HomeMy WebLinkAboutCIP1997-2002BILL NO. 97-40 RESOLUTION NO. A RESOLUTION ADOPTING THE FISCAL 1997-2002 CAPITAL IMPROVEMENTS PROGRAM WHEREAS, Article VI, Section 6.04 of the Charter of the City of Cape Girardeau requires a Capital Improvements Program; and WHEREAS, the City Manager has presented a proposed Capital Improvements Program to the City Council; and WHEREAS, proper notice has been published concerning the availability for inspection of the proposed Capital Improvements Program and the time and place for a public hearing on the Capital Improvements Program; and WHEREAS, the City Council_ has held a public hearing on the proposed Capital Improvements Program. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Council hereby adopts the five-year Capital Improvements Program for fiscal 1997-2002, copies of which are on file in the office of the City Clerk. ARTICLE 2. The City Clerk is instructed to attach an executed copy of this resolution to a copy of the Capital Improvements Program for fiscal 1997-2002 and to retain such copy with the permanent records of the City. PASSED AND ADOPTED THIS /_7;tk DAY OF AafjQ(,J , 19 q_7 . A. R. Spradling, III, yor ATTEST: .j " d / "� 6T)" a (9L Gayl L. Conrad Deputy City Clerk CITY OF CAPE GI-RARDEAU, MISSOURI Office of the City Ma:.:iger Council Letter No. 6 3 Agenda March 17, 1997 The Honorable Mayor and Members of the City Council City of Cape Girardeau, Missouri RE: Adoption of the Capital improvements Program for the City of Cape Girardeau, Fiscal 1997-2002 Dear Mayor and Council Members: In accordance with the requirements of the City Charter, a proposed five-year Capital Improvements Program was submitted to the City Cou=--1 by .!he staff on. January 30, 1997. Following this submission, a special wort: session on the program was held by the Council on February 18th. The required public hearing regarding the 1997-2002 Capital improvements Program was held on Monday, March 3, 1997, at 7:30 P.M. The City Charter requires that t_h_;� program he adopted on or before April_ 1, 1997. Attached for the Council's consideration is a resolution adopting the Capital Improvements Program. It is recommended that the City Council with this action. Respe fully submitted, Mill G. Mille; City Manager John R. Richbourg finance .Director X Tient M. Bratton City Planner MGM/JRR/KMB/rlf CITE' OF CAPE +GIRARDEAUS MISSOURI Office of the City Manager Council L €er No. 47 Aoenoa March 3 1997 The Honorable Mayor and Members of the City Council City of Cape Girardeau, Missouri Subject: Public Hearing on Capital Improveinerts Prourarri Dear Mayor and Council Members: In accordance with requirements of the City Charter, a public hearing regarding the 1997- 2002 Capital Improvements Program has been set for Monday, March 3, 1997, at 7:30 P.M. The public notice of the hearing was`published in the Southeast Missourian on Sunday, February 16, 1997. Unless otherwise directed, the staff will prepare a resolution for adoption o -f the proposed Capital Improvements. Program, with any further amendments the Council wishes to make, for the Council's agenda for Monday, March 17th. The City Charter requires that the . Capital Improvements Program be adopted on or before April 1, 1997. The draft of the proposed Capital I_mprovements Program was submitted to the Citi Council on January 30, 1997, by Council Memorandum No. 7. The Council held a special work- session orksession on the Capital Improvements Program on.Feb _ 18th. Respe fully submitted, City Manager John R. Richbourg U Finance Director Sent M. Bratton City Planner MGM/JRR/KMB/rlf 17FEM PAGE Introduction: City Manager's Letter .. ............................... i Summaries: Revenue Funding Sources by Fiscal Year Graph ..................... vii Summary of Funding Sources by Fiscal Year 1997-2002 ...... ..........viii Summary of Recommended Capital Improvements Program Expenditures 1997-2002 by Program -Description -and Source of Funds ........................................ ix Summary of Funding Sources Graph x Capital Improvements Budget by Program Area Graph ........ xi Revenue Sources ...... .... ..............:.......... xii Capital Improvements Program: Transportation and Public Works ... . ................ 1 Environment ........................................... 57 Parks and Recreation ..... .. ......... .. ........ 115 Community Development.......... ............ . 125 Unfunded Needs List .............. ......... 141 The Honorable Mayor and Members of the City Council City of Cape Girardeau Dear Mayor and Council Members: April 12, 1997 INTRODUCTION The City staff herewith submits the adopted Five -Year Capital Improvements Program. This program, for the period July .1, 1997, through June 30, 2002, is submitted in accordance with Article VI, Section 6.04 of the City Charter. On March 3, 1997, in accordance with the City Charter, the City Council held a public hearing for the Capital Improvements Program. Following public input, the City Council adopted the Capital Improvements Program by resolution at its March 17, 1997, meeting. The material contained within this document complies with the requirements of the Charter as to program proposals, cost estimates, methods of financing, projection of revenue sources to meet costs, recommended time schedule for each improvement, and any anticipated impact on the annual operating budget. In reviewing the program, the City Council should give particular emphasis to establishing priorities for projects and realistic financing sources for implementation. While the projects included herein are attainable through available revenue sources, a number of these depend on the cooperation of property owners and other agencies, and further action by the City Council. Projects for which a reliable funding source is not currently proposed are included under the Unfunded Needs Section. Each of the City's advisory boards involved in planning for capital improvements were given the opportunity to provide input, as well as those City departments involved in planning and implementation of such improvements. BACKGROUND The Capital Improvements Program should be considered as an investment in the future of the community. The selection and evaluation of capital projects is a difficult task that involves some speculation and the ability to make estimations which, to some extent, are based on historical perspectives. The City Council, in 1983, formally considered and adopted a long-range Capital Improvements Program for the first time under the current Charter requirement. This budget process should provide a relevant approach to identifying and implementing important community -wide and neighborhood projects. i PROGRAM AND FINANCING DESCRIPTIONS The major program areas within which the Transportation and Public `'Yorks, Environn Development. These major categories contain various projects have been described include ent, Parks and Recreation, and Community the following types of projects: Transnortation and Public Works. The projects in this category provide for the construction of the public streets within the City, the Regional Airport, and site of Public Works facilities. 2. Environment. These projects provide for the preservation, restoration, and care of the physical resources of the City, including solid waste, water, wastewater, and stormwater services. 3. Parks and Recreation. The programs under this area provide the facilities for citizens to participate in organized and unorganized recreation and leisure time activities. 4. Communitv Development. Projects under this category include construction of . general public facilities and community projects which have city-wide effects. The Capital Improvements Program includes types of revenue sources recommended as ways to finance the capital improvements proposed. The following is a brief discussion of what the various revenue sources include.. A. General Fund Revenues. These revenues are available on an annual appropriation basis from the City's general fund, which includes the receipt of revenues from a number of sources. I These funds are subject to the annual budgeting process. B. and C. Revenue/PFA Bonds. These bonds are issued for the financing of self-supporting and general public improvements. Revenue bonds are not included within the limitations of indebtedness of the City and are issued upon the authorization of a majority voter approval. These bonds are normally used for enterprise funds such as water, sewer, and solid waste utilities. PFA (Public Facility Authority) bonds are used upon City Council approval based on collateralized. assets and annual lease/purchase appropriations. Cash flows for debt retirement come from existing revenue and from new receipts to be generated by the facilities' operations. Within the Capital Improvements Program, revenue/PFA bonds already issued or authorized by the electorate or City Council are denoted as "B". Those that are pending, i.e. will require subsequent approval of the electorate or Council, are denoted as "C". ii O. State Grants. The City is eligible to submit grant applications to the State of M;.s-ouri for funds that they may have available either from their own revenue sources or, in some cases, from revenue sources that they administer for various federal agencies. E. Motor Fuel Tax Receipts: This fund provides for the receipt and disbursement of revenues the City receives as its portion of the State Gasoline Tax, State Motor Vehicle Licensing, and State Motor Vehicle Sales Tax. The revenues from this source can be used for capital improvements, as well as annual operating maintenance expenses as they relate to improvements on the City's streets. F. Federal Grants. The City is eligible to receive various federal grants on a competitive basis from appropriate federal agencies. This could include the Environmental Protection Agency as it relates to wastewater improvements, the Federal Highway Administration which administers and distributes funds from the Federal Gasoline Tax revenue through the Federal Aid Urban program, or the Federal Aviation Administration for airport improvements. Most of these funds, however, are now administered by the State through related State agencies. G. Special Assessments. This category provides for the consideration of special assessments which are used for public improvements affecting specific areas. The total, or a portion of, the cost of an improvement is divided among property owners who benefit from the project. This type of funding can be used for diverse improvements including streets, water, stormwater, sanitary sewer or sidewalk improvements. However, it should be noted that the "up front" cost of special assessment projects (i.e., the initial funding) must be borne by the City from available revenue sources, with the special assessment "costs" recovered afterwards, typically over a period of ten years through special tax bills _paid by the benefitting property owners. H. Capital Improvements Sales Tax. A 1/4 cent, 3/8 cent, or 1/2 cent Sales Tax can be issued by the City for various types of public improvements. Such a tax requires approval by the electorate with a simple majority. For example, in November, 1988,- the voters of Cape Girardeau adopted a 1/4 cent sales tax effective January 1, 1990, restricted to flood control projects. 'On April 5, 1994, the voters of Cape Girardeau approved the extension of this tax for an additional twenty years to pay for improvements to the City's sewer system. Other. This category denotes funds from donations, operating revenues from funds other than the General Fund, reserves, proceeds from the sale of fixed assets and other sources. J. General Obligation Bonds. These bonds are normally issued for the financing of general public improvements. General obligation bonds must be authorized by a 4/7th vote of the voters which also authorizes a tax levy to be used for debt retirement. Total outstanding general obligation bonds are limited by State statute to 20% of the City's total assessed valuation. K. Transportation Sales Tax. Pursuant to Sections 94.700 - 94.755 of the State statutes, the voters of the City of Cape Girardeau approved a lh% sales tax for transportation purposes on August 8, 1995, for a period of five (5) years. This tax went into effect on January 1, 1996. Revenues from this source are placed in a special Transportation Trust Fund to be used only for these purposes. PROPOSED IMPROVEMENTS The total Capital Improvements Program included herein includes a total of $86,456,800 in improvements: The largest category for funding proposed improvements is through the proposed (pending) issuance of Revenue/PFA Bonds. This provides for $30,801,300 in funding over the next five years. The second source for funding proposed improvements over the next five years is through the use of remaining funds of previously issued Revenue/PFA Bonds. This provides for $24,2.60,400 in funding over this period. The third largest funding source is the Transportation Sales Tax. This includes $14,518,100 in funds over the next five years. State Grants and Loans will provide the fourth largest source of funds, with $7,074,680 projected for the program period. The bulk of the funds will be used for improvements at the Regional Airport. The largest program area is Environment ($56,249,500). The most significant projects in this area will continue to be the sewer improvements funded by the April, 1994, sales tax extension and bond issue ($21,713,000). Also included in this area is $25,205,500 for expansion of the water system's production/treatment capacity (water bond) and $2,627,000 for the completion of the Corps of Engineers' Flood Control Project on Walker Branch and the detention basin. The Transportation and Public Works program area ($25,331,800) contains the second largest amount for proposed projects over the next five years. This amount is comprised of $16,523,200 for street and bridge projects, $6,694,600 for airport projects, and $2,114,000 for public works improvements. The Parks and Recreation program area ($493,000) is for six relatively small improvement projects and general park development and continued payment for land acquisition for the additions to Shawnee Park and the purchase of Osage Park. The Community Development program area ($4,382,500) includes $2,388,200 in new construction or improvements to the City's fire stations. Also included is a new Convention and Visitors Bureau administrative office, and replacement of the police station heating and cooling system. iv CONCLUSION The capital improvements program proposed herein is a progressive program. The implementation of this program will allow