Loading...
HomeMy WebLinkAboutCIP1998-2003CAPITAL IMPROVEMENTS PROGRAM ADOPTED FISCAL 1998-2003 •�i ��,�SEAL CITY OF CAPE GIRARDEAU MISSOURI BILL NO. 98-39 RESOLUTION NO. )3qU, A RESOLUTION ADOPTING THE FISCAL 1998-2003 CAPITAL IMPROVEMENTS PROGRAM WHEREAS, Article VI, Section 6.04 of the Charter of the City of Cape Girardeau requires a Capital Improvements Program; and WHEREAS, the City Manager has presented a proposed Capital Improvements Program to the City Council; and WHEREAS, proper notice has been published concerning the availability for inspection of the proposed Capital Improvements Program and the time and place for a public hearing on the Capital Improvements Program; and WHEREAS, the City Council has held a public hearing on the proposed Capital Improvements Program. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Council hereby adopts the five-year Capital Improvements Program for fiscal 1998-2003, copies of which are on file in the office of the City Clerk. ARTICLE 2. The City Clerk is instructed to attach an executed copy of this resolution to a copy of the Capital Improvements Program for fiscal 1998-2003 and to retain such copy with the permanent records of the City. PASSED AND ADOPTED THIS :2?1tD DAY OF i��Ci2(�.�� , 19 A. M. Spradling, III, May ATTEST: Al- ( zaa'' Gayle(t. Conrad Deputy City Clerk CITY OF CAPE GIRARDEAU, MISSOURI Office of the City Manager Council Letter No. 73 Agenda March 2, 1998 The Honorable Mayor and Members of the City Council City of Cape Girardeau, Missouri Subject: Adoption of the Capital Improvements Program, Fiscal 1998-2003 Dear Mayor and Council Members: In accordance with the requirements of the City Charter, a public hearing regarding the 1998-2003 Capital Improvements Program was held on Tuesday, February 17, 1998, at 7:30 P.M. The City Charter requires that this program be adopted on or before April 1, 1998. Attached for the Council's consideration is a resolution adopting the Capital Improvements program. It is recommended that the City Count roceed th this action. illy submitted, Michael G. Miller City Manager John R. Richbourg Finance Director ent M. Bratton City Planner MGM/JRR/KMB/rlf CITY OF CAPE GIRARDEAU Office of the City Manager Council Letter No. 54 Agenda February 17, 1998 The Honorable Mayor and Members of the City Council City of Cape Girardeau, Missouri RE. Public Hearing on 1998-2003 Capital Improvements Program Dear Mayor and Council Members: In accordance with requirements of the City Charter, a public hearing regarding the 1998-2003 Capital Improvements Program has been set for Tuesday, February 17, 1998, at 7:30 P.M. The public notice of the hearing was published in the Southeast Missourian on Friday, January 30, 1998. Unless otherwise directed, the staff will prepare a resolution for adoption of the proposed Capital Improvements Program, with any amendments the Council wishes to make, for the Council's agenda for Monday, March 2"d. The City Charter requires that the Capital Improvements Program be adopted on or before April 1, 1998. The draft of the proposed Capital Improvements Program was submitted to the City Council on January 23, 1998, by Council Memorandum No. 17. The Council held a special work session on the Capital Improvements Program on January 2.61h. , At that meeting, the Council discussed adding two projects to the Parks and Recreation section and the staff has prepared estimates for those projects, as follows: 1. A new restroom/storage/concession/change room building for the Capaha Park main ballfield. $185,500 2. A new restroom/shower building for Arena Park. The Fair Board has requested that showers be included in this facility. $137,000 Since the limited general revenue funding available for park projects for the 1998-1999 fiscal year has already been programmed, these projects will need to be programmed for 1999-2000 at the earliest and funding from other sources (I) will need to be indicated. If the Council wishes to add these projects to the Capital Improvements Program at this point, we would request that you do so by motion. Respectfully submitted, �0/ w,� Kent M. Bratton City Planner KMB/JRR/MGM/rlf John R. Richbourg Finance Director Michael G. Miller City Manager TABLE OF CONTENTS ITEM Introduction: PAGE City Manager's Letter ..................................... i Summaries: Revenue Funding Sources by Fiscal Year Graph ..................... vii Summary of Funding Sources by Fiscal Year 1998-2003 ................ viii Summary of Recommended Capital Improvements Program Expenditures 1998-2003 by Program Description and Source of Funds ........................................ ix Summary of Funding Sources Graph ............................ x Capital Improvements Budget by Program Area Graph ................. xi Revenue Sources ........................................ xii Capital Improvements Program: Transportation and Public Works ............................. 1 Environment .......................................... 59 Parks and Recreation .................................... 121 Community Development ................................. 133 Unfunded Needs List .................................... 151 The Honorable Mayor and Members of the City Council City of Cape Girardeau Dear Mayor and Council Members: March 16, 1998 INTRODUCTION The City staff herewith submits the adopted Five -Year Capital Improvements Program. This program, for the period July 1, 1998, through June 30, 2003, is submitted in accordance with Article VI, Section 6.04 of the City Charter. On February 17, 1998, in accordance with the City Charter, the City Council held a public hearing for the Capital Improvements Program. Following public input, the City Council adopted the Capital Improvements Program by resolution at its March 2, 1998, meeting. The material contained within this document complies with the requirements of the Charter as to program proposals, cost estimates, methods of financing, projection of revenue sources to meet costs, recommended time schedule for each improvement, and any anticipated impact on the annual operating budget. While the projects included herein are attainable through available revenue sources, a number of these depend on the cooperation of property owners and other agencies, and further action by the City Council. Projects for which a reliable funding source is not currently proposed are included under the Unfunded Needs Section. Each of the City's advisory boards involved in planning for capital improvements were given the opportunity to provide input, as well as those City departments involved in planning and implementation of such improvements. BACKGROUND The Capital Improvements Program should be considered as an investment in the future of the community. The selection and evaluation of capital projects is a difficult task that involves some speculation and the ability to make estimations which, to some extent, are based on historical perspectives. The City Council, in 1983, formally considered and adopted a long-range Capital Improvements Program for the first time under the current Charter requirement. This budget process should provide a relevant approach to identifying and implementing important community -wide and neighborhood projects. 1 PROGRAM AND FINANCING DESCRIPTIONS The major program areas within which the various projects have been described include Transportation and Public Works, Environment, Parks and Recreation, and Community Development. These major categories contain the following types of projects: Transportation and Public Works. The projects in this category provide for the construction of the public streets within the City, the Regional Airport, and site of Public Works facilities. 2. Environment. These projects provide for the preservation, restoration, and care of the physical resources of the City, including solid waste, water, wastewater, and stormwater services. 3. Parks and Recreation. The programs under this area provide the facilities for citizens to participate in organized and unorganized recreation and leisure time activities. 4. Community Development. Projects under this category include construction of general public facilities and community projects which have city-wide effects. The Capital Improvements Program includes types of revenue sources recommended as ways to finance the capital improvements proposed. The following is a brief discussion of what the various revenue sources include. A. General Fund Revenues. These revenues are available on an annual appropriation basis from the City's general fund, which includes the receipt of revenues from a number of sources. These funds are subject to the annual budgeting process. B. and C. Revenue/PFA Bonds. These bonds are issued for the financing of self-supporting and general public improvements. Revenue bonds are not included within the limitations of indebtedness of the City and are issued upon the authorization of a majority voter approval. These bonds are normally used for enterprise funds such as water, sewer, and solid waste utilities. PFA (Public Facility Authority) bonds are used upon City Council approval based on collateralized assets and annual lease/purchase appropriations. Cash flows for debt retirement come from existing revenue and from new receipts to be generated by the facilities' operations. Within the Capital Improvements Program, revenue/PFA bonds already issued or authorized by the electorate or City Council are denoted as "B". Those that are pending, i.e. will require subsequent approval of the electorate or Council, are denoted as "C". D. State Grants. The City is eligible to submit grant applications to the State of Missouri for funds that they may have available either from their own revenue sources or, in some cases, from revenue sources that they administer for various federal agencies. ii E. Motor Fuel Tax Receipts. This fund provides for the receipt and disbursement of revenues the City receives as its portion of the State Gasoline Tax, State Motor Vehicle Licensing, and State Motor Vehicle Sales Tax. The revenues from this source can be used for capital improvements, as well as annual operating maintenance expenses as they relate to improvements on the City's streets. F. Federal Grants. The City is eligible to receive various federal grants on a competitive basis from appropriate federal agencies. This could include the Environmental Protection Agency as it relates to wastewater improvements, the Federal Highway Administration which administers and distributes funds from the Federal Gasoline Tax revenue through the Federal Aid Urban program, or the Federal Aviation Administration for airport improvements. Most of these funds, however, are now administered by the State through related State agencies. G. Special Assessments. This category provides for the consideration of special assessments which are used for public improvements affecting specific areas. The total, or a portion of, the cost of an improvement is divided among property owners who benefit from the project. This type of funding can be used for diverse improvements including streets, water, stormwater, sanitary sewer or sidewalk improvements. However, it should be noted that the "up front" cost of special assessment projects (i.e., the initial funding) must be borne by the City from available revenue sources, with the special assessment "costs" recovered afterwards, typically over a period of ten years through special tax bills paid by the benefiting property owners. H. Capital Improvements Sales Tax. A 1/4 cent, 3/8 cent, or 1/2 cent Sales Tax can be issued by the City for various types of public improvements. Such a tax requires approval by the electorate with a simple majority. For example, in November, 1988, the voters of Cape Girardeau adopted a 1/4 cent sales tax effective January 1, 1990, restricted to flood control projects. On April 5, 1994, the voters of Cape Girardeau approved the extension of this tax for an additional twenty years to pay for improvements to the City's sewer system. In November of 1996, the voters adopted an additional '/a cent sales tax effective January 1, 1997, for expansion of the water treatment plant and various other water improvements. Other. This category denotes funds from donations, operating revenues from funds other than the General Fund, reserves, proceeds from the sale of fixed assets and other sources. J. General Obligation Bonds. These bonds are normally issued for the financing of general public improvements. General obligation bonds must be authorized by a 4/7th vote of the voters which also authorizes a tax levy to be used for debt retirement. Total outstanding general obligation bonds are limited by State statute to 20% of the City's total assessed valuation. K. Transportation Sales Tax. Pursuant to Sections 94.700 - 94.755 of the State statutes, the voters of the City of Cape Girardeau approved a '/a % sales tax for iii transportation purposes on August 8, 1995, for a period of five (5) years. This tax went into effect on January 1, 1996. Revenues from this source are placed in a special Transportation Trust Fund to be used only for these purposes. PROPOSED IMPROVEMENTS The total Capital Improvements Program included herein includes a total of $80,510,965 in improvements for the five-year period 1998-2003 by fiscal year. The largest category for funding proposed improvements is through the proposed (pending) issuance of Revenue/PFA Bonds. This provides for $29,643,500 in funding over this period, most of which is connected with the November, 1996, passage of the issue for water system improvements. The second largest funding source is the Transportation Sales Tax. This includes $11,419,200 in funds over the next five years. The third largest category for funding proposed improvements over the next five years is through the use of remaining funds of previously issued Revenue/PFA Bonds. This provides for $9,519.200 in funding over the next five years, primarily is association with the sewer improvement and Corps of Engineers flood control project. State Grants and Loans will provide the fourth largest source of funds, with $7,405,930 projected for the program period. The majority of these funds, if available, will be used for improvements at the Regional Airport. The largest program area is Environment ($45,397,900). The most significant projects in this area will continue to be the sewer improvements funded by the April, 1994, bond issue ($11,127,000). Also included in this area is $25,243,200 for expansion of the water system's production/treatment/ distribution capacity to be funded by revenue bonds authorized November 5, 1996. This category also includes $2,191,000 for the completion of the Corps of Engineers' Flood Control Project on Walker Branch and the detention basin. The Transportation and Public Works program area ($26,212,600) contains the second largest amount for proposed projects over the next five years. This amount is comprised of $19,692,000 for street and bridge projects, $6,792,600 for airport projects, and $3,791,000 for public works improvements. The Parks and Recreation program area includes $742,950 for seven relatively small improvement projects, general park development, continued payment for land acquisition for the additions to Shawnee Park and the purchase of Osage Park, and construction of a new pro shop at the Municipal Golf Course. The Community Development program area ($8,157,515) includes $3,044,155 in proposed new construction or improvements to the City's fire stations and $4,580,000 for an addition to police headquarters. Also included is remodeling of Convention and Visitors Bureau administrative offices, replacement of the police station heating and cooling system, city hall remodeling, and iv construction of a city hall elevator. CONCLUSION The capital improvements program proposed herein is a progressive program. The implementation of this program will allow for the creation of new job opportunities, an increase in revenue to private businesses, opportunities for new businesses, existing business expansions, increased tax revenues to all taxing jurisdictions, and the strengthening of the quality of life in Cape Girardeau and the surrounding area. It is hoped that this plan will focus attention on community goals, needs and capabilities; reduce scheduling problems and conflicting or overlapping projects; maintain a sound and stable financial program; enhance opportunities for participation in federal or state funded programs; and achieve the highest public benefit from the expenditure of City revenue. The projects proposed in this document are the product of many hours of deliberative thought by a number of people within this community. The Charter requires an annual review and revision of the Capital Improvements Program which assures that the Program remains responsive to changing demands, priorities, and available revenues. The final plan should be regarded as a sound, fiscally responsible working document that can and will be implemented through the annual budget appropriation process of the City Council, support from the citizens of Cape Girardeau-€arpropriate revenue sources, and diligent action by the City staff. J MGM/KMB/JR/rlf submitted, "Michael G. Miller City Manager ient M. Bratton City Planner John Richbourg Finance Director W REVENUE FUND/NC S®URCES BY FisCAL YEAR CAPITAL IMPROVEMENTS PROGRAM 35,000,000 30,000,000 25,000,000 20,000,000 15,000,000 10,000,000 5,000,000 