide for the preservation, restoration, and care of the environmental resources of the City, including solid waste, water, wastewater, and stormwater services. 3. Parks and Recreation. The programs under this area provide the facilities for citizens to engage in organized and unorganized recreation and leisure time activities. 4. Community Development. Projects under this category include construction of general public facilities and community projects which have city-wide effects, and improvements to Public Works facilities other than utilities. The Capital Improvements Program includes several revenue sources recommended to finance the capital improvements proposed. The following is a brief description of the various revenue sources: A. General Fund Revenues. These revenues are available on an annual appropriation basis from the City's general fund, which includes the receipt of revenues from a number of sources. These funds are subject to the annual operating budgeting process. B. and C. Revenue/PFA Bonds. These bonds are issued for the financing of self-supporting and general public improvements. Revenue bonds are not included within the limitations of indebtedness of the City and are issued upon the authorization of a majority voter approval. These bonds are normally used for enterprise funds such as water, sewer, and solid waste utilities. PFA (Public Facility Authority) bonds are used upon City Council approval based on collateralized assets and annual lease/purchase appropriations. Cash flows for debt retirement come from existing revenue and from new receipts to be generated by the facilities' operations. Within the Capital Improvements Program, revenue/PFA bonds already issued or authorized by the electorate or City Council are denoted as "B". Those that are pending, i.e. will require subsequent approval of the electorate or Council, are denoted as "C". D. State Grants. The City is eligible to submit grant applications to the State of Missouri for funds that they may have available either from their own revenue sources or, in some cases, from revenue sources that they administer for various federal agencies. ii E. Motor Fuel Tax Receipts. This fund provides for the receipt and disbursement of revenues the City receives as its portion of the State Gasoline Tax, State Motor Vehicle Licensing Fees, and State Motor Vehicle Sales Tax. The revenues from this source can be used for capital improvements, as well as annual operating and maintenance expenses as they relate to improvements on the City's streets. F. Federal Grants. The City is eligible to receive various federal grants on a competitive basis from appropriate federal agencies. This could include the Environmental Protection Agency as it relates to wastewater improvements, the Federal Highway Administration which administers and distributes funds from the Federal Gasoline Tax through the Federal Aid Urban program, or the Federal Aviation Administration for airport improvements. Most of these funds, however, are now administered by the State through related State agencies. G. ficial Assessments. This category provides for the consideration of special assessments which are used for public improvements affecting specific areas. The total, or a portion of, the cost of an improvement is divided among property owners who benefit from the project. This type of funding can be used for diverse improvements including streets, water, stormwater, sanitary sewer or sidewalk improvements. It should be noted, however, that the "up front" cost of special assessment projects (i.e., the initial funding) must be borne by the City from available revenue sources, with the special assessment "costs" recovered afterwards, typically over a period of ten years through special tax bills paid by the benefiting property owners. H. Capital Improvements Sales Tax. A 1/4 cent, 3/s cent, or '/2 cent Sales Tax can be issued by the City for various types of public improvements. Such a tax requires approval by the electorate with a simple majority. For example, in November, 1988, the voters of Cape Girardeau adopted a'/4 cent sales tax effective January 1, 1990, restricted to flood control projects. On April 5, 1994, the voters of Cape Girardeau approved the extension of this tax for an additional twenty years to pay for improvements to the City's sewer system. In November of 1996, the voters adopted an additional '/4 cent sales tax effective January 1, 1997, for expansion of the water treatment plant and various other water improvements. I. Other. This category denotes funds from donations, operating revenues from funds other than the General Fund, reserves, proceeds from the sale of fixed assets and other sources. J. General Obligation Bonds. These bonds are normally issued for the financing of general public improvements. General obligation bonds must be authorized by a 4/7th vote of the voters which also authorizes a tax levy to be used for debt retirement. Total outstanding general obligation bonds are limited by State statute to 20% of the City's total assessed valuation. iii K. Transportation Sales Tax. Pursuant to Sections 94.700 - 94.755 of the State statutes, the voters of the City of Cape Girardeau approved a %s% sales tax for transportation purposes on August 8, 1995, for a period of five (5) years. This tax went into effect on January 1, 1996. Revenues from this source are placed in a special Transportation Trust Fund to be used only for the projects and purposes outlined in the current program. While this tax expired on December 31, 2000, some projects remain to be completed and are carried over into the 2001-2002 fiscal year. On August 8, 2000, the voters approved the extension of the '/Z% sales tax for additional specific street improvement projects for another period of five (5) years. This tax went into effect on January 1, 2001. The revenues from this source will be placed into a separate Transportation Trust Fund and will be used for the specific projects approved. PROPOSED IMPROVEMENTS The total Capital Improvements Program included herein includes a total of $83,772,048 in improvements for the five-year period 2001-2006 by fiscal year. Other Funding will provide the largest source of funds, with $29,253,800 projected for the program period. These funds, if available, will be used for new construction and improvements at the City's fire stations, an addition to police headquarters, a new public works facility, and a new clubhouse at the golf course. The second largest category for funding proposed improvements is through Revenue/PFA Bonds. This provides for $19,225,163 in funding over this period, most of which is connected with the November, 1996, passage of the issue for water system improvements. The third largest funding source is the Transportation Sales Tax. This includes $17,841,900 in funds for the program period. The fourth largest category for funding proposed improvements is Federal Grants and Loans. This provides for $4,549,790 in funding over this period. The largest program area is Environment ($38,744,413). The most significant projects in this area will continue to be the sewer improvements funded by the April, 1994, bond election and an additional sewer bond issue approved on February 8, 2000 ($7,472,298). Also included in this area is $15,707,315 for expansion of the water system's production/treatment/distribution capacity, part of which is to be funded by revenue bonds authorized November 5, 1996. This category also includes $1,300,000 for the completion of the Corps of Engineers' Flood Control Project detention basin. The Transportation program area ($26,707,600) contains the second largest amount for proposed projects over the next five years. This amount is comprised of $21,516,115 for street and bridge projects ($17,841,900 of the projects are Transportation Trust Fund projects), and $5,328,000 for airport projects. iv The Community Development program area ($18,330,570) includes $3,620,720 in proposed new construction or improvements to the City's fire stations, $985,100 for a regional fire training center, $4,685,000 for an addition to police headquarters, and $8,604,850 for a new public works facility. Also included is replacement of the police station heating and cooling system, City Hall remodeling, and construction of a City Hall elevator. The Parks and Recreation program area includes $3,018,450 for five relatively small improvement projects, general park development, continued payment for land acquisition for the additions to Shawnee Park and the purchase of Osage Park, renovations at Fort D, and construction of a new pro shop at the Municipal Golf Course. Also included is the expansion of the Riverfront Park and the Riverfront Trail, and the Hopper Road Trail system. CONCLUSION The capital improvements program proposed herein is a progressive program. The implementation of this program will allow for the creation of new job opportunities, an increase in revenue to private businesses, opportunities for new businesses, existing business expansions, increased tax revenues to all taxing jurisdictions, and the strengthening of the quality of life in Cape Girardeau and the surrounding area. It is hoped that this plan will focus attention on community goals, needs and capabilities; reduce scheduling problems and conflicting or overlapping projects; maintain a sound and stable financial program; enhance opportunities for participation in federal or state funded programs; and achieve the highest public benefit from the expenditure of City revenue. The projects proposed in this document are the product of many hours of deliberative thought by a number of people within the community. The Charter requires an annual review and revision of the Capital Improvements Program which assures that the Program remains responsive to changing demands, priorities, and available revenues. The final plan should be regarded as a sound, fiscally responsible working document that can and will be implemented through the annual budget appropriation process of the City Council, support from the citizens of Cape Girardeau for appropriate revenue sources, and diligent action by the City staff. micnaei fir. miner City Manager MGM/KMB/JR/rlf Hent ivi. Bratton Director of Planning Services W John Richbourg Finance Director 40,000,000 35,000,000 30,000,000 25,000,000 20,000,000 15,000,000 10,000,000 5,000,000 REVENUE FUNDING SOURCES BY FISCAL YEAR CAPITAL IMPROVEMENTS PROGRAM 2001-02 2002-03 2003-04 2004-05 2005-06 Vll SUMMARY OF FUNDING SOURCES BY FISCAL YEAR 2001-2006 SOURCE OF FUNDS 2001-02 1 2002-03 2003-04 1 2004-05 1 2005-06 1 =AL GENERAL FUND REVENUES 1,290,760 556,700 237,400 163,000 151,400 2,399,260 REVENUE/PFA BONDS: ISSUED 18,562,863 562,300 100,000 19,225,163 REVENUE/PFA BONDS: PENDING 4,076,200 4,076,200 STATE GRANTS/LOANS 1,505,945 796,750 2,302,695 MOTOR FUEL TAX RECEIPTS 810,310 582,530 859,000 323,200 550,000 3,125,040 FEDERAL GRANTS/LOANS 818,890 100,000 1,027,000 1,669,000 934,900 4,549,79 SPECIAL ASSESSMENTS 614,100 236,600 850,700 CAPITAL IMPROVEMENT SALES TAX 35,000 52,500 30,000 30,000 147,500 OTHER 2,449,525 11,674,155 11,742,120 2,796,400 591,600 29,253,800 GEN. OBLIGATION BONDS: PENDING TRANSPORTATION SALES TAX 5,448,600 5,854,800 3,212,000 2,372,000 954,500 17,841,90 TOTALS 35,612,193 20,416,335 17,207,520 7,353,600 3,182,400 83,772,048 SUMMARY OF RECOMMENDED CAPITAL IMIPROVEMENT PROGRAM EXPENDITURES 2001-2006 BY PROGRAM DESCRIPTION AND SOURCE OF FUNDS SOURCE OF FUNDS PROGRAM DESCRIPTIONS TRANSPORTATION & PUBLIC WORKS ENVIRONMENT PARKS & RECREATION COMMUNITY DEVELOPMENT TOTAL GENERAL FUND REVENUES 761,310 175,000 945,950 517,000 2,399,260 REVENUE/PFA BONDS: ISSUED 19,225,163 - 19,225,163 REVENUE/PFA BONDS: PENDING 4,076,200 4,076,200 STATE GRANTS/LOANS 835,639 1,128,400 338,656 - 2,302,695 MOTOR FUEL TAX RECEIPTS 3,032,876 - 92,164 3,125,040 FEDERAL GRANTS/LOANS 4,144,790 405,000 - 4,549,790 SPECIAL ASSESSMENTS 850,700 - 850,700 CAPITAL IMPROVEMENT SALES TAX - 147,500 - - 147,500 OTHER 62,100 9,736,450 1,641,680 17,813,570 29,253,800 GEN. OBLIGATION BONDS: PENDING - - - TRANSPORTATION SALES TAX 17,841,900 - - 17,841,900 OTALS 26,678,67----,35,744,4131 3,018,450 18,330,570 83,772,048 lX TRANSPORTATION SALES TAX 21% GEN. OBLIGATION BONDS: PENDING 0% OTHER 35% GENERALFUND REVENUES 3% X REVENUE/PFA BONDS: ISSUED 23% REVENUE/PFA BONDS: PENDING 5% STATE GRANTS/LOANS 3% MOTOR FUEL TAX RECEIPTS 4% FEDERAL GRANTS/LOANS 5% SPECIAL ASSESSMENTS 1% CAPITAL IMPROVEMENT SALES TAX 0% CAPITAL IMPROVEMENT BUDGET COMMUNITY DEVELOPMENT 77oi PARKS & RECREATION 4% TRANSPORTATION & ^UBLIC WORKS ENVIRONMENT 42% X1 32% A. B. C. D. E. F. REVENUE SOURCES General Revenue Fund G. Special Assessments Revenue/PFA Bonds: Issued H. Capital Improvement Sales Tax Revenue/PFA Bonds: Pending 1. Other State Grants and Loans J. General Obligation Bonds Motor Fuel Tax Receipts K. Transportation Sales Tax Federal Grants and Loans xii 8000000 7000000 6000000 5000000 4000000 3000000 2000000 1000000 -Z7 T 2001-02 FISCAL 2002-03 FISCAL 2003-04 FISCAL 2004-05 FISCAL 2005-06 FISCAL YEAR YEAR YEAR YEAR YEAR TRANSPORTATION PROPOSED PROJECTS PROJECT IMPROVEMENT TOTAL 2001-02 2002-03 2003-04 2004-05 2005-06 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL YEAR YEAR YEAR YEAR YEAR 1-1 Existing Street Paving Program 3,025,000 650,000 650,000 650,000 650,000 425,000 E,K E,K E,K E,K E,K E,K 1-2 Street, Curb & Gutter Repair 1,687,500 375,000 375,000 375,000 375,000 187,500 K K K K K K 173 Sidewalk Repair and 450,000 100,000 100,000 100,000 100,000 50,000 Reconstruction K K K K K K 1-4 New Sidewalk Construction 135,000 30,000 30,000 30,000 30,000 15,000 K K K K K K 1-5 Street Lights - New 1,350,000 300,000 300,000 300,000 300,000 150,000 Installations & Upgrades K K K K K K -R-1 IN W Kage Road: Mt. Auburn to Hopper Road 98,600 K 98,600 K ,' 7 Independence: Reconstruct.: 424,000 424,000 Pacific St. to Sprigg St. K K #.. Lorimier: Morgan Oak to New 264,800 264,800 Highway 74 K K -'Silver Springs I: Southern 1,022,000 1,022,000 Expressway to Kingshighway K K Siemens Drive: Widening with 1,561,000 1,561,000 Traffic Signals: William St. to K K Bloomfield Road Silver Springs II: Shawnee 1,088,000 1,088,000 Parkway to Southern K K Expressway 1812 Bloomfield Road: Phase III: 2,228,000 2,228,000 Siemers to Stonebridge and K K Ramsey Branch Bridge 1-1.3; - Independence Widening I: 2,107,000 2,107,000 Kingshighway to Pacific St. K K Broadway Widening & 1,957,000 1,957,000 Improvement: Perry Ave. to K K Houck Place Mt. Auburn IV: Widening & 1,117,000 1,117,000 Improvement: William St. to K K Bloomfield Road A GENERAL REVENUE FUND B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTS/LOANS E MOTOR FUEL TAX F FEDERAL GRANTS/LOANS G SPECIAL ASSESSMENTS H CAPITAL IMPROVEMENT SALES TAX 1 OTHER J GEN. OBLIGATION BONDS: PENDING K TRANSPORTATION SALES TAX Projects included in Transportation Trust Fund Program, TTF-2, supported by a '/z% transportation sales tax for fiv years approved by vote on August 8, 2000. Projects included in Transportation Trust Fund Program, TTF-1, supported by a %s% transportation sales tax for fiv, years approved by vote on August 8, 1995. 