HomeMy WebLinkAboutCIP1999-2004t t ' H ��J ��,�SEAL CITY OF CAPE GIRARDEAU MISSOURI BILL NO. 99-64 RESOLUTION NO. A RESOLUTION ADOPTING THE FISCAL 1999 - 2004 CAPITAL IMPROVEMENTS PROGRAM WHEREAS, Article VI, Section 6.04 of the Charter of the City of Cape Girardeau requires a Capital Improvements Program; and WHEREAS, the City Manager has presented a proposed Capital Improvements Program to the City Council; and WHEREAS, proper notice has been published concerning the availability for inspection of the proposed Capital Improvements Program and the time and place for a public hearing on the Capital Improvements Program; and WHEREAS, the City Council has held a public hearing on the proposed Capital Improvements Program. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Council hereby adopts the five-year Capital Improvements Program for fiscal 1999-2004, copies of which are on file in the office of the City Clerk. ARTICLE 2. The City Clerk is instructed to attach an executed copy of this resolution to a copy of the Capital Improvements Program for fiscal 1999-2004 and to retain such copy with the permanent records of the City. PASSED AND ADOPTED THIS 1 DAY OF �� �� 19 . A. Spradling, III, Maor ATTEST: Gayle 1. Conrad Deputy City Clerk CITY OF CAPE GIRARDEAU, MISSOURI Office of the City Manager Council Letter No. 115 Agenda March 15, 1999 The Honorable Mayor and Members of the City Council City of Cape Girardeau, Missouri Subject: Adoption of the Capital Improvements Program, Fiscal 1999-2004 Dear Mayor and Council Members: In accordance with the requirements of the City Charter, a public hearing regarding the 1999-2004 Capital Improvements Program was held on Monday, March 1, 1999, at 7:30 P.M, in the Council Chambers. In accordance with the Council's direction, the motor fuel tax street projects in the Transportation Section have been amended as follows: College Street, Minnesota to Missouri, and Missouri Avenue, College to Jefferson Fiscal Year: 1999-2000 Cost: $243,900 College Street, Missouri to West End Fiscal Year: 2000-2001 Cost: $177,300 Minnesota Avenue, Herman Street to College Fiscal Year: 2001-2002 Cost: $181,800 Minnesota Avenue, Herman Street to Bloomfield Fiscal Year: 2002-2003 Cost: $290,900 In order to accommodate the above projects, the Old Sprigg Street Road box culvert and Linden Street reconstruction projects were moved to the 2003-2004 fiscal year. Also, in accordance with the Council's direction, we have added the "Ranchito-Meadow Lane-Kingsway" Watershed Drainage and Sewer Project to the Environment Section with the following schedule: Preliminary Engineering Fiscal Year: 1999-2000 Cost: $14,000 Honorable Mayor and Council Members Agenda March 15, 1999 Page 2 Design Engineering, Easement/Right-of-Way Acquisition Fiscal Year: 2000-2001 Cost: $213,000 Construction of Sanitary Sewer and Drainage Structures Fiscal Year: 2001-2002 Cost: $982,900 The City Charter requires that the Capital Improvements Program be adopted on or before April 1, 1999. Attached for the Council's consideration is a resolution adopting the Capital Improvements program. It is recommended that the City Council proceed with this action. City Manager John R. Richbourg 7ent Director . Bratton City Planner 15-cTI-ArNT I: im CITE' OF CAPE GIRARDEAU Office of the City Manager Council Letter No. 6 8 Agenda March 1, 1999 The Honorable Mayor and Members of the City Council City of Cape Girardeau, Missouri RE: Public Hearing on 1999-2004 Capital Improvements Program Dear Mayor and Council Members: In accordance with requirements of the City Charter, a public hearing regarding the 1999- 2004 Capital Improvements Program has been set for Monday, March 1, 1999, at 7;30 P.M. The public notice of the hearing was published in the Southeast Missourian on Saturday, February 13, 1999. Unless otherwise directed, the staff will prepare a resolution for adoption of the proposed Capital Improvements Program, with any amendments the Council wishes to make, for the Council's agenda for Monday, March 150'. The City Charter requires that the Capital Improvements Program be adopted on or before April 1, 1998. The draft of the proposed Capital Improvements Program was submitted to the City Council on February 1, 1999, by Council Memorandum No. 14. The Council held a special work session on the Capital Improvements Program on February 8"'. At that meeting, the Council directed the staff to look at revising the scheduling on Minnesota Avenue and College Street projects as they relate to Jefferson School. At the time of writing this letter, the staff had met with the school principal and examined the area in the field. A separate_rQort on these projects will be presented to the Council at the March V meeting. Resp fully submitted, Kent M. Bratton City Planner KMB/JRR/MGM/rlf V-1 X11— %W-SA John R. Richbourg Finance Director Michael G. Miller City Manager TABLE OF CONTENTS ITEM Tntroduction- PAGE CityManager's Letter................................................................................. i Summaries: Revenue Funding Sources by Fiscal Year Graph ................................................ vii Summary of Funding Sources by Fiscal Year 1999-2004 ..................................... viii Summary of Recommended Capital Improvements Program Expenditures 1999-2004 by Program Description and Sourceof Funds......................................................................................... ix Summary of Funding Sources Graph............................................................... x Capital Improvements Budget by Program Area Graph ......................................... xi RevenueSources....................................................................................... xii Capital Improvements Program: Transportation and Public Works.................................................................. 1 Environment........................................................................................... 55 Parks and Recreation................................................................................113 Community Development...........................123 .................... Unfunded Needs List................................................................................141 The Honorable Mayor and Members of the City Council City of Cape Girardeau Dear Mayor and Council Members: July 30, 1999 INTRODUCTION The City staff herewith presents the adopted Five -Year Capital Improvements Program. This program, for the period July 1, 1999, through June 30, 2004, is submitted in accordance with Article VI, Section 6.04 of the City Charter. On March 1, 1999, in accordance with the City Charter, the City Council held a public hearing for the Capital Improvements Program. Following public input, the City Council adopted the Capital Improvements Program by resolution at its March 15, 1999, meeting. The material contained within this document complies with the requirements of the Charter as to program proposals, cost estimates, methods of financing, projection of revenue sources to meet costs, recommended time schedule for each improvement, and any anticipated impact on the annual operating budget. While the projects included herein are attainable through available revenue sources, a number of these depend on the cooperation of property owners and other agencies, and further action by the City Council. Projects for which a reliable funding source is not currently proposed are included under the Unfunded Needs Section. Each of the City's advisory boards involved in planning for capital improvements were given the opportunity to provide input, as well as those City departments involved in planning and implementation of such improvements. BACKGROUND The Capital Improvements Program should be considered as an investment in the future of the community. The selection and evaluation of capital projects is a difficult task that involves some speculation and the ability to make estimations which, to some extent, are based on historical perspectives. The City Council, in 1983, formally considered and adopted a long-range Capital Improvements Program for the first time under the current Charter requirement. This budget process should provide a relevant approach to identifying and implementing important community -wide and neighborhood projects. i PROGRAM AND FINANCING DESCRIPTIONS The major program areas within which the various projects have been described include Transportation and Public Works, Environment, Parks and Recreation, and Community Development. These major categories contain the following types of projects: 1. Transportation and Public Works. The projects in this category provide for the construction of the public streets within the City, improvements at the Regional Airport, and improvements in site of Public Works facilities other than utilities. 2. Environment. These projects provide for the preservation, restoration, and care of the physical resources of the City, including solid waste, water, wastewater, and stormwater services. 3. Parks and Recreation. The programs under this area provide the facilities for citizens to participate in organized and unorganized recreation and leisure time activities. 4. Community Development. Projects under this category include construction of general public facilities and community projects which have city-wide effects. The Capital Improvements Program includes types of revenue sources recommended as ways to finance the capital improvements proposed. The following is a brief discussion of what the various revenue sources include. A. General Fund Revenues. These revenues are available on an annual appropriation basis from the City's general fund, which includes the receipt of revenues from a number of sources. These funds are subject to the annual budgeting process. B. and C. Revenue/PFA Bonds. These bonds are issued for the financing of self-supporting and general public improvements. Revenue bonds are not included within the limitations of indebtedness of the City and are issued upon the authorization of a majority voter approval. These bonds are normally used for enterprise funds such as water, sewer, and solid waste utilities. PFA (Public Facility Authority) bonds are used upon City Council approval based on collateralized assets and annual lease/purchase appropriations. , Cash flows for debt retirement come from existing revenue and from new receipts to be generated by the facilities' operations. Within the Capital Improvements Program, revenue/PFA bonds already issued or authorized by the electorate or City Council are denoted as "B". Those that are pending, i.e. will require subsequent approval of the electorate or Council, are denoted as "C". D. State Grants. The City is eligible to submit grant applications to the State of Missouri for funds that they may have available either from their own revenue ii sources or, in some cases, from revenue sources that they administer for various federal agencies. E. Motor Fuel Tax Receipts. This fund provides for the receipt and disbursement of revenues the City receives as its portion of the State Gasoline Tax, State Motor Vehicle Licensing, and State Motor Vehicle Sales Tax. The revenues from this source can be used for capital improvements, as well as annual operating maintenance expenses as they relate to improvements on the City's streets. F. Federal Grants. The City is eligible to receive various federal grants on a competitive basis from appropriate federal agencies. This could include the Environmental Protection Agency as it relates to wastewater improvements, the Federal Highway Administration which administers and distributes funds from the Federal Gasoline Tax revenue through the Federal Aid Urban program, or the Federal Aviation Administration for airport improvements. Most of these funds, however, are now administered by the State through related State agencies. G. Special Assessments. This category provides for the consideration of special assessments which are used for public improvements affecting specific areas. The total, or a portion of, the cost of an improvement is divided among property owners who benefit from the project. This type of funding can be used for diverse improvements including streets, water, stormwater, sanitary sewer or sidewalk improvements. However, it should be noted that the "up front" cost of special assessment projects (i.e., the initial funding) must be borne by the City from available revenue sources, with the special assessment "costs" recovered afterwards, typically over a period of ten years through special tax bills paid by the benefiting property owners. H. Capital Improvements Sales Tax. A 1/4 cent, 3/8 cent, or 1/2 cent Sales Tax can be issued by the City for various types of public improvements. Such a tax requires approval by the electorate with a simple majority. For example, in November, 1988, the voters of Cape Girardeau adopted a 1/4 cent sales tax effective January 1, 1990, restricted to flood control projects. On April 5, 1994, the voters of Cape Girardeau approved the extension of this tax for an additional twenty years to pay for improvements to the City's sewer system. In November of 1996, the voters adopted an additional 1/4 cent sales tax effective January 1, 1997, for expansion of the water treatment plant and various other water improvements. I. Other. This category denotes funds from donations, operating revenues from funds other than the General Fund, reserves, proceeds from the sale of fixed assets and other sources. J. General Obligation Bonds. These bonds are normally issued for the financing of general public improvements. General obligation bonds must be authorized by a 4/7th vote of the voters which also authorizes a tax levy to be used for debt retirement. Total outstanding general obligation bonds are limited by State statute to 20% of the City's total assessed valuation. iii K. Transportation Sales Tax. Pursuant to Sections 94.700 - 94.755 of the State statutes, the voters of the City of Cape Girardeau approved a '/i % sales tax for transportation purposes on August 8, 1995, for a period of five (5) years. This tax went into effect on January 1, 1996. Revenues from this source are placed in a special Transportation Trust Fund to be used only for the projects and purposes outlined in the current program. PROPOSED IMPROVEMENTS The total Capital Improvements Program included herein includes a total of $80,510,965 in improvements for the five-year period 1999-2004 by fiscal year. The largest category for funding proposed improvements over the next five years is through the use of remaining funds of previously issued Revenue/PFA Bonds. This provides for $26,540,475 in funding over the next five years, primarily in association with sewer system improvements, the Corps of Engineers flood control project, expansion of Water Plant # 1, and other water system improvements. The second largest category for funding proposed improvements is through the proposed (pending) issuance of Revenue/PFA Bonds. This provides for $14,823,900 in funding over this period, for improvements to the City's water and sewer systems and construction of a Police Station #1 Annex. The third largest funding source is the Transportation Sales Tax. This includes $12,326,800 in funds to complete the remainder of the projects originally proposed to be funded from the tax when it was approved in August, 1995. Other Funding will provide the fourth largest source of funds, with $8,176,600 projected for the program period. The funds will be used for sewer, water, stormwater, solid waste, and Public Works site improvements and facility replacement. The largest program area is Environment ($44,557,975). The most significant projects in this area will continue to be the sewer improvements funded by the April, 1994, bond issue ($10,100,000). Also included in this area is $21,123,475 for expansion of the water system's production/treatment/ distribution capacity to be funded by revenue bonds issued in December, 1998. This category also includes $2,275,600 for the completion of the Corps of Engineers' Flood Control Project on Walker Branch and the detention basin. The Transportation and Public Works program area ($24,355,600) contains the second largest amount for proposed projects over the next five years. This amount is comprised of $16,507,800 for street and bridge projects, $4,018,900 for airport projects, and $3,828,900 for public works improvements. The Parks and Recreation program area includes $737,950 for seven relatively small improvement projects, general park development, continued payment for land acquisition for the additions to Shawnee Park and the purchase of Osage Park, and construction of a new pro shop at the Municipal Golf Course. iv The Community Development