1998-99 1999-00 2000-01 2001-02 2002-03 V12 SUMMARY OF FUNDING SOURCES BY FISCAL YEAR 1998-2003 I! SOURCE OF FUNDS I 1998-99 I 1999-00 1 2000-01 1 2001-02 I 2002-03 ! TOTAL II GENERAL FUND REVENUES $ 548,030 $ 481,945 1 $ i 627,795 $ 143,575 S 264,840 $ I 2,066,185 REVENUE/PFA BONDS: ISSUED $ 8,969,200 $ 550,000 s S 1 0 $ 0 $ 0 S 9,519,200 REVENUE/PFA BONDS: PENDING S 9,826,125 $13,259,825 $ 5,840,425 $ 717,125 $ 0 $ 29,643,500 STATE GRANTS/LOANS $ 1,333,670 $ 204,750 , $ 1,585,360 $ 992,490 S 3,289,660 S 7,405,930 I MOTOR FUEL TAX RECEIPTS $ 563,300 $ 715,950 I $ j 587,000 $ 439,100 S 611,0001 $ 2,916,350 FEDERAL GRANTS/LOANS $ 557,500 $ 289,200 $ 289,200 $ 214,200 $ 214,200 S 1,564,300 SPECIAL ASSESSMENTS $ 1,463,300 $ 129,200 $ 0 $ 0 Sc 0 i $ 1,592,500 CAPITAL IMPROVEMENT SALES TAX S 280,200 $ 330,000 1 $ 20,000 S 0 S 0 S 630,200 OTHER $ 2,333,600 $ 3,328,900 $ 276,000 $ 202,000 $ 725,000 $ 6,865,500 GEN. OBLIGATION BONDS: PENDING 5 0 $ 296,000 $ 1,158,000 S 4,890,000 $ 544,100 S 6,888,100 TRANSPORTATION SALES TAX $ 5,014,400 $ 3,675,500 i $ 2,729,300 $ 0 $ 0 ' $ 11,419,200 TOTALS $30,889,325 $23,261,270 ( $ 13,113,080 $ 7,598,490 1 $ 5,648,800 1 $ 80,510,965 vi—ii SUMMARY OF RECOMMENDED CAPITAL IMPROVEMENT PROGRAM EXPENDITURES 1998-2003 BY PROGRAM DESCSRIPTION AND SOURCE OF FUNDS SOURCE OF FUNDS PROGRAM DESCRIPTIONS TRANSPORTATION & PUBLIC WORKS ENVIRONMENT PARKS & RECREATION COMMUNITY DEVELOPMENT TOTALS GENERAL FUND REVENUES $ 435,920o S 453,950 S 1,176,315 S 2,066,185 REVENUE/PFA BONDS: ISSUED $ 0 $ 9,519,200 S O $ 0 ( $ 9,519,200 REVENUE/PFA BONDS: PENDING $ 0 $ 29,643,500 ( $ 0 $ 0 $ 29,643,500 STATE GRANTS/LOANS $ 6,763,930 $ 642,000 S 0 $ 0 $ 7,405,930 . MOTOR FUEL TAX RECEIPTS $ 2,916,350 $ 0 $ 0 0 $ 2,916,350 FEDERAL GRANTS/LOANS $ 0 $ 1,564,300 $ 0 $ 0 S 1,564,300 SPECIAL ASSESSMENTS $ 886,200 S 706,300 $ 0 S 0 $ 1,592,500 CAPITAL IMPROVEMENT SALES TAX $ 0 S 630,200 $ 0 $ 0 $ 630,200 I OTHER S 3,791,000 $ 2,692,400 S 289,000 S 93,100 S 6,865,500 GEN. OBLIGATION BONDS: PENDING $ 0 $ 0 S 0 S 6,888,100 S 6,888,100 TRANSPORATION SALES TAX $ 11,419,200 $ 0 S 0 S 0 S 11,419,200 TOTALS L S 26,212,600 S 45,397,900 ( S 742,950 $ 8,157,515 S 80,510,965 I 1x SUMMARY OF FUNDiNG SouRcEs CAPITAL IMPRO VE/V EN T BUDGET GEN. FUND REVENUES 2.6% MOTOR FUEL TAX REC. 3.6% 2 "- " OTHER 8.5% SPECIAL ASSESSMENTS 2.0% liq PARKS (X RECREAT'^"� ^ ^"' ENVIRONMENT 56 xi PUB. WORKS 32.6% COMMUNITY DEV. 10.1 % A. B. C. D. E. F REVENUE SOURCES General Fund Revenues G. Special Assessments Revenue/PFA Bonds: Issued H. Capital Improvement Sales Tax Revenue/PFA Bonds: Pending I. Other State Grants and Loans J. General Obligation Bonds Motor Fuel Tax Receipts K. Transportation Sales Tax Federal Grants and Loans xii R -AIV PO, R- . TION AND PUBLIC WORKS 8,000,000 7,000,000 6,000,000 5,000,000 4,000,000 3,000,000 2,000,000 1,000,000 1998-99 1999-00 2000-01 2001-02 2002-03 TRANSPORTATION AND PUBLIC WORKS A GENERAL FUND - - - - B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTS/LOANS E MOTOR FUEL TAX F FED. GRANTS/LOANS G SPEC. ASSESSMENTS H CAP. IMP. SALES TAX OTHER J GEN. OBL. BONDS: PENDING K TRANS. SALES TAX - - Projects included in Transportation Trust Fund Program supported by a 1/2% transportation sales tax ?€ for five years approved by vote on August 8, 1995. * Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. 2 PROPOSED PROJECTS� PROJECT 1998-99 1999 -CO 2000.01 2001-02 2002.03 NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR FISCAL YEAR I FISCAL YEAR FISCAL YEAR ?T? Streit Overlay Program 1,750,000 550,Q00 3 550,000 350,000 150,000 150,00- cl E,K E,K E,K t EK 1 _ E 1 >7'2`# "': Gavel Street Paving 800,000 270,000 270,000 160,000 50,000 50,000 Program E,G,K 1 I "G,K i E,G,K E,G,K E I I I 1 Street, Curb & Gutter Repair 937,500 375,000 375,000 187,500 K s K i K K. ?'l 4"i Sidewalk Repair & 312,5-0 125,000 125,000 62,500 r Reconstruction I K K r K I K 1 1-5 Traffic Controls Replacement 50,000 50,000 I E E I i I 1-6 Hopper Road Bridge and 353,900 353,900 9 Reconstruction: Clippard ; D,E" ! D,E School to Mt. Auburn Road { i 1 1-7 Bloomfield Road Bridge Over 272,900 272,900 it Ramsey Branch I D,E• D,E 1-8 Kenneth Drive Connection: 16,400 1 16,400 ' I I Woodland Hills to Randol E Farms 9^[ Hopper Road: Phase 1: Mt. c 686, 00 686,500 Auburn Road to Kage Road K , K r 1 70" Silver Springs Road: William 356,500 " I 356,503 i St. to Independence St. I K K f I I A GENERAL FUND - - - - B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTS/LOANS E MOTOR FUEL TAX F FED. GRANTS/LOANS G SPEC. ASSESSMENTS H CAP. IMP. SALES TAX OTHER J GEN. OBL. BONDS: PENDING K TRANS. SALES TAX - - Projects included in Transportation Trust Fund Program supported by a 1/2% transportation sales tax ?€ for five years approved by vote on August 8, 1995. * Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. 2 TRANSPORTATION AND PUBLIC WORKS LPROPOSED PROJECTS PROJECT I y 1998-99 1999-00 2000-01 2001-02 2002-03 NUMBER IMPROVEMENT ITEM TOTAL COST ! FISCAL YEAR FISCAL YEAR. 1 FISCAL YEAR FISCAL YEAR FISCAL YEAR t.1 E Broadway Widening & 942,900 942,900 1 ::; Reconstruction: ClarkI K K { •:• Avenue to Perry Avem - Ij Lorimier: Morgan Oak tc 255,800 iIi 1 ' 255,800 I " New Highway 74 E K 1 I K ':i':?3 Siemers Drive: Bloomfield to 508,000 508,000 Seeear New Highway 74 K K Aetaif mei 1 Bloomfield Road: Phase Il: i 964 700 964,700 l f i Kingshighway to 1-55 K K [ 1 T5 Hopper Road: Phase!!: 348,900 348,900 I I .. Kage Road to 1-55 K K •;a`.<15 William Street: Improvement/ • 486,300 r 486,300 <. Widening: Sprigg to Main K ! K =7? Perryville Road: City Limits 986,300 ( 986,300 to Route W # K 1 K y 1 s<E'.Y7$>' Kage Road: Mt. Auburn to 86,900 86,900 4 •`. Hopper Road K K t t I :..:.:.::.: :.`�;=1 Mt. Auburn: New Highway t 764,000 I 764,000 i 74 to Southern Expressway K K I :::::::......:::> t t:0€ Southern Expressway: 472;600 472,600 Kingshighway to Silver I K , K Springs Road I >2_(> Independence: Reconstruct.: 332,600 332,600 Pacific to Spri99 S K, I 1 ii K I i A GENERAL FUND. B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRAN7S/LOANS E MOTOR FUEL TAX F FED. GRANTS/LOANS G SPEC. ASSESSMENTS - - H CAP. IMP. SALES TAX OTHER J GEN. OBL. BONDS: PENDING K TRANS. SALES TAX Projects included in Transportation Trust Fund Program supported by a 1/2% transportation sales tax for five years approved by vote on August 8, 1995. * Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. 3 TRANSPORTATION AND PUBLIC WORKS j: !j PROPOSED PROJECTS PROJECT 1 1998-99 ` 1999-00 { 2000-01 2001-02 2002-03 S NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR FSCAL YEAR FISCAL YEAR FISCAL YEAR 22 New Madrid: Reconstruction: 779,000 I 779,000 See;3 --- ... >: < > Perry to Show Me Center Kr K i3eFaiESif »:=> Rodney: Bridge & Re -const.: 64S,200 } s t 648,200 { I :::::-»:_>:>:: i> [ >»: ................... Armory to Hawthorne K• j K i I l { f{ �? 1-24 Siemers Drive Widening: 886,200 s E 886,200 � l Campster to Bloomfield Road G ; G i I{ with Signals at Lambert and i 1 3 1 Bloomfield F E I Ii { 1-25 Linden Street: Reconst.: ( 175,000 175,000 !� Benton to Sprigg with j E E Sidewalk; Widening: Benton II to West End with Sidewalk j t 1-26 Clark Street: Marietta South 110,100 f i 110,100 1 to Victorian Estates E { ( i E 1-27 Minnesota: Bloomfield Road 447,800 447,800 1 to College with Sidewalks E{ j E I 1-28 I College Street: Louis to 387,000 1 387,000 West End Boulevard with E Sidewalk t ! ; i IE i i {j 1 1-29 Sidewalk along Perryville 129,000 129,000 Road, Lexington Avenue to E I E Cape Rock Drive ' I Il 1-30 Sidewalk along Lexington 131,000 j 1 131,000 Avenue, Perryville Road to E ! c Cape La Croix Road 1 �I A GENERAL FUND B REV/PFA BONDS: ISSUED - - C REV/PFA BONDS: PENDING D STATE GRANTS/LOANS E MOTOR FUEL TAX F FED. GRANTSILOANS G SPEC. ASSESSMENTS H CAP. IMP. SALES TAX OTHER J GEN. OBL BONDS: PENDING - K TRANS. SALES TAX Projects included in Transportation Trust Fund Program supported by a th% transportation sales tax for five years approved by vote on August 8, 1995. * Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. W d TRANSPORTATION AND PUBLIC WORKS A GENERAL FUND 9 REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTS/LOANS - - - E MOTOR FUEL TAX F FED. GRANTS/LOANS - - - .G SPEC. ASSESSMENTS H CAP. IMP. SALES TAX I OTHER - - - J GEN. OBL. BONDS: PENDING - - - - K TRANS. SALES TAX - - - - - * Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. 5 PROPOSED PROJECTS I PROJECT k 1998-99 1999-00 tt i " 2000-01 2001-02 2002-03 NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR i FISCAL YEAR FISCAL YEAR FISCAL YEAR i I 1-31 (01d Sprigg Street Road and ( 33,500 3 33,500 Lexington: Extend Box E i E Culvert ' ! 1-32 1 West End Boulevard: i 280,000 I j 280,000 Bloomfield South to I] Shawnae Parkway (Hwy. 74) SUBTOTAL -STREET 1 15,692,000 t 6,729,400 4,596,200 3,316,3006 611,000 11,009 PROJECTS 1-33 Airport T -Hangar Ramp 401,600 I 401,600 I i 1 i Replacement A,0 e A,D i I i ` Airport Emergency Power 47,000 t 47,000 �1-34 ! I Back -Up for Runway 10/28 ( I A,D* A,D I 1 1-35 p Airport Maintenance/Snow i 52,200 52,200 I Removal Equipment/AARF 1 A* D - A Building I 1-36 Airport Taxiway Extension i 1,564,500 ! I 1,564,500 for Runway 2/20 A,D i A,D i ` 1-37 Airport Runway 2/20 Cab!e i 104,300 ° 104,300. and Lighting I A,D ; i i A,D + I { i �' i I f 1-38 Airport Aircraft Rescue and 260,800 � ! 260,800 I Fire Fighting Building A,D* ! ; E ! A,D f f 1-39 Airport Taxiway Extension 469,400 = I 469,400 ; for "T* Hangars ! A,D t A,D 1-40 Airport 'T' Hangar -and � 332,000 i 1 1 � 332,000 Associated Taxiwaysi A,D ! i A,D A GENERAL FUND 9 REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTS/LOANS - - - E MOTOR FUEL TAX F FED. GRANTS/LOANS - - - .G SPEC. ASSESSMENTS H CAP. IMP. SALES TAX I OTHER - - - J GEN. OBL. BONDS: PENDING - - - - K TRANS. SALES TAX - - - - - * Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. 5 TRANSPORTATION AND PUBLIC WORKS PROPOSED PROJECTS PROJECT i 1998-99 # 1999 CO # 2000-01 2001-02 2002-03 NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR i FISCAL YEAR FISCAL YEAR FISCAL YEAR I 1 f 1-41 Airport Main Runway i 3,462,800 f 1 3,402,300 (10/28) Extension A,O i I AD I ! ! iI 1-42 Airport Hangar Door East1 35,000 35,000 !i Side of Air Evac i A A ) i 2 �I SUBTOTAL - AIRPORT 1 6,729,600 i 483,600 52,200 1,668,800 1,062,200 I 3,462,800 PROJECTS f 1-43 Public Works Partial Roof 64,000 15,000 16,000 i 16,000 17,000 iii Replacement ( i I 1-44 Public Works Siructurz! ! % 200,000 •� 50,000 � 75,000 75,000 f Reinforcement -Retrofit Bldg: I l j I t 1-45 Public Works Fuel Island 30,000 I 30,000 < j ! Canopy I l ! ! ( l 1-46 Public Works/Water 15,000 15,00C Operations Emergency 1* 1 f f Power Back -Up } !I 1-47 Public Works Facility { 3,350,000 350,000 I 3,000,000 f 1 I 1-48 Public Works Chemical � 72,000 ' 12,000 j I Material Storage I I 1 ! ) 1-49 Public Works Equipment 60,000 ! 60,000 ' l Storage Sheds 1-50 Public Works Material I 60,000 60,000 Storage Facility ! l I I SUBTOTAL- PUBLIC 3,791,000 ; 592,000 3,091,000 91,000 17,000 I WORKS PROJECTS ! A GENERAL FUND 9 REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTS/LOANS E MOTOR FUEL TAX F FED. GRANTS/LOANS- G SPEC_ ASSESSMENTS H CAP. IMP. SALES TAX - - - - OTHER J GEN. OBL. BONDS: PENDING K TRANS. SALES TAX Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. 6 TRANSPORTATION AND PUBLIC WORKS r— - PROPOSED PROJECTS PROJECT `` f 1993-99 I 1999-00 2000-012001-02 { 2002-03 NUMBER IMPROVEMENT ITEM t TOTAL COST F!SCAL YEAR FISCAL YEAR FISCAL YEAR. FISCAL YEAR ! FISCAL YEAR ! I I { TOTALS ; 526,212,600 i 57,805,000 $7,739,400 $5,076,100 $1.518,300 $4,073,800 t s ! + t' A GENERAL FUND ( S 435,920 S 57,430 $ 52,200 $ 83,440 S 69,710 S 173,140 { {: �l S REVIPFA BONDS: ISSUED �{ C REV/PFA BONDS: PENDING D STATE GRANTS/LOANS { S 6,763,930 S 691,670 { $ 204,750 j $ 1,585,360 5 992ASO $ 3,289,680 E �11 MOTOR FUEL TAX $ 2,916,350 S 553,300 { S 715,950 11 $ 587,000 $ 439,100 S 611,000 I F FED. GRANTS/LOANS � tl G SPEC. ASSESSMENTS $ 886,200 I S 886,200 I i H CAP. IMP. SALES TAX { I 1 OTHER S 3,791,OOC S 592,000 S 3,091,000 $ 91,000 $ 17,000 J GEN. OBL. BONDS: PEND. K TRANS. SALES TAX $11,419,200 iii { $ 5,014,400 $ 3,675,500 $ 2,729,300 * Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection.. 7 TRANSPORTATION AND PUBLIC WO=KS PROJECT T ITLE: STREET OVERLAY PROGRAM LOCATION: CITY-WIDE PURPOSE: PROVIDES FOR CONTINUING PRIMARY STREET MAINTENANCE PROGRAM TO PROVIDE FOR THE ASPHA!.T OVERLAY OF LOCAL AND COLLECTOR STREETS. PHYSICAL DESCRIPTION: MILLING OR USING OTHER SURFACE PROFILING METHOD AND ASPHALT OVERLAY. UNIT OF WORK: CONSTRUCT JUSTIFICATION: COST EFFECTIVE MAINTENANCE TO PREVENT NEED FOR FUTURE RECONSTRUCTION OR ENTIRE PAVEMENT. IMPACT ON NO SIGNIFICANT IMPACT. OPERATING BUDGET: FINANCING: $ 750,000 MOTOR FUEL TAX (E) $1,000,000 TRANSPORTATION SALES TAX (K) $ 1,750,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-1 N TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: GRAVEL STREET PAVING PROGRAM LOCATION: VARIOUS CITY STREETS PURPOSE: TO SURFACE EXISTING RESIDENTIAL GRAVEL STREETS. PHYSICAL DESCRIPTION: MINIMUM 20 -FOOT -WIDE, HOT MIX ASPHALTIC CONCRETE SURFACE UP TO 30 -FOOT CONCRETE SURFACE ON EXISTING GRAVEL STREET BASE AND DRAINAGE IMPROVEMENTS AS NEEDED. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: REDUCE GRAVEL STREET MAINTENANCE COSTS. ENHANCE NEIGHBORHOOD QUALITY. IMPACT ON PAVING OF GRAVEL STREETS WILL SIGNIFICANTLY OPERATING BUDGET: REDUCE COSTS OF GRADING AND ROCK REPLACEMENT. FINANCING: $ 250,000 MOTOR FUEL TAX (E) $ 550,000 TRANSPORTATION SALES TAX (K) $ 800,000 TOTAL CITY COUNCIL POLICY (RESOLUTION NO. 1127, DECEMBER 18, 1995) HAS ESTABLISHED A MAXIMUM SPECIAL ASSESSMENT FOR RESIDENTIAL GRAVEL STREETS EXISTING AS OF AUGUST 8, 1995, AT $10.00 PER FRONT FOOT FOR ABUTTING PROPERTY OWNERS. SPECIAL ASSESSMENT REVENUES RETURNED FROM THESE PROJECTS WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. SALES TAX AND MOTOR FUEL FUNDS WILL BE USED TO PAY THE UP -FRONT COSTS FOR ENGINEERING, RIGHT-OF-WAY, AND CONSTRUCTION. 1-2 9 TRANSPORTATION! AND PUBLIC WORKS PROJECT TITLE: STREET, CURB, AND GUTTER REPAIR LOCATION: UNSPECIFIED PURPOSE: SPECIFIC PROGRAM TO PROVIDE FOR RECONSTRUCTION OF CURBS AND GUTTERS IN CONJUNCTION WITH EXPANDED STREET REPAIR OR OVERLAY PROJECTS. PHYSICAL DESCRIPTION: IN GENERAL, COMPLETE REMOVAL OF DETERIORATED SECTIONS OF EXISTING CURB . %ND GUTTER AND REPLACEMENT. UNIT OF WORK: REMOVE AND RECONSTRUCT. JUSTIFICATION: IMPROVE LIFE OF EXISTING STREETS. ENHANCE NEIGHBORHOOD QUALITY. IMPACT ON COST EFFECTIVE MAINTENANCE TO EXTEND LIFE OPERATING BUDGET: OF EXISTING STREETS AND REDUCE MAINTENANCE COSTS. FINANCING: $ 937,500 TRANSPORTATION SALES TAX (K) S 937,500 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-3 i0 T RARSPORTATION AN, D PUBLIC WORKS PROJECT TITLE: SIDEWALK REPAIR AND RECONSTRUCTION LOCATION: UNSPECIFIED PURPOSE: SPECIFIC PROGRAM TO REPAIR AND RECONSTRUCT DETERIORATED SIDEWALKS. PHYSICAL DESCRIPTION: REPLACE DETERIORATED SIDEWALK SECTIONS WITHNEW NEW CONCRETE SECTIONS. UNIT OF WORK: REMOVE AND RECONSTRUCT. JUSTIFICATION: REPAIR DETERIORATED FACILITIES AND ENHANCE NEIGHBORHOOD QUALITY. IMPACT ON WILL REDUCE MAINTENANCE COSTS FOR OPERATING BUDGET: ABUTTING PROPERTY OWNERS. FINANCING: $ 312,500 TRANSPORTATION SALES TAX (K) $ 312,500 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-4 1-, 1-5 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: TRAFFIC CONTROLS REPLACEMENT LOCATION: TEN LOCATIONS, CITY-WIDE PURPOSE: TO REPLACE AGED ELECTRO -MECHANICAL TRAFFIC CONTROLLERS WITH ELECTRONIC CONTROLLERS. PHYSICAL DESCRIPTION: INSTALL ELECTRONIC TRAFFIC CONTROLLERS WITH CAPABILITIES FOR COORDINATION AND SEQUENCING. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING CONTROLLERS ARE OUTDATED AND SUSCEPTIBLE TO BREAKDOWN. PARTS ARE INCREASINGLY HARDER TO LOCATE; SUPPLIERS NO LONGER OFFER NEW PARTS. NEWER SYSTEM COULD BE SEQUENCED FOR TRAFFIC PATTERNS AND SPECIAL EVENTS. IMPACT ON NO SIGNIFICANT IMPACT. OPERATING BUDGET: FINANCING: $ 50,000 MOTOR FUEL TAX (E) $ 50,000 TOTAL 12 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: HOPPER ROAD BRIDGE AND RECONSTRUCTION LOCATION: HOPPER ROAD, CLIPPARD SCHOOL TO MOUNT AUBURN ROAD PURPOSE: PROVIDE FOR THE REPLACEMENT OF THE BRIDGE ON HOPPER ROAD EAST OF MOUNT AUBURN ROAD AND THE RECONSTRUCTION OF HOPPER ROAD FROM CLIPPARD SCHOOL TO MOUNT AUBURN ROAD. PHYSICAL DESCRIPTION: 110 FOOT, TWO-LANE BRIDGE OVER CAPE LA CROIX CREEK. 1,090 LINEAR FEET OF CONCRETE OR ASPHALT PAVEMENT WITH CURBS, 36 FEET WIDE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: BRIDGE IS FUNCTIONALLY OBSOLETE AND TOO NARROW FOR EXISTING TRAFFIC VOLUME. EXTEND EXISTING HIGH -TYPE PAVEMENT ON HOPPER ROAD TO HANDLE INCREASED TRAFFIC AND TO MATCH BRIDGE REPLACEMENT. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT. $ 265,500 STATE GRANTS (D) $ 88,400 MOTOR FUEL TAX (E) $ 353,900 TOTAL 13 1-6 1-7 TRfi.FISPORTATION AND PUBLIC WORKS PROJECT TITLE: BLOOfVIFIELD ROAD BRIDGE OVER RAMSEY BRANCH LOCATION: BLOOMFIELD ROAD AT RAMSEY BRANCH PURPOSE: REPLACE EXISTING 54 -FOOT, 3 -SPAN BRIDGE THAT IS DETERIORATING. PHYSICAL DESCRIPTION: NEW 3 -SPAN CONTINUOUS CONCRETE I -GIRDER SUPERSTRUCTURE SUPPORTING A REINFORCED CONCRETE SLAB WITH TWO INTEGRAL END BENTS „ND TWO OPEN CONCRETE INTERMEDIATE BENTS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING BRIDGE IS FUNCTIONALLY AND STRUCTURALLY INADEQUATE. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 204,750 STATE GRANTS/LOANS (D) S 68,150 MOTOR FUEL TAX (F) $ 272,900 TOTAL 14 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: KENNETH DRIVE CONNECTION LOCATION: FROM CURRENT TERMINUS IN WOODLAND HILLS SUBDIVISION TO NEW DEVELOPMENT IN RANDOL FARMS SUBDIVISION. PURPOSE: PROVIDE THROUGH CONNECTION AND ADDITIONAL ACCESS. i PHYSICAL DESCRIPTION: APPROXIMATELY 120 FEET O, PAVING 1NITH ANCILLARY STORMWATER FACILITIES. RIGHT-OF- WAY WAS PREVIOUSLY DEDICATED IN WOODLAND HILLS SUBDIVISION. UNIT OF WORK: DESIGN AND CONSTRUCT 1 JUSTIFICATION: PROJECT IS NEEDED TO CONNECT EXISTING SUBDIVISION WITH NEW DEVELOPMENT. IMPACT ON NO SIGNIFICANT II'JiPACT OPERATING BUDGET: FINANCING: $ 16,400 MOTOR FUEL TAX (E) $ 16,400 TOTAL 1-S 15 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: HOPPER ROAD: PHASE I LOCATION: FROM MT AUBURN WEST TO KAGE ROAD .i jE PURPOSE: PROVIDE A NEW COLLECTOR STREET TO PROVIDE !� FOR CONTINUED DEVELOPMENT !N THE it NORTHWEST PART OF THE CITY. PHYSICAL DESCRIPTION: APPROXIMATELY 3,500 LINEAL FEET OF STREET, 35 FEET WIDE WITH CURB AND CUTTERS. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND li CONSTRUCT. JUSTIFICATION: TRAFFIC VOLUMES ON EXISTING HOPPER AND KAGE ROADS ARE INCREASING AS A RESULT OF ` NEW DEVELOPMENT, AND ANEW STREET BUILT TO CURRENT STANDARDS ON A NEW ALIGNMENT IS NEEDED. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: S 686:500 TRANSPORTATION SALES TAX (K) V 686,500 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-9 16 TRANSPO`ITATION AND PUBLIC t!+JORKS PROJECT T ITLE: SILVER SPRINGS ROAD LOCATION: WILLIAM STREET (ROUTE K) NORTH TO CURRENT TERMINUS SOUTH OF INDEPENDENCE PURPOSE: PROVIDE FINAL CONNECTION OF THIS DESIGNATED COLLECTOR STREET THROUGH THE DESCRIBED SECTION, IMPROVE NORTH/ SOUTH ACCESS IN THE WEST END OF THE CITY, AND ASSIST IN FURTHER . DEVELOPMENT. PHYSICAL DESCPIPTION: APPROXIMATELY 2,100 FEET OF 36 -FOOT WIDE PAVING, WITH CURBS, GUTTERS, AND ANCILLARY STORMWATER FACILITIES, WITH SOME RECONSTRUCTION REQUIRED ON GORDONVILLE ROAD. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY (PART PREVIOUSLY ACQUIRED), AND CONSTRUCT JUSTIFICATION: CONNECTION NEEDED TO PROVIDE ADDITIONAL MAJOR NORTH/SOUTH ACCESS IN HIGH TRAFFIC COMMERCIAL/INSTITUTIONAL AREA. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: S 356,500 TRANSPORTATION SALES TAX (K) S 356,500 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-10 17 TRANSPORTATION ANID PUBLIC WORKS PROJECT TITLE: BROADWAY WIDENING AND RECONSTRUCTION LOCATION: FROM CLARK STREET EAST TO PERRY AVENUE PURPOSE: PROVIDE IMPROVED TRAFFIC FLOW AND REDUCE FLOODING ON MAJOR ARTERY. PHYSICAL DESCRIPTION: WIDEN STREET TO FOUR LANES, UPGRADE TRAFFIC SIGNALS AT CARUTHE S, INSTALL NEW SIGNALS AT CLARK, AND INSTALL STORMINATER RELIEF LINE. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: STREET CURRENTLY IS SUBJECT TO FLASH FLOODING AND TRAFFIC FLOW IS ROUTINELY CONGESTED WITH LINES SEVERAL BLOCKS LONG. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 942,900 TRANSPORTATION SALES TAX (K) $ 942,900 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUED RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 18 TRANSPORTATION AND PUBLIC WORKS PROJ=CT TITLE: LORIMIER STREET EXTENSION LOCATION: EXTENSION FROM MORGAN OAK SOUTH TO NEW HIGHWAY 74 PURPOSE: PROVIDE A CONNECTION BETWEEN NEW HIGHWAY 74 AND THE DOWNTOWN BUSINESS DISTRICT. PHYSICAL DESCRIPTION: PAVING OF APPROXIMATELY 1,930 FEET OF STREET, -40 FEET WIDE, WITH CURBS AND CUTTERS. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: ACCESS TO THE DOWNTOWN AREA IS NEEDED TO MAINTAIN ECONOMIC VIABILITY. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 25-0,800 TRANSPORTATION SALES TAX (K) $ 255,800 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX !, FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-12 919 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: SIEMERS DRIVE EXTENSION LOCATION: EXTENSION FROM BLOOMFIEL D ROAD SOUTH TO THE NEW HIGHWAY 74/1-55 INTERCHANGE PURPOSE: PROVIDE A CONNECTION BETWEEN THE SIEMERS DRIVE COLLECTOR AND THE NEW INTERCHANGE. PHYSICAL DESCRIPTION: APPROXIMATELY 1,950 FEET OF PAVING, 50 FEET WIDE, WITH CURBS AND /-;NCILLARY STQRMWATER FACILITIES. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY (ADDITIONAL), AND CONSTRUCT JUSTIFICATION: CONNECTION NEEDED TO PROVIDE ACCESS TO THE NEW 74/1-55 INTERCHANGE FOR SAFETY, CONVENIENCE, AND ECONOMIC DEVELOPMENT. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME FINANCING: $ 508,000 TRANSPORTATION SALES TAX (K) $ 508,000 TOTAL NOTE: AGREEMENT BETWEEN CITY AND DRURY SOUTHWEST COMPANY FOR CONSTRUCTION OF THE SIEMERS DRIVE EXTENSION PROVIDES THAT CITY WILL REIMBURSE DSW FOR AGREED COSTS ON JULY 1, 1998. FINAL COSTS SHOWN ABOVE ARE ESTIMATED ONLY AT THIS TIME. NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-13 20 TRA NSPORTATIOL! AND PUBLIC W0RKS PROJECT TITLE: BLOOiv,/IFIELD ROAD: PHASE 11 LOCATION: KINGSHIGHWAY WEST TO 1-55 PURPOSE: TO UPGRADE EXISTING STREET TO CURRENT STANDARDS. PHYSICAL DESCRIPTION: APPROXIMATELY 6,500 LINEAR FEET OF STREET CONSTRUCTION INCLUDING WIDENING TO 36 FEET WITH CURBS AND GUTTERS, AND SOME REA!-IGNI! ENT. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: EXISTING STREET IS FUNCTIONALLY INADEQUATE. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: S 964,700 TRANSPORTATION SALES TAX (K) $ 964,700 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-14 21 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: HOPPER ROAD: PHASE II LOCATION: KALE ROAD TO 1-55 PURPOSE: TO UPGRADE EXISTING STREET TO CURRENT STANDARDS. PHYSICAL DESCRIPTION: APPROXIMATELY 2,000 LINEAR FEET OF STREET CONSTRUCTION !NCLUD!NG WIDENING TO 36 FEET WITH CURBS AND GUTTERS. UNIT OF WORK: DESIGN, ACQUIRE 'SIGHT -OF -WAY, AND CONSTRUCT. JUSTIFICATION: EXISTING STREET IS FUNCTIONALLY INADEQUATE. IMPACT ON NO S!GNIFICANT IMPACT OPERATING BUDGET: FINANCING: � 348,900 TRANSPORTATION SALES TAX (K) $ 348,900 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX h FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION II COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE f+� TRANSPORTATION TRUST FUND. 1-15 22 TRANSPORTATIO'd AND PUBLIC WORKS PROJECT TITLE: WILLIAM STREET --GENERAL IMPROVEMENT AND/OP WIDENING LOCATION: SPRIGG STREET TO MAIN STREET PURPOSE: TO IMPROVE TRAFFIC CAPACITY PHYSICAL DESCRIPTION: UPGRADE APPROXIMATELY 2,400 LINEAR FEET OF EXISTING STREET, WITH POSSIBLE WIDENING TO 42 FEET. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: PROVIDE FOR CONTINUED ECONOMIC DEVELOPMENT IN THE DOWNTOWN AREA. IMPACT OR NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 486,300 TRANSPORTATION SALES TAX (K) S 486,300 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-16 23 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PERRYVILLE ROAD LOCATION: CITY LIMITS NORTH TO ROUTE i/l/ AND CYPRESS DRIVE PURPOSE: PROVIDE FOR CONTINUED DEVELOPMENT OF PERRYVILLE ROAD AS A COLLECTOR STREET NORTH TO THE ROUTE W AREA. PHYSICAL DESCRIPTION: APPROXIMATELY 3,400 LINEAR FEET OF STREET RECONSTRUCTION INCLUDING WIDENING TO 35 FEET WITH CURBS AND GUTTERS, AND SOME REALIGNMENT. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: INCREASE THE SERVICE LEVEL OF THE EXISTING ROADWAY TO HANDLE ADDITIONAL TRAFFIC VOLUME AND CONSTRUCT STREET TO COLLECTOR STANDARDS PER MAJOR STREET PLAN. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 986,300 TRANSPORTATION SALES TAX (K) $ 986,300 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-17 24 TPANI,SPORTATIGN AND PUBLIC VeORKS PROJECT TITLE: KALE ROAD LOCATION: MT. AUBURN TO HOPPER ROAD PURPOSE: TO UPGRADE EXISTING STREET TO CURRENT STANDARDS. PHYSICAL DESCRIPTION: ,^,PPROXIMATELY 4,800 LINEAR FEET OF STREE T IMPROVEMENT: WIDENING WITH CONSTRUCTION OF CURB AND GUTTER, WITH OVERLAY OF EXISTING PAVEMENT AND EXTENSION OF STORM DRAINAGE. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: EXISTING STREET IS FUNCTIONALLY INADEQUATE. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 86,900 TRANSPORTATION SALES TAX (K) $ 86,900 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-18 25 TRANSPORTATION AND PUBLIC WORKS I PROJECT TITLE: MT. AUBURN ROAD EXTENSION LOCATION: NEW HIGHWAY 74 SOUTH TO SOUTHERN EXPRESSWAY (EXTENDED WEST TO SILVER SPRINGS ROAD) PURPOSE: PROVIDE A NEW ARTERIAL CONNECTION BETWEEN NEW HIGHWAY 74 AND THE SOUTHWEST PART OF THE CITY, TYING EACH TO KINGSHIGHWAY. WILL SUPPORT NEW COMMERCIAL, SCHOOL, AND RESIDENTIAL DEVELOPMENT. PHYSICAL DESCRIPTION: UNIT OF WORK JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: APPROXIMATELY 3,600 LINEAR FEET OF PAVING, 44 FEET WIDE, WITH CURBS AND STORMWATER FACILITIES. DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT ACCESS TO THIS PART OF THE CITY IS LIMITED TO SILVER SPRINGS ROAD ONLY. NEW STREET WILL ADD MAINTENANCE COSTS, UNQUANTIFIABLE AT THIS TIME. $ 764,000 TRANSPORTATION SALES TAX (K) $ 764,800 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-19 26 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: SOUTHERN EXPRESSWAY EXTENSION LOCATION: WEST FROM KINGSHIGHWAY TO SILVER SPRINGS ROAD PURPOSE: CONNECT KINGSHIGHWAY TO NEW MT. AUBURN ROAD EXTENSION AND PROVIDE ADEQUATE ACCESS TO THE SOUTHWEST PART OF THE CITY. WILL SUPPORT NEW COMMERCIAL, SCHOOL, AND RESIDENTIAL DEVELOPMENT. PHYSICAL DESCRIPTION: APPROXIMATELY 2,500 LINEAR FEET OF PAVING, 44 FEET WIDE, WITH CURBS AND DRAINAGE. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: ACCESS TO THIS PART OF THE CITY IS LIMITED TO SILVER SPRINGS ROAD ONLY. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME FINANCING: $ 472,600 TRANSPORTATION SALES TAX (K) $ 472,600 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-20 27 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: INDEPENDENCE STREET RECONSTRUCTION LOCATION: PACIFIC STREET TO SPRIGG STREET, INCLUDING INTERSECTIONS. PURPOSE: UPGRADE THIS SECTION OF STREET TO CURRENT STANDARDS. PHYSICAL DESCRIPTION: APPROXIMATELY 940 LINEAR FEET OF PAVEMENT AND SIDEWALK RECONSTRUCTION WITH NEW TRAFFIC SIGNALS AS REQUIRED. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THIS SECTION OF INDEPENDENCE STREET IS IN NEED OF MAJOR RECONSTRUCTION. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 332,600 TRANSPORTATION SALES TAX (K) $ 332,600 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-21 28 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: NEW MADRID STREET RECONSTRUCTION LOCATION: PERRY AVENUE EAST TO SHOW -ME CENTER PURPOSE: UPGRADE EXISTING STREET SECTION AND RECONSTRUCT/REALIGN HENDERSON - NEW MADRID INTERSECTION. PHYSICAL DESCRIPTION: APPROXIMATELY 3,000 LINEAR FEET OF STREET RECONSTRUCTION WITH WIDENING AND CURBS AND GUTTERS, PLUS INTERSECTION WORK. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: NEW MADRID STREET PROVIDES A MAJOR ACCESS ROUTE TO THE UNIVERSITY AND IT IS CURRENTLY FUNCTIONALLY INADEQUATE. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 779,000 TRANSPORTATION SALES TAX (K) $ 779,000 TOTAL NOTE: AGREEMENT BETWEEN CITY AND UNIVERSITY FOR CONSTRUCTION OF THE HENDERSON-NEW MADRID !NTERSECTION PROVIDES THAT CITY WILL REIMBURSE UNIVERSITY FOR CITY SHARE OF PROJECT ON JANUARY 1, 1999, IF TRUST FUNDS ARE PROJECTED TO BE AVAILABLE TO COMPLETE ALL 20 TRUST FUND PROJECTS, BUT NO LATER THAN APRIL 1, 2000. FINAL COST FIGURES WERE NOT AVAILABLE AT THE TIME OF PREPARATION OF THIS C.I.P., BUT ARE PROJECTED TO BE APPROXIMATELY $230,000 FOR CONSTRUCTION AND $72,000 FOR ENGINEERING (TOTAL: APPROXIMATELY $302,000). THE CITY ALSO INCURRED $10,450 IN RIGHT-OF-WAY COSTS FOR THE INTERSECTION PROJECT. NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-22 29 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: RODNEY STREET: NEW CAPE LA CROIX CREEK BRIDGE AND RECONSTRUCTION LOCATION: FROM NATIONAL GUARD ARMORY NORTH TO HAWTHORNE PURPOSE: UPGRADE EXISTING STREET AND BRIDGE TO CURRENT STANDARDS. PHYSICAL DESCRIPTION: REPLACEMENT OF THE EXISTING BRIDGE AND RECONSTRUCTION OF 1,600 LINEAR FEET OF PAVEMENT TO 28 FEET IN WIDTH. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING STREET AND BRIDGE ARE FUNCTIONALLY INADEQUATE. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 648,200 TRANSPORTATION SALES TAX (K) $ 648,200 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE SUED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-23 30 TRAILSPORTATIOIL AND PUBLIC WORKS PROJECT TITLE: SIEMERS DRIVE WIDENING AND SIGNAL INSTALLATION LOCATION: WIDENING OF SIEMERS DRIVE FROM CAMPSTER DRIVE TO BLOOMFIELD ROAD, AND INSTALLING TRAFFIC SIGNALS AT LAMBERT DRIVE AND BLOOMFIELD ROAD. PURPOSE: WIDEN AND SIGNALIZE THE SIEMERS DRIVE COLLECTOR STREET TO ACCOMODATE DEVELOPED TRAFFIC LOAD. PHYSICAL DESCRIPTION: WIDEN APPROXIMATELY 4,800 LINEAL FEET OF STREET FROM 32 FEET TO 50 FEET (MINIMUM) AND INSTALL SIGNALS. UNIT OF WORK: DESIGN, CONSTRUCT AND INSTALL JUSTIFICATION: SIEMERS DRIVE WAS CONSTRUCTED OUTSIDE OF THE CITY LIMITS TO LESS THAN CITY STANDARDS. RECENT DEVELOPMENT HAS OVERLOADED THE STREETS TRAFFIC CAPACITY. IMPACT ON SOME INCREASE FOR OPERATION AND OPERATING BUDGET: MAINTENANCE OF TRAFFIC SIGNALS. FINANCING: $ 886,200 SPECIAL ASSESSMENTS (G) $ 886,200 TOTAL 1-24 31 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: LINDEN STREET RECONSTRUCTION AND WIDENING WITH SIDEWALK LOCATION: RECONSTRUCTION OF LINDEN STREET FROM BENTON STREET TO SPRIGG STREET WITH SIDEWALK, AND WIDENING EXISTING PORTION OF LINDEN STREET FROM BENTON STREET TO WEST END BOULEVARD WITH SIDEWALK. PURPOSE: UPGRADE MAJOR THROUGH STREET BETWEEN HIGHWAY 74 AND SOUTHERN EXPRESSWAY TO CARRY ADDITIONAL TRAFFIC FROM RECENT DEVELOPMENT AND PROVIDE IMPROVED ACCESS TO SHAWNEE PARK. PHYSICAL DESCRIPTION: APPROXIMATELY 1,100 LINEAL FEET OF RECONSTRUCTION AND 1,500 LINEAL FEET OF WIDENING TO STANDARD 30 -FOOT WIDTH. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: RECENT DEVELOPMENT ON LINDEN STREET HAS INCREASED TRAFFIC LOAD AND UPGRADING THIS STREET WILL PROVIDE IMPROVED ACCESS BETWEEN SPRIGG AND WEST END FOR THE GENERAL AREA. IMPACT ON OPERATING BUDGET: FINANCING: 1-25 NO SIGNIFICANT IMPACT $ 175,000 MOTOR FUEL TAX (E) $ 175,000 TOTAL 32 TRANSPORTATIOM AND PUBLIC WORKS PROJECT TITLE: CLARK STREET, MARIETTA SOUTH TO VICTORIAN ESTATES LOCATION: MARIETTA STREET SOUTH TO NORTH EDGE OF VICTORIAN ESTATES SUBDIVISION PURPOSE: UPGRADE EXISTING STREET TO PROVIDE PROPER CONNECTION OF CLARK BETWEEN MARIETTA STREET AND LOMBARDO DRIVE. PHYSICAL DESCRIPTION: RECONSTRUCT AND CONSTRUCT APPROXIMATELY 700 LINEAL FEET TO STANDARD 30 -FOOT WIDTH. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: IF VICTORIAN ESTATES SUBDIVISION IS DEVELOPED, THE SECTION OF CLARK STREET THROUGH THE SUBDIVISION AND CONNECTING TO LOMBARDO WILL BE CONSTRUCTED. THIS PROJECT WILL PROVIDE FOR THE CONNECTION OF THE NEW SECTION OF STREET NORTH TO MARIETTA. IMPACT ON OP=RATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $110,100 MOTOR FUEL TAX (E) $ 110,100 TOTAL 33 1-26 1-27 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: MINNESOTA AVENUE, BLOOMFIELD ROAD TO COLLEGE STREET WITH SIDEWALKS LOCATION: MINNESOTA AVENUE, FROM BLOOMFIELD TO COLLEGE PURPOSE: UPGRADE STREET SERVING JEFFERSON SCHOOL AND ADJOINING NEIGHBORHOOD AND CONNECT TO NEV1f SECTION OF COLLEGE STREET PROPOSED FOR CONSTRUCTION. PHYSICAL DESCRIPTION: RECONSTRUCT APPROXIMATELY 1,300 LINEA! FEET OF STREET TO STANDARD 30 -FOOT WIDTH WITH CURBS AND GUTTERS, ANCILLARY STORMWATER FACILITIES, AND SIDEWALKS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: WITH UPGRADING AND EXPANSION OF JEFFERSON SCHOOL, IT IS DESIRABLE TO UPGRADE THIS STREET TO CURRENT STANDARDS TO PROVIDE IMPROVED ACCESS TO THE SCHOOL AND THE GENERAL AREA. IMPACT ON NO SIGN!FICANT IMPACT OPERATING BUDGET: FINANCING: S 447,800 MOTOR FUEL TAX (E) $ 447,800 TOTAL 34 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: COLLEGE STREET, LOUIS STREET TO WEST END BOULEVARD WITH SIDEWALKS LOCATION: COLLEGE STREET, FROM LOUIS STREET EAST TO WEST END PURPOSE: TO DEVELOP A THROUGH STREET TO PROVIDE ACCESS FROM THE NEIGHBORHOOD TO THE WEST AND JEFFERSON! SCHOOL TO WEST END BOULEVARD NEAR THE NEW HIGHWAY 74 INTERSECTION. PHYSICAL DESCRIPTION: CONSTRUCT APPROXIMATELY 1,700 LINEAL FEET OF NEW STREET TO STANDARD 30 -FOOT WIDTH WITH CURBS AND GUTTERS, ANCILLARY STOR11nViWATER FACILITIES, AND SIDEWALK. UNIT OF WORK: DESIGN AND CONSTRUCT (RIGHT-OF-WAY EXISTS) JUSTIFICATION: COMPLETION OF NEW HIGHWAY 74 AND THE SIGNALIZED INTERSECTION AT WEST END PROVIDES AN OPPORTUNITY TO IMPROVE ACCESS FOR THE AREA WEST OF WEST END AND NORTH OF NEW 74 AND FOR JEFFERSON SCHOOL. THE STREET WILL ALSO PROVIDE ACCESS TO THE PART OF SHAWNEE PARK NORTH OF HIGHWAY 74 ALLOWING ITS DEVELOPMENT IN THE FUTURE. IMPACT ON NEW STREET WILL ADD MAINTENANCE COSTS, OPERATING BUDGET: UNQUANTIFIABLE AT THIS TIME. FINANCING: $387,000 MOTOR FUEL TAX (E) $ 387,000 TOTAL 1-28 35 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: SIDEWALK ALONG PERRYVILLE ROAD, LEXINGTON AVENUE TO CAPE ROCK DRIVE LOCATION: PERRYVILLE ROAD, FROM JUST NORTH OF LEXINGTON TO THE CAPE ROCK !NTERSECTION PURPOSE: TO PROVIDE A PEDESTRIAN SIDEWALK ON PERRYVILLE ROAD THAT WILL CONNECT TO THE SIDEWALK BEING BUILT AS PART OF THE PERRYVILLE ROAD PHASE I PROJECT. PHYSICAL DESCRIPTION: APPROXIMATELY 4,600 LINEAL FEET OF SIDEWALK 4 -FEET IN WIDTH. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO ALLOW THE REMOVAL OF PEDESTRIAN TRAFFIC FROM THE STREET AND TIE IN WITH PROPOSED LEXINGTON SIDEWALK AND THEREBY CONNECT TO THE CAPE LA CROIX TRAIL, ALSO PROVIDING PEDESTRIAN ACCESS FROM SUBDIVISIONS ALONG PERRYVILLE ROAD TO CHEROKEE PARK AND OSAGE PARK. IMPACT ON OPERATING BUDGET: FINANCING: 1-29 NO SIGNIFICANT IMPACT $ 129,000 MOTOR FUEL TAX (E) $ 129,000 TOTAL 36 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: SIDEWALK ALONG LEXINGTON AVENUE, PERRYVILLE ROAD TO CAPE LA CROIX ROAD LOCATION: LEXINGTON AVENUE, FROM PERRYVILLE ROAD TO CAPE LA CROIX ROAD PURPOSE: TO PROVIDE A PEDESTRIAN SIDEWALK ON LEXINGTON AVENUE THAT WILL CONNECT THE PERRYVILLE ROAD SIDEWALK WITH THE CAPE LA CROIX TRAIL. PHYSICAL DESCRIPTION: APPROXIMATELY 6,200 LINEAL FEET OF SIDEWALK 4 -FEET IN WIDTH. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO ALLOW THE REMOVAL OF PEDESTRIAN TRAFFIC FROM THE STREET AND TIE IN WITH THE PERRYVILLE ROAD SIDEWALK AND THE CAPE LA CROIX TRAIL, ALSO PROVIDING PEDESTRIAN ACCESS FROM SUBDIVISIONS ALONG LEXINGTON TO OSAGE PARK AND CHEROKEE PARK. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 131,000 MOTOR FUEL TAX (E) $ 131,000 TOTAL 37 1-30 1-31 TRAMSPORTATION AND PUBLIC WORKS PROJECT TITLE: OLD SPRIGG STREET ROAD AND LEXINGTON AVENUE, EXTEND BOX CULVERT LOCATION: ON OLD SPRIGG STREET ROAD, JUST SOUTH OF LEXINGTON AVENUE PURPOSE: EXTEND BOX CULVERT TO WIDEN APPROACH TO LEXINGTON INTERSECTION. PHYSICAL DESCRIPTION: WIDEN 10 -FOOT BY 8 -FOOT PDX CULVERT 30 LINEAL FEET. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT BOX CULVERT IS MANY YEARS OLD AND NOT CONSTRUCTED TO CURRENT STANDARDS, RESULTING IN A NARROW APPROACH TO THE INTERSECTION WITH NO SHOULDERS. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 33,500 MOTOR FUEL TAX (E) $ 33,500 38 TOTAL TRANSPORTATION AMD PUBLIC WORKS PROJECT TITLE: WEST END BOULEVARD, BLOOMFIELD SOUTH TO SHAWNEE PARKWAY (NEW HIGHWAY 74) LOCATION: WEST END BOULEVARD, BLOOMFIELD ROAD TO SHAWNEE PARKWAY PURPOSE: WIDEN AND RECONSTRUCT NARROW SECTION OF WEST END TO IMPROVE ACCESS FROM SHAWNEE PARKWAY TO WILLIAM STREET. PHYSICAL DESCRIPTION: WIDEN APPROXIMATELY 1,400 LINEAL FEET OF STREET FROM 36 FEET TO 44 FEET IN WIDTH, CONSTRUCT 6 -FOOT TO 10 -FOOT PARKWAY INHERE FEASIBLE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: WEST END BOULEVARD IS THE ONLY ACCESS POINT FROM NEW HIGHWAY 74 INTO THE EAST - CENTRAL PART OF THE CITY, AND A PRINCIPAL ACCESS ROUTE TO THE UNIVERSITY AND NEEDS TO BE IMPROVED TO HANDLE INCREASED TRAFFIC LOAD. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 280,000 MOTOR FUEL TAX (E) $ 280,000 TOTAL 39 1-32 1-33 TRANSPORTATION AND PUBLIC WORKS t+� PROJECT TITLE: AIRPORT T -HANGAR RAMP REPLACEMENT ,! LOCATION: REGIONAL AIRPORT PURPOSE: INSTALLATION OF PAVEMENT BASE AND REPLACEMENT OF ASPHALT SURFACES. FULL RECONSTRUCTION OF EXISTING PAVEMENT. PAVEMENT WAS EVIDENTLY LAID AS TEMPORARY PAVEMENT OVER 40 YEARS AGO. SUB -BASE IS INADEQUATE FOR TRAFFIC USING IT. PHYSICAL DESCRIPTION: REMOVE AND REPLACE APPROXIMATELY ?,430 SQ. YDS. OF ASPHALT RAMP AREA. REPLACE- MENT WILL INCLUDE INSTALLATION OF ADEQUATE SUB -BASE TO PREVENT SIMILAR DETERIORATION OF THE AREA IN THE FUTURE. UNIT OF WORK: ENGINEERING AND CONSTRUCTION JUSTIFICATION: EXISTING ASPHALT RAMP IS DETERIORATING AT A RAPID PACE. PAVEMENT IS DISPLAYING EXTREME CRACKING WHICH USUALLY INDICATES SEVERE BASE FAILURE. DETERIORATION WILL CONTINUE UNTIL AN OVERLAY CAN BE ACCOMPLISHED. PAVEMENT IS NEARING A POINT THAT SAFETY WILL BECOME A REAL CONCERN. EXISTING PAVEMENT MAY BECOME UNUSABLE WITHIN 3 TO 5 YEARS. IMPACT ON IN THE SHORT TERM, IT WILL REDUCE OPERATING BUDGET: MAINTENANCE COSTS OF CONTINUALLY REPAIRING DETERIORATED PAVEMENT. WILL REDUCE LABOR AND EQUIPMENT COSTS REQUIRED TO CLEAR POTENTIALLY DANGEROUS DEBRIS FROM PAVEMENT. FINANCING: $ 20,080 GENERAL FUND (A) $ 381,520 STATE GRANTS/LOANS (D) $ 401,600 TOTAL 40 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT EMERGENCY POWER BACK-UP FOR RUNWAY 10/28 LOCATION: REGIONAL AIRPORT PURPOSE: INSTALL EMERGENCY POWER BACK-UP SYSTEM TO MAIN RUNWAY 10/28 LIGHTING SYSTEM. PHYSICAL DESCRIPTION: EMERGENCY POWER GENERATOR (NATURAL GAS OR DIESEL) TO PROVIDE BACK-UP TO CURRENT COMMERCIAL -POWERED VAULT. UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: CURRENT POWER TO MAIN RUNWAY IS A COMMERCIAL POWER SOURCE SUBJECT TO POWER OUTAGES DURING STORMS. EMERGENCY OPERATIONS PLAN FOR DISASTER RELIEF REQUIRES AIRPORT TO HAVE A RELIABLE POWER SOURCE. IMPACT ON MINOR INCREASE IN OPERATIONAL COSTS FOR OPERATING BUDGET: FUEL, MAINTENANCE, ETC. FINANCING: $ 2,350 GENERAL FUND (A) $ 44,650 STATE GRANTS/LOANS (D) $ 47,000 TOTAL 1-34 41 1-35 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT MAINTENANCE/ARFF BUILDING LOCATION: REGIONAL AIRPORT PURPOSE: TO ALLOW AIRSIDE ACCESS BY MAINTENANCE VEHICLES; STORAGE SPACE FOR CITY EQUIPMENT, TOOLS AND SUPPLIES; AND HOUSE THE INITIAL RESPONSE AIRCRAFT RESCUE AND FIREFIGHTING (ARFF) VEHICLE. PHYSICAL DESCRIPTION: APPROXIMATELY 30' X 50' UTILITY BUILDING; FRAME CONSTRUCTION WITH WOODEN TRUSSES WITH PAINTED METAL EXTERIOR. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: DIRECT AIRSIDE ACCESS IS AN IMPORTANT NEED FOR MAINTAINING AIRPORT GROUNDS AND FOR EMERGENCY RESPONSE PURPOSES. IMPACT ON INCREASED UTILITY COST, OFFSET BY RENTING OPERATING BUDGET: OUT SPACE, AND BY ELIMINATING NEED TO PLUG IN SNOW REMOVAL EQUIPMENT. FINANCING: $ 52,200 GENERAL FUND (A) $ 52,200 TOTAL 42 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT TAXIWAY EXTENSION FOR RUNWAY 02/20 LOCATION: REGIONAL AIRPORT PURPOSE: EXTEND PARALLEL TAXIWAY TO ENTIRE LENGTH OF RUNWAY 02/20. PHYSICAL DESCRIPTION: CONSTRUCT 78,000 SQ. FT. OF PARALLEL TAXIWAY NORTH FROM TAXIWAY "A" TO NORTH END OF RUNWAY 02/20 AT TAXIWAY "F". UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: ELIMINATE CONGESTION OF AIRCRAFT ARRIVING ON RUNWAY 02 TAXIING THROUGH TERMINAL RAMP VIA TAXIWAY "E" TO GET TO GENERAL AVIATION APRON. IMPACT ON INCREASED MAINTENANCE COST FOR SNOW AND OPERATING BUDGET: ICE REMOVAL. FINANCING: $ 78,225 GENERAL FUND (A) $1,486,275 STATE GRANTS/LOANS (D) $1,564,500 TOTAL 1-36 43 1-37 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT RUNWAY 02/20 CABLE AND LIGHTING LOCATION: REGIONAL AIRPORT PURPOSE: RECABLE RUNWAY 02/20 EDGE AND THRESHOLD LIGHTS. PHYSICAL DESCRIPTION: REPLACE AND REWIRE ALL EXISTING LIGHT FIXTURES, TRANSFORMERS, AND WIRING FOR RUNWAY 02/20. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING CABLES ARE OVER 40 YEARS OLD AND SUBJECT TO FREQUENT POWER OUTAGES AND REPAIR. IMPACT ON MAINTENANCE COSTS FOR FREQUENT REPAIRS OPERATING BUDGET: WILL BE REDUCED. FINANCING: $ 5,215 GENERAL FUND (A) $ 99,085 STATE GRANTS/LOANS (D) $ 104,300 TOTAL 44 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT AIRCRAFT RESCUE AND FIRE FIGHTING BUILDING (AARF) LOCATION: REGIONAL AIRPORT PURPOSE: PROVIDE ON-SITE LOCATION FOR HOUSING OF AIRCRAFT RESCUE AND FIRE FIGHTING VEHICLE. PHYSICAL DESCRIPTION: CONSTRUCT ARFF BUILDING TO HOUSE ARFF VEHICLE AND MAINTENANCE AND CREW FACILITIES. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: PROJECTED INCREASES IN AIRCRAFT PASSENGER LOADS AND AIRCRAFT TYPES WILL REQUIRE UPGRADING FOR FAA -MANDATED RESPONSE TIMES AND LOCATION OF FIRE FIGHTING EQUIPMENT. IMPACT ON INCREASED OPERATING AND MAINTENANCE OPERATING BUDGET: COSTS. FINANCING: $ 13,040 GENERAL FUND (A) $ 247,760 STATE GRANTS/LOANS (D) $ 260,800 TOTAL 1-38 45 1-39 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT TAXIWAY EXTENSION FOR "T" HANGARS LOCATION: REGIONAL AIRPORT PURPOSE: EXTEND "T" HANGAR TAXIWAY TO CONNECT TO EXISTING TAXIWAYS. PHYSICAL DESCRIPTION: CONSTRUCT 38,000 SQ. FT. OF TAXIWAY ON SOUTH SIDE OF CITY "T" HANGARS WEST TO CONNECT TO TAXIWAY "E" AND BEYOND TO PROPOSED PARALLEL TAXIWAY FOR RUNWAY 02/20. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING TAXIWAY (ACTUAL ROAD ACCESS) AT NORTHEAST END OF TERMINAL RAMP IS ONLY EXIT FOR CAPE CENTRAL AIRWAYS "T" HANGAR RESULTING IN AIRCRAFT TRAFFIC CONFLICTS. IMPACT ON INCREASED MAINTENANCE FOR SNOW AND ICE OPERATING BUDGET: REMOVAL. FINANCING: $ 23,470 GENERAL FUND (A) $ 445,930 STATE GRANTS/LOANS (D) $ 469,400 TOTAL 46 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT T -HANGAR AND ASSOCIATED TAXIWAYS LOCATION: REGIONAL AIRPORT PURPOSE: TO MEET A NEED FOR ADDITIONAL HANGAR SPACE AT THE AIRPORT. PHYSICAL DESCRIPTION: ALL METAL, 10 I:NIT, DOUBLE -NESTED, T -HANGAR STRUCTURE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: ALL AVAILABLE HANGAR SPACE IS FILLED, WITH A WAITING LIST OF POTENTIAL USERS. ADDITIONAL HANGAR SPACE WILL ATTRACT MORE AIRCRAFT TO BASE AT THE AIRPORT. IMPACT ON INCREASED OPERATING AND MAINTENANCE OPERATING BUDGET: COSTS OFFSET BY REVENUE GENERATED BY UNIT RENTAL. FINANCING: $ 33,200 GENERAL FUND (A) $ 298,800 STATE GRANTS/LOANS (D) $ 332,000 TOTAL 1-40 47 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT: MAIN RUNWAY (10/28) EXTENSION LOCATION: REGIONAL AIRPORT PURPOSE: EXTEND MAIN RUNWAY LENGTH FROM 6500 FEET TO 8000 FEET. PHYSICAL DESCRIPTION: EXTEND EXISTING 150 -FOOT -WIDE MAIN RUNWAY AND 75 -FOOT -WIDE TAXIWAY BY 1500 FEET. UNIT OF WORK: DESIGN, ACQUIRE PROPERTY, AND CONSTRUCT JUSTIFICATION: 727 -TYPE AIRCRAFT PROJECTED TO BE OPERATING FROM AIRPORT WILL REQUIRE RUNWAY LENGTHS BEYOND 6500 FEET. IMPACT ON INCREASED OPERATING AND MAINTENANCE OPERATING BUDGET: COSTS FINANCING: $ 173,140 GENERAL FUND (A) $3,289,660 STATE GRANTS/LOANS (D) $3,462,800 TOTAL 1-41 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT HANGAR DOOR EAST SIDE OF AIR EVAC LOCATION: REGIONAL AIRPORT PURPOSE: REPLACE OLD ROLL -UP DOOR ON EAST SIDE OF HANGAR. REPLACEMENT OF THIS DOOR WOULD COMPLETE HANGAR REPLACEMENT DOOR PROJECT, SINCE WEST SIDE DOOR WAS REPLACED 1N 1957. PHYSICAL DESCRIPTION: MOTORIZED ALUMINUM BI -FOLD HANGAR DOOR UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: CURRENT ROLL -UP DOOR PROVIDES CONDINUAL MAINTENANCE REPAIR PROBLEMS AND IS NOT AT ALL AIR TIGHT, CAUSING TREMENDOUS UTILITY LOSS. IMPACT ON IN THE LONG TERM, WILL RECUDE OUR OPERATING BUDGET: MAINTENANCE REPAIR COSTS WHICH WE HAVE INCURRED DUE TO CONTINUAL PROBLEMS WITH THE OLD ROLL -UP DOORS. THE NEW DOORS WILL ALSO REDUCE OUR LIABILITY RISK DUE TO THE INCREASED STRENGTH AND WIND RESISTANCE, MAKING THEM LESS LIKELY TO COLLAPSE. ADDITIONAL, THE NEW DOORS WILL LOWER UTILITY COSTS FOR HEATING. FINANCING: $ 35,000 GENERAL FUND (A) $ 35,000 TOTAL 1-42 49 1-43 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS PARTIAL ROOF REPLACEMENT LOCATION: PUBLIC WORKS SITE, NORTH KINGSHIGHWAY PURPOSE: REPLACE APPROXIMATELY 3000 SQ. FT. OF ROOF ON ONE SECTION OF MAIN BUILDING EACH YEAR UNTIL ALL AREAS HAVE BEEN REPLACED. PHYSICAL DESCRIPTION: 3000 SQ. FT. OF RUBBER ROOF. UNIT OF WORK: DESIGN AND INSTALL. JUSTIFICATION: THE MAIN BUILDING HAS ELEVEN DIFFERENT ROOF AREAS. THEY ARE ALL IN VARIOUS STAGES OF AGING AND LEVELS OF USEFUL LIFE. FUNDS ARE REQUESTED FOR THE NEXT FIVE YEARS IN ORDER TO IMPLEMENT A REPLACEMENT PROGRAM. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 64,000 OTHER (1) $ 64,000 TOTAL 50 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS STRUCTURAL REINFORCEMENT - RETROFIT BUILDING LOCATION: PUBLIC WORKS SITE, NORTH KINGSHIGHWAY PURPOSE: RETROFIT UN -REINFORCED MASONRY BUILDING WITH STEEL REINFORCING STRUCTURE. PHYSICAL DESCRIPTION: SOILS AND STRUCTURAL ENGINEERING STUDY, INSTALL FOOTINGS AND STEEL COLUMNS AND FRAME WORK WITHIN EXISTING BUILDING. UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: TO REINFORCE WEAK POINTS OF STRUCTURES TO PREVENT COLLAPSE. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 200,000 OTHER([) $ 200,000 TOTAL 1-44 51 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS FUEL ISLAND CANOPY LOCATION: PUBLIC WORKS SITE, NORTH KINGSHIGHWAY PURPOSE: PROVIDE WEATHER PROTECTION WHILE FUELING VEHICLES AND EQUIPMENT DURING INCLEMENT WEATHER. PHYSICAL DESCRIPTION: FREE STANDING CANOPY APPROXIMATELY 24' X 50'. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: FUELING OPERATIONS DURING RAIN AND SNOW SUBJECT DRIVER/OPERATOR TO WET CONDITIONS; INCREASES THE RISK OF FUEL CONTAMINATION AND FROZEN PUMP CONTROLS. IMPACT ON OPERATING BUDGET: FINANCING: 1-45 NO SIGNIFICANT IMPACT $ 30,000 OTHER (1) $ 30,000 TOTAL 52 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKSM/ATER OPERATIONS EMERGENCY POWER BACK-UP LOCATION: WATER DIVISION, NORTH BROADVIEW PURPOSE: PROVIDE BACK-UP ELECTRICAL POWER IN ORDER TO ALLOW ESSENTIAL FUNCTIONS TO CONTINUE IN THE EVENT OF A PROLONGED POWER DISRUPTION. PHYSICAL DESCRIPTION: ONE TRAILER MOUNTED 40 KW DIESEL POWERED ELECTRICAL GENERATOR WITH AUTOMATIC SWITCH GEAR. UNIT OF'0jORK: DESIGN AND INSTALL JUSTIFICATION: IN THE EVENT OF A POWER DISRUPTION, WATER SERVICES WOULD BE A MAJOR CONCERN AND STANDBY ELECTRICAL POWER WILL BE CRITICAL IN ALLOWING THE WATER DEPARTMENT TO FUNCTION AS NECESSARY. IMPACT ON UNQUANTIFIABLE SAVINGS IN LOSS OF DATA AND OPERATING BUDGET: PRODUCTION TIME IN THE EVENT OF AN OUTAGE. FINANCING: S 15,000 OTHER (1) $ 15,000 TOTAL 1-46 53 -47 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS FACILITY LOCATION: PUBLIC WORKS SITE, NORTH KINGSHIGHWAY; NORTH BROADVIEW PURPOSE: REPLACE EXISTING STRUCTURE(S) PHYSICAL DESCRIPTION: PRE-ENGINEERED METAL BUILDING, WITH APPROXIMATELY 25,000 SQ. FT INCLUDING OFFICE AREA, MAINTENANCE SHOPS AND MATERIAL /EQUIPMENT STORAGE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: COMMERCIAL DEVELOPMENT ON KINGSHIGHWAY IS RESULTING IN GROWING TRAFFIC CONGESTION AND MORE TRAFFIC CONFLICTS. VIRTUALLY ALL OPEN SPACE HAS BEEN UTILIZED WITHIN THE SITE AND INTERNAL SPACE CONGESTION HAS ALSO BECOME A PROBLEM. EXISTING MAIN BUILDING HAS MULTIPLE ROOF LEAKS; HAS SEVERAL AREAS OF MINOR AND MAJOR MIASONRY JOINT CRACKING AND DISPLACEMENT; DOES NOT HAVE ADEQUATE NOR EFFICIENT HVAC SYSTEMS; ELECTRICAL SYSTEMS ARE PATCHED TOGETHER, OUTDATED AND NOT EASILY CONTROLLED; LAYOUT OF BUILDING IS NOT FUNCTIONAL; OFFICE IS NOT ADA ACCESSIBLE; SHOPS ARE SPREAD OUT AND NOT VERY WORKABLE; SHOP ROOF HEIGHTS DO NOT ALLOW FOR INSIDE HOISTS. IMPACT ON SOME SAVINGS ATTRIBUTABLE TO IMPROVED OPERATING BUDGET: WORK AND ENERGY EFFICIENCY BUT NOT QUANTIFIABLE. FINANCING: $3,350,000 OTHER (1) $3,350,000 TOTAL 54 RANISPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS CHEMICAL MATERIAL STORAGE LOCATION: PUBLIC WORKS BUILDING PURPOSE: TO PROVIDE SEGREGATED STORAGE FACILITIES FOR CHEMICAL MATERIALS, SUCH AS PESTICIDES AND HERBICIDES. PHYSICAL DESCRIPTION: SELF CONTAINED, PRE -FABRICATED, WEATHERPROOF, FIRE -RATED BUILDING. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: SECTION 5.12 OF THE CITY SAFETY MANUAL REQUIRES THAT CHEMICAL STORAGE NEEDS TO BE STORED PROPERLY. EXISTING STORAGE DOES NOT MEET THESE REQUIREMENTS. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 12,000 OTHER (1) 12,000 TOTAL 55 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS EQUIPMENT STORAGE SHEDS LOCATION: PUBLIC WORKS PURPOSE: TO KEEP EQUIPMENT UNDER COVER, PROTECTED FROM THE WEATHER AND VANDALISM. PHYSICAL DESCRIPTION,: TWO MACHINE SHED TYPE BUILDINGS, APPROXIMATELY 160 FEET BY 30 FEET. UNIT OF WORK: DESIGN AND CONSTRUC i JUSTIFICATION: VEHICLES AND EQUIPMENT WHICH ARE STORED OUTSIDE EXPOSED TO WEATHER DETERIORATE FASTER AND ARE SUSCEPTIBLE TO MORE MECHANICAL PROBLEMS; SNOW AND ICE CAUSE DELAYS WHILE EQUIPMENT IS THAWING AND WARMING UP; EXPOSED EQUIPMENT IS SUSCEPTIBLE TO VANDALISM. IMPACT ON OPERATING BUDGET: FINANCING: dKIM NO SIGNIFICANT IMPACT $ 60,000 $ 60,000 M. OTHER (1) TOTAL TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS MATERIAL STORAGE FACILITY LOCATION: PURPOSE PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: PUBLIC WORKS TO PROVIDE COVERED STORAGE FOR THE MATERIAL PILES AND CONTROL STORMWATER RUNOFF. WOOD FRAMED BUILDING AND FOUNDATION WITH CONTAINMENT DIKE TO PROTECT MATERIAL FROM WEATHER AND CONTROL STORMWATER RUNOFF. DESIGN AND CONSTRUCT MATERIALS THAT ARE EXPOSED TO WEATHER START TO CAKE AND CLUMP AND BECOME DIFFICULT TO USE. NO SIGNIFICANT IMPACT $60,000 OTHER (1) $ 60,000 TOTAL 57 1-50 This page left blank intentionally. m ENVIRONMENT CAPITAL IMPROVEMENTS PROGRAM 24,000,000 20,000,000 16,000,000 12,000,000 8,000,000 4,000,000 1998-99 1999-00 2000-01 2001-02 2002-03 59 ENVIRONMENT PROPOSED PROJECTS � 1 PROJECT i 1998-99 � 1999-00 2000-01 2001-02 2002-03 NUMBER. f IMPROVEMENT ITEM i TOTAL COST ' FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR 2-1 Cape La Croix Creek/Wa!ker 1,164,000 614,000 550,000 Sees 6i, Branch Flood Control Project E. B EefaASf:ee (Walker Branch III - iDetention I Reservoir) I Z ' 2-2 Upper Cape La Croix - 1,027,000 1,027,000 p { Detention Trunk Sewer I B,D,F ; B,D,F SUBTOTAL - CORPS 2,191,000 1,641,000 550,000 PROJECT i i ..... 3> [ > Combined Sewer 3,848,000 3,848,000 ?'?>3'? Segregation B B t1 4, ., Mississippi River Lift 3,551,000 3,551,000 i Stations Replacement- B i E II Renovation j I ) '» >3.-5?><z': Sloan Creek Relief/Extension 2,707,000 I 21117,000 590,000 k Sewer C- I C C South Ramsey Branch Lift 1,021,000 800,000 221,000 I Station/Extension Sewer C C C i_ I 2-7 Clark Avenue Relief Sewer 266,200 266,200 I B B 2-8 Meadowbrook Sewer District 91,300 91,300 1 G i G I 2-9 Lakeshore Drive Sewer 127,700 District G G F �! A GENERAL FUND B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTS/LOANS E MOTOR FUEL TAX F FED.GRANTS/LOANS G SPEC. ASSESSMENTS H CAP. IMP. SALES TAX 1 OTHER - J GEN. OBL BONDS: PENDING K TRANS. SALES TAX Projects included in Sewer Revenue Bond Issue supported by a 1/4% capital improvement sales tax extension for 20 years approved by vote on April 5, 1994. * Projects for which federal funding will be sought under the Disaster Resistant Communities_ Program, primarily designed for earthquake, flood and storm protection. - ENVIRONMENT A GENERAL FUND B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING - - - - D STATE GRANTS/LOANS E MOTOR FUEL TAX F FED.GRANTS/LOANS G SPEC. ASSESSMENTS - - - - - H CAP. IMP. SALES TAX OTHER J GEN. OBL BONDS: PENDING - - - K TRANS. SALES TAX - - - * Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. 