2 TRANSPORTATION PROPOSED PROJECTS PROJECT IMPROVEMENT TOTAL 2001-02 2002-03 2003-04 2004-05 2005-06 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL YEAR YEAR YEAR YEAR YEAR 1'. Independence II: Gen. Imp.: 327,000 327,000 Sprigg St. to Water St. K K 1-17 Linden Street: Reconst.: 195,800 195,800 Benton to Sprigg with E E Sidewalk; Widening: Benton to West End with Sidewalk 1-18 Traffic Signal Installation: 124,200 124,200 Sprigg Street & Normal/ E,I E,I Washington Intersection 1-19 Missouri Avenue: College 187,900 187,900 Street to Jefferson Avenue E E 1-20 Lexington Trace 1: Trail/ 362,935 362,935 Sidewalk Construction: D,E D,E Perryville Rd., Lexington Ave. to Cape Rods Dr., and Lexington Ave., Cape La Croix Rd. to Perryville Rd. 1-21 Lexington Trace 11: Trail/ 379,680 379,680 Sidewalk Construction: D,E D,E Lexington Ave., Perryville Rd. to Sprigg St., and Sprigg St, Lexington Ave. to Bertling St. 1-22 Sussex Drive: Wyandotte 98,800 98,800 Acres to Perryville Road E E 1-23 Minnesota: Bloomfield Road to 501,100 192,700 308,400 College with Sidewalk E E E 1-24 Old Sprigg Street Road and 37,500 37,500 Lexington Ave.: Extend Box E E Culvert 1-25 West End Blvd.: Bloomfield 313,100 313,100 South to Shawnee Parkway E E (Highway 74) 1-26 Clark Street: Marietta South to 123,200 123,200 Victorian Estates E E 1-27 Lombardo Street: Box Culvert 250,000 250,000 Addition and Street E E Realignment A GENERAL REVENUE FUND B REVIPFA BONDS: ISSUED C REVIPFA BONDS: PENDING D STATE GRANTSILOANS E MOTOR FUEL TAX F FEDERAL GRANTSILOANS G SPECIAL ASSESSMENTS H CAPITAL IMPROVEMENT SALES TAX 1 OTHER J GEN. OBLIGATION BONDS: PENDING K TRANSPORTATION SALES TAX Projects included in Transportation Trust Fund Program, TTF-2, supported by a '/z% transportation sales tax for five years approved by vote on August 8, 2000. 3 TRANSPORTATION PROPOSED PROJECTS PROJECT IMPROVEMENT TOTAL 2001-02 2002-03 2003-04 2004-05 2005-06 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL 1-36 Airport Taxiway Extension for 1,650,600 YEAR YEAR YEAR YEAR YEAR 1-28 Howell Street: Box Culvert 100,000 725,646 575,030 85 A,F 100,0( 1-37 Replacement E 92 G SPECIAL ASSESSMENTS 106,400 SUBTOTAL -STREET 21,516,115 6,519,435 6,725,980 4,071,000 2,695,200 1,504,5( 1-38 PROJECTS 516,000 62,100 J 516,000 1-29 Security Fencing: Remove 70,000 70,000 K TRANSPORTATION SALES TAX 17,841,900 A. 5,&-A,8001 and Replace A,F A,F 1-30 Land Acquisition for Fire 180,000 180,000 (ARFF) and Snow Removal A,F A,F Equipment Building and VOR Protection 1-31 Airport T -Hangar Ramp 432,100 432,100 Replacement A,F A,F 1-32 Utilities and Entrance Road to 280,000 280,000 New Fire (ARFF) and Snow A,D A,D Removal Equipment Location 1-33 Airport T -Hangar and 402,100 402,100 Associated Taxiways A.D A,D 1-34 Airport ARFF/Snow Removal 750,000 68,210 425,700 750,000 B 495,300 Equipment Building A,F C A,F A,F 1-3o rurport 1 axlway %,onstrucuon tv Connect Taxiway E to Taxiway cov,vvv A,F 68,210 425,700 __wW A,F B 495,300 F A,F C REV/PFA BONDS: PENDING A,F 1-36 Airport Taxiway Extension for 1,650,600 STATE GRANTSILOANS 835,639 283,089 1,650,600 E Runway 2/20 A,F 725,646 575,030 85 A,F IF 1-37 Airport Runway 2/20 Cable and 106,400 92 G SPECIAL ASSESSMENTS 106,400 Lighting A,F CAPITAL IMPROVEMENT SALES TAX A,F 1-38 jAirport Land Acquisition 516,000 62,100 J 516,000 A c K TRANSPORTATION SALES TAX 17,841,900 A. 1-39 Airport Taxiway Extension for 495,300 68,210 425,700 10 B 495,300 IT -Hangars A,F C REV/PFA BONDS: PENDING A,F -AIRPORT 1 5,162,5001 652,1UUI tiuz,IUUI 1 1,/a/,VUVI 1,v1 1, TOTALS 1 26,678,6151 7,201,5351 7,408,0801 5,101,0001 4,45 2,2001 A GENERAL REVENUE FUND 761,310 68,210 425,700 10 B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTSILOANS 835,639 283,089 552,550 E MOTOR FUEL TAX 3,032,876 725,646 575,030 85 F FEDERAL GRANTSILOANS 4,144,790 613,890 92 G SPECIAL ASSESSMENTS H CAPITAL IMPROVEMENT SALES TAX 1 OTHER 62,100 62,100 J GEN. OBLIGATION BONDS: PENDING K TRANSPORTATION SALES TAX 17,841,900 5,448,600 5,&-A,8001 3,21 n TRANSPORTATION PROJECT TITLE: EXISTING STREET PAVING PROGRAM LOCATION: CITY-WIDE PURPOSE: PROVIDES FOR CONTINUING PRIMARY STREET MAINTENANCE PROGRAM TO PROVIDE FOR THE ASPHALT OVERLAY OF LOCAL AND MAJOR STREETS. ALSO TO SURFACE EXISTING RESIDENTIAL GRAVEL STREETS WHERE NECESSARY. PHYSICAL DESCRIPTION: MILLING OR USING OTHER SURFACE PROFILING METHOD AND ASPHALT OVERLAY, OR MINIMUM 20 -FOOT -WIDE, HOT MIX ASPHALTIC CONCRETE SURFACE OR UP TO 30 - FOOT CONCRETE SURFACE ON EXISTING GRAVEL STREET BASE AND DRAINAGE IMPROVEMENTS AS NEEDED. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: COST EFFECTIVE MAINTENANCE TO PREVENT NEED FOR FUTURE RECONSTRUCTION OF ENTIRE PAVEMENT, AND REDUCE GRAVEL STREET MAINTENANCE COSTS AND ENHANCE NEIGHBORHOOD QUALITY. IMPACT ON TIMELY PAVING WILL REDUCE MAINTENANCE COSTS AND OPERATING BUDGET: EXTEND PAVEMENTN LIFE. FINANCING: $ 1,000,000 MOTOR FUEL TAX (E) $ 2.025.000 TRANSPORTATION SALES TAX (K) $ 3,025,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-1 R TRANSPORTATION PROJECT TITLE: STREET, CURB, AND GUTTER REPAIR LOCATION: UNSPECIFIED PURPOSE: SPECIFIC PROGRAM TO PROVIDE FOR RECONSTRUCTION OF CURBS AND GUTTERS IN CONJUNCTION WITH EXPANDED STREET REPAIR OR OVERLAY PROJECTS PHYSICAL DESCRIPTION: IN GENERAL, COMPLETE REMOVAL OF DETERIORATED SECTIONS OF EXISTING CURB AND GUTTER AND REPLACEMENT UNIT OF WORK: REMOVE AND CONSTRUCT JUSTIFICATION: IMPROVE LIFE OF EXISTING STREETS, AND ENHANCE NEIGHBORHOOD QUALITY. IMPACT ON COST EFFECTIVE MAINTENANCE TO EXTEND LIFE OF OPERATING BUDGET: EXISTING STREETS AND REDUCE MAINTENANCE COSTS. FINANCING: $ 1.687.500 TRANSPORTATION SALES TAX (K) $ 1,687,500 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-2 Z 1-3 7 TRANSPORTATION PROJECT TITLE: SIDEWALK REPAIR AND RECONSTRUCTION LOCATION: UNSPECIFIED PURPOSE: SPECIFIC PROGRAM TO REPAIR AND RECONSTRUCT DETERIORATED SIDEWALKS PHYSICAL DESCRIPTION: REPLACE DETERIORATED SIDEWALK SECTIONS WITH NEW CONCRETE SECTIONS UNIT OF WORK: REMOVE AND RECONSTRUCT JUSTIFICATION: REPAIR DETERIORATED FACILITIES AND ENHANCE NEIGHBORHOOD QUALITY IMPACT ON WILL REDUCE MAINTENANCE COSTS FOR ABUTTING OPERATING BUDGET: PROPERTY OWNERS FINANCING: 450,000 TRANSPORTATION SALES TAX (K) $ 450,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-3 7 1-4 TRANSPORTATION PROJECT TITLE: NEW SIDEWALK CONSTRUCTION LOCATION: UNSPECIFIED PURPOSE: SPECIFIC PROGRAM TO CONSTRUCT SIDEWALKS PHYSICAL DESCRIPTION: TO CONSTRUCT 4 -FOOT WIDE SIDEWALKS TO INFILL LOCATIONS WHERE SIDEWALKS ARE NEEDED. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO COMPLETE THE CITY'S EXISTING SIDEWALK SYSTEM. IMPACT ON SOME INCREASED MAINTENANCE COSTS, BUT SOME OPERATING BUDGET: REDUCTION IN MOWING COSTS. FINANCING: $135,000 TRANSPORTATION SALES TAX (K) $ 135,000 TOTAL 8 TRANSPORTATION I PROJECT TITLE: STREET LIGHTS - NEW INSTALLATIONS AND UPGRADES LOCATION: UNSPECIFIED PURPOSE: TO INSTALL NEW STREET LIGHTS AND UPGRADE EXISTING STREET LIGHTS PHYSICAL DESCRIPTION: INSTALL APPROXIMATELY 850 NEW STREET LIGHTS AND UPGRADE APPROXIMATELY 1,000 EXISTING STREET LIGHTS. UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: IMPROVE THE OVERALL LEVEL OF STREET LIGHTING CITY-WIDE WHICH IS CURRENTLY WELL BELOW ACCEPTED STANDARDS. IMPACT ON AN INCREASE OF APPROXIMATELY $130,000 ANNUALLY OPERATING BUDGET: AFTER ALL INSTALLATIONS AND UPGRADES ARE COMPLETE. FINANCING: $ 1,350.000 TRANSPORTATION SALES TAX (K) $ 1,350,000 TOTAL 1-5 z FINANCING: 98,600 TRANSPORTATION SALES TAX (K) - $ 98,600 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATON TRUST FUND. 1-6 Ito] TRANSPORTATION PROJECT TITLE: KAGE ROAD LOCATION: MOUNT AUBURN ROAD TO HOPPER ROAD PURPOSE: TO UPGRADE EXISTING STREET TO CURRENT STANDARDS PHYSICAL DESCRIPTION: CONSTRUCTION OF APPROXIMATELY 4,800 LINEAR FEET OF STREET IMPROVEMENT: ADDITION OF CURB AND GUTTER SECTIONS, WITH OVERLAY OF EXISTING PAVEMENT AND EXTENSION OF STORM DRAINAGE. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: EXISTING STREET IS FUNCTIONALLY INADEQUATE IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 98,600 TRANSPORTATION SALES TAX (K) - $ 98,600 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATON TRUST FUND. 1-6 Ito] TRANSPORTATION PROJECT TITLE: INDEPENDENCE STREET RECONSTRUCTION LOCATION: PACIFIC STREET TO SPRIGG STREET, INCLUDING I INTERSECTIONS PURPOSE: UPGRADE THIS SECTION OF STREET TO CURRENT STANDARDS PHYSICAL DESCRIPTION: APPROXIMATELY 940 LINEAR FEET OF PAVEMENT AND SIDEWALK RECONSTRUCTION WITH NEW TRAFFIC SIGNALS AS REQUIRED. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THIS SECTION OF INDEPENDENCE STREET IS IN NEED OF MAJOR RECONSTRUCTION. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 424,000 TRANSPORTATION SALES TAX (K) $ 424,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-7 11 TRANSPORTATION PROJECT TITLE: LORIMIER STREET EXTENSION LOCATION: EXTENSION FROM MORGAN OAK SOUTH TO NEW HIGHWAY 74 PURPOSE: PROVIDE A CONNECTION BETWEEN NEW HIGHWAY 74 AND THE DOWNTOWN BUSINESS DISTRICT PHYSICAL DESCRIPTION: CONSTRUCTION OF APPROXIMATELY 1,930 FEET OF STREET, 40 FEET WIDE, WITH CURBS AND GUTTERS UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: ACCESS TO THE DOWNTOWN AREA IS NEEDED TO MAINTAIN ECONOMIC VIABILITY IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: 264,800 TRANSPORTATION SALES TAX (K) $ 264,800 TOTAL NOTE: AGREEMENT BETWEEN CITY AND UNIVERSITY FOR JOINTLY FUNDED DEVELOPMENT OF ST. VINCENT SEMINARY PROPERTY (RIVER CAMPUS) PROVIDES FOR A CITY ALLOCATION OF $255,800 FROM THE TRANSPORTATION TRUST FUND FOR THE CONSTRUCTION OF A CONNECTING STREET BETWEEN SHAWNEE PARKWAY (MISSOURI ROUTE 74) AND MORGAN OAK STREET. ANY ADDITIONAL CONSTRUCTION COSTS WILL BE CONSIDERED AS A COST FOR THE JOINT FACILITIES. NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-8 12 TRANSPORTATION PROJECT TITLE: SILVER SPRINGS ROAD - PHASE I LOCATION: SOUTHERN EXPRESSWAY (EXTENDED) TO KINGSHISGHWAY PURPOSE: WIDEN AND UPGRADE EXISTING GRAVEL STREET TO CURRENT MAJOR STREET STANDARDS AND PROVIDE ACCESS TO NEW HIGH SCHOOL AND CAREER CENTER. PHYSICAL DESCRIPTION: CONSTRUCTION OF APPROXIMATELY 3,900 LINEAR FEET OF PAVING, 6 INCHES THICK AND 48 FEET WIDE WITH CURBS, ASSOCIATED STORM DRAINAGE WORK, AND ALL NECESSARY APPURTENANCES. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: EXISTING STREET IS FUNCTIONALLY AND PHYSICALLY INADEQUATE. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 1.022,000 TRANSPORTATION SALES TAX (K) $ 1,022,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATON TRUST FUND. �7 13 TRANSPORTATION PROJECT TITLE: SIEMERS DRIVE WIDENING LOCATION: WILLIAM STREET (ROUTE K) TO BLOOMFIELD ROAD PURPOSE: WIDEN HIGH -TRAFFIC STREET TO FULL COMMERCIAL AND MAJOR STREET STANDARDS. PHYSICAL DESCRIPTION: IMPROVEMENT AND WIDENING OF APPROXIMATELY 4,900 LINEAR FEET OF 7 INCH THICK PCC PAVEMENT FROM EXISTING 32 -FEET WIDE TO A 60 -FOOT WIDTH, ALL ASSOCIATED STORM DRAINAGE WORK, A POSSIBLE TRAFFIC SIGNAL (DEPENDING ON WARRANTS), AND ALL OTHER NECESSARY APPURTENANCES. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: EXISTING STREET IS FUNCTIONALLY INADEQUATE. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 1,561,000 TRANSPORTATION SALES TAX (K) $ 1,561,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATON TRUST FUND. 1-10 14 TRANSPORTATION PROJECT TITLE: SILVER SPRINGS ROAD - PHASE II LOCATION: SHAWNEE PARKWAY (ROUTE 74) TO SOUTHERN EXPRESSWAY PURPOSE: WIDEN AND UPGRADE EXISTING ASPHALT STREET TO CURRENT MAJOR STREET STANDARDS AND IMPROVE ACCESS TO NEW HIGH SCHOOL AND CAREER CENTER. PHYSICAL DESCRIPTION: DEMOLITION AND REMOVAL OF EXISTING ASPHALT PAVEMENT AND CONSTRUCTION OF APPROXIMATELY 3,950 LINEAR FEET OF 36 -FOOT WIDE, 6 -INCH THICK PCC PAVEMENT INCLUDING: CURBS, DRAINAGE STRUCTURES, AND ALL NECESSARY APPURTENANCES. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: EXISTING STREET IS FUNCTIONALLY AND PHYSICALLY INADEQUATE. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 1,088.000 TRANSPORTATION SALES TAX (K) $ 1,088,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATON TRUST FUND. 15 TRANSPORTATION PROJECT TITLE: BLOOMFIELD ROAD - PHASE III LOCATION: SIEMERS DRIVE TO THE ENTRANCE TO STONEBRIDGE SUBDIVISION, INCLUDING RAMSEY BRANCH BRIDGE PURPOSE: WIDEN AND UPGRADE EXISTING ASPHALT ROAD AND BRIDGE TO CURRENT MAJOR STREET STANDARDS. PHYSICAL DESCRIPTION: DEMOLITION AND REMOVAL OF EXISTING ASPHALT PAVEMENT AND CONSTRUCTION OF APPROXIMATELY 3,450 LINEAR FEET OF 36 -FOOT WIDE, 6 -INCH THICK PCC PAVEMENT INCLUDING: CURBS, DRAINAGE STRUCTURES, SIDEWALK, AND ALL NECESSARY APPURTENANCES. ALSO INCLUDES CONSTRUCTION OF NEW BRIDGE OVER RAMSEY BRANCH. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: EXISTING ROAD AND BRIDGE ARE FUNCTIONALLY AND PHYSICALLY INADEQUATE. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 2.228,000 TRANSPORTATION SALES TAX (K) $ 2,228,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATON TRUST FUND. 1-12 IV TRANSPORTATION I PROJECT TITLE: INDEPENDENCE STREET WIDENING - PHASE I LOCATION: KINGSHIGHWAY TO PACIFIC STREET PURPOSE: WIDEN AND UPGRADE THIS SECTION OF STREET TO CURRENT MAJOR STREET STANDARDS. PHYSICAL DESCRIPTION: IMPROVEMENT AND WIDENING FROM 36 -FEET WIDE TO 44 -FEET WIDE OF APPROXIMATELY 6,160 LINEAR FEET OF ROADWAY, INCLUDING THE REPLACEMENT OF 6 -INCH PCC PAVEMENT AND CURB AND GUTTER WITH NEW 6 - INCH PCC PAVEMENT AND CURBS, ASSOCIATED STORM DRAINAGE WORD, SIDEWALK IMPROVEMENTS, INTERSECTION IMPROVEMENTS, AND ALL NECESSARY APPURTENANCES. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: EXISTING STREET IS FUNCTIONALLY INADEQUATE. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 2,107,000 TRANSPORTATION SALES TAX (K) $ 2,107,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATON TRUST FUND. 1-13 17 TRANSPORTATION PROJECT TITLE: BROADWAY WIDENING AND IMPROVEMENT LOCATION: PERRY AVENUE TO HOUCK PLACE PURPOSE: WIDEN AND UPGRADE THIS SECTION OF STREET TO CURRENT MAJOR STREET STANDARDS AND EXTEND GENERAL BROADWAY IMPROVEMENTS TOWARD THE DOWNTOWN AREA. PHYSICAL DESCRIPTION: IMPROVEMENT AND WIDENING FROM 36 -FEET TO 44 - FEET OF APPROXIMATELY 2,600 LIENAR FEET OF ROADWAY IMPROVEMENTS TO INCLUDE NEW PAVEMENT, CURB AND GUTTER, WIDENING, STORM DRAINAGE IMPROVEMENTS, TRAFFIC SIGNAL UPGRADES, AND ALL OTHER NECESSARY APPURTENANCES. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: EXISTING STREET IS FUNCTIONALLY INADEQUATE. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 1.957,000 TRANSPORTATION SALES TAX (K) $ 1,957,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATON TRUST FUND. 1-14 18 TRANSPORTATION PROJECT TITLE: MOUNT AUBURN ROAD WIDENING AND IMPROVEMENT - PHASE IV LOCATION: WILLIAM STREET (ROUTE K) TO BLOOMFIELD ROAD PURPOSE: WIDEN EXISTING STREET TO CURRENT MAJOR STREET STANDARDS. PHYSICAL DESCRIPTION: APPROXIMATELY 3,960 LINEAR FEET OF ROADWAY IMPROVEMENTS INCLUDING WIDENING THE EXISTING 44 - FOOT PAVEMENT TO 48 -FEET WIDE, CURB AND GUTTER, STORM DRAINAGE IMPROVEMENTS, SIDEWALKS, AND ALL OTHER APPURTENANCES NECESSARY. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: EXISTING STREET IS FUNCTIONALLY INADEQUATE. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 1,117,000 TRANSPORTATION SALES TAX (K) $ 1,117,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATON TRUST FUND. 1-15 19 TRANSPORTATION PROJECT TITLE: INDEPENDENCE STREET - PHASE II LOCATION: SPRIGG STREET TO WATER STREET PURPOSE: GENERAL IMPROVEMENT OF EXISTING MAJOR STREET TO IMPROVE TRAVEL AND TRAFFIC CONDITIONS. PHYSICAL DESCRIPTION: IMPROVEMENT OF APPROXIMATELY 2,450 LINEAR FEET OF PAVEMENT INCLUDING THE REPLACEMENT OF EXISTING CURB AND GUTTER WITH NEW PCC CURB AND GUTTER, THE OVERLAY OF THE EXISTING STREET WITH TWO (2) INCHES OF ASPHALTIC CONCRETE, AND ANY ASSOCIATED STORM DRAINAGE WORK. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: EXISTING STREET IS PHYSICALLY INADEQUATE. IMPACT ON NO SIGNIFICANT IMPACT. OPERATING BUDGET: FINANCING: 327,000 TRANSPORTATION SALES TAX (K) $ 327,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATON TRUST FUND. 1-16 20 TRANSPORTATION PROJECT TITLE: LINDEN STREET RECONSTRUCTION AND WIDENING WITH SIDEWALK LOCATION: RECONSTRUCTION OF LINDEN STREET FROM BENTON STREET TO SPRIGG STREET WITH SIDEWALK, AND WIDENING EXISTING PORTION OF LINDEN STREET FROM BENTON STREET TO WEST END BOULEVARD WITH SIDEWALK. PURPOSE: UPGRADE MAJOR THROUGH STREET BETWEEN HIGHWAY 74 AND SOUTHERN EXPRESSWAY TO CARRY ADDITIONAL TRAFFIC FROM RECENT DEVELOPMENT AND PROVIDE IMPROVED ACCESS TO SHAWNEE PARK. PHYSICAL DESCRIPTION: APPROXIMATELY 1,100 LINEAR FEET OF RECONSTRUCTION AND 1,500 LINEAR FEET OF WIDENING TO STANDARD 30 -FOOT WIDTH. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: RECENT DEVELOPMENT ON LINDEN STREET HAS INCREASED TRAFFIC LOAD AND UPGRADING THIS STREET WILL PROVIDE IMPROVED ACCESS BETWEEN SPRIGG AND WEST END FOR THE GENERAL AREA. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 195,800 MOTOR FUEL TAX (E) $ 195,800 TOTAL 1-17 21 TRANSPORTATION PROJECT TITLE: TRAFFIC SIGNAL INSTALLATION LOCATION: SPRIGG STREET AT WASHINGTON AVENUE/NORMAL AVENUE INTERSECTION PURPOSE: PUBLIC SAFETY AND CONVENIENCE PHYSICAL DESCRIPTION: INSTALLATION OF FULLY ACTUATED TRAFFIC SIGNAL UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: PUBLIC SAFETY IMPACT ON MINOR INCREASE IN STREET MAINTENANCE COSTS OPERATING BUDGET: FINANCING: $ 62,100 MOTOR FUEL TAX (E) 6$ 2.100 OTHER (1) $ 124,200 TOTAL NOTE: SOUTHEAST MISSOURI STATE UNIVERSITY HAS AGREED TO PAY HALF OF THIS PROJECT. 1-18 22 TRANSPORTATION PROJECT TITLE: MISSOURI AVENUE, COLLEGE STREET TO JEFFERSON AVENUE LOCATION: MISSOURI AVENUE, FROM COLLEGE STREET TO JEFFERSON AVENUE PURPOSE: TO DEVELOP A THROUGH STREET TO PROVIDE ACCESS FROM THE NEIGHBORHOOD TO THE WEST AND JEFFERSON SCHOOL TO WEST END BOULEVARD NEAR THE NEW HIGHWAY 74 INTERSECTION. PHYSICAL DESCRIPTION: CONSTRUCT APPROXIMATELY 1,700 LINEAR FEET OF NEW STREET TO STANDARD 30 -FOOT WIDTH WITH CURBS AND GUTTERS, ANCILLARY STORMWATER FACILITIES, AND SIDEWALK. UNIT OF WORK: DESIGN AND CONSTRUCT (RIGHT-OF-WAY EXISTS) JUSTIFICATION: COMPLETION OF NEW HIGHWAY 74 AND THE SIGNALIZED INTERSECTION AT WEST END BOULEVARD PROVIDES AN OPPORTUNITY TO IMPROVE ACCESS FOR THE AREA WEST OF WEST END BOULEVARD AND NORTH OF NEW ROUTE 74 AND FOR JEFFERSON SCHOOL. THE STREET WILL ALSO PROVIDE ACCESS TO THE PART OF SHAWNEE PARK NORTH OF HIGHWAY 74 ALLOWING ITS DEVELOPMENT IN THE FUTURE. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: 187,900 MOTOR FUEL TAX (E) $ 187,900 TOTAL NOTE: THIS PROJECT WILL BE COMPLETED IN PHASES. THE FIRST PHASE WILL BE THE PORTION OF COLLEGE STREET BETWEEN MINNESOTA AVENUE AND MISSOURI AVENUE, AND MISSOURI AVENUE, BETWEEN COLLEGE STREET AND JEFFERSON AVENUE, AND IS SCHEDULED FOR FY00-01. THE SECOND PHASE WILL BE THE PORTION OF COLLEGE STREET BETWEEN MISSOURI AVENUE AND WEST END BOULEVARD, AND IS SCHEDULED FOR FY01-02. 1-19 23 1-20 TRANSPORTATION PROJECT TITLE: LEXINGTON TRACE I - TRAIUSIDEWALK ALONG PERRYVILLE ROAD, FROM LEXINGTON AVENUE TO CAPE ROCK DRIVE, AND ALONG LEXINGTON AVENUE, FROM CAPE LA CROIX ROAD TO PERRYVILLE ROAD LOCATION: PERRYVILLE ROAD, FROM JUST NORTH OF LEXINGTON AVENUE TO THE CAPE ROCK DRIVE INTERSECTION AND LEXINGTON AVENUE, FROM CAPE LA CROIX ROAD TO PERRYVILLE ROAD PURPOSE: TO PROVIDE PEDESTRIAN/BIKEWAY CONNECTIONS FROM THE NORTHERN SECTION OF THE CITY TO THE CAPE LA CROIX RECREATIONAL TRAIL. PHYSICAL DESCRIPTION: APPROXIMATELY 5,850 LINEAR FEET OF WALK/BIKEWAY 6 -FEET IN WIDTH ALONG LEXINGTON AVENUE, AND 5,235 LINEAR FEET OF A 4 -FOOT WIDE SIDEWALK ALONG PERRYVILLE ROAD. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO ALLOW THE REMOVAL OF PEDESTRIAN TRAFFIC FROM THE STREET AND CONNECT TO THE CAPE LA CROIX TRAIL, PROVIDING PEDESTRIAN ACCESS FROM SUBDIVISIONS ALONG PERRYVILLE ROAD TO CHEROKEE PARK AND OSAGE PARK. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 283,089 STATE GRANTS/LOANS (D) 79.846 MOTOR FUEL TAX (E) $ 362,935 TOTAL 24 TRANSPORTATION PROJECT TITLE: LEXINGTON TRACE II - TRAIUSIDEWALK ALONG LEXINGTON AVENUE, FROM PERRYVILLE ROAD TO SPRIGG STREET, AND SPRIGG STREET, FROM LEXINGTON AVENUE TO BERTLING STREET LOCATION: LEXINGTON AVENUE, FROM PERRYVILLE ROAD TO NORTH SPRIGG STREET, AND NORTH SPRIGG STREET, FROM LEXINGTON AVENUE TO JUST SOUTH OF THE BERTLING STREET INTERSECTION, AND A SMALL SECTION OF BERTLING STREET PURPOSE: TO PROVIDE A PEDESTRIAN SIDEWALK ON LEXINGTON AVENUE AND NORTH SPRIGG STREET IN THE VICINITY OF THE NEW BLANCHARD GRADE SCHOOL, AND THE SEMO RECREATION FACILITIES, PROVIDING A CONNECTION TO THE CAPE LA CROIX TRAIL. PHYSICAL DESCRIPTION: APPROXIMATELY 15,000 LINEAR FEET OF SIDEWALK 4 - FEET IN WIDTH UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO ALLOW THE REMOVAL OF PEDESTRIAN TRAFFIC FROM THE STREET AND PROVIDE CONNECTION TO THE CAPE LA CROIX TRAIL. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $296,150 STATE GRANTS/LOANS (D) 83.530 MOTOR FUEL TAX (E) $ 379,680 TOTAL 1-21 25 1-22 TRANSPORTATION PROJECT TITLE: SUSSEX DRIVE, WYANDOTTE ACRES TO PERRYVILLE ROAD LOCATION: EAST EDGE OF WYANDOTTE ACRES SUBDIVISION, EAST TO PERRYVILLE ROAD PURPOSE: TO DEVELOP A THROUGH STREET AND PROVIDE ADDITIONAL ACCESS TO THE NEIGHBORHOOD TO THE WEST PHYSICAL DESCRIPTION: CONSTRUCT APPROXIMATELY 350 LINEAR FEET OF NEW STREET TO STANDARD 30 -FOOT WIDTH WITH CURBS AND GUTTERS, AND ANCILLARY STORMWATER FACILITIES. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: CURRENTLY WYANDOTTE ACRES SUBDIVISION ONLY HAS ONE ENTRANCE (KENT STREET). A SECOND ACCESS IS NEEDED TO IMPROVE TRAFFIC FLOW AND ENSURE EMERGENCY SERVICES. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: 98,800 MOTOR FUEL TAX (E) $ 98,800 TOTAL 26 TRANSPORTATION PROJECT TITLE: MINNESOTA AVENUE, BLOOMFIELD ROAD TO COLLEGE STREET WITH SIDEWALKS LOCATION: MINNESOTA AVENUE, FROM BLOOMFIELD ROAD TO COLLEGE STREET PURPOSE: UPGRADE STREET SERVING JEFFERSON SCHOOL AND ADJOINING NEIGHBORHOOD AND CONNECT TO NEW SECTION OF COLLEGE STREET PROPOSED FOR CONSTRUCTION. PHYSICAL DESCRIPTION: RECONSTRUCT APPROXIMATELY 1,300 LINEAR FEET OF STREET TO STANDARD 30 -FOOT WIDTH WITH CURBS AND GUTTERS, ANCILLARY STORMWATER FACILITIES, AND SIDEWALKS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: WITH UPGRADING AND EXPANSION OF JEFFERSON SCHOOL, IT IS DESIRABLE TO UPGRADE THIS STREET TO CURRENT STANDARDS TO PROVIDE IMPROVED ACCESS TO THE SCHOOL AND THE GENERAL AREA. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $501,100 MOTOR FUEL TAX (E) $ 501,100 TOTAL NOTE: THIS PROJECT WILL BE COMPLETED IN TWO PHASES. THE FIRST PHASE WILL BE THE PORTION OF MINNESOTA AVENUE BETWEEN HERMAN STREET AND COLLEGE STREET, AND IS SCHEDULED FOR FY02-03. THE SECOND PHASE WILL BE THE PORTION OF MINNESOTA AVENUE BETWEEN HERMAN STREET AND BLOOMFIELD ROAD, AND IS SCHEDULED FOR IN FY 03-04. 1-23 27 1-24 TRANSPORTATION PROJECT TITLE: OLD SPRIGG STREET ROAD AND LEXINGTON AVENUE, EXTEND BOX CULVERT LOCATION: ON OLD SPRIGG STREET ROAD, JUST SOUTH OF I LEXINGTON AVENUE PURPOSE: EXTEND BOX CULVERT TO WIDEN APPROACH TOI LEXINGTON AVENUE INTERSECTION. PHYSICAL DESCRIPTION: WIDEN 10 -FOOT BY 8 -FOOT BOX CULVERT 30 LINEAR I FEET. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT BOX CULVERT IS MANY YEARS OLD AND NOT CONSTRUCTED TO CURRENT STANDARDS, RESULTING IN A NARROW APPROACH TO THE INTERSECTION WITH NO SHOULDERS. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 37,600 MOTOR FUEL TAX (E) $ 37,500 TOTAL 28 TRANSPORTATION PROJECT TITLE: WEST END BOULEVARD, BLOOMFIELD STREET SOUTH TO SHAWNEE PARKWAY (NEW HIGHWAY 74) LOCATION: WEST END BOULEVARD, BLOOMFIELD STREET SOUTH TO SHAWNEE PARKWAY PURPOSE: WIDEN AND RECONSTRUCT NARROW SECTION OF WEST END BOULEVARD TO IMPROVE ACCESS FROM SHAWNEE PARKWAY TO WILLIAM STREET. PHYSICAL DESCRIPTION: WIDEN APPROXIMATELY 1,400 LINEAR FEET OF STREET FROM 36 FEET TO 44 FEET IN WIDTH, CONSTRUCT 6 -FOOT TO 10 -FOOT PARKWAY WHERE FEASIBLE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: WEST END BOULEVARD IS THE ONLY ACCESS POINT FROM NEW HIGHWAY 74 INTO THE EAST -CENTRAL PART OF THE CITY, AND A PRINCIPAL ACCESS ROUTE TO THE UNIVERSITY AND NEEDS TO BE IMPROVED TO HANDLE INCREASED TRAFFIC LOAD. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $313,100 MOTOR FUEL TAX (E) $ 313,100 TOTAL 1-25 29 1-26 TRANSPORTATION PROJECT TITLE: CLARK STREET, MARIETTA SOUTH TO VICTORIAN ESTATES LOCATION: MARIETTA STREET SOUTH TO NORTH EDGE OF VICTORIAN ESTATES SUBDIVISION PURPOSE: UPGRADE EXISTING STREET TO PROVIDE PROPER CONNECTION OF CLARK BETWEEN MARIETTA STREET AND LOMBARDO DRIVE. PHYSICAL DESCRIPTION: RECONSTRUCT AND CONSTRUCT APPROXIMATELY 700 I LINEAR FEET TO STANDARD 30 -FOOT WIDTH. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: IF VICTORIAN ESTATES SUBDIVISION IS DEVELOPED, THIS SECTION OF CLARK STREET THROUGH THE SUBDIVISION AND CONNECTING TO LOMBARDO WILL BE CONSTRUCTED. THIS PROJECT WILL PROVIDE FOR THE CONNECTION OF THE NEW SECTION OF STREET NORTH TO MARIETTA. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 123,200 MOTOR FUEL TAX (E) $ 123,200 TOTAL 30 TRANSPORTATION PROJECT TITLE: LOMBARDO DRIVE BOX CULVERT ADDITION AND STREET RE -ALIGNMENT LOCATION: AT WALKER BRANCH BETWEEN CLARK AVENUE AND LANDGRAF DRIVE PURPOSE: PROVIDE ADDITIONAL CAPACITY TO A DRAINAGE STRUCTURE WITHIN THE IMPROVED FLOOD CONTROL CHANNEL AND FURTHER SECURE IMPROVED TRAFFIC SAFETY BY THE ELIMINATION OF THE CENTER LINE OFFSET IN LOMBARDO BETWEEN THE BOX CULVERT AND CLARK AVE. PHYSICAL DESCRIPTION: ADD A DOUBLE REINFORCED CONCRETE BOX CULVERT TO THE EAST SIDE OF THE EXISTING DRAINAGE STRUCTURE, ONE HAVING A PILOT CHANNEL TO CONNECT BOTH UP STREAM AND DOWN STREAM TO THE EXISTING PILOT CHANNEL. RECONSTRUCT THE STREET PAVEMENT FROM THE WEST SIDE OF THE EXISTING DRAINAGE STRUCTURE, EAST TO THE CLARK AVE. INTERSECTION. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY IF NECESSARY AND CONSTRUCT JUSTIFICATION: CAPACITY OF EXISTING DRAINAGE STRUCTURE IS LIMITED TO AN APPROXIMATE 10 YEAR RAIN EVENT (PER CORPS OF ENGINEERS STUDY) IN A CHANNEL IMPROVED TO CONTAIN A 100 YEAR EVENT. THE CENTER LINE OFFSET IN LOMBARDO HAS HISTORICALLY CONTRIBUTED TO TRAFFIC ACCIDENTS, MANY OF WHICH HAVE INVOLVED A SINGLE VEHICLE. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 250,000 MOTOR FUEL TAX (E) $ 250,000 TOTAL 1-27 31 1-28 TRANSPORTATION PROJECT TITLE: HOWELL STREET BOX CULVERT REPLACEMENT LOCATION: 1400 BLOCK OF HOWELL STREET OVER THE SCIVALLY BRANCH OF WALKER BRANCH PURPOSE: INCREASE THE CAPACITY OF THE EXISTING DRAINAGE STRUCTURE TO REDUCE FLOOD DAMAGE TO PROPERTY IMPROVEMENTS LOCATED UP STREAM PHYSICAL DESCRIPTION: REPLACE THE EXISTING STRUCTURE TO ACCOMMODATE HIGH FLOWS GENERATED BY HEAVY RAIN EVENTS IN THE SCIVALLY BRANCH WATERSHED, AND IMPROVE APPROXIMATELY 60 FEET OF CREEK CHANNEL DOWN STREAM OF THE STRUCTURE TO THE WALKER BRAHNCH FLOOD CONTROL PROJECT (CORPS OF ENGINEERS) UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY AND CONSTRUCT JUSTIFICATION: CAPACITY OF THE EXISTING STRUCTURE IS'LESS THAN THAT OF A 10 YEAR RAIN EVENT AND THUS CONTRIBUTES TO FLOOD DAMAGE TO PROPERTY AND FURTHER THREATENS THE LIFE AND SAFETY OF CITIZENS AT TIMES OF HIGH FLOWS WHEN VERY SWIFT STORM WATER OVERTOPS THE STREET AT THIS LOCATION IMPACT ON WILL ELIMINATE THE NEED TO BARRICADE THE STREET OPERATING BUDGET: DURING A HEAVY RAIN STORMS FINANCING: $100,000 MOTOR FUEL TAX (E) $ 100,000 TOTAL 32 TRANSPORTATION I PROJECT TITLE: SECURITY FENCING, REMOVE AND REPLACE LOCATION: REGIONAL AIRPORT PURPOSE: REPLACEMENT OF CURRENT FOUR -FOOT FENCING TO PROVIDE SIX-FOOT SECURING FENCING BARRIER FOR IMPROVED SECURITY. PHYSICAL DESCRIPTION: REMOVE OLD FOUR -FOOT FENCING AND REPLACE WITH APPROXIMATELY 6,000 LINEAR FEET OF SIX-FOOT HIGH SECURITY FENCING WITH BARBED WIRE STRANDS AT THE TOP. UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: THE EXISTING FOUR -FOOT HIGH SECURITY FENCE DOES NOT PROVIDE ADEQUATE SECURITY PROTECTION FOR THE AIRPORT GENERAL AVIATION DEVELOPMENT AREA AND THE COMMERCIAL AIR CARRIER AREAS ADJACENT TO THE TERMINAL BUILDING. THE REPLACEMENT OF THE FOUR -FOOT FENCING WITH NEW SIX-FOOT FENCING WILL PROVIDE ADEQUATE SECURITY. IMPACT ON NO SIGNIFICANT IMPACT. OPERATING BUDGET: FINANCING: $ 7,000 GENERAL REVENUE (A) 63,000 FEDERAL GRANTS/LOANS (F) $ 70,000 TOTAL 2-29 33 iff011 TRANSPORTATION PROJECT TITLE: LAND ACQUISITION FOR FIRE (ARFF) AND SNOW REMOVAL EQUIPMENT (SNE) BUILDING AND VOR PROTECTION LOCATION: REGIONAL AIRPORT PURPOSE: PROVIDE LAND FOR CONSTRUCTION OF ARFF/SRE BUILDING. PHYSICAL DESCRIPTION: APPROXIMATELY 15 ACRES OF PROPERTY CONTIGUOUS TO THE REGIONAL AIRPORT. UNIT OF WORK: PURCHASE PROPERTY JUSTIFICATION: LAND NEEDED FOR NEW ARFF/SRE BUILDING. NEW FACILITY NEEDED TO PROVIDE DIRECT ACCESS TO THE AIRFIELD FOR EMERGENCY VEHICLES. PASSENGER EMPLANEMENT INCREASES WILL REQUIRE UPGRADING OF ARFF CAPABILITY ON AIRFIELD. IMPACT ON INCREASED OPERATING AND MAINTENANCE COSTS OPERATING BUDGET: FINANCING: $ 18,000 GENERAL REVENUE (A) 162,000 FEDERAL GRANTS/LOANS (F) $ 180,000 TOTAL 34 TRANSPORTATION I PROJECT TITLE: AIRPORT T -HANGAR RAMP REPLACEMENT LOCATION: REGIONAL AIRPORT PURPOSE: INSTALLATION OF PAVEMENT BASE AND REPLACEMENT OF ASPHALT SURFACES. FULL RECONSTRUCTION OF EXISTING PAVEMENT. PAVEMENT WAS EVIDENTLY LAID AS TEMPORARY PAVEMENT OVER 40 YEARS AGO. SUB- BASE IS INADEQUATE FOR TRAFFIC USING IT. PHYSICAL DESCRIPTION: REMOVE AND REPLACE APPROXIMATELY 7,430 SQUARE YARDS OF ASPHALT RAMP AREA. REPLACEMENT WILL INCLUDE INSTALLATION OF APPROPRIATE AND ADEQUATE SUB -BASE TO PREVENT SIMILAR DETERIORATION IN THE FUTURE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING ASPHALT RAMP IS DETERIORATING AT A RAPID PACE. PAVEMENT IS DISPLAYING EXTREME CRACKING WHICH USUALLY INDICATES SEVERE BASE FAILURE. DETERIORATION WILL CONTINUE UNTIL AN OVERLAY CAN BE ACCOMPLISHED. PAVEMENT IS NEARING A POINT THAT SAFETY WILL BECOME A REAL CONCERN. EXISTING PAVEMENT MAY BECOME UNUSABLE WITHIN 3 TO 5 YEARS. IMPACT ON IN THE SHORT TERM, IT WILL REDUCE MAINTENANCE OPERATING BUDGET: COSTS OF CONTINUALLY REPAIRING DETERIORATED PAVEMENT. WILL REDUCE LABOR AND EQUIPMENT COSTS REQUIRED TO CLEAR POTENTIALLY DANGEROUS DEBRIS FROM PAVEMENT AND ELIMINATE POTENTIAL LEGAL PROBLEMS AND COSTS FROM DAMAGE OR INJURY CAUSED BY LOOSE DEBRIS. FINANCING: $ 43,210 GENERAL REVENUE (A) 388,890 FEDERAL GRANTS/LOANS (F) $ 432,100 TOTAL 1-31 35 1-32 TRANSPORTATION PROJECT TITLE: UTILITIES AND ENTRANCE ROAD TO ARFF AND SNOW REMOVAL EQUIPMENT LOCATION LOCATION: REGIONAL AIRPORT PURPOSE: TO PROVIDE UTILITIES AND VEHICLE ACCESS TOI PROPOSED ARFF/SRE BUILDING. PHYSICAL DESCRIPTION: CONSTRUCT APPROXIMATELY 1,800 LINEAR FEET OF ACCESS ROAD AND PROVIDE UTILITIES TO PROPOSED ARFF/SRE BUILDING SITE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THE UTILITIES AND ENTRANCE ROAD WILL BE NECESSARY TO PROVIDE ACCESS TO THE PROPOSED ARFF/SRE FACILITY. CURRENTLY THERE IS NO ACCESS TO THIS SITE. IMPACT ON INCREASED OPERATING AND MAINTENANCE COSTS. OPERATING BUDGET: FINANCING: $ 28,000 GENERAL FUND (A) 252,000 STATE GRANTS/LOANS (D) $ 280,000 TOTAL 36 TRANSPORTATION I PROJECT TITLE: AIRPORT T -HANGAR AND ASSOCIATED TAXIWAYS 1 LOCATION: REGIONAL AIRPORT PURPOSE: TO MEET A NEED FOR ADDITIONAL HANGAR SPACE AT THE AIRPORT. PHYSICAL DESCRIPTION: ALL METAL, 10 -UNIT, 48 -FOOT WIDE STALLS, DOUBLE NESTED T -HANGAR STRUCTURE, WITH OVERHEAD BI - FOLD DOORS WITH ELECTRICALLY OPERATED WINCH OPENERS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: ALL AVAILABLE HANGAR SPACE IS FILLED, WITH A WAITING LIST OF POTENTIAL USERS. ADDITIONAL HANGAR SPACE WILL ATTRACT MORE AIRCRAFT TO BASE AT THE AIRPORT. IMPACT ON INCREASED OPERATING AND MAINTENANCE COSTS OPERATING BUDGET: OFFSET BY REVENUE GENERATED BY UNIT RENTAL. FINANCING: $ 397,700 GENERAL REVENUE (A) $ 4.400 STATE