program area ($8,388,600) includes $3,349,300 in proposed new construction or improvements to the City's fire stations and $4,685,000 for an addition to police headquarters. Also included replacement of the police station heating and cooling system, City Hall remodeling, and construction of a city hall elevator. CONCLUSION The capital improvements program proposed herein is a progressive program. The implementation of this program will allow for the creation of new job opportunities, an increase in revenue to private businesses, opportunities for new businesses, existing business expansions, increased tax revenues to all taxing jurisdictions, and the strengthening of the quality of life in Cape Girardeau and the surrounding area. It is hoped that this plan will focus attention on community goals, needs and capabilities; reduce scheduling problems and conflicting or overlapping projects; maintain a sound and stable financial program; enhance opportunities for participation in federal or state funded programs; and achieve the highest public benefit from the expenditure of City revenue. The projects proposed in this document are the product of many hours of deliberative thought by a number of people within this community. The Charter requires an annual review and revision of the Capital Improvements Program which assures that the Program remains responsive to changing demands, priorities, and available revenues. The final plan should be regarded as a sound, fiscally responsible working document that can and will be implemented through the annual budget appropriation process of the City Council, support from the citizens of Cape Girardeau for appropriate revenue sources, and diligent action by the City staff. MGM/KMB/JR/rlf submitted, i ael G. City Manager ///OA�at— Kent M. Bratton City Planner John Richbourg Finance Director u 45,000,000 40,000,000 35,000,000 30,000,000 25,000,000 20,000,000 15,000,000 10,000,000 5,000,000 REVENUE FUNDING SOURCES BY FISCAL YEAR CAPITAL IMPROVEMENTS PROGRAM 1999-00 2000-01 2001-02 2002-03 2003-04 vii SUMMARY OF FUNDING SOURCES BY FISCAL YEAR 1999-2004 SOURCE OF FUNDS IL 1999-00 11 2000-01 1 2001-02 2002-03 2003-04 TOTAL GENERAL FUND REVENUES 499,300 1,041,900 176,750 179,700 113,100 2,010,750 REVENUE/PFA BONDS: ISSUED 19,982,925 5,840,425 717,125 26,540,475 REVENUE/PFA BONDS: PENDING 6,535,900 4,250,000 4,038,000 14,823,900 STATE GRANTS/LOANS 843,600 343,400 1,187,000 MOTOR FUEL TAX RECEIPTS 613,800 562,000 517,900 629,200 647,000 2,969,900 FEDERAL GRANTS/LOANS 886,200 314,200 778,600 1,883,200 723,300 4,585,500 SPECIAL ASSESSMENTS 1,584,900 1,584,900 CAPITAL IMPROVEMENT SALES TAX 410,400 35,000 35,000 35,000 515,400 OTHER 1,886,900 3,651,300 1,290,400 725,000 623,000 8,176,600 GEN. OBLIGATION BONDS: PENDING 295,000 541,400 1,074,200 1,048,300 360,000 3,318,900 TRANSPORTATION SALES TAX 9,135,400 3,191,400 12,326,800 TOTALS 42,674,325 15,521,025 j 8,839,975 4,500,400 j 6,504,400 78,040,125 [slit" SUMMARY OF RECOMMENDED CAPITAL IMPROVEMENT PROGRAM EXPENDITURES 1999-2004 BY PROGRAM DESCRIPTION AND SOURCE OF FUNDS SOURCE OF FUNDS PROGRAM DESCRIPTIONS TRANSPORTATION & PUBLIC WORKS ENVIRONMENT I PARKS & RECREATION COMMUNITY DEVELOPMENT TOTAL GENERAL FUND REVENUES 708,100 482,950 819,700 2,010,750 REVENUE/PFA BONDS: ISSUED 26,540,475 26,540,475 REVENUE/PFA BONDS: PENDING 10,573,900 4,250,000 14,823,900 STATE GRANTS/LOANS 559,500 627,500 1,187,000 MOTOR FUEL TAX RECEIPTS 2,969,900 2,969,900 FEDERAL GRANTS/LOANS 2,967,400 1,618,100 4,585,500 SPECIAL ASSESSMENTS 935,000 649,900 1,584,900 CAPITAL IMPROVEMENT SALES TAX 515,400 515,400 OTHER 3,888,900 4,032,700 255,000 8,176,600 GEN. OBLIGATION BONDS: PENDING 3,318,900 3,318,900 TRANSPORTATION SALES TAX 12,326,800 12,326,800 TOTALS 24,355,600 44,557,975 737,950 8,388,600 78,040,125 ix SUMMARY OF FUNDING SOURCES CAPITAL IMPROVEMENT BUDGET TRANSPORTATION SALES TAX 22% GEN. OBLIGATION BONDS: PENDING 1% OTHER 4% CAPITAL IMPROVEMENT SALES TAX 1% SPECIAL ASSESSMENTS 4% FEDERAL GRANTS/LOANS 2% MOTOR FUEL TAX RECEIPTS 1% STATE GRANTS/LOANS 2% GENERAL FUND REVENUES 1% REVENUE/PFA BONDS: PENDING 15% X REVENUE/PFA BONDS: ISSUED 47% CAPITAL IMPROVEMENT BUDGET BY PROGRAM AREA PARKS & RECRE 1% COMMUNITY nCVCI f%MRACAIr rNVlmuNm=N 1 57% X1 NSPORTATION & UBLIC WORKS 31% A. B. C. D. E. F. REVENUE SOURCES General Revenue Fund G. Special Assessments Revenue/PFA Bonds: Issued H. Capital Improvement Sales Tax Revenue/PFA Bonds: Pending I. Other State Grants and Loans J. General Obligation Bonds Motor Fuel Tax Receipts K. Transportation Sales Tax Federal Grants and Loans xu TRANSPORTATION AND PUBLIC WORKS CAPITAL IMPROVEMENTS PROGRAM 1 TRANSPORTATION AND PUBLIC WORKS PROPOSED PROJECTS PROJECT IMPROVEMENT TOTAL 1999-002000-01 2001-02 2002-03 2003-04 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL YEAR YEAR YEAR YEAR YEAR 1 1, 3• Street Overlay Program 1,350,000 550,000 350,000 150,000 150,000 150,000' E,K E,K E,K E E E 1 2 : Gravel Street Paving Program 580,000 270,000 160,000 50,000 50,000 50,000 66,w E,G,K E,G,K E,G,K E E E 1 3 Street, Curb & Gutter Repair 562,500 375,000 187,500 K K K F1-4 3 Sidewalk Repair and 187,500 125,000 62,500 Reconstruction K K K 1 8 ;Broadway Widening & 1,300,000 1,300,000 Reconstruction: Clark Ave. to K K Perry Avenue 1-6 �: Bloomfield Road: Phase 1 110,900 110,900 K K ! 7d Bloomfield Road: Phase 11: 1,335,000 1,335,000 Kingshighway to Siemers K K v Drive 1-8 s _, Mt. Auburn: Bloomfield Road 850,000 850,000 to New Highway 74 K K Hopper Road: Phase I: Mt. 1,164,800 1,164,800 Auburn Road to Kae Road K K F1�1Qr„ ; Silver Springs Road: William 640,600 640,600 " . St. to Independence St. K K 5 1 11 Lorimier: Morgan Oak to New 255,800 255,800 r x Highway 74 K K Hopper Road: Phase 11: Oak 182,900 182,900 Ridge Court to 1-55 K K nu 1U - 3 ' William Street: Improvement/ 513,100 513,100 l��� Widening: Sprigg to Main K K R F1 14Perryville Road: City Limits to 1,040,600 1,040,600 ' Route W K K 1g Kage Road: t. Auburn to 91,700 91,700 K Hopper Road Mt. Auburn: New Highway 74 806,100 806,100 to South em Expressway K K gx ! 17 Southern Expressway: 498,600 498,600 Kingshighway to Silver K K Springs Road K 1 18 Independence: Reconstruct.: 350,900 350,900 Pacific to Sprigg K K A GENERAL REVENUE FUND B REV/PFA BONDS: ISSUED C REVIPFA BONDS: PENDING D STATE GRANTSILOANS E MOTOR FUEL TAX F FEDERAL GRANTSILOANS G SPECIAL ASSESSMENTS H CAPITAL IMPROVEMENT SALES TAX I OTHER J GEN. OBLIGATION BONDS: PENDING K TRANSPORTATION SALES TAX Projects included in Transportation Trust Fund Program supported by a %Z% transportation sales tax for five years approved by vote on August 8, 1995. 2 TRANSPORTATION AND PUBLIC WORKS PROPOSED PROJECTS PROJECT IMPROVEMENT TOTAL 1999-00 2000-01 2001-02 2002-03 2003-04 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL YEAR YEAR YEAR YEAR YEAR New Madrid: Reconstruction: 821,900 821,900 Perry to Show Me Center K K 1 20 Rodney: Bridge & Reconst.: 683,900 683,900 Armory to Hawthorne K K 1-21 Bloomfield Road Bridge Over 288,000 288,000 Ramsey Branch D,E D,E 1-22 Old Sprigg Street Road and 35,400 35,400 Lexington: Extend Box Culvert E E 1-23 Siemers Drive Widening: 935,000 935,000 Campster to Bloomfield Road G G with Signals at Lambert and Bloomfield 1-24 Linden Street: Reconst.: 184,700 184,700 Benton to Sprigg with E E Sidewalk; Widening: Benton to West End with Sidewalk 1-25 Street Lighting: Lexington 38,000 38,000 Avenue & Siemers Drive E E 1-26 Traffic Signal Installation: 120,000 120,000 Sprigg Street & Normal/ E,I E,I Washington Intersection 1-27 Minnesota: Bloomfield Road 472,700 181,800 290,900 to College with Sidewalk E E E 1-28 College Street: Louis to West 421,200 243,900 177,300 End Boulevard with Sidewalk E E E and Missouri Avenue: College to Jefferson 1-29 Sidewalk Along Perryville 136,100 136,100 Road, Lexington Avenue to E E Cape Rock Drive 1-30 Sidewalk Along Lexington 138,300 138,300 Avenue, Perryville Road to E E Cape La Croix Road 1-31 West End Blvd.: Bloomfield 295,400 295,400 South to Shawnee Parkway E E (Highway 74) 1-32 Clark Street: Marietta South to 116,200 116,200 Victorian Estates E E A GENERAL REVENUE FUND B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTSILOANS E MOTORFUELTAX F FEDERAL GRANTSILOANS GSPECIAL ASSESSMENTS H CAPITAL IMPROVEMENT SALES TAX I OTHER J GEN. OBLIGATION BONDS: PENDING K TRANSPORTATION SALES TAX Projects included in Transportation Trust Fund Program supported by a %s% transportation sales tax for five years approved by vote on August 8, 1995. 3 TRANSPORTATION AND PUBLIC WORKS PROPOSED PROJECTS PROJECT IMPROVEMENT TOTAL 1999-00 2000-01 2001-02 2002-03 2003-04 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL YEAR YEAR YEAR YEAR YEAR SUBTOTAL -STREET 16,507,800 10,960,300 3,753,400 517,900 629,200 647,000 PROJECTS 1-33 Airport Hangar Door East Side 35,700 35,700 of Air Evac A A 1-34 Airport Emergency Power 48,000 48,000 Back -Up for Runway 10/28 A,F* A,F 1-35 Airport Maintenance/Snow 75,000 75,000 Removal Equipment/ARFF A,F A,F Building 1-36 Airport T -Hangar Ramp 423,700 423,700 Replacement A,D A.D 1-37 Airport T -Hangar and 402,100 402,100 Associated Taxiways A,D A,D 1-38 Airport Land Acquisition 516,000 516,000 A,F A,F 1-39 Airport Taxiway Extension for 1,650,600 1,650,600 Runway 2/20 A,F A,F 1-40 Airport Runway 2/20 Cable 106,400 106,400 and Lighting A,F A,F 1-41 Airport Aircraft Rescue and 266,100 266,100 Fire Fighting Building A,F A,F 1-42 Airport Taxiway Extension for 495,300 495,300 T -Hangars A,F A,F SUBTOTAL -AIRPORT 4,018,900 158,700 825,800 516,000 1,757,000 761,400 PROJECTS 1-43 Public Works Partial Roof 90,000 20,000 20,000 25,000 25,000 Replacement I I I I I 1-44 Public Works Structural 204,000 51,000 76,500 76,500 Reinforcement -Retrofit Bldg. I I 1 1 1-45 Public Works Fuel Island 30,600 30,600 Canopy I I 1-46 Public Works Facility 3,417,000 1 357,000 1 3,060,000 1 1-47 Public Works Chemical 12,300 12,300 Material Storage 1 1 1-48 Public Works Equipment 75,000 75,000 Storage Sheds I I SUBTOTAL -PUBLIC 3,828,900 545,900 3,156,500 101,500 25,000 WORKS PROJECTS A GENERAL REVENUE FUND B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTSILOANS E MOTOR FUEL TAX F FEDERAL GRANTS(LOANS G SPECIAL ASSESSMENTS H CAPITAL IMPROVEMENT SALES TAX I OTHER J GEN. OBLIGATION BONDS: PENDING K TRANSPORTATION SALES TAX Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. TRANSPORTATION AND PUBLIC WORKS PROPOSED PROJECTS PROJECT IMPROVEMENT TOTAL 1999-00 2000-01 2001-02 2002-03 2003-04 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL YEAR YEAR YEAR YEAR YEAR TOTALS 24,355,600 11,664,900 7,735,700 1,135,400 2,411,200 1,408,400 A GENERAL REVENUE FUND 708,100 48,000 482,400 51,600 88,000 38,100 B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D E STATE GRANTSILOANS MOTORFUELTAX 559,500 2,969,900 216,100 613,800 343,400 562,000 517,900 629,200 647,000 F FEDERAL GRANTSILOANS 2,967,400 110,700 464,400 1,669,000 723,300 G SPECIAL ASSESSMENTS 935,000 935,000 H 1 CAPITAL IMPROVEMENT SALES TAX OTHER 3,888,900 605,900 3,156,500 101,500 25,000 J GEN. OBLIGATION BONDS: PENDING K TRANSPORTATION SALES TAX 12,326,800 9,135,400 3,191,400 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: STREET OVERLAY PROGRAM LOCATION: CITY-WIDE PURPOSE: PROVIDES FOR CONTINUING PRIMARY STREET MAINTENANCE PROGRAM TO PROVIDE FOR THE ASPHALT OVERLAY OF LOCAL AND COLLECTOR STREETS PHYSICAL DESCRIPTION: MILLING OR USING OTHER SURFACE PROFILING METHOD AND ASPHALT OVERLAY UNIT OF WORK: CONSTRUCT JUSTIFICATION: COST EFFECTIVE MAINTENANCE TO PREVENT NEED FOR FUTURE RECONSTRUCTION OF ENTIRE PAVEMENT. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 750,000 MOTOR FUEL TAX (E) $ 600,000 TRANSPORTATION SALES TAX (K) $ 1,350,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-1 2 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: GRAVEL STREET PAVING PROGRAM LOCATION VARIOUS CITY STREETS PURPOSE: TO SURFACE EXISTING RESIDENTIAL GRAVEL STREETS PHYSICAL DESCRIPTION: MINIMUM 20 -FOOT -WIDE, HOT MIX ASPHALTIC CONCRETE SURFACE UP TO 30 -FOOT CONCRETE SURFACE ON EXISTING GRAVEL STREET BASE AND DRAINAGE IMPROVEMENTS AS NEEDED UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: REDUCE GRAVEL STREET MAINTENANCE COSTS. ENHANCE NEIGHBORHOOD QUALITY. IMPACT ON PAVING OF GRAVEL STREETS WILL SIGNIFICANTLY OPERATING BUDGET: REDUCE COSTS OF GRADING AND ROCK REPLACEMENT. FINANCING: $ 250,000 MOTOR FUEL TAX (E) $ 330,000 TRANSPORTATION SALES TAX (K) $ 580,000 TOTAL CITY COUNCIL POLICY (RESOLUTION NO. 1127, DECEMBER 18, 1995) HAS ESTABLISHED A MAXIMUM SPECIAL ASSESSMENT FOR RESIDENTIAL GRAVEL STREETS EXISTING AS OF AUGUST 8, 1995, AT $10.00 PER FRONT FOOT FOR ABUTTING PROPERTY OWNERS. SPECIAL ASSESSMENT REVENUES RETURNED FROM THESE PROJECTS WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. SALES TAX AND MOTOR FUEL FUNDS WILL BE USED TO PAY THE UP -FRONT COSTS FOR ENGINEERING, RIGHT-OF-WAY, AND CONSTRUCTION. 1-2 7 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: STREET, CURB, AND GUTTER REPAIR LOCATION: UNSPECIFIED PURPOSE: SPECIFIC PROGRAM TO PROVIDE FOR RECONSTRUCTION OF CURBS AND GUTTERS IN CONJUNCTION WITH EXPANDED STREET REPAIR OR OVERLAY PROJECTS PHYSICAL DESCRIPTION: IN GENERAL, COMPLETE REMOVAL OF DETERIORATED SECTIONS OF EXISTING CURB AND GUTTER AND REPLACEMENT UNIT OF WORK: REMOVE AND CONSTRUCT JUSTIFICATION: IMPROVE LIFE OF EXISTING STREETS. ENHANCE NEIGHBORHOOD QUALITY. IMPACT ON COST EFFECTIVE MAINTENANCE TO EXTEND LIFE OF OPERATING BUDGET: EXISTING STREETS AND REDUCE MAINTENANCE COSTS. FINANCING: $ 562,500 TRANSPORTATION SALES TAX (K) $ 562,500 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-3 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: SIDEWALK REPAIR AND RECONSTRUCTION LOCATION: UNSPECIFIED PURPOSE: SPECIFIC PROGRAM TO REPAIR AND RECONSTRUCT DETERIORATED SIDEWALKS PHYSICAL DESCRIPTION: REPLACE DETERIORATED SIDEWALK SECTIONS WITH NEW CONCRETE SECTIONS UNIT OF WORK: REMOVE AND RECONSTRUCT JUSTIFICATION: REPAIR DETERIORATED FACILITIES AND ENHANCE NEIGHBORHOOD QUALITY IMPACT ON WILL REDUCE MAINTENANCE COSTS FOR ABUTTING OPERATING BUDGET: PROPERTY OWNERS FINANCING: $ 187,500 TRANSPORTATION SALES TAX (K) $ 187,500 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-4 w TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: BROADWAY WIDENING AND RECONSTRUCTION LOCATION: FROM CLARK AVENUE EAST TO PERRY AVENUE PURPOSE: PROVIDE IMPROVED TRAFFIC FLOW AND REDUCE FLOODING ON MAJOR ARTERY PHYSICAL DESCRIPTION: WIDEN STREET TO FOUR LANES, UPGRADE TRAFFIC SIGNALS AT CARUTHERS, INSTALL NEW SIGNALS AT CLARK, AND INSTALL STORMWATER RELIEF LINE. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: STREET CURRENTLY IS SUBJECT TO FLASH FLOODING AND TRAFFIC FLOW IS ROUTINELY CONGESTED WITH LINES SEVERAL BLOCKS LONG. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 1,300,000 TRANSPORTATION SALES TAX (K) $ 1,300,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATON TRUST FUND. 1-5 10 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: BLOOMFIELD ROAD: PHASE LOCATION: CHRISTINE STREET EAST TO SPRING AVENUE PURPOSE: UPGRADE EXISTING STREET PHYSICAL DESCRIPTION: ADDITION OF 7 -FOOT -WIDE PAVEMENT AND CURB SECTION ON EACH SIDE OF EXISTING PAVEMENT FOR APPROXIMATELY 930 FEET, WITH ASSOCIATED DRAINAGE FACILITIES UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: MATCHES EXISTING PAVEMENT ON EITHER END AND ELIMINATES RESTRICTION TO TRAFFIC FLOW CAUSED BY NARROW PAVEMENT. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 110,900 TRANSPORTATION SALES TAX (K) $ 110,900 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-6 11 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: BLOOMFIELD ROAD: PHASE II LOCATION: KINGSHIGHWAY WEST TO SIEMERS DRIVE PURPOSE: TO UPGRADE EXISTING STREET TO CURRENT STANDARDS PHYSICAL DESCRIPTION: APPROXIMATELY 6,500 LINEAR FEET OF STREET CONSTRUCTION INCLUDING WIDENING TO 36 FEET WITH CURBS AND GUTTERS, AND SOME REALIGNMENT, EXCLUDING 1-55 OVERPASS. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: EXISTING STREET IS FUNCTIONALLY INADEQUATE IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 1,335,000 TRANSPORTATION SALES TAX (K) $ 1,335,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATON TRUST FUND. 1-7 12 TRANSPORTATON AND PUBLIC WORKS PROJECT TITLE: MOUNT AUBURN ROAD EXTENSION LOCATION: EXTENSION FROM BLOOMFIELD ROAD SOUTH TO NEW HIGHWAY 74 PURPOSE: PROVIDE A CONNECTION BETWEEN THE MOUNT AUBURN ROAD ARTERIAL AND NEW HIGHWAY 74 PHYSICAL DESCRIPTION: APPROXIMATELY 1,380 FEET OF PAVING, 48 FEET WIDE, WITH CURBS AND DRAINAGE UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: CONNECTION NEEDED TO PROVIDE ACCESS TO THE NEW 74/1-55 INTERCHANGE FOR SAFETY, CONVENIENCE AND ECONOMIC DEVELOPMENT. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME FINANCING: $ 850,000 TRANSPORTATION SALES TAX (K) $ 850,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. i» 13 PUBLIC WORKS TITLE: HOPPER ROAD: PHASE 1 LOCATION: FROM MOUNT AUBURN ROAD WEST TO KAGE ROAD PURPOSE: PROVIDE A NEW COLLECTOR STREET TO PROVIDE FOR CONTINUED DEVELOPMENT IN THE NORTHWEST PART OF THE CITY PHYSICAL DESCRIPTION: APPROXIMATELY 3,500 LINEAR FEET OF STREET, 36 FEET WIDE WITH CURBS AND GUTTERS UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: TRAFFIC VOLUMES ON EXISTING HOPPER AND KAGE ROADS ARE INCREASING AS A RESULT OF NEW DEVELOPMENT, AND A NEW STREET BUILT TO CURRENT STANDARDS ON A NEW ALIGNMENT IS NEEDED. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 1,164,800 TRANSPORTATION SALES TAX (K) $ 1,164,800 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-9 14 TRANSPORTATION AND PUBLIC WORKS TITLE: SILVER SPRING LOCATION: WILLIAM STREET (ROUTE K) NORTH TO CURRENT TERMINUS SOUTH OF INDEPENDENCE STREET PURPOSE: PROVIDE FINAL CONNECTION OF THIS DESIGNATED COLLECTOR STREET THROUGH THE DESCRIBED SECTION, IMPROVE NORTH/SOUTH ACCESS IN THE WEST END OF THE CITY, AND ASSIST IN FURTHER DEVELOPMENT. PHYSICAL DESCRIPTION: APPROXIMATELY 2,100 FEET OF 40 -FOOT WIDE PAVING, WITH CURBS, GUTTERS, AND ANCILLARY STORMWATER FACILITIES, WITH SOME RECONSTRUCTION REQUIRED ON GORDONVILLE ROAD. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY (PART PREVIOUSLY ACQUIRED), AND CONSTRUCT JUSTIFICATION: CONNECTION NEEDED TO PROVIDE ADDITIONAL MAJOR NORTH/SOUTH ACCESS IN HIGH TRAFFIC COMMERCIAL/ INSTITUTIONAL AREA. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 640,600 TRANSPORTATION SALES TAX (K) $ 640,600 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-10 15 I TRANSPORTATION AND PUBLIC WORKS I PROJECT TITLE: LORIMIER STREET EXTENSION LOCATION: EXTENSION FROM MORGAN OAK SOUTH TO NEW HIGHWAY 74 PURPOSE: PROVIDE A CONNECTION BETWEEN NEW HIGHWAY 74 AND THE DOWNTOWN BUSINESS DISTRICT PHYSICAL DESCRIPTION: PAVING OF APPROXIMATELY 1,930 FEET OF STREET, 40 FEET WIDE, WITH CURBS AND GUTTERS UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: ACCESS TO THE DOWNTOWN AREA IS NEEDED TO MAINTAIN ECONOMIC VIABILITY IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 255,800 TRANSPORTATION SALES TAX (K) $ 255,800 TOTAL NOTE: AGREEMENT BETWEEN CITY AND UNIVERSITY FOR JOINTLY -FUNDED DEVELOPMENT OF ST. VINCENT SEMINARY PROPERTY (RIVER CAMPUS) PROVIDES FOR A CITY ALLOCATION OF $255,800 FROM THE TRANSPORTATION TRUST FUND FOR THE CONSTRUCTION OF A CONNECTING STREET BETWEEN SHAWNEE PARKWAY (MISSOURI ROUTE 74) AND MORGAN OAK STREET. ANY ADDITIONAL CONSTRUCTION COSTS WILL BE CONSIDERED AS A COST FOR THE JOINT FACILITIES. NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 16 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: HOPPER ROAD: PHASE II LOCATION: OAK RIDGE COURT TO 1-55 PURPOSE: TO UPGRADE EXISTING STREET TO CURRENT STANDARDS PHYSICAL DESCRIPTION: APPROXIMATELY 2,000 LINEAR FEET OF STREET CONSTRUCTION INCLUDING WIDENING TO 36 FEET WITH CURBS AND GUTTERS. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: EXISTING STREET IS FUNCTIONALLY INADEQUATE IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 182,900 TRANSPORTATION SALES TAX (K) $ 182,900 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-12 17 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: WILLIAM STREET - GENERAL IMPROVEMENT AND/OR WIDENING LOCATION: SPRIGG STREET TO MAIN STREET PURPOSE: TO IMPROVE TRAFFIC CAPACITY PHYSICAL DESCRIPTION: UPGRADE APPROXIMATELY 2,400 LINEAR FEET OF EXISTING STREET, WITH POSSIBLE WIDENING TO 42 FEET UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: PROVIDE FOR CONTINUED ECONOMIC DEVELOPMENT IN THE DOWNTOWN AREA IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 513,100 TRANSPORTATION SALES TAX (K) $ 513,100 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-13 IV TRANSPORTATION AND PUBLIC WORKS N PROJECT TITLE: PERRYVILLE ROAD LOCATION: CITY LIMITS NORTH TO ROUTE W AND CYPRESS DRIVE PURPOSE: PROVIDE FOR CONTINUED DEVELOPMENT OF PERRYVILLE ROAD AS A COLLECTOR STREET NORTH TO THE ROUTE W AREA PHYSICAL DESCRIPTION: APPROXIAMTELY 3,400 LINEAR FEET OF STREET RECONSTRUCTION INCLUDING WIDENING TO 36 FEET WITH CURBS AND GUTTERS, AND SOME REALIGNMENT. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: INCREASE THE SERVICE LEVEL OF THE EXISTING ROADWAY TO HANDLE ADDITIONAL TRAFFIC VOLUME AND CONSTRUCT STREET TO COLLECTOR STANDARDS PER MAJOR STREET PLAN. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 1,040,600 TRANSPORTATION SALES TAX (K) $ 1,040,600 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-14 19 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: KAGE ROAD LOCATION: MOUNT AUBURN ROAD TO HOPPER ROAD PURPOSE: TO UPGRADE EXISTING STREET TO CURRENT STANDARDS PHYSICAL DESCRIPTION: APPROXIMATELY 4,800 LINEAR FEET OF STREET IMPROVEMENT: WIDENING WITH CONSTRUCTION OF CURBS AND GUTTER, WITH OVERLAY OF EXISTING PAVEMENT AND EXTENSION OF STORM DRAINAGE. UNIT OF WORK: DESIGN, ACQUIRE RIGHTOF-WAY, AND CONSTRUCT JUSTIFICATION: EXISTING STREET IS FUNCTIONALLY INADEQUATE IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 91,700 TRANSPORTATION SALES TAX (K) $ 91,700 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATON TRUST FUND. 1-15 20 TRANSPORTATION AND PUBLIC WORKS N PROJECT TITLE: MOUNT AUBURN ROAD EXTENSION LOCATION: NEW HIGHWAY 74 SOUTH TO SOUTHERN EXPRESSWAY (EXTENDED WEST TO SILVER SPRINGS ROAD) PURPOSE: PROVIDE A NEW ARTERIAL CONNECTION BETWEEN NEW HIGHWAY 74 AND THE SOUTHWEST PART OF THE CITY, TYING EACH TO KINGSHIGHWAY. WILL SUPPORT NEW COMMERCIAL, SCHOOL, AND RESIDENTIAL DEVELOPMENT. PHYSICAL DESCRIPTION: APPROXIMATELY 3,600 LINEAR FEET OF PAVING, 44 FEET WIDE, WITH CURBS AND STORMWATER FACILITIES. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: ACCESS TO THIS PART OF THE CITY IS LIMITED TO SILVER SPRINGS ROAD ONLY. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 806,100 TRANSPORTATION SALES TAX (K) $ 806,100 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-16 21 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: SOUTHERN EXPRESSWAY EXTENSION LOCATION: WEST FROM KINGSHIGHWAY TO SILVER SPRINGS ROAD PURPOSE: CONNECT KINGSHIGHWAY TO NEW MOUNT AUBURN ROAD EXTENSION AND PROVIDE ADEQUATE ACCESS TO THE SOUTHWEST PART OF THE CITY. WILL SUPPORT NEW COMMERCIAL, SCHOOL, AND RESIDENTIAL DEVELOPMENT. PHYSICAL DESCRIPTION: APPROXIMATELY 2,500 LINEAR FEET OF PAVING, 44 FEET WIDE, WITH CURBS AND DRAINAGE. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: ACCESS TO THIS PART OF THE CITY IS LIMITED TO SILVER SPRINGS ROAD ONLY. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 498,600 TRANSPORTATION SALES TAX (K) $ 498,600 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATON TRUST FUND. 1-17 22 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: INDEPENDENCE STREET RECONSTRUCTION LOCATION: PACIFIC STREET TO SPRIGG STREET, INCLUDING INTERSECTIONS PURPOSE: UPGRADE THIS SECTION OF STREET TO CURRENT STANDARDS PHYSICAL DESCRIPTION: APPROXIMATELY 940 LINEAR FEET OF PAVEMENT AND SIDEWALK RECONSTRUCTION WITH NEW TRAFFIC SIGNALS AS REQUIRED. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THIS SECTION OF INDEPENDENCE STREET IS IN NEED OF MAJOR RECONSTRUCTION. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 350,900 TRANSPORTATION SALES TAX (K) $ 350,900 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-18 23 I TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: NEW MADRID STREET RECONSTRUCTION LOCATION: PERRY AVENUE EAST TO SHOW ME CENTER PURPOSE: UPGRADE EXISTING NEW MADRID STREET SECTION WEST OF HENDERSON AND PAY FOR THE HENDERSON- NEW MADRID INTERSECTION TO SHOW ME CENTER SECTION PHYSICAL DESCRIPTION: APPROXIMATELY 3,000 LINEAR FEET OF STREET RECONSTRUCTION WITH WIDENING AND CURBS AND GUTTERS, PLUS INTERSECTION WORK. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: NEW MADRID STREET PROVIDES A MAJOR ACCESS ROUTE TO THE UNIVERSITY AND IT IS CURRENTLY FUNCTIONALLY INADEQUATE. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 821,900 TRANSPORTATION SALES TAX (K) $ 821,900 TOTAL NOTE: AGREEMENT BETWEEN CITY AND UNIVERSITY FOR CONSTRUCTION OF THE HENDERSON- NEW MADRID INTERSECTION PROVIDES THAT CITY WILL REIMBURSE UNIVERSITY FOR CITY SHARE OF PROJECT ON JANUARY 1, 1999, IF TRUST FUNDS ARE PROJECTED TO BE AVAILABLE TO COMPLETE ALL 20 TRUST FUND PROJECTS, BUT NO LATER THAN APRIL 1, 2000. NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATON TRUST FUND. 1-19 24 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: RODNEY STREET: NEW CAPE LA CROIX CREEK BRIDGE AND RECONSTRUCTION LOCATION: FROM NATIONAL GUARD ARMORY NORTH TO HAWTHORNE PURPOSE: UPGRADE EXISTING STREET AND BRIDGE TO CURRENT STANDARDS PHYSICAL DESCRIPTION: REPLACEMENT OF THE EXISTING BRIDGE AND RECONSTRUCTION OF 1,600 LINEAR FEET OF PAVEMENT TO 28 FEET IN WIDTH UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING STREET AND BRIDGE ARE FUNCTIONALLY INADEQUATE. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 683,900 TRANSPORTATION SALES TAX (K) $ 683,900 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATON TRUST FUND. 1-20 25 1-21 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: BLOOMFIELD ROAD BRIDGE OVER RAMSEY BRANCH LOCATION: BLOOMFIELD ROAD AT RAMSEY BRANCH PURPOSE: REPLACE EXISTING 54 -FOOT, 3 -SPAN BRIDGE THAT IS DETERIORATING PHYSICAL DESCRIPTION: NEW 3 -SPAN CONTINUOUS CONCRETE I -GIRDER SUPERSTRUCTURE SUPPORTING A REINFORCED CONCRETE SLAB WITH TWO INTEGRAL END BENTS AND TWO OPEN CONCRETE INTERMEDIATE BENTS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING BRIDGE IS FUNCTIONALLY AND STRUCTURALLY INADEQUATE IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 216,100 STATE GRANTS/LOANS (D) $ 71,900 MOTOR FUEL TAX (E) $ 288,000 TOTAL 26 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: OLD SPRIGG STREET ROAD AND LEXINGTON AVENUE, EXTEND BOX CULVERT LOCATION: ON OLD SPRIGG STREET ROAD, JUST SOUTH OF LEXINGTON AVENUE PURPOSE: EXTEND BOX CULVERT TO WIDEN APPROACH TO LEXINGTON AVENUE INTERSECTION. PHYSICAL DESCRIPTION: WIDEN 10 -FOOT BY 8 -FOOT BOX CULVERT 30 LINEAR FEET. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT BOX CULVERT IS MANY YEARS OLD AND NOT CONSTRUCTED TO CURRENT STANDARDS, RESULTING IN A NARROW APPROACH TO THE INTERSECTION WITH NO SHOULDERS. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 35,400 MOTOR FUEL TAX (E) $ 35,400 TOTAL 1-22 27 1-23 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: SIEMERS DRIVE WIDENING AND SIGNAL INSTALLATION LOCATION: WIDENING OF SIEMERS DRIVE FROM CAMPSTER DRIVE TO BLOOMFIELD ROAD, AND INSTALLING TRAFFIC SIGNALS AT LAMBERT DRIVE AND BLOOMFIELD ROAD PURPOSE: WIDEN AND SIGNALIZE THE SIEMERS DRIVE COLLECTOR STREET TO ACCOMMODATE DEVELOPED TRAFFIC LOAD PHYSICAL DESCRIPTION: WIDEN APPROXIMATELY 4,800 LINEAR FEET OF STREET FROM 32 FEET TO 50 FEET (MINIMUM) AND INSTALL SIGNALS. UNIT OF WORK: DESIGN, CONSTRUCT AND INSTALL JUSTIFICATION: SIEMERS WAS CONSTRUCTED OUTSIDE OF THE CITY LIMITS TO LESS THAN CITY STANDARDS. RECENT DEVELOPMENT HAS OVERLOADED THE STREET'S TRAFFIC CAPACITY. IMPACT ON SOME INCREASE FOR OPERATION AND MAINTENANCE OF OPERATING BUDGET: TRAFFIC SIGNALS. FINANCING: $ 935,000 SPECIAL ASSESSMENTS (G) $ 935,000 TOTAL W TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: LINDEN STREET RECONSTRUCTION AND WIDENING WITH SIDEWALK LOCATION: RECONSTRUCTION OF LINDEN STREET FROM BENTON STREET TO SPRIGG STREET WITH SIDEWALK, AND WIDENING EXISTING PORTION OF LINDEN STREET FROM BENTON STREET TO WEST END BOULEVARD WITH SIDEWALK. PURPOSE: UPGRADE MAJOR THROUGH STREET BETWEEN HIGHWAY 74 AND SOUTHERN EXPRESSWAY TO CARRY ADDITIONAL TRAFFIC FROM RECENT DEVELOPMENT AND PROVIDE IMPROVED ACCESS TO SHAWNEE PARK. PHYSICAL DESCRIPTION: APPROXIMATELY 1,100 LINEAR FEET OF RECONSTRUCTION AND 1,500 LINEAR FEET OF WIDENING TO STANDARD 30 -FOOT WIDTH. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: RECENT DEVELOPMENT ON LINDEN STREET HAS INCREASED TRAFFIC LOAD AND UPGRADING THIS STREET WILL PROVIDE IMPROVED ACCESS BETWEEN SPRIGG AND WEST END FOR THE GENERAL AREA. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 184,700 MOTOR FUEL TAX (E) $ 184,700 TOTAL WE 1-24 1-25 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: STREET LIGHTING LOCATION: LEXINGTON AVENUE - CAPE ROCK DRIVE TO BIG BEND ROAD, AND SIEMERS DRIVE - BLOOMFIELD ROAD TO HIGHWAY 74 PURPOSE: PROVIDE STREET LIGHTS FOR NEW STREETS PHYSICAL DESCRIPTION: PLACE POLES, LIGHTS, AND PROVIDE ANY NECESSARY POWER SUPPLY ALONG NEWLY CONSTRUCTED STREETS IN ORDER TO PROVIDE LIGHTING FOR IMPROVED TRAFFIC SAFETY UNIT OF WORK: CONSTRUCT JUSTIFICATION: COMPLY WITH THE CURRENT CITY POLICY AND PRACTICE OF PROVIDING STREET LIGHTING ALONG PUBLIC STREETS WITHIN THE CITY LIMITS. IMPACT ON WITHOUT THIS FUNDING, IT WOULD BE NECESSARY TO OPERATING BUDGET: DIVERT FUNDING FROM THE STREET DIVISION MAINTENANCE BUDGET, THUS REDUCING THE AMOUNT OF FUNDS AVAILABLE FOR NORMAL STREET MAINTENANCE OPERATIONS. FINANCING: $ 38,000 MOTOR FUEL TAX (E) $ 38,000 TOTAL 30 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: TRAFFIC SIGNAL INSTALLATION LOCATION: SPRIGG STREET AT WASHINGTON AVENUE/NORMAL AVENUE INTERSECTION PURPOSE: PUBLIC SAFETY AND CONVENIENCE PHYSICAL DESCRIPTION: INSTALLATION OF FULLY ACTUATED TRAFFIC SIGNAL UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: PUBLIC SAFETY IMPACT ON MINOR INCREASE IN STREET MAINTENANCE COSTS OPERATING BUDGET: FINANCING: $ 60,000 MOTOR FUEL TAX (E) $ 60,000 OTHER (1) $ 120,000 TOTAL 31 1-26 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: MINNESOTA AVENUE, BLOOMFIELD ROAD TO COLLEGE STREET WITH SIDEWALKS LOCATION: MINNESOTA AVENUE, FROM BLOOMFIELD ROAD TO COLLEGE STREET PURPOSE: UPGRADE STREET SERVING JEFFERSON SCHOOL AND ADJOINING NEIGHBORHOOD AND CONNECT TO NEW SECTION OF COLLEGE STREET PROPOSED FOR CONSTRUCTION. PHYSICAL DESCRIPTION: RECONSTRUCT APPROXIMATELY 1,300 LINEAR FEET OF STREET TO STANDARD 30 -FOOT WIDTH WITH CURBS AND GUTTERS, ANCILLARY STORMWATER FACILITIES, AND SIDEWALKS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: WITH UPGRADING AND EXPANSION OF JEFFERSON SCHOOL, IT IS DESIRABLE TO UPGRADE THIS STREET TO CURRENT STANDARDS TO PROVIDE IMPROVED ACCESS TO THE SCHOOL AND THE GENERAL AREA. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 472,700 MOTOR FUEL TAX (E) $ 472,700 TOTAL NOTE: THIS PROJECT WILL BE COMPLETED IN TWO PHASES. THE FIRST PHASE WILL BE THE PORTION OF MINNESOTA AVENUE BETWEEN HERMAN STREET AND COLLEGE STREET, AND IS SCHEDULED FOR FY01-02. THE SECOND PHASE WILL BE THE PORTION OF MINNESOTA AVENUE BETWEEN HERMAN STREET AND BLOOMFIELD ROAD, AND IS SCHEDULED FOR IN FY 02-03. 1-27 32 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: COLLEGE STREET, LOUIS STREET TO WEST END BOULEVARD WITH SIDEWALKS AND MISSOURI AVENUE, COLLEGE STREET TO JEFFERSON AVENUE LOCATION: COLLEGE STREET, FROM LOUIS STREET EAST TO WEST END BOULEVARD AND MISSOURI AVENUE, FROM COLLEGE STREET TO JEFFERSON AVENUE PURPOSE: TO DEVELOP A THROUGH STREET TO PROVIDE ACCESS FROM THE NEIGHBORHOOD TO THE WEST AND JEFFERSON SCHOOL TO WEST END BOULEVARD NEAR THE NEW HIGHWAY 74 INTERSECTION. PHYSICAL DESCRIPTION: CONSTRUCT APPROXIMATELY 1,700 LINEAR FEET OF NEW STREET TO STANDARD 30 -FOOT WIDTH WITH CURBS AND GUTTERS, ANCILLARY STORMWATER FACILITIES, AND SIDEWALK. UNIT OF WORK: DESIGN AND CONSTRUCT (RIGHT-OF-WAY EXISTS) JUSTIFICATION: COMPLETION OF NEW HIGHWAY 74 AND THE SIGNALIZED INTERSECTION AT WEST END BOULEVARD PROVIDES AN OPPORTUNITY TO IMPROVE ACCESS FOR THE AREA WEST OF WEST END AND NORTH OF NEW 74 AND FOR JEFFERSON SCHOOL. THE STREET WILL ALSO PROVIDE ACCESS TO THE PART OF SHAWNEE PARK NORTH OF HIGHWAY 74 ALLOWING ITS DEVELOPMENT IN THE FUTURE. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 421,200 MOTOR FUEL TAX (E) $ 421,200 TOTAL NOTE: THIS PROJECT WILL BE COMPLETED IN PHASES. THE FIRST PHASE WILL BE THE PORTION OF COLLEGE STREET BETWEEN MINNESOTA AVENUE AND MISSOURI AVENUE, AND MISSOURI AVENUE, BETWEEN COLLEGE STREET AND JEFFERSON AVENUE, AND IS SCHEDULED FOR FY99-00. THE SECOND PHASE WILL BE THE PORTION OF COLLEGE STREET BETWEEN MISSOURI AVENUE AND WEST END BOULEVARD, AND IS SCHEDULED FOR FY00-01. 1-28 33 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: SIDEWALK ALONG PERRYVILLE ROAD, AVENUE TO CAPE ROCK DRIVE LOCATION: PERRYVILLE ROAD, FROM JUST NORTH OF LEXINGTON AVENUE TO THE CAPE ROCK DRIVE INTERSECTION PURPOSE: TO PROVIDE A PEDESTRIAN SIDEWALK ON PERRYVILLE ROAD THAT WILL CONNECT TO THE SIDEWALK BEING BUILT AS PART OF THE PERRYVILLE ROAD PHASE I PROJECT. PHYSICAL DESCRIPTION: APPROXIMATELY 4,600 LINEAR FEET OF SIDEWALK 4 - FEET IN WIDTH UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO ALLOW THE REMOVAL OF PEDESTRIAN TRAFFIC FROM THE STREET AND TIE IN WITH PROPOSED LEXINGTON SIDEWALK AND THEREBY CONNECT TO THE CAPE LA CROIX TRAIL, ALSO PROVIDING PEDESTRIAN ACCESS FROM SUBDIVISIONS ALONG PERRYVILLE ROAD TO CHEROKEE PARK AND OSAGE PARK. IMPACT ON OPERATING BUDGET: FINANCING: 1-29 NO SIGNIFICANT IMPACT $ 136,100 MOTOR FUEL TAX (E) $ 136,100 TOTAL 34 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: SIDEWALK ALONG LEXINGTON AVENUE, PERRYVILLE ROAD TO CAPE LA CROIX ROAD LOCATION: LEXINGTON AVENUE, FROM PERRYVILLE ROAD TO CAPE LA CROIX ROAD PURPOSE: TO PROVIDE A PEDESTRIAN SIDEWALK ON LEXINGTON AVENUE THAT WILL CONNECT THE PERRYVILLE ROAD SIDEWALK WITH THE CAPE LA CROIX TRAIL. PHYSICAL DESCRIPTION: APPROXIMATELY 6,200 LINEAR FEET OF SIDEWALK 4 - FEET IN WIDTH. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO ALLOW THE REMOVAL OF PEDESTRIAN TRAFFIC FROM THE STREET AND TIE IN WITH THE PERRYVILLE ROAD SIDEWALK AND THE CAPE LA CROIX TRAIL, ALSO PROVIDING PEDESTRIAN ACCESS FROM SUBDIVISIONS ALONG LEXINGTON AVENUE TO OSAGE PARK AND CHEROKEE PARK. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 138,300 MOTOR FUEL TAX (E) $ 138,300 TOTAL 1-30 35 1-31 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: WEST END BOULEVARD, BLOOMFIELD STREET SOUTH TO SHAWNEE PARKWAY (NEW HIGHWAY 74) LOCATION: WEST END BOULEVARD, BLOOMFIELD STREET SOUTH TO SHAWNEE PARKWAY PURPOSE: WIDEN AND RECONSTRUCT NARROW SECTION OF WEST END BOULEVARD TO IMPROVE ACCESS FROM SHAWNEE PARKWAY TO WILLIAM STREET. PHYSICAL DESCRIPTION: WIDEN APPROXIMATELY 1,400 LINEAR FEET OF STREET FROM 36 FEET TO 44 FEET IN WIDTH, CONSTRUCT 6 -FOOT TO 10 -FOOT PARKWAY WHERE FEASIBLE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: WEST END BOULEVARD IS THE ONLY ACCESS POINT FROM NEW HIGHWAY 74 INTO THE EAST -CENTRAL PART OF THE CITY, AND A PRINCIPAL ACCESS ROUTE TO THE UNIVERSITY AND NEEDS TO BE IMPROVED TO HANDLE INCREASED TRAFFIC LOAD. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 295,400 MOTOR FUEL TAX (E) $ 295,400 TOTAL 36 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: CLARK STREET, MARIETTA SOUTH TO VICTORIAN ESTATES LOCATION: MARIETTA STREET SOUTH TO NORTH EDGE OF VICTORIAN ESTATES SUBDIVISION PURPOSE: UPGRADE EXISTING STREET TO PROVIDE PROPER CONNECTION OF CLARK BETWEEN MARIETTA STREET AND LOMBARDO DRIVE. PHYSICAL DESCRIPTION: RECONSTRUCT AND CONSTRUCT APPROXIMATELY 700 LINEAR FEET TO STANDARD 30 -FOOT WIDTH. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: IF VICTORIAN ESTATES SUBDIVISION IS DEVELOPED, THIS SECTION OF CLARK STREET THROUGH THE SUBDIVISION AND CONNECTING TO LOMBARDO WILL BE CONSTRUCTED. THIS PROJECT WILL PROVIDE FOR THE CONNECTION OF THE NEW SECTION OF STREET NORTH TO MARIETTA. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 116,200 MOTOR FUEL TAX (E) $ 116,200 TOTAL 1-32 37 TRANSPORTATION AND PUBLIC WORKS I PROJECT TITLE: AIRPORT HANGAR DOOR - EAST SIDE OF AIR EVAC LOCATION: REGIONAL AIRPORT - AIR EVAC AVIATION PURPOSE: REPLACE OLD ROLL -UP DOOR ON EAST SIDE OF HANGAR. REPLACEMENT OF THIS DOOR WOULD COMPLETE HANGAR REPLACEMENT DOOR PROJECT SINCE WEST DOOR WAS REPLACED IN 1997. PHYSICAL DESCRIPTION: MOTORIZED ALUMINUM BI -FOLD HANGAR DOOR UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: CURRENT ROLL -UP DOOR PROVIDES CONTINUAL MAINTENANCE REPAIR PROBLEMS AND IS NOT AT ALL AIR TIGHT, CAUSING TREMENDOUS UTILITY LOSS. IMPACT ON IN THE LONG TERM WILL REDUCE OUR MAINTENANCE OPERATING BUDGET: REPAIR COSTS WHICH WE HAVE INCURRED DUE TO CONTINUAL PROBLEMS WITH THE OLD ROLL -UP DOORS. THE NEW DOORS WILL ALSO REDUCE OUR LIABILITY RISK DUE TO INCREASED STRENGTH AND WIND RESISTANCE MAKING THEM LESS LIKELY TO COLLAPSE. ADDITIONALLY THE NEW DOORS WILL LOWER UTILITY COSTS FOR HEATING. FINANCING: 1-33 $ 35,700 GENERAL REVENUE (A) $ 35,700 TOTAL TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT EMERGENCY POWER BACK-UP FOR RUNWAY 10/28 LOCATION: REGIONAL AIRPORT PURPOSE: PROVIDE EMERGENCY POWER BACK-UP FOR RUNWAY 10/28 LIGHTING SYSTEM IN CASE OF POWER FAILURE PHYSICAL DESCRIPTION: EMERGENCY POWER GENERATOR UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: CURRENTLY THERE IS NO WAY TO PROVIDE BACK-UP LIGHTING FOR THE AIRFIELD IN THE EVENT OF A POWER OUTAGE. CURRENT POWER TO MAIN RUNWAY IS A COMMERCIAL POWER SOURCE SUBJECT TO POWER OUTAGES DURING STORMS. EMERGENCY OPERATIONS PLANS FOR DISASTER RELIEF REQUIRE THE AIRPORT TO HAVE A RELIABLE POWER SOURCE. RECOMMENDED BY THE DISASTER RESISTANCE COMMUNITY PROJECT IMPACT STEERING COMMITTEE. IMPACT ON MINOR INCREASES IN OPERATIONAL COSTS FOR FUEL, OPERATING BUDGET: MAINTENANCE, ETC. FINANCING: $ 4,800 GENERAL REVENUE (A) $ 43,200 FEDERAL GRANTS/LOANS (F) $ 48,000 TOTAL 1-34 39 1-35 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT MAINTENANCE/SNOW REMOVAL EQUIPMENT/ ARFF BUILDING LOCATION: REGIONAL AIRPORT PURPOSE: TO ALLOW DIRECT AIRSIDE ACCESS TO THE AIRPORT BY AIRPORT MAINTENANCE VEHICLES, TO CREATE DIRELY NEEDED STORAGE SPACE FOR CITY EQUIPMENT, TOOLS AND SUPPLIES. THIS WOULD ALSO HOUSE THE INITIAL RESPONSE AIRCRAFT RESCUE AND FIREFIGHTING (ARFF) VEHICLE ALLOWING DIRECT AIRSIDE ACCESS. PHYSICAL DESCRIPTION: CONSTRUCT A 30 FOOT BY 50 FOOT POLE BARN TYPE UTILITY BUILDING TO HOUSE INITIAL RESPONSE ARFF UNIT, AND MAINTENANCE AND CREW FACILITIES. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: DIRECT AIRSIDE ACCESS TO THE AIRPORT IS AN IMPORTANT NEED FOR MAINTAINING AIRPORT GROUNDS. PROJECTED INCREASES IN AIRCRAFT PASSENGER LOADS AND AIRCRAFT TYPES WILL REQUIRE UPGRADING FOR FAA -MANDATED RESPONSE TIMES AND LOCATION OF FIRE FIGHTING EQUIPMENT. IMPACT ON INCREASED OPERATING AND MAINTENACE COSTS OPERATING BUDGET: FINANCING: $ 7,500 GENERAL REVENUE (A) $ 67,500 FEDERAL GRANTS/LOANS (F) $ 75,000 TOTAL .E I TRANSPORTATION AND PUBLIC WORKS I ROJECT TITLE: AIRPORT T -HANGAR RAMP REPLACEMENT LOCATION: AIR EVAC T -HANGARS, REGIONAL AIRPORT PURPOSE: INSTALLATION OF PAVEMENT BASE AND REPLACEMENT OF ASPHALT SURFACES. FULL RECONSTRUCTION OF EXISTING PAVEMENT. PAVEMENT WAS EVIDENTLY LAID AS TEMPORARY PAVEMENT OVER 40 YEARS AGO. SUB- BASE IS INADEQUATE FOR TRAFFIC USING IT. PHYSICAL DESCRIPTION: REMOVE AND REPLACE APPROXIMATELY 7,430 SQUARE YARDS OF ASPHALT RAMP AREA. REPLACEMENT WILL INCLUDE INSTALLATION OF APPROPRIATE AND ADEQUATE SUB -BASE TO PREVENT SIMILAR DETERIORATION IN THE FUTURE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING ASPHALT RAMP IS DETERIORATING AT A RAPID PACE. PAVEMENT IS DISPLAYING EXTREME CRACKING WHICH USUALLY INDICATES SEVERE BASE FAILURE. DETERIORATION WILL CONTINUE UNTIL AN OVERLAY CAN BE ACCOMPLISHED. PAVEMENT IS NEARING A POINT THAT SAFETY WILL BECOME A REAL CONCERN. EXISTING PAVEMENT MAY BECOME UNUSABLE WITHIN 3 TO 5 YEARS. IMPACT ON IN THE SHORT TERM, IT WILL REDUCE MAINTENANCE OPERATING BUDGET: COSTS OF CONTINUALLY REPAIRING DETERIORATED PAVEMENT. WILL REDUCE LABOR AND EQUIPMENT COSTS REQUIRED TO CLEAR POTENTIALLY DANGEROUS DEBRIS FROM PAVEMENT AND ELIMINATE POTENTIAL LEGAL PROBLEMS AND COSTS FROM DAMAGE OR INJURY CAUSED BY LOOSE DEBRIS. FINANCING: $ 84,700 GENERAL REVENUE (A) $ 339,000 STATE GRANTS/LOANS (D) $ 423,700 TOTAL 1-36 41 1-37 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT T -HANGAR AND ASSOCIATED TAXIWAYS LOCATION: REGIONAL AIRPORT PURPOSE: TO MEET A NEED FOR ADDITIONAL HANGAR SPACE AT THE AIRPORT. PHYSICAL DESCRIPTION: ALL METAL, 10 -UNIT, 48 -FOOT WIDE STALLS, DOUBLE NESTED T -HANGAR STRUCTURE, WITH OVERHEAD BI - FOLD DOORS WITH ELECTRICALLY OPERATED WINCH OPENERS. UNIT OF WORK DESIGN AND CONSTRUCT JUSTIFICATION: ALL AVAILABLE HANGAR SPACE IS FILLED, WITH A WAITING LIST OF POTENTIAL USERS. ADDITIONAL HANGAR SPACE WILL ATTRACT MORE AIRCRAFT TO BASE AT THE AIRPORT. IMPACT ON INCREASED OPERATING AND MAINTENANCE COSTS OPERATING BUDGET: OFFSET BY REVENUE GENERATED BY UNIT RENTAL. FINANCING: $ 397,700 GENERAL FUND (A) $ 4,400 STATE GRANTS/LOANS (D) $ 402,100 TOTAL 42 I TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT LAND ACQUISITION LOCATION: REGIONAL AIRPORT PURPOSE: TO PURCHASE PROPERTY, IN ACCORDANCE WITH THE AIRPORT'S MARKETING PLAN, NECESSARY TO PROVIDE AIRPORT COMMERCIAL AND INDUSTRIAL PARK FACILITIES INCLUDING PROPERTY NECESSARY FOR INGRESS AND EGRESS FROM AIRPORT ROAD PHYSICAL DESCRIPTION: APPROXIMATELY 40 - 45 ACRES OF PROEPRTY CONTIGUOUS TO THE AIRPORT UNIT OF WORK: PURCAHSE PROPERTY JUSTIFICATION: THERE IS A NEED FOR COMMERCIAL AND INDUSTRIAL PROPERTY WITH INFRASTRUCTURE AND FACILITIES TO ENTICE AVIATION RELATED BUSINESSES TO LOCATE ON AIRPORT PROPERTY. IMPACT ON THE ADDITIONAL IMPACT ON OPERATION EXPENSES FOR OPERATING BUDGET: MOWING AND UPKEEP SHOULD BE WELL OFFSET IN THE LONG TERM BY AGRICULTURAL AND INDUSTRIAL LEASING REVENUES. FINANCING: $ 51,600 GENERAL REVENUE (A) $ 464,400 FEDERAL GRANTS/LOANS (F) $ 516,000 TOTAL 1-38 43 1-39 TRANSPORTATION AND PUBLIC WORKS I PROJECT TITLE: AIRPORT TAXIWAY EXTENSION FOR RUNWAY 02/20 LOCATION: REGIONAL AIRPORT PURPOSE: EXTEND PARALLEL TAXIWAY TO ENTIRE LENGTH OF RUNWAY 02/20 PHYSICAL DESCRIPTION: CONSTRUCT 78,000 SQUARE FEET OF PARALLEL TAXIWAY NORTH FROM TAXIWAY "A" TO NORTH END OF RUNWAY 02/20 AT TAXIWAY "F" UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: ELIMINATE CONGESTION OF AIRCRAFT ARRIVING ON RUNWAY 02 TAXIING THROUGH TERMINAL RAMP VIA TAXIWAY "E" TO GET TO GENERAL AVIATION APRON. IMPACT ON INCREASED MAINTENANCE COST FOR SNOW AND ICE OPERATING BUDGET: REMOVAL. FINANCING: $ 82,600 GENERAL REVENUE (A) $ 1,568,000 FEDERAL GRANTS/LOANS (F) $ 1,650,600 TOTAL 44 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT RUNWAY 02/20 CABLE AND LIGHTING LOCATION: REGIONAL AIRPORT PURPOSE: RE -CABLE RUNWAY 02/20 EDGE AND THRESHOLD LIGHTS PHYSICAL DESCRIPTION: REPLACE AND REWIRE ALL EXISTING LIGHT FIXTURES, TRANSFORMERS, AND WIRING FOR RUNWAY 02/20 UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING CABLES ARE OVER 40 YEARS OLD AND SUBJECT TO FREQUENT POWER OUTAGES AND REPAIR. IMPACT ON MAINTENANCE COSTS FOR FREQUENT REPAIRS WILL BE OPERATING BUDGET: REDUCED. FINANCING: $ 5,400 GENERAL REVENUE (A) $ 101,000 FEDERAL GRANTS/LOANS (F) $ 106,400 TOTAL 1-40 45 1-41 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT AIRCRAFT RESCUE AND FIRE FIGHTING BUILDING (ARFF) LOCATION: REGIONAL AIRPORT PURPOSE: PROVIDE ON-SITE LOCATION FOR HOUSING OF AIRCRAFT RESCUE AND FIRE FIGHTING VEHICLE PHYSICAL DESCRIPTION: CONSTRUCT ARFF BUILDING TO HOUSE ARFF VEHICLE AND MAINTENANCE AND CREW FACILITIES UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: PROJECTED INCREASES IN AIRCRAFT PASSENGER LOADS AND AIRCRAFT TYPES WILL REQUIRE UPGRADING FOR FAA -MANDATED RESPONSE TIMES AND LOCATION OF FIRE FIGHTING EQUIPMENT. IMPACT ON INCREASED OPERATING AND MAINTENANCE COSTS OPERATING BUDGET: FINANCING: $ 13,300 GENERAL REVENUE (A) $ 252,800 FEDERAL GRANTS/LOANS (F) $ 266,100 TOTAL 46 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT TAXIWAY EXTENSION FOR T' HANGARS LOCATION: REGIONAL AIRPORT PURPOSE: EXTEND T' HANGAR TAXIWAY TO CONNECT TO EXISTING TAXIWAYS PHYSICAL DESCRIPTION: CONSTRUCT 38,000 SQUARE FEET OF TAXIWAY ON SOUTH SIDE OF CITY T' HANGARS WEST TO CONNECT TO TAXIWAY "E" AND BEYOND TO PROPOSED PARALLEL TAXIWAY FOR RUNWAY 02/20 UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING TAXIWAY (ACTUAL ROAD ACCESS) AT NORTHEAST END OF TERMINAL RAMP IS ONLY EXIT FOR CAPE CENTRAL AIRWAYS `T' HANGAR RESULTING IN AIRCRAFT TRAFFIC CONFLICTS. IMPACT ON INCREASED MAINTENANCE FOR SNOW AND ICE OPERATING BUDGET: REMOVAL FINANCING: $ 24,800 GENERAL REVENUE (A) $ 470,500 FEDERAL GRANTS/LOANS (F) $ 495,300 TOTAL 1-42 47 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS PARTIAL ROOF REPLACEMENT LOCATION: PUBLIC WORKS FACILITY, NORTH KINGSHIGHWAY PURPOSE: REPLACE APPROXIMATELY 3,000 SQUARE FEET OF ROOF ON ONE SECTION OF OUR MAIN BUILDING EACH YEAR UNTIL ALL AREAS HAVE BEEN REPLACED PHYSICAL DESCRIPTION: 3,000 SQUARE FEET OF RUBBER ROOF UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: THE MAIN BUILDING HAS ELEVEN DIFFERENT ROOF AREAS. THEY ARE ALL IN VARIOUS STAGES OF AGING AND LEVELS OF USEFUL LIFE. FUNDS ARE REQUESTED FOR THE NEXT FOUR YEARS IN ORDER TO CONTINUE REPLACEMENT PROGRAM. IMPACT ON OPERATING BUDGET: FINANCING: 1-43 NO SIGNIFICANT IMPACT $ 90,000 OTHER (1) $ 90,000 TOTAL W-1 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS STRUCTURAL REINFORCEMENT - RETROFIT BUILDING LOCATION: PUBLIC WORKS FACILITY, NORTH KINGSHIGHWAY PURPOSE: RETROFIT UN -REINFORCED MASONRY BUILDING WITH STEEL REINFORCING STRUCTURE PHYSICAL DESCRIPTION: SOILS AND STRUCTURAL ENGINEERING STUDY. INSTALL FOOTINGS AND STEEL COLUMNS AND FRAME WORK WITHIN EXISTING BUILDING. UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: TO REINFORCE WEAK POINTS OF STRUCTURE TO PREVENT COLLAPSE IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 204,000 OTHER (1) $ 204,000 TOTAL 1-44 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS FUEL ISLAND CANOPY LOCATION: PUBLIC WORKS FACILITY, NORTH KINGSHIGHWAY PURPOSE: PROVIDE WEATHER PROTECTION WHILE FUELING VEHICLES AND EQUIPMENT DURING INCLEMENT WEATHER PHYSICAL DESCRIPTION: FREE STANDING CANOPY APPROXIMATELY 24 FEET BY 50 FEET UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: FUELING OPERATIONS DURING RAIN AND SNOW SUBJECT DRIVER/OPERATOR TO WET CONDITIONS; INCREASES RISK OF FUEL CONTAMINATION AND FROZEN PUMP CONTROLS IMPACT ON OPERATING BUDGET: FINANCING: 1-45 NO SIGNIFICANT IMPACT $ 30,600 OTHER (1) $ 30,600 TOTAL 50 11 TRANSPORTATION AND PUBLIC WORKS N PROJECT TITLE: PUBLIC WORKS FACILITY LOCATION: NORTH KINGSHIGHWAY/NORTH BROADVIEW STREET PURPOSE: PROVIDE PROPERTY, A PRELIMINARY AND FINAL DESIGN, AND CONSTRUCTION FOR A NEW PUBLIC WORKS FACILITY. PHYSICAL DESCRIPTION: PURCHASE A MINIMUM OF 10 ACRES OF PROPERTY, RETAIN PROFESSIONAL SERVICES TO DEVELOP FACILITY PLAN AND BUDGET PROGRAM. DESIGN AND CONSTRUCT BUILDING WITH APPROXIMATELY 73,000 SQUARE FEET, INCLUDING OFFICE AREA, MAINTENANCE SHOPS AND HEATED EQUIPMENT STORAGE AREA. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING FACILITY PROPERTY NOW CONSISTS OF ONLY 7 ACRES. COMMERCIAL DEVELOPMENT ON KINGSHIGHIWAY IS RESULTING IN GROWING TRAFFIC CONGESTION AND MORE TRAFFIC CONFLICTS. VIRTUALLY ALL OPEN SPACE HAS BEEN UTILIZED WITHIN THE SITE AND INTERNAL SPACE CONGESTION HAS ALSO BECOME A PROBLEM. EXISTING MAIN BUILIDNG HAS MULTIPLE ROOF LEAKS; HAS SEVERAL AREAS OF MINOR AND MAJOR MASONRY JOINT CRACKING AND DISPLACEMENT; DOES NOT HAVE ADEQUATE NOR EFFICIENT HVAC SYSTEMS; ELECTRICAL SYSTEMS ARE PATCHED TOGETHER, OUTDATED AND NOT EASILY CONTROLLED; LAYOUT OF BUILDING IS NOT FUNCTIONAL; OFFICE IS NOT ADA ACCESSIBLE; SHOPS ARE SPREAD OUT AND NOT VERY WORKABLE; SHOP ROOF HEIGHTS DO NOT ALLOW FOR INSIDE HOISTS. IMPACT ON SOME SAVINGS WILL BE ATTRIBUTABLE TO IMPROVED OPERATING BUDGET: WORK AND ENERGY EFFICIENCY, BUT IS NOT QUANTIFIABLE. FINANCING: $ 3,417,000 OTHER (1) $ 3,417,000 TOTAL 1-46 51 1-47 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS CHEMICAL MATERIAL STORAGE LOCATION: PUBLIC WORKS FACILITY, NORTH KINGSHIGHWAY PURPOSE: TO PROVIDE SEGREGATED STORAGE FACILITIES FOR CHEMICAL MATERIALS, SUCH AS PESTICIDES AND HERBICIDES PHYSICAL DESCRIPTION: SELF CONTAINED, PRE -FABRICATED, WEATHERPROOF, FIRE -RATED BUILDING UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: SECTION 5.12 OF THE CITY SAFETY MANUAL REQUIRES THAT CHEMICALS BE STORED PROPERLY. EXISTING STORAGE DOES NOT MEET THESE REQUIREMENTS. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 12,300 OTHER (1) $ 12,300 TOTAL 52 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS EQUIPMENT STORAGE SHEDS LOCATION: PUBLIC WORKS FACILITY, NORTH KINGSHIGHWAY PURPOSE: TO KEEP EQUIPMENT UNDER COVER, PROTECTED FROM THE WEATHER AND VANDALISM PHYSICAL DESCRIPTION: TWO MACHINE SHED TYPE BUILDINGS, APPROXIMATELY 160 FEET BY 30 FEET UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: VEHICLES AND EQUIPMENT WHICH ARE STORED OUTSIDE EXPOSED TO WEATHER DETERIORATE FASTER AND ARE SUSCEPTIBLE TO MORE MECHANICAL PROBLEMS; SNOW AND ICE CAUSE DELAYS WHILE EQUIPMENT IS THAWING AND WARMING UP; EXPOSED EQUIPMENT IS SUSCEPTIBLE TO VANDALISM. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 75,000 OTHER (1) $ 75,000 TOTAL 53 1-48 This page intentionally left blank. 