6? PROPOSED PROJECTS JECT 1998-99 1999-00j2000-01 2001-02 2002-03 FNUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR j FISCAL YEAR FISCAL YEAR FISCAL YEAR l l 2-10 South Kingshighway/ 727,200 727,200 j Technology Park Sewer G G District I 2-11 Hanover Area Sewer District 63,500 1 25,600 37,900 ! = G = G, G I I I 2-12 Wastewater System SCADA 125,000 25,000 25,000 25,000 25,000 25,000 Upgrade 1* 1 ` f ; I 1 t I I 1 1 2-13 Wastewater Standby Power 56,800 ' _ 56,800 F I at Bouldercrest & I* I Stonebridge Lift Stations I 2-14 Wastewater Standby Powe,- 280,000 I 280,000 Generator ! 2-15 Wastewater Standby Power 29,500 29,500 at Airport Lift Station 2-16 Wastewater Plant Trickling 1,200,000 1,200,000 i Filter Rehabilitation C* C 2-17 Wastewater Standby Power 31,000 ( ! 31,000 at 1-55 Lift Station I 1* I 2-18 Replacement of South Screw 110,000 110,000 ' Pump at Wastewater Plant 1 I I ! 2-19 Replacement of North Screw 110,000 110,000 1 Pump at Wastewater Plant i 1 I 2-20 Elimination of Clarkton Place 18,200 18,200 Lift Station I I 2-21 Sanitary Sewer Rehab. of 225,000 75,000 75,000 75,000 Red Star Area F I F F F A GENERAL FUND B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING - - - - D STATE GRANTS/LOANS E MOTOR FUEL TAX F FED.GRANTS/LOANS G SPEC. ASSESSMENTS - - - - - H CAP. IMP. SALES TAX OTHER J GEN. OBL BONDS: PENDING - - - K TRANS. SALES TAX - - - * Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. 6? ENVIRONMENT PROPOSED PROJECTS PROJECT NUMBER i IMPROVEMENT ITEM 1 TOTAL COST 1 1998-99 I FISCAL YEAR 1 1999-00 FISCAL YEAR 1 2000-01 FISCAL YEAR 2001-02 FISCAL YEAR 2002-03 FISCAL YEAR 2-22 Sanitary Sewer 1 90,500 90,500_ I j t ! j Rehabilitation and Relining F F I} 2-24 Extension of Transfer Station I 65,000 s 66,900 E 75,000 j I y 1 I I C i 1 2-23 Sanitary Sewer Infiltration/ 1 45,000 45,000 j Inflow Analysis & Elimination r'• F 75,000 75,000 75,000 75,000 by Watershed C,I , I C I A B C D E F G H i J K SUBTOTAL -SEWER I 14,123,900 11,482,700 i 2,271,200 210,000 135,000 s 25,000 PROJECTS t ! j I 2-24 Extension of Transfer Station I 66,900 65,000 s 66,900 E 75,000 75,000 Tipping Floor & Building f y 1 I I C i 1 2-25 Standby Power for Transfer € 35,000 35,000 z Station F F 75,000 75,000 75,000 75,000 Extensions I C,I C I C C I 2-26 Solid Waste Machine 65,000 65,000 REV/PFA BONDS: ISSUED- Storage Building 1 REV/PFA BONDS: PENDING [f[R:..ycling Center 120,000 120,000 MOTOR FUEL TAX F,I F,I FED. GRANTS/LOANS A B C D E F G H i J K Projects totally, or partially included in Water Revenue Bond Issue supported by a t/a% sales tax for >` 20 years approved by vote on November 5, 1996. Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. 62 SUBTOTAL - SOLID WASTE 286,900 155,000 131,900 1 I i PROJECTS I Water Distribution 355,000 65,000 65,000 75,000 75,000 75,000 Improvements Program C,I C C C C 1 z Water Development/Main I 375,000 75,000 75,000 75,000 75,000 75,000 Extensions I C,I C I C C C GENERAL FUND REV/PFA BONDS: ISSUED- REV/PFA BONDS: PENDING STATE GRANTS/LOANS MOTOR FUEL TAX FED. GRANTS/LOANS SPEC. ASSESSMENTS CAP. IMP. SALES TAX OTHER GEN. OBL. BONDS: PENDING - - - - - TRANS. SALES TAX - - - - - Projects totally, or partially included in Water Revenue Bond Issue supported by a t/a% sales tax for >` 20 years approved by vote on November 5, 1996. Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. 62 ENVIRONMENT PROPOSED PROJECTS 11 PROJECT 1998-991 1999-00 2000-01 - 2001-02 2002-03 1 NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR 1 FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR is>Z 3Q#: Two -Inch Water Main/ 875,000 175,000 175,000 175,000 175,000 175,000 Service Replacement C,1 C C C C I Program >3 f € Two -Inch Water Main 1,125,000. ( 225,0000 225,000 225,000 225,000 22.5,000 (( Replacment (Contract C,I I C C C C I Program) 11 2-32 Water Meter Replacement 1 250,000 50,000 50,000 j 50,000 50,000 50,000 Program 1 =33 Water Storage Tank i 268,500 57,125 67,125 67,125 67,125 1 Rehabilitation (Four Tanks) ! C C C I C C > �� `. Water System Seismic 1;137,200 280,400 214,200 214,200 214,200 214,200 Protection C,F• C F F F F ?:=35 Expand and Rehab Cape 18,653,000 4,772,000 8,995,000 4,836,000 Rock Water Plant No. 1 and C" t�t C C ! C Construct Alluvial Well Field .'.`Water .. Pumping Station a It 103,400 iI 103,400> { 1111 I I I 1� `z'>`>>>3> Retrofit C i C 37:::: Lexington/Melody Lane f 163,500 i 168,500 h '`;::;">:" Water Extension ! G ! G 1 North Sprigg Water 151,200 151,200 i '': Extension C,G C,G ! I 93j:`: Water Plant No. 2 Sludge 151,300 1 151,300 '> System C C I ) A GENERAL FUND B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING - - D STATE GRANTS/LOANS E MOTOR FUEL TAX F FED. GRANTSILOANS G SPEC. ASSESSMENTS H CAP. IMP. SALES TAX 1 OTHER _ - - J GEN. OBL BONDS: PENDING K TRANS. SALES TAX Projects totally, or partially included in Water Revenue Bond Issue supported by a 1/4% sales tax for 20 years approved by vote on November 5, 1996. Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. 63 ENVIRONMENT PROPOSED PROJECTS PROJECT 1999-00 2000-01 2001-02 2002-C3 NUMBER IMPROVEMENT ITEM 1 i! TOTAL COST 11998-99 FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR Z3Q':>_ Mt. Auburn Corridor Water 904,200 904,200 j Dist. Main Augmentation C C ; t >'z I.: Elevated Elevated Water Storage Tank 237,30Q R 237,300 i C i C ) 20 -Inch Main Project (East j 723,300 723,300 Cape Rock Drive) C C <'2i3>"t<: 16 -inch Main Project 672,100 672,100 [[: (Bertling Street) E C I C Fire Hydrant Replacement 500,000 100,000 100,000 100,000 100,000 100,000 ................. C,I C C C C I 2-45 Mt. Auburn/Siemers Main 600,000 600,000 Upgrade (Proposed North I I Loop) 2-46 South Plant -Nash Road 635,900 635,900 Potable Water Main C,D" C,D 2-47 Emergency Generator 80,000 80,000 I Installation I t I 2-48 Route K Pumping Station I 200,000 I I 200,000 I I " SUBTOTAL- WATER 28,165,900 8,652,725 11,513,025 6,104,625 981,325 914,200 PROJECTS i A GENERAL FUND B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTS/LOANS E MOTOR FUEL TAX F FED. GRANTS/LOANS G SPEC. ASSESSMENTS H CAP. IMP. SALES TAX I OTHER J GEN. OBL. BONDS: PENDING K TRANS. SALES TAX Projects totally, or partially included in Water Revenue Bond Issue supported by a t/4% sales tax for 20 years approved by vote on November 5, 1996. Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. ENVIRONMENT PROPOSED PROJECTS PROJECT I 1998-99 ; 1999-00 2000-01 2001-02 2002-02 NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR. FISCAL YEAR FISCAL YEAR FISCAL YEAR t 2-49 Middle Street Storm 191,100 I 191,100 Drainage Project H* H I 2-50 Kingshighway/Commercial j 64,100 64,1C0 ; f Channel Construction & H* H Ditch Cleaning i 2-51 Arena Creek Realignment 185,000 185,000 ! I (Arena Park) H* 1 H 2-52 Stormwater Detention Basin 100,000 100,000 (Arena Creek Watershed) H. H f 2-53 Stormwater Improvements at 20,000 20,000 Clark and New Madrid { ` 1 H , 2-54 Flood Warning System 70,000 i 25,000 25,000 20,000 H" H H H SUBTOTAL- STORMWATER 630,200 280,200 330,000 20,000 PROJECTS I ( TOTALS 45,397,900 22,211,625 1 14,796,125 3 6,334,625 1,116,325 939,200 1 f1 � t ij 1 A GENERAL FUND B REV/PFA BONDS: ISSUED 9,519,200 8,969,200 550,000 C REV/PFA BONDS: PENDING 29,E43,500 9,826,126 13,^!159,825. 5,840,425 717,125 D STATE GRANTS/LOANS 642,000 642,000 j E MOTOR FUEL TAX I I F FED. GRANTS/LOANS 1,564,300 557,500 289,200 289,200 214,200 214,200 G SPEC. ASSESSMENTS 706,300 577,100 129,200 H CAP. IMP. SALES TAX 630,200 280,200 330,000 20,000 I I OTHER - 2,692,400 1,359,500 237,900. 1e5,000 185,000 725,000 ' J GEN. OBL BONDS: PENDING K TRANS. SALES TAX s I Projects for which federal funding will be sought under the Disaster Resistant Communities Program, primarily designed for earthquake, flood and storm protection. 65 ENVIRONMENT PROJECT TITLE: CAPE LA CROIX CREEK/WALKER BRANCH FLOOD CONTROL PROJECT LOCATION: CAPE LA CROIX CREEK AND WALKER BRANCH PURPOSE: TO REDUCE FLOODING IN PROJECT AREAS PHYSICAL DESCRIPTION: THREE MILES OF STREAM CHANNELIZATION; 157 - ACRE DETENTION FACILITY; PARK AND RECREATION FACILITIES. UNIT OF WORK: ACQUIRE RIGHT-OF-WAY AND CONSTRUCT JUSTIFICATION: FLOODING IN THE CAPE LA CROIX CREEK/WALKER BRANCH WATERSHED HAS CAUSED SERIOUS DAMAGE TO PROPERTY AND ENDANGERED THE LIVES OF CAPE GIRARDEAU CITIZENS, AND THIS HAZARD WILL CONTINUE UNLESS MITIGATED. IMPACT ON ADDITIONAL PERSONNEL AND EQUIPMENT WILL BE OPERATING BUDGET: REQUIRED FOR MAINTENANCE OF THESE FACILITIES. FINANCING: $1,164,000 REVENUE/PFA BONDS: ISSUED (B) $1,164,000 TOTAL NOTE: INCLUDES REMAINING PORTION OF CITY'S COMMITMENT FOR WALKER BRANCH PROJECT (PHASE III) AND DETENTION RESERVOIR PROJECT ON LASALLE FORK OF CAPE LA CROIX CREEK. PROJECT SCHEDULES AND FUNDING COMMITMENTS ARE BEST ESTIMATES AS OF 1/98. 2-1 EIMVIRONMENT PROJECT TITLE: UPPER CAPE LA CROIX - DETENTION TRUNK SEWER LOCATION: ROUTE W TO AND THROUGH CORPS OF ENGINEERS' PROJECT DETENTION AREA (LASAL LE FORK OF CAPE LA CROIX-CREEK) PURPOSE: TO EXTEND SEWER SERVICE TO NORTHWEST PAPT OF CITY AND ROUTE W MOBILE HOME PARK PHYSICAL DESCRIPTION: CONSTRUCTION OF APPROXIMATELY 1.9 MILES OF SANITARY TRUNK SEWER UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: WILL EXTEND SEWER SERVICE IN NORTHWEST PART OF CITY GROWTH AREA AND ELIMINATE SEWAGE LAGOONS AT THE ROUTE W MOBILE HOME PARK. IMPACT ON INCREASED DEPRECIATION EXPENSE, INCREASED OPERATING BUDGET: MAINTENANCE EXPENSE. FINANCING: $ 690,000 REVENUE/PFA BONDS: ISSUED (B) $ 125,000 STATE GRANTS/LOANS (D) $ 212,000 FEDERAL GRANTS/LOANS (CORPS OF ENG.) (F) $ 1,027,000 TOTAL 2-2 67 ENVIRONMENT PROJECT TITLE: COMBINED SENDER SEGREGATION LOCATION: COLLEGE-HENDERSON NORTH, AND MAIN DRAINAGE BASINS (EAST -CENTRAL PART OF CITY) PURPOSE: SEGREGATE COMBINED STORMWATER AND SANITARY SEWER FLOWS PHYSICAL DESCRIPTION: CONSTRUCTION OF NEN! SANITARY SEWER LINES WITH APPURTENANCES. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTiFICATION: COMBINED SEWERS ARE CREATING OVERFLOW PROBLEMS, OVERSTRESSING PUMPING AND TREATMENT FACILITIES, AND CREATING ENVIRONMENTAL PROBLEMS. IMPACT ON INCREASED DEPRECIATION EXPENSE, ADDITIONAL OPERATING BUDGET: PERSONNEL AND MAINTENANCE EQUIPMENT MAY BE REQUIRED. FINANCING: $3,848,000 REVENUE/PFA BONDS: ISSUED (B) $3,848,000 TOTAL 2-3 ENVIRO.P'MEN T PROJECT TITLE: MISSISSIPPI RIVER LIFT STATIONS/ REPLACEMENT - RENOVATION LOCATION: ALONG MISSISSIPPI RIVER FROM SLOAN CREEK AREA TO FORT D AREA. PURPOSE: UPGRADE FOUR EXISTING LIFT STATIONS AND CONSTRUCT A NEW PRIMARY FORCE MAIN PHYSICAL DESCRIPTION: REPLACE/RENOVATE LIFT STATIONS 1, 2, 3 AND 4 AND CONSTRUCT APPROXIMATELY 8,200 FEET OF PARALLEL FORCE MAIN FROM MILL STREET TO G!BONEY STREET. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: EXISTING LIFT STATIONS ARE APPROACHING 30 YEARS OLD AND ARE OUTMODED IN TERMS OF STRUCTURAL INTEGRITY, CAPACITIES, AND AGE OF EQUIPMENT. THE FORCE MAIN IS NEEDED TO REDUCE FRICTION LOSSES AND IMPROVE CAPACITY. IMPACT ON INCREASED DEPRECIATION EXPENSE. SOME OPERATING BUDGET: REDUCTION IN OPERATING EXPENSE IMAY BE ANTICIPATED. FINANCING: $ 3,551,000 REVENUE/PFA BONDS: ISSUED (B) $ 3,551,000 TOTAL 2-4 2-5 E!�IVtR®�lE�E�,9T PROJECT TITLE: SLOAN CREEK RELIEF/EXTENSION SEWER LOCATION: SL OAN CREEK FROM NEAR MISSISSIPPI RIVER TO VICINITY OF LEXINGTON AVENUE PURPOSE: RELIEVE OVERLOADED EXISTING SEWERS AND PROVIDE FOR FUTURE GROWTH. PHYSICAL DESCRIPTION: APPROXIMATELY 9,300 FEET OF 15 -INCH TO 24 - INCH RELIEF SEWER LINE AND APPROXIMATELY 5,600 FEET OF TRUNK SEWER EXTENSION. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: EXISTING TRUNK SEWER IS SURCHARGED AT PEAK FLOW. CONSTRUCTION OF RELIEF SEWER AND EXTENSION WILL PROVIDE SEWER SERVICE TO AN AREA PRESENTLY UNSERVED. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: S 2,707,000 REVENUE/PFA BONDS: PENDING (C) $ 2,707,000 TOTAL 70 ENVIRONMENT PROJECT TITLE: SOUTH RAMSEY BRANCH LIFT STATION/ EXTENSION SEINER LOCATION: SOUTH RAMSEY BRANCH (INTERSTATE 55 - HIGHWAY 74 - MEADOWBROOK AREA) PURPOSE:' PROVIDE SEWER SERVICE TO PREVIOUSLY UNSERVED AREA PHYSICAL DESCRIPTION: APPROXIMATELY 8,600 FEET OF GRAVITY AND FORCE MAIN SEWER WITH ONE LIFT STATION UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: WILL EXTEND SEWER SERVICE TO UNSERVED AREA AT FAR SOUTH END OF RAMSEY BRANCH. WILL RELIEVE EXISTING ENVIRONMENTAL PROBLEMS IN THIS AREA AND PROVIDE FOR ADDITIONAL DEVELOPMENT. IMPACT ON INCREASED DEPRECIATION AND OPERATIONAL OPERATING BUDGET: EXPENSE FINANCING: $ 1,021,000 REVENUE/PFA BONDS: PENDING (C) $ 1,021,700 TOTAL 2-6 71 2-7 ENVIRONMENT PROJECT TITLE: CLARK AVENUE RELIEF SEWER LOCATION: ADJACENT TO WALKER BRANCH FROM PERRYVILL E ROAD TO PARKSITE DRIVE PURPOSE: TO RELIEVE SURCHARGING ON THIS SECTION OF TRUNK SEWER LINE. PHYSICAL DESCRIPTION: APPROXIMATELY 2,500 PEET OF 15 -INCH DIAMETER SANITARY SEWER LINE. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: RELIEVE EXISTING OVERLOAD AND PERMIT COMPLETE DEVELOPMENT OF THE DRAINAGE BASIN. PERMIT WIDENING OF WALKER BRANCH TO REDUCE FLOODING. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: $ 266,200 REVENUE/PFA BONDS: ISSUED (B) $ 266,200 TOTAL 72 ENVIRONMENT PROJECT TITLE: MEADOWBROOK SEWER DISTRICT LOCATION: HIGHWAY 7-4 AND MEADOWBROOK LANE AREA PURPOSE: TO PROVIDE SEWER SERVICE TO MEADOWBROOK AREA PHYSICAL DESCRIPTION: LATERAL SANITARY SEWER LINES AND DISTRICT LIFT STATION UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: AREA CURRENTLY ON PRIVATE SEPTIC SYSTEMS. IMPACT ON INCREASED DEPRECIATION AND OPERATIONAL OPERATING BUDGET: EXPENSE. FINANCING: $ 91,300 SPECIAL ASSESSMENTS (G) $ 91,300 TOTAL im 73 2-9 ENVIRONMENT PROJECT TITLE: LAKESHORE DRIVE SEWER DISTRICT LOCATION: LAKESHORE DRIVE NEAR PERRYVILL E ROAD PURPOSE: PROVIDE SEWER SERVICE TO PREVIOUSLY UNSERVED AREA. PHYSICAL DESCRIPTION: APPROXIMATELY 4,780 FEET OF SANITARY SEWER AND APPURTENANCES. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: REPLACEMENT OF SEPTIC SYSTEMS IN RESIDENTIAL AREA. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: $ 127,700 SPECIAL ASSESSMENTS (G) $ 127,700 TOTAL 74 ENVIRONMENT PROJECT TITLE: SOUTH KINGSHIGHWAY/TECHNOLOGY PARK SEWER DISTRICT LOCATION: SOUTH KINGSHIGHWAY, SOUTHERN EXPRESSWAY AREA/UNIVERSITY TECHNOLOGY PARK PURPOSE: PROVIDE SEWER SERVICE TO PREVIOUSLY UNSERVED AREA AND ELIMINATE ONE LIFT STATION. PHYSICAL DESCRIPTION: APPROXIMATELY 1,620 FEET OF SANITARY SEWER AND APPURTENANCES UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: REPLACEMENT OF SEPTIC SYSTEMS IN COMMERCIAL/INDUSTRIAL AREAS. IMPACT ON DECREASED OPERATIONAL AND MAINTENANCE OPERATING BUDGET: COSTS FROM ELIMINATION OF LIFT STATION. FINANCING: S 127,200 SPECIAL ASSESSMENTS (G) $ 127,200 TOTAL 2-10 75 2-11 ENVIRONMENT PROJECT TITLE: HANOVER AREA SEWER DISTRICT LOCATION: PERRYVILLE ROAD NEAR HANOVER CHURCH AND EVERGREEN DRIVE PURPOSE: PROVIDE LATERAL SEWER SERVICE TO UNSERVED AREA PHYSICAL DESCRIPTION: APPROXIMATELY 1,000 FEET OF SANITARY SENDER AND APPURTENANCES UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: REPLACEMENT OF SEPTIC SYSTEMS IN RESIDENTIAL AREA. IMPACT ON DECREASE IN OPERATING EXPENSE OPERATING BUDGET: FINANCING:$ 63,500 SPECIAL ASSESSMENTS (G) 8 63,500 TOTAL 76 ENVIRONMENT PROJECT TITLE: WASTEWATER SYSTEM SCADA UPGRADE LOCATION: ALL WASTEWATER LIFT STATIONS EXCEPT NUMBERS 1, 2, 3 & 4 PURPOSE: TO MONITOR THE LIFT STATIONS PHYSICAL DESCRIP T ION: -% WIRELESS SYSTEM THAT INCLUDES THE MASTER CONTROLLER AT THE TREATMENT PLANT, AND REMOTE UNITS SUCH AS PLC'S AT EACH LIFT STATION. UNIT OF WORK: INSTALL MASTER CONTROLLER, PLC'S AND THE NETWORK OF ANTENNAS WHICH WOULD CONNECT THE SYSTEM TOGETHER. JUSTIFICATION: A TELEPHONE LINE CHARGE EACH MONTH IS ELIMINATED. MORE RELIABLE SYSTEM OF MONITORING OVER THE PRESENT TELEPHONE LINES. MORE MONITORING CAPABILITIES AVAILABLE WITH SCADA. AS THE LIFT STATIONS IN THE CSO PROJECT ARE REPLACED, WILL REQUIRE SCADA SYSTEMS TO BE INSTALLED (LIFT STATIONS NUMBERED ONE THROUGH FOUR). IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 125,000 OTHER (OPERATIONS) (1) $ 125,000 TOTAL NOTE: SCADA = SUPERVISORY CONTROL AND DATA ACQUISITION. 2-12 77 2-13 ENVIRONMENT PROJECT TITLE: WASTEWATER STANDBY POk&fER AT BOULDER CREST AND STONEBRIDGE LIFT STATIONS LOCATION: BOULDER CREST AND STONEBRIDGE LIFT STAT iONIS PURPOSE: PROVIDE BACK-UP POWER FOR LIFT STATION PUMPING IN CASE OF A POWER :FAILURE. PHYSICAL DESCRIPTION: GENERATORS, PADS, CONTROL PANELS, FENCE AND GATE, INSTALLATION OF -EQUIPMENT. UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: LIFT STATIONS CURRENTLY BYPASS RAW SEWAGE WHEN POWER FAILS. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 55,800 OTHER (1) S 56,800 TOTAL 78 ?ENVIRONMENT PROJECT TITLE: WASTEWATER STANDBY POWER GENERATOR LOCATION: WASTEWATER TREATMENT PLANT PURPOSE: TO PROVIDE ELECTRICITY FOR TREATMENT PLANT OPERATIONS IN CASE OF A UNION ELECTRIC POWER FAILURE. PHYSICAL DESCRIPTION: 12.47 KV, 1 100 KW DIESEL GENERATING STATION; 5,000 GALLON UNDERGROUND FUEL TANK AND PUMP WITH AUTOMATIC CONTROLS. INCLUDES AUTOMATIC SWITCH GEAR EQUIPMENT. UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: NEED FOR A SECOND POWER SOURCE FOR THE PLANT. IN THE NEAR FUTURE, ANY BYPASS OF RAW SEWAGE INTO THE MISSISSIPPI RIVER WILL NOT BE PERMITTED. PLANT CURRENTLY BYPASSES WHEN THERE IS A POWER FAILURE. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 280,000 OTHER (1) $ 280,000 TOTAL 79 2-14 2-15 ENVIRONMENT PROJECT TITLE: WASTEWATER STANDBY POWER AT AIRPORT LIFT STATION LOCATION: CAPE GIRARDEAU REGIONAL AIRPORT LIFT STATION! PURPOSE: PROVIDE BACK-UP POWER FOR LIFT STATION PUMPING IN CASE OF A POWER FAILURE. PHYSICAL DESCRIPTION: GENERATOR, PAD, CONTROL PANEL, FENCE AND GATE, INSTALLATION OF EQUIPMENT. UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: LIFT STATION CURRENTLY BYPASSES RAW SEWAGE WHEN POWER FAILS. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 29,500 OTHER (i) $ 29,500 TOTAL_ HIN ENVIRONMENT PROJECT TITLE: WASTEWATER PLANT TRICKLING FILTER REHABILITATION LOCATION: WASTEWATER TREATMENT PLANT PURPOSE: REHABILITATION OF THE TRICKLING FILTER AT THE TREATMENT PLANT. PHYSICAL DESCRIPTION: REPLACEMENT OF OXIDATION MEDIA, REPLACE CORRUGATED FIBERGLASS WALL PANELS WITH WEATHER AND UV RESISTANT PANELS, REPLACE AND/OR ADD SOME INTERIOR STRUCTURAL BEAMS WITH FIBERGLASS BEAMS, AND REPAINTING STRUCTURAL STEEL. PROJECT SUBJECT TO ENGINEERING ASSESSMENT OF TRICKLING FILTER VERSUS DNR PERMIT EFFLUENT LIMITATIONS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO IMPROVE AND BRING BACK UP TO FUNCTIONAL AND VISUAL STANDARDS, AS CAUSED BY WEAR AND TEAR DUE TO OPERATION, OTHER MAINTENANCE, AND WEATHERING. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $1,200,000 REVENUE/PFA BONDS: PENDING (C) $1,200,000 TOTAL 2-16 81 2-17 ENIVIRON-MENT PROJECT TITLE: WASTEWATER STANDBY POWER AT 1-55 LIFT STATION LOCATION: 1-55 LIFT STATION PURPOSE: PROVIDE BACK-UP POWER FOR LIFT STATION PUMPING IN CASE OF A POWER FAILURE. PHYSICAL DESCRIPTION: GENERATOR, PAD, CONTROL PANEL, FENCE AND GATE, INSTALLATION OF EQUIPMENT UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: LIFT STATION CURRENTLY BYPASSES RAW SEWAGE WHEN POWER FAILS. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 31,000 OTHER (1) $ 31,000 TOTAL 82 ENVIRONMENT PROJECT TITLE: REPLACEMENT OF SOUTH SCREW PUMP AT WASTEWATER PLANT LOCATION: WASTEWATER TREATMENT PLANT PURPOSE: TO REPLACE A SCREW PUMP THAT IS 20 YEARS OLD. PHYSICAL DESCRIPTION: SIX-FOOT DIAMETER SPIRAL SCREW PUMP BY 60 FEET LONG. ALSO WOULD INCLUDE BEARINGS, SEALS, AND ETC. UNIT OF WORK: INSTALLATION JUSTIFICATION: THE SCREW PUMPS IN PLACE NOW ARE 20 YEARS OLD. THE EDGES ARE WORN DOWN AND THE PUMPS THEMSELVES HAVE BEEN SANDBLASTED AND RECOATED ONCE ALREADY. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 110,000 OTHER (1) $ 110,000 TOTAL 2-18 8 2-19 EUVi1 ONMENT PROJECT TITLE: REPLACEMENT OF NORTH SCREW PUMP AT WASTEWATER PLANT LOCATION: WASTEWATER TREATMENT PLANT PURPOSE: TO REPLACE A SCREW PUMP THAT IS 20 YEARS OLD. PHYSICAL DESCRIPTION: SIX-FOOT DIAMETER SPIRAL SCREW PUMP BY 60 FEET LONG. ALSO WOULD INCLUDE BEARINGS, SEALS, AND ETC. UNIT OF WORK: INSTALLATION JUSTIFICATION: THE SCREW PUMPS IN PLACE NOW ARE 20 YEARS OLD. THE EDGES ARE WORN DOWN AND THE PUMPS THEMSELVES HAVE BEEN SANDBLASTED AND RECOATED ONCE ALREADY. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 110,000 OTHER (1) S 110,000 TOTAL 84. ENVIRONMENT PROJECT TITLE: ELIMINATION OF CLARKTON PLACE L!rT STATION LOCATION: CLARKTON PLACE SUBIVISION (ON HOPPER ROAD NEAR HOPPER/KAGE INTERSECTION) PURPOSE: TO REMOVE LIFT STATION FROM THE SYSTEM AND HOOK TO THE SEWER TRUNK LINE. PHYSICAL DESCRIPTION: REMOVAL OF EXISTING STRUCTURE, PAD, ELECTRICAL PANELS, TELEPHONE POLE AND UNE. CONSTRUCTION OF 500 FEET OF GRAVITY SEWER LINE. UNIT OF WORK: DESIGN` AND CONSTRUCT RELIEF SEWER UNE JUSTIFICATION: CLARKTON PLACE IS SCHEDULED FOR A GENERATOR IN THE 1998-99 BUDGET AT A COST OF $22,400 AND HOOK-UP TO SCADA AT ABOUT $12,500. ELIMINATION OF THIS LIFT STATION WOULD COST LESS THAN INSTALLING THE GENERATOR AND SCADA SYSTEM. ALSO, IN THE LONG RUN, THERE WOULD NOT BE ANY EQUIPMENT AT THE SITE TO MAINTAIN. IMPACT ON DECREASED OPERATING AND MAINTENANCE OPERATING BUDGET: COSTS FINANCING: $ 18,200 OTHER (1) 518,200 TOTAL 2-20 m ENVIRONMENT PROJECT TITLE: SANITARY SEWER REHABILITATION OF RED STAR AREA LOCATION: RED STAR DISTRICT PURPOSE: TO PREVENT INFLOW AND INFILTRATION INTO THE SANITARY SEWER SYSTEM DURING FLOOD CONDITIONS. PHYSICAL DESCRIPTION: RELINING SEWERS, RELINING MANHOLES, INSTALLING ABOVE FLOOD ELEVATION VENTS, SEALING MANHOLE LIDS, LATERAL LINE VALVES TO SHUT OFF FLOW DURING FLOOD EVENTS. UNIT OF WORK: PROJECT IDENTIFICATION AND IMPLEMENTATION AND REHABILITATION JUSTIFICATION: TO ENHANCE AND PROTECT THE SANITARY COLLECTION SYSTEM AND PREVENT EXCESS FLOW AT THE WATERWATER TREATMENT PLANT. IMPACT ON DECREASED OPERATING AND MAINTENANCE OPERATING BUDGET: COSTS FINANCING: $ 225,000 FEDERAL GRANTS/LOANS (F) $ 225,000 TOTAL 2-21 87 EINVIROHHENT PROJECT TITLE: SANITARY SEWER REHABILITATION AND RELINING LOCATION: SIX LOCATIONS IN THE CITY, TOTAL OF 1,810 FEET OF 8 -INCH LINE PURPOSE: REDUCE INFLOW AS WELL AS OUTFLOW OF THE I� SANITARY SEWERS. C PHYSICAL DESCRIPTION: RELINE 1,810 FEET OF 8 -INCH PIPE WITH ' INSITUFORM OR LIKE SYSTEM. II UNIT OF WORK: DESIGN AND CONSTRUCT f JUSTIFICATION: I HELP PREVENT SURCHARGING OF SANITARY j SEWER LINES. IMPACT ON DECREASED OPERATING AND MAINTENANCE OPERATING BUDGET: COSTS FINANCING: $ 90,500 FEDERAL GRANTS/LOANS (F) I! 9 $ 90,500 TOTAL f 87 ENVIRONMENT PROJECT TITLE: SANITARY SEWER INFILTRATION/INFLOW ANALYSIS AND ELIMINATION BY WATERSHED I I LOCATION: ARENA CREEK, WALKER BRANCH, RED STAR BRANCH WATERSHEDS PURPOSE: TO PURCHASE FLOW METERS AND NECESSARY J MOUNTING RING EQUIPMENT TO MONITOR LINES i FROM FOUR INCHES TO FIFTEEN INCHES. PREVENT f INFLOW/INFILTRATION AND LINE SURCHARGING. I ONE OF THESE AREAS IS THE PEACH TREE AND I RANCHITO AREA. I PHYSICAL DESCRIPTION: INITIATE I AND I ELIMINATION PROGRAM. i 2-23 UNIT OF WORK: PURCHASE OF EQUIPMENT, OPERATION, AND I AND I ELIMINATION JUSTIFICATION: PREVENT LINE SURCHARGING AND BASEMENT FLOODING. IMPACT ON DECREASED OPERATING AND MAINTENANCE OPERATING BUDGET: COSTS FINANCING: $ 45,000 FEDERAL GRANTS/LOANS (F) $ 45,000 TOTAL .: ENVIRONMENT PROJECT TITLE: EXTENSION OF TRANSFER STATION TIPPING FLOOR AND BUILDING LOCATION: SOLID WASTE TRANSFER STATION PURPOSE: TO INCREASE LOADING AND TONNAGE CAPACITY TO MEET DNR REGULATIONS. PHYSICAL DESCRIPTION: EXTENSION OF BUILDING AND TIPPING FLOOR. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: INCREASED LOADING AND HANDLING FACILITIES ARE NEEDED TO MEET DNR REGULATIONS. THIS INCLUDES TRASH CONTAINMENT RUN-OFF CONTROL, AND OPERATIONAL AND CUSTOMER SAFETY. IMPACT ON SOME SAVINGS SHOULD RESULT FROM MORE OPERATING BUDGET: EFFICIENT OPERATIONS. FINANCING: $ 66,900 OTHER (1) $ 66,900 TOTAL 2-24 ENVIRONMENT PROJECT TITLE: STANDBY POWER FOR TRANSFER STATION LOCATION: SOLID WASTE TRANSFER STATION PURPOSE: PROVIDE OPERATING POWER FOR TRANSFER STATION DURING POWER OUTAGES. PHYSICAL DESCRIPTION: ONE FAD -MOUNTED, DIESEL POWERED, 25 KVA GENERATOR. UNIT OF WORK: INSTALL JUSTIFICATION: DURING POWER OUTAGES, OPERATION OF TRANSFER STATION IS SHUT DOWN AT PRESENT. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 35,000 FEDERAL GRANTS/LOANS (F) $ 35,000 TOTAL 2-25 ENVIRONMENT PROJECT TITLE: SOLID WASTE MACHINE STORAGE BUILDING LOCATION: SOLID WASTE TRANSFER STATION PURPOSE: TO STORE THE HI -LIFT, BACKHOE, AND ROLL -OFF CONTAINER TRUCKS. PHYSICAL DESCRIPTION: 45 -FOOT BY 54 -FOOT BY 14 -FOOT POLE BUILDING WITH A CONCRETE FLOOR, INSULATED, WITH A 24 -FOOT END SLIDE DOOR. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO ALLOW INSIDE STORAGE OF THE TRANSFER STATION EQUIPMENT. THIS WOULD ALSO PROVIDE THE MECHANICS WITH AN AREA TO MAKE REPAIRS ON THE EQUIPMENT. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: $ 65,000 OTHER (1) $ 65,000 TOTAL 2-26 w 2-27 ENVIRONMENT PROJECT TITLE: RECYCLING CENTER LOCATION: PUBLIC WORKS SITE, NORTH BROADVIEW PURPOSE: TO CREATE A MORE EFFICIENT AND SAFE WORKING ENVIRONMENT FOR EMPLOYEES, STREAMLINE THE PROCESSING OPERATIONS AND REORGANIZE THE PUBLIC DROP OFF CENTER TO PROVIDE FOR A SAFER COLLECTION OPERATION. PHYSICAL DESCRIPTION: 60 -FOOT BY 90 -FOOT, INSULATED, CLEAR SPAN BUILDING WITH A 30 -FOOT BY 90 -FOOT OPEN SIDED LEAN-TO FOR DROP OFF. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THE CURRENT FACILITY IS AN OLD CONCRETE BLOCK BUILDING WITH POOR HEATING, LIGHTING AND VENTILATION. THE HEIGHT IS RESTRICTED FOR THE NEW RECYCLING TRUCKS DUMP BODIES. A NEW CENTER WILL INCREASE EFFICIENCY AND ALLOW FOR ADDITIONAL ITEMS TO BE RECYCLED. IMPACT ON INCREASED DEPRECIATION EXPENSE OPERATING BUDGET: FINANCING: $ 100,000 FEDERAL GRANTS/LOANS (F) $ 20,000 OTHER (1) $ 120,000 TOTAL 'y, ENVIROPIMENT PROJECT TITLE: WATER DISTRIBUTION IMPROVEMENTS PROGRAM LOCATION: DISTRIBUTION MAINS - CITY WIDE PURPOSE: INSTALL NEW MAIN PIPES CONNECTING EXISTING MAINS SO THAT FIRE FLOWS, PRESSURE, AND WATER QUALITY ARE IMPROVED. ALSO REPLACE EXISTING PIPES AND HYDRANTS AS REQUIRED OTHER THAN ROUTINE REPAIRS. THIS INCLUDES RELOCATING FACILITIES FOR STATE PROJECTS WHERE NECESSARY. PHYSICAL DESCRIPTION: INSTALL PIPING AS REQUIRED DEPENDING ON EXISTING LOCATIONS AND CONDITIONS. APPROXIMATELY 27,000 FT./5 YRS., 5,400 FT./YR. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (IF NECESSARY), AND CONSTRUCT JUSTIFICATION: WILL IMPROVE FIRE FLOWS, PRESSURE, AND WATER QUALITY. IMPACT ON OPERATING BUDGET: POSSIBLE LOWER ENERGY COSTS, INCREASED DEPRECIATION EXPENSE. FINANCING: $ 280,000 REVENUE/PFA BONDS: PENDING (C) $ 75,000 OTHER (1) $ 355,000 TOTAL 2-28 93 2-29 ENVIRONMENT PROJECT TITLE: WATER DEVELOPMENT/MAIN EXTENSIONS LOCATION: VARIOUS LOCATIONS PURPOSE: EXTENSION OF WATER SERVICE TO NEW DEVELOPING AREAS PREVIOUSLY UNSERVED. PHYSICAL DESCRIPTION: CITY PARTICIPATION IN DEVELOPMENT MAIN INSTALLATIONS, I.E., OVERSIZING, HYDRANTS, VALVES, TAPPING SLEEVES, ETC. AND OTHER ITEMS AS DIRECTED. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXTENSION OF WATER MAINS IS AN ESSENTIAL INFRASTRUCTURE ELEMENT NEEDED TO ENABLE GROWTH. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 300,000 REVENUE/PFA BONDS: PENDING (C) $ 75,000 OTHER (1) $ 375,000 TOTAL 94 PROJECT TITLE: TWO-INCH WATER MAIN/SERVICE REPLACEMENT PROGRAM LOCATION: CITY-WIDE PURPOSE: REPLACEMENT OF SUBSTANDARD, HIGH FAILURE/ REPAIR SECTIONS OF THE WATER DISTRIBUTION SYSTEM WITH NEW 6 -INCH MAIN MINIMUM TO IMPROVE SERVICE, INCREASE FIRE FLOWS AND REDUCE MAINTENANCE COSTS. PHYSICAL DESCRIPTION: REPLACE EXISTING MAIN WITH NEW 6 -INCH MAIN, AND REPLACE EXISTING SERVICES TO NEW LINE. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (WHERE REQUIRED), AND CONSTRUCT JUSTIFICATION: THE REMAINING 2 -INCH MAINS IN THE SYSTEM ARE PRIMARILY GALVANIZED, BADLY CORRODED AND FAIL FREQUENTLY. ADDITIONALLY, MINIMAL FIRE FLOWS ARE POSSIBLE IN THESE MAINS. REPLACEMENT OF SERVICES WILL REMOVE LEAD SOURCE IN THE OLDEST SERVICES. IMPACT ON OPERATING BUDGET: MAINTENANCE COST DUE TO MAIN LEAKS ON THESE LINES WILL DECREASE AS REPLACEMENT PROGRESSES. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 700,000 REVENUE/PFA BONDS: PENDING (C) $ 175,000 OTHER (1) $ 875,000 TOTAL 2-30 o ENVIRONIMENT PROJECT TITLE: TWO-INCH WATER MAIN/SERVICE REPLACEMENT 1?I+vRlIV:; LOCATION: CITY WIDE PHYSICAL DESCRIPTION: REPLACE EXISTING MAIN WITH NEW 6 -INCH MAIN, AND REPLACE EXISTING SERVICES TO NEW LINE. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (WHERE REQUIRED), AND CONSTRUCT JUSTIFICATION: THE REMAINING TWO-INCH MAINS IN THE SYSTEM ARE PRIMARILY GALVANIZED, BADLY CORRODED AND FAIL FREQUENTLY. ADDITIONALLY, MINIMAL FIRE FLOWS ARE POSSIBLE IN! THESE MAINS. REPLACEMENT OF SERVICES WILL REMOVE LEAD SOURCE IN THE OLDEST SERVICES. IMPACT ON OPERATING BUDGET: MAINTENANCE COST DUE TO MAIN LEAKS ON THESE LINES WILL DECREASE AS REPLACEMENT PROGRESSES. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 900,000 REVENUE/PFA BONDS: PENDING (C) $ 225,000 OTHER (1) $ 1,125,000 TOTAL 2-31 ENVIRONMENT PROJECT TITLE: !MATER METER REPLACEMENT PROGRAM LOCATION: VARIOUS LOCATIONS THROUGHOUT THE CITY - SERVICE INSTALLATIONS. PURPOSE: TO REPLACE AGED, INACCURATE METERS WITH NEW METERS SO THAT WATER BILLINGS REFLECT ACTUAL USAGE. PHYSICAL DESCRIPTION: IMPLEMENT 10 -YEAR, METER TEST PROGRAM REPLACING METERS OUTSIDE AWWA ACCEPTANCE STANDARDS FOR ACCURACY. UNIT OF WORK: REPLACE METERS, EACH BASED ON LAST TEST OR INSTALLATION DATE. JUSTIFICATION: METERS TYPICALLY REGISTER LESS THAN THE QUANTITY ACTUALLY CONSUMED AS THEY AGE AND MECHANICAL WEAR OCCURS. THIS RESULTS IN LOST WATER ACCOUNTABILITY. IMPACT ON OPERATING BUDGET: WILL INCREASE REVENUE BY ENSURING METER ACCURACY (METERS OVER, 10 YRS. OLD TYPICALLY UNDER -REGISTER BY APPROX. 5%). FINANCING: S 250,000 OTHER (OPERATIONS) (1) 250,000 TOTAL 2-32 97 2-33 ENVIRONMENT PROJECT TITLE: WATER STORAGE TANK REHABILITATION (FOUR TANKS) LOCATION: TO BE DETERMINED BY SELECTION CRITERIA BASED ON INSPECTION PURPOSE: PROLONG TANK LIFE AND ENSURE WATER QUALITY. PHYSICAL DESCRIPTION: RE -COAT STORAGE TANKS, PERFORM NECESSARY MAINTENANCE. UNIT OF WORK: INSPECT AND REHABILITATE JUSTIFICATION: PROGRAMMED PREVENTIVE MAINTENANCE IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 268,500 REVENUE/PFA BONDS: PENDING (C) $ 268,500 TOTAL m ENVIRONMENT PROJECT TITLE: WATER SYSTEM SEISMIC PROTECTION LOCATION: TREATMENT PLANTS AND STORAGE TANKS PURPOSE: MINIMIZE DAMAGE AND WATER LOSS IN THE EVENT OF SEISMIC ACTIVITY. PHYSICAL DESCRIPTION: AUTOMATIC ISOLATION VALVES AND FLEXIBLE CONNECTIONS AT INFLUENT AND EFFLUENT PIPING TO TANKS AND CLEAR WELLS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: MAINTAIN INTEGRITY OF DRINKING WATER SUPPLY IN THE EVENT OF SEISMIC ACTIVITY. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 280,400 REVENUE/PFA BONDS: PENDING (C) $ 856,800 FEDERAL GRANTS/LOANS (F) $ 1,137,200 99 TOTAL 2-35 ENVIRONMENT PROJECT TITLE: EXPAND AND REHAB CAPE ROCK WATER PLANT NO. 1 AND CONSTRUCT ALLUVIAL WELL FIELD LOCATION: WATER TREATMENT PLANT NO. 1 (CAPE ROCK PLANT) PURPOSE: PROVIDE INCREASED CAPACITY FOR SUPPLY OF POTABLE WATER TO CITY OF CAPE GIRARDEAU FOR EXISTING AND FUTURE DEVELOPMENT. PHYSICAL DESCRIPTION: DESIGN AND CONSTRUCT PLANT FACILITIES. UNIT OF WORK: DESIGN, ACQUIRE PROPERTY/EASEMENTS, AND CONSTRUCT JUSTIFICATION: NEEDED TO MEET NEAR AND LONG-TERM WATER SYSTEM DEMANDS AS IDENT!FIED IN WATER SYSTEM MASTER PLAN. IMPACT ON OPERATION AND MAINTENANCE COSTS WILL OPERATING BUDGET: CHANGE. INSUFFICIENT D:�TE AVAILABLE CURRENTLY TO FORECAST EFFECT. INCREASED DEPRECIATION EXPENSE. FINANCING: $18,653,000 REVENUE/PFA BONDS: PENDING (C) $18,653,000 TOTAL 100 ENVIRONMENT PROJECT TITLE: WATER PUMPING STATION/VAULT RETROFIT LOCATION: VARIOUS LOCATIONS PURPOSE: RETROFIT CONFINED -SPACE PUMPING STATIONS/VAULTS WITH FORCED AIR VENTILATION AND LIGHTWEIGHT ACCESS HATCHES. ADDITIONAL PUMPING STATION FOR WEST OR NORTHWEST AREA PER WATER SYSTEM MASTER PLAN. PHYSICAL DESCRIPTION: INSTALL BLOWERS, SWITCHES, WIRING AND RETROFIT HATCHES WITH LIGHTWEIGHT MATERIALS. ADD MOTOR OPERATED VALVE AT COLLEGE FOR PUMPING CONTROL. PUMPING STATION DESIGN AND INSTALLATION. UNIT OF WORK: DESIGN AND CONSTRUCT/RETROFIT. JUSTIFICATION: EMPLOYEE SAFETY AND STRICTER CONFINED - SPACE ENTRY REQUIREMENTS. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 103,400 REVENUE/FFA BONDS: PENDING (C) $ 103,400 TOTAL 2-36 101 ENVIRONMENT PROJECT TITLE: LEXINGTON/MELODY LANE WATER EXTENSION LOCATION: LEXINGTON AVENUE, OLD SPRIGG STREET ROAD TO NEAR BIG BEND ROAD, SHORT EXTENSION DOWN MELODY LANE. PURPOSE: DEVELOPMENT MAIN EXTENSION. A PORTION OF LEXINGTON MAIN EXTENSION IS IDENTIFIED IN BLACK. AND VEATCH MASTER PLAN AS IMPROVEMENT MAIN. PHYSICAL DESCRIPTION: TOGETHER WITH NORTH SPRIGG WATER EXTENSION, 8,284 FEET OF 8 -INCH PIPE, 700 FEET OF 6 -INCH PIPE. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (IF REQUIRED), AND CONSTRUCT JUSTIFICATION: PROVIDE WATER SERVICE TO NEW AREA AS IT DEVELOPS. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 168,500 SPECIAL ASSESSMENTS (G) $ 168,500 TOTAL NOTE: IN ORDER TO MAINTAIN THE INTEGRITY OF THE WATER SYSTEM, THIS PROJECT WILL NEED TO BE COORDINATED, AND CONSTRUCTED, WITH PROJECT NO. 2-38 (NORTH SPRIGG WATER EXTENSION). 2-37 102 ENVIRONMENT PROJECT TITLE: NORTH SPRIGG WATER EXTENSION LOCATION: NORTH SPRIGG STREET, BERTLING TO NEW LEXINGTON AVENUE PURPOSE: DEVELOPMENT MAIN EXTENSION PHYSICAL DESCRIPTION: TOGETHER WITH LEXINGTON WATER EXTENSION, 8,284 FEET OF 8 -INCH PIPE, 700 FEET OF 6 -INCH PIPE. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (IF REQUIRED), AND CONSTRUCT JUSTIFICATION: PROVIDE WATER SERVICE TO NEW AREA AS IT DEVELOPS. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 23,100 REVENUE/PFA BONDS: PENDING (C) $ 128,100 SPECIAL ASSESSMENTS (G) $ 151,200 TOTAL NOTE: IN ORDER TO MAINTAIN THE INTEGRITY OF THE WATER SYSTEM, THIS PROJECT WILL NEED TO BE COORDINATED, AND CONSTRUCTED, WITH PROJECT NO. 2-37 (LEXINGTON/MELODY LANE WATER EXTENSION). 