for the creation of new job opportunities, an increase in revenue to private businesses, opportunities for new businesses, existing business expansions, increased tax revenues to all taxing jurisdictions, and the strengthening of the quality of life in Cane Girardeau and the surrounding area. It is hoped that this plan will focus attention on community goals, needs and capabilities; reduce scheduling problems and conflicting or overlapping projects; maintain a sound and stable financial program; enhance opportunities for participation in federal or state funded programs; and achieve the highest public benefit from the expenditure of City revenue. The projects proposed in this document are the product of many hours of deliberative thought by a number of people within this community. The Charter requires an annual review and- revision ndrevision of the Capital Improvements Program which assures that the Program remains responsive to changing demands, priorities, and available revenues. The final plan should be regarded as a sound, fiscally responsible working document that can and will be implemented through the annual budget appropriation process of the City Council, support from the citizens of Cape Girardeau for appropriate revenue sources, and diligent action by the City staff. MGM/KMB/JR/rlf ctfully submitted, Michael G. i City Manager 1 4 1 z Kent M. Bratton City Planner CC (1A-� John Richbourg Finance Director V REVENUE FUND/NG SOURCES BY FISCAL YEAR CAPITAL IMPROVEMENTS PROGRAM 35,000,000 30,000,000 25,000,000 99090mol 15,000,000 5,000,000 37,326,600 23,355,800 13,409,700 5,521,600 6,843,100 1997-98 1998-99 1999-00 2000-01 2001-02 V11 SUMMARY OF FUNDING SOURCES BY FISCAL YEAR 1997-2002 SOURCE OF FUNDS 1997-98 1998-99 1999-00 2000-01 2001-02 TOTAL GENERAL FUND REVENUES $ 472,680 $ 203,150 $ 228,840 $ 132,810 $ 263,140 $ 1,300,620 REVENUE/PFA BONDS: ISSUED $16,559,400 $ 7,288,000 $ 377,000 $ 36,000 $ 0 $ 24,260,400 REVENUE/PFA BONDS: PENDING $11,555,400 $11,025,000 S 6,294,400 $ 1,276,500 $ 650,000 $ 30,801,300 STATE GRANTS/LOANS $ 1,461,320 S 44,650 S 1,585,360 $ 693,690 $ 3,289,660 $ 7,074,680 MOTOR FUEL TAX RECEIPTS $ 391,400 S 255,900 S 200,000 $ 200,000 $ 200,000 $ 1,247,300 FEDERAL GRANTS/LOANS $ 212,000 $ 0 $ 0 $ 0 $ 0 $ 212,000 SPECIAL ASSESSMENTS $ 629,400 S 88,300 $ 0 $ 0 $ 0 $ 717,700 CAPITAL IMPROVEMENT SALES TAX $ 317,200 $ 246,800 $ O $ 0 $ 0 $ 564,000 OTHER $ 839,900 S 693,200 $ 182,000 $ 176,000 $ 177,000 $ 2,068,100 GEN. OBLIGATION BONDS: PENDING $ 0 $ 130,200 $ 950,500 $ 348,600 $ 2,263,300 $ 3,692,600 TRANSPORTATION SALES TAX $ 4,887,900 $ 3,380,600 $ 3,591,600 $ 2,658,000 $ 0 $ 14,518,100 TOTALS 37,326,600 $23,355,800 S 13,409,700 $ 5,521,600 $ 6,843,100 $ 86,456,800 SUMMARY OF RECOMMENDED CAPITAL IMPROVEMENT PROGRAM EXPENDITURES 1997-2002 BY PROGRAM DESCSRIPTION AND SOURCE OF FUNDS SOURCE OF FUNDS PROGRAM DESCRIPTIONS TRANSPORTATION & PUBLIC WORKS ENVIRONMENT PARKS & RECREATION COMMUNITY DEVELOPMENT TOTALS GENERAL FUND REVENUES $ 367,720 S 0 $ 493,000 $ 439,900 $ 1,300,620 REVENUE/PFA BONDS: ISSUED $ 0 S 24,260,400 $ 0 $ 0 $ 24,260,400 REVENUE/PFA BONDS: PENDING $ 1,982,000 S 28,819,300 $ 0 $ 0 S 30,801,300 STATE GRANTS/LOANS $ 6,449,680 S 625,000 $ 0 $ 0 $ 7,074,680 MOTOR FUEL TAX RECEIPTS S 1,247,300 $ 0 $ 0 S 0 $ 1,247,300 FEDERAL GRANTS/LOANS $ 0 $ 212,000 $ 0 $ 0 $ 212,000 SPECIAL ASSESSMENTS $ 0 $ 717,700 $ 0 $ 0 $ 717,700 CAPITAL IMPROVEMENT SALES TAX $ 303,000 $ 261,000 $ 0 $ 0 $ 564,000 OTHER $ 464,000 S 1,354,100 $ 0 $ 250,000 $ 2,068,100 GEN. OBLIGATION BONDS: PENDING $ 0 S 0 $ 0 $ 3,692,600 $ 3,692,600 TRANSPORATION SALES TAX $ 14,518,100 S 0 $ 0 $ 0 $ 14,518,100 TOTALS $ 25,331,800 $ 56,249,500 $ 493,000 $ 4,382,500 $ 86,456,800 1X SUMMARY OF FUND/NG SOURCES CAPITAL IMPROVEMENT BUDGET REV/PFA BONDS:ISS 28.1 % STATE GRANTS 8.2% CAP. IMP. SALES TAX 0.7% REV/PFA BONDS:PEND 35.6% x FEDERAL GRANTS 0.2% TRANS. SALES TAX 16.8% GEN. FUND REVENUES 1.5% MOTOR FUEL TAX REG. 1.4% GEN. OBL BONDS 4.3% OTHER 2.4% SPECIAL ASSESSMENTS 0.8% CAPITAL IMPROVEMENT BUDGET BY PROGRAM AREA PARKS & RECREATION 0.6% ENVIRONMENT 6; xi & PUB. WORKS 29.3% COMMUNITY DEV. 5.1 % A. B. C. D. E. F. REVENUE SOURCES General Fund Revenues G. Special Assessments Revenue/PFA Bonds: Issued H. Capital Improvement Sales Tax Revenue/PFA Bonds: Pending I. Other State Grants and Loans J. General Obligation Bonds Motor Fuel Tax Receipts K. Transportation Sales Tax Federal Grants and Loans xii TiRANspoRTA TION AND PUBLIC FORKS CAPITAL IMPROVEMENTS PROGRAM 7,000,000 6,000,000 5,000,000 4,000,000 3,000,000 2,000,000 1,000,000 1997-98 1998-99 1999-00 2000-01 2001-02 TRANSPORTATION AND PUBLIC WORKS PROPOSED PROJECTS PROJECT 1997-98 1998-99 1999-00 2000-01 2001-02 NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR "# Street Overlay Program $ 2,150,000 S 550,000 $ 550,000 S 550,000 $ 350,000 S 150,000 E,K EX EX E,K EX E - i Gravel Street Paving $ 1,020,000 $ 270,057 S 270,005 S 270,000 $ 160,000 $ 50,000 I Program E,G,K E,G,K E,G,K E,G,K E,G,K E i j : - z Street, Curb, & Gutter Repair S 1,312,500 ! S 375,000 $ 375,000 $ 375,000 $ 187,500 K ; K K K K i 1 Sidewalk Repair & $ 437,500 $ 125,000 S 125,000 $ 125,000 $ 62,500 Reconstruction K K K K K 1-5 Traffic Controls Replacement $ 50,000 S 10,000 S 40,000 E E II i 1-6 Flood Control Project Bridge $ 303,000 S 303,000 ! Replacement -Marietta Street H H f� 1-7 Hopper Road Bridge and 5 342,300 S 342,300 Reconstruction: Clippard D,E D,E I School to Mt. Auburn Road 1-8 Bloomfield Road Bridge Over S 263,900 S 263,900 f Ramsey Branch D,E D,E 1-9 Kenneth Drive Connection: $ 15,900 $ 15,900 Woodland Hills to Randol i E Farms j iA ??:' Perryville Road: Near Meyer $ 1,393,600 $1,393,650 1{ '< Dr. to City Limits K K E` (z Hopper Road: Phase 1: Mt. $ 655,200 S 655,200 I Auburn Road to Kae Road K K ................. 9 I Silver Springs Road: William I $ 344,800 S 344,800 ! :<? to Independence K K A GENERAL FUND B - 9EV/PFA BONDS: ISSUED - - - - C REV/PFA BONDS: PENDING D STATE GRANTS/LOANS E MOTOR FUEL TAX F FED. GRANTS/LOANS G SPEC. ASSESSMENTS H CAP. IMP. SALES TAX - - - - OTHER - - - - - J GEN. OBL. BONDS: PENDING K TRANS. SALES TAX - - >? Projects included in Transportation Trust Fund Program supported by a th% transportation sales tax for five years approved by vote on August 8, 1595. 2 TRANSPORTATION AND PUBLIC WORKS PROPOSED PROJECTS PROJECT 1997-98 1998-99 - 1999-00 2000-01 2001-02 i NUMBER IMPROVEMENT ITEM 1 TOTAL COST FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR Broadway Widening & S 796,200 $ 796,200 ?: Reconstruction: Clark K K i I `z Avenue to Perry Avenue i #::;`s> :............ Mt. Auburn: Widening: $ 106,600 $ 106,600 pp >;''>'`<`'••»%%'!` William to Independence St. K K } z<'•s1=i5•':f#'?' Mt. Auburn: Traffic Signals: S 100,300 I $ 100,300 ( 1 At Independerice Streat K K Lorimier. Morgan Oak to $ 247,400 I $ 247,400 1 New Hwy. 74 K K II >73E7E?:'•:``. Mt. Auburn: Bloomfield o t $ 337,000 5 337,000 i I X. New Hwy. 74 K Ki Siemers Drive: Bloomfield to S 906,200 S 906,200 l New Hwy. 74 K I K �I If Silver Springs Road: $ 34,200 S 34,200 Bloomfield to New Hwy. 74 K K Bloomfield Road: Phase If: $ 933,000 S 933,000 Kingshighway to 1-55 K K f Hopper Road: Phase If: Kage $, 337,400 1- $ 337,400 i Road to 1-55 K K William Street: Improvement/ $ 470,300 I $ 470,300 I i i Widening: Sprigg to Main K K 1 �. zi: Perryville Road: City Limits $ 953,900 ( $ 953,900 to Route W K K ttt Kage Road: Mt. Auburn to $ 84,000 $ 84,000 1 :'. Hopper Road K K i A GENERAL FUND RdgPFA BONDS: ISSUED -C REV/PFA BONDS: PENDING - - - - K) STATE GRANTS/LOANS - - - - - E MOTOR FUEL TAX F FEED.GRANTS/LOANS - - - - SPEC. ASSESSMENTS -H CAP. IMP. SALES TAX OTHER J CEN. OBL. BONDS: PENDING K TRANS. SALES TAX Projects included in Transportation Trust Fund Program supported by a 1h% transportation sales tax for five years approved by vote on August 8, 1995. 3 TRANSPORTATION AND PUBLIC WORKS PROPOSED PROJECTS PROJECT 1997-981998-99 1999-00 2000-01 2001-02 NUMBER IMPROVEMENT ITEM j TOTAL COST i FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR > :> 7` ``:E#•'E`# Mt. Auburn: New Hwy. 74 $ 738,900 S 738,930 1 to S. Expressway K K S. Exp.: Kingshighway to S 457,100 S 457,100 j s Silver Springs K r �} Independence: Reconstruct.: S 321,700 $ 321,700 I Pacific to Sprigg K K <`<1'�$:,'•,; New Madrid: Reconstruction: $ 753,400 $ 753,400 N.:: Perry to Show Me Center K K #:sr : Rodney: Bridge & Reconst.: S 626,900 $ 626,900 I `> Armory to Hawthorne K K 1-30 S. Sprigg St. Levee Removal/ f $ 30,000 S 30,000 Shoulder Improvement ( E I SUBTOTAL -STREET 516,523,200 $6,037,100 $3,636,500 $3,791,600 $2,858,000 CONSTRUCTION 7200,000 1.31 Airport T -Hanger Ramp $ 401,600 $ 401,600 Replacement A,D A,D 1-32 Airport Emergency Power $ 47,000 $ 47,000 i Back -Up for Runway 10,28 A,D A,D 1-33 Airport Maintenance/AARF $ 52,200 S 52,200 ! S Building A A 1-34 Airport Taxiway Extension $ 1,564,500 $1,564,500 for Runway 2/20 A,D A,D I 1-35 Airport Runway 2/20 Cable $ 104,300 $ 104,300 and Lighting A,D A,D ((( A GENERAL FUND B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTS/LOANS E MOTOR FUEL TAX F FED. GRANTS/LOANS G SPEC. ASSESSMENTS H CAP. IMP. SALES TAX I OTHER J GEN. OBL. BONDS: PENDING K TRANS. SALES TAX Projects included in Transportation Trust Fund Program supported by a th% transportation sales tax for five years approved by vote on August 8, 1995. 4- TRANSPORTATION AND. PUBLIC WORKS PROPOSED PROJECTS PROJECT I 1997-98 I 1998-99 1999-00 2000-01 2001-02 NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR j 1-36 Airport Aircraft Rescue and $ 260,800 $ 260,800 ' Fire Fighting Building A,D A,D i, 1-37 Airport Taxiway Extension 1 .$ 469,400 $ 469,400 1 for 'T" Hangars A,D A,D E w 1-38 Airport 'T' Hangar and S 332,000 E $ 332,000 Associated Taxiways C i C 1-39 Airport Main Runway t S3,462,800 $3,462,800 �+ (10/28) Extension A,D A,D E1 SUBTOTAL -AIRPORT $6,694,600 $ 401,600 ' $ 99,200 $1,668,800 $1,062,200 I $3,462,800 PROJECTS i 1-40 Public Works Partial Roof a $ 79,000 5 15,000 S 15,000 S 16,000 $ 16,000 1 $ 17,000 Replacement 1 1-41 Public Works Structural : $ 175,000 $ 50,000 $ 50,000 S 75,000 Reinforcement -Retrofit Bldg. I I I 1 1-42 Public Works Fuel Island $ 30,000 $ 30,000 Canopy ( I I 1-43 Public Works/Water $ 15,000 $ 15,000 i + Operations Emergency I( I Power Back -Up 1-44 Public Works Fuel System S 14,000. $ 14,000 Upgrade I I 1-45 Public Works Facility S11,650,000 $1,650,000 C C4 1-46 Public Works Heating &Air $ 4,000_ 5 4,000 , Conditioning Unit I 1 Replacement �( ! 1-47 I Public Works *Steel Room' S 15,000 S 15,000 Shop I I f I i1 GENERAL FUND REN/PFA BONDS: ISSUED REV/PFA BONDS: PENDING D STATE GRANTS/LOANS _ MOTOR FUEL TAX FED. GRANTS/LOANS SPEC. ASSESSMENTS -A CAP. IMP. SALES TAX I OTHER - J GEN. OBL. BONDS: PENDING - TRANS. SALES TAX TRANSPORTATION AND PUBLIC WORKS PROPOSED PROJECTS Ij i. PROJECT 1997-98 1998-99 1999-00 i 2000-01 2001-02 NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR FISCAL YEAR i FISCAL YEAR FISCAL YEAR 1-48 Public Works Chemical $ 12,000 S 12,000 j Material Storage ! I (i 1-49 Public Works Equipment $ 60,000 $ 60,000 Storage Shed I I ! ! it 1-50 Pub!ic Works Material S 60,000 S 60,000 's Storage Facility I I SUBTOTAL -PUBLIC $2,114,000 S 275,000 51,715,000 S 91,000 $ 16,000 S 17,000 WORKS PROJECTS ` I TOTALS $25,331,800 $6,713,700 $5,450,700 $5,551,400 $3,935,200 $3,679,800 1 s E � 1 A GENERAL FUND $ 367,720 $ 20,080 ( S 54,550 I $ 33,440 j $ 36,510 $ 173,140 B REV/PFA BONDS: ISSUED ! 11 C REV/PFA BONDS: PENDING $ 1,982,000 $ 1,650,090 S 332,000 +� D STATE GRANTSILOANS $ 6,449,680 S 836,320 S 44,650 fig S 1,585,360 j $ 693,690 $ 3,289,660 E MOTOR FUEL TAX $ 1,247,300 $ 391,400 S 255,930 S 209,000 ' $ 200,000 S 20C,000 F FED. GRANTS/LOANS G SPEC. ASSESSMENTS ! I {{ H CAP. IMP. SALES TAX S 303,000 $ 303,000 j 1 OTHER S 464,OCO $ 275,000 $ 65,000 $ 91,000 $ 16,000 fj S 17,000 J GEN. OBL. BONDS:PENDING { K TRANS. SALES TAX $14,518,100 $ 4,887,900 S3,380,600 $ 3,591,600 1 $ 2,658,000 j t E TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: STREET OVERLAY PROGRAM LOCATION: CITY-WIDE PURPOSE: PROVIDES FOR CONTINUING PRIMARY STREET MAINTENANCE PROGRAM TO PROVIDE FOR THE ASPHALT OVERLAY OF LOCAL AND COLLECTOR STREETS. PHYSICAL DESCRIPTION: MILLING OR USING OTHER SURFACE PROFILING METHOD AND ASPHALT OVERLAY. UNIT OF WORK: CONSTRUCT JUSTIFICATION: COST EFFECTIVE MAINTENANCE TO PREVENT NEED FOR FUTURE RECONSTRUCTION OR ENTIRE PAVEMENT. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $ 750,000 MOTOR FUEL TAX (E) $1,400,000 TRANSPORTATION SALES TAX (K) $2,150,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-1 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: GRAVEL STREET PAVING PROGRAM LOCATION: VARIOUS CITY STREETS PURPOSE: TO SURFACE EXISTING RESIDENTIAL GRAVEL STREETS. PHYSICAL DESCRIPTION: MINIMUM 20 -FOOT WIDE HOT MIX ASPHALTIC CONCRETE SURFACE UP TO 30 -FOOT CONCRETE SURFACE ON EXISTING GRAVEL STREET BASE AND DRAINAGE IMPROVEMENTS AS NEEDED. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: REDUCE GRAVEL STREET MAINTENANCE COSTS. ENHANCE NEIGHBORHOOD QUALITY. IMPACT ON OPERATING BUDGET: PAVING OF GRAVEL STREETS WILL SIGNIFICANTLY REDUCE COSTS OF GRADING AND ROCK REPLACEMENT. FINANCING: $ 250,000 MOTOR FUEL TAX (E) $ 770,000 TRANSPORTATION SALES TAX (K) $1,020,000 TOTAL CITY COUNCIL POLICY (RESOLUTION NO. 1127, DECEMBER 18, 1995) HAS ESTABLISHED A MAXIMUM SPECIAL ASSESSMENT FOR RESIDENTIAL GRAVEL STREETS EXISTING AS OF AUGUST 8, 1995, AT $10.00 PER FRONT FOOT FOR ABUTTING PROPERTY OWNERS. SPECIAL ASSESSMENT REVENUES RETURNED FROM THESE PROJECTS WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. SALES TAX AND MOTOR FUEL FUNDS WILL BE USED TO PAY THE UP -FRONT COSTS FOR ENGINEERING, RIGHT-OF-WAY, AND CONSTRUCTION. 