54 ENVIRONMENT CAPITAL IMPROVEMENTS PROGRAM 1999-00 FISCAL 2000-01 FISCAL 2001-02 FISCAL 2002-03 FISCAL 2003-04 FISCAL YEAR YEAR YEAR YEAR YEAR 55 ENVIRONMENT PROPOSED PROJECTS PROJECT IMPROVEMENT TOTAL 1999-00 2000-01 2001-02 2002-03 2003-04 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL YEAR YEAR YEAR YEAR YEAR 2-1 Cape La Croix Creek/Walker 1,228,000 1,228,000 Branch Flood Control Project B B (Walker Branch III - Detention Reservoir) 2-2 Upper Cape La Croix - 1,047,600 1,047,600 Detention Trunk Sewer B,D,F B,D,F SUBTOTAL -CORPS 2,275,600 2,275,600 - - PROJECT 1 r 2 3 �i Mississippi River Lift Stations5,500,000 5,500,000 Replacement -Renovation B B 24" Sloan Creek Relief/Extension 3,400,000 3,400,000 Sewer C C x Y 2 5 South Ramsey Branch Lift 1,200,000 1,200,000 s�f Station/Extension Sewer C C 2-6 Clark Avenue Relief Sewer 271,600 271,600 B B 2-7 Meadowbrook Sewer District 93,200 93,200 G G 2-8 Lakeshore Drive Sewer 130,300 130,300 District G G 2-9 Wastewater System SCADA 75,000 30,000 30,000 15,000 Upgrade I I 1 1 2-10 Wastewater Standby Power at 212,800 31,000 91,800 31,000 59,000 Seven (7) Lift Stations I I I I I 2-11 Wastewater Standby Power 250,000 250,000 Generator 10 1 2-12 Wastewater Plant Trickling 1,200,000 1,200,000 Filter Rehabilitation C C 2-13 Replacement of South Screw 110,000 110,000 Pump at Wastewater Plant I I 2-14 Replacement of North Screw 110,000 110,000 Pump at Wastewater Plant I I A GENERAL REVENUE FUND B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTSILOANS E MOTOR FUEL TAX F FEDERAL GRANTSILOANS G SPECIAL ASSESSMENTS H CAPITAL IMPROVEMENT SALES TAX OTHER J GEN. OBLIGATION BONDS: PENDING K TRANSPORTATION SALES TAX Projects included in Sewer Revenue Bond Issue supported by a'/,% capital improvement sales tax extension for 20 years approved by vote on April 5, 1994. • Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. REO ENVIRONMENT PROPOSED PROJECTS PROJECT IMPROVEMENT TOTAL 1999-00 2000-01 2001-02 2002-03 2003-04 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL YEAR YEAR YEAR YEAR YEAR 2-15 Sanitary Sewer Rehab. Of 300,000 100,000 100,000 100,000 75,000 79,000 Red Star Area F F F F I I 2-16 Sanitary Sewer Rehabilitation 100,000 100,000 67,125 67,125 150,000 and Relining F F B B I 2-17 Sanitary Sewer Infiltration/ 45,000 45,000 A GENERAL REVENUE FUND Inflow Analysis & Elimination F F B REV/PFA BONDS: ISSUED by Watershed C REV/PFA BONDS: PENDING D STATE GRANTSILOANS 2-18 Replacement of Sludge 26,000 E MOTOR FUEL TAX 26,000 Thickener Turntable 1 G SPECIAL ASSESSMENTS 1 2-19 South Kingshighway/ 129,800 129,800 I OTHER Technology Park Sewer G G J GEN. OBLIGATION BONDS: PENDING District K TRANSPORTATION SALES TAX SUBTOTAL -SEWER 13,153.700 12,480,900 331,800 256,000 85,000 PROJECTS 2-20 Solid Waste Machine Storage 65,000 65,000 Building 1 1 2-21 Recycling Drop -Off Facility 120,000 120,000 F,I F.1 2-22 Transfer Station Renovations 150,000 I 150,000 I SUBTOTAL - SOLID WASTE 335,000 335,000 PROJECTS 1 V, Water Distribution 369,000 65,000 75,000 75,000 75,000 79,000 M,� Improvement Program B,I B B B I I 4 Water Development/Main 379,000 75,000 75,000 75,000 75,000 79,000 Extensions B,I B B B I I ft,5 Water Storage Tank 351,375 67,125 67,125 67,125 150,000 I wo-mcn water main/ bervlce u10,000 l ia,000 11 0,UUU l 10,000 110,000 7 10,000 Replacement Program B,I B B B I I Projects totally or partially included in Water Revenue Bond Issue supported by a '/.% capital improvement sales tax extension for 20 years approved by vote on November 5, 1996. 57 Replacement (Contract B,I B B B M,� Program) 2-27 Water Meter Replacement 255,000 50,000 50,000 50,000 50,000 55,000 Program I I I I I I ft,5 Water Storage Tank 351,375 67,125 67,125 67,125 150,000 Rehabilitation (Eight Tanks) B,I B B B I A GENERAL REVENUE FUND B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTSILOANS E MOTOR FUEL TAX F FEDERAL GRANTS/LOANS G SPECIAL ASSESSMENTS H CAPITAL IMPROVEMENT SALES TAX I OTHER J GEN. OBLIGATION BONDS: PENDING K TRANSPORTATION SALES TAX Projects totally or partially included in Water Revenue Bond Issue supported by a '/.% capital improvement sales tax extension for 20 years approved by vote on November 5, 1996. 57 ENVIRONMENT PROPOSED PROJECTS PROJECT IMPROVEMENT TOTAL 1999-00 2000-01 2001-02 2002-03 2003-04 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL YEAR YEAR YEAR YEAR YEAR 2-29y°' Water System Seismic 856,800 214,200 214,200 214,200 214,200 Protection F• F F F F Expand and Rehab Cape 13,881,000 8,995,000 4,886,000 Rock Water Plant No. 1 and B B B F Construct Alluvial Well Field 2»31 Water Pumping StationNault 103,400 103,400 Retrofit B B 2 32 Lexington/Melody Lane Water 168,500 168,500 Extension G G �2 33 North Sprigg Water Extension 151,200 151,200 3 B,G B,G 2;34 Water Plant No. 2 Sludge 151,300 151,300 System B B >f2-35 Mt. Auburn Corridor Water 904,200 904,200 �-A R Dist. Main Augmentation B B i -RIZ -3 =° Elevated Water Storage Tank 237,300 237,300 r B B 20 -Inch Main Project (East 723,300 723,300 f Cape Rock Drive) B B 2-38 16 -Inch Main Project (Bertling 672,100 672,100 x Street) --9 , Fire Hydrant Replacement 400,000 100,000 100,000 100,000 100,000 ,. B,1 B B B 2-40 Mt. Aubum/Siemers Main 600,000 600,000 Upgrade (Proposed North C C Loop) 2-41 South Plant -Nash Road 635,900 635,900 Potable Water Main C,D C.D 2-42 Emergency Generator 80,000 80,000 Installations 1 1 2-43 Residual Storage & Disposal 4,038,000 4,038,000 Cape Rock Water Plant # 1 C C 2-44 Route K Pumping Station 204,000 I 204,000 I SUBTOTAL - WATER 26,936,375 14,360,225 6,104,625 981,325 914,200 4,576,000 PROJECTS A GENERAL REVENUE FUND B REV/PFA BONDS: ISSUED C REVIPFA BONDS: PENDING D STATE GRANTSILOANS E MOTOR FUEL TAX F FEDERAL GRANTS/LOANS G SPECIAL ASSESSMENTS H CAPITAL IMPROVEMENT SALES TAX I OTHER J GEN. OBLIGATION BONDS: PENDING K TRANSPORTATION SALES TAX Projects totally or partially included in Water Revenue Bond Issue supported by a %% capital improvement sales tax extension for 20 years approved by vote on November 5, 1996. • Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. ENVIRONMENT PROPOSED PROJECTS PROJECT IMPROVEMENT TOTAL 1999-00 2000-01 2001-02 2002-03 2003-04 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL YEAR YEAR YEAR YEAR YEAR 2-45 Kingshighway/Commercial 70,000 70,000 Channel Construction & Ditch H H Cleaning 2-46 Arena Creek Realignment 185,000 185,000 (Arena Park) H H 2-47 Stormwater Detention Basin 100,000 100,000 (Arena Creek Watershed) H H 2-48 Flood Warning System 140,000 35,000 35,000 35,000 35,000 He H H H H 2-49 Riverboat Tie -Off Structure 12,000 1 12,000 1 2-50 Cape Meadows Stormwater 120,000 120,000 Flume Construction 1 1 2-51 Stormwater Improvements at 20,400 20,400 Clark and New Madrid H H 2-52 "Ranchito" Watershed 1,209,900 14,000 213,000 982,900 Stormwater and Sanitary I 1 I I Sewer Project SUBTOTAL - STORMWATER 1,857,300 556,400 248,000 1,017,900 35,000 PROJECTS TOTALS 44,557,975 30,008,125 6,684,425 2,255,225 949,200 4,661,000 A GENERAL REVENUE FUND B REV/PFA BONDS: ISSUED 26,540,475 19,982,925 5,840,425 717,125 C REV/PFA BONDS: PENDING 10,573,900 6,535,900 4,038,000 D STATE GRANTS/LOANS 627,500 627,500 E MOTORFUELTAX F FEDERAL GRANTS/LOANS 1,618,100 775,500 314,200 314,200 214,200 G SPECIAL ASSESSMENTS 649,900 649,900 H CAPITAL IMPROVEMENT SALES TAX 515,400 410,400 35,000 35,000 35,000 1 OTHER 4,032,700 1,026,000 494,800 1,188,900 700,000 623,000 J GEN. OBLIGATION BONDS: PENDING K TRANSPORTATION SALES TAX Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. W ENVIRONMENT CAPE LA CROIX CREEK/WALKER BRANCH FLOOD CONTROL PROJECT LOCATION: CAPE LA CROIX CREEK AND WALKER BRANCH PURPOSE: TO REDUCE FLOODING IN PROJECT AREAS PHYSICAL DESCRIPTION: THREE MILES OF STREAM CHANNELIZATION; 157 -ACRE DETENTION FACILITY; PARK AND RECREATION FACILITIES UNIT OF WORK: ACQUIRE RIGHT-OF-WAY AND CONSTRUCT JUSTIFICATION: FLOODING IN THE CAPE LA CROIX CREEK/WALKER BRANCH WATERSHED HAS CAUSED SERIOUS DAMAGE TO PROPERTY AND ENDANGERED THE LIVES OF CAPE GIRARDEAU CITIZENS, AND THIS HAZARD WILL CONTINUE UNLESS MITIGATED. IMPACT ON ADDITIONAL PERSONNEL AND EQUIPMENT WILL BE OPERATING BUDGET: REQUIRED FOR MAINTENANCE OF THESE FACILITIES. FINANCING: $ 1,228,000 REVENUE/PFA BONDS: ISSUED (B) $ 1,228,000 TOTAL NOTE: INCLUDES REMAINING PORTION OF CITY'S COMMITMENT FOR WALKER BRANCH PROJECT (PHASE III) AND DETENTION RESERVOIR PROJECT ON LASALLE FORK OF CAPE LA CROIX CREEK. PROJECT SCHEDULES AND FUNDING COMMITMENTS ARE BEST ESTIMATES AS OF 1/99. 2-1 .E ENVIRONMENT PROJECT TITLE: UPPER CAPE LA CROIX - DETENTION TRUNK SEWER LOCATION: ROUTE W TO AND THROUGH CORPS OF ENGINEER'S PROJECT DETENTION AREA (LASALLE FORK OF CAPE LA CROIX CREEK) PURPOSE: TO EXTEND SEWER SERVICE TO NORTHWEST PART OF CITY AND ROUTE W MOBILE HOME PARK PHYSICAL DESCRIPTION: CONSTRUCTION OF APPROXIMATELY 1.9 MILES OF SANITARY TRUNK SEWER UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: WILL EXTEND SEWER SERVICE IN NORTHWEST PART OF CITY GROWTH AREA AND ELIMINATE SEWAGE LAGOONS AT THE ROUTE W MOBILE HOME PARK. IMPACT ON INCREASED DEPRECIATION EXPENSE, INCREASED OPERATING BUDGET: MAINTENANCE EXPENSE FINANCING: $ 703,800 REVENUE/PFA BONDS: ISSUED (B) $ 127,500 STATE GRANTS/LOANS (D) $ 216,300 FEDERAL GRANTS/LOANS (CORPS OF ENGINEERS) (F) $ 1,047,600 TOTAL 2-2 61 2-3 62 ENVIRONMENT PROJECT TITLE: MISSISSIPPI RIVER LIFT STATIONS/REPLACEMENT - RENOVATION LOCATION: ALONG MISSISSIPPI RIVER FROM SLOAN CREEK AREA TO FORT D PURPOSE: UPGRADE FOUR EXISTING LIFT STATIONS AND CONSTRUCT A NEW PRIMARY FORCE MAIN PHYSICAL DESCRIPTION: REPLACE/RENOVATE LIFT STATIONS 1, 2, 3, AND 4 AND CONSTRUCT APPROXIMATELY 8,200 FEET OF PARALLEL FORCE MAIN FROM MILL STREET TO GIBONEY STREET. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: EXISTING LIFT STATIONS ARE APPROACHING 30 YEARS OLD AND ARE OUTMODED IN TERMS OF STRUCTURAL INTEGRITY, CAPACITIES, AND AGE OF EQUIPMENT. THE FORCE MAIN IS NEEDED TO REDUCE FRICTION LOSSES AND IMPROVE CAPACITY. IMPACT ON INCREASED DEPRECIATION EXPENSE. SOME REDUCTION OPERATING BUDGET: IN OPERATING EXPENSE MAY BE ANTICIPATED. FINANCING: $ 5,500,000 REVENUE/PFA BONDS: ISSUED (B) $ 5,500,000 TOTAL 2-3 62 ENVIRON EK RELIEF/EXTENS LOCATION: SLOAN CREEK FROM NEAR MISSISSIPPI RIVER TO VICINITY OF LEXINGTON AVENUE PURPOSE: RELIEVE OVERLOADED EXISTING SEWERS AND PROVIDE FOR FUTURE GROWTH PHYSICAL DESCRIPTION: APPROXIMATELY 9,300 FEET OF 15 -INCH TO 24 -INCH RELIEF SEWER LINE AND APPROXIMATELY 5,600 FEET OF TRUNK SEWER EXTENSION. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: EXISTING TRUNK SEWER IS SURCHARGED AT PEAK FLOW. CONSTRUCTION OF RELIEF SEWER AND EXTENSION WILL PROVIDE SEWER SERVICE TO AN AREA PRESENTLY UNSERVED. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: $ 3,400,000 REVENUE/PFA BONDS: PENDING (C) $ 3,400,000 TOTAL 2-4 63 2-5 PROJECT TITLE: ENVIRONMENT SEWER SION I LOCATON: SOUTH RAMSEY BRANCH (INTERSTATE 55 - HIGHWAY 74 - MEADOWBROOK AREA) PURPOSE: PROVIDE SEWER SERVICE TO PREVIOUSLY UNSERVED AREA PHYSICAL DESCRIPTION: APPROXIMATELY 8,600 FEET OF GRAVITY AND FORCE MAIN SEWER WITH ONE LIFT STATION UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS AND CONSTRUCT JUSTIFICATION: WILL EXTEND SEWER SERVICE TO UNSERVED AREA AT FAR SOUTH END OF RAMSEY BRANCH. WILL RELIEVE EXISTING ENVIRONMENTAL PROBLEMS IN THIS AREA AND PROVIDE FOR ADDITIONAL DEVELOPMENT. IMPACT ON INCREASED DEPRECIATION AND OPERATIONAL EXPENSE OPERATING BUDGET: FINANCING: $ 1,200,000 REVENUE/PFA BONDS: PENDING (C) $ 1,200,000 TOTAL 64 ENVIRONMENT PROJECT TITLE: CLARK AVENUE RELIEF SEWER LOCATION: ADJACENT TO WALKER BRANCH FROM PERRYVILLE ROAD TO PARKSITE DRIVE PURPOSE: TO RELIEVE SURCHARGING ON THIS SECTION OF TRUNK SEWER LINE. PHYSICAL DESCRIPTION: APPROXIMATELY 2,500 FEET OF 15 -INCH DIAMETER SANITARY SEWER LINE UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: RELIEVE EXISTING OVERLOAD AND PERMIT COMPLETE DEVELOPMENT OF THE DRAINAGE BASIN. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: $ 271,600 REVENUE/PFA BONDS: ISSUED (B) $ 271,600 TOTAL 2-6 RE, PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: 2-7 ENVIRONMENT MEADOWBROOK SEWER DISTRICT HIGHWAY 74 AND MEADOWBROOK LANE AREA TO PROVIDE SEWER SERVICE TO MEADOWBROOK AREA LATERAL SANITARY SEWER LINES AND DISTRICT LIFT STATION DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT AREA CURRENTLY ON PRIVATE SEPTIC SYSTEMS INCREASED DEPRECIATION AND OPERATIONAL EXPENSE $ 93,200 SPECIAL ASSESSMENTS (G) $ 93,200 TOTAL ENVIRONMENT PROJECT TITLE: LAKESHORE DRIVE SEWER DISTRICT LOCATION: LAKESHORE DRIVE NEAR PERRYVILLE ROAD PURPOSE: PROVIDE SEWER SERVICE TO PREVIOUSLY UNSERVED AREA PHYSICAL DESCRIPTION: APPROXIMATELY 4,780 FEET OF SANITARY SEWER AND APPURTENANCES UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: REPLACEMENT OF SEPTIC SYSTEMS IN RESIDENTIAL AREA IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: $130,300 SPECIAL ASSESSMENTS (G) $ 130,300 TOTAL 2-8 67 ENVIRONMENT PROJECT TITLE: WASTEWATER SCADA SYSTEM UPGRADE LOCATION: ALL WASTEWATER LIFT STATIONS EXCEPT NUMBERS 1, 2, 3, AND 4 PURPOSE: TO MONITOR THE LIFT STATIONS PHYSICAL DESCRIPTION: A WIRELESS SYSTEM THAT INCLUDES THE MASTER CONTROLLER AT THE TREATMENT PLANT, AND REMOTE UNITS SUCH AS PLC'S AT EACH LIFT STATION. UNIT OF WORK: INSTALL MASTER CONTROLLER, PLC'S AND THE NETWORK OF ANTENNAS WHICH WOULD CONNECT THE SYSTEMS TOGETHER. JUSTIFICATION: ELIMINATION OF A TELEPHONE LINE CHARGE EACH MONTH. MORE RELIABLE SYSTEM OF MONITORING OVER THE PRESENT TELEPHONE LINES. MORE MONITORING CAPABILITIES AVAILABLE WITH SCADA. AS THE LIFT STATIONS IN THE CSO PROJECT ARE PLACED, WE WILL REQUIRE SCADA SYSTEMS TO BE INSTALLED (LIFT STATIONS NUMBERED ONE TO FOUR). IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 75,000 OTHER (OPERATIONS) (1) $ 75,000 TOTAL NOTE: SCADA- SUPERVISORY CONTROL AND DATA ACQUISITION 2-9 PROJECT TITLE: WASTEWATER STANDBY POWER AT SEVEN (7) LI STATIONS LOCATION: BOULDER CREST, STONEBRIDGE, AIRPORT, 1-55, CAPE ROCK, KINGSWAY, AND TWIN LAKES PURPOSE: TO PROVIDE BACK-UP POWER FOR LIFT STATION PUMPING IN CASE OF A POWER FAILURE PHYSICAL DESCRIPTION: GENERATORS, PADS, CONTROL PANELS, FENCE AND GATE, INSTALLATION OF EQUIPMENT UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: WE CURRENTLY BYPASS RAW SEWAGE AT THESE LOCATIONS DURING POWER FAILURES. THIS WILL NOT BE ALLOWED BY DNR IN THE NEAR FUTURE. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 212,800 OTHER (1) $ 212,800 TOTAL 2-10 ENVIRONMENT PROJECT TITLE: WASTEWATER STANDBY POWER GENERATOR LOCATION: WASTEWATER PLANT PURPOSE: TO PROVIDE ELECTRICITY TO THE TREATMENT PLANT OPERATIONS IN CASE OF AN AMEREN UE ELECTRIC POWER FAILURE PHYSICAL DESCRIPTION: 12.47 KV, 1100 KW DIESEL GENERATING STATION. 5,000 GALLON UNDERGROUND FUEL TANK AND PUMP WITH AUTOMATIC CONTROLS. INCLUDES AUTOMATIC SWITCH GEAR EQUIPMENT. DISASTER RESISTANT COMMUNITIES PROGRAM PROJECT. UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: NEED FOR A SECOND POWER SOURCE FOR THE PLANT. IN THE NEAR FUTURE, ANY BYPASS OF RAW SEWAGE INTO THE MISSISSIPPI RIVER WILL NOT BE PERMITTED. WE CURRENTLY BYPASS WHEN WE HAVE A POWER FAILURE. IMPACT ON OPERATING BUDGET: FINANCING: 2-11 NO SIGNIFICANT IMPACT $ 250,000 OTHER (1) $ 250,000 TOTAL 70 ENVIRONMENT PROJECT TITLE: WASTEWATER PLANT TRICKLING FILTER REHABILITATION LOCATION: WASTEWATER PLANT PURPOSE: TO REHABILITATE THE TRICKLING FILTER PHYSICAL DESCRIPTION: REPLACEMENT OF OXIDATION MEDIA. REPLACEMENT OF CORRUGATED FIBERGLASS WALL PANELS WITH WEATHER AND UV RESISTANT PANELS, REPLACEMENT AND/OR ADDITION OF SOME INTERIOR STRUCTURAL BEAMS WITH FIBERGLASS BEAMS, BASED ON A SEISMIC STUDY. ALSO THE REPAINTING OF THE STRUCTURAL STEEL. PROJECT SUBJECT TO ENGINEERING ASSESSMENT OF TRICKLING FILTER VERSUS DNR EFFLUENT LIMITATIONS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO IMPROVE AND BRING BACK UP TO FUNCTIONAL AND VISUAL STANDARDS, AS CAUSED BY WEAR AND TEAR DUE TO OPERATION, OTHER MAINTENANCE AND WEATHERING OVER THE PAST 22 YEARS. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 1,200,000 REVENUE/PFA BONDS: PENDING (C) $ 1,200,000 TOTAL 2-12 71 ENVIRONMENT PROJECT TITLE: REPLACEMENT OF SCREW PUMP (SOUTH) LOCATION: WASTEWATER PLANT PURPOSE: TO REPLACE THE SCREW PUMP THAT IS 22 YEARS OLD PHYSICAL DESCRIPTION: 6 -FOOT DIAMETER SPIRAL SCREW PUMP, 60 FEET LONG. ALSO WOULD INCLUDE BEARINGS, SEALS, ETC. UNIT OF WORK: INSTALLATION JUSTIFICATION: THE SCREW PUMPS IN PLACE NOW ARE GOING TO BE 22 YEARS OLD IN 1999. THE EDGES ARE STARTING TO WEAR DOWN AND THE PUMPS THEMSELVES HAVE BEEN SANDBLASTED AND RECOATED ONCE ALREADY. IMPACT ON OPERATING BUDGET: FINANCING: 2-13 NO SIGNIFICANT IMPACT $ 110,000 OTHER (I) $ 110,000 TOTAL 72 ENVIRONMENT PROJECT TITLE: REPLACEMENT OF SCREW PUMP (NORTH) LOCATION: WASTEWATER PLANT PURPOSE: TO REPLACE THE SCREW PUMP THAT IS 22 YEARS OLD PHYSICAL DESCRIPTION: 6 -FOOT DIAMETER SPIRAL SCREW PUMP, 60 FEET LONG. ALSO WOULD INCLUDE BEARINGS, SEALS, ETC. UNIT OF WORK: INSTALLATION JUSTIFICATION: THE SCREW PUMPS IN PLACE NOW ARE GOING TO BE 22 YEARS OLD IN 1999. THE EDGES ARE STARTING TO WEAR DOWN AND THE PUMPS THEMSELVES HAVE BEEN SANDBLASTED AND RECOATED ONCE ALREADY. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 110,000 OTHER (I) $ 110,000 TOTAL 73 2-14 ENVIRONMENT PROJECT TITLE: SANITARY SEWER REHAB OF RED STAR AREA LOCATION: RED STAR DISTRICT PURPOSE: TO PREVENT INFLOW AND INFILTRATION INTO THE SANITARY SEWER SYSTEM DURING FLOOD CONDITIONS PHYSICAL DESCRIPTION: RELINING SEWERS, RELINING MANHOLES, INSTALLING ABOVE FLOOD ELEVATION VENTS, SEALING MANHOLE LIDS, LATERAL LINE VALVES TO SHUT OFF FLOW DURING FLOOD EVENTS. DISASTER RESISTANT COMMUNITIES PROGRAM PROJECT. 