2-38 103 2-39 ENVIRONMENT PROJECT TITLE: WATER PLANT NO. 2 SLUDGE SYSTEM LOCATION: WATER PLANT NO. 2 (RAMSEY BRANCH PLANT) PURPOSE: SLUDGE DISPOSAL TO SEWER SYSTEM RATHER THAN HOLDING LAGOON. PHYSICAL DESCRIPTION: SEWER LIFT STATION AND LATERAL TO DISPOSE OF PROCESS SLUDGE (WHEN TRUCK AVAILABLE). UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: REDUCE SLUDGE DISPOSAL COSTS, LAGOON MAINTENANCE AND BENEFIT SEWER TREATMENT PROCESS (COAGULANT). IMPACT ON OPERATING BUDGET: SLUDGE LAGOON CLEANING COSTS ARE APPROXIMATELY $50,000 AND ON A THREE (3) YEAR INTERVAL. AS PLANT NO. 2 USE INCREASES, THIS WILL SHORTEN INTERVAL. THE SEWER TREATMENT DISPOSAL OPTION IS MUCH MORE COST EFFECTIVE AND WOULD SAVE APPROXIMATELY $300,000 OVER THE NEXT 15 YEARS. FINANCING: $ 15;,300 REVENUE/PFA BONDS: PENDING (C) $ 151,300 TOTAL 104 ENVIROIl MENT PROJECT TITLE: MT. AUBURN CORRIDOR WATER DISTRIBUTION: MAIN AUGMENTATION LOCATION: MT. AUBURN ROAD, FROM DOCTORS PARK NORTH TO HOPPER ROAD PURPOSE: PROVIDE ADEQUATE FLOWS AND PRESSURE TO SERVE DEVELOPING AREAS ALONG MT. AUBURN ROAD. PHYSICAL DESCRIPTION: CONSTRUCT PIPE SEGMENTS 544, 545, 547, 548, 550, 551, AND 552 ON FIGURE 12, RECOMMENDED IMPROVEMENTS, BLACK & VEATCH MASTER PLAN 1993. (MAY REQUIRE ADDI T iONAL PIPE SEGMENT TO COMPLETE PROJECT.) UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: SYSTEM DEMAND IS INCREASING AS A RESULT OF GROWTH ALONG THE MT. AUBURN CORRIDOR. UPGRADES IN LINE SIZING ARE NEEDED TO ACCOMMODATE PRESENT AND FUTURE GROWTH. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION! EXPENSE. MINOR POWER SAVINGS WITH REDUCED FRICTION LOSS. FINANCING: $ 904,200 REVENUE/FFA BONDS: PENDING (C) $ 904,200 TOTAL 2-40 105 2-41 ENVIRONMENT PROJECT TITLE: ELEVATED WATER STORAGE TANK LOCATION: AREA ADJACENT TO 1-55 NORTH OF ROUTE K PURPOSE: PROVIDE STORAGE CAPACITY TO MEET PEAK HOUR DEMANDS IN DEVELOPING AREAS PHYSICAL DESCRIPTION: ELEVATED STORAGE TANK UNIT OF WORK: DESIGN, SITE IDENTIFICATION, CONSTRUCT, AND EQUIP. JUSTIFICATION: GROWTH AND DEVELOPMENT IMPACT ON OPERATING BUDGET: ADDITIONAL COSTS WILL BE INCURRED FOR OPERATION AND MAINTENANCE AT APPROXIMATELY $2,000 ANNUALLY. 10 -YEAR REPAINTING SCHEDULED IN YEAR 2010 AT APPROXIMATELY $100,000. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 237,300 REVENUE/PFA BONDS: PENDING (C) $ 237,300 TOTAL 106 ENVIRONMENT PROJECT TITLE: 20 -INCH MAIN PROJECT (EAST CAPE ROCK DRIVE) LOCATION: EAST CAPE ROCK DRIVE, FROM WATER PLANT NO. 1 TO BERTLING STREET PURPOSE: INCREASE FLOW FROM MAIN PLANT TO DISTRIBUTION SYSTEM. PHYSICAL DESCRIPTION: APPROXIMATELY 5,300 FEET OF 20 -INCH TRANSMISSION MAIN. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: NEEDED TO INCREASE TRANSMISSION CAPACITY, IMPROVE PRESSURE CONDITIONS AND FIRE FLOWS. REPLACE 14 -INCH TRANSMISSION MAINS INSTALLED IN 1931 AND 1953. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 723,300 REVENUE/PFA BONDS: PENDING (C) $ 723,300 TOTAL 2-42 107 2-43 ENVIRONMENT PROJECT TITLE: 16 -INCH MAIN PROJECT (BERTLING STREET) LOCATION: BERTLING STREET, FROM OLD SPRIGG STREET ROAD WEST TO CAPE ROCK DRIVE PURPOSE: INCREASE FLOW FROM MAIN PLANT TO DISTRIBUTION SYSTEM. PHYSICAL DESCRIPTION: APPROXIMATELY 5,420 FEET OF 16 -INCH TRANSMISSION MAIN. UNIT OF WORK: -DESIGN AND CONSTRUCT JUSTIFICATION: NEEDED TO INCREASE TRANSMISSION CAPACITY, IMPROVE PRESSURE CONDITIONS AND FIRE FLOWS. REPLACE 12 -INCH TRANSMISSION MAIN INSTALLED IN 1951-52. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 672,100 REVENUE/PFA BONDS: PENDING (C) $ 672,100 TOTAL 108 ENVIRONMENT PROJECT TITLE: FIRE HYDRANT REPLACEMENT LOCATION: CIT Y WIDE PURPOSE: FIRE PROTECTION FLOW INCREASE PHYSICAL DESCRIPTION: 798 41/2 -INCH HYDRANTS REPLACED WITH 51/4 - !NCH HYDRANTS. UNIT OF WORK: INSTALL JUSTIFICATION: HYDRANTS OUTDATED - LOW FLOW CAPACITIES. DO NOT MEET CURRENT DESIGN SPECIFICATIONS. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 400,000 REVENUE/PFA BONDS: PENDING (C) w 100,000 OTHER (I) $ 500,000 TOTAL 2-44 109 2-45 ENVIRONMENT PROJECT TITLE: MOUNT AUBURN/SIEMERS MAIN UPGRADE LOCATION: !`JIT. AUBURN ROAD TO SIEMERS DRIVE IN VICINITY OF ROUTE K/1-55 INTERCHANGE (PROPOSED NORTH LOOP) PURPOSE: PROVIDE INCREASED WATER FLOW AND PRESSURES TO THE DEVELOPING AREA ALONG SIEMERS DRIVE. PHYSICAL DESCRIPTION: APPROXIMATELY 6,950 FEET OF 16 -INCH WATER MAIN WITH APPURTENANCES. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: DEVELOPMENT ALONG SIEMERS DRIVE WILL REQUIRE WATER SUPPLY ENHANCEMENT TO SUPPORT FUTURE GROWTH. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 600,000 REVENUE/PFA BONDS: PENDING (C) $ 600,000 TOTAL ilo ENVIRONMENT PROJECT TITLE: SOUTH PLANT-NASH ROAD POTABLE WATER MAIN LOCATION: SOUTH WATER TREATMENT PLANT, SOUTH TO NASH ROAD NEAR JUNCTION WITH AIRPORT ROAD PURPOSE: TO PROVIDE POTABLE WATER TO THE GREATER CAPE GIRARDEAU INDUSTRAIL PARK. PHYSICAL DESCRIPTION: APPROXIMATELY 7,800 FEET OF 12 -INCH WATER MAIN WITH CROSSINGS OF THE DUTCHTOWN DITCH, HEADWATER DIVERSION CHANNEL, AND LIT T LE RIMER MAIN STEM LEVEE UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THE CITY -OWNED WATER SYSTEM ON NASH ROAD SUPPLIES NON -POTABLE WATER FOR PRODUCTION AND FIRE FIGHTING ONLY. POTABLE WATER IS NEEDED FOR EXPANDING ECONOMIC DEVELOPMENT. IMPACT ON INCREASED DEPRECIATION AND MAINTENANCE OPERATING BUDGET: EXPENSE. FINANCING: $ 500,000 STATE GRANTS/LOANS (D) 135,900 REVENUE/PFA BONDS: PENDING (C) $ 635,900 TOTAL NOTE: THIS PROJECT IS CONTINGENT UPON THE LOCATION OF A NEW INDUSTRY OR EXPANSION THAT WILL SATISFY THE "BUT FOR" REQUIREMENT FOR STATE GRANT FUNDS UP TO A MAXIMUM OF $$500,000. THE CITY'S SHARE OF THE PROJECT IS ALSO CONTINGENT UPON OTHER FACTORS, SUCH AS THE STATUTS OF STATE REVOLVING LOAN FUNDS, IF SUCH ARE AVAILABLE. 2-46 111 2-47 ENVIRONMENT PROJECT TITLE: EMERGENCY GENERATOR INSTALLATION LOCATION: GORDONVILLE WATER TANKS AND CAPE ROCK- PERRYVILLE ROAD BOOSTER STATION PURPOSE: PROVIDE STANDBY POWER FOR GORDONVILLE BOOSTER PUMPS AND CAPE ROCK.-PERRYVILLE ROAD PUMP STATION. PHYSICAL DESCR!FTION: INSTALL TWO DONATED, LARGE -CAPACITY GENERATORS, INCLUDING AUTOMATIC SWITCHING EQUIPMENT, PAD MOUNTS, ENCLOSURES, AND FUEL SYSTEMS. UNIT OF WORK: INSTALL JUSTIFICATION: POWER OUTAGE CREATES LOW OR NO PRESSURE TO THESE ZONES. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 80,000 OTHER (1) $ 80,000 TOTAL 112 ENVIRONMENT PROJECT TITLE: ROUTE K PUMPING STATION LOCATION: ROUTE K WEST OF 1-55 INTERCHANGE PURPOSE: PROVIDE INCREASED WATER FLOW TO GROWTH AREA WEST ON ROUTE K. PHYSICAL DESCRIPTION: DESIGN! AND CONSTRUCT SCADA-CONTROLLED BOOSTER PUMP STATION, WITH TWO PUMP UNITS AND EMERGENCY GENERATOR. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXTENSION OF WATER MAINS WEST ON ROUTE K WILL REQUIRE PUMP STATION AT AREA DEVELOPS. IMPACT ON INCREASED OPERATING AND MAINTENANCE OPERATING BUDGET: EXPENSE FINANCING: S 200,000 OTHER (1) $ 200,000 TOTAL .: 113 2-49 ENVIRONMENT PROJECT TITLE: MIDDLE STREET STORM DRAINAGE SYSTEM LOCATION: MIDDLE AND INDEPENDENCE STREET INTERSECTION PURPOSE: TO ALLEVIATE FLOODING AT THE INDEPENDENCE AND MIDDLE STREET INTERSECTION. PHYSICAL DESCRIPTION: CONSTRUCT DETENTION BASIN AND STORM SENDER LINES. UNIT OF WORK: CONSTRUCT IN CONNECTION WITH MAIN CSO PROJECT JUSTIFICATION: PARTS 2 AND 3 OF A PLAN TO REDUCE STREET AND PROPERTY FLOODING IN THE PROJECT AREA. IMPACT ON OPERATING BUDGET: INCREASED MAINTENANCE COSTS FOR DETENTION BASIN. FINANCING: $ 191,100 CAPITAL IMPROVEMENT SALES TAX (H) $ 191,100 TOTAL 114 ENVIRONMENT PROJECT TITLE: KINGSHIGHWAY/COMMERC!AL CHANNEL CONSTRUCTION AND DITCH CLEANING LOCATION: FROM SOUTH KINGSHIGHWAY TO CAPE LA CROIX CREEK. FROM THE DITCH SOUTH OF AUTO TRIM DESIGN TO THE BOX CULVERT ON COMMERCIAL STREET AND CONTINUING PAST THE KUSS ENTERTAINMENT PROPERTY TO CAPE LA CROIX CREEK. ALSO, POSSIBLE REPLACEMENT OF THE BOX CULVERT. PURPOSE: TO PERMIT STORMWATER TO FLOW PROPERLY FROM KINGSHIGHWAY TO CAPE LA CROIX CREEK AND STABILIZE THE BANKS SO THAT MAINTENANCE CAN BE PERFORMED. PHYSICAL DESCRIPTION: APPROXIMATELY 1,600 FEET OF CHANNEL WORK INCLUDING A CONCRETE -LINED CHANNEL BOTTOM AND VEGETATED SIDE SLOPES. ALSO LOOK AT THE CONDITION OF THE BOX CULVERT ON COMMERCIAL AND LOOK FOR PROPER FLOW AND SIZING. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THE HIGHWAY DEPARTMENT IMPROVEMENTS ASSOCIATED WITH NEW HIGHWAY 74 HAVE INCREASED FLOW THROUGH THIS SECTION OF DRAINAGE DITCH AND THEIR IMPROVEMENTS STOPPED AT KINGSHIGHWAY. THIS HAS ALLOWED WATER TO POND IN THIS AREA. IMPACT ON IF THE CITY ASSUMES MAINTENANCE OF THIS OPERATING BUDGET: CHANNEL, THERE WILL BE ADDITIONAL MAINTENANCE COSTS. FINANCING: $ 64,100 CAPITAL IMPROVEMENT SALES TAX (H) $ 64,100 TOTAL 2-50 115 2-51 ENVIROI`!!►EiiENT PROJECT TITLE: ARENA CREEK REALIGNMENT LOCATION: ARENA PARK AREA, FROM KINGSHIGHWAY TO CAPE LA CROIX CREEK PURPOSE: TO ALLOW THE AREA TO DRAIN PROPERLY AND PREVENT FLOODING. PHYSICAL DESCRIPTION: CHANNELIZATION OF THE CREEK. UNIT OF WORK: ACQUIRE PROPERTY (IF NEEDED), DESIGN, AND CONSTRUCT JUSTIFICATION: PREVENT FLOODING. IMPACT ON IF THE CITY ASSUMES FULL MAINTENANCE OF OPERATING BUDGET: THIS CHANNEL, THERE WILL BE ADDITIONAL MAINTENANCE COSTS. F!NANCING: $ 185,000 CAPITAL IMPROVEMENT SALES TAX (H) $ 185,000 TOTAL 116 ENVIRONMENT PROJECT TITLE: STORMWATER DETENTION BASIN (ARENA CREEK WATERSHED) LOCATION: BEHIND HUCKSTEP AUTO BODY ON NORTH KINGSHIGHWAY. PURPOSE: TO CONTROL FLOOD RUNOFF. PHYSICAL DESCRIPTION: STORMWATER DETENTION BASIN. UNIT OF WORK: ACQUIRE PROPERTY, DESIGN, AND CONSTRUCT JUSTIFICATION: TO HELP PREVENT FLOODING FROM THE DETENTION BASIN TO THE ARENA PARK AREA. IMPACT ON INCREASED MAINTENANCE COST OPERATING BUDGET: FINANCING: S 100,000 CAPITAL IMPROVEMENT SALES TAX (H) 100,000 TOTAL 2-52 11-7 2-53 ENVIRONMENT PROJECT TITLE: STORMWATER IMPROVEMENTS AT CLARK AND NEW MADRID LOCATION: CLARK STREET, BETWEEN NEW MADRID AND DUNKLIN PURPOSE: TO REDUCE STORMWATER FLOWING ONTO CLARK. PHYSICAL DESCRIPTION: INSTALLATION OF 500 LINEAL FEET OF 21 -INCH REINFORCED CONCRETE PIPE WITH INLETS AND NECESSARY APPURTENANCES. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: PROJECT WILL IMPROVE TRAFF-IC SAFETY AND REDUCE STREET MAINTENANCE. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: S20,000 CAPITAL IMPROVEMENT SALES TAX (H) $ 20,000 TOTAL 118 ENVIRONMENT PROJECT TITLE: FLOOD WARNING SYSTEM LOCATION: HOPPER ROAD BRIDGE, INDEPENDENCE BRIDGE, AND BLOOMFIELD BRIDGE OVER CAPE LA CROIX CREEK. LOMBARDO BRIDGE OVER WALKER BRANCH, AND CAPE LA CROIX CREEK HEADWATER DETENTION BASIN. PURPOSE: TO BE ABLE TO MONITOR INCREASES IN THE CREEK LEVEL AND DETENTION BASIN LEVEL. HELP PREVENT DOWNSTREAM PROPERTY DAMAGE. PHYSICAL DESCRIPTION: ULTRASONIC FLOW MONITORING AND REPORTING VIA THE WATERWATER PLANT AND PUBLIC WORKS SERVICE CENTER SCADA SYSTEM. ALSO, WILL HAVE THE CAPACITY FOR THE POLICE AND FIRE TO MONITOR WITH THE APPROPRIATE EQUIPMENT. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: MONITOR FLOW TO HELP PREPARE AND PREVENT DOWNSTREAM DAMAGE. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 70,000 CAPITAL IMPROVEMENT SALES TAX (H) $ 70,000 TOTAL 2-54 119 This page left blank intentionally. 120 ARKS AND RECREA "ION CAPITA, IMPRO EVEN "PROGRAM 500,000 400,000 300,000 200,000 100,000 1998-99 1999-00 2000-01 2001-02 2002-03 121 PARKS AND RECREATION PROPOSED PROJECTS PROJECT $ 10,000 $ .10,000 1998-991999-00 2000-01 2001-02 2002-03 I NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR 3-1 General Park Development $ 225,000 $ 89,000 $ 50,000 S 50,000 $ 50,000 5 75,000 1 j I A i A i A A A 3-2 Land Acquisition--Shaee wn $ 150,950 $ 41,000 $ 39,000 S 37,000 $ 17,250 $ 16,700 and Osage Parks A i A A A A A I 3-3 Golf Course Maintenance/ $ 50,003 S 50,000 $ 87,000 ji $ 67,250 S 91,700 B REV/PFA BONDS: ISSUED Storage Bldg. Enlargement j A A ! i C REV/PFA BONDS: PENDING 1 D 3-4 j Goff Course Pro Shop S250,000 I $ 250,000 I - - E 3-5 Arena Park Shelter $ 15,000 S 15,000 F FED. GRANTS/LOANS Replacement A,I A,1 G 3-6 Arena Parking Lot Paving $ 16,500 I $ 16,500 t i H 3-7 Cape Rock Fountain Park $ 2,500 $ 2,500 1 I Development, ! I f J K ( 3-8 Ranney Park Improvements i $ 20,000 $ 20,000 (Parking Area and AI AI i Playground Construction) 3-9 Washington Park Paving I k( S 3,000 S 3,000 (Parking Area) I A A �. 3-10 Washington Park Basketball $ 10,000 $ .10,000 j Court A i A TOTALS $ 742,950 $ 408,000 $ 89,000 $ 87,000 $ 67,250 $ 91,700 1 R 1 ( i A GENERAL FUND $ 453,950 $ 119,000 S 89,000 $ 87,000 ji $ 67,250 S 91,700 B REV/PFA BONDS: ISSUED ( C REV/PFA BONDS: PENDING 1 D STATE GRANTS/LOANS - - E MOTOR FUEL TAX F FED. GRANTS/LOANS G SPEC. ASSESSMENTS ( i H CAP. IMP. SALES TAX 1 OTHER ( $ 289,000 S289,000 1 J K GEN. OBL. BONDS: PENDING TRANS. SALES TAX 122 PARKS AND RECREATION PROJECT TITLE: GENERAL PARK DEVELOPMENT LOCATION: VARIOUS PARKS PURPOSE: TO PROVIDE VARIOUS PARK AND RECREATION AMENITIES AND EQUIPMENT. PHYSICAL DESCRIPTION: CONSTRUCTION OF PARK AMENITIES, RECREATIONAL AND OTHER FACILITIES. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: VARIOUS PARKS HAVE UNANTICIPATED NEEDS EACH YEAR. IMPACT ON MINOR INCREASES IN OPERATIONAL AND OPERATING BUDGET: MAINTENANCE EXPENSES, DEPENDING ON FACILITIES CONSTRUCTED. FINANCING: $ 225,000 GENERAL FUND (A) $ 225,000 TOTAL NOTE: THESE FUNDS COULD ALSO BE USED FOR MATCHING DONATIONS FROM CIVIC GROUPS OR INDIVIDUALS FOR PARK IMPROVEMENTS 3-1 123 3-2 PARKS AND RECREATION PROJECT TITLE: LAND ACQUISITION - SHAWNEE AND OSAGE PARKS LOCATION: SHAWNEE PARK (SOUTH WEST =ND BOULEVARD) AND OSAGE PARK (NORTH KINGSHIGHWAY) PURPOSE: TO PROVIDE ADDITIONAL PARK ACREAGE, RECREATION FACILITIES, AND GREEN SPACE. PHYSICAL DESCRIPTION: PURCHASE OF 90 ACRES OF LAND. UNIT OF WORK: SCHEDULED PAYMENTS ON LAND PURCHASED IN 1992 AND 1993. JUSTIFICATION: ADDITIONAL AREAS ARE NEEDED AND USED FOR OSAGE COMMUNITY CENTER, SHAWNEE PARK SPORTS COMPLEX, CAPE LA CROIX TRAIL, AND CAPE WOODS CONSERVATION AREA. IMPACT ON WILL REQUIRE ADDITIONAL PERSONNEL AND OPERATING BUDGET: EQUIPMENT FOR MAINTENANCE AS AREAS ARE DEVELOPED AND USED. FINANCING: S 150,950 GENERAL FUND (A) $ 150,950 TOTAL 124 PARKS AND RECREATION PROJECT TITLE: GOLF COURSE i 3-4 PARKS AND RECREATION PROJECT TITLE: GOLF COURSE PRO SHOP LOCATION: J. C. MUNICIPAL GOLF COURSE PURPOSE: TO PROVIDE NEEDED STORAGE SPACE, CUSTOMER USE AREA, AND MERCHANDISE SALES AND DISPLAY AREA. PHYSICAL DESCRIPTION: CONSTRUCTION OF NEW 3,000 SQUARE FOOT PRO SHOP LOCATED AT THE SITE OF THE PRESENT SHOP. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THE PRESENT PRO SHOP SIZE OF 1,300 SQUARE FEET IS INADEQUATE FOR THE NEEDS OF CUSTOMER SPACE, MERCHANDISE STORAGE AND SALES AREA. INCREASING GOLF COURSE USE AND REVENUES JUSTIFIES THIS PROJECT. IMPACT ON MINOR INCREASE IN OPERATING EXPENSES OPERATING BUDGET: ANTICIPATED. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 250,000 OTHER (1) $ 250,000 TOTAL 126 PARKS AND RECREATION PROJECT TITLE: ARENA PARK SHELTER REPLACEMENT LOCATION: ARENA PARK PURPOSE: PROVIDE ADDITIONAL PICNIC FACILITIES AND REPLACE OLD SHELTER. PHYSICAL DESCRIPTION: TO REPLACE SHELTER # 5 LOCATED IN THE NORTHERN PORTION OF ARENA PARK. UNIT OF WORK: TO REMOVE EXISTING SHELTER COMPLETELY AND INSTALL A NEW SHELTER WITH TABLES, GRILL, FOUNTAIN, AND ELECTRICITY. JUSTIFICATION: OLD SHELTER IS DETERIORATED. NEED TO PROVIDE PICNIC FACILITIES ADJACENT TO NEW PLAYGROUND UNIT. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 5,000 GENERAL FUND (A) $ 10,000 OTHER (1) $ 15,000 TOTAL 3-5 127 PARKS AND RECREATION PROJECT TITLE: ARENA PARKING LOT PAVING LOCATION: ARENA PARK TENNIS COURT- HIKING/BIKING TRAIL PARKING AREA PURPOSE: TO PROVIDE STABLE PARKING FOR USERS. PHYSICAL DESCRIPTION: APPROXIMATELY 16,000 SQUARE FEET OF PAVING. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: 3-6 INCREASED USE OF PARKING AREA BECAUSE OF HIKING/BIKING TRAIL AND SAND VOLLEYBALL COURT IN ADDITION TO TENNIS COURTS. NO SIGNIFICANT IMPACT $ 16,500 OTHER (1) $ 16,500 TOTAL 128 PARKS AND RECREATION PROJECT TITLE: CAPE ROCK FOUNTAIN PARK DEVELOPMENT LOCATION: CAPE ROCK FOUNTAIN PARK PURPOSE: TO IMPROVE THIS HIGH VISIBILITY AREA WITH SITE AMENITIES FOR VISITORS. PHYSICAL DESCRIPTION: INSTALLA T ION OF PICNIC TABLES, BENCHES, AND LIGHTING FIXTURES. UNIT OF WORK: INSTALLATION JUSTIFICATION: NO EXISTING AMENITIES. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 2,500 OTHER (1) $ 2,500 TOTAL 3-7 129 PARKS AND RECREATION PROJECT TITLE: RANNEY PARK IMPROVEMENTS (PARKING AREA AND PLAYGROUND CONSTRUCTION) LOCATION: RANNEY PARK PURPOSE: TO PROVIDE PLAYGROUND FACILITIES FOR THIS AREA AND PAVED PARKING LOT. PHYSICAL DESCRIPTION: CONSTRUCTION OF PLAYGROUND FACILITIES AND 2,400 SQUARE FEET OF PAVING. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: OLD PLAYGROUND EQUIPMENT WAS REMOVED AND NEEDS REPLACEMENT AND STABILIZATION OF GRAVEL PARKING. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 10,000 GENERAL FUND (A) $ 10,000 OTHER (1) $ 20,000 TOTAL 130 PARKS AND RECREATION PROJECT TITLE: WASHINGTON PARK PAVING (PARKING AREA) LOCATION: WASHINGTON PARK PURPOSE: TO PROVIDE HARD SURFACE PARKING AT NEW SHELTER FACILITY. PHYSICAL DESCRIPTION: 2,400 SQUARE FEET OF PAVING. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: STABILIZATION OF GRAVEL PARKING. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 3,000 GENERAL FUND (A)- $3,000 TOTAL 3-9 131 PARKS AND RECREATION PROJECT TITLE: WASHINGTON PARK BASKETBALL COURT LOCATION: WASHINGTON PARK PURPOSE: TO PROVIDE REGULATION SIZE BASKETBALL COURT FOR RECREATIONAL ACTIVITIES. PHYSICAL DESCRIPTION: 120' BY 70' BASKETBALL COURT, 2 POSTS, 2 BACKBOARDS, AND 2 RIMS WITH NETS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO PROVIDE BASKETBALL COURT FOR NEIGHBORHOOD YOUTH. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: 3-10 s 10,000 $ 10,000 132 GENERAL FUND (A) TOTAL uo mumTy DEVELOPMENT CAPITAL IMPROVEMENTS PROGRAM 4,800,000 4,000,000 3,200,000 2,400,000 1,600,000 800,000 1998-99 1999-00 2000-01 2001-02 2002-03 133 COMMUNITY DEVELOPMENT PROPOSED PROJECTS PROJECT r 1998-99 1999-00 2000-01 2001-02 2002-103 NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR 41 Police Station HVAC 187,600 84,200 t ! 