1-2 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: STREET, CURB, AND GUTTER REPAIR LOCATION: UNSPECIFIED PURPOSE: SPECIFIC PROGRAM TO PROVIDE FOR RECONSTRUCTION OF CURBS AND GUTTERS IN CONJUNCTION WITH EXPANDED STREET REPAIR OR OVERLAY PROJECTS. PHYSICAL DESCRIPTION: IN GENERAL, COMPLETE REMOVAL OF DETERIORATED SECTIONS OF EXISTING CURB AND GUTTER AND REPLACEMENT. UNIT OF WORK: REMOVE AND RECONSTRUCT. JUSTIFICATION: IMPROVE LIFE OF EXISTING STREETS. ENHANCE NEIGHBORHOOD QUALITY. IMPACT ON OPERATING BUDGET: COST EFFECTIVE MAINTENANCE TO EXTEND LIFE OF EXISTING STREETS AND REDUCE MAINTENANCE COSTS. FINANCING: $1,312,500 TRANSPORTATION SALES TAX (K) $1,312,500 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-3 9 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: SIDEWALK REPAIR AND RECONSTRUCTION LOCATION: UNSPECIFIED PURPOSE: SPECIFIC PROGRAM TO REPAIR AND RECONSTRUCT DETERIORATED SIDEWALKS. PHYSICAL DESCRIPTION: REPLACE DETERIORATED SIDEWALK SECTIONS WITH NEW CONCRETE SECTIONS. UNIT OF WORK: REMOVE AND RECONSTRUCT. JUSTIFICATION: REPAIR DETERIORATED FACILITIES AND ENHANCE NEIGHBORHOOD QUALITY. IMPACT ON OPERATING BUDGET: WILL REDUCE MAINTENANCE COSTS FOR ABUTTING PROPERTY OWNERS. FINANCING: $ 437,500 TRANSPORTATION SALES TAX (K) $ 437,500 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. T-4 10 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: TRAFFIC CONTROLS REPLACEMENT LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: TEN LOCATIONS, CITY-WIDE TO REPLACE AGED ELECTRO -MECHANICAL T RAFF:C CONTROLLERS WITH ELECTRONIC CONTROLLERS. INSTALL ELECTRONIC TRAFFIC CONTROLLERS WITH CAPABILITIES FOR COORDINATION AND SEQUENCING. DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING CONTROLLERS ARE OUTDATED AND SUSCEPTIBLE TO BREAKDOWN. PARTS ARE INCREASINGLY HARDER TO LOCATE; SUPPLIERS NO LONGER OFFER NEW PARTS. NEWER SYSTEM COULD BE SEQUENCED FOR TRAFFIC PATTERNS AND SPECIAL EVENTS. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT. 8 50,000 MOTOR FUEL TAX (E) $ 50,000 TOTAL. 11 1-5 1-6 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: FLOOD CONTROL PROJECT BRIDGE REPLACEMENT - MARIETTA STREET LOCATION: MARIETTA STREET AT WALKER BRANCH PURPOSE: REPLACEMENT OF BRIDGE TO ACCOMMODATE FLOOD PROTECTION MEASURES. PHYSICAL DESCRIPTION: REMOVE AND REPLACE ?RIDGE AND APPROACHES. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: INTEGRAL PART OF WALKER BRANCH SECTION OF CORPS OF ENGINEERS' FLOOD CONTROL PROJECT. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 303,000 CAPITAL IMPROVEMENT SALES TAX (H) S 303,000 TOTAL 12 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: HOPPER ROAD BRIDGE AND RECONSTRUCTION LOCATION: HOPPER ROAD, CLIPPARD SCHOOL TO MOUNT AUBURN ROAD PURPOSE: PROVIDE FOR THE REPLACEMENT OF THE BRIDGE ON HOPPER ROAD EAST OF MOUNT AUBURN ROAD AND THE RECONSTRUCTION OF HOPPER ROAD FROM CLIPPARD SCHOOL TO MOUNT AUBURN ROAD. PHYSICAL DESCRIPTION: 110 FOOT, TWO-LANE BRIDGE OVER CAPE LA CROIX CREEK. 1,090 LINEAR FEET OF CONCRETE OR ASPHALT PAVEMENT WITH CURBS, 36 FEET WIDE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: BRIDGE IS FUNCTIONALLY OBSOLETE AND TOO NARROW FOR EXISTING TRAFFIC VOLUME. EXTEND EXISTING HIGH -TYPE PAVEMENT ON HOPPER ROAD TO HANDLE INCREASED TRAFFIC AND TO MATCH BRIDGE REPLACEMENT. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT. $ 256,800 STATE GRANTS (D) $ 85,500 MOTOR FUEL TAX (E) $ 342,300 TOTAL '3 1-7 Im TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: BLOOMFIELD ROAD BRIDGE OVER RAMSEY BRANCH LOCATION: BLOOMFIELD ROAD AT RAMSEY BRANCH PURPOSE: REPLACE EXISTING 54 -FOOT, 3 -SPAN BRIDGE THAT IS DETERIORATING. PHYSICAL DESCRIPTION: NEW 3 -SPAN CONTINUOUS CONCRETE I -GIRDER SUPERSTRUCTURE SUPPORTING A REINFORCED CONCRETE SLAB WITH TWO INTEGRAL END BENTS AND TWO OPEN CONCRETE INTERMEDIATE BENTS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING BRIDGE IN FUNCTIONALLY AND STRUCTURALLY INADEQUATE. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 198,000 STATE GRANTS/LOANS (D) $ 65,900 MOTOR FUEL TAX (E) $ 263,900 TOTAL 14 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: KENNETH DRIVE CONNECTION LOCATION: FROM CURRENT TERMINUS IN WOODLAND HILLS SUBDIVISION TO NEW DEVELOPMENT IN RANDOL FARMS SUBDIVISION. PURPOSE: PROVIDE THROUGH CONNECTION AND ADDITIONAL ACCESS. PHYSICAL DESCRIPTION: APPROXIMATELY 120 FEET OF PAVING WITH ANCILLARY STORMWATER FACILITIES. RIGHT-OF- WAY WAS PREVIOUSLY DEDICATED IN WOODLAND HILLS SUBDIVISION. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: PROJECT IS NEEDED TO CONNECT EXISTING SUBDIVISION WITH NEW DEVELOPMENT. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 15,900 MOTOR FUEL TAX (E) $ 15,900 TOTAL 1-9 15 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PERRYVILLE ROAD, NEAR MEYER DRIVE TO CITY LIMITS LOCATION: PERRYVILLE ROAD, FROM NORTH OF MEYER DRIVE TO CITY LIMITS (HANOVER CHURCH) PURPOSE: PROVIDE FOR CONTINUED DEVELOPMENT OF PERRYVILLE ROAD AS A COLLECTOR STREET NORTH TO THE CITY LIMITS. PHYSICAL DESCRIPTION: APPROXIMATELY 4,800 LINEAR FEET OF STREET CONSTRUCTION INCLUDING WIDENING TO 36 -FEET WITH CURBS AND GUTTERS, AND SOME REALIGNMENT. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: INCREASE THE SERVICE LEVEL OF THE EXISTING ROADWAY TO HANDLE ADDITIONAL TRAFFIC VOLUME AND CONSTRUCT STREET TO COLLECTOR STANDARDS PER MAJOR STREET PL AN. IMPACT O N OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $1,363,600 TRANSPORTATION SALES TAX (K) $1,393,600 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-10 UP TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: HOPPER ROAD: PHASE I LOCAT ION: FROM MT AUBURN WEST TO KAGE ROAD PURPOSE: PROVIDE A NEW COLLECTOR STREET TO PROVIDE FOR CONTINUED DEVELOPMENT IN THE NORTHWEST PART OF THE CITY. PHYSICAL DESCRIPTION: APPROXIMATELY 3,500 LINEAR FEET OF STREET, 36 FEET WIDE WITH CURB AND GUTTERS. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT. JUSTIFICATION: TRAFFIC VOLUMES ON EXISTING HOPPER AND KAGE ROADS ARE INCREASING AS A RESULT OF NEW DEVELOPMENT, AND A NEW STREET BUILT TO CURRENT STANDARDS ON A NEW ALIGNMENT IS NEEDED. IMPACT ON OPERATING BUDGET: NEW STREET WILL ADD MAINTENANCE COSTS, UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 655,200 TRANSPORTATION SALES TAX (K) $ 655,200 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 17 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: SILVER SPRINGS ROAD LOCATION: WILLIAM STREET (ROUTE K) NORTH TO CURRENT TERMINUS SOUTH OF INDEPENDENCE PURPOSE: PROVIDE FINAL CONNECTION OF THIS DESIGNATED COLLECTOR STREET THROUGH THE DESCRIBED SECTION, IMPROVE NORTH/ SOUTH ACCESS IN THE WEST END OF THE CITY, AND ASSIST IN FURTHER DEVELOPMENT. PHYSICAL DESCRIPTION: APPROXIMATELY 2,100 FEET OF 36 -FOOT WIDE PAVING, WITH CURBS, GUTTERS, AND ANCILLARY STORMWATER FACILITIES, WITH SOME RECONSTRUCTION REQUIRED ON GORDONVILLE ROAD. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY (PART PREVIOUSLY ACQUIRED), AND CONSTRUCT JUSTIFICATION: CONNECTION NEEDED TO PROVIDE ADDITIONAL MAJOR NORTH/SOUTH ACCESS IN HIGH TRAFFIC COMMERCIAL/INSTITUTIONAL AREA. IMPACT ON OPERATING BUDGET: NEW STREET WILL ADD MAINTENANCE COSTS, UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 344,800 TRANSPORTATION SALES TAX (K) $ 344,800 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-12 18 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: BROADWAY WIDENING AND RECONSTRUCTION LOCATION: FROM CLARK STREET EAST TO PERRY AVENUE PURPOSE: PROVIDE IMPROVED TRAFFIC FLOW AND REDUCE FLOODING ON MAJOR ARTERY. PHYSICAL DESCRIPTION: WIDEN STREET TO FOUR LANES, UPGRADE TRAFFIC SIGNALS AT CARUTHERS, AND INSTALL STORMWATER RELIEF LINE. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: STREET CURRENTLY IS SUBJECT TO FLASH FLOODING AND TRAFFIC FLOW IS ROUTINELY CONGESTED WITH LINES SEVERAL BLOCKS LONG. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 796,200 TRANSPORTATION SALES TAX (K) $ 796,200 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUED RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-13 19 TRANSPORTATION AND PUBLIC WORDS PROJECT TiTLE: MiT. AUBURN ROAD WIDENING TO FULL FOUR LANES LOCATION: WILLIAM STREET TO INDEPENDENCE PURPOSE: TO ACCOMMODATE FOUR LANES OF TRAFFIC FLOW. PHYSICAL DESCRIPTION: ADD APPROXIMATELY THREE FEET ON EACH SIDE WITH INTEGRAL 6 -INCH CURB AND ASSOCIATED CONSTRUCTION. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO ALLOW FOR GREAT ER TRAFFIC CAPACITY ON THIS SECTION OF MT. AUBURN ROAD. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 106,600 TRANSPORTATION SALES TAX (K) $ 106,600 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-14 20 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: MT. AUBURN ROAD TRAFFIC SIGNALS LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: INDEPENDENCE INTERSECTION PUBLIC TRAFFIC SAFETY AND CONVENIENCE. INSTALLATION OF FULLY -ACTIVATED TRAFFIC SIGNALS. DESIGN AND CONSTRUCT PUBLIC SAFETY MINOR INCREASE IN MAINTENANCE COSTS $ 100,300 TRANSPORTATION SALES TAX (K) $ 100,300 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. i-15 21 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: LORIMIER STREET EXTENSION LOCATION: EXTENSION FROM MORGAN OAK SOUTH TO NEW HIGHWAY 74 PURPOSE: PROVIDE A CONNECTION BETWEEN NEW HIGHWAY 74 AND THE DOWNTOWN BUSINESS DISTRICT. PHYSICAL DESCRIPTION: PAVING OF APPROXIMATELY 1,930 FEET OF STREET, 40 FEET WIDE, WITH CURBS AND GUTTERS. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: ACCESS TO THE DOWNTOWN AREA IS NEEDED TO MAINTAIN ECONOMIC VIABILITY. IMPACT ON OPERATING BUDGET: NEW STREET WILL ADD MAINTENANCE COSTS, UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 247,400 TRANSPORTATION SALES TAX (K) $ 247,400 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-16 22 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: MT. AUBURN ROAD EXTENSION LOCATION: EXTENSION FROM BLOOMFIELD ROAD SOUTH TO NEW HIGHWAY 74 PURPOSE: PROVIDE A CONNECTION BETWEEN THE MT. AUBURN ARTERIAL AND NEW HIGHWAY 74. PHYSICAL DESCRIPTION: APPROXIMATELY 1,380 FEET OF PAVING, 44 FEET WIDE, WITH CURBS AND DRAINAGE. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: CONNECTION NEEDED TO PROVIDE ACCESS TO THE NEW 7411-55 INTERCHANGE FOR SAFETY, CONVENIENCE AND ECONOMIC DEVELOPMENT. IMPACT ON OPERATING BUDGET: NEW STREET WILL ADD MAINTENANCE COSTS, UNQUANTIFIABLE AT THIS TIME. FINANCING: 8 337,000 TRANSPORTATION SALES TAX (K) 337,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-17 23 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: SIEMERS DRIVE EXTENSION LOCATION: EXTENSION FROM BLOOMFIELD ROAD SOUTH TO THE NEW HIGHWAY 74/1-55 INTERCHANGE PURPOSE: PROVIDE A CONNECTION BETWEEN THE SIEMERS DRIVE COLLECTOR AND THE NEW INTERCHANGE. PHYS!CAL DESCRIPTION: APPROXIMATELY 1,950 FEET OF PAVING, 40 FEET WIDE, WITH CURBS AND DRAINAGE. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY (ADDITIONAL), AND CONSTRUCT JUSTIFICATION: CONNECTION NEEDED TO PROVIDE ACCESS TO THE NEW 74/1-55 INTERCHANGE FOR SAFETY, CONVENIENCE, AND ECONOMIC DEVELOPMENT. IMPACT ON OPERATING BUDGET: NEW STREET WILL ADD MAINTENANCE COSTS, UNQUANTIFIABLE AT THIS TIME FINANCING: $ 906,200 TRANSPORTATION SALES TAX (K) $ 906,200 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-18 24 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: SILVER SPRINGS ROAD CONNECTION UPGRADE LOCATION: BLOOMFIELD ROAD SOUTH TO RELOCATED SILVER SPRINGS AT NEW HIGHWAY 74 INTERSECTION PURPOSE: TO UPGRADE CONNECTION OF SILVER SPRINGS ROAD TO BLOOMFIELD ROAD, NORTH FROM END OF RELOCATED SILVER SPRINGS ROAD. PHYSICAL DESCRIPTION: 24 -FOOT WIDE PAVEMENT WITH SHOULDER, 280 FEET REQUIRED FOR CONNECTION. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING PAVEMENT WILL NOT BE ADEQUATE TO HANDLE INCREASED TRAFFIC FROM NEW BRIDGE ROUTE. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 34,200 TRANSPORTATION SALES TAX (K) $ 34,200 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-19 25 T RANSPORTATION AND PUBLIC WORKS PROJECT TITLE: BLOOMFIELD ROAD: PHASE it LOCATION: KINGSHIGHWAY WEST TO 1-55 PURPOSE: TO UPGRADE EXISTING STREET TO CURRENT STANDARDS. PHYSICAL DESCRIPTION: APPROXIMATELY 6,500 LINEAR FEET OF STREET CONSTRUCTION INCLUDiNC WIDENING TO 36 FEET WITH CURBS AND GUTTERS, AND SOME REALIGNMENT. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: EXISTING STREET IS FUNCTIONALLY INADEQUATE. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 933,000 TRANSPORTATION SALES TAX (K) 933,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-20 26 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: HOPPER ROAD: PHASE 11 LOCATION: KAGE ROAD TO 1-55 PURPOSE: TO UPGRADE EXISTING STREET TO CURRENT STANDARDS. PHYSICAL DESCRIPTION: APPROXIMATELY 2,000 LINEAR FEET OF STREET IMPROVEMENTS: WIDENING WITH CONSTRUCTION OF CURB AND GUTTER, AND OVERLAY OR RECONSTRUCTION OF EXISTING PAVEMENT. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT. JUSTIFICATION: EXISTING STREET IS FUNCTIONALLY INADEQUATE. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 337,400 TRANSPORTATION SALES TAX (K) $ 337,400 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-21 27 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: WILLIAM STREET --GENERAL IMPROVEMENT AND/OR WIDENING LOCATION: SPRIGG STREET TO MAIN STREET PURPOSE: TO IMPROVE TRAFFIC CAPACITY PHYSICAL DESCRIPTION: UPGRADE APPROXIMATELY 2,400 LINEAR FEET OF EXISTING STREET, WITH POSSIBLE WIDENING TO 42 FcET. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OFA"JAY, AND CONSTRUCT JUSTIFICATION: POTENTIAL IMPACT OF RIVERBOAT GAMING OPERATIONS AND/OR OTHER ECONOMIC DEVELOPMENTS IN THE DOWNTOWN AREA MAY RQUIRE THIS IMPROVEMENT. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 470,300 TRANSPORTATION SALES TAX (K) S 470,300 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-22 28 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PERRYVILLE ROAD LOCATION: C!TY LIMITS NORTH TO ROUTE W AND CYPRESS DRIVE PURPOSE: PROVIDE FOR CONTINUED DEVELOPMENT OF PERRYVILLE ROAD AS A COLLECTOR STREET NORTH TO THE ROUTE W AREA. PHYSICAL DESCRIPTION: APPROXIMATELY 3,400 LINEAR FEET OF STREET RECONSTRUCTION INCLUDING WIDENING TO 36 FEET WITH CURBS AND GUTTERS, AND SOME REALIGNMENT. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: INCREASE THE SERVICE LEVEL OF THE EXISTING ROADWAY TO HANDLE ADDITIONAL TRAFF!C VOLUME AND CONSTRUCT STREET TO COLLECTOR STANDARDS PER MAJOR STREET PLAN. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 953,900 TRANSPORTATION SALES TAX (K) $ 953,900 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-23 29 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: KAGE ROAD LOCATION: MT. AUBURN TO HOPPER ROAD PURPOSE: TO UPGRADE EXISTING STREET TO CURRENT STANDARDS. PHYSICAL DESCRIPTION: APPROXIMATELY 4,800 LINEAR FEET OF STREET IMPROVEMENT: WIDENING WITH CONSTRUCTION OF CURB AND GUTTER, WITH OVERLAY OF EXISTING PAVEMENT AND EXTENSION OF STORM DRAINAGE. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: EXISTING STREET IS FUNCTIONALLY INADEQUATE. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 84,000 TRANSPORTATION SALES TAX (K) $ 84,000 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-24 30 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: MT. AUBURN ROAD EXTENSION LOCATION: NEW HIGHWAY 74 SOUTH TO SOUTHERN EXPRESSWAY (EXTENDED WEST TO SILVER SPRINGS ROAD) PURPOSE: PROVIDE A NEW ARTERIAL CONNECTION BETWEEN NEW HIGHWAY 74 AND THE SOUTHWEST PART OF THE CITY, TYING EACH TO KINGSHIGHWAY. WILL SUPPORT NEW COMMERCIAL AND RESIDENTIAL DEVELOPMENT. PHYSICAL DESCRIPTION: APPROXIMATELY 3,600 LINEAR FEET OF PAVING, 44 FEET WIDE, WITH CURBS AND DRAINAGE. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: ACCESS TO THIS PART OF THE CITY IS LIMITED TO SILVER SPRINGS ROAD ONLY. IMPACT ON OPERATING BUDGET: NEW STREET WILL ADD MAINTENANCE COSTS, UNQUANTIFIABLE AT THIS TIME. FINANCING: $ 738,900 TRANSPORTATION SALES TAX (K) $ 738,900 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-25 31 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: SOUTHERN EXPRESSWAY EXTENSION LOCATION: WEST FROM KINGSHIGHWAY TO SILVER SPRINGS ROAD PURPOSE: CONNECT KINGSHIGHWAY TO NEW M T . AUBURN ROAD EXTENSION AND PROVIDE ADEQUATE ,ACCESS TO THE SOUTHWEST PART OF THE CITY. WILL SUPPORT NEW COMMERCIAL AND RESIDENTIAL DEVELOPMENT. PHYSICAL DESCRIPTION: APPROXIMATELY 2,500 LINEAR FEET OF PAVING, 44 FEET WIDE, WITH CURBS AND DRAINAGE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: ACCESS TO THIS PART OF THE CITY IS LIMITED TO SILVER SPRINGS ROAD ONLY. IMPACT ON OPERATING BUDGET: NEW STREET WILL ADD MAINTENANCE COSTS, UNQUANTIFIABLE AT THIS TIME FINnNCING: $ 457,100 TRANSPORTATION SALES TAX (K) $ 457,100 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-26 32 TRANSPORTATION ARID PUBLIC WORKS PROJECT TITLE: INDEPENDENCE STREET RECONSTRUCTION LOCATION: PACIFIC STREET TO SPRIGG STREET, INCLUDING INTERSECTIONS. PURPOSE: UPGRADE THIS SECTION OF STREET TO CURRENT STANDARDS. PHYSICAL DESCRIPTION: APPROXIMATELY 940 LINEAR FEET OF PAVEMENT AND SIDEWALK RECONSTRUCTION WITH NEW TRAFFIC SIGNALS AT PACIFIC AND SPRIGG. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THIS SECTION OF INDEPENDENCE STREET IS IN NEED OF MAJOR RECONSTRUCTION. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 321,700 TRANSPORTATION SALES TAX (K) S 321,700 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-27 33 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: NEW MADRID STREET RECONSTRUCTION LOCATION: PURPOSE: PHYSICAL DESCRIPTION: PERRY AVENUE EAST TO SHOW -ME CENTER UPGRADE EXISTING STREET SECTION AND RECONSTRUCT/REALIGN HENDERSON-NEW MADR!D INTERSECTION. APPROXIMATELY 3,000 LINEAR FEET OF STREET RECONSTRUCTION WITH WIDENING AND CURBS AND GUTTERS, PLUS INTERSECTION WORK. UNIT OF WORK: DESIGN, ACQUIRE RIGHT-OF-WAY, AND CONSTRUCT JUSTIFICATION: NEW MADRID STREET PROVIDES A MAJOR ACCESS ROUTE TO THE UNIVERSITY AND IT IS CURRENTLY FUNCTIONALLY INADEQUATE, ALSO, THE PRESENT INTERSECTION IMPEDES TRAFFIC FLOW. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: S 7:33,400 TRANSPORTATION SALES TAX (K) $ 753,400 TOTAL NOTE: AGREEMENT BETWEEN CITY AND UNIVERSITY FOR WORK ON THE HENDERSON-NEW MADRID INTERSECTION PROVIDES THAT CITY WILL REIMBURSE UNIVERSITY FOR CITY SHARE OF PROJECT ON JANUARY 1, 1999, IF TRUST FUNDS ARE AVAILABLE, BUT NO LATER THAN APRIL 1, 2000. NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE USED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-28 34 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: RODNEY STREET: NEW CAPE LA CROIX CREEK BRIDGE AND RECONSTRUCTION FROM NATIONAL GUARD ARMORY NORTH TO HAWTHORNE UPGRADE EXISTING STREET AND BRIDGE TO CURRENT STANDARDS. REPLACEMENT OF THE EXISTING BRIDGE AND RECONSTRUCTION OF 9,600 LINEAR FEET OF PAVEMENT TO 28 FEET IN WIDTH. DESIGN AND CONSTRUCT EXISTING STREET AND BRIDGE ARE FUNCTIONALLY INADEQUATE. NO SIGNIFICANT IMPACT 8 626,900 TRANSPORTATION SALES TAX (K) $ 626,900 TOTAL NOTE: IF ANY SPECIAL ASSESSMENTS ARE LEVIED FOR THIS PROJECT, SALES TAX FUNDS WILL BE SUED TO PAY FOR THE ENGINEERING, R.O.W. AND CONSTRUCTION COSTS, AND SPECIAL ASSESSMENT REVENUES RETURNED WILL BE CREDITED TO THE TRANSPORTATION TRUST FUND. 1-29 35 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: 1-30 SOUTH SPRIGG STREET LEVEE REMOVAL/ SHOULDER IMPROVEMENT SOUTH SPRIGG STREET, 1 MILE SOUTH OF THE SPRIGG STREET BRIDGE OVER CAPE LA CROIX CREEK TO REMOVE A SUBSTANTIAL PART OF AN EARTHEN LEVEE CONSTRUCTED DURING THE FLOOD OF 1993. REMOVAL OF LEVEE MATERIAL FOR A DISTANCE OF 3,200 FEET TO LEAVE A 6 -FOOT WIDE SHOULDER ON THE EAST SIDE OF SPRIGG WITH 3 TO 1 SIDE SLOPES. SHOULDER TO BE COVERED WITH 6 -INCH LAYER OF COMPACTED CRUSHED AGGREGATE. REMOVE EXCESS EARTH, REGRADE AND IMPROVE SHOULDER LEVEE IS IN DISREPAIR AND IS SLOUGHING OFF ONTO SPRIGG STREET CAUSING A TRAFFIC HAZARD AND A MAINTENANCE PROBLEM. WILL REDUCE REDUNDANT MAINTENANCE EXPENSE ON LEVEE EROSION $ 30,000 $ 30,000 36 MOTOR FUEL TAX (E) TOTAL TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT T -HANGAR RAMP REPLACEMENT LOCATION: REGIONAL AIRPORT PURPOSE: INSTALLATION OF PAVEMENT BASE AND REPLACEMENT OF ASPHALT SURFACES. FULL RECONSTRUCTION OF EXISTING PAVEMENT. PAVEMENT WAS EVIDENTLY LAID AS TEMPORARY PAVEMENT OVER 40 YEARS AGO. SUB -BASE IS INADEQUATE FOR TRAFFIC USING IT. PHYSICAL DESCRIPTION: UNIT OF WORK: REMOVE AND REPLACE APPROXIMATELY 7,430 SQ. YDS. OF ASPHALT RAMP AREA. REPLACE- MENT WILL INCLUDE INSTALLATION OF APPRO- PRIATE AND ADEQUATE SUB -BASE TO PREVENT SIMILAR DETERIORATION AREA IN THE FUTURE. ENGINEERING AND CONSTRUCTION JUSTIFICATION: EXISTING ASPHALT RAMP IS DETERIORATING AT A RAPID PACE. PAVEMENT IS DISPLAYING EXTREME CRACKING WHICH USUALLY INDICATES SEVERE BASE FAILURE. DETERIORATION WILL CONTINUE UNTIL AN OVERLAY CAN BE ACCOMPLISHED. PAVEMENT IS NEARING A POINT THAT SAFETY WILL BECOME A REAL CONCERN. EXISTING PAVEMENT MAY BECOME UNUSABLE WITHIN 3 TO 5 YEARS. IMPACT ON OPERATING BUDGET: IN THE SHORT TERM, IT WILL REDUCE MAINTENANCE COSTS OF CONTINUALLY REPAIRING DETERIORATED PAVEMENT. WILL REDUCE LABOR AND EQUIPMENT COSTS REQUIRED TO CLEAR POTENTIALLY DANGEROUS DEBRIS FROM PAVEMENT AND ELIMINATE POTENTIAL LEGAL PROBLEMS AND COSTS FROM DAMAGE OR INJURY CAUSED BY LOOSE DEBRIS. F!NANCING: $ 20,080 GENERAL FUND (A) $ 381,520 STATE GRANTS/LOANS (D) $ 401,600 TOTAL 1-31 37 1-32 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT EMERGENCY POWER BACK-UP FOR RUNWAY 10/28 LOCATION: REGIONAL AIRPORT PURPOSE: INSTALL EMERGENCY POWER BACK-UP SYSTEM TO MAIN RUNWAY 10/28 LIGHTING SYSTEM. PHYSICAL DESCRIPTION: EMERGENCY POWER GENERATOR (NATURAL GAS OR DIESEL) TO PROVIDE BACK-UP TO CURRENT COMMERCIAL -POWERED VAULT. UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: CURRENT POWER TO MAIN RUNWAY IS A COMMERCIAL POWER SOURCE SUBJECT TO POWER OUTAGES DURING STORMS. EMERGENCY OPERATIONS PLANS FOR DISASTER RELIEF REQUIRES AIRPORT TO HAVE A RELIABLE POWER SOURCE. IMPACT ON OPERATING BUDGET: MINOR INCREASE IN OPERATIONAL COSTS FOR FUEL, MAINTENANCE, ETC. FINANCING: $ 2,350 GENERAL FUND (A) $ 44,650 STATE GRANTS/LOANS (D) $ 47,000 TOTAL 38 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT MAIN T ENANCE/ARFF BUILDING LOCATION: REGIONAL AIRPORT PURPOSE: TO ALLOW AIRSIDE ACCESS BY MAINTENANCE VEHICLES; STORAGE SPACE FOR CITY EQUIPMENT, TOOLS AND SUPPLIES; AND HOUSE THE INITIAL RESPONSE AIRCRAFT RESCUE AND FIREFIGHTING (ARFF) VEHICLE. PHYSICAL DESCRIPTION: APPROXIMATELY 30'X 50' UTILITY BUILDING; FRAME CONSTRUCTION WITH WOODEN TRUSSES WITH PAINTED METAL EXTERIOR. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICA T ION: DIRECT AIRSIDE ACCESS IS AN IMPORTANT NEED FOR MAINTAINING AIRPORT GROUNDS AND FOR EMERGENCY RESPONSE PURPOSES. IMPACT ON OPERATING BUDGET: INCREASED UTILITY COST, OFFSET BY RENTING OUT SPACE, AND BY ELIMINATING NEED TO PLUG IN SNOW REMOVAL EQUIPMENT. FINANCING: $ 52,200 GENERAL FUND (A) S 52,200 TOTAL 1-33 39 1-34 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT TAXIWAY EXTENSION FOR RUNWAY 02./20 LOCATION: REGIONAL AIRPORT PURPOSE: EXTEND PARALLEL TAXIWAY TO ENTIRE LENGTH OF RUNWAY 02/20. PHYSICAL DESCRIPTION: CONSTRUCT 78,000 SQ. FT. OF PARALLEL TAXIWAY NORTH FROM TAXIWAY "A" TO NORTH END OF RUNWAY 02/20 AT TAXIWAY "F". UNIT 0r= WORK: DESIGN AND CONSTRUCT JUSTIFICATION: ELIMINATE CONGESTION OF AIRCRAFT ARRIVING ON RUNWAY 02 TAXIING THROUGH TERMINAL RAMP VIA TAXIWAY "E" TO GET TO GENERAL AVIATION APRON. IMPACT ON OPERATING BUDGET: INCREASED MAINTENANCE COST FOR SNOW AND ICE REMOVAL. FINANCING: M 78,225 GENERAL FUND (A) $1,486,275 STATE GRANTS/LOANS (D) $1,564,500 TOTAL 40 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT RUNWAY 02/20 CABLE AND LIGHTING LOCATION: REGIONAL AIRPORT PURPOSE: RECABLE RUNWAY 02/20 EDGE AND THRESHOLD LIGHTS. PHYSICAL DESCRIPTION: REPLACE AND REWIRE ALL EXISTING LIGHT F!XTURES, TRANSFORMERS, AND WIRING FOR RUNWAY 02/20. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING CABLES ARE OVER 40 YEARS OLD AND SUBJECT TO FREQUENT POWER OUTAGES AND REPAIR. IMPACT ON OPERATING BUDGET: MAINTENANCE COSTS FOR FREQUENT REPAIRS WILL BE REDUCED. FINANCING: $ 5,215 GENERAL FUND (A) 99,085 STATE GRANTS/LOANS (D) $ 104,300 TOTAL 1-35 41 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT AIRCRAFT RESCUE AND FIRE FIGHTING BUILDING (AARF) LOCATION: REGIONAL AIRPORT PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: PROVIDE ON-SITE LOCATION FOR HOUSING OF AIRCRAFT RESCUE AND FIRE FIGHTING VEHICLE. CONSTRUCT ARFF BUILDING TO HOUSE ARFF VEHICLE AND MAINTENANCE AND CREW FACILITIES. DESIGN AND CONSTRUCT JUSTIFICATION: PROJECTED INCREASES IN AIRCRAFT PASSENGER LOADS AND AIRCRAFT TYPES WILL REQUIRE UPGRADING FOR FAA -MANDATED RESPONSE TIMES AND LOCATION OF FIRE FIGHTING EQUIPMENT. IMPACT ON OPERATING BUDGET: FINANCING: 1-36 INCREASED OPERATING AND MAINTENANCE COSTS. $ 13,040 GENERAL FUND (A) $ 247,760 STATE GRANTS/LOANS (D) $ 260,800 TOTAL 42 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT TAXIWAY EXTENSION FOR "T" HANGARS LOCATION: REGIONAL AIRPORT PURPOSE: EXTEND "T" HANGAR TAXIWAY TO CONNECT TO EXISTING TAXIWAYS. PHYSICAL DESCRIPTION: CONSTRUCT 38,000 SQ. FT. OF TAXIWAY ON SOUTH SIDE OF CITY "T" HANGARS WEST TO CONNECT TO TAXIWAY ''E" AND BEYOND TO PROPOSED PARALLEL TAXIWAY FOR RUNWAY 02_/20. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXISTING TAXIWAY (ACTUAL ROAD ACCESS) AT NORTHEAST END OF TERMINAL RAMP IS ONLY EXIT FOR CAPE CENTRAL AIRWAYS "T" HANGAR RESULTING IN AIRCRAFT TRAFFIC CONFLICTS. IMPACT ON OPERATING BUDGET: INCREASED MAINTENANCE FOR SNOW AND ICE REMOVAL. FINANCING: $ 23,470 GENERAL FUND (A) $ 445,930 STATE GRANTS/LOANS (D) $ 469,400 TOTAL 1-37 43 1-38 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT T -HANGAR AND ASSOCIATED TAXIWAYS LOCATION: REGIONAL AIRPORT PURPOSE: TO MEET A NEED FOR ADDITIONAL HANGAR SPACE AT THE AIRPORT. PHYSICAL DESCRIPTION: ALL METAL, 10 UNIT, DOUBLE -NESTED, T -HANGAR STRUCTURE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: ALL AVAILABLE HANGAR SPACE IS FILLED, WITH A WAITING LIST OF POTENTIAL USERS. ADDITIONAL HANGAR SPACE WILL ATTRACT MORE AIRCRAFT TO BASE AT THE AIRPORT. IMPACT ON OPERATING BUDGET: INCREASED OPERATING AND MAINTENANCE COSTS OFFSET BY REVENUE GENERATED BY UNIT RENTAL. FINANCING: $ 332,000 REVENUE/PFA BONDS: PENDING (C) $ 332,000 TOTAL 44 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: AIRPORT: MAIN RUNWAY (10/28) EXTENSION LOCATION: REGIONAL AIRPORT PURPOSE: EXTEND MAIN RUNWAY LENGTH FROM 6500 FEET TO 8000 FEET. PHYSICAL DESCRIPTION: EXTEND EXISTING 150 -FOOT -WIDE MAIN RUNWAY AND 75 -FOOT -WIDE TAXIWAY BY 1500 FEET. UNIT OF WORK: DESIGN, ACQUIRE PROPERTY, AND CONSTRUCT JUSTIFICATION: 727 -TYPE AIRCRAFT PROJECTED TO BE OPERATING FROM AIRPORT WILL REQUIRE RUNWAY LENGTHS BEYOND 6500 FEET. IMPACT ON OPERATING BUDGET: INCREASED OPERATING AND MAINTENANCE COSTS FINANCING: $ 173,140 GENERAL FUND (A) $3,289,660 STATE GRANTS/LOANS (D) $3,462,800 TOTAL 1-39 45 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS PARTIAL ROOF REPLACEMENT LOCATION: PUBLIC WORKS SITE, NORTH KINGSHIGHWAY PURPOSE: REPLACE APPROXIMATELY 3000 SQ. FT. OF ROOF ON ONE SECTION OF MAIN BUILDING EACH YEAR UNTIL ALL AREAS HAVE BEEN REPLACED. PHYSICAL DESCRIPTION: 3000 SQ. FT. OF RUBBER ROOF. UNIT OF WORK: DESIGN AND INSTALL. JUSTIFICATION: THE MAIN BUILDING HAS ELEVEN DIFFERENT ROOF AREAS. THEY ARE ALL IN VARIOUS STAGES OF AGING AND LEVELS OF USEFUL LIFE. FUNDS ARE REQUESTED FOR THE NEXT FIVE YEARS IN ORDER TO IMPLEMENT A REPLACEMENT PROGRAM. IMPACT ON OPERATING BUDGET: FINANCING: 1-40 NO SIGNIFICANT IMPACT $ 79,000 OTHER (I) $ 79,000 TOTAL 46 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS STRUCTURAL REINFORCEMENT - RETROFIT BUILDING LOCATION: PUBLIC WORKS SITE, NORTH KINGSHIGHWAY PURPOSE: RETROFIT UN -REINFORCED MASONRY BUILDING WITH STEEL REINFORCING STRUCTURE. PHYSICAL DESCRIPTION: SOILS AND STRUCTURAL ENGINEERING STUDY; INSTALL FOOTINGS AND STEEL COLUMNS AND FRAME WORK WITHIN EXISTING BUILDING. UNIT OP WORK: DESIGN AND INSTALL JUSTIFICATION: TO REINFORCE WEAK POINTS OF STRUCTURES TO PREVENT COLLAPSE. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 175,000 OTHER (1) $ 175,000 TOTAL 1-41 47 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS FUEL ISLAND CANOPY LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: PUBLIC WORKS SITE, NORTH KINGSHIGHWAY PROVIDE WEATHER PROTECTION WHILE FUELING VEHICLES AND EQUIPMENT DURING INCLEMENT WEATHER. FREE STANDING CANOPY APPROXIMATELY 24'X 50'. DESIGN AND CONSTRUCT JUSTIFICATION: FUELING OPERATIONS DURING RAIN AND SNOW SUBJECT DRIVER/OPERATOR TO WET CONDITIONS; INCREASES THE RISK OF FUEL CONTAMINATION AND FROZEN PUMP CONTROLS. IMPACT ON OPERATING BUDGET: FINANCING: 1-42 NO SIGNIFICANT IMPACT $ 30,000 OTHER (1) $ 30,000 TOTAL 48 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS/WATER OPERATIONS EMERGENCY POWER BACK-UP LOCATION: WATER DIVISION, NORTH BROADVIEW PURPOSE: PROVIDE BACK-UP ELECTRICAL POWER IN ORDER TO ALLOW ESSENTIAL FUNCTIONS TO CONTINUE IN THE EVENT OF A PROLONGED POWER DISRUPTION. PHYSICAL DESCRIPTION: ONE TRAILER MOUNTED 40 KW DIESEL POWERED ELECTRICAL GENERATOR WITH AUTOMATIC SWITCH GEAR. UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: IN THE EVENT OF A POWER DISRUPTION, WATER SERVICES WOULD BE A MAJOR CONCERN AND STANDBY ELECTRICAL POWER WILL BE CRITICAL IN ALLOWING THE WATER DEPARTMENT TO FUNCTION AS NECESSARY. IMPACT ON OPERATING BUDGET: UNQUANTIFIABLE SAVINGS IN LOSS OF DATA AND PRODUCTION TIME IN THE EVENT OF AN OUTAGE. FINANCING: $ 15,000 OTHER (1) $ 15,000 TOTAL 1-43 49 jQlLA1 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS FUEL SYSTEM UPGRADE LOCATION: PUBLIC WORKS SITE, NORTH KINGSHIGHWAY PURPOSE: PROVIDE SECURITY AND ACCOUNTABILITY DURING FUEL DISPENSING OPERATIONS AND TO PROVIDE A SYSTEM THAT ACCURATELY RECORDS MILEAGE AND AMOUNTS OF FUEL USAGE FOR ALL EQUIPMENT. PHYSICAL DESCRIPTION: UNIT OF WORK: FUEL SITE CONTROLLER, OFFICE PRINTER, STANDARD MEMORY, PC/CRT CABLE, FUEL ISLAND TERMINAL, CARD REORDER, REMOTE PUMP, CONTROL TERMINALS, LABOR AND MATERIALS TO INSTt"%LL . DESIGN AND INSTALL JUSTIFICATION: EXISTING EQUIPMENT IS OUTDATED AND WEARING OUT. SYSTEM IS EXPERIENCING INCORRECT READINGS AND EMPLOYEES ARE SOMETIMES DELAYED WHEN ATTEMPTING TO REFUEL VEHICLES. FUEL USAGE INFORMATION IS OFTEN INCORRECT DUE TO EQUIPMENT MALFUNCTIONS. IMPACT ON OPERATING BUDGET: SOME