GRANTS/LOANS (D) $ 402,100 TOTAL 1-33 37 1-34 TRANSPORTATION PROJECT TITLE: AIRPORT ARFF/SNOW REMOVAL EQUIPMENT BUILDING LOCATION: REGIONAL AIRPORT PURPOSE: PROVIDE ON-SITE LOCATION FOR HOUSING OF AIRCRAFT RESCUE AND FIREFIGHTING VEHICLE AND STORAGE OF SNOW REMOVAL EQUIPMENT PHYSICAL DESCRIPTION: CONSTRUCT FACILITY TO HOUSE ARFF VEHICLE AND SUPPORT CREWS, AS WELL AS SNOW REMOVAL EQUIPMENT UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: PROVIDE ADEQUATE FIREFIGHTING/EMERGENCY RESPONSE CAPABILITIES AT THE AIRPORT. PROJECTED INCREASES IN AIRCRAFT PASSENGER LOADS AND AIRCRAFT TYPES WILL REQUIRE UPGRADING FOR FAA - MANDATED RESPONSE TIMES AND LOCATION OF FIRE FIGHTING EQUIPMENT. PROVIDE HEATED STORAGE SPACE FOR SNOW REMOVAL EQUIPMENT. IMPACT ON INCREASED OPERATING AND MAINTENANCE COSTS. OPERATING BUDGET: FINANCING: $ 75,000 GENERAL REVENUE (A) $ 675.000 FEDERAL GRANTS/LOANS (F) $ 750,000 TOTAL 38 TRANSPORTATION PROJECT TITLE: AIRPORT TAXIWAY CONSTRUCTION TO CONNECT TAXIWAY E TO TAXIWAY F LOCATION: REGIONAL AIRPORT PURPOSE: TO PROVIDE MORE EFFICIENT TAXI ROUTING FOR GENERAL AVIATION AIRCRAFT PHYSICAL DESCRIPTION: TO CONSTRUCT APPROXIMATELY 700 FEET BY 60 FEET I OF TAXIWAY UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO PROVIDE DIRECT AIRCRAFT ACCESS FROM THE AIRFIELD TO PROPOSED T -HANGAR DEVELOPMENT AREA. IMPACT ON INCREASED OPERATING AND MAINTENANCE COSTS OPERATING BUDGET: FINANCING: $ 28,000 GENERAL REVENUE (A) 252,000 FEDERAL GRANTS/LOANS (F) $ 280,000 TOTAL 1-35 39 1-36 TRANSPORTATION PROJECT TITLE: AIRPORT TAXIWAY EXTENSION FOR RUNWAY 02/20 LOCATION: REGIONAL AIRPORT PURPOSE: EXTEND PARALLEL TAXIWAY TO ENTIRE LENGTH OF RUNWAY 02/20 PHYSICAL DESCRIPTION: CONSTRUCT 78,000 SQUARE FEET OF PARALLEL TAXIWAY NORTH FROM TAXIWAY "A" TO NORTH END OF RUNWAY 02/20 AT TAXIWAY "F" UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: ELIMINATE CONGESTION OF AIRCRAFT ARRIVING ON RUNWAY 02 TAXIING THROUGH TERMINAL RAMP VIA TAXIWAY "E" TO GET TO GENERAL AVIATION APRON. IMPACT ON INCREASED MAINTENANCE FOR SNOW AND ICE OPERATING BUDGET: REMOVAL FINANCING: $ 82,600 GENERAL REVENUE (A) $ 1,568,000 FEDERAL GRANTS/LOANS (F) $ 1,650,600 TOTAL 40 TRANSPORTATION I PROJECT TITLE: AIRPORT RUNWAY 02/20 CABLE AND LIGHTING I LOCATION: REGIONAL AIRPORT PURPOSE: RE -CABLE RUNWAY 02/20 EDGE AND THRESHOLD LIGHTS PHYSICAL DESCRIPTION: REPLACE AND REWIRE ALL EXISTING LIGHT FIXTURES, TRANSFORMERS, AND WIRING FOR RUNWAY 02/20 UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING CABLES ARE OVER 40 YEARS OLD AND SUBJECT TO FREQUENT POWER OUTAGES AND REPAIR. IMPACT ON MAINTENANCE COSTS FOR FREQUENT REPAIRS WILL BE OPERATING BUDGET: REDUCED. FINANCING: $ 5,400 GENERAL REVENUE (A) 101,000 FEDERAL GRANTS/LOANS (F) $ 106,400 TOTAL 1-37 41 1-38 TRANSPORTATION PROJECT TITLE: AIRPORT LAND ACQUISITION LOCATION: REGIONAL AIRPORT PURPOSE: TO PURCHASE PROPERTY, IN ACCORDANCE WITH THE AIRPORT'S MARKETING PLAN, NECESSARY TO PROVIDE AIRPORT COMMERCIAL AND INDUSTRIAL PARK FACILITIES INCLUDING PROPERTY NECESSARY FOR INGRESS AND EGRESS FROM AIRPORT ROAD PHYSICAL DESCRIPTION: APPROXIMATELY 40 - 45 ACRES OF PROPERTY CONTIGUOUS TO THE AIRPORT. UNIT OF WORK: PURCHASE PROPERTY JUSTIFICATION: THERE IS A NEED FOR COMMERCIAL AND INDUSTRIAL PROPERTY WITH INFRASTRUCTURE AND FACILITIES TO ENTICE AVIATION RELATED BUSINESSES TO LOCATE ON AIRPORT PROPERTY IMPACT ON THE ADDITIONAL IMPACT ON OPERATION EXPENSES FOR OPERATING BUDGET: MOWING AND UPKEEP SHOULD BE WELL OFFSET IN THE LONG TERM BY AGRICULTURAL AND INDUSTRIAL LEASING REVENUES. FINANCING: $ 51,600 GENERAL REVENUE (A) 464,400 FEDERAL GRANTS/LOANS (F) $ 516,000 TOTAL 42 TRANSPORTATION PROJECT TITLE: AIRPORT TAXIWAY EXTENSION FOR T -HANGARS LOCATION: REGIONAL AIRPORT PURPOSE: EXTEND T -HANGAR TAXIWAY TO CONNECT TO EXISTING TAXIWAYS PHYSICAL DESCRIPTION: CONSTRUCT 38,000 SQUARE FEET OF TAXIWAY ON SOUTH SIDE OF CITY T -HANGARS WEST TO CONNECT TO TAXIWAY "E" AND BEYOND TO PROPOSED TAXIWAY FOR RUNWAY 02/20 UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING TAXIWAY (ACTUAL ROAD ACCESS) AT NORTHEAST END OF TERMINAL RAMP IS ONLY EXIT FOR FBO T -HANGARS RESULTING IN AIRCRAFT TRAFFIC CONFLICTS. IMPACT ON INCREASED MAINTENANCE FOR SNOW AND ICE OPERATING BUDGET: REMOVAL FINANCING: $ 24,800 GENERAL REVENUE (A) 470,500 FEDERAL GRANTS/LOANS (F) $ 495,300 TOTAL 1-39 43 This page intentionally left blank. 44 30000000 25000000 20000000 15000000 1000000( 500000( ENVIRONMENT CAPITAL IMPROVEMENTS PROGRAM 2001-02 FISCAL 2002-03 FISCAL 2003-04 FISCAL 2004-05 FISCAL 2005-06 FISCAL YEAR YEAR YEAR YEAR YEAR 45 ENVIRONMENT PROPOSED PROJECTS PROJECT IMPROVEMENT TOTAL 2001-02 2002-03 2003-04 2004-05 2005-06 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL YEAR YEAR YEAR YEAR YEAR 2-1 Cape La Croix Creek/Walker 1,100,000 1,100,000 Branch Flood Control Project B B (Detention Reservoir) 2-2 Upper Cape La Croix - 200,000 200,000 Detention Trunk Sewer B B SUBTOTAL -CORPS 1,300,000 1,300,000 - - - - PROJECT 2-3 Mississippi River Lift Stations 1,428,298 1,428,298 and Force Main Replacement B B 2-4, -:.<:> Sloan Creek Relief Sewer 1,770,000 1,770,000 B B 2-5 South Ramsey Branch Lift 956,000 956,000 B e Station/Extension Sewer B 2-6 _ Trickling Filter Rehabilitation at 1,808,000 1,808,000 `4. Wastewater Treatment Plant C C t 2 7 . Ranchito/Arena Watershed 1,510,000 1,510,000 Relief Sewer C C 2-8 Wastewater System SCADA 80,000 32,000 32,000 16,000 Upgrade I I 1 1 2-9 Sanitary Sewer Rehabilitation 300,000 100,000 100,000 100,000 of Red Star Area F F F F 2-10 Clark Avenue Relief Sewer 288,000 288,000 B B 2-11 Kingsway Sewer Project 80,300 80,300 G G 2-12 Lakeshore Sewer Project 230,000 230,000 G G 2-13 Land Acquisition for Sludge 450,000 450,000 Program 1 1 2-14 Sanitary Sewer Rehabilitation 105,000 105,000 and Relining F F 2-15 Replacement of South Screw 110,000 110,000 Pump at Wastewater Plant I I A GENERAL REVENUE FUND B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTS/LOANS E MOTOR FUEL TAX F FEDERAL GRANTSILOANS G SPECIAL ASSESSMENTS H CAPITAL IMPROVEMENT SALES TAX I OTHER J GEN. OBLIGATION BONDS: PENDING K TRANSPORTATION SALES TAX Projects included in Sewer Revenue Bond Issue supported by a %% capital improvement sales tax extension for 2( years approved by vote on April 5, 1994, and an additional Sewer Revenue Bond issued approved by vote or February 8, 2000. Jel ENVIRONMENT PROPOSED PROJECTS PROJEC IMPROVEMENT TOTAL 2001-02 2002-03 2003-04 2004-05 2005-06 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL YEAR YEAR YEAR YEAR YEAR 2-16 Replacement of North Screw 110,000 110,000 Pump at Wastewater Plant 1 1 2-17 Meadowbrook Sewer District 98,900 98,900 G G 2-18 South Kingshighway/ 137,700 137,700 Technology Park Sewer G G District 2-19 Replacement of Sludge 53,000 53,000 Thickener Turntable I I SUBTOTAL - SEWER 9,515,198 8,867,598 478,600 116,000 53,000 - PROJECTS 2-20 Solid Waste Machine Storage 80,000 80,000 Building I I 2-21 Transfer Station Contractor 60,000 60,000 Ramp 1 1 2-22 Transfer Station Entrance 100,000 100,000 Scale I I SUBTOTAL - SOLID WASTE 240,000 140,000 100,000 - - - PROJECTS Water Distribution 229,000 75,000 75,000 79,000 Improvement Program 1 I 1 I " ZWater ,, ' Development/Main Extensions 229,000 I 75,000 1 75,000 79,000 =2 Two-inch Water Main/ Service 525,000 175,000 175,000 175,000 b�. 4 Replacement Program A,I A 1 1 Two -Inch Water Main 675,000 225,000 225,000 225,000 Replacement (Contract B,I B B I Program) �7 Water Storage Tank 284,250 67,125 67,125 150,000 "Rehabilitation (Eight Tanks) I I I I Fire Hydrant Replacement 300,000 100,000 100,000 100,000 B B B B 2$ Water System Seismic 428,400 214,200 214,200 Protection D D D A GENERAL REVENUE FUND B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTSILOANS E MOTOR FUEL TAX F FEDERAL GRANTSILOANS G SPECIAL ASSESSMENTS H CAPITAL IMPROVEMENT SALES TAX 1 OTHER J GEN. OBLIGATION BONDS: PENDING K TRANSPORTATION SALES TAX Projects totally or partially included in Water Revenue Bond Issue supported by a '/4% capital improvement sales tax extension for 20 years approved by vote on November 5, 1996. 47 ENVIRONMENT PROPOSED PROJECTS PROJECT IMPROVEMENT TOTAL 2001-02 2002-03 2003-04 2004-05 2005-06 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL YEAR YEAR YEAR YEAR YEAR 2-30 ;."=;;; Expand and Rehab Cape Rock 9,910,000 9,910,000 Water Plant No. 1 and B B Construct Alluvial Well Field 2731 '. Water Pumping Station/Vault 103,400 103,400 Retrofit B B 2732 : _ Lexington/Melody Lane Water 172,600 172,600 Extension G G 2-33 North Sprigg Water Extension 154,900 154,900 B,G B,G Water Plant No. 2 Sludge 158,865 158,865 System B B =a 2 4,4 Mt. Auburn Corridor Water 904,200 904,200 ',- Dist. Main Augmentation B B 236. 20 -Inch Main Project (East 723,300 723,300 " 1= Cape Rock Drive) B B 2 37 16 -Inch Main Project (Bertling 672,100 672,100 ,r n: Street) B B Elevated Water Storage Tank 237,300 237,300 B B 2-39 Ramsey Branch Water Plant 640,000 128,000 128,000 128,000 128,000 128,000' Filter Valve Replacement I I I I I I 2-40 Rebuild Existing Filters at 640,500 10,500 210,000 210,000 210,000 Cape Rock Water Treatment I I I I I Plant 2-41 Water Meter Replacement 210,000 50,000 50,000 55,000 55,000 Program I I I 1 1 2-42 Mt. Aubum/Siemers Main 600,000 600,000 Upgrade (Proposed North C C Loop) 2-43 South Plant -Nash Road 658,200 658,200 Potable Water Main C,D C,D 2-44 Route K Pumping Station 204,000 1 204,000 1 2-45 Ramsey Branch Clarifier 15,000 15,000 Building Improvements I I 2-46 Electrical Equipment and 92,000 92,000 Storage Building at Gordonville I I Road Tank Site A GENERAL REVENUE FUND B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTSILOANS E MOTOR FUEL TAX F FEDERAL GRANTS/LOANS G SPECIAL ASSESSMENTS H CAPITAL IMPROVEMENT SALES TAX I OTHER J GEN. OBLIGATION BONDS: PENDING K TRANSPORTATION SALES TAX ' r Projects totally or partially included in Water Revenue Bond Issue supported by a %% capital improvement sales tax extension for 20 years approved by vote on November 5, 1996. 48 ENVIRONMENT PROPOSED PROJECTS PROJEC IMPROVEMENT TOTAL 2001-02 2002-03 2003-04 2004-05 2005-06 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL YEAR YEAR YEAR YEAR YEAR 2-47 12 -Inch Water Main - 176,400 176,400 Downtown: Mill Street to St. I I Vincent 2-48 Residual Storage & Disposal 4,239,900 4,239,900 Cape Rock Water Plant # 1 1 1 2-49 Cape Girardeau -Jackson 358,000 358,000 Water System Interconnection I SUBTOTAL - WATER 23,541,315 15,488,390 1,733,025 5,440,900 393,000 486,000 PROJECTS 2-50 Flood Warning System 147,500 35,000 52,500 30,000 30,000 H H H H H 2-51 Ranchito/Arena Watershed 750,400 68,400 682,000 Stormwater Project I I I 2-52 Kingshighway/Commercial 170,000 170,000 Channel Construction & Ditch D D Cleaning 2-53 Shawnee Park/Arena Park 20,000 20,000 Bank Stabilization 1 1 2-54 Storm Sewer Along Highway 60,000 60,000 74 D,I D,1 SUBTOTAL-STORMWATER 1,147,900 293,400 794,500 30,000 30,000 PROJECTS TOTALS 35,744,413 26,089,388 3,106,125 5,586,900 476,000 486,000 A B GENERAL REVENUE FUND REV/PFA BONDS: ISSUED 175,000 19,225,163 175,000 18,562,863 562,300 100,000 C D REV/PFA BONDS: PENDING STATE GRANTS/LOANS 4,076,200 1,128,400 4,076,200 884,200 244,200 E F MOTOR FUEL TAX FEDERALGRANTS/LOANS 405,000 2D5,0D0 100,000 100.000 G H SPECIAL ASSESSMENTS CAPITAL IMPROVEMENT SALES TAX 850,700 147,500 614,100 35,000 236,600 52,500 30,000 30,000 1 OTHER 9,736,450 1,537,025 1,910,525 5,356,900 446,000 486, 000 J GEN. OBLIGATION BONDS: PENDING K TRANSPSORTATION SALES TAX ENVIRONMENT PROJECT TITLE: CAPE LA CROIX CREEKWALKER BRANCH FLOOD CONTROL PROJECT LOCATION CAPE LA CROIX CREEK PURPOSE: TO REDUCE FLOODING IN PROJECT AREAS PHYSICAL DESCRIPTION: 157 -ACRE DETENTION FACILITY; PARK AND RECREATION FACILITIES UNIT OF WORK: ACQUIRE RIGHT-OF-WAY AND CONSTRUCT JUSTIFICATION: FLOODING IN THE CAPE LA CROIX CREEK/WALKER BRANCH WATERSHED HAS CAUSED SERIOUS DAMAGE TO PROPERTY AND ENDANGERED THE LIVES OF CAPE GIRARDEAU CITIZENS, AND THIS HAZARD WILL CONTINUE UNLESS MITIGATED. IMPACT ON ADDITIONAL PERSONNEL AND EQUIPMENT WILL BE OPERATING BUDGET: REQUIRED FOR MAINTENANCE OF THESE FACILITIES. FINANCING: $ 1.100,000 REVENUE/PFA BONDS: ISSUED (B) $ 1,100,000 TOTAL NOTE: INCLUDES REMAINING PORTION OF CITY'S COMMITMENT FOR THE DETENTION RESERVOIR PROJECT ON LASALLE FORK OF CAPE LA CROIX CREEK. 2-1 Kil ENVIRONMENT PROJECT TITLE: UPPER CAPE LA CROIX - DETENTION TRUNK SEWER LOCATION: ROUTE W TO AND THROUGH CORPS OF ENGINEER'S PROJECT DETENTION AREA (LASALLE FORK OF CAPE LA CROIX CREEK) PURPOSE: TO EXTEND SEWER SERVICE TO NORTHWEST PART OF CITY AND ROUTE W MOBILE HOME PARK. PHYSICAL DESCRIPTION: COMPLETE CONSTRUCTION AND CLOSE OUT SEWAGE LAGOONS SERVING ROUTE W MOBILE HOME PARK. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: WILL EXTEND SEWER SERVICE IN NORTHWEST PART OF CITY GROWTH AREA AND ELIMINATE SEWAGE LAGOONS AT THE ROUTE W MOBILE HOME PARK. IMPACT ON INCREASED DEPRECIATION EXPENSE, INCREASED OPERATING BUDGET: MAINTENANCE EXPENSE FINANCING: 200,000 REVENUE BONDS: ISSUED (B) $ 200,000 TOTAL 2-2 51 2-3 ENVIRONMENT PROJECT TITLE: MISSISSIPPI RIVER LIFT STATIONS AND FORCE MAIN REPLACEMENT LOCATION: ALONG MISSISSIPPI RIVER FROM SLOAN CREEK AREA TO LA CRUZ STREET PURPOSE: UPGRADE FOUR EXISTING LIFT STATIONS AND CONSTRUCT A NEW PRIMARY FORCE MAIN PHYSICAL DESCRIPTION: REPLACE/RENOVATE LIFT STATIONS 1, 2, 3, AND 4 AND CONSTRUCT APPROXIMATELY 8,200 FEET OF PARALLEL FORCE MAIN FROM MILL STREET TO LA CRUZ STREET. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: EXISTING LIFT STATIONS ARE APPROACHING 30 YEARS OLD AND ARE OUTMODED IN TERMS OF STRUCTURAL INTEGRITY, CAPACITIES, AND AGE OF EQUIPMENT. THE FORCE MAIN IS NEEDED TO REDUCE FRICTION LOSSES AND IMPROVE CAPACITY. IMPACT ON INCREASED DEPRECIATION EXPENSE. SOME REDUCTION OPERATING BUDGET: IN OPERATING EXPENSE MAY BE ANTICIPATED. FINANCING: $ 1,428.298 REVENUE/PFA BONDS: ISSUED (B) $ 1,428,298 TOTAL 52 ENVIRONMENT PROJECT TITLE: SLOAN CREEK RELIEF SEWER LOCATION: SLOAN CREEK FROM NEAR MISSISSIPPI RIVER TO OLD SPRIGG STREET ROAD PURPOSE: RELIEVE OVERLOADED EXISTING SEWERS AND PROVIDE FOR FUTURE GROWTH PHYSICAL DESCRIPTION: APPROXIMATELY 9,300 FEET OF 15 -INCH TO 24 -INCH RELIEF SEWER LINE. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: EXISTING TRUNK SEWER IS SURCHARGED AT PEAK FLOW. CONSTRUCTION OF RELIEF SEWER. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: $ 1,770.000 REVENUE/PFA BONDS: ISSUED (B) $ 1,770,000 TOTAL 2-4 53 2-5 ENVIRONMENT PROJECT TITLE: SOUTH RAMSEY BRANCH LIFT STATION/EXTENSION SEWER LOCATON: SOUTH RAMSEY BRANCH (INTERSTATE 55 - HIGHWAY 74 I - MEADOWBROOK AREA) PURPOSE: PROVIDE SEWER SERVICE TO PREVIOUSLY UNSERVED I AREA PHYSICAL DESCRIPTION: APPROXIMATELY 8,600 FEET OF GRAVITY AND FORCE I MAIN SEWER WITH ONE LIFT STATION UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS AND CONSTRUCT JUSTIFICATION: WILL EXTEND SEWER SERVICE TO UNSERVED AREA AT FAR SOUTH END OF RAMSEY BRANCH. WILL RELIEVE EXISTING ENVIRONMENTAL PROBLEMS IN THIS AREA AND PROVIDE FOR ADDITIONAL DEVELOPMENT INCLUDING NEW CAREER CENTER AND HIGH SCHOOL. IMPACT ON INCREASED DEPRECIATION AND OPERATIONAL EXPENSE OPERATING BUDGET: FINANCING: 956,000 REVENUE/PFA BONDS: ISSUED (B) $ 956,000 TOTAL 54 ENVIRONMENT PROJECT TITLE: TRICKLING FILTER REHABILITATION LOCATION: WASTEWATER TREATMENT PLANT PURPOSE: TO REHABILITATE THE TRICKLING FILTER PHYSICAL DESCRIPTION: REPLACEMENT OF OXIDATION MEDIA. REPLACEMENT OF CORRUGATED FIBERGLASS WALL PANELS WITH WEATHER AND UV RESISTANT PANELS, REPLACEMENT AND/OR ADDITION OF SOME INTERIOR STRUCTURAL BEAMS WITH FIBERGLASS BEAMS, BASED ON A SIESMIC STUDY. ALSO THE REPAINTING OF THE STRUCTURAL SEAL. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO IMPROVE AND BRING BACK UP TO FUNCTIONAL AND VISUAL STANDARDS, AS CAUSED BY WEAR AND TEAR DUE TO OPERATION, OTHER MAINTENANCE AND WEATHERING OVER THE PAST 20+ YEARS. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 1.808.000 REVENUE/PFA BONDS: PENDING (C) $ 1,808,000 TOTAL 2-6 55 2-7 ENVIRONMENT PROJECT TITLE: RANCHITO/ARENA WATERSHED RELIEF SEWER LOCATION: KINGSWAY, MEADOW LANE, RANCHITO DRIVE, JANET DRIVE AREA PURPOSE: TO RELIEVE SURCHARGING ON THIS SECTION OF TRUNK SEWER LINE AND TO IMPROVE SANITARY SEWER DRAINAGE. PHYSICAL DESCRIPTION: INSTALLATION OF APPROXIMATELY 4,000 LINEAR FEET OF 15 -INCH SANITARY SEWER LINE AND APPURTENANCES. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: FACILITIES ARE NEEDED TO RELIEVE SANITARY SEWER SURCHARGING IN THE AREA. IMPACT ON INCREASED DEPRECIATION AND OPERATIONAL EXPENSE OPERATING BUDGET: FINANCING: $ 1.510.000 REVENUE/PFA BONDS: PENDING (C) $ 1,510,000 TOTAL 56 ENVIRONMENT I PROJECT TITLE: WASTEWATER SCADA SYSTEM UPGRADE 1 LOCATION: WASTEWATER LIFT STATIONS PURPOSE: TO MONITOR 5 LIFT STATIONS PHYSICAL DESCRIPTION: A WIRELESS SYSTEM THAT INCLUDES THE MASTER CONTROLLER AT THE TREATMENT PLANT, AND REMOTE UNITS SUCH AS PLC'S AT EACH LIFT STATION. UNIT OF WORK: INSTALL MASTER CONTROLLER, PLC'S AND THE NETWORK OF ANTENNAS WHICH WOULD CONNECT THE SYSTEMS TOGETHER. JUSTIFICATION: ELIMINATION OF A TELEPHONE LINE CHARGE EACH MONTH. MORE RELIABLE SYSTEM OF MONITORING OVER THE PRESENT TELEPHONE LINES. MORE MONITORING CAPABILITIES AVAILABLE WITH SCADA. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 80,000 OTHER (OPERATIONS) (1) $ 80,000 TOTAL NOTE: SCADA - SUPERVISORY CONTROL AND DATA ACQUISITION 2-8 Wfl ENVIRONMENT PROJECT TITLE: SANITARY SEWER REHABILITATION OF RED STAR AREA LOCATION: RED STAR DISTRICT PURPOSE: TO PREVENT INFLOW AND INFILTRATION INTO THE SANITARY SEWER SYSTEM DURING FLOOD CONDITIONS PHYSICAL DESCRIPTION: RELINING SEWERS, RELINING MANHOLES, INSTALLING ABOVE FLOOD ELEVATION VENTS, SEALING MANHOLE LIDS, LATERAL LINE VALVES TO SHUT OFF FLOW DURING FLOOD EVENTS. DISASTER RESISTANT COMMUNITIES PROGRAM PROJECT. UNIT OF WORK: PROJECT IDENTIFICATION AND IMPLEMENTATION AND REHABILITATION JUSTIFICATION: TO ENHANCE AND PROTECT THE SANITARY COLLECTION SYSTEM AND PREVENT EXCESS FLOW AT THE WASTEWATER TREATMENT PLANT IMPACT ON DECREASED OPERATING AND MAINTENANCE COSTS OPERATING BUDGET: FINANCING: 300,000 FEDERAL GRANTS/LOANS (F) $ 300,000 TOTAL 58 ENVIRONMENT PROJECT TITLE: CLARK AVENUE RELIEF SEWER LOCATION: ADJACENT TO WALKER BRANCH FROM PERRYVILLE I ROAD TO PARKSITE DRIVE PURPOSE: TO RELIEVE SURCHARGING ON THIS SECTION OF TRUNK I SEWER LINE. PHYSICAL DESCRIPTION: APPROXIMATELY 2,500 FEET OF 15 -INCH DIAMETER I SANITARY SEWER LINE UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: RELIEVE EXISTING OVERLOAD AND PERMIT COMPLETE I DEVELOPMENT OF THE DRAINAGE BASIN. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: 288,000 REVENUE/PFA BONDS: ISSUED (B) $ 288,000 TOTAL 2-10 59 2-11 ENVIRONMENT PROJECT TITLE: KINGSWAY SEWER PROJECT LOCATION: KINGSWAY DRIVE, MELROSE AVENUE TO KURRE LANE PURPOSE: ELIMINATION OF SEPTIC TANKS AND HEALTH CONCERNS PHYSICAL DESCRIPTION: 952 LINEAR FEET OF 8 -INCH SEWER MAIN, WITH ELEVEN (11) WYES AND FOUR (4) STANDARD MANHOLES. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: SUFFICIENT SEWER PETITION BY OWNERS AND COUNCIL AUTHORIZED PLANS (3-19-99). ORDINANCE OF NECESSITY ON 4-19-99. IMPACT ON INCREASED DEPRECIATION AND OPERATIONAL EXPENSE OPERATING BUDGET: FINANCING:8$ 0,300 SPECIAL ASSESSMENTS (G) $ 80,300 TOTAL .c 2-12 61 ENVIRONMENT PROJECT TITLE: LAKESHORE SEWER DISTRICT LOCATION: LAKESHORE DRIVE PURPOSE: TO PROVIDE SANITARY SEWER SERVICE TO PREVIOUSLY UNSERVED AREA. PHYSICAL DESCRIPTION: APPROXIMATELY 3,000 FEET OF SANITARY SEWER AND NECESSARY APPURTENANCES. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT. JUSTIFICATION: REPLACEMENT OF DETERIORATING SEPTIC SYSTEMS IN A RESIDENTIAL AREA. IMPACT ON INCREASED DEPRECIATION AND OPERATIONAL EXPENSE OPERATING BUDGET: FINANCING:2$ 30,000 SPECIAL ASSESSMENTS (G) $ 230,000 TOTAL 2-12 61 2-13 ENVIRONMENT PROJECT TITLE: LAND ACQUISITION FOR SLUDGE PROGRAM (LAP) LOCATION: UNKNOWN AT THIS TIME, WILL BE MORE THAN ONE LOCATION PURPOSE: TO ENSURE THAT THE CITY WILL HAVE A DISPOSAL AREA FOR SLUDGE, ESPECIALLY DURING THE SPRING AND SUMMER MONTHS WHEN FARMLAND IS NOT AVAILABLE. PHYSICAL DESCRIPTION: MOSTLY FLAT LAND WITH SANDY SOIL. 300 ACRES I NEEDED. UNIT OF WORK: PURCHASE OF LAND JUSTIFICATION: FARMERS ARE NOT LEAVING ANY ACREAGE SET ASIDE FOR THE CITY TO INJECT SLUDGE DURING THE SPRING AND SUMMER. IT IS GETTING DIFFICULT TO FIND ENOUGH ACREAGE FOR SLUDGE DISPOSAL. REGULATIONS WILL ONLY ALLOW APPLICATION OF SLUDGE AT SO MANY TONS PER ACRE. THIS WILL PROBABLY BECOME MORE RESTRICTIVE WHEN THE CITY'S NEW PERMIT IS ISSUED IN 2001. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: 450,000 OTHER (1) $ 450,000 TOTAL 62 ENVIRONMENT _ I PROJECT TITLE: SANITARY SEWER REHABILITATION AND RELINING LOCATION: SIX LOCATIONS IN CITY -TOTAL OF 1,810 FEET OF 8 -INCH LINE PURPOSE: REDUCE INFLOW AS WELL AS OUTFLOW OF THE SANITARY SEWERS PHYSICAL DESCRIPTION: RELINE 1,810 FEET OF 8 -INCH PIPE WITH INSITUFORM OR LIKE SYSTEM UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: HELP PREVENT SURCHARGING OF SANITARY SEWER LINES IMPACT ON DECREASED OPERATING AND MAINTENANCE COSTS OPERATING BUDGET: FINANCING: 105,000 FEDERAL GRANTS/LOANS (F) $105,000 TOTAL 2-14 63 ENVIRONMENT PROJECT TITLE: REPLACEMENT OF SOUTH SCREW PUMP AT WASTEWATER PLANT LOCATION: WASTEWATER PLANT PURPOSE: TO REPLACE THE SCREW PUMP THAT IS 24 YEARS OLD PHYSICAL DESCRIPTION: 6 -FOOT DIAMETER SPIRAL SCREW PUMP, 60 FEET LONG. ALSO WOULD INCLUDE BEARINGS, SEALS, ETC. UNIT OF WORK: INSTALLATION JUSTIFICATION: THE SCREW PUMPS IN PLACE NOW ARE GOING TO BE 24 YEARS OLD IN 2001. THE EDGES ARE STARTING TO WEAR DOWN AND THE PUMPS THEMSELVES HAVE BEEN SANDBLASTED AND RECOATED ONCE ALREADY. 2-15 IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING:1$ 10.000 OTHER (I) $ 110,000 TOTAL 64 2-16 :1<1 ENVIRONMENT PROJECT TITLE: REPLACEMENT OF NORTH SCREW PUMP AT WASTEWATER PLANT LOCATION: WASTEWATER PLANT PURPOSE: TO REPLACE THE SCREW PUMP THAT IS 24 YEARS OLD PHYSICAL DESCRIPTION: 6 -FOOT DIAMETER SPIRAL SCREW PUMP, 60 FEET LONG. ALSO WOULD INCLUDE BEARINGS, SEALS, ETC. UNIT OF WORK: INSTALLATION JUSTIFICATION: THE SCREW PUMPS IN PLACE NOW ARE GOING TO BE 24 YEARS OLD IN 2001. THE EDGES ARE STARTING TO WEAR DOWN AND THE PUMPS THEMSELVES HAVE BEEN SANDBLASTED AND RECOATED ONCE ALREADY. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $110,000 OTHER (I) $ 110,000 TOTAL 2-16 :1<1 ENVIRONMENT PROJECT TITLE: MEADOWBROOK SEWER DISTRICT LOCATION: HIGHWAY 74 AND MEADOWBROOK LANE AREA PURPOSE: TO PROVIDE SEWER SERVICE TO MEADOWBROOK AREA PHYSICAL DESCRIPTION: LATERAL SANITARY SEWER LINES AND DISTRICT LIFT I STATION UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: AREA CURRENTLY ON PRIVATE SEPTIC SYSTEMS IMPACT ON INCREASED DEPRECIATION AND OPERATIONAL EXPENSE OPERATING BUDGET: FINANCING:9$ 8,900 SPECIAL ASSESSMENTS (G) $ 98,900 TOTAL 2-17 ENVIRONMENT PROJECT TITLE: SOUTH KINGSHIGHWAY/TECHNOLOGY PARK SEWER DISTRICT LOCATION: SOUTH KINGSHIGHWAY, SOUTHERN EXPRESSWAY AREA/ I UNIVERSITY TECHNOLOGY PARK PURPOSE: PROVIDE SEWER SERVICE TO PREVIOUSLY UNSERVED I AREA AND ELIMINATE ONE LIFT STATION. PHYSICAL DESCRIPTION: APPROXIMATELY 1,620 FEET OF SANITARY SEWER AND I APPURTENANCES. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: REPLACEMENT OF SEPTIC SYSTEMS IN COMMERCIAL/ INDUSTRIAL AREAS. IMPACT ON DECREASED OPERATIONAL AND MAINTENANCE COSTS OPERATING BUDGET: FROM ELIMINATION OF LIFT STATION FINANCING: 137,700 SPECIAL ASSESSMENTS (G) $ 137,700 TOTAL 2-18 �:f7 2-19 ENVIRONMENT PROJECT TITLE: REPLACEMENT OF SLUDGE THICKENER TURNTABLE LOCATION: WASTEWATER TREATMENT PLANT PURPOSE: TO REPLACE 22 YEAR OLD TURNTABLE THAT HAS HAD TWO MAJOR MECHANICAL FAILURES PHYSICAL DESCRIPTION: TURNTABLE ASSEMBLY, BEARINGS AND HARDWARE. THIS ASSEMBLY OPERATES CONTINUOUSLY. UNIT OF WORK: REMOVAL AND REPLACEMENT OF ASSEMBLY JUSTIFICATION: TURNTABLE ASSEMBLY IS 22 YEARS OLD WITH TWO MECHANICAL FAILURES. WHEN THE LAST FAILURE OCCURRED, THE UNIT WAS DOWN FOR 6 MONTHS. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING:5$ 3.000 OTHER (1) $ 53,000 TOTAL 68 ENVIRONMENT PROJECT TITLE: SOLID WASTE MACHINE STORAGE BUILDING LOCATION: SOLID WASTE TRANSFER STATION PURPOSE: TO STORE HI -LIFT, BACKHOE, TRAILER TRANSFER TRUCK, AND PICK-UP TRUCK PHYSICAL DESCRIPTION: 45 FOOT BY 54 FOOT BY 14 FOOT POLE BUILDING WITH A CONCRETE FLOOR, INSULATED, WITH A 24 -FOOT END SLIDE DOOR UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO ALLOW INSIDE STORAGE OF THE TRANSFER STATION EQUIPMENT. THIS WOULD ALSO PROVIDE THE MECHANICS WITH AN AREA TO MAKE REPAIRS ON THE EQUIPMENT. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: 80,000 OTHER (1) $ 80,000 TOTAL 2-20 N. ENVIRONMENT I PROJECT TITLE: TRANSFER STATION CONTRACTOR RAMP LOCATION: TRANSFER STATION PURPOSE: TO OFF-LOAD MATERIALS INTO ROLL -OFF CONTAINERS AWAY FROM THE TIPPING FLOOR. PHYSICAL DESCRIPTION: A 20 FOOT BY 100 FOOT RAMP THAT IS 10 FEET HIGH. CONCRETE CONSTRUCTION WITH REBAR FOR REINFORCEMENT. HANDRAILS INSTALLED. CANOPY OVER THE RAMP AREA. UNIT OF WORK: DESIGN AND CONSTRUCT. WORK TO BE DONE WITH CITY CREWS. ENGINEERING WILL BE CONTRACTED OUT. JUSTIFICATION: NEEDED TO PROVIDE A BETTER AND SAFER SERVICE FOR THE CUSTOMERS. WILL ALLOW BETTER UTILIZATION OF THE CURRENT TIPPING FLOOR. WILL ALSO EXPEDITE FLOW THROUGH THE TRANSFER STATION. IMPACT ON OPERATING BUDGET: FINANCING: 2-21 NO IMPACT 60,000 OTHER (1) $ 60,000 TOTAL FTI ENVIRONMENT PROJECT TITLE: TRANSFER STATION ENTRANCE SCALE LOCATION: TRANSFER STATION PURPOSE: TO BETTER SERVE THE CUSTOMERS AT THE TRANSFER STATION AND BACKUP THE EXISTING SCALE. PHYSICAL DESCRIPTION: 70 -FOOT LONG ABOVE GROUND SCALE THAT IS TIED INTO THE TRANSFER STATION COMPUTER SYSTEM. UNIT OF WORK: DESIGN AND INSTALL SCALES, DESIGN AND INSTALL COMPUTER SOFTWARE AND HARDWARE JUSTIFICATION: THIS WOULD ALLOW FOR BETTER TRAFFIC FLOW, EASIER FOR THE CUSTOMERS, AND ALSO PROVIDE BACK-UP FOR THE EXISTING SCALE. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: 100,000 OTHER (1) $ 100,000 TOTAL 2-22 71 2-23 ENVIRONMENT PROJECT TITLE: WATER DISTRIBUTION IMPROVEMENT PROGRAM LOCATION: DISTRIBUTION MAINS -CITY WIDE PURPOSE: INSTALL NEW MAIN PIPES CONNECTING EXISTING MAINS SO THAT FIRE FLOWS, PRESSURE, AND WATER QUALITY ARE IMPROVED. ALSO REPLACE EXISTING PIPES AND HYDRANTS AS REQUIRED OTHER THAN ROUTINE REPAIRS. THIS INCLUDES RELOCATING FACILITIES FOR STATE PROJECTS WHERE NECESSARY. PHYSICAL DESCRIPTION: INSTALL PIPING AS REQUIRED DEPENDING ON EXISTING LOCATIONS AND CONDITIONS. APPROXIMATELY 16,200 FT./3 YRS., 5,400 FT./YR. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (IF NECESSARY), AND CONSTRUCT JUSTIFICATION: GROWTH IS ACCELERATING THE NEED FOR SYSTEM IMPROVEMENTS VERSUS PREVIOUS ESTIMATES IMPACT ON POSSIBLE LOWER ENERGY, COSTS, INCREASED OPERATING BUDGET: DEPRECIATION EXPENSE FINANCING: 229,000 OTHER (1) $ 229,000 TOTAL 72 ENVIRONMENT PROJECT TITLE: WATER DEVELOPMENT/MAIN EXTENSIONS LOCATION: VARIOUS LOCATIONS PURPOSE: EXTENSION OF WATER SERVICE TO DEVELOPING AREAS PREVIOUSLY UNSERVED PHYSICAL DESCRIPTION: CITY PARTICIPATION IN DEVELOPMENT MAIN INSTALLATIONS, I.E., OVERSIZING, HYDRANTS, VALVES, TAPPING SLEEVES, ETC. AND OTHER ITEMS AS DIRECTED UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXTENSION OF WATER MAINS IS AN ESSENTIAL INFRASTRUCTURE ELEMENT NEEDED TO ENABLE GROWTH. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: 229,000 OTHER (1) $ 229,000 TOTAL 2-24 73 2-25 ENVIRONMENT PROJECT TITLE: TWO-INCH WATER MAIN/SERVICE REPLACEMENT PROGRAM LOCATION: CITY-WIDE PURPOSE: REPLACEMENT OF SUBSTANDARD, HIGH FAILURE/REPAIR SECTIONS OF THE WATER DISTRIBUTION SYSTEM WITH NEW 6 -INCH MAIN MINIMUM TO IMPROVE SERVICE, INCREASE FIRE FLOWS AND REDUCE MAINTENANCE COSTS. PHYSICAL DESCRIPTION: REPLACE EXISTING MAIN WITH NEW 6 -INCH MAIN, AND REPLACE EXISTING SERVICES TO NEW LINE UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (WHERE REQUIRED), AND CONSTRUCT JUSTIFICATION: COSTS OF TWO-INCH REPLACEMENT ARE HIGHER THAN EXPECTED (PRIMARILY PAVEMENT REPAIR). ADDITIONAL FUNDING WILL PREVENT REDUCTION OF ANNUAL FOOTAGE TARGETS. IMPACT ON MAINTENANCE COST DUE TO MAIN LEAKS ON THESE OPERATING BUDGET: LINES WILL DECREASE AS REPLACEMENT PROGRESSES. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 175,000 GENERAL REVENUE FUND (A) 3$ 50,000 OTHER (1) $ 525,000 TOTAL 74 ENVIRONMENT PROJECT TITLE: TWO-INCH WATER MAIN REPLACEMENT Q .., d LOCATION: CITY-WIDE PURPOSE: REPLACEMENT OF SUBSTANDARD, HIGH FAILURE/REPAIR SECTIONS OF THE WATER DISTRIBUTION SYSTEM WITH NEW 6 -INCH MAIN MINIMUM TO IMPROVE SERVICE, INCREASE FIRE FLOWS AND REDUCE MAINTENANCE PHYSICAL DESCRIPTION: REPLACE EXISTING MAIN WITH NEW 6 -INCH MAIN, AND REPLACE EXISTING SERVICES TO NEW LINE UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (WHERE REQUIRED), AND CONSTRUCT JUSTIFICATION: THE REMAINING TWO-INCH MAINS IN THE SYSTEM ARE PRIMARILY GALVANIZED, BADLY CORRODED AND FAIL FREQUENTLY. ADDITIONALLY, MINIMAL FIRE FLOWS ARE POSSIBLE IN THESE MAINS. REPLACEMENT OF SERVICES WILL REMOVE LEAD SOURCE IN THE OLDEST SERVICES. IMPACT ON MAINTENANCE COST DUE TO MAIN LEAKS ON THESE OPERATING BUDGET: LINES WILL DECREASE AS REPLACEMENT PROGRESSES. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 450,000 REVENUE/PFA BONDS: ISSUED (B) 225,000 OTHER (1) $ 675.000 TOTAL 2-26 75 2-27 ENVIRONMENT PROJECT TITLE: WATER STORAGE TANK REHABILITATION (EIGHT TANKS) LOCATION: TO BE DETERMINED BY SELECTION CRITERIA BASED ON INSPECTION PURPOSE: PROLONG TANK LIFE AND ENSURE WATER QUALITY PHYSICAL DESCRIPTION: RE -COAT STORAGE TANKS, PERFORM NECESSARY I MAINTENANCE UNIT OF WORK: INSPECT AND REHABILITATE JUSTIFICATION: PROGRAMMED PREVENTATIVE MAINTENANCE IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 284,250 OTHER (1) $ 284,250 TOTAL 76 ENVIRONMENT PROJECT TITLE: FIRE HYDRANT REPLACEMENT LOCATION: CITY WIDE PURPOSE: FIRE PROTECTION FLOW INCREASE PHYSICAL DESCRIPTION: 798 - 4 % INCH HYDRANTS REPLACED WITH 5 % INCH HYDRANTS UNIT OF WORK: INSTALL JUSTIFICATION: HYDRANTS OUTDATED - LOW FLOW CAPACITIES. DO NOT MEET CURRENT DESIGN SPECIFICATIONS. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: 300,000 REVENUE/PFA BONDS:ISSUED (B) $ 300,000 TOTAL 2-28 77 2-29 78 ENVIRONMENT PROJECT TITLE: WATER SYSTEM SEISMIC PROTECTION LOCATION: TREATMENT PLANTS AND STORAGE TANKS PURPOSE: MINIMIZE DAMAGE AND WATER LOSS IN THE EVENT OF SEISMIC ACTIVITY PHYSICAL DESCRIPTION: AUTOMATIC ISOLATION VALVES AND FLEXIBLE CONNECTIONS AT INFLUENT AND EFFLUENT PIPING TO TANKS AND CLEAR WELLS UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: MAINTAIN INTEGRITY OF DRINKING WATER SUPPLY IN THE EVENT OF SEISMIC ACTIVITY IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 428,400 FEDERAL GRANTS/LOANS (D) $ 428,400 TOTAL 2-29 78 ENVIRONMENT PROJECT TITLE: EXPAND AND REHABILITATE CAPE ROCK WATER PLANT #1 AND CONSTRUCT ALLUVIAL WELL FIELD LOCATION: WATER TREATMENT PLANT NO. 1 (CAPE ROCK PLANT) PURPOSE: PROVIDE INCREASED CAPACITY FOR SUPPLY OF POTABLE WATER TO CITY OF CAPE GIRARDEAU FOR EXISTING AND FUTURE DEVELOPMENTS PHYSICAL DESCRIPTION: DESIGN AND CONSTRUCT PLANT FACILITIES UNIT OF WORK: DESIGN, ACQUIRE PROPERTY/EASEMENTS, AND I CONSTRUCT JUSTIFICATION: NEEDED TO MEET NEAR AND LONG-TERM WATER SYSTEM DEMANDS AS IDENTIFIED IN WATER SYSTEM MASTER PLAN IMPACT ON OPERATION AND MAINTENANCE COSTS WILL CHANGE. OPERATING BUDGET: INSUFFICIENT DATA AVAILABLE CURRENTLY TO FORECAST EFFECT. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 9,910,000 REVENUE/PFA BONDS:ISSUED (B) $ 9,910,000 TOTAL 2-30 79 2-31 ENVIRONMENT PROJECT TITLE: WATER PUMPING STATIONNAULT RETROFIT LOCATION: VARIOUS LOCATIONS PURPOSE: RETROFIT CONFINED -SPACE PUMPING STATIONSNAULTS WITH FORCED AIR VENTILATION AND LIGHTWEIGHT ACCESS HATCHES. ADDITIONAL PUMPING STATION FOR WEST OR NORTHWEST AREA PER WATER SYSTEM MASTER PLAN. PHYSICAL DESCRIPTION: INSTALL BLOWERS, SWITCHES, WIRING AND RETROFIT HATCHES WITH LIGHTWEIGHT MATERIALS. ADD MOTOR OPERATED VALVE AT COLLEGE FOR PUMPING CONTROL. PUMPING STATION DESIGN AND INSTALLATION. UNIT OF WORK: DESIGN AND CONSTRUCT/RETROFIT JUSTIFICATION: EMPLOYEE SAFETY AND STRICTER CONFINED -SPACE ENTRY REQUIREMENTS. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 103,400 REVENUE/PFA BONDS: ISSUED (B) $ 103,400 TOTAL 80 ENVIRONMENT PROJECT TITLE: LEXINGTON/MELODY LANE WATER EXTENSION I LOCATION: LEXINGTON AVENUE, OLD SPRIGG STREET ROAD TO NEAR BIG BEND ROAD, SHORT EXTENSION DOWN MELODY LANE PURPOSE: DEVELOPMENT MAIN EXTENSION. PHYSICAL DESCRIPTION: TOGETHER WITH NORTH SPRIGG WATER EXTENSION, 5,245 FEET OF 12 -INCH PIPE, 1,000 FEET OF 6 -INCH PIPE. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (IF REQUIRED), AND CONSTRUCT JUSTIFICATION: PROVIDE WATER SERVICE TO NEW AREA AS IT DEVELOPS. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: 172,600 SPECIAL ASSESSMENTS (G) $ 172,600 TOTAL NOTE: IN ORDER TO MAINTAIN THE INTEGRITY OF THE WATER SYSTEM, THIS PROJECT WILL NEED TO BE COORDINATED, AND CONSTRUCTED, WITH PROJECT NO. 2-33 (NORTH SPRIGG WATER EXTENSION). 2-32 81 ENVIRONMENT PROJECT TITLE: NORTH SPRIGG WATER EXTENSION LOCATION: NORTH SPRIGG STREET, BERTLING STREET TOI LEXINGTON AVENUE PURPOSE: DEVELOPMENT MAIN EXTENSION PHYSICAL DESCRIPTION: TOGETHER WITH LEXINGTON WATER EXTENSION, 5,245 FEET OF 12 -INCH PIPE, 1,000 FEET OF 6 -INCH PIPE. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (IF REQUIRED), AND CONSTRUCT JUSTIFICATION: PROVIDE WATER SERVICE TO NEW AREA AS IT I DEVELOPS. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: $ 23,700 REVENUE/PFA BONDS: ISSUED (B) 131,200 SPECIAL ASSESSMENTS (G) $ 154,900 TOTAL NOTE: IN ORDER TO MAINTAIN THE INTEGRITY OF THE WATER SYSTEM, THIS PROJECT WILL NEED TO BE COORDINATED, AND CONSTRUCTED WITH PROJECT NO. 2-32 (LEXINGTON/MELODY LANE WATER EXTENSION). 2-33 82 ENVIRONMENT PROJECT TITLE: WATER PLANT #2 SLUDGE SYSTEM LOCATION: WATER PLANT #2 PURPOSE: SLUDGE DISPOSAL TO SEWER SYSTEM RATHER THAN LAGOON HOLDING PHYSICAL DESCRIPTION: DESIGN AND CONSTRUCT SEWER LIFT STATION AND LATERAL TO DISPOSE OF PROCESS SLUDGE (WHEN TRUNK IS AVAILABLE) UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: REDUCE SLUDGE DISPOSAL COSTS, LAGOON MAINTENANCE AND BENEFIT SEWER TREATMENT PROCESS (COAGULANT). IMPACT ON SLUDGE LAGOON CLEANING COSTS ARE OPERATING BUDGET: APPROXIMATELY $50,000 AND ON A THREE (3) YEAR INTERVAL. AS PLANT NO. 2 USE INCREASES, THIS WILL SHORTEN INTERVAL. THE SEWER TREATMENT DISPOSAL OPTION IS MUCH MORE COST EFFECTIVE AND WOULD SAVE APPROXIMATELY $300,000 OVER THE NEXT 15 YEARS. FINANCING: 158,865 REVENUE/PFA BONDS: ISSUED (B) $ 158,865 TOTAL 2-34 83 2-35 ENVIRONMENT PROJECT TITLE: MOUNT AUBURN CORRIDOR WATER DISTRIBUTION MAIN AUGMENTATION LOCATION: MOUNT AUBURN ROAD, FROM DOCTORS PARK NORTH TO HOPPER ROAD PURPOSE: PROVIDE ADEQUATE FLOWS AND PRESSURE TO SERVE DEVELOPING AREAS ALONG MOUNT AUBURN ROAD PHYSICAL DESCRIPTION: CONSTRUCT PIPE SEGMENTS 544, 545, 547, 548, 550, 551, AND 552 ON FIGURE 12, RECOMMENDED IMPROVEMENTS, BLACK AND VEATCH MASTER PLAN 1993. (MAY REQUIRE ADDITIONAL PIPE SEGMENT TO COMPLETE PROJECT.) UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: SYSTEM DEMAND IS INCREASING AS A RESULT OF GROWTH ALONG THE MOUNT AUBURN CORRIDOR. UPGRADES IN LINE SIZING ARE NEEDED TO ACCOMMODATE PRESENT AND FUTURE GROWTH. IMPACT ON INCREASED DEPRECIATION EXPENSE. MINOR POWER OPERATING BUDGET: SAVINGS WITH REDUCED FRICTION LOSS. FINANCING: 904,200 REVENUE/PFA BONDS: ISSUED (B) $ 904,200 TOTAL 84 ENVIRONMENT PROJECT TITLE: 20 -INCH MAIN PROJECT (EAST CAPE ROCK DRIVE) LOCATION: EAST CAPE ROCK DRIVE, FROM WATER PLANT NO. 1 TO BERTLING STREET PURPOSE: INCREASE FLOW FROM MAIN PLANT TO DISTRIBUTION SYSTEM PHYSICAL DESCRIPTION: APPROXIMATELY 5,300 FEET OF 20 -INCH TRANSMISSION MAIN UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: NEEDED TO INCREASE TRANSMISSION CAPACITY, IMPROVE PRESSURE CONDITIONS AND FIRE FLOWS. REPLACE 14 -INCH TRANSMISSION MAINS INSTALLED IN 1931 AND 1953. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: 723,300 REVENUE/PFA BONDS: ISSUED (B) $ 723,300 TOTAL 2-36 85 2-37 ENVIRONMENT PROJECT TITLE: 16 -INCH MAIN PROJECT (BERTLING STREET) LOCATION: BERTLING STREET, FROM OLD SPRIGG STREET ROAD WEST TO CAPE ROCK DRIVE PURPOSE: INCREASE FLOW FROM MAIN PLANT TO DISTRIBUTION SYSTEM PHYSICAL DESCRIPTION: APPROXIMATELY 5,420 FEET OF 16 -INCH TRANSMISSION MAIN UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: NEEDED TO INCREASE TRANSMISSION CAPACITY, IMPROVE PRESSURE CONDITIONS AND FIRE FLOWS. REPLACE 12 -INCH TRANSMISSION MAIN INSTALLED IN 1951-52. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: 672,100 REVENUE/PFA BONDS: ISSUED (B) $ 672,100 TOTAL 86 2-38 87 ENVIRONMENT PROJECT TITLE: ELEVATED WATER STORAGE TANK LOCATION: AREA ADJACENT TO 1-55 NORTH OF ROUTE K PURPOSE: PROVIDE STORAGE CAPACITY TO MEET PEAK HOUR DEMANDS IN DEVELOPING AREAS PHYSICAL DESCRIPTION: ELEVATED STORAGE TANK UNIT OF WORK: DESIGN, SITE IDENTIFICATION, CONSTRUCT AND EQUIP JUSTIFICATION: GROWTH AND DEVELOPMENT IMPACT ON ADDITIONAL COSTS WILL BE INCURRED FOR OPERATION OPERATING BUDGET: AND MAINTENANCE AT APPROXIMATELY $2,000 ANNUALLY. 10 -YEAR REPAINTING SCHEDULED IN YEAR 2012 AT APPROXIMATELY $100,000. INCREASED DEPRECIATION EXPENSE. FINANCING:23$ 7,300 REVENUE/PFA BONDS: ISSUED (B) $ 237,300 TOTAL 2-38 87 ENVIRONMENT PROJECT TITLE: RAMSEY BRANCH WATER PLANT FILTER VALVE REPLACEMENT PURPOSE: UPGRADE VALVES AND ACTUATORS FROM ELECTRIC TO PNEUMATIC. PHYSICAL DESCRIPTION: REPLACE FILTER VALVES AND ACTUATORS FROM ELECTRIC TO PNEUMATIC, INSTALL AIR COMPRESSORS, LINES AND WIRING. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: REPLACEMENT PARTS ARE NOT AVAILABLE FOR CURRENT VALVES. REPLACEMENT IS NECESSARY FOR CONTINUED OPERATION OF THESE FILTERS. CAPE ROCK WATER PLANT INCREASED CAPACITY WILL ALLOW TIME TO PHASE CONSTRUCTION. IMPACT ON LOWER OPERATION AND MAINTENANCE COSTS. OPERATING BUDGET: FINANCING: 640,000 OTHER (1) $ 640,000 TOTAL 2-39 ENVIRONMENT PROJECT TITLE: REBUILD EXISTING FILTERS AT CAPE ROCK WATER TREATMENT PLANT LOCATION: CAPE ROCK WATER TREATMENT PLANT PURPOSE: REPLACE FILTER MEDIA, UNDERDRAINS, VALVES AND PIPING. PHYSICAL DESCRIPTION: REMOVE AND REPLACE EXISTING MEDIA, UNDERDRAINS, VALVES, AND PIPING. UNIT OF WORK: DESIGN/CONSTRUCT RETROFIT JUSTIFICATION: THIS PROJECT WAS CUT FROM THE PLANT RENOVATION PROJECT WHEN THE ORIGINAL BID WAS OVER BUDGET. PHASED REBUILDING OF THE EXISTING 1930'S HARDWARE IS NECESSARY FOR CONTINUED OPERATION OF THESE FILTERS. NEW FILTER CAPACITY ALLOWS TIME TO PHASE CONSTRUCTION. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT 640,500 OTHER (1) $ 640,500 TOTAL 89 2-40 ENVIRONMENT PROJECT TITLE: WATER METER REPLACEMENT PROGRAM LOCATION: VARIOUS LOCATIONS THROUGHOUT THE CITY - SERVICE INSTALLATIONS PURPOSE: TO REPLACE AGED, INACCURATE METERS WITH NEW METERS SO THAT WATER BILLINGS REFLECT ACTUAL USAGE PHYSICAL DESCRIPTION: IMPLEMENT 10 -YEAR, METER TEST PROGRAM REPLACING METERS OUTSIDE AWWA ACCEPTANCE STANDARDS FOR ACCURACY UNIT OF WORK: REPLACE METERS, EACH BASED ON LAST TEST OR INSTALLATION DATE JUSTIFICATION: METERS TYPICALLY REGISTER LESS THAN THE QUANTITY ACTUALLY CONSUMED AS THEY AGE AND MECHANICAL WEAR OCCURS. THIS RESULTS IN LOST WATER ACCOUNTABILITY. IMPACT ON WILL INCREASE REVENUE BY ENSURING METER OPERATING BUDGET: ACCURACY (METERS OVER 10 YEARS OLD TYPICALLY UNDER -REGISTER BY APPROXIMATELY 5%). FINANCING: $210,000 OTHER (OPERATIONS) (1) $ 210,000 TOTAL 2-41 ENVIRONMENT PROJECT TITLE: MOUNT AUBURN/SIEMERS MAIN UPGRADE LOCATION: MOUNT AUBURN ROAD TO SIEMERS DRIVE IN VICINITY OF ROUTE K/1-55 INTERCHANGE (PROPOSED NORTH LOOP) PURPOSE: PROVIDE INCREASED WATER FLOW AND PRESSURES TO THE DEVELOPING AREA ALONG SIEMERS DRIVE. PHYSICAL DESCRIPTION: APPROXIMATELY 6,950 FEET OF 16 -INCH WATER MAIN WITH APPURTENANCES UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: DEVELOPMENT ALONG SIEMERS DRIVE WILL REQUIRE WATER SUPPLY ENHANCEMENT TO SUPPORT FUTURE GROWTH. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: 600,000 REVENUE/PFA BONDS: PENDING (C) $ 600,000 TOTAL 2-42 91 ENVIRONMENT PROJECT TITLE: SOUTH PLANT-NASH ROAD POTABLE WATER MAIN LOCATION: SOUTH WATER TREATMENT PLANT, SOUTH TO NASH ROAD NEAR JUNCTION WITH AIRPORT ROAD PURPOSE: TO PROVIDE POTABLE WATER TO THE GREATER CAPE GIRARDEAU INDUSTRIAL PARK PHYSICAL DESCRIPTION: APPROXIMATELY 7,800 FEET OF 12 -INCH WATER MAIN WITH CROSSINGS OF THE DUTCHTOWN DITCH, HEADWATER DIVERSION CHANNEL, AND LITTLE RIVER MAIN STEM LEVEE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THE CITY -OWNED WATER SYSTEM ON NASH ROAD SUPPLIES NON -POTABLE WATER FOR PRODUCTION AND FIRE FIGHTING ONLY. POTABLE WATER IS NEEDED FOR EXPANDING ECONOMIC DEVELOPMENT. IMPACT ON INCREASED DEPRECIATION AND MAINTENANCE COSTS OPERATING BUDGET: FINANCING: $ 158,200 REVENUE/PFA BONDS: PENDING (C) 500,000 STATE GRANTS/LOANS (D) $ 658,200 TOTAL NOTE: THIS PROJECT IS CONTINGENT UPON THE LOCATION OF A NEW INDUSTRY OR EXPANSION THAT WILL SATISFY THE "BUT FOR" REQUIREMENT FOR STATE GRANT FUNDS UP TO A MAXIMUM OF $500,000. THE CITY'S SHARE OF THE PROJECT IS ALSO CONTINGENT UPON OTHER FACTORS, SUCH AS THE STATUS OF STATE REVOLVING LOAN FUNDS, IF SUCH ARE AVAILABLE. 2-43 92 ENVIRONMENT PROJECT TITLE: ROUTE K PUMPING STATION LOCATION: ROUTE K WEST OF 1-55 INTERCHANGE PURPOSE: PROVIDE INCREASED WATER FLOW TO GROWTH AREA WEST ON ROUTE K PHYSICAL DESCRIPTION: DESIGN AND CONSTRUCT SCADA-CONTROLLED BOOSTER PUMP STATION, WITH TWO PUMP UNITS AND EMERGENCY GENERATOR. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXTENSION OF WATER MAINS WEST ON ROUTE K WILL REQUIRE PUMP STATION AS AREA DEVELOPS. IMPACT ON INCREASED OPERATING AND MAINTENANCE EXPENSE OPERATING BUDGET: FINANCING: 204,000 OTHER (1) $ 204,000 TOTAL 2-44 93 ENVIRONMENT PROJECT TITLE: RAMSEY BRANCH CLARIFIER BUILDING IMPROVEMENTS LOCATION: RAMSEY BRANCH WATER PLANT # 2 PURPOSE: TO PROVIDE ADDITIONAL STORAGE FOR CHEMICALS PHYSICAL DESCRIPTION: POUR AND FINISH CONCRETE FLOOR IN CLARIFIER BUILDING AND REPLACE EXISTING CHEMICAL FEED LINES. UNIT OF WORK: CONSTRUCT JUSTIFICATION: CONCRETE FLOOR WOULD PROVIDE ADDITIONAL STORAGE SPACE, EXISTING CHEMICAL FEED LINES WOULD NEED TO BE MOVED FROM UNDERGROUND TO OVERHEAD TO PROVIDE ACCESS. IMPACT ON OPERATING BUDGET: FINANCING: 2-45 NO SIGNIFICANT IMPACT. 1$ 5.000 OTHER (1) $ 15,000 TOTAL 94 ENVIRONMENT PROJECT TITLE: ELECTRICAL EQUIPMENT AND STORAGE BUILDING LOCATION: GORDONVILLE WATER TANK SITE PURPOSE: PROVIDE ADEQUATE BUILDING FOR ELECTRICAL EQUIPMENT, GENERATORS, RADIO EQUIPMENT AND MAINTENANCE SUPPLIES. PHYSICAL DESCRIPTION: CONSTRUCT BUILDING APPROXIMATELY 30 FEET BY 401 FEET WITH SLAB FLOOR AND OVERHEAD DOORS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING BUILDING DOES NOT MEET EXISTING I ELECTRICAL EQUIPMENT REQUIREMENTS. IMPACT ON NO SIGNIFICANT IMPACT. OPERATING BUDGET: FINANCING: 92,000 OTHER (1) $ 92,000 TOTAL 2-46 95 ENVIRONMENT PROJECT TITLE: 12 -INCH WATER MAIN LOCATION: DOWNTOWN AREA - MILL STREET TO ST. VINCENT PURPOSE: INCREASE FIRE FLOW TO DOWNTOWN AREA. PULL 10,000 FEET OF 12 -INCH WATER LINE THROUGH ABANDONED 18 -INCH FORCE MAIN PHYSICAL DESCRIPTION: REPLACE 12 -INCH MAIN INSIDE EXISTING ABANDONED 18- I INCH FORCE MAIN. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: DOWNTOWN AREA AND POTENTIAL RIVER CAMPUS AREA LACK MAJOR NORTH -SOUTH WATER MAIN LOOP FOR FIRE FLOW OR HIGH DEMAND. EXISTING 18 -INCH FORCE MAIN COULD BE USED AS CONDUIT WITH MINIMAL EXCAVATION. IMPACT ON OPERATING BUDGET: FINANCING: 2-47 NO SIGNIFICANT IMPACT 176,400 OTHER (1) $ 176,400 TOTAL ENVIRONMENT PROJECT TITLE: RESIDUAL STORAGE AND DISPOSAL LOCATION: CAPE ROCK WATER PLANT #1 PURPOSE: THIS WILL PROVIDE FOR CAPITAL EXPENSE TO DISPOSE OF TREATMENT PROCESS RESIDUAL BY STORAGE, TRANSFER AND LAND APPLICATIONS VERSUS RETURN TO RIVER PHYSICAL DESCRIPTION: SEE B & M DESCRIPTION - STORAGE TANKS, LOAD STATION, TANKER TRUCKS UNIT OF WORK: DESIGN, CONSTRUCT AND EQUIP FOR RESIDUAL STORAGE AND DISPOSAL JUSTIFICATION: REGULATORY REQUIREMENT FOR PERMITTING CONSTRUCTION AND OPERATION (DNR) IMPACT ON OPERATION AND MAINTENANCE COSTS WILL CHANGE. OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 4,239,900 OTHER (1) $ 4,239,000 TOTAL 2-48 97 ENVIRONMENT PROJECT TITLE: CAPE GIRARDEAU-JACKSON WATER SYSTEM INTERCONNECTION LOCATION: INTERCONNECTION BETWEEN NORTH CAPE COUNTY TANK (CAPE) AND i-55 TANK (JACKSON) PURPOSE: TO INTERCONNECT THE MUNICIPAL WATER SYSTEMS OF CAPE GIRARDEAU AND JACKSON FOR MUTUAL SUPPORT PURPOSES. PHYSICAL DESCRIPTION: INSTALL APPROXIMATELY 3,200 LINEAL FEET OF 8 -INCH WATER LINE WITH APPURTENANCES, WITH ONE HIGHWAY BORE (1-55). UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THE CITIES OF CAPE GIRARDEAU AND JACKSON HAVE GROWN TOGETHER, WITH A COMMON BOUNDARY ALONG INTERSTATE 55 AND THEIR WATER SYSTEMS ARE VIRTUALLY ADJOINING AS WELL. INTERCONNECTION WILL ALLOW THE TWO SYSTEMS TO MUTUALLY SUPPORT EACH OTHER IN TIMES OF WATER EMERGENCIES IN EITHER CITY. IMPACT ON OPERATING BUDGET: FINANCING: 2-49 NO SIGNIFICANT IMPACT 358,000 OTHER (1) $ 358,000 TOTAL L• ENVIRONMENT PROJECT TITLE: FLOOD WARNING SYSTEM LOCATION: HOPPER ROAD BRIDGE, LOMBARDO BRIDGE, BROADWAY BRIDGE, AND WILLIAM BRIDGE ON WALKER BRANCH. ALSO HAVE AN INSTALLATION AT THE HEADWATER DETENTION BASIN. ADD FOUR WEATHER STATIONS TO WARNING SYSTEM - TWO IN 2002-2003 AND TWO IN 2003- 2004. PURPOSE: TO BE ABLE TO MONITOR INCREASES IN THE CREEK LEVEL AND DETENTION BASIN LEVEL. HELP PREVENT DOWNSTREAM PROPERTY DAMAGE. PHYSICAL DESCRIPTION: ULTRASONIC FLOW MONITORING AND REPORTING VIA THE WASTEWATER PLANT AND PUBLIC WORKS SERVICE CENTER SCADA SYSTEM. ALSO WILL HAVE THE CAPACITY FOR THE POLICE, FIRE, AND PLANNING TO MONITOR WITH THE APPROPRIATE EQUIPMENT. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: MONITOR FLOW TO HELP PREPARE AND PREVENT DOWNSTREAM DAMAGE. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $147,500 CAPITAL IMPROVEMENT SALES TAX (H) $ 147,500 TOTAL 2-50 2-51 ENVIRONMENT PROJECT TITLE: RANCHITO/ARENA WATERSHED STORMWATER PROJECT LOCATION: ARENA CREEK AND EAST FORK ARENA CREEK, KINGSWAY, MEADOW LANE, RANCHITO DRIVE, JANET DRIVE AREA PURPOSE: IMPROVE STORMWATER DRAINAGE IN THE ARENA CREEK WATERSHED PHYSICAL DESCRIPTION: IMPROVEMENTS TO SURFACE STORMWATER FACILITIES (UNDESIGNED AT PRESENT). UNIT OF WORK: ENGINEER, DESIGN AND CONSTRUCT JUSTIFICATION: FACILITIES ARE NEEDED TO REDUCE STORMWATER FLOODING PROBLEMS. IMPACT ON WILL REQUIRE ADDITIONAL FUNDING FOR STORMWATER OPERATING BUDGET: FACILITY MAINTENANCE. FINANCING: 750,400 OTHER (1) $ 750,400 TOTAL 100 ENVIRONMENT PROJECT TITLE: KINGSHIGHWAY/COMMERCIAL CHANNEL CONSTRUCTION AND DITCH CLEANING - PHASE II LOCATION: FROM COMMERCIAL STREET TO CAPE LA CROIX CREEK. FROM THE BOX CULVERT ON COMMERCIAL STREET AND CONTINUING PAST THE KUSS ENTERTAINMENT PROPERTY TO CAPE LA CROIX CREEK. PURPOSE: TO PERMIT STORMWATER TO FLOW PROPERLY FROM KINGSHIGHWAY TO CAPE LA CROIX CREEK AND STABILIZE THE BANKS SO THAT MAINTENANCE CAN BE PERFORMED PHYSICAL DESCRIPTION: APPROXIMATELY 1,600 FEET OF CHANNEL WORK INCLUDING A CONCRETE -LINED CHANNEL BOTTOM AND VEGETATED SIDE SLOPES. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO ALLOW FOR PROPER MAINTENANCE AND IMPROVED DRAINAGE FROM COMMERCIAL STREET TO CAPE LA CROIX CREEK. IMPACT ON IF THE CITY ASSUMES MAINTENANCE OF THIS CHANNEL, OPERATING BUDGET: THERE WILL BE ADDITIONAL MAINTENANCE COSTS. FINANCING: $170,000 STATE GRANTS AND LOANS (D) $ 170,000 TOTAL 2-52 101 2-53 ENVIRONMENT PROJECT TITLE: SHAWNEE PARK/ARENA PARK BANK STABILIZATION LOCATION: SHAWNEE AND ARENA PARKS ON CAPE LA CROIX CREEK PURPOSE: TO STABILIZE THE BANKS TO PREVENT THE COLLAPSE OF THE RECREATION TRAIL, BALL FIELDS, SOCCER FIELDS AND PARK LAND. PHYSICAL DESCRIPTION: LAY BROKEN CONCRETE AND RIP RAP STONE ON THE I BANKS TO PREVENT EROSION. UNIT OF WORK: DEPOSIT CONCRETE AND STONE, RENT EQUIPMENT, WORK TO BE DONE BY CITY CREWS. JUSTIFICATION: PREVENT COLLAPSE OF RECREATION TRAIL, BALL I FIELDS, SOCCER FIELDS AND PARK LAND. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 20,000 OTHER (1) $ 20,000 TOTAL 102 ENVIRONMENT PROJECT TITLE: STORM SEWER ALONG STATE HIGHWAY 74 LOCATION: MISSOURI STATE ROUTE 74 AND WILLOW STREET PURPOSE: TO COLLECT STORM WATER FROM BOTH THE STATE HIGHWAY AND CITY STREET. PHYSICAL DESCRIPTION: APPROXIMATELY 2,000 FEET OF 36 -INCH DIAMETER STORMWATER SEWER AND ALL NECESSARY APPURTENANCES. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO KEEP FROM OVERLOADING DOWN STREAM STORMWATER INLETS AND REDUCE FLOODING. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 30,000 STATE GRANTS AND LOANS (D) 30.000 OTHER (1) $ 60,000 TOTAL 2-54 103 This page intentionally left blank. 104 PARKS AND RECREATION CAPITAL IMPROVEMENTS PROGRAM 105 PARKS AND RECREATION PROPOSED PROJECTS PROJECT IMPROVEMENT TOTAL 2001-02 2002-03 2003-04 2004-05 2005-06� NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCALII YEAR YEAR YEAR YEAR YEAR 3-1 General Park Development 325,000 50,000 50,000 75,000 75,000 75,0 ( A A A A A II 3-2 Land Acquisition -Shawnee 33,950 17,250 16,700 and Osage Parks A A A 3-3 Capaha Park Shelter 15,000 15,000 Replacement A A 3-4 Arena Park Shelter 15,000 15,000 Replacement A A 3-5 Shawnee Park Soccer/ 200,000 200,000 Football Fields A A 3-6 Arena Park Parking Lot 90,000 90,000 A A 3-7 Washington Park Basketball 15,000 15,000 Court A A 3-8 Fort D Renovations 50,000 50,000 A A 3-9 Golf Course Club House 500,000 I 500,000 I 3-10 Youth Baseball Field 202,000 202,000 Improvements A A 3-11 Golf Course Pond 15,000 15,000 Improvement 1 1 3-12 Hopper Road Trail System 7,500 7,500 E E 3-13 Riverfront Trail and Riverfront 1,550,000 423,320 426,680 400,000 300,000 Park Expansion D,E,I D,E I I I TOTALS 3,018,450 1,592,570 500,880 475,000 375,000 75,000 A GENERAL REVENUE FUND 945,950 654,250 66,700 75,000 75,000 75,000 B REVIPFA BONDS: ISSUED C REVIPFA BONDS: PENDING D E STATE GRANTS/LOANS MOTOR FUEL TAX 338,656 92,164 448,656 84,664 7,500 F FEDERAL GRANTSILOANS G SPECIAL ASSESSMENTS H I CAPITAL IMPROVEMENT SALES TAX OTHER 1,641,680 515,000 426,680 400,000 300,000 J GEN. OBLIGATION BONDS: PENDING K TRANSPORTATION SALES TAX 106 PARKS AND RECREATION PROJECT TITLE: GENERAL PARK DEVELOPMENT LOCATION: VARIOUS PARKS PURPOSE: TO PROVIDE VARIOUS PARK AND RECREATION AMENITIES AND EQUIPMENT PHYSICAL DESCRIPTION: CONSTRUCTION OF PARK AMENITIES, RECREATIONAL AND OTHER FACILITIES UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: VARIOUS PARKS HAVE UNANTICIPATED NEEDS EACH I YEAR IMPACT ON MINOR INCREASES IN OPERATING AND MAINTENANCE OPERATING BUDGET: EXPENSES, DEPENDING ON FACILITIES CONSTRUCTED. FINANCING: 325,000 GENERAL REVENUE (A) $ 325,000 TOTAL NOTE: THESE FUNDS COULD ALSO BE USED FOR MATCHING DONATIONS FROM CIVIC GROUPS OR INDIVIDUALS FOR PARK IMPROVEMENTS. 3-1 107 3-2 PARKS AND RECREATION PROJECT TITLE: LAND ACQUISITION - SHAWNEE AND OSAGE PARKS LOCATION: SHAWNEE PARK (SOUTH WEST END BOULEVARD) AND OSAGE PARK (NORTH KINGSHIGHWAY) PURPOSE: TO PROVIDE ADDITIONAL PARK ACREAGE, RECREATION FACILITIES, AND GREEN SPACE PHYSICAL DESCRIPTION: PURCHASE OF 90 ACRES OF LAND UNIT OF WORK: SCHEDULED PAYMENTS ON LAND PURCHASED IN 1992 AND 1993 JUSTIFICATION: ADDITIONAL AREAS ARE NEEDED FOR OSAGE COMMUNITY CENTRE, SHAWNEE PARK SPORTS COMPLEX, CAPE LA CROIX TRAIL, AND CAPE WOODS CONSERVATION AREA. IMPACT ON WILL REQUIRE ADDITIONAL PERSONNEL AND EQUIPMENT OPERATING BUDGET: FOR MAINTENANCE AS AREAS ARE DEVELOPED AND USED. FINANCING: 33,950 GENERAL REVENUE (A) $ 33,950 TOTAL 108 PARKS AND RECREATION PROJECT TITLE: CAPAHA PARK SHELTER REPLACEMENT I LOCATION: CAPAHA PARK PURPOSE: TO REPLACE OLD SHELTER PHYSICAL DESCRIPTION: REPLACEMENT OF SHELTER #3 ON EAST SIDE OF THE PARK UNIT OF WORK: REMOVE EXISTING SHELTER COMPLETELY AND INSTALL A NEW SHELTER WITH TABLES, GRILL, FOUNTAIN AND ELECTRICITY JUSTIFICATION: OLD SHELTER IS DETERIORATED. IMPACT ON NO SIGNIFICANT IMPACT. OPERATING BUDGET: FINANCING:1$ 5.000 GENERAL REVENUE -(A) $ 15,000 TOTAL 3-3 109 3-4 PARKS AND RECREATION PROJECT TITLE: ARENA PARK SHELTER REPLACEMENT LOCATION: ARENA PARK PURPOSE: PROVIDE ADDITIONAL PICNIC FACILITIES AND REPLACE OLD SHELTER PHYSICAL DESCRIPTION: TO REPLACE SHELTER #5 LOCATED IN THE NORTHERN PORTION OF ARENA PARK UNIT OF WORK: TO REMOVE EXISTING SHELTER COMPLETELY AND INSTALL A NEW SHELTER WITH TABLES, GRILL, FOUNTAIN, AND ELECTRICITY JUSTIFICATION: OLD SHELTER IS DETERIORATED. NEED TO PROVIDE PICNIC FACILITIES ADJACENT TO NEW PLAYGROUND UNIT. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING:1$ 5.000 GENERAL REVENUE (A) $ 15,000 TOTAL 110 PARKS AND RECREATION PROJECT TITLE: SHAWNEE PARK SOCCER/FOOTBALL FIELDS LOCATION: SHAWNEE PARK SPORTS COMPLEX PURPOSE: TO PROVIDE A PERMANENT YOUTH TACKLE FOOTBALL FIELD AND ADDITIONAL SOCCER FIELDS PHYSICAL DESCRIPTION: CONSTRUCTION OF FOUR FIELDS FOR SOCCER AND YOUTH TACKLE FOOTBALL UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT FIELDS ARE INADEQUATE FOR NUMBER OF SOCCER USERS, AND FOOTBALL USERS NEED PERMANENT FIELD. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING:2$ 00,000 GENERAL REVENUE (A) $ 200,000 TOTAL 3-5 111 c PARKS AND RECREATION PROJECT TITLE: ARENA PARK PARKING LOT LOCATION: ARENA PARK PURPOSE: TO PROVIDE ADDITIONAL PARKING FOR EVENTS AND GENERALUSAGE PHYSICAL DESCRIPTION: 300 FOOT BY 250 FOOT PARKING LOT ON THE SOUTH SIDE OF THE ARENA BUILDING UNIT OF WORK: CONSTRUCT JUSTIFICATION: TO PROVIDE ADDITIONAL PARKING SPACE NEEDED FOR INCREASED EVENTS AND FOR GENERAL PARK USAGE IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 90,000 GENERAL REVENUE (A) $ 90,000 TOTAL 112 PARKS AND RECREATION 11 PROJECT TITLE: WASHINGTON PARK BASKETBALL COURT LOCATION: WASHINGTON PARK PURPOSE: TO PROVIDE REGULATION SIZE BASKETBALL COURT FOR RECREATIONAL ACTIVITIES PHYSICAL DESCRIPTION: 120 FOOT BY 70 FOOT BASKETBALL COURT, 2 POSTS, 2 BACKBOARDS, AND 2 RIMS WITH NETS UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO PROVIDE BASKETBALL COURT FOR NEIGHBORHOOD YOUTH IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING:1$ 5,000 GENERAL REVENUE (A) $ 15,000 TOTAL 3-7 113 3-8 PARKS AND RECREATION PROJECT TITLE: FORT D RENOVATION LOCATION: FORT D PURPOSE: IMPROVE THE FORT D FACILITY TO ENHANCE ITS USE PHYSICAL DESCRIPTION: GENERAL RENOVATION UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT USE OF THE PROPERTY IS LIMITED IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 50,000 GENERAL REVENUE (A) $ 50,000 TOTAL 114 PARKS AND RECREATION PROJECT TITLE: GOLF COURSE CLUB HOUSE LOCATION: J. C. MUNICIPAL GOLF COURSE PURPOSE: TO PROVIDE NEEDED STORAGE SPACE, CUSTOMER USE AREA, AND MERCHANDISE SALES AND DISPLAY AREA PHYSICAL DESCRIPTION: CONSTRUCTION OF NEW 3,000 SQUARE FOOT PRO SHOP LOCATED AT THE SITE OF THE PRESENT SHOP UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THE PRESENT PRO SHOP SIZE OF 1,300 SQUARE FEET IS INADEQUATE FOR THE NEEDS OF CUSTOMER SPACE, MERCHANDISE STORAGE AND SALES AREA. INCREASING GOLF COURSE USE AND REVENUES JUSTIFIES THIS PROJECT. IMPACT ON MINOR INCREASE IN OPERATING EXPENSES OPERATING BUDGET: ANTICIPATED. INCREASED DEPRECIATION EXPENSE. FINANCING: 500,000 OTHER (1) $ 500,000 TOTAL 115 3-10 PARKS AND RECREATION PROJECT TITLE: YOUTH BASEBALL FIELD IMPROVEMENT LOCATION: ARENA PARK SPORTS COMPLEX PURPOSE: TO PROVIDE BETTER FACILITIES FOR YOUTH BASEBALL TEAMS THAT USE THE FIELDS. PHYSICAL DESCRIPTION: REPLACE BACKSTOPS, FENCING AND DUGOUTS FOR TWO (2) FIELDS. INSTALL IRRIGATION, PORTABLE OUTFIELD FENCE, SCOREBOARDS, NEW LIGHTING, AND STORAGE BUILDINGS. UNIT OF WORK: CONSTRUCT JUSTIFICATION: CURRENT FACILITIES ARE OLD AND NEED REPLACEMENT. IMPACT ON NO SIGNIFICANT IMPACT. OPERATING BUDGET: FINANCING: 202,000 GENERAL REVENUE FUND (A) $ 202,000 TOTAL 116 PARKS AND RECREATION PROJECT TITLE: GOLF COURSE POND IMPROVEMENT LOCATION: JAYCEE MUNICIPAL GOLF COURSE, # 5 FAIRWAY PURPOSE: INCREASE VOLUME OF WATER HELD IN EXISTING POND TO PROVIDE ADDITIONAL WATER FOR IRRIGATION OF GREENS, FAIRWAYS, AND TEES. PHYSICAL DESCRIPTION: RAISE THE HEIGHT AND EXTEND THE LENGTH OF THE EXISTING POND DAM. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THE EXISTING PONDS PROVIDE 90% OF THE IRRIGATION WATER FOR THE COURSE. DURING PERIODS OF EXTREME DROUGHT, EXISTING WATER SUPPLIES ARE MARGINALLY SUFFICIENT FOR IRRIGATION NEEDS. EXPANSION OF THIS POND WOULD PROVIDE THE WATER NECESSARY FOR THESE PERIODS. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT. 15,000 OTHER (1) $ 15,000 TOTAL 117 3-11 3-12 PARKS AND RECREATION PROJECT TITLE: HOPPER ROAD TRAIL SYSTEM LOCATION: FROM CAPE LA CROIX TRAIL ALONG HOPPER ROAD AND VARIOUS CITY STREETS TO COUNTY PARK SOUTH PURPOSE: TO PROVIDE A TRAIL SYSTEM USING CITY STREETS AND SIDEWALKS CONNECTING CAPE LA CROIX RECREATIONAL TRAIL TO COUNTY PARK SOUTH PHYSICAL DESCRIPTION: DESIGNATE VARIOUS CITY STREETS AS PART OF THE TRAIL SYSTEM AND CONSTRUCT TRAIL CONNECTIONS BETWEEN ROSEWOOD DRIVE AND PROSPECT DRIVE, AND HUNTER'S LANE AND SOUTH COUNTY PARK DRIVE UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: PROVIDE LINKAGES BETWEEN EXISTING TRAILS AND STREETS TO PARK LAND IMPACT ON TRAIL CONNECTIONS WILL ADD SOME MAINTENANCE OPERATING BUDGET: COSTS. FINANCING: 7,500 MOTOR FUEL TAX (E) $ 7,500 TOTAL 118 PARKS AND RECREATION PROJECT TITLE: RIVERFRONT TRAIL AND RIVERFRONT PARK EXPANSION LOCATION: MISSISSIPPI RIVER FRONTAGE, RED STAR AREA (FIRST STREET) SOUTH TO RIVER CAMPUS SITE PURPOSE: TO PROVIDE EXPANDED WALKING TRAIL FACILITIES AND RECREATIONAL AND INTERPRETATIONAL OPPORTUNITIES ALONG THE MISSISSIPPI RIVER PHYSICAL DESCRIPTION: CONSTRUCT APPROXIMATELY 6,100 FEET OF 10 TO 12 - FOOT WALKWAY NORTH AND SOUTH OF THE EXISTING RIVERFRONT PARK, UTILIZE AND RENOVATE THE OLD TOEWALL ("LANDING") SOUTH OF RIVERFRONT PARK, CONSTRUCT A PEDESTRIAN BRIDGE OVER SLOAN CREEK AND CONSTRUCT RIVERFRONT PARK PLATFORM EXTENSIONS TO THE NORTH AND SOUTH OF RIVERFRONT PARK. THIS PROJECT WILL NEED TO BE CONSTRUCTED IN PHASES OVER SEVERAL YEARS. UNIT OF WORK: DESIGN, ENGINEER AND CONSTRUCT JUSTIFICATION: RECREATIONAL AND INTERPRETATIONAL OPPORTU- NITIES ALONG THE MISSISSIPPI RIVER ARE PRESENTLY LIMITED AND NEED TO BE EXPANDED TO TAKE FULL ADVANTAGE OF THIS OUTSTANDING PHYSICAL, CULTURAL, AND TOURIST ATTRACTION. IMPACT ON INCREASED OPERATIONAL AND MAINTENANCE COSTS, OPERATING BUDGET: UNDETERMINED AT THIS TIME. FINANCING: $ 338,656 STATE GRANTS AND LOANS (D) 84,664 MOTOR FUEL (E) 1.126,680 OTHER (1) $ 1,550,000 TOTAL NOTE: PHASE I OF THIS PROJECT IS FUNDED BY A TRANSPORTATION ENHANCEMENT (TEA -21) GRANT (DECEMBER, 2000) FROM THE MISSOURI DEPARTMENT OF TRANSPORTATION IN THE AMOUNT OF $383,656.34 WITH A LOCAL (CITY) MATCH REQUIRED OF $84,664.09 TO BE PROVIDED WITH MOTOR FUEL FUNDS. THE PHASE I PROJECT WILL EXTEND THE RIVERFRONT PARK WALKWAY SOUTH TO, AND WILL INCLUDE, THE OLD TOEWALL ("LANDING"). 3-13 119 This page intentionally left blank. 120 COMMUNITY DEVELOPMENT CAPITAL IMPROVEMENTS PROGRAM 2001-02 FISCAL 2002-03 FISCAL 2003-04 FISCAL 2004-05 FISCAL 2005-06 FISCAL YEAR YEAR YEAR YEAR YEAR 121 COMMUNITY DEVELOPMENT PROPOSED PROJECTS PROJECT IMPROVEMENT TOTAL 2001-02 2002-03 2003-04 2004-05 2005-06 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL YEAR YEAR YEAR YEAR YEAR 4-1 Police Station HVAC 196,100 88,100 55,900 52,100 Replacement A A A A 4-2 Police Department Annex 4,685,000 1 25,000 1 410,000 1 4,250,000 1 4-3 Fire Station No. 1 HVAC 23,800 8,100 8,400 7,300 Upgrade A A A A 4-4 Fire Station No. 1 Office and 8,300 8,300 Dormitory Renovation A A 4-5 Fire Station No. 1 Office and 213,800 213,800 Administrative Area I I Renovation 4-6 Fire Station No. 1 Sprinkler 33,300 33,300 Retrofit I I 4-7 Fire Station No. 1 Parking 49,000 49,000 Expansion I I 4-8 Fire Station No. 2 158,700 158,700 Maintenance/Storage Bldg. 1 1 4-9 Fire Station No. 2 Sprinkler 27,700 27,700 Retrofit I I 4-10 Fire Station No. 3 Relocation 1,769,620 I 125,000 I 1,644,620 I 4-11 Fire Station No. 4 Relocation 1,230,900 I 110,700 I 62,900 I 1,057,300 I 4-12 New Fire Station No. 5 105,600 I 105,600 I 4-13 Regional Fire Training Center 985,100 I 41,000 I 944,100 I 4-14 City Hall Remodeling (Main 15,700 15,700 Floor) A A 4-15 City Hall Elevator 157,100 157,100 A A 4-16 City Hall Roof Repair/ 66,000 66,000 Replacement A A 4-17 Public Works Site - Preliminary 50,000 50,000 Work A A 4-18 Public Works Facility 8,554,850 I 8,554,850 I TOTALS 18,330,570 728,700 9,401,250 6,044,620 2,050,400 105,600 A GENERAL REVENUE FUND 517,000 393,300 64,300 59,400 B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTS/LOANS E MOTOR FUEL TAX F FEDERAL GRANTSILOANS G SPECIAL ASSESSMENTS H I CAPITAL IMPROVEMENT SALES TAX OTHER 17,813,570 335,400 9,336,950 5,985,220 2,050,400 105,600 J GEN. OBLIGATION BONDS: PENDING K TRANSPORTATION SALES TAX 122 COMMUNITY DEVELOPMENT I PROJECT TITLE: POLICE STATION HVAC REPLACEMENT LOCATION: POLICE HEADQUARTERS, SOUTH SPRIGG STREET PURPOSE: REPLACE/MODIFY MULTI -ZONE HEATING AND AIR CONDITIONING SYSTEM PHYSICAL DESCRIPTION: REMOVE 20 TON MULTI -ZONE SYSTEM ON ROOF, TWO (2) 10 TON UNITS ON ROOF FOR JAIL AND ADMINISTRATIVE OFFICES, 23 TON MULTI -ZONE UNIT IN BASEMENT. RECONFIGURE VENTING, REPLACE WITH ADEQUATE EQUIPMENT PER TECHNICAL ASSISTANCE ENERGY STUDY PREPARED BY STRICKLAND ENGINEERING. UNIT OF WORK: INSTALL EQUIPMENT JUSTIFICATION: THESE UNITS ARE IN NEED OF REPAIR, THE CONTROLLING SYSTEM FOR EACH IS COMPLEX AND NON-FUNCTIONAL. UNITS ARE NO LONGER IN PRODUCTION (OUTDATED), PARTS ARE EXTREMELY DIFFICULT TO OBTAIN THUS CREATING HIGH MAINTENANCE COSTS AND COMPANIES TO REPAIR THEM ARE SCARCE. IMPACT ON UPGRADE/REPLACEMENT SHOULD REDUCE OPERATION OPERATING BUDGET: AND MAINTENANCE COSTS FINANCING: 196,100 GENERAL REVENUE (A) $ 196,100 TOTAL 4-1 123 4-2 COMMUNITY DEVELOPMENT PROJECT TITLE: POLICE DEPARTMENT ANNEX LOCATION: POLICE HEADQUARTERS, SOUTH SPRIGG STREET PURPOSE: CONSTRUCT ANNEX TO EXISTING HEADQUARTERS TO PROVIDE ADDITIONAL SPACE FOR AN EMERGENCY OPERATIONS CENTER, COURTROOM, ADDITIONAL OFFICE SPACE, INTERVIEW SUITES, AND LOCKER FACILITIES FOR PUBLIC SAFETY PERSONNEL. RENOVATE AND UPGRADE EXISTING STRUCTURE. PHYSICAL DESCRIPTION: TWO-STORY, 16,000 SQUARE FOOT ADDITION TO THE NORTH AND EAST SIDES OF THE EXISTING FACILITY. ACQUISITION OF 6 PARCELS OF LAND EAST OF THE EXISTING BUILDING; DEMOLITION, EXCAVATION AND CONSTRUCTION OF A SECURE PARKING FACILITY. RENOVATION OF EXISTING STRUCTURE. UNIT OF WORK: CONSTRUCTION OF BUILDING. ACQUISITION OF ADDITIONAL PROPERTY. RENOVATION/UPGRADE OF EXISTING BUILDING. JUSTIFICATION: CONSTRUCTION AND RENOVATION WOULD ENHANCE EARTHQUAKE MITIGATION EFFORTS FOR EMERGENCY RESPONSE PERSONNEL AND PROVIDE A FULL SERVICE POLICE FACILITY, INCLUDING COURTROOM ACCESS. IMPACT ON SOME INCREASE IN EQUIPMENT, PERSONNEL AND OPERATING BUDGET: OPERATING BUDGET ANTICIPATED, UNQUANTIFIABLE AT THIS TIME. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 4,685,000 OTHER (1) $ 4,685,000 TOTAL 124 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 1 HVAC UPGRADE LOCATION: 1 SOUTH SPRIGG STREET PURPOSE: THE SECOND YEAR IN A MULTI-YEAR PROGRAM FOR THE UPGRADING AND REPLACEMENT OF HVAC SYSTEM AND HVAC COOLING TOWER. PROGRAM WILL ALLOW TWO (2) UNITS PER YEAR TO BE REPLACED PHYSICAL DESCRIPTION: HVAC HEATING, HEAT PUMP AND AIR CONDITIONING I SYSTEM AND HVAC COOLING TOWER UNIT OF WORK: INSTALL TWO (2) UNITS PER YEAR, PLUS COOLING I TOWER JUSTIFICATION: CURRENT UNITS ARE 21 YEARS OLD AND WORN OUT. THIS PROGRAM WILL ALLOW FOR THE SYSTEMATIC REPLACEMENT OF SAME OVER A FOUR-YEAR PERIOD. IMPACT ON REDUCED ENERGY COSTS SHOULD PAY FOR COST OF OPERATING BUDGET: REPLACEMENT FINANCING: 23,800 GENERAL REVENUE (A) $ 23,800 TOTAL 4-3 125 4-4 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 1 OFFICE AND DORMITORY RENOVATION LOCATION: FIRE STATION NO. 1, SOUTH SPRIGG STREET PURPOSE: TO REPLACE 21 YEAR OLD CARPETING UPSTAIRS AT STATION 1 PHYSICAL DESCRIPTION: CARPET AND LABOR UNIT OF WORK: INSTALLATION JUSTIFICATION: UPSTAIRS TRAINING ROOM (OCCASIONALLY USED AS A PUBLIC MEETING ROOM) AND DORMITORY AREAS HAVE NOT BEEN REPLACED AND ARE VERY WORN. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 8,300 GENERAL REVENUE (A) $ 8,300 TOTAL 126 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 1 OFFICE AND ADMINISTRATIVE AREAS RENOVATION LOCATION: FIRE STATION NO. 1, 1 SOUTH SPRIGG STREET PURPOSE: TO PROVIDE OFFICE AND SUPPORT AREAS THAT WILL MEET THE NEEDS OF THE FIRE DEPARTMENT FOR THE NEXT 10 TO 15 YEARS PHYSICAL DESCRIPTION: TOTAL REDESIGN AND RENOVATION OF FIRE I DEPARTMENT ADMINISTRATIVE OFFICE AREAS UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT AREA IS POORLY DESIGNED AND INCAPABLE OF MEETING THE EXPANDING NEEDS OF A GROWING ORGANIZATION. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 213,800 OTHER (1) $ 213,800 TOTAL 4-5 127 4-6 128 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 1 SPRINKLER RETROFIT LOCATION: 1 SOUTH SPRIGG STREET PURPOSE: TO PROVIDE FUNDING NECESSARY TO RETROFIT FIRE STATION NO. 1 WITH AUTOMATIC SPRINKLER SYSTEM PHYSICAL DESCRIPTION: MONITORED WET SPRINKLER SYSTEM PER NFPA STANDARDS UNIT OF WORK: RETROFIT FIRE STATION NO. 1 JUSTIFICATION: CURRENT NFPA 1500 (OCCUPATIONAL SAFETY AND HEALTH) STANDARDS RECOMMEND MODIFICATIONS. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 33,300 OTHER (1) $ 33,300 TOTAL 4-6 128 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 1 PARKING EXPANSION LOCATION: FIRE STATION NO. 1, SOUTH SPRIGG STREET PURPOSE: ACQUISITION OF ADDITIONAL LAND AND CONSTRUCTION OF FACILITIES FOR ADDITIONAL PARKING AT FIRE STATION NO. 1 PHYSICAL DESCRIPTION: ACQUIRE APPROXIMATELY 15,000 SQUARE FEET, MORE OR LESS, OF PROPERTY AND EXPAND PARKING. UNIT OF WORK: ACQUIRE PROPERTY, DESIGN AND CONSTRUCT JUSTIFICATION: PARKING AT REAR OF FIRE STATION NO. 1 (HEADQUARTERS) IS SEVERELY LIMITED IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 49,000 OTHER (1) $ 49,000 TOTAL 4-7 129 4-8 COMMUNITY DEVELOPMENT PROJECT NAME: FIRE STATION NO. 2 MAINTENANCE/STORAGE FACILITY LOCATION: BEHIND FIRE STATION NO. 2, 378 SOUTH MOUNT AUBURN ROAD PURPOSE: TO PROVIDE A ONE -BAY VEHICLE REPAIR/MAINTENANCE AREA WITH PIT AND A SIGNIFICANT SPACE FOR GENERAL FIRE DEPARTMENT STORAGE PHYSICAL DESCRIPTION: METAL BUILDING WITH CONCRETE FOUNDATION UNIT OF WORK: PURCHASE OF MATERIALS AND LABOR COSTS JUSTIFICATION: THE FIRE DEPARTMENT CURRENTLY HAS NO SPACE FOR STORAGE AND THE MECHANIC HAS NO BAY WITH PIT AREA IN WHICH TO DO TRUCK MAINTENANCE/REPAIR. IMPACT ON NO SIGNIFICANT IMPACT, INCREASED DEPRECIATION OPERATING BUDGET: EXPENSE FINANCING: 158,700 OTHER (1) $ 158,700 TOTAL 130 m 131 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO.2 SPRINKLER RETROFIT LOCATION: 378 SOUTH MOUNT AUBURN ROAD PURPOSE: TO PROVIDE FUNDING NECESSARY TO RETROFIT FIRE STATION NO. 2 WITH AUTOMATIC SPRINKLER SYSTEM PHYSICAL DESCRIPTION: MONITORED WET SPRINKLER SYSTEM PER NFPA STANDARDS UNIT OF WORK: RETROFIT FIRE STATION NO. 2 JUSTIFICATION: CURRENT NFPA 1500 (OCCUPATIONAL SAFETY AND HEALTH) STANDARDS RECOMMEND MODIFICATION. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 27,700 OTHER (1) $ 27,700 TOTAL m 131 4-10 COMMUNITY DEVELOPMENT PROJECT TITLE: RELOCATION AND CONSTRUCTION OF FIRE STATION NO. 3 LOCATION: NORTH SPRIGG STREET PURPOSE: TO DEVELOP PLANS AND SPECIFICATIONS FOR NEW FIRE STATION NO. 3 AND CONSTRUCT SAME (PROPERTY ALREADY ACQUIRED) PHYSICAL DESCRIPTION: ONE STORY MASONRY THREE -BAY DRIVE-THROUGH FIRE STATION. ONE BAY TO BE USED AS A SHOP BAY IF NO OTHER PROVISION IS MADE. BASEMENT UNDER LIVING AREA OF STATION TO BE USED FOR CITY EOC AND TO HOUSE EMERGENCY COMMUNICATIONS CENTER WHICH IS CURRENTLY AT POLICE HEADQUARTERS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING FIRE STATION NUMBER 3 IS FUNCTIONALLY OBSOLETE. IMPACT ON SOME INCREASE IN EQUIPMENT, PERSONNEL AND OPERATING BUDGET: OPERATING BUDGET ANTICIPATED, UNQUANTIFIABLE AT THIS TIME. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 1.769,620 OTHER (1) $ 1,769,620 TOTAL 132 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO.4 RELOCATION LOCATION: VICINITY OF LEXINGTON AND KINGSHIGHWAY PURPOSE: TO PROVIDE FUNDING FOR THE RELOCATION, PLANS AND SPECIFICATIONS FOR CONSTRUCTION, AND CONTRUCTION OF NEW FIRE STATION NO.4 PHYSICAL DESCRIPTION: ONE STORY MASONRY THREE -BAY DRIVE-THROUGH FIRE STATION ON APPROXIMATELY 3 TO 4 ACRES OF PROPERTY FRONTING ON MAJOR ROAD(S). UNIT OF WORK: ACQUIRE PROPERTY, DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT STRUCTURE IS UNDERSIZED AND POORLY LOCATED TO COMPLY WITH CURRENT AND FUTURE GROWTH IN NORTHERN AND WESTERN PARTS OF THE CITY. IMPACT ON SOME INCREASE IN EQUIPMENT, PERSONNEL AND OPERATING BUDGET: OPERATING BUDGET ANTICIPATED, UNQUANTIFIABLE AT THIS TIME. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 1.230.900 OTHER (1) $ 1,230,900 TOTAL 4-11 133 4-12 COMMUNITY DEVELOPMENT PROJECT TITLE: NEW FIRE STATION NO. 5 LOCATION: WEST OF INTERSTATE HIGHWAY 55 PURPOSE: TO PROVIDE FUNDING FOR THE PURCHASE OF LAND FOR THE CONSTRUCTION OF FIRE STATION NO. 5 PHYSICAL DESCRIPTION: APPROXIMATELY 3 TO 4 ACRES OF PROPERTY FRONTING ON MAJOR ROAD(S) UNIT OF WORK: ACQUIRE PROPERTY JUSTIFICATION: TO COMPLY WITH CURRENT AND FUTURE GROWTH IN WESTERN PART OF THE CITY IMPACT ON SOME INCREASE IN EQUIPMENT, PERSONNEL AND OPERATING BUDGET: OPERATING BUDGET ANTICIPATED, UNQUANTIFIABLE AT THIS TIME. INCREASED DEPRECIATION EXPENSE. FINANCING: 105,600 OTHER (1) $ 105,600 TOTAL 134 COMMUNITY DEVELOPMENT PROJECT TITLE: REGIONAL FIRE TRAINING CENTER LOCATION: SOUTH SPRIGG STREET PURPOSE: PLANS AND SPECIFICATIONS, AND CONSTRUCTION OF A REGIONAL FIRE TRAINING FACILITY PHYSICAL DESCRIPTION: PER NEEDS REQUIREMENTS OF REGIONAL FIRE TRAINING TO INCLUDE LIVE -FIRE TRAINING, CLASSROOMS, TRAINING TOWER, TRANSPORTATION SCENARIOS, AND NECESSARY SERVICE/SUPPORT FACILITIES UNIT OF WORK: DESIGN AND CONSTRUCTION JUSTIFICATION: THERE IS CURRENTLY NO FIRE TRAINING SITE AVAILABLE IN SOUTHEAST MISSOURI. DEVELOPMENT OF SUCH A FACILITY WOULD ALLOW THE CITY TO BECOME A REGIONAL CENTER FOR PUBLIC SAFETY AND INDUSTRIAL TRAINING. IMPACT ON SOME INCREASE IN OPERATING BUDGET ANTICIPATED, OPERATING BUDGET: UNQUANITIFIABLE AT THIS TIME. FINANCING: 985,100 OTHER (1) $ 985,100 TOTAL 4-13 135 4-14 COMMUNITY DEVELOPMENT PROJECT TITLE: CITY HALL REMODELING (MAIN FLOOR) LOCATION: CITY HALL PURPOSE: PROVIDE MAIN FLOOR OFFICE SPACE FOR DIVISION OF PLANNING SERVICES TO PROVIDE IMPROVED PUBLIC ACCESS AND RELIEVE OVERCROWDING ON SECOND FLOOR. PHYSICAL DESCRIPTION: RECONSTRUCTION AND REMODELING OF APPROXIMATELY 7,200 SQUARE FEET OF OFFICE SPACE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: PLANNING SERVICES OFFICES ARE LOCATED ON THE SECOND FLOOR OF CITY HALL. RELOCATION TO THE MAIN FLOOR OF THE MAIN OPERATIONS WILL IMPROVE CUSTOMER ACCESS AND CONVENIENCE. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING:1$ 5,700 GENERAL REVENUE (A) $ 15,700 TOTAL 136 COMMUNITY DEVELOPMENT PROJECT TITLE: CITY HALL ELEVATOR I LOCATION: CITY HALL PURPOSE: PERMIT ACCESS, INCLUDING ACCESS FOR MOBILITY - IMPAIRED PERSONS, TO ALL THREE LEVELS FOR SERVICES OFFERED. TO BE IN COMPLIANCE WITH AMERICANS WITH DISABILITIES ACT. PHYSICAL DESCRIPTION: ELEVATOR MEETING ALL HANDICAPPED -ACCESSIBILITY REQUIREMENTS INTERCONNECTING ALL THREE FLOORS OF CITY HALL. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CONVENIENCE AND SAFETY OF PUBLIC AND COMPLIANCE WITH AMERICANS WITH DISABILITIES ACT. IMPACT ON ADDITIONAL OPERATING AND MAINTENANCE COSTS OPERATING BUDGET: FINANCING: 157,100 GENERAL REVENUE (A) $ 157,100 TOTAL 4-15 137 PARKS AND RECREATION 11 PROJECT TITLE: CITY HALL ROOF REPAIR/REPLACEMENT LOCATION: CITY HALL PURPOSE: TO REPAIR AND REPLACE DETERIORATING ROOFING MATERIALS PHYSICAL DESCRIPTION: REMOVAL OF EXISTING ROOFING MATERIALS AND REPLACEMENT OF WORN AND WEATHERED SHINGLES, REPLACEMENT OF RUBBER FLAT ROOF, AND REPLACEMENT OF TWO SMALL FLAT PORCH ROOFS AND VAULT ROOF UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: 4-16 REMOVE AND REPLACE TO REPLACE DETERIORATED ROOF NO SIGNIFICANT IMPACT 66,000 GENERAL REVENUE (A) $ 66,000 TOTAL 138 COMMUNITY DEVELOPMENT PROJECT TITLE: PUBLIC WORKS SITE - PRELIMINARY WORK I LOCATION: CORPORATE CIRCLE PURPOSE: HAUL ENGINEERED SOIL TO SITE FOR AREAS TO BE FILLED. PHYSICAL DESCRIPTION: LOCATE, TEST, AND HAUL SOIL TO THE NEW PUBLIC WORKS SITE. MAY INVOLVE HIRING A GEOTECHNICAL SERVICE TO ASSIST IN LOCATING PROPER SOIL AND TO CONDUCT SOIL TEST TO DETERMINE THE SOIL STRUCTURALADEQUACY. UNIT OF WORK: ENGINEER AND CONTRACT HAULING JUSTIFICATION: HAULING IN PROPERLY ENGINEERED SOIL IN ADVANCE OF CONSTRUCTION CAN REDUCE COSTS OF OVERALL PROJECT AND MINIMIZE DELAYS FOR COMPLETION OF THE PROJECT. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 50,000 GENERAL REVENUE FUND (A) $ 50,000 TOTAL 4-17 1*19 4-18 COMMUNITY DEVELOPMENT PROJECT TITLE: PUBLIC WORKS FACILITY LOCATION: 2055 CORPORATE CIRCLE PURPOSE: FINAL DESIGN AND CONSTRUCTION FOR A NEW PUBLIC WORKS FACILITY. PHYSICAL DESCRIPTION: DESIGN AND CONSTRUCT BUILDING WITH APPROXIMATELY 86,000 SQUARE FEET, INCLUDING OFFICE AREA, MAINTENANCE SHOPS AND EQUIPMENT STORAGE AREA. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: INTERNAL SPACE CONGESTION HAS BECOME A PROBLEM. EXISTING MAIN BUILDING HAS MULTIPLE ROOF LEAKS; HAS SEVERAL AREAS OF MINOR AND MAJOR MASONRY JOINT CRACKING AND DISPLACEMENT; DOES NOT HAVE ADEQUATE NOR EFFICIENT HVAC SYSTEMS; ELECTRICAL SYSTEMS ARE PATCHED TOGETHER, OUTDATED AND NOT EASILY CONTROLLED; LAYOUT OF BUILDING IS NOT FUNCTIONAL; OFFICE IS NOT ADA ACCESSIBLE; SHOPS ARE SPREAD OUT AND NOT VERY WORKABLE; SHOP ROOF HEIGHTS DO NOT ALLOW FOR INSIDE HOISTS. IMPACT ON OPERATING INCREASE IS UNQUANTIFIABLE AT THIS TIME. OPERATING BUDGET: SOME SAVINGS WILL BE ATTRIBUTABLE TO IMPROVED WORK AND ENERGY EFFICIENCY, BUT IS NOT QUANTIFIABLE. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 8.554,850 OTHER (1) $ 8,554,850 TOTAL 140 LONG-RANGE CAPITAL IMPROVEMENT PROGRAM Unfunded Needs List The following list of Capital Improvement Program Needs consists of those projects which have been identified as major long-range facility improvements for which funding is currently not available. These projects are not listed in any order of priority. TRANSPORTATION 1) Bloomfield Road — Stonebridge Drive to Benton Hill Road 2) Broadview from Independence to North Kingshighway (at Maria Louise Lane) 3) Broadway — Houck Place to Main Street (general improvements) 4) Cape Rock Drive — Big Bend Road to Cape Rock Park — widening with curb and gutter 5) Edgewood Drive — Gordonville Road to Bloomfield Road — widening and general improvements 6) Gordonville Road — Independence to the west — widening with curb and gutter 7) Hopper Road (existing) — Mount Auburn to Kage — widening with curb and gutter 8) Big Bend Road — Mason Street to Lexington Avenue (and short distance north) — widening, storm drainage and sidewalks (parts) 9) Main Street — Mason Street to Second Street — realignment and new Sloan Creek Bridge 10) Main Street —Mill to Mason — widening 11) New Madrid Street — Clark to Perry Avenue — widening with curb and gutter, storm drainage 12) North Sprigg Street — Lexington to Route 177 — extension 13) Sprigg Street — New Madrid to Southern Expressway — general improvements and/or widening 14) Vantage Drive — Percy Drive to Kingshighway at Boulder Crest (west) 15) West End Boulevard — Southern Expressway to Shawnee Parkway and Bloomfield to Bertling and extended to Lexington — general upgrade and extension 16) Kingshighway/Cape Rock Drive — reconstruction of intersection with northbound right turn lane 17) Street lighting improvements — beyond TTF-2 18) Public Transportation — expanded taxi coupon system and/or small bus system. 19) Additional streets per Major Street Plan 20) Airport— additional airport improvement projects per Airport Master Plan 21) Airport — corporate parcel and utility road extensions 22) Airport — development of an Airport Industrial Park 23) Airport — new wastewater treatment facilities 141 ENVIRONMENT 1) Old Sprigg Street Road and North Sprigg Street (Upper Sloan Creek) extension 2) Highland Drive -Oakland Street -Engram Street trunk sewer 3) Sewer improvement projects per Sewer Master Plan 4) Water System improvement projects per Water Master Plan 5) Public Works — new facility development 6) Stormwater detention basins/major stormwater channel projects 7) Water Plant No. 1, Phase III expansion 8) Storage facility west of I-55 (additional) 9) Bloomfield Road pump station 10) Kingshighway booster pump station 11) Water Plant No. 2 expansion 12) 20 -inch main extension (Plant 2 to Highway 61) 13) 16 -inch main extension (Plant 2 to Highway 61) 14) I-55 and William Street 14 -inch upgrade 15) 14 -inch main extension (North Sprigg) 16) 12 -inch main extension (Kingshighway) 17) 12 -inch main extension (Highway 177 to Cape Rock) 18) 12 -inch main extension (Lexington) 19) 12 -inch main extension on Perryville Road 20) 12 -inch main extension Plant 2 to Industrial Park/Airport 21) 8 -inch main extension (Mount Auburn and Hopper Road) 22) Main replacement (Downtown) 23) 4 -inch main replacement (City wide) 24) 2 -inch main replacement (City wide) 25) Fire protection upgrade (Kingshighway) 26) Fire hydrant replacement (City wide) 27) Water tank seismic protection 28) North County Park water improvements 29) North County Park sewer system and lift station 30) Cape Rock Village/Tanglewood Estates — main lift station and force main 142 — trunk sewer PARKS AND RECREATION 1) Aquatic center. 2) Cherokee Park — shelter parking lot paving. 3) Indian Park improvements. 4) Capaha Park basketball court (lighted, fenced, regulation court). 5) Arena Park — paving off street parking lots #5, # 10, and # 11. 6) Arena Park — ballfield spectator paving, tennis court parking paving. 7) Arena Park — road paving by fields #12, #13, #14, and #15. 8) Tennis court renovation (lights, fence, windscreen color coating). 9) New bandshell restroom. 10) General park development. 11) Parking lot paving at Arena, Washington, and Ranney Parks. 12) Additional parking for Osage Community Center. 13) In-line hockey/skateboard facility. 14) Bent grass greens at golf course. 15) Driving range. 16) General golf course development. 17) Riverfront trail project — future phases. COMMUNITY DEVELOPMENT 1) 2) 3) City Hall standby power system Neighborhood and downtown redevelopments Historic preservation 143 This page intentionally left blank. 144