2-15 UNIT OF WORK: PROJECT IDENTIFICATION AND IMPLEMENTATION AND REHABILITATION JUSTIFICATION: TO ENHANCE AND PROTECT THE SANITARY COLLECTION SYSTEM AND PREVENT EXCESS FLOW AT THE WASTEWATER TREATMENT PLANT IMPACT ON DECREASED OPERATING AND MAINTENANCE COSTS OPERATING BUDGET: FINANCING: $ 300,000 FEDERAL GRANTS/LOANS (F) $ 300,000 TOTAL 74 ENVIRONMENT PROJECT TITLE: SANITARY SEWER REHABILITATION AND RELINING LOCATION: SIX LOCATIONS IN CITY - TOTAL OF 1,810 FEET OF 8 -INCH LINE PURPOSE: REDUCE INFLOW AS WELL AS OUTFLOW OF THE SANITARY SEWERS PHYSICAL DESCRIPTION: RELINE 1,810 FEET OF 8 -INCH PIPE WITH INSITUFORM OR LIKE SYSTEM UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: HELP PREVENT SURCHARGING OF SANITARY SEWER LINES IMPACT ON DECREASED OPERATING AND MAINTENANCE COSTS OPERATING BUDGET: FINANCING: $ 100,000 FEDERAL GRANTS/LOANS (F) $ 100,000 TOTAL 2-16 75 2-17 ENVIRONMENT PROJECT TITLE: SANITARY SEWER INFILTRATION/INFLOW ANALYSIS AND ELIMINATION BY WATERSHED LOCATION: ARENA CREEK, WALKER BRANCH, RED STAR BRANCH WATERSHEDS PURPOSE: TO PURCHASE FLOW METERS AND NECESSARY MOUNTING RING EQUIPMENT TO MONITOR LINES FROM FOUR INCHES TO FIFTEEN INCHES. PREVENT INFLOW/ INFILTRATION AND LINE SURCHARGING. ONE OF THESE AREAS IS THE PEACH TREE AND RANCHITO AREA PHYSICAL DESCRIPTION: INITIATE I AND I ELIMINATION PROGRAM. DISASTER RESISTANT COMMUNITIES PROGRAM PROJECT. UNIT OF WORK: PURCHASE OF EQUIPMENT, OPERATION, AND I AND ELIMINATION JUSTIFICATION: PREVENT LINE SURCHARGING AND BASEMENT FLOODING IMPACT ON DECREASED OPERATING AND MAINTENANCE COSTS OPERATING BUDGET: FINANCING: $ 45,000 FEDERAL GRANTS/LOANS (F) $ 45,000 TOTAL 76 ENVIRONMENT PROJECT TITLE: REPLACEMENT OF SLUDGE THICKENER TURNTABLE LOCATION: WASTEWATER TREATMENT PLANT PURPOSE: TO REPLACE 22 YEAR OLD TURNTABLE THAT HAS HAD TWO MAJOR MECHANICAL FAILURES PHYSICAL DESCRIPTION: TURNTABLE ASSEMBLY, BEARINGS AND HARDWARE. THIS ASSEMBLY OPERATES CONTINUOUSLY. UNIT OF WORK: REMOVAL AND REPLACEMENT OF ASSEMBLY JUSTIFICATION: TURNTABLE ASSEMBLY IS 22 YEARS OLD WITH TWO MECHANICAL FAILURES. WHEN THE LAST FAILURE OCCURRED, THE UNIT WAS DOWN FOR 6 MONTHS. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 26,000 OTHER (1) $ 26,000 TOTAL 2-18 77 2-19 PROJECT TITLE: SOUTH KINGSHIGHWAY/TECHNOLOGY PARK SEWER DISTRICT LOCATION: SOUTH KINGSHIGHWAY, SOUTHERN EXPRESSWAY AREA/ UNIVERSITY TECHNOLOGY PARK PURPOSE: PROVIDE SEWER SERVICE TO PREVIOUSLY UNSERVED AREA AND ELIMINATE ONE LIFT STATION. PHYSICAL DESCRIPTION: APPROXIMATELY 1,620 FEET OF SANITARY SEWER AND APPURTENANCES. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: REPLACEMENT OF SEPTIC SYSTEMS IN COMMERCIAL/ INDUSTRIAL AREAS. IMPACT ON DECREASED OPERATIONAL AND MAINTENANCE COSTS OPERATING BUDGET: FROM ELIMINATION OF LIFT STATION FINANCING: $ 129,800 SPECIAL ASSESSMENTS (G) $ 129,800 TOTAL INN ENVIRONMENT PROJECT TITLE: SOLID WASTE MACHINE STORAGE BUILDING LOCATION: SOLID WASTE TRANSFER STATION PURPOSE: TO STORE HI -LIFT, BACKHOE, AND ROLL -OFF CONTAINER TRUCKS PHYSICAL DESCRIPTION: 45 FOOT BY 54 FOOT BY 14 FOOT POLE BUILDING WITH A CONCRETE FLOOR, INSULATED, WITH A 24 -FOOT END SLIDE DOOR UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO ALLOW INSIDE STORAGE OF THE TRANSFER STATION EQUIPMENT. THIS WOULD ALSO PROVIDE THE MECHANICS WITH AN AREA TO MAKE REPAIRS ON THE EQUIPMENT. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: $ 65,000 OTHER (1) $ 65,000 TOTAL 2-20 79 ENVIRONMENT PROJECT TITLE: CAPE GIRARDEAU RECYCLING DROP OFF FACILITY LOCATION: PUBLIC WORKS SITE, NORTH BROADVIEW PURPOSE: TO CREATE A SAFER, MORE CONVENIENT FACILITY FOR THE PUBLIC, MORE EFFICIENT AND SAFE WORKING ENVIRONMENT FOR EMPLOYEES, STREAMLINE THE PROCESSING OPERATIONS AND REORGANIZE THE PUBLIC DROP OFF CENTER TO PROVIDE FOR AN OVERALL SAFER COLLECTION OPERATION PHYSICAL DESCRIPTION: 40 FEET BY 90 FEET BY 14 FEET CLEAR SPAN BUILDING OPEN ON THE WEST SIDE WTIH A 20 FOOT PAVED ACCESS/DRIVE THROUGH DROP OFF AND TWELVE NEW 4 CUBIC YARD SELF DUMPING CONTAINERS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THE CURRENT PUBLIC DROP OFF CENTER IS A VERY CONGESTED AREA. THE DRIVEWAY THAT THE PUBLIC WORKS CREWS OF WATER, SEWER, STREET, SOLID WASTE USE IS BETWEEN THE RECYCLING CENTER AND THE CURRENT RECYCLING DROP OFF AREA. THIS ARRANGEMENT IS POTENTIALLY THREATENING TO SOME CITIZENS AND TENDS TO DECREASE PARTICIPATION. THERE IS A NEED TO SAFELY SEPARATE THE CITIZENS FROM THESE PUBLIC WORKS OPERATIONS. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: $ 100,000 FEDERAL GRANTS/LOANS (F) $ 20,000 OTHER (1) $ 120,000 TOTAL 2-21 ENT OVATIONS TO TRANSFER STA LOCATION: TRANSFER STATION PURPOSE: TO REDUCE THE COST OF OPERATION PHYSICAL DESCRIPTION: MAKE CHANGES AT THE TRANSFER STATION TO THE LOADING, COMPACTION, AND HAULING PHASES OF THE OPERATION THAT WOULD SAVE THE CITY IN OPERATIONAL EXPENSE. UNIT OF WORK: ENGINEER, DESIGN AND CONSTRUCT JUSTIFICATION: WE WOULD CHANGE THE LOADING, COMPACTION AND HAULING PHASES BY SWITCHING THE OPERATION TO A WALKING FLOOR TRAILER METHOD INSTEAD OF THE CURRENT COMPACTORS, ROLLOFF CONTAINERS, AND ROLLOFF TRUCKS. IMPACT ON SIGNIFICANT IMPACT TO THE SOLID WASTE BUDGET, OPERATING BUDGET: CHANGES SHOULD SAVE FUNDS IN OPERATIONAL COSTS SUCH AS CONTAINERS, COMPACTORS AND TRUCKS. FINANCING: $ 150,000 OTHER([) $ 150,000 TOTAL 2-22 911 2-23 ENVIRONMENT PROJECT TITLE: WATER DISTRIBUTION IMPROVEMENTS PROGRAM LOCATION: DISTRIBUTION MAINS -CITY WIDE PURPOSE: INSTALL NEW MAIN PIPES CONNECTING EXISTING MAINS SO THAT FIRE FLOWS, PRESSURE, AND WATER QUALITY ARE IMPROVED. ALSO REPLACE EXISTING PIPES AND HYDRANTS AS REQUIRED OTHER THAN ROUTINE REPAIRS. THIS INCLUDES RELOCATING FACILITIES FOR STATE PROJECTS WHERE NECESSARY. PHYSICAL DESCRIPTION: INSTALL PIPING AS REQUIRED DEPENDING ON EXISTING LOCATIONS AND CONDITIONS. APPROXIMATELY 27,000 FT./5 YRS., 5,400 FT./YR. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (IF NECESSARY), AND CONSTRUCT JUSTIFICATION: GROWTH IS ACCELERATING THE NEED FOR SYSTEM IMPROVEMENTS VERSUS PREVIOUS ESTIMATES IMPACT ON POSSIBLE LOWER ENERGY COSTS, INCREASED OPERATING BUDGET: DEPRECIATION EXPENSE FINANCING: $ 215,000 REVENUE/PFA BONDS: ISSUED (B) $ 154,000 OTHER (1) $ 369,000 TOTAL 82 2-24 ENVIRONMENT PROJECT TITLE: WATER DEVELOPMENT/MAIN EXTENSION LOCATION: VARIOUS LOCATIONS PURPOSE: EXTENSION OF WATER SERVICE TO NEW DEVELOPING AREAS PREVIOUSLY UNSERVED PHYSICAL DESCRIPTION: CITY PARTICIPATION IN DEVELOPMENT MAIN INSTALLATIONS, I.E., OVERSIZING, HYDRANTS, VALVES, TAPPING SLEEVES, ETC. AND OTHER ITEMS AS DIRECTED UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXTENSION OF WATER MAINS IS AN ESSENTIAL INFRASTRUCTURE ELEMENT NEEDED TO ENABLE GROWTH. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: $ 225,000 REVENUE/PFA BONDS: ISSUED (B) $ 154,000 OTHER (1) $ 379,000 TOTAL 2-24 ENVIRONMENT PROJECT TITLE: 2 -INCH WATER MAIN/SERVICE REPLACEMENT PROGRAM LOCATION: CITY-WIDE PURPOSE: REPLACEMENT OF SUBSTANDARD, HIGH FAILURE/REPAIR SECTIONS OF THE WATER DISTRIBUTION SYSTEM WITH NEW 6 -INCH MAIN MINIMUM TO IMPROVE SERVICE, INCREASE FIRE FLOWS AND REDUCE MAINTENANCE COSTS. PHYSICAL DESCRIPTION: REPLACE EXISTING MAIN WITH NEW 6 -INCH MAIN, AND REPLACE EXISTING SERVICES TO NEW LINE UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (WHERE REQUIRED), AND CONSTRUCT JUSTIFICATION: COSTS OF 2 -INCH REPLACEMENT ARE HIGHER THAN EXPECTED (PRIMARILY PAVEMENT REPAIR). ADDITIONAL FUNDING WILL PREVENT REDUCTION OF ANNUAL FOOTAGE TARGETS. IMPACT ON MAINTENANCE COST DUE TO MAIN LEAKS ON THESE OPERATING BUDGET: LINES WILL DECREASE AS REPLACEMENT PROGRESSES. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 525,000 REVENUE/PFA BONDS: ISSUED (B) $ 350,000 OTHER (1) $ 875,000 TOTAL 2-25 PROJECT TITLE: LOCATION ENVIRONMENT CITY-WIDE MAIN REPLACEME PURPOSE: REPLACEMENT OF SUBSTANDARD, HIGH FAILURE/REPAIR SECTIONS OF THE WATER DISTRIBUTION SYSTEM WITH NEW 6 -INCH MAIN MINIMUM TO IMPROVE SERVICE, INCREASE FIRE FLOWS AND REDUCE MAINTENANCE PHYSICAL DESCRIPTION REPLACE EXISTING MAIN WITH NEW 6 -INCH MAIN, AND REPLACE EXISTING SERVICES TO NEW LINE UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (WHERE REQUIRED), AND CONSTRUCT JUSTIFICATION: THE REMAINING TWO-INCH MAINS IN THE SYSTEM ARE PRIMARILY GALVANIZED, BADLY CORRODED AND FAIL FREQUENTLY. ADDITIONALLY, MINIMAL FIRE FLOWS ARE POSSIBLE IN THESE MAINS. REPLACEMENT OF SERVICES WILL REMOVE LEAD SOURCE IN THE OLDEST SERVICES. IMPACT ON MAINTENANCE COST DUE TO MAIN LEAKS ON THESE OPERATING BUDGET: LINES WILL DECREASE AS REPLACEMENT PROGRESSES. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 675,000 REVENUE/PFA BONDS: ISSUED (B) $ 225,000 OTHER (1) $ 900,000 TOTAL 2-26 ER ENVIRONMENT PROJECT TITLE: WATER METER REPLACEMENT PROGRAM LOCATION: VARIOUS LOCATIONS THROUGHOUT THE CITY — SERVICE INSTALLATIONS PURPOSE: TO REPLACE AGED, INACCURATE METERS WITH NEW METERS SO THAT WATER BILLINGS REFLECT ACTUAL USAGE PHYSICAL DESCRIPTION: IMPLEMENT 10 -YEAR, METER TEST PROGRAM REPLACING METERS OUTSIDE AWWA ACCEPTANCE STANDARDS FOR ACCURACY 2-27 UNIT OF WORK: REPLACE METERS, EACH BASED ON LAST TEST OR INSTALLATION DATE JUSTIFICATION: METERS TYPICALLY REGISTER LESS THAN THE QUANTITY ACTUALLY CONSUMED AS THEY AGE AND MECHANICAL WEAR OCCURS. THIS RESULTS IN LOST WATER ACCOUNTABILITY. IMPACT ON WILL INCREASE REVENUE BY ENSURING METER OPERATING BUDGET: ACCURACY (METERS OVER 10 YEARS OLD TYPICALLY UNDER -REGISTER BY APPROXIMATELY 5%). FINANCING: $ 255,000 OTHER (OPERATIONS) (1) $ 255,000 TOTAL mol ENVIRONMENT PROJECT TITLE: WATER STORAGE TANK REHABILITATION (EIGHT TANKS) LOCATION: TO BE DETERMINED BY SELECTION CRITERIA BASED ON INSPECTION PURPOSE: PROLONG TANK LIFE AND ENSURE WATER QUALITY PHYSICAL DESCRIPTION: RE -COAT STORAGE TANKS, PERFORM NECESSARY MAINTENANCE UNIT OF WORK: INSPECT AND REHABILITATE JUSTIFICATION: PROGRAMMED PREVENTIVE MAINTENANCE IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 201,375 REVENUE/PFA BONDS: ISSUED (B) $ 150,000 OTHER (1) $ 351,375 TOTAL 2-28 �lffi 2-29 ENVIRONMENT PROJECT TITLE: WATER SYSTEM SEISMIC PROTECTION LOCATION: TREATMENT PLANTS AND STORAGE TANKS PURPOSE: MINIMIZE DAMAGE AND WATER LOSS IN THE EVENT OF SEISMIC ACTIVITY PHYSICAL DESCRIPTION: AUTOMATIC ISOLATION VALVES AND FLEXIBLE CONNECTIONS AT INFLUENT AND EFFLUENT PIPING TO TANKS AND CLEAR WELLS UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: MAINTAIN INTEGRITY OF DRINKING WATER SUPPLY IN THE EVENT OF SEISMIC ACTIVITY IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 856,800 FEDERAL GRANTS/LOANS (D) $ 856,800 TOTAL 2-29 2-30 ENVIRONMENT PROJECT TITLE: EXPAND AND REHABILITATE CAPE ROCK WATER PLANT #1 AND CONSTRUCT ALLUVIAL WELL FIELD LOCATION: WATER TREATMENT PLANT NO. 1 (CAPE ROCK PLANT) PURPOSE: PROVIDE INCREASED CAPACITY FOR SUPPLY OF POTABLE WATER TO CITY OF CAPE GIRARDEAU FOR EXISTING AND FUTURE DEVELOPMENTS PHYSICAL DESCRIPTION: DESIGN AND CONSTRUCT PLANT FACILITIES UNIT OF WORK: DESIGN, ACQUIRE PROPERTY/EASEMENTS, AND CONSTRUCT JUSTIFICATION: NEEDED TO MEET NEAR AND LONG-TERM WATER SYSTEM DEMANDS AS IDENTIFIED IN WATER SYSTEM MASTER PLAN IMPACT ON OPERATION AND MAINTENANCE COSTS WILL CHANGE. OPERATING BUDGET: INSUFFICIENT DATA AVAILABLE CURRENTLY TO FORECAST EFFECT. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 13,881,000 REVENUE/PFA BONDS:ISSUED (B) $ 13,881,000 TOTAL 2-30 ENVIRONMENT PROJECT TITLE: WATER PUMPING STATIONNAULT RETROFIT LOCATION: VARIOUS LOCATIONS PURPOSE: RETROFIT CONFINED -SPACE PUMPING STATIONSNAULTS WITH FORCED AIR VENTILATION AND LIGHTWEIGHT ACCESS HATCHES. ADDITIONAL PUMPING STATION FOR WEST OR NORTHWEST AREA PER WATER SYSTEM MASTER PLAN. PHYSICAL DESCRIPTION: INSTALL BLOWERS, SWITCHES, WIRING AND RETROFIT HATCHES WITH LIGHTWEIGHT MATERIALS. ADD MOTOR OPERATED VALVE AT COLLEGE FOR PUMPING CONTROL. PUMPING STATION DESIGN AND INSTALLATION. UNIT OF WORK: DESIGN AND CONSTRUCT/RETROFIT JUSTIFICATION: EMPLOYEE SAFETY AND STRICTER CONFINED -SPACE ENTRY REQUIREMENTS. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 103,400 REVENUE/PFA BONDS: ISSUED (B) $ 103,400 TOTAL 2-31 ENVIRONMENT PROJECT TITLE: LEXINGTON/MELODY LANE WATER EXTENSION LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: LEXINGTON AVENUE, OLD SPRIGG STREET ROAD TO NEAR BIG BEND ROAD, SHORT EXTENSION DOWN MELODY LANE DEVELOPMENT MAIN EXTENSION. A PORTION OF LEXINGTON MAIN EXTENSION IS IDENTIFIED IN BLACK AND VEATCH MASTER PLAN AS IMPROVEMENT MAIN. TOGETHER WITH NORTH SPRIGG WATER EXTENSION, 8,284 FEET OF 8 -INCH PIPE, 800 FEET OF 6 -INCH PIPE DESIGN, ACQUIRE EASEMENTS (IF REQUIRED), AND CONSTRUCT PROVIDE WATER SERVICE TO NEW AREA AS IT DEVELOPS INCREASED DEPRECIATION EXPENSE $ 168,500 SPECIAL ASSESSMENTS (G) $ 168,500 TOTAL NOTE: IN ORDER TO MAINTAIN THE INTEGRITY OF THE WATER SYSTEM, THIS PROJECT WILL NEED TO BE COORDINATED, AND CONSTRUCTED, WITH PROJECT NO. 2-33 (NORTH SPRIGG WATER EXTENSION). 2-32 91 ENVIRONMENT PROJECT TITLE: NORTH SPRIGG WATER EXTENSION LOCATION: NORTH SPRIGG STREET, BERTLING TO LEXINGTON AVENUE PURPOSE: DEVELOPMENT MAIN EXTENSION PHYSICAL DESCRIPTION: TOGETHER WITH LEXINGTON WATER EXTENSION, 8,284 FEET OF 8 -INCH PIPE, 700 FEET OF 6 -INCH PIPE UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (IF REQUIRED), AND CONSTRUCT JUSTIFICATION: PROVIDE WATER SERVICE TO NEW AREA AS IT DEVELOPS IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: $ 23,100 REVENUE/PFA BONDS: ISSUED (B) $ 128,100 SPECIAL ASSESSMENTS (G) $ 151,200 TOTAL NOTE: IN ORDER TO MAINTAIN THE INTEGRITY OF THE WATER SYSTEM, THIS PROJECT WILL NEED TO BE COORDINATED, AND CONSTRUCTED, WITH PROJECT NO. 2-32 (LEXINGTON/MELODY LANE WATER EXTENSION). 2-33 92 ENVIRONMENT PROJECT TITLE: WATER PLANT #2 SLUDGE SYSTEM LOCATION: WATER PLANT #2 PURPOSE: SLUDGE DISPOSAL TO SEWER SYSTEM RATHER THAN LAGOON HOLDING PHYSICAL DESCRIPTION: DESIGN AND CONSTRUCT SEWER LIFT STATION AND LATERAL TO DISPOSE OF PROCESS SLUDGE (WHEN TRUNK IS AVAILABLE) UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: REDUCE SLUDGE DISPOSAL COSTS, LAGOON MAINTENANCE AND BENEFIT SEWER TREATMENT PROCESS (COAGULANT). IMPACT ON SLUDGE LAGOON CLEANING COSTS ARE OPERATING BUDGET: APPROXIMATELY $50,000 AND ON A THREE (3) YEAR INTERVAL. AS PLANT NO. 2 USE INCREASES, THIS WILL SHORTEN INTERVAL. THE SEWER TREATMENT DISPOSAL OPTION IS MUCH MORE COST EFFECTIVE AND WOULD SAVE APPROXIMATELY $300,000 OVER THE NEXT 15 YEARS. FINANCING: $ 151,300 REVENUE/PFA BONDS: ISSUED (B) $ 151,300 TOTAL 2-34 93 ENVIRONMENT PROJECT TITLE: MOUNT AUBURN CORRIDOR WATER DISTRIBUTION MAIN AUGMENTATION LOCATION: MOUNT AUBURN ROAD, FROM DOCTORS PARK NORTH TO HOPPER ROAD PURPOSE: PROVIDE ADEQUATE FLOWS AND PRESSURE TO SERVE DEVELOPING AREAS ALONG MOUNT AUBURN ROAD PHYSICAL DESCRIPTION: CONSTRUCT PIPE SEGMENTS 544, 545, 547, 548, 550, 551, AND 552 ON FIGURE 12, RECOMMENDED IMPROVEMENTS, BLACK AND VEATCH MASTER PLAN 1993. (MAY REQUIRE ADDITIONAL PIPE SEGMENT TO COMPLETE PROJECT.) 2-35 UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: SYSTEM DEMAND IS INCREASING AS A RESULT OF GROWTH ALONG THE MOUNT AUBURN CORRIDOR. UPGRADES IN LINE SIZING ARE NEEDED TO ACCOMMODATE PRESENT AND FUTURE GROWTH. IMPACT ON INCREASED DEPRECIATION EXPENSE. MINOR POWER OPERATING BUDGET: SAVINGS WITH REDUCED FRICTION LOSS. FINANCING: $ 904,200 REVENUE/PFA BONDS: ISSUED (B) $ 904,200 TOTAL 94 2-36 95 ENVIRONMENT PROJECT TITLE: ELEVATED WATER STORAGE TANK LOCATION: AREA ADJACENT TO 1-55 NORTH OF ROUTE K PURPOSE: PROVIDE STORAGE CAPACITY TO MEET PEAK HOUR DEMANDS IN DEVELOPING AREAS PHYSICAL DESCRIPTION: ELEVATED STORAGE TANK UNIT OF WORK: DESIGN, SITE IDENTIFICATION, CONSTRUCT AND EQUIP JUSTIFICATION: GROWTH AND DEVELOPMENT IMPACT ON ADDITIONAL COSTS WILL BE INCURRED FOR OPERATION OPERATING BUDGET: AND MAINTENANCE AT APPROXIMATELY $2,000 ANNUALLY. 10 -YEAR REPAINTING SCHEDULED IN YEAR 2010 AT APPROXIMATELY $100,000. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 237,300 REVENUE/PFA BONDS: ISSUED (B) $ 237,300 TOTAL 2-36 95 2-37 ENVIRONMENT I PROJECT TITLE: 20 -INCH MAIN PROJECT (EAST CAPE ROCK DRIVE) LOCATION: EAST CAPE ROCK DRIVE, FROM WATER PLANT NO. 1 TO BERTLING STREET PURPOSE: INCREASE FLOW FROM MAIN PLANT TO DISTRIBUTION SYSTEM PHYSICAL DESCRIPTION: APPROXIMATELY 5,300 FEET OF 20 -INCH TRANSMISSION MAIN UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: NEEDED TO INCREASE TRANSMISSION CAPACITY, IMPROVE PRESSURE CONDITIONS AND FIRE FLOWS. REPLACE 14 -INCH TRANSMISSION MAINS INSTALLED IN 1931 AND 1953. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: $ 723,300 REVENUE/PFA BONDS: ISSUED (B) $ 723,300 TOTAL a ENVIRONMENT PROJECT TITLE: 16 -INCH MAIN PROJECT (BERTLING STREET) LOCATION: BERTLING STREET, FROM OLD SPRIGG STREET ROAD WEST TO CAPE ROCK DRIVE PURPOSE: INCREASE FLOW FROM MAIN PLANT TO DISTRIBUTION SYSTEM PHYSICAL DESCRIPTION: APPROXIMATELY 5,420 FEET OF 16 -INCH TRANSMISSION MAIN UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: NEEDED TO INCREASE TRANSMISSION CAPACITY, IMPROVE PRESSURE CONDITIONS AND FIRE FLOWS. REPLACE 12 -INCH TRANSMISSION MAIN INSTALLED IN 1951-52. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: $ 672,100 REVENUE/PFA BONDS: ISSUED (B) $ 672,100 TOTAL 2-38 97 2-39 .• ENVIRONMENT PROJECT TITLE: FIRE HYDRANT REPLACEMENT LOCATION: CITY WIDE PURPOSE: FIRE PROTECTION FLOW INCREASE PHYSICAL DESCRIPTION: 798 - 4 % INCH HYDRANTS REPLACED WITH 5 % INCH HYDRANTS UNIT OF WORK: INSTALL JUSTIFICATION: HYDRANTS OUTDATED - LOW FLOW CAPACITIES. DO NOT MEET CURRENT DESIGN SPECIFICATIONS. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: $ 300,000 REVENUE/PFA BONDS:ISSUED (B) $ 100,000 OTHER (1) $ 400,000 TOTAL 2-39 .• ENVIRONMENT PROJECT TITLE: MOUNT AUBURN/SIEMERS MAIN UPGRADE LOCATION: MOUNT AUBURN ROAD TO SIEMERS DRIVE IN VICINITY OF ROUTE K/1-55 INTERCHANGE (PROPOSED NORTH LOOP) PURPOSE: PROVIDE INCREASED WATER FLOW AND PRESSURES TO THE DEVELOPING AREA ALONG SIEMERS DRIVE. PHYSICAL DESCRIPTION: APPROXIMATELY 6,950 FEET OF 16 -INCH WATER MAIN WITH APPURTENANCES UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: DEVELOPMENT ALONG SIEMERS DRIVE WILL REQUIRE WATER SUPPLY ENHANCEMENT TO SUPPORT FUTURE GROWTH. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: $ 600,000 REVENUE/PFA BONDS: PENDING (C) $ 600,000 TOTAL mll ENVIRONMENT PROJECT TITLE: SOUTH PLANT-NASH ROAD POTABLE WATER MAIN LOCATION: SOUTH WATER TREATMENT PLANT, SOUTH TO NASH ROAD NEAR JUNCTION WITH AIRPORT ROAD PURPOSE: TO PROVIDE POTABLE WATER TO THE GREATER CAPE GIRARDEAU INDUSTRIAL PARK PHYSICAL DESCRIPTION: APPROXIMATELY 7,800 FEET OF 12 -INCH WATER MAIN WITH CROSSINGS OF THE DUTCHTOWN DITCH, HEADWATER DIVERSION CHANNEL, AND LITTLE RIVER MAIN STEM LEVEE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THE CITY -OWNED WATER SYSTEM ON NASH ROAD SUPPLIES NON -POTABLE WATER FOR PRODUCTION AND FIRE FIGHTING ONLY. POTABLE WATER IS NEEDED FOR EXPANDING ECONOMIC DEVELOPMENT. IMPACT ON INCREASED DEPRECIATION AND MAINTENANCE COSTS OPERATING BUDGET: FINANCING: $ 135,900 REVENUE/PFA BONDS: PENDING (C) $ 500,000 STATE GRANTS/LOANS (D) $ 635,900 TOTAL NOTE: THIS PROJECT IS CONTINGENT UPON THE LOCATION OF A NEW INDUSTRY OR EXPANSION THAT WILL SATISFY THE "BUT FOR" REQUIREMENT FOR STATE GRANT FUNDS UP TO A MAXIMUM OF $500,000. THE CITY'S SHARE OF THE PROJECT IS ALSO CONTINGENT UPON OTHER FACTORS, SUCH AS THE STATUS OF STATE REVOLVING LOAN FUNDS, IF SUCH ARE AVAILABLE. 2-41 100 2-42 101 ENVIRONMENT PROJECT TITLE: EMERGENCY GENERATOR INSTALLATIONS LOCATION: ALL REMOTE PUMP SITES PURPOSE: PROVIDE STANDBY POWER FOR REMOTE BUILDINGS AND PUMP STATIONS AS NEEDED. PHYSICAL DESCRIPTION: TRAILER MOUNT TWO DONATED, LARGE -CAPACITY GENERATORS, INCLUDING CABLE AND PLUG INS, ENCLOSURES, AND FUEL SYSTEMS, AND PLUG-IN AND SWITCH GEAR AT SITES. UNIT OF WORK: INSTALL JUSTIFICATION: POWER OUTAGES CREATE LOW OR NO PRESSURE AT PUMP STATIONS EXPERIENCING OUTAGES. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 80,000 OTHER (1) $ 80,000 TOTAL 2-42 101 2-43 102 ENVIRONMENT PROJECT TITLE: RESIDUAL STORAGE AND DISPOSAL LOCATION: CAPE ROCK WATER PLANT #1 PURPOSE: THIS WILL PROVIDE FOR CAPITAL EXPENSE TO DISPOSE OF TREATMENT PROCESS RESIDUAL BY STORAGE, TRANSFER AND LAND APPLICATIONS VERSUS RETURN TO RIVER PHYSICAL DESCRIPTION: SEE B & M DESCRIPTION - STORAGE TANKS, LOAD STATION, TANKER TRUCKS UNIT OF WORK: DESIGN, CONSTRUCT AND EQUIP FOR RESIDUAL STORAGE AND DISPOSAL JUSTIFICATION: REGULATORY REQUIREMENT FOR PERMITTING CONSTRUCTION AND OPERATION (DNR) IMPACT ON OPERATION AND MAINTENANCE COSTS WIL CHANGE. OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 4,038,000 REVENUE/PFA BONDS: PENDING (C) $ 4,038,000 TOTAL 2-43 102 ENVIRONMENT PROJECT TITLE: ROUTE K PUMPING STATION LOCATION: ROUTE K WEST OF 1-55 INTERCHANGE PURPOSE: PROVIDE INCREASED WATER FLOW TO GROWTH AREA WEST ON ROUTE K PHYSICAL DESCRIPTION: DESIGN AND CONSTRUCT SCADA-CONTROLLED BOOSTER PUMP STATION, WITH TWO PUMP UNITS AND EMERGENCY GENERATOR. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXTENSION OF WATER MAINS WEST ON ROUTE K WILL REQUIRE PUMP STATION AS AREA DEVELOPS. IMPACT ON INCREASED OPERATING AND MAINTENANCE EXPENSE OPERATING BUDGET: FINANCING: $ 204,000 OTHER (1) $ 204,000 TOTAL 2-44 103 2-45 ENVIRONMENT PROJECT TITLE: KINGSHIGHWAY/COMMERCIAL CHANNEL CONSTRUCTION AND DITCH CLEANING LOCATION: FROM SOUTH KINGSHIGHWAY TO CAPE LA CROIX CREEK. FROM THE DITCH SOUTH OF AUTO TRIM DESIGN TO THE BOX CULVERT ON COMMERCIAL STREET AND CONTINUING PAST THE KUSS ENTERTAINMENT PROPERTY TO CAPE LA CROIX CREEK. ALSO POSSIBLY REPLACEMENT OF THE BOX CULVERT. PURPOSE: TO PERMIT STORMWATER TO FLOW PROPERLY FROM KINGSHIGHWAY TO CAPE LA CROIX CREEK AND STABILIZE THE BANKS SO THAT MAINTENANCE CAN BE PERFORMED PHYSICAL DESCRIPTION: APPROXIMATELY 1,600 FEET OF CHANNEL WORK INCLUDING A CONCRETE -LINED CHANNEL BOTTOM AND VEGETATED SIDE SLOPES. ALSO LOOK AT THE CONDITION OF THE BOX CULVERT ON COMMERCIAL AND LOOK FOR PROPER FLOW AND SIZING. DISASTER RESISTANT COMMUNITIES PROGRAM PROJECT. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THE HIGHWAY DEPARTMENT IMPROVEMENTS ASSOCIATED WITH THE NEW HIGHWAY 74 HAVE INCREASED FLOWS THROUGH THIS SECTION OF DRAINAGE DITCH AND THEIR IMPROVEMENTS STOPPED AT KINGSHIGHWAY. THIS HAS ALLOWED WATER TO POND IN THIS AREA. IMPACT ON IF THE CITY ASSUMES MAINTENANCE OF THIS CHANNEL, OPERATING BUDGET: THERE WILL BE ADDITIONAL MAINTENANCE COSTS. FINANCING: $ 70,000 CAPITAL IMPROVEMENT SALES TAX (H) $ 70,000 TOTAL 104 ENVIRONMENT PROJECT TITLE: ARENA CREEK REALIGNMENT LOCATION: ARENA PARK AREA - FROM KINGSHIGHWAY TO CAPE LA CROIX CREEK PURPOSE: TO ALLOW THE AREA TO DRAIN PROPERLY AND PREVENT FLOODING PHYSICAL DESCRIPTION: CHANNELIZATION OF THE CREEK. DISASTER RESISTANT COMMUNITIES PROGRAM PROJECT. UNIT OF WORK: ACQUIRE PROPERTY (IF NEEDED), DESIGN AND CONSTRUCT JUSTIFICATION: PREVENT FLOODING IMPACT ON IF THE CITY ASSUMES FULL MAINTENANCE OF THIS OPERATING BUDGET: CHANNEL, THERE WILL BE ADDITIONAL MAINTENANCE COSTS. FINANCING: $ 185,000 CAPITAL IMPROVEMENT SALES TAX (H) $ 185,000 TOTAL 2-46 105 2-47 ENVIRONMENT PROJECT TITLE: STORMWATER DETENTION BASIN (ARENA CREEK WATERSHED) LOCATION: BEHIND HUCKSTEP AUTO BODY ON NORTH KINGSHIGHWAY PURPOSE: TO CONTROL FLOOD RUNOFF PHYSICAL DESCRIPTION: STORMWATER DETENTION BASIN UNIT OF WORK: ACQUIRE PROPERTY, DESIGN AND CONSTRUCT JUSTIFICATION: TO HELP PREVENT FLOODING FROM THE DETENTION BASIN TO THE ARENA PARK AREA. DISASTER RESISTANT COMMUNITIES PROGRAM PROJECT. IMPACT ON INCREASED MAINTENANCE COSTS OPERATING BUDGET: FINANCING: $ 100,000 CAPITAL IMPROVEMENT SALES TAX (H) $ 100,000 TOTAL 2-47 I ENVIRONMENT PROJECT TITLE: FLOOD WARNING SYSTEM LOCATION: HOPPER ROAD BRIDGE, INDEPENDENCE BRIDGE, BLOOMFIELD BRIDGE, ROUTE W BRIDGE ON CAPE LA CROIX CREEK, AND LOMBARDO BRIDGE, BROADWAY BRIDGE, WILLIAM BRIDGE ON WALKER BRANCH. ALSO HAVE AN INSTALLATION AT THE HEADWATER DETENTION BASIN PURPOSE: TO BE ABLE TO MONITOR INCREASES IN THE CREEK LEVEL AND DETENTION BASIN LEVEL. HELP PREVENT DOWNSTREAM PROPERTY DAMAGE. PHYSICAL DESCRIPTION: ULTRASONIC FLOW MONITORING AND REPORTING VIA THE WASTEWATER PLANT AND PUBLIC WORKS SERVICE CENTER SCADA SYSTEM. ALSO WILL HAVE THE CAPACITY FOR THE POLICE AND FIRE TO MONITOR WITH THE APPROPRIATE EQUIPMENT. DISASTER RESISTANT COMMUNITIES PROGRAM PROJECT. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: MONITOR FLOW TO HELP PREPARE AND PREVENT DOWNSTREAM DAMAGE. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 140,000 CAPITAL IMPROVEMENT SALES TAX (H) $ 140,000 TOTAL 2-48 107 2-49 1: ENVIRONMENT PROJECT TITLE: RIVERBOAT TIE OFF STRUCTURE LOCATION: RIVERFRONT PARK NEAR THE BROADWAY FLOODGATE PURPOSE: TO ANCHOR THE TOURIST RIVERBOATS DURING HIGH RIVER STAGES PHYSICAL DESCRIPTION: METAL RING TIE OFFS UNIT OF WORK: ENGINEER, DESIGN AND CONSTRUCT JUSTIFICATION: THIS IMPROVEMENT WOULD ALLOW THE RIVERBOATS TO DOCK AT STAGES THAT THEY NORMALLY CANNOT DOCK IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 12,000 OTHER (1) $ 12,000 TOTAL 1: ENVIRONMENT PROJECT TITLE: CAPE MEADOWS STORMWATER FLUME CONSTRUCTION LOCATION: FITZGERALD AND BIG BEND ROAD STORMWATER STRUCTURE PURPOSE: TO PROTECT FITZGERALD STREET AND STORM INLETS FROM BASE/SUPPORT EROSION CAUSING DROPPING AND SLIPPING TO THE WEST. ALSO TO PROTECT DOWNSTREAM/DOWN GRADE PROPERTIES FROM PROPERTY LOSS AND DAMAGE DUE TO HIGH VELOCITY UNCONTROLLED STORMWATER RUNOFF. PHYSICAL DESCRIPTION: CONSTRUCTION OF APPROXIMATELY 175 FEET OF GABION BASKETS AND RETAINING WALLS TO LINE A DEEP GULLY. REFURBISH AND IMPROVE STORMWATER COLLECTION PIPES AND INLETS, REMOVAL AND REPLACEMENT OF APPROXIMATELY 450 SQUARE YARDS OF CONCRETE PAVEMENT AND REPLACEMENT OF 550 FEET OF 4 -INCH HIGH CURBING WITH 6 -INCH HIGH CURBING. INSTALLATION OF APPROXIMATELY 160 FEET OF 48 -INCH RCP TO GREEN ACRES DRIVE TO TIE INTO A PIPE. UNIT OF WORK: ENGINEER, DESIGN AND CONSTRUCT JUSTIFICATION: PROTECTION TO THE CITY STREET, AND EROSION IS DAMAGING PUBLIC AND PRIVATE PROPERTY. DURING STORM EVENTS, THE STORMWATER CREATES A SERIOUS HAZARD WHERE IT POOLS AND WASHES ACROSS THE ROAD. THERE ARE SEVERAL YOUNG CHILDREN IN THE AREA THAT PLAY IN THIS AREA. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 120,000 OTHER (1) $ 120,000 TOTAL 1; 2-50 PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: 2-51 NME IMPROVEMENTS AT CLARK AND NEW MADRID CLARK STREET, BETWEEN NEW MADRID AND DUNKLIN TO REDUCE STORMWATER FLOWING ONTO CLARK INSTALLATION OF 500 LINEAR FEET OF 21 -INCH REINFORCED CONCRETE PIPE WITH INLETS AND NECESSARY APPURTENANCES. DESIGN AND CONSTRUCT PROJECT WILL IMPROVE TRAFFIC SAFETY AND REDUCE STREET MAINTENANCE. NO SIGNIFICANT IMPACT $ 20,400 CAPITAL IMPROVEMENT SALES TAX (H) TOTAL $ 20,400 110 ENVIRONMENT PROJECT TITLE: "RANCHITO" WATERSHED STORMWATER AND SANITARY SEWER PROJECT LOCATION: EAST FORK ARENA CREEK; KINGSWAY, MEADOW LANE, RANCHITO, JANET DRIVE AREA PURPOSE: IMPROVE STORMWATER AND SANITARY SEWER DRAINAGE IN THIS SUB -WATERSHED OF ARENA PARK. PHYSICAL DESCRIPTION: INSTALLATION OF APPROXIMATELY 4,000 LINEAL FEET OF 15 -INCH SANITARY SEWER LINE AND APPURTENANCES AND IMPROVEMENTS TO SURFACE STORMWATER FACILITIES (UNDESIGNED AT PRESENT). UNIT OF WORK: ENGINEER, DESIGN AND CONSTRUCT JUSTIFICATION: FACILITIES ARE NEEDED TO RELIEVE SANITARY SEWER SURCHARGING AND REDUCE STORMWATER FLOODING PROBLEMS. IMPACT ON WILL REQUIRE ADDITIONAL FUNDING FOR STORMWATER OPERATING BUDGET: FACILITY MAINTENANCE FINANCING: $ 1,209,900 OTHER (1) $ 1,209,900 TOTAL 2-52 111 This page intentionally left blank. 112 PARKS AND RECREATION CAPITAL IMPROVEMENTS PROGRAM 1999-00 FISCAL 2000-01 FISCAL 2001-02 FISCAL 2002-03 FISCAL 2003-04 FISCAL YEAR YEAR YEAR YEAR YEAR 113 PARKS AND RECREATION PROPOSED PROJECTS PROJECT IMPROVEMENT TOTAL 1999-00 2000-01 2001-02 2002-03 2003-04 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL YEAR YEAR YEAR YEAR YEAR 3-1 General Park Development 300,000 50,000 50,000 50,000 75,000 75,00 A A A A A 3-2 Land Acquisition -Shawnee 109,950 39,000 37,000 17,250 16,700 and Osage Parks A A A A A 3-3 Golf Course Pro Shop 250,000 1 250,000 1 3-4 Arena Park Shelter 15,000 15,000 Replacement A A 3-5 Ranney Park Improvements 17,000 17,000 (Playground Construction) A,I A,I 3-6 Washington Park Basketball 10,000 10,000 Court A A 3-7 Central Pool Bathhouse Roof 18,000 18,000 Replacement A A 3-8 Fort D Renovations 18,000 18,000 A A TOTALS 737,950 417,000 87,000 67,250 91,700 75,00 A GENERAL REVENUE FUND 482,950 162,000 87,000 67,250 91,700 75,00 B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTSILOANS E MOTOR FUEL TAX F FEDERAL GRANTS/LOANS G SPECIAL ASSESSMENTS H CAPITAL IMPROVEMENT SALES TAX I OTHER 255,000 255.000 J GEN. OBLIGATION BONDS: PENIDNG K TRANSPORTATION SALES TAX 114 3-1 115 PARKS AND RECREATION PROJECT TITLE: GENERAL PARK DEVELOPMENT LOCATION: VARIOUS PARKS PURPOSE: TO PROVIDE VARIOUS PARK AND RECREATION AMENITIES AND EQUIPMENT PHYSICAL DESCRIPTION: CONSTRUCTION OF PARK AMENITIES, RECREATIONAL AND OTHER FACILITIES UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: VARIOUS PARKS HAVE UNANTICIPATED NEEDS EACH YEAR IMPACT ON MINOR INCREASES IN OPERATING AND MAINTENANCE OPERATING BUDGET: EXPENSES, DEPENDING ON FACILITIES CONSTRUCTED. FINANCING: $ 300,000 GENERAL REVENUE (A) $ 300,000 TOTAL NOTE: THESE FUNDS COULD ALSO BE USED FOR MATCHING DONATIONS FROM CIVIC GROUPS OR INDIVIDUALS FOR PARK IMPROVEMENTS. 3-1 115 3-2 PARKS AND RECREATION PROJECT TITLE: LAND ACQUISITION - SHAWNEE AND OSAGE PARKS LOCATION: SHAWNEE PARK (SOUTH WEST END BOULEVARD) AND OSAGE PARK (NORTH KINGSHIGHWAY) PURPOSE: TO PROVIDE ADDITIONAL PARK ACREAGE, RECREATION FACILITIES, AND GREEN SPACE PHYSICAL DESCRIPTION: PURCHASE OF 90 ACRES OF LAND UNIT OF WORK: SCHEDULED PAYMENTS ON LAND PURCHASED IN 1992 AND 1993 JUSTIFICATION: ADDITIONAL AREAS ARE NEEDED FOR OSAGE COMMUNITY CENTER, SHAWNEE PARK SPORTS COMPLEX, CAPE LA CROIX TRAIL, AND CAPE WOODS CONSERVATION AREA. IMPACT ON WILL REQUIRE ADDITIONAL PERSONNEL AND EQUIPMENT OPERATING BUDGET: FOR MAINTENANCE AS AREAS ARE DEVELOPED AND USED. FINANCING: $ 109,950 GENERAL REVENUE (A) $ 109,950 TOTAL 116 PARKS AND RECREATION PROJECT TITLE: GOLF COURSE PRO SHOP LOCATION: J. C. MUNICIPAL GOLF COURSE PURPOSE: TO PROVIDE NEEDED STORAGE SPACE, CUSTOMER USE AREA, AND MERCHANDISE SALES AND DISPLAY AREA PHYSICAL DESCRIPTION: CONSTRUCTION OF NEW 3,000 SQUARE FOOT PRO -SHOP LOCATED AT THE SITE OF THE PRESENT SHOP UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THE PRESENT PRO SHOP SIZE OF 1,300 SQUARE FEET IS INADEQUATE FOR THE NEEDS OF CUSTOMER SPACE, MERCHANDISE STORAGE AND SALES AREA. INCREASING GOLF COURSE USE AND REVENUES JUSTIFIES THIS PROJECT. IMPACT ON MINOR INCREASE IN OPERATING EXPENSES OPERATING BUDGET: ANTICIPATED. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 250,000 OTHER (1) $ 250,000 TOTAL 3-3 117 3-4 PARKS AND RECREATION PROJECT TITLE: ARENA PARK SHELTER REPLACEMENT LOCATION: ARENA PARK PURPOSE: PROVIDE ADDITIONAL PICNIC FACILITIES AND REPLACE OLD SHELTER PHYSICAL DESCRIPTION: TO REPLACE SHELTER #5 LOCATED IN THE NORTHERN PORTION OF ARENA PARK UNIT OF WORK: TO REMOVE EXISTING SHELTER COMPLETELY AND INSTALL A NEW SHELTER WITH TABLES, GRILL, FOUNTAIN, AND ELECTRICITY JUSTIFICATION: OLD SHELTER IS DETERIORATED. NEED TO PROVIDE PICNIC FACILITIES ADJACENT TO NEW PLAYGROUND UNIT. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 15,000 GENERAL REVENUE (A) $ 15,000 TOTAL 118 3-5 119 PARKS AND RECREATION PROJECT TITLE: RANNEY PARK IMPROVEMENTS LOCATION: RANNEY PARK PURPOSE: TO PROVIDE PLAYGROUND FACILITIES FOR THIS AREA PHYSICAL DESCRIPTION: CONSTRUCTION OF PLAYGROUND UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: OLD PLAYGROUND EQUIPMENT WAS REMOVED AND NEEDS TO BE REPLACED IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 5,000 GENERAL REVENUE (A) $ 12,000 OTHER (1) $ 17,000 TOTAL 3-5 119 3-6 120 PARKS AND RECREATION PROJECT TITLE: WASHINGTON PARK BASKETBALL COURT LOCATION: WASHINGTON PARK PURPOSE: TO PROVIDE REGULATION SIZE BASKETBALL FOR RECREATIONAL ACTIVITIES PHYSICAL DESCRIPTION: 120 FOOT BY 70 FOOT BASKETBALL COURT, 2 POSTS, 2 BACKBOARDS, AND 2 RIMS WITH NETS UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO PROVIDE BASKETBALL COURT FOR NEIGHBORHOOD YOUTH IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 10,000 GENERAL REVENUE (A) $ 10,000 TOTAL 3-6 120 3-7 121 PARKS AND RECREATION PROJECT TITLE: CENTRAL POOL BATHHOUSE ROOF REPLACEMENT LOCATION: CENTRAL POOL PURPOSE: REPLACE EXISTING ROOF MATERIALS PHYSICAL DESCRIPTION: REMOVE EXISTING ROOF AND REPLACE WITH BUILT-UP ROOF UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING ROOF HAS SEVERAL LEAKS IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 18,000 GENERAL REVENUE (A) $ 18,000 TOTAL 3-7 121 PARKS AND RECREATION PROJECT TITLE: GENERAL RENOVATION OF FORT D LOCATION: FORT D PURPOSE: IMPROVE THE FORT D FACILITY TO ENHANCE ITS USE PHYSICAL DESCRIPTION: GENERAL RENOVATION UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT USE OF THE PROPERTY IS LIMITED IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 18,000 GENERAL REVENUE (A) $ 18,000 TOTAL 122 COMMUNITY DEVELOPMENT CAPITAL IMPROVEMENTS PROGRAM 123 COMMUNITY DEVELOPMENT PROPOSED PROJECTS PROJECT IMPROVEMENT TOTAL 1999-00 2000-01 2001-02 2002-03 2003-04 NUMBER ITEM COST FISCAL FISCAL FISCAL FISCAL FISCAL YEAR YEAR YEAR YEAR YEAR 4-1 Police Station HVAC 191,500 86,000 54,600 50,900 Replacement A A A A 4-2 Police Department Annex 4,685,000 25,000 410,000 4,250,000 A,C A A C 4-3 Fire Station No. 1 HVAC 22,600 7,700 7,900 7,000 Upgrade A A A A 4-4 Fire Station No. 1 Office and 7,800 7,800 Dormitory Renovation A A 4-5 Fire Station No. 1 Sprinkler 31,500 31,500 Retrofit J J 4-6 Fire Station No. 3 Relocation 1,065,100 77,200 987,900 J J J 4-7 Fire Station No. 2 Sprinkler 26,300 26,300 Retrofit J J 4-8 Fire Station No. 1 Office and 202,700 202,700 Administrative Area J J Renovation 4-9 Fire Station No. 4 Relocation 1,167,000 105,000 60,000 1,002,000 J J J J 4-10 Regional Fire Training Center 530,000 40,000 230,000 260,000 J J J 4-11 Fire Station No. 1 Parking 46,300 46,300 Expansion J J 4-12 Fire Station No. 2 150,000 150,000 Maintenance/Storage Bldg. J J 4-13 Fire Station No. 5 100,000 100,000 J J 4-14 City Hall Remodeling (Main 14,900 14,900 Floor) A A 4-15 City Hall Elevator 147,900 147,900 A A TOTALS 8,388,600 584,300 1,013,900 5,382,100 1,048,300 360,000 A GENERAL REVENUE FUND 819,700 289,300 472,500 57,900 B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING 4,250,000 4,250,000 D STATE GRANTSILOANS E MOTORFUELTAX F FEDERAL GRANTS/LOANS G SPECIAL ASSESSMENTS H CAPITAL IMPROVEMENT SALES TAX I J OTHER GEN. OBLIGATION BONDS: PENDING 3,318,.900 295,000 541,400 1,074,200 1,048,300 360,000 K TRANSPORTATION SALES TAX 124 I COMMUNITY DEVELOPMENT I ENT LOCATION: POLICE HEADQUARTERS, SOUTH SPRIGG STREET PURPOSE: REPLACE/MODIFY MULTI -ZONE HEATING AND AIR CONDITIONING SYSTEM PHYSICAL DESCRIPTION: REMOVE 20 TON MULTI -ZONE SYSTEM ON ROOF, TWO (2) 10 TON UNITS ON ROOF FOR JAIL AND ADMINISTRATIVE OFFICES, 23 TON MULTI -ZONE UNIT IN BASEMENT. RECONFIGURE VENTING, REPLACE WITH ADEQUATE EQUIPMENT PER TECHNICAL ASSISTANCE ENERGY STUDY PREPARED BY STRICKLAND ENGINEERING. UNIT OF WORK: INSTALL EQUIPMENT JUSTIFICATION: THESE UNITS ARE IN NEED OF REPAIR, THE CONTROLLING SYSTEM FOR EACH IS COMPLEX AND NON-FUNCTIONAL. UNITS ARE NO LONGER 1N PRODUCTION (OUTDATED), PARTS ARE EXTREMELY DIFFICULT TO OBTAIN THUS CREATING HIGH MAINTENANCE COSTS AND COMPANIES TO REPAIR THEM ARE SCARCE. IMPACT ON UPGRADE/REPLACEMENT SHOULD REDUCE OPERATION OPERATING BUDGET: AND MAINTENANCE COSTS FINANCING: $ 191,500 GENERAL REVENUE (A) $ 191,500 TOTAL 4-1 125 4-2 COMMUNITY DEVELOPMENT PROJECT TITLE: POLICE DEPARTMENT ANNEX LOCATION: POLICE HEADQUARTERS, SOUTH SPRIGG STREET PURPOSE: CONSTRUCT ANNEX TO EXISTING HEADQUARTERS TO PROVIDE ADDITIONAL SPACE FOR AN EMERGENCY OPERATIONS CENTER, COURTROOM, ADDITIONAL OFFICE SPACE, INTERVIEW SUITES, AND LOCKER FACILITIES FOR PUBLIC SAFETY PERSONNEL. RENOVATE AND UPGRADE EXISTING STRUCTURE. PHYSICAL DESCRIPTION: TWO-STORY, 16,000 SQUARE FOOT ADDITION TO THE NORTH AND EAST SIDES OF THE EXISTING FACILITY. ACQUISITION OF 6 PARCELS OF LAND EAST OF THE EXISTING BUILDING; DEMOLITION, EXCAVATION AND CONSTRUCTION OF A SECURE PARKING FACILITY. RENOVATION OF EXISTING STRUCTURE. UNIT OF WORK: CONSTRUCTION OF BUILDING. ACQUISITION OF ADDITIONAL PROPERTY. RENOVATION/UPGRADE OF EXISTING BUILDING. JUSTIFICATION: CONSTRUCTION AND RENOVATION WOULD ENHANCE EARTHQUAKE MITIGATION EFFORTS FOR EMERGENCY RESPONSE PERSONNEL AND PROVIDE A FULL SERVICE POLICE FACILITY, INCLUDING COURTROOM ACCESS. IMPACT ON FUNDING DOES NOT EXIST FOR THIS CIP. COMPLETION OPERATING BUDGET: WOULD LIKELY REQUIRE A BOND ISSUE FOR SUCCESSFUL COMPLETION. FINANCING: $ 435,000 GENERAL REVENUE (A) $ 4,250,000 REVENUE/PFA BONDS: PENDING (C) $ 4,685,000 TOTAL 126 COMMUNITY DEVELOPMENT PROJECT TITLE: UPGRADE HVAC SYSTEM AT FIRE STATION NO. 1 LOCATION: 1 SOUTH SPRIGG STREET PURPOSE: THE SECOND YEAR IN A MULTI-YEAR PROGRAM FOR THE UPGRADING AND REPLACEMENT OF HVAC SYSTEM AND HVAC COOLING TOWER. PROGRAM WILL ALLOW TWO (2) UNITS PER YEAR TO BE REPLACED PHYSICAL DESCRIPTION: HVAC HEATING, HEAT PUMP AND AIR CONDITIONING SYSTEM AND HVAC COOLING TOWER UNIT OF WORK: INSTALL TWO (2) UNITS PER YEAR, PLUS COOLING TOWER JUSTIFICATION: CURRENT UNITS ARE 15 YEARS OLD AND WORN OUT. THIS PROGRAM WILL ALLOW FOR THE SYSTEMATIC REPLACEMENT OF SAME OVER A FOUR-YEAR PERIOD. IMPACT ON REDUCED ENERGY COSTS SHOULD PAY FOR COST OF OPERATING BUDGET: REPLACEMENT FINANCING: $ 22,381 GENERAL REVENUE (A) $ 22,381 TOTAL 4-3 127 4-4 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 1 OFFICE AND DORMITORY RENOVATION LOCATION: FIRE STATION NO. 1, SOUTH SPRIGG STREET PURPOSE: TO REPLACE 18 YEAR OLD CARPETING UPSTAIRS AT STATION 1 PHYSICAL DESCRIPTION: CARPET AND LABOR UNIT OF WORK: INSTALLATION JUSTIFICATION: UPSTAIRS TRAINING ROOM (OCCASIONALLY USED AS A PUBLIC MEETING ROOM) AND DORMITORY AREAS HAVE NOT BEEN REPLACED AND ARE VERY WORN. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 7,770 GENERAL REVENUE (A) $ 7,770 TOTAL 128 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 1 SPRINKLER RETROFIT LOCATION: 1 SOUTH SPRIGG STREET PURPOSE: TO PROVIDE FUNDING NECESSARY TO RETROFIT FIRE STATION NO. 1 WITH AUTOMATIC SPRINKLER SYSTEM PHYSICAL DESCRIPTION: MONITORED WET SPRINKLER SYSTEM PER NFPA STANDARDS UNIT OF WORK: RETROFIT FIRE STATION NO. 1 JUSTIFICATION: CURRENT NFPA 1500 (OCCUPATIONAL SAFETY AND HEALTH) STANDARDS RECOMMEND MODIFICATIONS. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 31,500 GEN. OBLIGATION BONDS: PENDING (J) $ 31,500 TOTAL 4-5 129 4-6 COMMUNITY DEVELOPMENT PROJECT TITLE: RELOCATION AND CONSTRUCTION OF FIRE STATION NO. 3 LOCATION: NORTH SPRIGG STREET PURPOSE: TO DEVELOP PLANS AND SPECIFICATIONS FOR NEW FIRE STATION NO. 3 AND CONSTRUCT SAME (PROPERTY ALREADY ACQUIRED) PHYSICAL DESCRIPTION: ONE STORY MASONRY THREE -BAY DRIVE-THROUGH FIRE STATION. ONE BAY TO BE USED AS A SHOP BAY IF NO OTHER PROVISION IS MADE. BASEMENT UNDER LIVING AREA OF STATION. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT CITY CAPITAL IMPROVEMENT PROGRAM CALLS FOR PLANNING AND DEVELOPMENT OF THIS PROJECT. IMPACT ON SOME INCREASE IN EQUIPMENT, PERSONNEL AND OPERATING BUDGET: OPERATING BUDGET ANTICIPATED, UNQUANTIFIABLE AT THIS TIME. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 1,065,015 GEN. OBLIGATION BONDS: PENDING (J) $ 1,065,015 TOTAL 130 4-7 131 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 2 SPRINKLER RETROFIT LOCATION: 378 SOUTH MOUNT AUBURN ROAD PURPOSE: TO PROVIDE FUNDING NECESSARY TO RETROFIT FIRE STATION NO. 2 WITH AUTOMATIC SPRINKLER SYSTEM PHYSICAL DESCRIPTION: MONITORED WET SPRINKLER SYSTEM PER NFPA STANDARDS UNIT OF WORK: RETROFIT FIRE STATION NO.2 JUSTIFICATION: CURRENT NFPA 1500 (OCCUPATIONAL SAFETY AND HEALTH) STANDARDS RECOMMEND MODIFICATION. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 26,250 GEN. OBLIGATION BONDS: PENDING (J) $ 26,250 TOTAL 4-7 131 4-8 132 COMMUNITY DEVELOPMENT PROJECT TITLE: OFFICE AND ADMINISTRATIVE AREAS RENOVATION LOCATION: FIRE STATION NO. 1, SOUTH SPRIGG STREET PURPOSE: TO PROVIDE OFFICE AND SUPPORT AREAS THAT WILL MEET THE NEEDS OF THE FIRE DEPARTMENT FOR THE NEXT 10 TO 15 YEARS PHYSICAL DESCRIPTION: TOTAL REDESIGN AND RENOVATION OF FIRE DEPARTMENT ADMINISTRATIVE OFFICE AREAS UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT AREA IS POORLY DESIGNED AND INCAPABLE OF MEETING THE EXPANDING NEEDS OF A GROWING ORGANIZATION. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 202,640 GEN. OBLIGATION BONDS: PENDING (J) $ 202,640 TOTAL 4-8 132 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO.4 RELOCATION LOCATION: VICINITY OF LEXINGTON AND KINGSHIGHWAY PURPOSE: TO PROVIDE FUNDING FOR THE RELOCATION, PLANS AND SPECIFICATIONS FOR CONSTRUCTION, AND CONTRUCTION OF NEW FIRE STATION NO.4 PHYSICAL DESCRIPTION: ONE STORY MASONRY THREE -BAY DRIVE-THROUGH FIRE STATION ON APPROXIMATELY 3 TO 4 ACRES OF PROPERTY FRONTING ON MAJOR ROAD(S). UNIT OF WORK: ACQUIRE PROPERTY, DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT STRUCTURE IS UNDERSIZED AND POORLY LOCATED TO COMPLY WITH CURRENT AND FUTURE GROWTH IN NORTHERN AND WESTERN PARTS OF THE CITY. IMPACT ON SOME INCREASE IN EQUIPMENT, PERSONNEL AND OPERATING BUDGET: OPERATING BUDGET ANTICIPATED, UNQUANTIFIABLE AT THIS TIME. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 1,166,952 GEN. OBLIGATION BONDS: PENDING (J) $ 1,166,952 TOTAL 4-9 133 COMMUNITY DEVELOPMENT PROJECT TITLE: REGIONAL TRAINING FACILITY LOCATION: SOUTH SPRIGG STREET PURPOSE: PLANS AND SPECIFICATIONS, AND CONSTRUCTION OF A REGIONAL FIRE TRAINING FACILITY PHYSICAL DESCRIPTION: PER NEEDS REQUIREMENTS OF REGIONAL FIRE TRAINING TO INCLUDE LIVE -FIRE TRAINING, CLASSROOMS, TRAINING TOWER, TRANSPORTATION SCENARIOS, AND NECESSARY SERVICE/SUPPORT FACILITIES 4-10 UNIT OF WORK: DESIGN AND CONSTRUCTION JUSTIFICATION: THERE IS CURRENTLY NO FIRE TRAINING SITE AVAILABLE IN SOUTHEAST MISSOURI. DEVELOPMENT OF SUCH A FACILITY WOULD ALLOW THE CITY TO BECOME A REGIONAL CENTER FOR PUBLIC SAFETY AND INDUSTRIAL TRAINING. IMPACT ON SOME INCREASE IN OPERATING BUDGET ANTICIPATED, OPERATING BUDGET: UNQUANITIFIABLE AT THIS TIME. FINANCING: $ 530,000 GEN. OBLIGATION BONDS: PENDING (J) $ 530,000 TOTAL 134 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 1 PARKING EXPANSION LOCATION: FIRE STATION NO. 1, SOUTH SPRIGG STREET PURPOSE: ACQUISITION OF ADDITIONAL LAND AND CONSTRUCTION OF FACILITIES FOR ADDITIONAL PARKING AT FIRE STATION NO. 1 PHYSICAL DESCRIPTION: ACQUIRE APPROXIMATELY 15,000 SQUARE FEET, MORE OR LESS, OF PROPERTY AND EXPAND PARKING. UNIT OF WORK: ACQUIRE PROPERTY, DESIGN AND CONSTRUCT JUSTIFICATION: PARKING AT REAR OF FIRE STATION NO. 1 (HEADQUARTERS) IS SEVERELY LIMITED IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 46,305 GEN. OBLIGATION BONDS: PENDING (J) $ 46,305 TOTAL 4-11 135 4-12 136 COMMUNITY DEVELOPMENT PROJECT NAME: FIRE STATION NO. 2 MAINTENANCE/STORAGE FACILITY LOCATION: BEHIND FIRE STATION NO. 2, SOUTH MOUNT AUBURN ROAD PURPOSE: TO PROVIDE A ONE -BAY VEHICLE REPAIR/MAINTENANCE AREA WITH PIT AND A SIGNIFICANT SPACE FOR GENERAL FIRE DEPARTMENT STORAGE PHYSICAL DESCRIPTION: METAL BUILDING WITH CONCRETE FOUNDATION UNIT OF WORK: PURCHASE OF MATERIALS AND LABOR COSTS JUSTIFICATION: THE FIRE DEPARTMENT CURRENTLY HAS NO SPACE FOR STORAGE AND THE MECHANIC HAS NO BAY WITH PIT AREA IN WHICH TO DO TRUCK MAINTENANCE/REPAIR. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 150,000 GEN. OBLIGATION BONDS: PENDING (J) $ 150,000 TOTAL 4-12 136 COMMUNITY DEVELOPMENT PROJECT TITLE: ESTABLISHMENT OF FIRE STATION NO. 5 LOCATION: WEST OF INTERSTATE HIGHWAY 55 PURPOSE: TO PROVIDE FUNDING FOR THE PURCHASE OF LAND FOR THE CONSTRUCTION OF FIRE STATION NO.5 PHYSICAL DESCRIPTION: APPROXIMATELY 3 TO 4 ACRES OF PROPERTY FRONTING ON MAJOR ROAD(S) UNIT OF WORK: ACQUIRE PROPERTY JUSTIFICATION: TO COMPLY WITH CURRENT AND FUTURE GROWTH IN WESTERN PART OF THE CITY IMPACT ON SOME INCREASE IN EQUIPMENT, PERSONNEL AND OPERATING BUDGET: OPERATING BUDGET ANTICIPATED, UNQUANTIFIABLE AT THIS TIME. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 100,00 GEN. OBLIGATION BONDS: PENDING (J) $ 100,000 TOTAL 4-13 137 COMMUNITY DEVELOPMENT PROJECT TITLE: CITY HALL REMODELING (MAIN FLOOR) LOCATION: CITY HALL PURPOSE: PROVIDE MAIN FLOOR OFFICE SPACE FOR DIVISION OF PLANNING SERVICES TO PROVIDE IMPROVED PUBLIC ACCESS AND RELIEVE OVERCROWDING ON SECOND FLOOR. PHYSICAL DESCRIPTION: RECONSTRUCTION AND REMODELING OF APPROXIMATELY 7,200 SQUARE FEET OF OFFICE SPACE. 4-14 UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: PLANNING SERVICES OFFICES ARE LOCATED ON THE SECOND FLOOR OF CITY HALL. RELOCATION TO THE MAIN FLOOR OF THE MAIN OPERATIONS WILL IMPROVE CUSTOMER ACCESS AND CONVENIENCE. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 14,900 GENERAL REVENUE (A) $ 14,900 TOTAL 138 COMMUNITY DEVELOPMENT PROJECT TITLE: CITY HALL ELEVATOR LOCATION: CITY HALL PURPOSE: PERMIT ACCESS, INCLUDING ACCESS FOR MOBILITY - IMPAIRED PERSONS, TO ALL THREE LEVELS FOR SERVICES OFFERED. TO BE IN COMPLIANCE WITH AMERICANS WITH DISABILITIES ACT. PHYSICAL DESCRIPTION: ELEVATOR MEETING ALL HANDICAPPED -ACCESSIBILITY REQUIREMENTS INTERCONNECTING ALL THREE FLOORS OF CITY HALL. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CONVENIENCE AND SAFETY OF PUBLIC AND COMPLIANCE WITH AMERICANS WITH DISABILITIES ACT. IMPACT ON ADDITIONAL OPERATING AND MAINTENANCE COSTS OPERATING BUDGET: FINANCING: $ 147,900 GENERAL REVENUE (A) $ 147,900 TOTAL 4-15 139 This page intentionally left blank. MIfII LONG-RANGE CAPITAL IMPROVEMENT PROGRAM Unfunded Needs List The following list of Capital Improvement Program Needs consists of those projects which have been identified as major long-range facility improvements for which funding is currently not available. These projects are not listed in any order of priority. TRANSPORTATION AND PUBLIC WORKS 1) Bloomfield Road — I-55 to Benton Hill Road 2) Broadview from Independence to North Kingshighway (at Maria Louise Lane) 3) Broadway — Perry to West End Boulevard or Henderson (widening) and West End Boulevard or Henderson to Main Street (general improvements) 4) Cape Rock Drive — Big Bend Road to Cape Rock Park — widening with curb and gutter 5) Edgewood Drive — Bloomfield to William Street 6) Gordonville Road — Independence to Mount Auburn — widening with curb and gutter 7) Hopper Road (existing) — Mount Auburn to Kage — widening with curb and gutter 8) Howell Street — low-water crossing improvements at Scivally Branch 9) Independence Street — Kingshighway to West End (widening) and from West End Boulevard to Water Street (general improvements) 10) Lombardo Street — box culvert additions and realignment at Walker Branch 11) Main Street — realignment from Mason Street to Second Street and new Sloan Creek Bridge 12) Main Street — widening from Mill to Mason 13) New Madrid Street — Clark to Perry Avenue — widening with curb and gutter 14) North Sprigg Street — Lexington to Route 177 extension 15) Old Sprigg Street Road/Lexington Avenue intersection improvements 16) Silver Springs Road (Shawnee Parkway to Southern Expressway extended) — general improvements 17) Sprigg Street — New Madrid to Southern Expressway — general improvements and/or widening 18) Vantage Drive — Percy Drive to Kingshighway at Boulder Crest (west) 19) West End Boulevard — Southern Expressway to Shawnee Parkway and Bloomfield to Bertling and extended to Lexington — general upgrade 20) Sussex Drive (Wyandotte Acres) connection to Perryville Road 21) Street lighting improvements 22) Additional streets per Major Street Plan 23) Airport — additional airport improvement projects per Airport Master Plan 24) Airport — corporate parcel and utility road extensions 25) Airport — development of an Airport Industrial Park 26) Airport — new wastewater treatment facilities 27) Public Works ADA upgrade 28) Public Works free-standing communications antenna 141 ENVIRONMENT 1) North Sprigg Street (Upper Sloan Creek) trunk sewer extension 2) Cape Rock Village/Tanglewood Estates main lift station and force main 3) Highland Drive -Oakland Street -Engram Street trunk sewer 4) Sewer improvement projects per Sewer Master Plan 5) Water System improvement projects per Water Master Plan 6) Public Works property acquisition — new recycling center — compost site 7) Stormwater detention basins/major stormwater channel projects 8) Water Plant No. 1, Phase III expansion 9) Storage facility west of I-55 (additional) 10) Bloomfield Road pump station 11) Kingshighway booster pump station 12) Water Plant No. 2 expansion 13) 20 -inch main extension (Plant 2 to Highway 61) 14) 16 -inch main extension (Plant 2 to Highway 61) 15) I-55 and William Street 14 -inch upgrade 16) 14 -inch main extension (North Sprigg) 17) 12 -inch main extension (Kingshighway) 18) 12 -inch main extension (Highway 177 to Cape Rock) 19) 12 -inch main extension (Lexington) 20) 12 -inch main extension on Perryville Road 21) 12 -inch main extension Plant 2 to Industrial Park/Airport 22) 8 -inch main extension (Mount Auburn and Hopper Road) 23) Main replacement (Downtown) 24) 4 -inch main replacement (City wide) 25) 2 -inch main replacement (City wide) 26) Fire protection upgrade (Kingshighway) 27) Fire hydrant replacement (City wide) 28) Water tank seismic protection 29) North County Park water improvements 30) North County Park sewer system and lift station 142 PARKS AND RECREATION 1) Aquatic center. 2) Capaha Park gazebo. 3) Cherokee Park shelter parking lot paving. 4) Indian Park improvements. 5) Capaha Park basketball court (lighted, fenced, regulation court). 6) Arena Park paving off street parking #5, #10, #11. 7) Arena Park ballfield spectator paving, tennis court parking paving. 8) Arena Park road paving by fields #12, #13, #14, #15. 9) Tennis court renovation (lights, fence, windscreen color coating). 10) New bandshell restroom. 11) General park development. 12) Parking lot paving at Arena, Washington, and Ranney Parks. 13) Parking lot for A. C. Brase Arena. 14) Additional parking for Osage Community Center. 15) Football/soccer field 16) In-line hockey/skateboard facility. 17) Bent grass greens at golf course. 18) Driving range. 19) Park 3 golf course. 20) General golf course development. 21) Riverfront trail project. COMMUNITY DEVELOPMENT 1) 2) 3) City Hall standby power system Neighborhood and downtown redevelopments Historic preservation 143 This page intentionally left blank. 144