53,500 49,900 Replacement A A A ' A 42 Fire Station No. 1 HVAC 28,245 i 6,930 7,245 7,455 6,615 Upgrade A A A A A 4-3 Fire Station No. 1 7,770 7,770 r }� Renovation of Office and A A Support Areas I 1 44 Fire Station No. 1 Breathing 20,000 20,000 Air Compressor Replacement A A 45 Fire Station No. 1 Sprinkler 30,000 30,000 Retrofit 1 J J 46 Fire Station No. 3 Relocation 1,013,000 ! 73,000 940,000 ! J J J I ! � 1 47. Fire Station No. 2 Sprinkler 25,000 25,000 Retrofit J J S 48 1i Fire Station No. 1 1193,000 S 193,000 I Renovation of Offices and J J I I Administrative Areas 49 Fire Station No. 4 Relocation 1,123,000 173,000 950,000 ' I r r i 410 Regional Fire Training Center 560,000 20,000 40,000 500,000 J J J J 411 Fire Station No. 1 Parking 44,100 f 44,100 Expansion 412 Police Department Annex 4,580,000 ; 280,000 i 400,000 3,900,000 A,J 1 A A r J i 413 Convention and Visitors 186,200 186,200 Bureau/Customer Service A,I j A,I 1 i Building Remodeling A B C D E F G H i J K GENERAL FUND REV/PFA BONDS: ISSUED REV/PFA BONDS: PENDING STATE GRANTS/LOANS MOTOR FUEL TAX FED.GRANTS/LOANS SPEC. ASSESSMENTS CAP. IMP. SALES TAX OTHER GEN. OBL. BONDS: PENDING TRANS. SALES TAX COMMUNITY DEVELOPMENT I PROPOSED PROJECTS ' _ PROJECT l 1998-99 i 1999-00 2000-01 2001-02 2002-03 NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR 4-14 City Hall Remodeling (.Main 14,600 14,600 Floor) A A 4-15 City Hall Elevator 145,000 00 145,000 TOTALS 8,157,..S.1 5 � 464,700 E36,745 7,675,355 � 4,896,675 I 544,100 l I �I 3 � E � l E A GENERAL FUND $ 1,176,315 $ 371,600 $ 340,745 S 457,355 $ 6,615 B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING j D STATE GRANTS/LOANS E MOTOR FUEL TAX F FED. GRANTSILOANS G SPEC. ASSESSMENTS t H CAP. IMP. SALES TAX 1 OTHER $ 93,100 $ 93,100 t- - J GEN_ OBL. BONDS: PENDING 1 $ 6,888,100 .e S296,000 � $ 1,158,000 � $ 4,890,000 $ 544,100 K TRANS. SALES TAX I � 135 4-1 COMMUNITY DEVELOPMENT PROJECT TITLE: POLICE STATION HVAC REPLACEMENT LOCATION: POLICE HEADQUARTERS, SOUTH SPRIGG STREET PURPOSE: REPLACE/MODIFY MULTI -ZONE HEATING AND AIR CONDITIONING SYSTEM. PHYSICAL DESCRIPTION: REMOVE 20 TON MULTI -ZONE SYSTEM ON ROOF, TWO (2) 10 TON UNITS ON ROOF FOR JAIL AND ADMINISTRATIVE OFFICES, 23 TON MULTI -ZONE UNIT IN BASEMENT. RECONFIGURE VENTING, REPLACE WITH ADEQUATE EQUIPMENT PER TECHNICAL ASSISTANCE ENERGY STUDY PREPARED BY STRICKLAND ENGINEERING. UNIT OF WORK: INSTALL EQUIPMENT JUSTIFICATION: THESE UNITS ARE IN NEED OF REPAIR, THE CONTROLLING SYSTEM FOR EACH IS COMPLEX AND NON-FUNCTIONAL. UNITS ARE NO LONGER IN PRODUCTION (OUTDATED), PARTS ARE EXTREMELY DIFFICULT TO OBTAIN THUS CREATING HIGH MAINTENANCE COSTS AND COMPANIES TO REPAIR THEM ARE SCARCE. IMPACT ON UPGRADE/REPLACEMENT SHOULD REDUCE OPERATIN 3 BUDGET: OPERATION AND MAINTENANCE COSTS. FINANCING: $ 187,600 GENERAL FUND (A) $ 187,600 TOTAL 136 COMMUNITY DEVELOPMENT PROJECT TITL E: FIRE STATION' NO. 1 HVAC UPGRADE LOCATION: FIRE STATION NO. 1, 1 SOUTH SPRIGG STREET PURPOSE: TO CONTINUE A MULTI-YEAR PROGRAM FOR THE UPGRADING AND REPLACEMENT OF HVAC SYSTEM AND HVAC COOLING TOWER. PROGRAM WILL ALLOW TWO (2) UNITS PER YEAR TO BE REPLACED. PHYSICAL DESCRIPTION: HVAC HEATING, HEAT PUMP AND AIR COND!T!ONING SYSTEM! AND HVAC COOLING TOWER. UNIT OF WORK: INSTALL TWO (2) UNITS PER YEAR, PLUS COOLING TOWER. JUSTIFICATION: CURRENT UNITS ARE 15 YEARS OLD AND WORN OUT. THIS PROGRAM WILL ALLOW FOR THE SYSTEMATIC REPLACEMENT OF SAME OVER A FOUR-YEAR PERIOD. IMPACT ON REDUCED ENERGY COSTS SHOULD PAY FOR COST OPERATING BUDGET: OF REPLACEMENT. FINANCING: $ 28,245 GENERAL FUND (A) $ 28,245 TOTAL 4-2 137 f, COI~.4MUNiTY DEVELOPMENT �I PROJECT TITLE: FIRE STATION NO. 1 RENOVATION OF OFFICE AND 11 I SUPPORT AREAS LOCATION: FIRE STATION NO. 1, 1 SOUTH SPRIGG STREET I. PURPOSE: TO ENABLE RENOVATION OF FIRST FLOOR OFFICE AREAS TO BE COMPLETED, TO REPLACE WALL COVERINGS, AND TO REPLACE CARPETING ON SECOND FLOOR. PHYSICAL DESCRIPTION: FINISH REPLACEMENT OF CARPETING, WALLPAPER AND OTHER RELATED AESTHETICS. UNIT OF WORD: RENOVATION JUSTIFICATION: MOST RENOVATION TO THIS AREA WAS COMPLETED BY STATION PERSONNEL. FUNDING WILL ALLOW PROJECT TO BE COMPLETELY FINISHED FOR DOWNSTAIRS AREA. IMPACT ON OPERATING BUDGET: FINANCING: 4-3 NO SIGNIFICANT IMPACT $ 7,770 $ 7,770 138 GENERAL FUND (A) TOTAL COMMUNITY DEVELOPMENT PROJECT TITLE: BREATHING AIR COMPRESSOR REPLACEMENT LOCATION: FIRE STATION NO. 1, 1 SOUTH SPRIGG STREET PURPOSE: TO REPLACE AIR COMPRESSOR USED FOR REFILLING SELF-CONTAINED BREATHING APPARATUS. PHYSICAL DESCRIPTION: ONE (1) AIR COMPRESSOR INSTALLED AT FIRE STATION NO. 1. UNIT OF WORK: INSTALLATION JUST!FICATION: CURRENT UNIT IS 24 YEARS OLD AND WILL NEED REPLACEMENT TO INSURE THAT AIR PARTICULATE MATTER IS IN LINE WITH OSHA REGULATIONS. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT S20,000 $ 20,000 139 GENERAL FUND (A) 4-4 4-5 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 1 SPRINKLER RETROFIT LOCATION: FIRE STATION NO. 1, 1 SOUTH SPRIGG STREET PURPOSE: TO RETROFIT FIRE STATION NO. 1 WITH AUTOMATIC SPRINKLER SYSTEM. PHYSICAL DESCRIPTION: MONITORED WET SPRINKLER SYSTEM PER NFPA STANDARDS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT NFPA 1500 (OCCUPATIONAL SAFETY AND HEALTH) STANDARDS RECOMMEND MODIFICATIONS. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 30,000 GEN. OBLIGATION BONDS: PENDING (J) $ 30,000 TOTAL 140 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 3 RELOCATION LOCATION: NORTH SPRIGG STREET PURPOSE: TO DEVELOP PLANS AND SPECIFICATIONS FOR NEW FIRE STATION NO. 3 AND CONSTRUCT SAME (PROPERTY ALREADY ACQUIRED). PHYSICAL DESCRIPTION: ONE-STORY MASONRY T HREE-BAY DRIVE- THROUGH FIRE STATION. ONE BAY TO BE USED AS A SHOP BAY. BASEMENT UDDER LIVING AREA OF STATION. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT CITY CAPITAL IMPROVEMENT CALLS FOR PLANNING AND DEVELOPMENT OF THIS PROJECT. IMPACT ON SOME INCREASE IN EQUIPMENT, PERSONNEL AND OPERATING BUDGET: OPERATING BUDGET ANTICIPATED, UNQUANTIFIABLE AT THIS TIME. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 1,013,000 GEN. OBLIGATION BONDS: PENDING (J) $ 1,013,000 TOTAL 4-6 141 4-7 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 2 RETROFIT LOCATION: FIRE STATION NO. 2, 378 SOUTH MOUNT AUBURN ROAD PURPOSE: TO RETROFIT FIRE STATION NO. 2 WITH AUTOMATIC SPRINKLER SYSTEM. PHYSICAL DESCRIPTION: MONITORED WET SPRINKLER SYSTEM PER NEPA STANDARDS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT NFPA 1500 (OCCUPATIONAL SAFETY AND HEALTH) STANDARDS RECOMMEND MODIFICATION. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 25,000 GEN. OBLIGATION BONDS: PENDING (J) $ 25,000 TOTAL 142 C0MMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 1 RENOVATION OF OFFICE AND ADMINISTRATIVE AREAS LOCATION: FIRE STATION NO. 1, 1 SOUTH SPRIGG STREET PURPOSE: TO PROVIDE OFFICE AND SUPPORT AREAS THAT WILL MEET THE NEEDS OF T HE FIRE DEPARTMENT FOR THE NEXT 10 TO 15 YEARS. PHYSICAL DESCRIPTION: T OTAL REDESIGN AND RENOVATION OF FIRE DEPARTMENT ADMINISTRATIVE OFFICE AREAS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT AREA IS POORLY DESIGNED AND INCAPABLE OF MEETING THE EXPANDING NEEDS OF A GROWING ORGANIZATION. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 193,000 GEN. OBLIGATION BONDS: PENDING (J) $ 193,000 TOTAL S. 143 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 4 RELOCATION LOCATION: VICINITY OF LEXINGTON AVENUE AND KINGSHIGHWAY PURPOSE: PURCHASE OF LAND FOR THE RELOCATION OF FIRE STATION NO. 4, PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF NEW FIRE STATION NO. 4, AND CONSTRUCTION OF SAME. PHYSICAL DESCRIPTION: ONE-STORY MASONRY THREE -BAY DRIVE- THROUGH FIRE STATION ON APPROXIMATELY 3 TO ACRES OF PROPERTY FRONTING ON MAJOR ROAD(S). UNIT OF WORK: ACQUIRE PROPERTY, DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT STRUCTURE IS UNDERSIZED AND POORLY LOCATED TO COMPLY WITH CURRENT AND FUTURE GROWTH IN NORTHERN AND WESTERN PARTS OF THE CITY. IMPACT ON SOME INCREASE IN EQUIPMENT, PERSONNEL AND OPERATING BUDGET: OPERATING BUDGET ANTICIPATED, UNQUANTIFIABLE AT THIS TIME. INCREASED DEPRECIATION EXPENSE. FINANCING: Y 1,123,000 GEN. OBLIGATION BONDS: PENDING (J) $ 1,123,000 TOTAL 144 COMMUNITY DEVELOPMENT PROJECT TITLE: REGIONAL FIRE TRAINING CENTER LOCATION: UNDETERMINED AT THIS TIME PURPOSE: LAND ACQUISITION, PLANS AND SPECIFICATIONS, AND CONSTRUCTION OF A REGIONAL FIRE TRAINING CENTER. PHYSICAL DESCRIPTION: PER REQUIREMENTS FOR REGION. -"'-%L FIRE TRAINING, TO INCLUDE LIVE -FIRE TRAINING, CLASSROOMS, TRAINING TOWER, TRANSPORTATION SCENARIOS, AND NECESSARY SERVICE/SUPPORT FACILITIES. UNIT OF WORK: ACQUIRE PROPERTY, DESIGN AND CONSTRUCT JUSTIFICATION: THERE IS CURRENTLY NO FIRE TRAINING SITE AVAILABLE IN SOUTHEAST MISSOURI. DEVELOPMENT OF SUCH A FACILITY WOULD ALLOW CITY TO BECOME A REGIONAL CENTER FOR PUBLIC SAFETY AND INDUSTRIA! TRAINING. IMPACT ON SOME INCREASE IN OPERATING BUDGET OPERATING BUDGET: ANTICIPATED, UNQUANTIFIABLE AT THIS TIME. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 560,000 GEN. OBLIGATION BONDS: PENDING (J) $ 560,000 TOTAL 4-10 145 4-11 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 1 PARKING EXPANSION LOCATION: FIRE STATION NO. 1, 1 SOUTH SPRIGG STREET PURPOSE: ACQUISITION OF ADDITIONAL LAND AND CONSTRUCTION OF FACILITIES FOR ADDITIONAL PARKING AT FIRE STATION NO. I. PHYSICAL DESCRIPTION: ACQUIRE APPROXIMATE 15,000 SQUARE FEET OF PROPERTY AND EXPAND PARKING UNIT OF WORK: ACQUIRE PROPERTY, DESIGN AND CONSTRUCT JUSTIFICATION: PARKING AT REAR OF FIRE STATION NO. 1 (HEADQUARTERS) IS SEVERELY LIMITED. IMPACT ON NO SIGNIFICANT IMPACT OPERATING BUDGET: FINANCING: $ 44,100 GEN. OBLIGATION BONDS: PENDING (J) $ 44,100 TOTAL 146 COMMUNITY DEVELOPMENT PROJECT TITLE: POLICE DEPARTMENT ANNEX LOCATION: POLICE HEADQUARTERS, SOUTH SPRIGG STREET PURPOSE: CONSTRUCT ANNEX TO EXISTING HEADQUARTERS TO PROVIDE ADDITIONAL SPACE FOR AN EMERGENCY OPERATIONS CENTER, COURTROOM, ADDITIONAL OFFICE SPACE, INTERVIEW SUITES, AND LOCKER FACILITIES FOR PUBLIC SAFETY PERSONNEL. PHYSICAL DESCRIPTION: TWO-STORY 16,000 SQUARE FOOT ADDITION TO THE NORTH AND EAST SIDES OF THE EXISTING FACILITY. ACQUISITION OF SIX (6) PARCELS OF LAND EAST OF EXISTING BUILDING; DEMOLITION, EXCAVATION AND CONSTRUCTION OF A SECURE PARKING FACILITY. UNIT OF WORK: ACQUIRE PROPERTY, DESIGN AND CONSTRUCT JUSTIFICATION: CONSTRUCTION WOULD ENHANCE EARTHQUAKE MITIGATION EFFORTS FOR EMERGENCY RESPONSE PERSONNEL AND PROVIDE A FULL SERVICE POLICE FACILITY, INCLUDE COURTROOM ACCESS. IMPACT ON SOME INCREASE IN EQUIPMENT, PERSONNEL AND OPERATING BUDGET: OPERATING BUDGET ANTICIPATED, UNQUANTIFIABLE AT THIS TIME. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 4,290,000 GEN. OBLIGATION BONDS: PENDING (J) $ 4,290,000 TOTAL 4-12 147 4-13 COMI~l1UNITY DEVELOPMENT PROJECT TITLE: CONVENTION AND VISITORS BUREAU/CUSTOMER SERVICE BUILDING REMODELING LOCATION: 100 BROADWAY PURPOSE: PROVIDE ADEQUATE, MODERN FACILITIES FOR THE CONVENTION AND VISITORS BUREAU AND CUSTOMER SERVICE OPERATIONS. PHYSICAL DESCRIPTION: DESIGN, PARTIAL DEMOLITION, RECONSTRUCTION AND REMODELING OF 14,000 -SQUARE -FOOT BUILDING PURCHASED IN 1997. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CONVENTION AND VISITORS BUREAU HAS NOT HAD PERMANENT, CITY -OWNED FACILITY FOR OPERATIONS AND CUSTOMER SERVICE OPERATIONS WILL BE ENHANCED THROUGH IMPROVED FACILITIES. IMPACT ON INCREASED OPERATING AND MAINTENANCE OPERATING BUDGET: EXPENSE. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 93,100 GENERAL FUND (A) 93,100 OTHER (1) $ 186,200 TOTAL 148 COMMUNITY DEVELOPMENT PROJECT TITLE: CITY HALL REMODELING (MAIN FLOOR OFFICES) LOCATION: CITY HALL PURPOSE: PROVIDE MAIN FLOOR OFFICE SPACE FOR DIVISION OF PLANNING SERVICES TO PROVIDE IMPROVED PUBLIC ACCESS AND RELIEVE OVERCROWDING ON SECOND FLOOR. PHYSICAL DESCRIPTION: RECONSTRUCTION AND REMODELING OF APPROXIMATELY 7,200 SQUARE FEET OF OFFICE SPACE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: PLANNING SERVICES OFFICES ARE LOCATED ON THE SECOND FLOOR OF CITY HALL. RELOCATION TO THE MAIN FLOOR OF THE MAIN OPERATIONS WILL IMPROVE CUSTOMER ACCESS AND CONVENIENCE. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 14,600 GENERAL FUND (A) $ 14,600 TOTAL 149 4-14 ES&I COMMUNITY DEVELOPMENT PROJECT TITLE: CITY HALL ELEVATOR LOCATION: CITY HALL PURPOSE: PERMIT ACCESS, INCLUDING ACCESS FOR MOBILITY -IMPAIRED PERSONS, TO ALL THREE LEVELS FOR SERVICES OFFERED. TO BE IN COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT. PHYSICAL DESCRIPTION: ELEVATOR MEETING ALL HANDICAPPED - ACCESSIBILITY REQUIREMENTS INTER- CONNECTING ALL THREE FLOORS OF CITY HALL. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CONVENIENCE AND SAFETY OF PUBLIC AND COMPLIANCE WITH AMERICANS WITH DISABILITIES ACT. IMPACT ON ADDITIONAL OPERATING AND MAINTENANCE OPERATING BUDGET: COSTS. FINANCING: $ 145,000 GENERAL FUND (A) $ 145,000 TOTAL 150 LONG-RANGE CAPITAL IMPROVEMENT PROGRAM Unfunded Needs List The following list of Capital Improvement Program Needs consists of those projects which have been identified as major long-range facility improvements for which funding is currently not available. These projects are not listed in any order of priority. TRANSPORTATION AND PUBLIC WORKS 1) Bloomfield Road - I-55 to Benton Hill Road 2) Broadview from Independence to North Kingshighway (at Maria Louise Lane) 3) Broadway - Perry to 'Vest End Boulevard or Henderson (widening) ' and West End Boulevard or Henderson to Main Street (general improvements) 4) Cape Rock Drive - Big Bend Road to Cape Rock Park widening with curb and gutter 5) Edgewood Drive - Bloomfield to William Street 6) Gordonville Road - Independence to Mount Auburn - widening with curb and gutter 7) Hopper Road (existing) - Mt. Auburn to Kage widening with curb and gutter 8) Howell Street - low-water crossing improvements at Scivally Branch 9) Independence Street - Kingshighway to West End (widening) and from West End Boulevard to Water Street (general improvement) 10) Lombardo Street - box culvert additions and realignment 11) Main Street - Realignment from Mason Street to Second Street and New Sloan Creek Bridge 12) Main Street - widening from Mill to Mason 13) New Madrid Street - Clark to Perry Avenue -widening with curb and gutter 14) North Sprigg Street - Lexington to Route 177 extension 15) Old Sprigg Street Road/Lexington Avenue intersection improvements 16) Silver Springs Road (Shawnee Parkway to Southern Expressway extended) - general improvements 17) Sprigg Street - New Madrid to Southern Expressway - general improvements and/or widening 18) Vantage Drive - Percy Drive to Kingshighway at Boulder Crest (west) 19) West End Boulevard - Southern Expressway to Shawnee Parkway and Bloomfield to Bertling and Extended to Lexington general upgrade 20) Connection of Sussex Drive (Wyandotte Acres Subdivision) to Perryville Road 21) Street lighting improvements 22) Additional streets per Major Street Plan 23) Airport - Additional Airport Improvement Program projects per Airport Master Plan 24) Airport - Corporate parcel and utility road extensions 25) Airport - land acquisition 26) Airport - Development of an Airport Industrial Park 27) Airport - New wastewater treatment facilities 28) Public Works ADA upgrade 29) Public Works free-standing communications antenna 151 ENVIRONMENT 1) N. Sprigg Street (Upper Sloan Creek) trunk sewer extension. 2) Cape Rock Village/Tanglewood Estates main lift station and force main 3) Highland Drive -Oakland Street -Engram Street trunk sewer 4) Sewer Improvement Program Projects per Sewer Master Plan 5) Water System Improvement Program Projects per Water Master Plan. 6) Public Works property acquisition new recycling center - compost site 7) Stormwater detention basins/major stormwater channel projects 8) Water Plant No. 1 Phase III expansion 9) Storage facility west of 1-55 (additional) 10) Bloomfield Road pump station 11) Kingsway booster pump station 12) Water Plant No. 2 expansion 13) 20 -inch main extension (Plant 2 to Highway 61) 14) 16 -inch main extension (Plant 2 to Highway 61) 15) 1-55 and William Street 14 -inch upgrade 16) 14 -inch main extension (North Sprigg) 17) 12 -inch main extension (Kingshighway) 18) 12 -inch main extension (Highway 177 to Cape Rock) 19) 12 -inch main extension (Lexington) 20) 12 -inch main extension on Perryville Road 21) 12 -inch main extension Plant 2 to Industrial Park/Airport 22) 8 -inch main extension (Mt. Auburn and Hopper Road) 23) Main replacement (Downtown) 24) 4 -inch main replacement (City wide) 25) 2 -inch main replacement (City wide) 26) Fire protection upgrade (Kingshighway) 27) Fire hydrant replacement (City wide) 28) Water rehabilitation (4 tanks) 29) Water, tank seismic, protection 30) North County Park water improvements 31) North County Park sewer system and lift station 152 PARKS AND RECREATION 1) Capaha Park Gazebo 2) Cherokee Park Shelter Parking Lot Paving 3) Indian Park Improvements 4) Capaha Park Basketball Court (lighted, fenced, regulation court) 5) Arena Park Paving Off Street Parking #5, #10, #11 6) Arena Park Ballfield Spectator Paving 7) Arena Park Road Paving by Fields #12, #13, #14, #15 8) Tennis Court Renovation (lights, fence, windscreen color coating) 9) New Bandshell Restroom 10) Arena Park Restroom (replace brick restroom) 11) Capaha Ballfield Restroom/Concession Facility 12) Bent Grass Greens at Golf Course 13) Driving Range 14) Par 3 Golf Course 15) General Golf Course Development 16) Riverfront Trail Project COMMUNITY DEVELOPMENT 1) City. Hall Standby Power System 2) Neighborhood and downtown redevelopments 3) Historic preservation 153 This page intentionally left blank. 154