SAVINGS DUE TO LESS DOWNTIME AND GREATER ACCOUNTABILITY, BUT NOT QUANTIFIABLE. FINANCING: $ 14,000 OTHER (1) $ 14,000 TOTAL 50 TRANSPORTATION AND PUBLIC WORDS PROJECT TITLE: PUBLIC WORKS FACILITY LOCATION: PUBLIC WORKS SITE, NORTH KINGSHIGHWAY; NORTH BROADVIEW PURPOSE: REPLACE EXISTING STRUCTURE(S) PHYSICAL DESCRIPTION: PRE-ENGINEERED METAL BUILDING, WITH APPROXIMATELY 25,000 SQ. FT INCLUDING OFFICE AREA, MAINTENANCE SHOPS AND MATERIAL/EQUIPMENT STORAGE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: COMMERCIAL DEVELOPMENT ON KINGSHIGHWAY !S RESULTING IN GROWING TRAFFIC CONGESTION AND MORE TRAFFIC CONFLICTS. VIRTUALLY ALL OPEN SPACE HAS BEEN UTILIZED WITHIN THE SITE AND INTERNAL SPACE CONGESTION HAS ALSO BECOME A PROBLEM. EXISTING MAIN BUILDING HAS MULTIPLE ROOF LEAKS; HAS SEVERAL AREAS OF MINOR AND MAJOR MASONRY JOINT CRACKING AND DISPLACEMENT; DOES NOT HAVE ADEQUATE NOR EFFICIENT HVAC -SYSTEMS; ELECTRICAL SYSTEMS ARE PATCHED TOGETHER, OUTDATED AND NOT EASILY CONTROLLED; LAYOUT OF BUILDING IS NOT FUNCTIONAL; OFFICE IS NOT ADA ACCESSIBLE; SHOPS ARE SPREAD OUT AND NOT VERY WORKABLE; SHOP ROOF HEIGHTS DO NOT ALLOW FOR INSIDE HOISTS. IMPACT ON OPERATING BUDGET: SOME SAVINGS ATTRIBUTABLE TO IMPROVED WORK AND ENERGY EFFICIENCY BUT NOT QUANTIFIABLE. FINANCING: $1,650,000 REVENUE/PFA BONDS: PENDING (C) $1,650,000 TOTAL 1-45 51 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS HEATING AND AIR CONDITIONING UNIT REPLACEMENT LOCATION: PUBLIC WORKS PURPOSE: REPLACE EXISTING HEATING AND AIR CONDITIONING UNIT IN THE MAIN OFFICE DOWNSTAIRS PHYSICAL DESCRIPTION: A 100,000 BTU 90% EFFICIENCY FURNACE AND A 2.0 TON AIR CONDITIONER UNIT OF WORK: INSTALL EQUIPMENT JUSTIFICATION: THE EXISTING HEATING UNIT IS 13 YEAR OLD. THE WALL OF THE HEAT EXCHANGER IS VERY THIN AND HAS THE POTENTIAL FOR DEVELOPING CRACKS OR HOLES WHICH WOULD ALLOW CARBON MONOXIDE TO ESCAPE DIRECTLY INTO THE OFFICE. THE AIR CONDITIONING UNIT IS THE SAME AGE AS THE FURNACE AND HAS RECENTLY BEEN IN NEED OF REPAIR. IMPACT ON OPERATING BUDGET: FINANCING: 1-46 REDUCED OPERATING COSTS MAY BE ATTAINABLE. $ 4,000 OTHER (1) S4,000 TOTAL 52 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS `STEEL ROOM" SHOP LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: PUBLIC WORKS BUILDING REBUILD "STEEL ROOM" SHOP TO PROVIDE WEATHERPROOF MATERIAL STORAGE. REBUILD ROOF STRUCTURE AND ROOFING, INSULATE SIDE WALLS, INSTALL ADEQUATE LIGHTING, REPAIR/REPLACE DOOR. DESIGN AND CONSTRUCT JUSTIFICATION: AREA CURRENTLY USED FOR MATERIAL STORAGE HAS SERIOUS ROOF LEAKS, INADEQUATE LIGHTING, AND DOOR IS NOT WEATHERPROOF. ROOM COULD BE USED AS FABRICATION BAY OR CONTAINER REPAIR AREA. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT S 15,000 OTHER (1) $ 15,000 TOTAL 53 1-47 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS CHEMICAL MATERIAL STORAGE LOCATION: PUBLIC WORKS BUILDING PURPOSE: TO PROVIDE SEGREGATED STORAGE FACILITIES FOR CHEMICAL MATERIALS, SUCH AS PESTICIDES AND HERBICIDES. PHYSICAL DESCRIPTION: SELF CONTAINED, PRE -FABRICATED, WEATHERPROOF, FIRE -RATED BUILDING. UNIT OF WORK: JUSTIFICATION: SECTION 5.12 OF THE CITY SAFETY MANUAL REQUIRES THAT CHEMICAL STORAGE NEEDS TO BE STORED PROPERLY. EXISTING STORAGE DOES NOT MEET THESE REQUIREMENTS. IMPACT ON OPERATING BUDGET: FINANCING: 1-48 NO SIGNIFICANT IMPACT $ 12,000 OTHER (1) $ 12,000 TOTAL 54 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS EQUIPMENT STORAGE SHEDS LOCATION: PUBLIC WORKS PURPOSE: TO KEEP EQUIPMENT UNDER COVER, PROTECTED FROM THE WEATHER AND VANDALISM. PHYSICAL DESCRIPTION: TWO MACHINE SHED TYPE BUILDINGS, APPROXIMATELY 160 FEET BY 30 FEET. UNIT OF WORK: JUSTIFICATION: VEHICLES AND EQUIPMENT WHICH ARE STORED OUTSIDE EXPOSED TO WEATHER DETERIORATE FASTER AND ARE SUSCEPTIBLE TO MORE MECHANICAL PROBLEMS; SNOW AND ICE CAUSE DELAYS WHILE EQUIPMENT IS THAWING AND WARMING UP; EXPOSED EQUIPMENT IS SUSCEPTIBLE TO VANDALISM. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 60,000 OTHER (1) $ 60,000 TOTAL 55 1-49 TRANSPORTATION AND PUBLIC WORKS PROJECT TITLE: PUBLIC WORKS MATERIAL STORAGE FACILITY LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: I M PACT ON OPERATING BUDGET: FINANCING: 1-50 PUBLIC WORKS TO PROVIDE COVERED STORAGE FOR THE MATERIAL PILES AND CONTROL STORMWATER RUNOFF. WOOD FRAMED BUILDING AND FOUNDATION WITH CONTAINMENT DIKE TO PROTECT MATERIAL FROM WEATHER AND CONTROL STORMWATER RUNOFF. DESIGN AND CONSTRUCT MATERIALS THAT ARE EXPOSED TO WEATHER START TO CAKE AND CLUMP AND BECOME DIFFICULT TO USE. NO SIGNIFICANT IMPACT $ 60,000 $ 60,000 56 OTHER (1) TOTAL &NVIRONMENT CAPITAL IMPROVEMENTS PROGRAM 28,000,000 24,000,000 20,000,000 16,000,000 12,000,000 8,000,000 4,000,000 1997-98 1998-99 1999-00 2000-01 2001-02 57 ENVIRONMENT PROPOSED PROJECTS PROJECT 1997-98 1998-99 1999-00 2000-01 2001-02 NUMBER IMPROVEMENT ITEM 1 TOTAL COST FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR 2-1 Cape La Croix Creek/Walker $ 1,730,000 $ 1,185,000 $ 132,000 $ 377,000 S 36,000 Branch Flood Control Project B B B B B 2-2 Upper Cape La Croix- S 897,000 $ 897,000 Detention Trunk Sewer B,D,F B,D,F SUBTOTAL - CORPS $ 2,627,000 $ 2,082,000 $ 132,000S 377,000 $ 36,000 PROJECT 3''' Combined Sewer $10,369,000 $ 7,722,000 $ 2,647,000 Segregation B B B Mississippi River Lift $ 5,262,000 $ 5,262,000 3 Stations Replacement- 6 B Renovation =5 West Side Relief Sewer $ 1,573,000 $ 1,573,000 6 B ' H Sloan Creek Relief/Extension $ 3,400,000 $ 3,400,000 Sewer B B i 27<<': South Ramsey Branch Lift $ 1,109,000 $ 1,109,000 Station/Extension Sewer B B 2-8 Meadowbrook Sewer District $ 108,800 $ 20,500 S 88,300 G G G 2-9 Clark Avenue Relief Sewer $ 257,400 S 257,400 B B 2-10 Lakeshore Drive Sewer $ 123,500 $ 123,500 District G G 2-11 S. Kingshighway Sewer $ 94,900 $ 94,900 I District G G A GENERAL FUND B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTS/LOANS E MOTOR FUEL TAX F FED. GRANTS/LOANS G SPEC. ASSESSMENTS H CAP. IMP. SALES TAX I OTHER J GEN. OBL. BONDS: PENDING K TRANS. SALES TAX Projects included in Sewer Revenue Bond Issue supported by a 1/4% capital improvement sales tax extension for 20 years approved by vote on April 5, 1994. 58 ENVIRONMENT PROPOSED PROJECTS PROJECT 1997-98 1998-99 1999-00 2000-01 2001-02 NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR 2-12 Technology Park Sewer $ 28,100 $ 28,100 District G G i I 2-13 Wastewater System SCADA $ 30,600 $ 10,000 $ 10,000 S 10,000 Upgrade I 1 2-14 Wastewater Standby Power $ 54,900 S 54,900 I at Bouldercrest & I I Stonebridge Lift Stations 2-15 Wastewater Backflow $ 15,000 $ 15,000 1 Prevention Valves & Building I I 2-16 Wastewater Bar Screen $ 40,000 $ 40,000 Building I I 2-17 Wastewater Standby Power$ 521,500 $ 521,500 I I Generator 1 i 1 I I 1 j 7 � 2-18 Wastewater Standby Power $ 46,700 $ 46,700 at Clarkton Place & Airport I I Lift Stations I 2-19 Wastewater Plant Trickling $ 984,400 $ 984,400 Filter Rehabilitation C C 2-20 Wastewater Standby Power $ 31,000 $ 31,000 I j I► j at 1-55 Lift Station I I 2-21 Replacement of South Screw $ 110,000 $ 110,000 Pump at Wastewater Plant I I 2-22 Replacement of North Screw $ 110,000 $ 110,000 Pump at Wastewater Piant I ( I 2-23 Ramsey Branch Trunk Sewer $ 2,276,800 S2,276,800 I I Option C C SUBTOTAL - SEWER $26,546,000 S17,478,100 I $ 7,822,500 $ 1,025,400 $ 110,000 S 110,000 I PROJECTS a GENERAL FUND FEV/PFA BONDS: ISSUED REV/PFA BONDS: PENDING D STATE GRANTS/LOANS MOTOR FUEL TAX FED. GRANTSILOANS SPEC. ASSESSMENTS i CAP. IMP. SALES TAX I OTHER J GEN. OBL. BONDS: PENDING TRANS. SALES TAX 59 ENVIRONMENT PROPOSED PROJECTS Ij PROJECT NUMBER IMPROVEMENT ITEM TOTAL COST 1997-98 FISCAL YEAR 1998-99 FISCAL YEAR 1999-00 FISCAL YEAR 2000-01 FISCAL YEAR 2001-02 FISCAL YEAR 2-24 Extension of Transfer Station Tipping Floor & B!dg. S 64,700 I S 64,700 I 75,000 Improvements Program I 2-25 Solid Waste Machine Storage Building S 62,600$ I 6DQ 62,600 I C C 2-26 Recycling Drop Off Facility S 17,700 I I S 17,700 I I i $ 375,000 $ SUBTOTAL - SOLID WASTE PROJECTS $ 145,000 1 $ 145,000 A B C D E F G H I J K GENERAL FUND REV/PFA BONDS: ISSUED REV/PFA BONDS: PENDING STATE GRANTS/LOANS MOTOR FUEL TAX FED. GRANTS/LOANS SPEC. ASSESSMENTS CAP. IMP. SALES TAX OTHER GEN. OBL. BONDS: PENDING TRANS. SALES TAX Projects totally, or partially included in Water Revenue Bond Issue supported by a t/a% sales tax for 20 years approved by vote on November 5, 1996. 60 Water Distribution S 345,000 $ e5,000 $ 65,000 $ 65,000 $ 75,000 $ 75,000 Improvements Program C C 1 C C C 1 C I Water Development/Main $ 375,000 $ 75,000 $ 75,000 $ 75,000 5 75,000 $ 75,000 Extensions C C C C C C Two -Inch Water Main/ $ 875,000 $ 175,000 S 175,000 $ 175,000 $ 175,000 $ 175,000 I Service Replacement C C C C C C Program .�( Two -Inch Water Main $ 1,000,000 $ 100,000 $ 225,000 $ 225,000 $ 225,000 $ 225,000 ; Replacement (Contract C C C C C C F Program) 2-31 Water Meter Replacement $ 250,000 $ 50,000 $ 50,000 5 50,000 $ 50,000 $ 50,000 i Program I I I I I I 1 Water Storage Tank $ 260,000 $ 65,000 $ 65,000 $ 65,000 $ 65,000 Rehabilitation (Four Tanks) C C C C C 1 < Water System Seismic $ 143,000 $ 143,000 Protection C C !� Expand and Rehab Cape $17,880,000 $ 4,615,000 $ 8,660,000 $ 4,605,000 I , Rock Water Plant No. 1 C C C C A B C D E F G H I J K GENERAL FUND REV/PFA BONDS: ISSUED REV/PFA BONDS: PENDING STATE GRANTS/LOANS MOTOR FUEL TAX FED. GRANTS/LOANS SPEC. ASSESSMENTS CAP. IMP. SALES TAX OTHER GEN. OBL. BONDS: PENDING TRANS. SALES TAX Projects totally, or partially included in Water Revenue Bond Issue supported by a t/a% sales tax for 20 years approved by vote on November 5, 1996. 60 ENVIRONMENT A GENERAL FUND 6 REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING ED STATE GRANTSILOANS E MOTOR FUEL TAX F FED.GRANTS/'_OANS =3 SPEC. ASSESSMENTS ,-I CAP. IMP. SALES TAX OTHER J GEN. OBL. BONDS: PENDING K TRANS. SALES TAX ..................... ..................... ..................... Projects totally, or partially included in Water Revenue Bond Issue supported by a 1/4% sales tax for 20 years approved by vote o7 November 5, 1996. 61 PROPOSED PROJECTS j j PROJECT 1997-98 1998-99 1999-00 2000-01 2001-02 NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR Water Pumping Station/Vault $ 100,000 $ 700,000 Retrofit C C Lexington/Melody Lane $ 163,000 $ 163,000 Water Extension G C I North Sprigg Water $ 146,200 $ 146,200 I Extension C,G CIG f Meadowbrook Water $ 75,500 I $ 75,500 I Extension G G ? ; Upgrade Existing Water $ 27,000 $ 27,000 X.:? SCADA System C C Electrical Supply Voltage/ $ 10,000 $ 10,000 Amp Monitoring C C .`•?'A1>F Water Plant No. 2 Sludge $ 146,300 $ 146,300 System C C i I .J Mt. Auburn Corridor Water $ 876,000 $ 576,000 i i is Dist. Main Augmentation C C Meadowbrook Storage/ $ 704,000 S 704,000 I Perryville Road Transmission C C Water Main Augmentation Elevated Water Storage Tank $ 229,500 ( $ 229,500 C i C 20 -Inch Main Project (East $ 700,000 $ 700,000 1 f Cape Rock Drive) C C I 16 -Inch Main Project S 650,000 $ 650,000 (Bertling Street) C C i i A GENERAL FUND 6 REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING ED STATE GRANTSILOANS E MOTOR FUEL TAX F FED.GRANTS/'_OANS =3 SPEC. ASSESSMENTS ,-I CAP. IMP. SALES TAX OTHER J GEN. OBL. BONDS: PENDING K TRANS. SALES TAX ..................... ..................... ..................... Projects totally, or partially included in Water Revenue Bond Issue supported by a 1/4% sales tax for 20 years approved by vote o7 November 5, 1996. 61 ENVIRONMENT F_ PROPOSED PROJECTS PROJECT 1997-98 1998-99 1999-00 2000-01 2001-02 NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR ?Z<57' Fire Hydrant Replacement S 500,000 S 100,000 5 100,000 $ 100,000 S 100,000 5 100,000 C C C C C I C 2-48 Mt. Auburn/Siemers Main $ 600,000 S 600,000 Upgrade (Proposed North C C Loop) 2-49 South Plant -Nash Road $ 615,000 $ 615,000 ( I Potable Water Main C,D C,D SUBTOTAL- WATER $26,670,500 510,191,000 $ 9,425,000 $ 5,360,000 $ 994,500 $ 700,000 PROJECTS 2-49 Middle Street Storm $ 184,800 $ 184,800 Drainage Project H H 2-50 Cape Meadows Stormwater $ 14,200 $ 14,200 Flume Construction H H 2-51 Kingshighway/Commercial $ 62,000 $ 62,000 1 Channel Construction & H H Ditch Cleaning SUBTOTAL - STORMWATER $ 261,000 $ 14,200 5 246,800 PROJECTS i TOTALS $56,249,500 $29,910,300 517,626,300 S6,762,400 $ 1,140,500 $ 8101000 f i A GENERAL FUND B REV/PFA BONDS: ISSUED $24,260,400 $16,559,400 S7,288,000 $ 377,000 S '36,000 C REV/PFA BONDS: PENDING $28,819,300 $11,555,400 $ 9,375,000 $ 6,294,400 S 944,500 S 650,000 D STATE G13ANTSILOANS S 625,000 S 625,000 E MOTOR FUEL TAX j F FED. GRANTS/LOANS S 212,000 $ 212,000 I G SPEC. ASSESSMENTS $ 717,700 $ 629,400 S 68,300 H CAP. IMP. SALES TAX S 261,G00 $ 14,200 S 246,800 1 OTHER $ 1,354,100 $ 314,900 $ 623,200 S 91,000 $ 150,000 5 160,000 J GEN. OBL. BONDS: PENDING 1 K TRANS. SALES TAX 1i Projects totally, or partially included in Water Revenue Bond Issue supported by a 1/4% sales tax for 20 years approved by vote on November 5, 1996. 62 ENVIRONMENT PROJECT TITLE: CAPE LA CROIX CREEK/WALKER BRANCH FLOOD CONTROL PROJECT LOCATION: CAPE LA CROIX CREEK AND WALKER BRANCH PURPOSE: TO REDUCE FLOODING IN PROJECT AREAS PHYSICAL DESCRIPTION: THREE MILES OF STREAM CHANNELIZATION; 157 - ACRE DETENTION FACILITY; PARK AND RECREATION FACILITIES. UNIT OF WORK: ACQUIRE RIGHT-OF-WAY AND CONSTRUCT JUSTIFICATION: FLOODING IN THE CAPE LA CROIX CREEK/WALKER BRANCH WATERSHED HAS CAUSED SERIOUS DAMAGE TO PROPERTY AND ENDANGERED THE LIVES OF CAPE GIRARDEAU CITIZENS, AND THIS HAZARD WILL CONTINUE UNLESS MITIGATED. IMPACT ON OPERATING BUDGET: ADDITIONAL PERSONNEL AND MAINTENANCE EQUIPMENT WILL BE REQUIRED FOR MAINTENANCE OF THESE FACILITIES. FINANCING: $ 1,730,000 REVENUE/PFA BONDS: ISSUED (B) $ 1,730,000 TOTAL NOTE: INCLUDES REMAINING LOCAL SPONSOR (CITY) SHARE ONLY. BRIDGE RELOCATION REQUIRED FOR THIS PROJECT IS SHOWN IN TRANSPORTATION SECTION. 2-1 63 2-2 ENVIRONMENT PROJECT TITLE: UPPER CAPE LA CROIX - DETENTION TRUNK SEWER LOCATION: ROUTE W TO AND THROUGH CORPS OF ENGINEERS' PROJECT DETENTION AREA PURPOSE: TO EXTEND SEWER SERVICE TO NORTHWEST PART OF CITY AND ROUTE W MOBILE HOME PARK PHYSICAL DESCRIPTION: CONSTRUCTION OF APPROXIMATELY 1.9 MILES OF SANITARY TRUNK SEWER UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: WILL EXTEND CITY SEWER SERVICE IN NORTHWEST PART OF CITY AND ELIMINATE SEWAGE LAGOONS AT THE ROUTE W MOBILE HOME PARK. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 560,000 REVENUE/PFA BONDS: ISSUED (B) $ 125,000 STATE GRANTS/LOANS (D) $ 212,000 FEDERAL GRANTS/LOANS (CORPS OF ENG.) (F) $ 897,000 TOTAL 64 ENVIRONMENT PROJECT TITLE: COMBINED SEWER SEGREGATION LOCATION: COLLEGE-HENDERSON NORTH, MAIN, AND FORT D DRAINAGE BASINS (EAST -CENTRAL PART OF CITY) PURPOSE: SEGREGATE COMBINED STORMWATER AND SANITARY SEWER FLOWS PHYSICAL DESCRIPTION: CONSTRUCTION OF NEW SANITARY SEWER LINES WITH APPURTENANCES. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: COMBINED SEWERS ARE CREATING OVERFLOW PROBLEMS, OVERSTRESSING PUMPING AND TREATMENT FACILITIES, AND CREATING ENVIRONMENTAL PROBLEMS. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE, ADDITIONAL PERSONNEL AND MAINTENANCE EQUIPMENT MAY BE REQUIRED. FINANCING: $10,369,000 REVENUE/PFA BONDS: ISSUED (B) $10,369,000 TOTAL 2-3 65 2-4 ENVIRONMENT PROJECT TITLE: MISSISSIPPI RIVER LIFT STATIONS/ REPLACEMENT - RENOVATION LOCATION: ALONG MISSISSIPPI RIVER FROM SLOAN CREEK AREA TO FORT D AREA. PURPOSE: UPGRADE FOUR EXISTING LIFT STATIONS AND CONSTRUCT A NEW PRIMARY FORCE MAIN PHYSICAL DESCRIPTION: REPLACE/RENOVATE LIFT STATIONS 1, 2, 3 AND 4 AND CONSTRUCT APPROXIMATELY 8,200 FEET OF PARALLEL FORCE MAIN FROM MILL STREET TO GIBONEY STREET. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: EXISTING LIFT STATIONS ARE APPROACHING 30 YEARS OLD AND ARE OUTMODED IN TERMS OF STRUCTURAL INTEGRITY, CAPACITIES, AND AGE OF EQUIPMENT. THE FORCE MAIN IS NEEDED TO REDUCE FRICTION LOSSES AND IMPROVE CAPACITY. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE. SOME REDUCTION IN OPERATING EXPENSE MAY BE ANTICIPATED. FINANCING: $ 5,262,000 REVENUE/PFA BONDS: ISSUED (B) $ 5,262,000 TOTAL 66 ENVIRONMENT PROJECT TITLE: WEST SIDE RELIEF SEWER LOCATION: SOUTH OF BRINK STREET ALONG CAPE LA CROIX CREEK TO WEST END BOULEVARD PURPOSE: TO RELIEVE SURCHARGING ON THIS SECTION OF TRUNK SEWER LINE. PHYSICAL DESCRIPTION: REPLACE A SEGMENT OF 21 -INCH DIAMETER PIPE WITH 36 -INCH DIAMETER PIPE APPROXIMATELY 5,000 FEET IN LENGTH. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: RELIEVE UPSTREAM SURCHARGING PROBLEMS AND PROVIDE CAPACITY FOR FUTURE GROWTH GENERATED BY THE EXTENSION OF UPSTREAM TRUNK LINES. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATED EXPENSE FINANCING: $ 1,573,000 REVENUE/PFA BONDS: ISSUED (B) $ 1,573,000 TOTAL 2-5 67 2-6 ENVIRONMENT PROJECT TITLE: SLOAN CREEK RELIEF/EXTENSION SEWER LOCATION: SLOAN CREEK FROM NEAR MISSISSIPPI RIVER TO VICINITY OF LEXINGTON AVENUE PURPOSE: RELIEVE OVERLOADED EXISTING SEWERS AND PROVIDE FOR FUTURE GROWTH. PHYSICAL DESCRIPTION: APPROXIMATELY 9,300 FEET OF 15 -INCH TO 24 - INCH RELIEF SEWER LINE AND APPROXIMATELY 5,600 FEET OF TRUNK SEWER EXTENSION. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: EXISTING TRUNK SEWER IS SURCHARGED AT PEAK FLOW. CONSTRUCTION OF RELIEF SEWER AND EXTENSION WILL PROVIDE SEWER SERVICE TO AN AREA PRESENTLY UNSERVED. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 3,400,000 REVENUE/PFA BONDS: ISSUED (B) $ 3,400,000 TOTAL .: ENVIRONMENT PROJECT TITLE: SOUTH RAMSEY BRANCH LIFT STATION/ EXTENSION SEWER LOCATION: SOUTH RAMSEY BRANCH (INTERSTATE 55 - HIGHWAY 74 - MEADOWBROOK AREA) PURPOSE: PROVIDE SEWER SERVICE TO PREVIOUSLY UNSERVED AREA PHYSICAL DESCRIPTION: APPROXIMATELY 8,600 FEET OF GRAVITY AND FORCE MAIN SEWER WITH ONE LIFT STATION UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: WILL EXTEND SEWER SERVICE TO UNSERVED AREA AT FAR SOUTH END OF RAMSEY BRANCH. WILL RELIEVE EXISTING ENVIRONMENTAL PROBLEMS IN THIS AREA AND PROVIDE FOR ADDITIONAL DEVELOPMENT. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION AND OPERATIONAL EXPENSE FINANCING: $ 1,109,000 REVENUE/PFA BONDS: ISSUED (B) $ 1,109,000 TOTAL 2-7 w ENVIRONMENT PROJECT TITLE: MEADOWBROOK SEWER DISTRICT LOCATION: HIGHWAY 74 AND MEADOWBROOK LANE AREA PURPOSE: TO PROVIDE SEWER SERVICE TO MEADOWBROOK AREA PHYSICAL DESCRIPTION: LATERAL SANITARY SEWER LINES AND DISTRICT LIFT STATION UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: AREA CURRENTLY ON PRIVATE SEPTIC SYSTEMS. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION AND OPERATIONAL EXPENSE. FINANCING: $ 108,800 SPECIAL ASSESSMENTS (G) $ 108,800 TOTAL 70 ENVIRONMENT PROJECT TITLE: CLARK AVENUE RELIEF SEWER LOCATION: ADJACENT TO WALKER BRANCH FROM PERRYVILLE ROAD TO PARKSITE DRIVE PURPOSE: TO RELIEVE SURCHARGING ON THIS SECTION OF TRUNK SEWER LINE. PHYSICAL DESCRIPTION: APPROXIMATELY 2,500 FEET OF 15 -INCH DIAMETER SANITARY SEWER LINE. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: RELIEVE EXISTING OVERLOAD AND PERMIT COMPLETE DEVELOPMENT OF THE DRAINAGE BASIN. PERMIT WIDENING OF WALKER BRANCH TO REDUCE FLOODING. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 257,400 REVENUE/PFA BONDS: ISSUED (B) $ 257,400 TOTAL 2-S 71 2-10 ENVIRONMENT PROJECT TITLE: LAKESHORE DRIVE SEWER DISTRICT LOCATION: LAKESHORE DRIVE NEAR PERRYVILLE ROAD PURPOSE: PROVIDE SEWER SERVICE TO PREVIOUSLY UNSERVED AREA. PHYSICAL DESCRIPTION: APPROXIMATELY 4,780 FEET OF SANITARY SEWER AND APPURTENANCES. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: REPLACEMENT OF SEPTIC SYSTEMS IN RESIDENTIAL AREA. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: Y 123,500 SPECIAL ASSESSMENTS (G) $ 123,500 TOTAL 72 ENVIRONMENT PROJECT TITLE: SOUTH KINGSHIGHWAY SEWER DISTRICT LOCATION: BOTH SIDES OF HIGHWAY 61 SOUTH FROM SOUTHERN EXPRESSWAY TO DRAINAGE DIVIDE. PURPOSE: PROVIDE SEWER SERVICE TO PREVIOUSLY UNSERVED AREA. PHYSICAL DESCRIPTION: APPROXIMATELY 1,680 FEET OF SANITARY SEWER AND APPURTENANCES UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: REPLACEMENT OF SEPTIC SYSTEMS IN RESIDENTIAL AND COMMERCIAL/INDUSTRIAL AREAS. IMPACT ON OPERATING BUDGET: FINANCING: INCREASED DEPRECIATION EXPENSE $ 94,900 SPECIAL ASSESSMENTS (G) $ 94,900 TOTAL 73 2-11 ENVIRONMENT PROJECT TITLE: TECHNOLOGY PARK SEWER DISTRICT LOCATION: FROM ACCESS STREET TO SOUTHERN EXPRESSWAY PURPOSE: PROVIDE ADDITIONAL SEWER SERVICE AND ELIMINATE THE "GERHARDT INDUSTRIAL PARK" LIFT STATION. PHYSICAL DESCRIPTION: APPROXIMATELY 1,200 FEET OF SANITARY SEWER AND APPURTENANCES UNIT OF WORK: ACQUIRE EASEMENTS AND CONSTRUCT JUSTIFICATION: REDUCE MAINTENANCE COST OF SEWER SYSTEM, ELIMINATE A FEW RESIDENTIAL AND COMMERCIAL SEPTIC TANKS, PROVIDE SEWER SERVICE TO ADDITIONAL AREA. IMPACT ON OPERATING BUDGET: FINANCING: 2-12 DECREASE IN OPERATING EXPENSE $ 28,100 SPECIAL ASSESSMENTS (G) $ 28,100 TOTAL 74 ENVIRONMENT PROJECT TITLE: WASTEWATER SYSTEM SCADA UPGRADE LOCATION: ALL WASTEWATER LIFT STATIONS EXCEPT NUMBERS 1, 2, 3 & 4 PURPOSE: TO MONITOR THE LIFT STATIONS PHYSICAL DESCRIPTION: A WIRELESS SYSTEM THAT INCLUDES THE MASTER CONTROLLER AT THE TREATMENT PLANT, AND REMOTE UNITS SUCH AS PLC'S AT EACH LIFT STATION. UNIT OF WORK: INSTALL MASTER CONTROLLER, PLC'S AND THE NETWORK OF ANTENNAS WHICH WOULD CONNECT THE SYSTEM TOGETHER. JUSTIFICATION: A TELEPHONE LINE CHARGE EACH MONTH IS ELIMINATED. MORE RELIABLE SYSTEM OF MONITORING OVER THE PRESENT TELEPHONE LINES. MORE MONITORING CAPABILITIES AVAILABLE WITH SCADA. AS THE LIFT STATIONS IN THE CSO PROJECT ARE REPLACED, WILL REQUIRE SCADA SYSTEMS TO BE INSTALLED (LIFT STATIONS NUMBERED ONE THROUGH FOUR). IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 30,000 OTHER (OPERATIONS) (1) $ 30,000 TOTAL NOTE: SCADA = SUPERVISORY CONTROL AND DATA ACQUISITION. 2-13 75 2-14 ENVIRONMENT PROJECT TITLE: WASTEWATER STANDBY POWER AT BOULDER CREST AND STONEBRIDGE LIFT STATIONS LOCATION: BOULDER CREST AND STONEBRIDGE LIFT STATIONS PURPOSE: PROVIDE BACK-UP POWER FOR LIFT STATION PUMPING IN CASE OF A POWER FAILURE. PHYSICAL DESCRIPTION: GENERATORS, PADS, CONTROL PANELS, FENCE AND GAT E, INSTALLATION OF EQUIPMENT. UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: LIFT STATIONS CURRENTLY BYPASS RAW SEWAGE WHEN POWER FAILS. I M PACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 54,900 OTHER (i) $ 54,900 TOTAL 76 ENVIRONMENT PROJECT TITLE: WASTEWATER BACKFLOW PREVENTION VALVES AND BUILDING LOCATION: WASTEWATER TREATMENT PLANT PURPOSE: REPLACE PRESENT BACKFLOW PREVENTION DEVICE. PHYSICAL DESCRIPTION: INSTALL TWO PARALLEL BACKFLOW PREVENTION VALVES WITH BUILDING TO HOUSE THEM. VALVES AND BUILDING WILL HAVE TO BE ELEVATED. UNIT OF WORK: DESIGN, INSTALL AND CONSTRUCT JUSTIFICATION: THE PRESENT BACKFLOW PREVENTION VALVE IS 20 YEARS OLD AND NEEDS TO BE REPLACED FOR PROTECTION AGAINST BACKFLOW OCCURRING. TWO DEVICES WILL BE NEEDED. ONE AS A BACKUP WHILE THE OTHER VALVE IS BEING CHECKED. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 15,000 OTHER (I) $ 15,000 TOTAL 77 2-15 ENVIRONMENT PROJECT TITLE: WASTEWATER PLANT BAR SCREEN BUILDING LOCATION: WASTEWATER TREATMENT PLANT PURPOSE: TO PROTECT THE BAR SCREENS FROM THE WEATHER. PHYSICAL DESCRIPTION: BUILDING APPROXIMATELY 161/2 FEET BY 25 FEET BY 141/2 FEET IN HEIGHT. BUILDING WILL NEED HEATING, INSULATION, VENTILATION, LIGHTING, HOIST AND DEHUMIDIFIER. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THE HYCOR BAR SCREENS SIT UP ON THE INLET STRUCTURE AND ARE EXPOSED TO THE WEATHER. WATER IS ALSO SUPPLIED TO THEM AND THIS SUPPLY NEEDS TO BE PROTECTED FROM FREEZING TO KEEP THE SYSTEM FUNCTIONING PROPERLY. IMPACT ON OPERATING BUDGET: FINANCING: 2-16 NO SIGNIFICANT IMPACT $ 40,000 OTHER (1) $ 40,000 TOTAL 78 ENVIRONMENT PROJECT TITLE: WASTEWATER STANDBY POWER GENERATOR LOCATION: WASTEWATER TREATMENT PLANT PURPOSE: PROVIDE ELECTRICITY FOR TREATMENT PLANT OPERATIONS IN CASE OF A UNION ELECTRIC POWER FAILURE. PHYSICAL DESCRIPTION: 12.47 KV, 1 100 KW DIESEL GENERATING STATION; 5000 GALLON UNDERGROUND FUEL TANK AND PUMP WITH AUTOMATIC CONTROLS. INCLUDES AUTOMATIC SWITCH GEAR EQUIPMENT. UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: NEED FOR A SECOND POWER SOURCE FOR THE PLANT. IN THE NEAR FUTURE, ANY BYPASS OF RAW SEWAGE INTO THE MISSISSIPPI RIVER WILL NOT BE PERMITTED. PLANT CURRENTLY BYPASSES WHEN THERE IS A POWER FAILURE. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 521,500 OTHER (1) $ 521,500 TOTAL 79 2-17 2-18 ENVIRONMENT PROJECT TITLE: WASTEWATER STANDBY POWER AT CLARKTON PLACE AND AIRPORT LIFT STATIONS LOCATION: CLARKTON PLACE AND CAPE GIRARDEAU REGIONAL AIRPORT LIFT STATIONS PURPOSE: PROVIDE BACK-UP POWER FOR LIFT STATION PUMPING IN CASE OF A POWER FAILURE. PHYSICAL DESCRIPTION: GENERATORS, PADS, CONTROL PANELS, FENCE AND GATE, INSTALLATION OF EQUIPMENT. UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: LIFT STATIONS CURRENTLY BYPASS RAW SEWAGE WHEN POWER FAILS. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 46,700 OTHER (1) $ 46,700 TOTAL 80 ENVIRONMENIT PROJECT TITLE: WASTEWATER PLANT TRICKLING FILTER REHABILITATION LOCATION: WASTEWATER TREATMENT PLANT PURPOSE: REHABILITATION OF THE TREATMENT FACILITY AT THE PLANT. PHYSICAL DESCsR!PTIOir!: REPLACEMENT OF OXIDATION MEDIA, CORRUGATED FIBERGLASS WALL PANELS, SOME INTERIOR STRUCTURAL BEAMS WITH FIBERGLASS BEAMS, AND REPAINTING STRUCTURAL STEEL. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO IMPROVE AND BRING BACK UP TO FUNCTIONAL AND VISUAL STANDARDS, AS CAUSED BY WEAR AND TEAR DUE TO OPERATION, OTHER MAINTENANCE, AND WEATHERING. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 984,400 REVENUE/PFA BONDS: PENDING (C) $ 984,400 TOTAL 2-19 81 2-20 ENVIRONMENT PROJECT TITLE: WASTEWATER STANDBY POWER AT 1-55 LIFT STATION LOCATION: 1-55 LIFT STATION PURPOSE: PROVIDE BACK-UP POWER FOR LIFT STATION PUMPING IN CASE OF A POWER FAILURE. PHYSICAL DESCRIPTION: GENERATORS, PADS, CONTROL PANELS, FENCE AND GATE, INSTALLATION OF EQUIPMENT UNIT OF WORK: DESIGN AND INSTALL .JUSTIFICATION: LIFT STATION CURRENTLY BYPASSES RAW SEWAGE WHEN POWER FAILS. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 31,000 OTHER (1) $ 31,000 TOTAL 82 ENVIRONMENT PROJECT TITLE: REPLACEMENT OF SOUTH SCREW PUMP AT WASTEWATER PLANT LOCATION: WASTEWATER TREATMENT PLANT PURPOSE: TO REPLACE A SCREW PUMP THAT IS 20 YEARS OLD. PHYSICAL DESCRIPTION: SIX-FOOT DIAMETER SPIRAL SCREW PUMP BY 60 FEET LONG. ALSO WOULD INCLUDE BEARINGS, SEALS, AND ETC. UNIT OF WORK: INSTALLATION JUSTIFICATION: THE SCREW PUMPS IN PLACE NOW ARE 20 YEARS OLD. THE EDGES ARE WORN DOWN AND THE PUMPS THEMSELVES HAVE BEEN SANDBLASTED AND RECOATED ONCE ALREADY. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 1 10,000 OTHER (1) $ 110,000 TOTAL =. 2-21 ENVIRONMENT PROJECT TITLE: REPLACEMENT OF NORTH SCREW PUMP AT WASTEWATER PLANT LOCATION: WASTEWATER TREATMENT PLANT PURPOSE: TO REPLACE A SCREW PUMP THAT IS 20 YEARS OLD. PHYSICAL DESCRIPTION: SIX-FOOT DIAMETER SPIRAL SCREW PUMP BY 60 FEET LONG. ALSO WOULD INCLUDE BEARINGS, SEALS, AND ETC. UNIT OF WORK: INSTALLATION JUSTIFICATION: THE SCREW PUMPS IN PLACE NOW ARE 20 YEARS OLD. THE EDGES ARE WORN DOWN AND THE PUMPS THEMSELVES HAVE BEEN SANDBLASTED AND RECOATED ONCE ALREADY. IMPACT ON OPERATING BUDGET: FINANCING: 2-22 NO SIGNIFICANT IMPACT $ 110,000 OTHER (1) $ 110,000 TOTAL 84 ENVIRONMENT PROJECT TITLE: RAMSEY BRANCH TRUNK SEWER OPTION LOCATION: RAMSEY BRANCH, ROUTE K TO NEAR 74/1-55 INTERCHANGE PURPOSE: PROVIDE TRUNK SEWER SERVICE TO THE MIDDLE REACH OF THE RAMSEY BRANCH WATERSHED. PHYSICAL DESCRIPTION: APPROXIMATELY 14,000 LINEAL FEET OF 15 -INCH TO 27 -INCH TRUNK SEWER LINE. UNIT OF WORK: DESIGN AND CONSTRUC T JUSTIFICATION: THE SEWER MASTER PLAN (1991) ENVISIONED THIS PROJECT ASA RECOMMENDED 10 -YEAR IMPROVEMENT, WITH THE LINE SIZED FROM 15 - INCH NEAR ROUTE K TO 27 -INCH NEAR 1-55. IT HAS BEEN PROPOSED THAT THIS LINE, OR AN ALTERNATIVE LINE ALL OF 15 -INCH DIAMETER BE CONSTRUCTED IN LIEU OF CONSTRUCTING THE LIFT STATION AND FORCE MAIN REQUIRED TO SERVE THE TWIN LAKES SUBDIVISION. TIME AND FINANCING CONSTRAINTS MAY HINDER DEVELOPMENT OF THIS OPTION PRIOR TO CONSTRUCTION OF THE TWIN LAKES SEWER PROJECT, WHICH CURRENTLY INCLUDES A LIFT STATION AND FORCE MAIN ON ROUTE K. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 2,276,800 REVENUE/PFA BONDS: PENDING (C) $ 2,276,800 TOTAL 2-23 85 2-24 ENVIRONMENT PROJECT TITLE: EXTENSION OF TRANSFER STATION TIPPING FLOOR AND BUILDING LOCATION: SOLID WASTE TRANSFER STATION PURPOSE: TO INCREASE LOADING AND TONNAGE CAPACITY TO MEET DNR REGULATIONS. PHYSICAL DESCRIPTION: EXTENSION OF BUILDING AND TIPPING FLOOR. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: INCREASED LOADING AND HANDLING FACILITIES ARE NEEDED TO MEET DNR REGULATIONS. TH!S INCLUDES TRASH CONTAINMENT RUN-OFF CONTROL, AND OPERATIONAL AND CUSTOMER SAFETY. IMPACT ON OPERATING BUDGET: SOME SAVINGS SHOULD RESULT FROM MORE EFFICIENT OPERATIONS. FINANCING: $ 64,700 OTHER (1) $ 64,700 TOTAL 86 ENVIRONMENT PROJECT TITLE: SOLID WASTE MACHINE STORAGE BUILDING LOCATION: SOLID WASTE TRANSFER STATION PURPOSE: TO STORE THE HI -LIFT, BACKHOE, AND ROLL -OFF CONTAINER TRUCKS. PHYSICAL DESCRIPTION: 45 -FOOT BY 54 -FOOT BY 14 -FOOT POLE BUILDING WITH A CONCRETE FLOOR, INSULATED, WITH A 24 -FOOT END SLIDE DOOR. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: TO ALLOW INSIDE STORAGE OF THE TRANSFER STATION EQUIPMENT. THIS WOULD ALSO PROVIDE THE MECHANICS WITH AN AREA TO MAKE REPAIRS ON THE EQUIPMENT. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 62,600 OTHER (1) $ 62,600 TOTAL gm 2-25 ENVIRONMENT PROJECT TITLE: RECYCLING DROP OFF FACILITY LOCATION: PUBLIC WORKS SITE, NORTH BROADVIEW PURPOSE: TO PROVIDE A DRIVE-THROUGH SEMI -CIRCLE FROM BROADVIEW FOR DROP OFF. PHYSICAL DESCRIPTiON: A PAVED DRIVE-THROUGH AREA WITH PAVED AREAS FOR THE CONTAINERS TO SIT ON, NEVA/ FENCING AND GATES, AND AN OPEN -SIDED SHELTER TO PROTECT CUSTOMERS FROM THE WEATHER. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THIS WOULD PROVIDE A BETTER SERVICE TO THE PUBLIC AND LIMIT PUBLIC ACCESS ONTO CITY PROPERTY. SAFETY IS THE PRIMARY CONCERN WITH CITY AND PRIVATE TRAFFIC BEING IN THE SAME AREA. IMPACT ON OPERATING BUDGET: FINANCING: 2-26 NO SIGNIFICANT IMPACT $ 17,700 OTHER (1) 8 17,700 TOTAL ENVIRONMENT PROJECT TITLE: WATER DISTRIBUTION IMPROVEMENTS PROGRAM LOCATION: DISTRIBUTION MAINS - CITY WIDE PURPOSE: INSTALL NEW MAIN PIPES CONNECTING EXISTING MAINS SO THAT FIRE FLOWS, PRESSURE, AND WATER QUALITY ARE IMPROVED. ALSO REPLACE EXISTING PIPES AND HYDRANTS AS REQUIRED OTHER THAN ROUTINE REPAIRS. THIS INCLUDES RELOCATING FACILITIES FOR STATE PROJECTS WHERE NECESSARY. PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: INSTALL PIPING AS REQUIRED DEPENDING ON EXISTING LOCATIONS AND CONDITIONS. APPROXIMATELY 27,000 FT./5 YRS., 5,400 FT./YR. DESIGN, ACQUIRE EASEMENTS (IF NECESSARY), AND CONSTRUCT WILL IMPROVE FIRE FLOWS, PRESSURE, AND WATER QUALITY. POSSIBLE LOWER ENERGY COSTS, INCREASED DEPRECIATION EXPENSE. $ 345,000 REVENUE/PFA BONDS: PENDING (C) $ 345,000 TOTAL m 2-27 ENVIRONMENT PROJECT TITLE: WATER DEVELOPMENT/MAIN EXTENSIONS LOCATION: VARIOUS LOCATIONS PURPOSE: EXTENSION OF WATER SERVICE TO NEW DEVELOPING AREAS PREVIOUSLY UNSERVED. PHYSICAL DESCRIPTION: CITY PARTICIPATION IN DEVELOPMENT MAIN INSTALLATIONS, I.E., OVERSIZING, HYDRANTS, VALVES, TAPPING SLEEVES, ETC. AND OTHER ITEMS AS DIRECTED. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXTENSION OF WATER MAINS IS AN ESSENTIAL INFRASTRUCTURE ELEMENT NEEDED TO ENABLE GROWTH. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 375,000 REVENUE/PFA BONDS: PENDING (C) $ 375,000 TOTAL 2-28 ENVIRONMENT PROJECT TITLE: TWO-INCH WATER MAIN/SERVICE REPLACEMENT PROGRAM LOCATION: CITY-WIDE PURPOSE: REPLACEMENT OF SUBSTANDARD, HIGH FAILURE/ REPAIR SECTIONS OF THE WATER DISTRIBUTION SYSTEM WITH NEW 6 -INCH MAIN MINIMUM TO IMPROVE SERVICE, INCREASE FIRE FLOWS AND REDUCE MAINTENANCE COSTS. PHYSICAL DESCRIPTION: REPLACE EXISTING MAIN WITH NEW 6 -INCH MAIN, AND REPLACE EXISTING SERVICES TO NEW LINE. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (WHERE REQUIRED), AND CONSTRUCT JUSTIFICATION: THE REMAINING 2 -INCH MAINS IN THE SYSTEM ARE PRIMARILY GALVANIZED, BADLY CORRODED AND FAIL FREQUENTLY. ADDITIONALLY, MINIMAL FIRE FLOWS ARE POSSIBLE IN THESE MAINS. REPLACEMENT OF SERVICES WILL REMOVE LEAD SOURCE IN THE OLDEST SERVICES. IMPACT 0 N OPERATING BUDGET: MAINTENANCE COST DUE TO MAIN LEAKS ON THESE LINES WILL DECREASE AS REPLACEMENT PROGRESSES. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 875,000 REVENUE/PFA BONDS: PENDING (C) 875,000 TOTAL 2-29 Si 2-30 ENVIRONMENT PROJECT TITLE: TWO-INCH WATER MAIN/SERVICE REPLACEMENT LOCATION: CITY WIDE PHYSICAL DESCRIPTION: REPLACE EXISTING MAIN WITH NEW 6 -INCH MAIN, AND REPLACE EXISTING SERVICES TO NEW LINE. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (WHERE REQUIRED), AND CONSTRUCT JUSTIFICATION: THE REMAINING TWO-INCH MAINS IN THE SYSTEM ARE PRIMARILY GALVANIZED, BADLY CORRODED AND FAIL FREQUENTLY. ADDITIONALLY, MINIMAL FIRE FLOWS ARE POSSIBLE IN THESE MAINS. REPLACEMENT OF SERVICES WILL REMOVE LEAD SOURCE IN THE OLDEST SERVICES. IMPACT ON OPERATING BUDGET: MAINTENANCE COST DUE TO MAIN LEAKS ON THESE LINES WILL DECREASE AS REPLACEMENT PROGRESSES. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 1,000,000 REVENUE/PFA BONDS: PENDING (C) $ 1,000,000 TOTAL 92 ENVIRONMENT PROJECT TITLE: WATER METER REPLACEMENT PROGRAM LOCATION: VARIOUS LOCATIONS THROUGHOUT THE CITY - SERVICE INSTALLATIONS. PURPOSE: TO REPLACE AGED, INACCURATE METERS WITH NEW METERS SO THAT WATER BILLINGS REFLECT ACTUAL USAGE. PHYSICAL DESCRIPTION: IMPLEMENT 10 -YEAR, METER TEST PROGRAM REPLACING METERS OUTSIDE AWWA ACCEPTANCE STANDARDS FOR ACCURACY. UNIT OF WORK: REPLACE METERS, EACH BASED ON LAST TEST OR INSTALLATION DATE. JUSTIFICATION: METERS TYPICALLY REGISTER LESS THAN THE QUANTITY ACTUALLY CONSUMED AS THEY AGE AND MECHANICAL WEAR OCCURS. THIS RESULTS IN LOST WATER ACCOUNTABILITY. IMPACT ON OPERATING BUDGET: WILL INCREASE REVENUE BY ENSURING METER ACCURACY (METERS OVER 10 YRS. OLD TYPICALLY UNDER -REGISTER BY APPROX. 5%). FINANCING: $ 250,000 OTHER (OPERATIONS) (1) $ 250,000 TOTAL 2-31 93 2-32 ENVIRONMENT PROJECT TITLE: WATER STORAGE TANK REHABILITATION (FOUR TANKS) LOCATION: TO BE DETERMINED BY SELECTION CRITERIA BASED ON INSPECTION PURPOSE: PROLONG TANK LIFE AND ENSURE WATER QUALITY. PHYSICAL DESCRIPTION: Rc-COAT STORAGE TANKS, PERFORM NECESSARY MAINTENANCE. UNIT OF WORK: INSPECT AND REHABILITATE JUSTIFICATION: PROGRAMMED PREVENTIVE MAINTENANCE IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 260,000 REVENUE/PFA BONDS: PENDING (C) $ 260,000 TOTAL 94 ENVIRONMENT PROJECT TITLE: WATER SYSTEM SEISMIC PROTECTION LOCATION: TREATMENT PLANTS AND STORAGE TANKS PURPOSE: MINIMIZE DAMAGE AND WATER LOSS IN THE EVENT OF SEISMIC ACTIVITY. PHYSICAL DESCRIPTION: AUTOMATIC ISOLATION VALVES AND FLEXIBLE CONNECTIONS AT INFLUENT AND EFFLUENT PIPING TO TANKS AND CLEAR WELLS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: MAINTAIN INTEGRITY OF DRINKING WATER SUPPLY IN THE EVENT OF SEISMIC ACTIVITY. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 143,000 REVENUE/PFA BONDS: PENDING (C) $ 143,000 TOTAL 2-33 95 ENVIRONMENT PROJECT TITLE: EXPAND AND REHAB CAPE ROCK WATER PLANT NO. 1 LOCATION: WATER TREATMENT PLANT NO. 1 (CAPE ROCK PLANT) PURPOSE: PROVIDE INCREASED CAPACITY FOR SUPPLY OF POTABLE WATER TO CITY OF CAPE GIRARDEAU FOR EXISTING AND FUTURE DEVELOPMENT. PHYSICAL DESCRIPTION: DESIGN AND CONSTRUCT PLANT FACILITIES. UNIT OF WORK: DESIGN, ACQUIRE PROPERTY/EASEMENTS, AND CONSTRUCT JUSTIFICATION: NEEDED TO MEET NEAR AND LONG-TERM WATER SYSTEM DEMANDS AS IDENTIFIED IN WATER SYSTEM MASTER PLAN. IMPACT ON OPERATING BUDGET: OPERATION AND MAINTENANCE COSTS WILL CHANGE. INSUFFICIENT DATE AVAILABLE CURRENTLY TO FORECAST EFFECT. INCREASED DEPRECIATION EXPENSE. FINANCING: $17,880,000 REVENUE/PFA BONDS: PENDING (C) $17,880,000 TOTAL 2-34 ENVIRONMENT PROJECT TITLE: WATER PUMPING STATION/VAULT RETROFIT LOCATION: VARIOUS LOCATIONS PURPOSE: RETROFIT CONFINED -SPACE PUMPING STATIONSNAULTS WITH FORCED AIR VENTILATION AND LIGHTWEIGHT ACCESS HATCHES. ADDITIONAL PUMPING STATION FOR WEST OR NORTHWEST AREA PER WATER SYSTEM MASTER PLAN. PHYSICAL DESCRIPTION: INSTALL BLOWERS, SWITCHES, WIRING AND RETROFIT HATCHES WITH LIGHTWEIGHT MATERIALS. ADD MOTOR OPERATED VALVE AT COLLEGE FOR PUMPING CONTROL. PUMPING STATION DESIGN AND INSTALLATION. UNIT OF WORK: DESIGN AND CONSTRUCT/RETROFIT. JUSTIFICATION: EMPLOYEE SAFETY AND STRICTER CONFINED - SPACE ENTRY REQUIREMENTS. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 100,000 REVENUE/PFA BONDS: PENDING (C) $ 100,000 TOTAL 2-35 97 ENVIRONMENT PROJECT TITLE: LEXINGTON/MELODY LANE WATER EXTENSION LOCATION: LEXINGTON AVENUE, I.E. MELODY LANE, OLD SPRIGG STREET ROAD TO NEAR BIG BEND ROAD. PURPOSE: DEVELOPMENT MAIN EXTENSION. A PORTION OF LEXINGTON MAIN EXTENSION IS IDENTIFIED IN BLACK AND VEATCH MASTER PLAN AS IMPROVEMENT MAIN. PHYSICAL DESCRIPTION: TOGETHER WITH NORTH SPRIGG WATER EXTENSION, 8,284 FEET OF 8 -INCH PIPE, 700 FEET OF 6 -INCH PIPE. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (IF REQUIRED), AND CONSTRUCT JUSTIFICATION: PROVIDE WATER SERVICE TO NEW AREA AS IT DEVELOPS. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 163,000 SPECIAL ASSESSMENTS (G) $ 163,000 TOTAL NOTE: IN ORDER TO MAINTAIN THE INTEGRITY OF THE WATER SYSTEM, THIS PROJECT WILL NEED TO BE COORDINATED, AND CONSTRUCTED, WITH PROJECT NO. 2-37 (NORTH SPRIGG WATER EXTENSION). 2-36 all ENVIRONMENT PROJECT TITLE: NORTH SPRIGG WATER EXTENSION LOCATION: NORTH SPRIGG STREET, BERTLING TO NEW LEXINGTON AVENUE PURPOSE: DEVELOPMENT MAIN EXTENSION PHYSICAL DESCRIPTION: TOGETHER WITH LEXINGTON/MELODY LANE WATER EXTENSION, 8,284 FEET OF 8 -INCH PIPE, 700 FEET OF 6 -INCH PIPE. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS (IF REQUIRED), AND CONSTRUCT JUSTIFICATION: PROVIDE WATER SERVICE TO NEW AREA AS IT DEVELOPS. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 22,300 REVENUE/PFA BONDS: PENDING (C) 123,900 SPECIAL ASSESSMENTS (G) $ 146,200 TOTAL NOTE: IN ORDER TO MAINTAIN THE INTEGRITY OF THE WATER SYSTEM, THIS PROJECT WILL NEED TO BE COORDINATED, AND CONSTRUCTED, WITH PROJECT NO. 2-36 (LEXINGTON/MELODY LANE WATER EXTENSION). 2-37 99 2-38 ENVIRONMENT PROJECT TITLE: MEADOWBROOK WATER EXTENSION LOCATION: HIGHWAY 74 AND MEADOWBROOK LANE AREA PURPOSE: DEVELOPMENT MAIN EXTENSION PHYSICAL DESCRIPTION: RAMSEY BRANCH CROSSING AND DISTRIBUTION MAINS. UNIT OF WORK: DESIGN, ACQUIRE EASEMENTS, AND CONSTRUCT JUSTIFICATION: PROVIDE WATER SERVICE TO AREA PREVIOUSLY UNSERVED BY UNION ELECTRIC COMPANY. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 75,500 SPECIAL ASSESSMENTS (G) $ 75,500 TOTAL 100 ENVIRONMENT PROJECT TITLE: UPGRADE EXISTING WATER SCADA SYSTEM LOCATION: SNAKE HILL REGULATING STATION, KINGSHIGHWAY BOOSTER, KINGSWAY BOOSTER, GORDONVILLE BOOSTER, COUNTY PARK TANK, NASH ROAD SYSTEM. PURPOSE: UPGRADE EXISTING MICRO COMPUTER UNITS, INSTALL ONE (1) NEW SCADA POINT. RETROFIT PLC BASED SCADA AT NEW EXISTING SCADA SITES FOR FULL COMPATIBILITY. ADD SNAKE HILL REGULATING STATION TO SCADA. PHYSICAL DESCRIPTION: CONFIGURE HARDWARE WITH PLC'S INTEGRATE WITH EXISTING RADIO COMMUNICATION EQUIPMENT AND INTEGRATE INTO WONDERWARE SCADA DATABASE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: NEEDED TO OPERATE AND CONTROL WATER SYSTEM FACILITIES. THIS WILL COMPLETE SCADA REHABILITATION. IMPACT ON OPERATING BUDGET: NONE IDENTIFIED FINANCING: $ 27,000 REVENUE/PFA BONDS: PENDING (C) $ 27,000 TOTAL NOTE: SCADA = SUPERVISORY CONTROL AND DATA ACQUISITION 2-39 101 2-40 ENVIRONMENT PROJECT TITLE: ELECTRICAL SUPPLY VOLTAGE/AMP MONITORING LOCATION: WATER PLANTS NO. 1 AND NO. 2 PURPOSE: TO ENABLE OPERATOR TO DETECT SUPPLY VOLTAGE/AMP CHANGES PRIOR TO EQUIPMENT DAMAGE. PHYSICAL DESCRIPTION: VOLT/AMP METERING UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: CURRENT INSTALLED CONDITION DOES NOT ALLOW OPERATOR TO DETECT ELECTRICAL SUPPLY PROBLEMS WHICH HAVE DAMAGED EQUIPMENT AT THE PLANTS. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 10,000 REVENUE/PFA BONDS: PENDING (C) $ 10,000 TOTAL 102 ENVIRONMENT PROJECT TITLE: WATER PLANT NO. 2 SLUDGE SYSTEM LOCATION: WATER PLANT NO. 2 (RAMSEY BRANCH PLANT) PURPOSE: SLUDGE DISPOSAL TO SEWER SYSTEM RATHER THAN HOLDING LAGOON. PHYSICAL DESCRIPTION: SEWER LIFT STATION AND LATERAL TO DISPOSE OF PROCESS SLUDGE (WHEN TRUCK AVAILABLE). UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: REDUCE SLUDGE DISPOSAL COSTS, LAGOON MAINTENANCE AND BENEFIT SEWER TREATMENT PROCESS (COAGULANT). IMPACT ON OPERATING BUDGET: SLUDGE LAGOON CLEANING COSTS ARE APPROXIMATELY $50,000 AND ON A THREE (3) YEAR INTERVAL. AS PLANT NO. 2 USE INCREASES, THIS WILL SHORTEN INTERVAL. THE SEWER TREATMENT DISPOSAL OPTION IS MUCH MORE COST EFFECTIVE AND WOULD SAVE APPROXIMATELY $300,000 OVER THE NEXT 15 YEARS. FINANCING: $ 146,300 REVENUE/PFA BONDS: PENDING (C) $ 146,300 TOTAL 2-41 103 2-42 ENVIRONMENT PROJECT TITLE: MT. AUBURN CORRIDOR WATER DISTRIBUTION MAIN AUGMENTATION LOCATION: MT. AUBURN ROAD, FROM DOCTORS PARK NORTH TO HOPPER ROAD PURPOSE: PROVIDE ADEQUATE FLOWS AND PRESSURE TO OPERATING BUDGET: SERVE DEVELOPING AREAS ALONG MT. AUBURN ROAD. PHYSICAL DESCRIPTION: CONSTRUCT PIPE SEGMENTS 544, 545, 547, 548, 550, 551, AND 552 ON FIGURE 12, RECOMMENDED IMPROVEMENTS, BLACK & VEATCH MASTER PLAN 1993. (MAY REQUIRE ADDITIONAL PIPE SEGMENT TO COMPLETE PROJECT.) UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: SYSTEM DEMAND IS INCREASING AS A RESULT OF GROWTH ALONG THE MT. AUBURN CORRIDOR. UPGRADES IN LINE SIZING ARE NEEDED TO ACCOMMODATE PRESENT AND FUTURE GROWTH. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE. MINOR POWER SAVINGS WITH REDUCED FRICTION LOSS. FINANCING: $ 876,000 REVENUE/PFA BONDS: PENDING (C) $ 876,000 TOTAL 104 ENVIRONMENT PROJECT TITLE: MEADOWBROOK STORAGE/PERRYVILLE ROAD TRANSMISSION WATER MAIN AUGMENTATION LOCATION: ALONG PERRYVILLE ROAD AND LEXINGTON AVENUE PURPOSE: TRANSMISSION OF WATER TO/FROM MEADOWBROOK STORAGE TANK PHYSICAL DESCRIPTION: CONSTRUCT PIPE SEGMENTS 428, 433, 436, AND 439 ON FIGURE 12, RECOMMENDED IMPROVEMENT. BL ACK & VEATCH MASTER PLAN, 1993. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: SYSTEM GROWTH IS INCREASING THE LOAD ON MEADOWBROOK PRESSURE ZONE. LOW PRESSURE COMPLAINTS OCCUR IN THE SUMMER CURRENTLY AND WILL CONTINUE TO INCREASE. TANK OPERATING RANGE DECREASING. THIS WILL AFFECT FIRE FLOWS/PRESSURE. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE. MINOR POWER SAVINGS WITH REDUCED FRICTION LOSS. FINANCING: S 704,000 REVENUE/PFA BONDS: PENDING (C) $ 704,000 TOTAL 2-43 105 2-44 ENVIRONMENT PROJECT TITLE: ELEVATED WATER STORAGE TANK LOCATION: AREA ADJACENT TO 1-55 NORTH OF ROUTE K PURPOSE: PROVIDE STORAGE CAPACITY TO MEET PEAK HOUR DEMANDS IN DEVELOPING AREAS PHYSICAL DESCRIPTION: ELEVATED STORAGE TANK UNIT OF WORK: DESIGN, SITE IDENTIFICATION, CONSTRUCT, AND EQUIP. JUSTIFICATION: GROWTH AND DEVELOPMENT IMPACT ON OPERATING BUDGET: ADDITIONAL COSTS WILL BE INCURRED FOR OPERATION AND MAINTENANCE AT APPROXIMATELY $2,000 ANNUALLY. 10 -YEAR REPAINTING SCHEDULED IN YEAR 2010 AT APPROXIMATELY $100,000. INCREASED DEPRECIATION EXPENSE. FINANCING: $ 229,500 REVENUE/PFA BONDS: PENDING (C) $ 229,500 TOTAL 106 ENVIRONMENT PROJECT TITLE: 20 -INCH MAIN PROJECT (EAST CAPE ROCK DRIVE) LOCATION: EAST CAPE ROCK DRIVE, FROM WATER PLANT NO. 1 TO BERTLING STREET PURPOSE: INCREASE FLOW FROM MAIN PLANT TO DISTRIBUTION SYSTEM. PHYSICAL DESCRIPTION: APPROXIMATELY 5,300 FEET OF 20 -INCH TRANSMISSION MAIN. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: NEEDED TO INCREASE TRANSMISSION CAPACITY, IMPROVE PRESSURE CONDITIONS AND FIRE FLOWS. REPLACE 14 -INCH TRANSMISSION MAINS INSTALLED IN 1931 AND 1953. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 700,000 REVENUE/PFA BONDS: PENDING (C) $ 700,000 TOTAL 2-45 107 2-46 ENVIRONMENT PROJECT TITLE: i 6 -INCH MAIN PROJECT (BERTLING STREET) LOCATION: BERTLING STREET, FROM OLD SPRIGG STREET ROAD WEST TO CAPE ROCK DRIVE PURPOSE: INCREASE FLOW FROM MAIN PLANT TO DISTRIBUTION SYSTEM. PHYSICAL DESCRIPTION: APPROXIMATELY 5,420 FEET OF 16 -INCH TRANSMISSION MAIN. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: NEEDED TO INCREASE TRANSMISSION CAPACITY, IMPROVE PRESSURE CONDITIONS AND FIRE FLOWS. REPLACE 12 -INCH TRANSMISSION MAIN INSTALLED IN 1951-52. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 650,000 REVENUE/PFA BONDS: PENDING (C) $ 650,000 TOTAL 108 PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: ENVIRONMIENT FIRE HYDRANT REPLACEMENT CITY WIDE FIRE PROTECTION FLOW INCREASE 798 41/2 -INCH HYDRANTS REPLACED WITH 51/4 - INCH HYDRANTS. INSTALL HYDRANTS OUTDATED - LOW FLOW CAPACITIES. DO NOT MEET CURRENT DESIGN SPECIFICATIONS. INCREASED DEPRECIATION EXPENSE $ 500,000 REVENUE/PFA BONDS: PENDING (C) $ 500,000 TOTAL i09 2-47 2-48 ENVIRONMENT PROJECT TITLE: MOUNT AUBURN/SIEMERS MAIN UPGRADE LOCATION: MT. AUBURN ROAD TO SIEMERS DRIVE IN VICINITY OF ROUTE K/1-55 INTERCHANGE (PROPOSED NORTH LOOP) PURPOSE: PROVIDE INCREASED WATER FLOW AND PRESSURES TO THE DEVELOPING AREA ALONG SIEMERS DRIVE. PHYSICAL DESCRIPTION: APPROXIMATELY 6,950 FEET OF 16 -INCH WATER MAIN WITH APPURTENANCES. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: DEVELOPMENT ALONG SIEMERS DRIVE WILL REQUIRE WATER SUPPLY ENHANCEMENT TO SUPPORT FUTURE GROWTH. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE FINANCING: $ 600,000 REVENUE/PFA BONDS: PENDING (C) 600,000 TOTAL 110 ENVIRONMENT PROJECT TITLE: SOUTH PLANT-NASH ROAD POTABLE WATER MAIN LOCATION: SOUTH WATER TREATMENT PLANT, SOUTH TO NASH ROAD NEAR JUNCTION WITH AIRPORT ROAD PURPOSE: TO PROVIDE POTABLE WATER TO THE GREATER CAPE GIRARDEAU INDUSTRAIL PARK. PHYSICAL DESCRIPTION: APPROXIMATELY 7,800 FEET OF 12 -INCH WATER MAIN WITH CROSSINGS OF THE DUTCHTOWN DITCH, HEADWATER DIVERSION CHANNEL, AND LITTLE RIVER MAIN STEM LEVEE UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THE CITY -OWNED WATER SYSTEM ON NASH ROAD SUPPLIES NON -POTABLE WATER FOR PRODUCTION AND FIRE FIGHTING ONLY. POTABLE WATER IS NEEDED FOR EXPANDING ECONOMIC DEVELOPMENT. IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION AND MAINTENANCE EXPENSE. FINANCING: $ 500,000 STATE GRANTS/LOANS (D) 115,000 REVENUE/PFA BONDS: PENDING (C) $ 615,000 TOTAL NOTE: THIS PROJECT IS CONTINGENT UPON THE LOCATION OF A NEW INDUSTRY OR EXPANSION THAT WILL SATISFY THE "BUT FOR" REQUIREMENT FOR STATE GRANT FUNDS UP TO A MAXIMUM OF $500,000. THE CITY'S SHARE OF THE PROJECT IS ALSO CONTINGENT UPON OTHER FACTORS, SUCH AS THE STATUTS OF STATE REVOLVING LOAN FUNFDS, IF SUCH ARE AVAILABLE. 2-a9 111 2-50 ENVIRONMENT PROJECT TITLE: MIDDLE STREET STORM DRAINAGE SYSTEM LOCATION: MIDDLE AND INDEPENDENCE STREET INTERSECTION PURPOSE: TO ALLEVIATE FLOODING AT THE INDEPENDENCE AND MIDDLE STREET INTERSECTION. PHYSICAL DESCRIPTION: CONSTRUCT DETENTION BASIN AND STORM SEWER LINES. UNIT OF WORK: CONSTRUCT IN CONNECTION WITH MAIN CSO PROJECT JUSTIFICATION: PARTS 2 AND 3 OF A PLAN TO REDUCE STREET AND PROPERTY FLOODING IN THE PROJECT AREA. IMPACT ON OPERATING BUDGET: INCREASED MAINTENANCE COSTS FOR DETENTION BASIN. FINANCING: $ 184,800 CAPITAL IMPROVEMENT SALES TAX (H) $ 184,800 TOTAL 112 ENVIRONMENT PROJECT TITLE: CAPE MEADOWS STORMWATER FLUME CONSTRUCTION LOCATION: FITZGERALD AND BIG BEND ROAD STORMWATER STRUCTURE PURPOSE: TO PROTECT FITZGERALD STREET AND STORM INLETS FROM BASE/SUPPORT EROSION CAUSING DROPPING AND SLIPPING WEST. ALSO TO PROTECT DOWNSTREAM/DOWN GRADE PROPERTIES FROM PROPERTY LOSS AND DAMAGE DUE TO HIGH VELOCITY UNCONTROLLED STORMWATER RUNOFF. PHYSICAL DESCRIPTION: APPROXIMATELY 175 -FOOT BY 25 -FOOT RIP RAP AND SLURRY CONCRETE FLUME CONSTRUCTED TO HANDLE EXTENSIVE, STEEP -GRADE STORMWATER RUNOFF FROM THE CAPE MEADOWS AREA WEST TOWARD BEND ROAD DITCH. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: INADEQUATE STORMWATER CONTROL AT THIS LOCATION IS RESULTING IN STORMWATER DAMAGE TO PRIVATE AND PUBLIC PROPERTY. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 14,200 CAPITAL IMPROVEMENT SALES TAX (H) $ 14,200 TOTAL 2 1 113 2-52 ENVIRONMENT I� PROJECT TITLE: KINGSHIGHWAY/COMMERCIAL CHANNEL CONSTRUCTION AND DITCH CLEANING �I LOCATION: FROM SOUTH KINGSHIGHWAY TO CAPE LA CROIX CREEK. FROM THE DITCH SOUTH OF AUTO TRIM DESIGN TO THE BOX CULVERT ON COMMERCIAL STREET AND CONTINUING PAST THE KUSS ENTERTAINMENT PROPERTY TO CAPE LA CROIX CREEK. PURPOSE: TO PERMIT STORMWATER TO FLOW PROPERLY FROM KINGSHIGHWAY TO CAPE LA CROIX CREEK AND STABILIZE THE BANKS SO THAT MAINTENANCE CAN BE PERFORMED. PHYSICAL DESCRIPTION: APPROXIMATELY 1,600 FEET OF CHANNEL WORK INCLUDING A CONCRETE -LINED CHANNEL BOTTOM AND VEGETATED SIDE SLOPES. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: THE HIGHWAY DEPARTMENT IMPROVEMENTS ASSOCIATED WITH NEW HIGHWAY 74 HAVE INCREASED FLOW THROUGH 1 -HIS SECTION OF DRAINAGE DITCH AND THEIR IMPROVEMENTS STOPPED AT KINGSHIGHWAY. THIS HAS ALLOWED WATER TO POND IN THIS AREA. IMPACT ON OPERATING BUDGET: IF THE CITY ASSUMES MAINTENANCE OF THIS CHANNEL, THERE WILL BE ADDITIONAL MAINTENANCE COSTS. FINANCING: $ 62,000 CAPITAL IMPROVEMENT SALES TAX (H) 114 62,000 TOTAL 150,000 120,000 90,000 ' 60,000 30,000 MAO x 1997-98 1998-99 1999-00 2000-01 2001-02 115 PARKS AND RECREATION PROPOSED PROJECTS PROJECT 1997-98 1998-99 1999-00 2000-01 2001-02 NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR 3-1 General Park Development $ 225,750 S 49,000 $ 51,000 $ 53,000 S 72,750 A A A A A i 3-2 Land Acquisition --Shawnee - $ 177,250 S 43,000 $ 41,000 $ 39,000 $ 37,000 5 17,250 and Osage Parks . A A A A I A A 3-3 Golf Course Maintenance/ $ 50,000 $ 50,000 I Storage Bldg. Enlargement A A 3-4 Arena Park Shelter $ 15,000 $ 15,000 f 1 Replacement A A t i 3-5 Arena Parking Lot Paving $ 16,500 $ 16,500 E I A A I I 3-6 Cape Rock Fountain Park S 2,500 $ 2,500 Development A A 3-7 Ranney Park Paving (Parking $ 3,000 $ 3,000 Area) A A I 3-8 Washington Park Paving $ 3,000 $ 3,000 I I I t (Parking Area) A A I II I�TOTALS S 493,000 $ 133,000 f 5 90,000 S 90,000 $ 90,000 5 90,000 E A - GENERAL FUND - S 493,000 _ $ 133,000 I $ 50,000 $ 90,300 S 90,000 S 90,000 B REV/PFA SONDS:ISSUED - C REV/PFA BONDS:PENDING D STATE GRANTS/LOANS E MOTOR FUEL TAX I 1 F FED. GRANTSILOANS G SPEC. ASSESSMENTS H CAP. IMP. SALES TAX OTHER j # J GEN. OBL. BONDS:PENDING j 1 K TRANS. SALES TAX I I1 116 PARKS AND RECREATION PROJECT TITLE: GENERAL PARK DEVELOPMENT LOCATION: VARIOUS PARKS PURPOSE: TO PROVIDE VARIOUS PARK AND RECREATION AMENITIES AND EQUIPMENT. PHYSICAL DESCRIPTION: CONSTRUCTION OF PARK AMENITIES, RECREATIONAL AND OTHER FACILITIES. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: VARIOUS PARKS HAVE UNANTICIPATED NEEDS EACH YEAR. IMPACT ON OPERATING BUDGET: MINOR INCREASES IN OPERATIONAL AND MAINTENANCE EXPENSES, DEPENDING ON FACILITIES CONSTRUCTED. FINANCING: $ 225,750 GENERAL FUND (A) W 225,750 TOTAL NOTE: THESE FUNDS COULD ALSO BE USED FOR MATCHING DONATIONS FROM CIVIC GROUPS OR INDIVIDUALS FOR PARK IMPROVEMENTS. 3-1 117 PARKS AND RECREATION PROJECT TITLE: LAND ACQUISITION - SHAWNEE AND OSAGE PARKS LOCATION: SHAWNEE PARK (S. WEST END BOULEVARD) AND OSAGE PARK (N. KINGSHIGHWAY) PURPOSE: TO PROVIDE ADDITIONAL PARK ACREAGE, RECREATION FACILITIES, AND GREEN SPACE. PHYSICAL DESCRIPTION: PURCHASE OF 90 ACRES OF LAND. UNIT OF WORK: PAYMENTS ON LAND PURCHASED IN 1992 AND 1993. JUSTIFICATION: ADDITIONAL AREA IS NEEDED AND USED FOR MULTI -USE BUILDING, SPORTS COMPLEX, CAPE LA CROIX TRAIL, AND URBAN/NATURAL CONSERVATION AREA. IMPACT ON OPERATING BUDGET: WILL REQUIRE ADDITIONAL PERSONNEL AND EQUIPMENT FOR MAINTENANCE AS AREAS ARE DEVELOPED AND USED. FINANCING: $ 177,250 GENERAL FUND (A) S 177,250 T OTAi 3-2 PARKS AND RECREATION PROJECT TITLE: GOLF COURSE MAINTENANCE/STORAGE BUILDING LOCATION: J.C. MUNICIPAL GOLF COURSE PURPOSE: TO PROVIDE ADDITIONAL EQUIPMENT AND CART STORAGE BUILD!NG. PHYSICAL DESCRIPTION: CONSTRUCTION OF A METAL STORAGE BUILDING APPROXIMATELY 48 FEET BY 102 FEET. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: STORAGE AREA IS INADEQUATE FOR CURRENT NEEDS. SEVERAL PIECES OF MOWING EQUIPMENT AND TRACTORS ARE STORED OUTSIDE. IMPACT ON OPERATING BUDGET: CAN HELP REDUCE SOME MAINTENANCE COSTS ON EQUIPMENT. FINANCING: $ 50,000 GENERAL FUND (A) $ 50,000 TOTAL 3-3 119 3-4 PARKS AND RECREATION PROJECT TITLE: SHELTER REPLACEMENT LOCATION: ARENA PARK PURPOSE: PROVIDE ADDITIONAL PICNIC FACILITIES AND REPLACE OLD SHELTER PHYSICAL DESCRIPTION: TO REPLACE SHELTER # 5 LOCATED IN THE NORTHERN PORTION OF ARENA PARK UNIT OF WORK: TO REMOVE EXISTING SHELTER COMPLETELY AND INSTALL A NEW SHELTER WITH TABLES, GRILL, FOUNTAIN, AND ELECTRICITY. JUSTIFICATION: OLD SHELTER IS DETERIORATED. NEED TO PROVIDE PICNIC FACILITIES ADJACENT TO NEW PLAYGROUND UNIT. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 15,000 GENERAL FUND (A) $ 15,000 TOTAL 120 PARKS AND RECREATION PROJECT TITLE: ARENA PARKING LOT PAVING LOCATION: ARENA PARK TENNIS COURT - HIKING/BIKING TRAIL PARKING AREA PURPOSE: TO PROVIDE STABLE PARKING FOR USERS. PHYSICAL DESCRIPTION: APPROXIMATELY 16,000 SQUARE FEET OF PAVING. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: INCREASED USE OF PARKING AREA BECAUSE OF HIKING/BIKING TRAIL AND SAND VOLLEYBALL COURT IN ADDITION TO TENNIS COURTS. IMPACT ON OPERAT ING BUDGET: MINIMAL ON BUDGET FINANCING: $ 16,500 GENERAL FUND (A; S 16,500 TOTAL 3-5 121 3-6 PARKS AND RECREATION PROJECT TITLE: CAPE ROCK FOUNTAIN PARK DEVELOPMENT LOCATION: CAPE ROCK FOUNTAIN PARK PURPOSE: TO IMPROVE THIS HIGH VISIBILITY AREA WITH SITE AMENITIES FOR VISITORS. PHYSICAL DESCRIPTION: INSTALLATION OF PICNIC TABLES, BENCHES, AND LIGHTING FIXTURES. UNIT OF WORK: INSTALLATION JUSTIFICATION: NO EXISTING AMENITIES. IMPACT ON OPERATING BUDGET: M!NIMAL IMPAC T FINANCING: S 2,500 GENERAL FUND (A) $ 2,500 TOTAL 122 PARKS AND RECREATION PROJECT TITLE: RANNEY PARK PAVING (PARKING AREA) LOCATION: RANNEY PARK PURPOSE: TO PROVIDE HARD SURFACE PARKING AREA AT THE NEW SHELTER FACILITY. PHYSICAL DESCRIPTION: 2,400 SQUARE FEET OF PAVING. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: NO EXISTING PARKING. IMPACT ON OPERATING BUDGET: MINIMAL IMPACT FINANCING: $ 3,000 GENERAL FUND (A) 3,000 TOTAL 3-7 123 PARKS AND RECREATION PROJECT TITLE: WASHINGTON PARK PAVING (PARKING AREAS) LOCATION: WASHINGTON PARK PURPOSE: TO PROVIDE HARD SURFACE PARKING AT NEN! SHELTER FACILITY. PHYSICAL DESCRIPTION: 2,400 SQUARE FEET OF PAVING. UNIT Oc: WORK: DESIGN AND CONSTRUCT JUSTIFICATION: STABILIZATION OF GRAVEL PARKING. IMPACT ON OPERATING BUDGET: MINIMAL IMPACT FINANCING: $ 3,000 GENERAL FUND (A) $ 3,000 TOTAL 124 CommuNiTy DEVELOPMENT CAPITAL IMPROVEMENTS PROGRAM 2,4CO3OCO 2,000,000 1,600,000 1,200,000 800,000 400,000 1997-98 1998-99 1999-00 2000-01 2001-02 125 COMMUNITY DEVELOPMENT PROPOSED PROJECTS PROJECT 1997-98 1998-99 1999-00 2000-01 2001-02 NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR 4.1 Police Station HVAC $"181,400 $ 81,400 $ 51,700 $ 48,300 Replacement A A A A 4-2 Fire Station No. 1 HVAC $ 26,900 S 6,603 S 6,9000 $ 7,100 y 6,300 Upgrade A A A A A 4-3 Fire Station Fuel Storage $ 24,200 $ 24,200 ' Upgrade A A I 4-4 Fire Station No. 1 $ 7,400 S 7,400 } Renovation of Office and A A Support Areas t 4-5 Fire Station No. 1 $ 60,200 $ 60,200 Sprinkler/Exhaust Retrofit J J 4-6 Fire Station No. 3 Relocation $ 966,C00 $ 70,000 S 896,000 J J J 4-7 Fire Station No. 2 S 54,500 S 54,500 Sprinkler/Exhaust Retrofit J J 4-8 Fire Station No. 1 S 183,800 $ 183,800 I Renovation of Offices and Administrative Areas 4-9 Fire Station No. 4 Relocation $1,023,200 S 114,400 $ 908,800 � J J 4-10 Fire/Police Regional Training $1;362,500 5 50,400 $1,312,500 Center J J J 4-11 Fire Station No. 1 Parking $ 42,000 $ 42,000 Expansion 4-12 f New Convention and Visitors S 250,000 $ 250,000 Bureau Center I ' I 4-13 City Hall Elevator $ 200,000 $ 200,000 A A I A GENERAL FUND B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTS/LOANS E MOTOR FUEL TAX F FED. GRANTSILOANS G SPEC. ASSESSMENTS H CAP. IMP. SALES TAX I OTHER - J GEN. OBL BONDS: PENDING K TRANS. SALES TAX 126 1 COMMUNITY DEVELOPMENT PROPOSED PROJECTS PROJECT 1997-98 1998-95 1999-00 2000-01 2001-02 NUMBER IMPROVEMENT ITEM TOTAL COST FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR TOTALS 54,382,500 S 569,600 5 188,800 $1,005,900 $ 354,900 $2,263,300 A GENERAL FUND $ 439,S00 S 319,600 ! S 58,600 S 55,400 S 6,300 B REV/PFA BONDS: ISSUED C REV/PFA BONDS: PENDING D STATE GRANTS/LOANS E MOTOR FUEL TAX F FED. GRANTSPLOANS G SPEC. ASSESSMENTS I H CAP. IMP. SALES TAX I I OTHER S 250,000 S 250,000 I J GEN. OBL. BONDS: PENDING $3,692,600 S '.30,200 $ 950,500 S 348,600 $2,283,300 f K TRANS. SALES TAX - - COMMUNITY DEVELOPMENT PROJECT TITLE: POLICE STATION HVAC REPLACEMENT LOCATION: POLICE HEADQUARTERS, SOUTH SPRIGG STREET PURPOSE: REPLACE/MODIFY MULTI -ZONE HEATING AND AIR- CONDITIONING SYSTEM. PHYSICAL DESCRIPTION: REMOVE 20 TON MULTI -ZONE SYSTEM ON ROOF, TWO (2) 10 TON UNITS ON ROOF FOR JAIL AND ADMINISTRATIVE OFFICES, 23 TON MULTI -ZONE UNIT IN BASEMENT. RECONFIGURE VENTING, REPLACE WITH ADEQUATE EQUIPMENT PER TECHNICAL ASSISTANCE ENERGY STUDY PREPARED BY STRICKLAND ENGINEERING. UNIT OF WORK: INSTALL EQUIPMENT JUSTIFICATION: THESE UNITS ARE IN NEED OF REPAIR, THE CONTROLLING SYSTEM FOR EACH IS COMPLEX AND NON-FUNCTIONAL. UNITS ARE NO LONGER IN PRODUCTION (OUTDATED), PARTS ARE EXTREMELY DIFFICULT TO OBTAIN THUS CREATING HIGH MAINTENANCE COSTS AND COMPANIES TO REPAIR THEM ARE SCARCE. IMPACT ON OPERATING BUDGET: FINANCING: 4-1 UPGRADE/REPLACEMENT SHOULD REDUCE OPERATION AND MAINTENANCE COSTS. $ 181,400 GENERAL FUND (A) $ 181,400 TOTAL 128 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 1 HVAC UPGRADE LOCATION: FIRE STATION NO. 1, SOUTH SPRIGG STREET PURPOSE: INITIATE A FOUR-YEAR PROGRAM FOR UPGRADING AND REPLACEMENT OF HVAC SYSTEM. PROGRAM WILL ALLOW TWO (2) UNITS I� PER YEAR TO BE REPLACED. PHYSICAL DESCRIPTION: HVAC HEATING, HEAT PUMP AND AIR- E CONDITIONING SYSTEM.i UNIT OF WORK: INSTALLATION OF TWO (2) UNITS PER YEAR i3 JUSTIFICATION: CURRENT UNITS ARE 15 YEARS OLD AND WORN OUT. THIS PROGRAM WILL ALLOW FOR SYSTEMATIC REPLACEMENT OVER A FOUR-YEAR PERIOD. IMPACT ON OPERATING BUDGET: REDUCED ENERGY COSTS SHOULD PAY FOR COST OF REPLACEMENT. FINANCING: $ 26,900 GENERAL FUND (A) $ 26,900 TOTAL 4-2 129 4-3 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION FUEL STORAGE UPGRADE LOCATION: FIRE STATION NO. 1, SOUTH SPRIGG STREET PURPOSE: UPGRADE CITY-WIDE FUEL STORAGE AND DISTRIBUTION SYSTEM. PHYSICAL DESCRIPTION: FUEL TANKS AND DISTRIBUTION SYSTEM. UNIT OF WORK: DESIGN AND INSTALL JUSTIFICATION: FEDERAL EPA AND STATE DNR REGULATIONS REQUIRE FUEL STORAGE AND DISTRIBUTION SYSTEMS TO BE UPGRADED. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 24,200 GENERAL FUND (A) S 24,200 TOTAL 130 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 1 RENOVATION OF OFFICE AND SUPPORT AREAS LOCATION: FIRE STATION NO. 1, SOUTH SPRIGG STREET PURPOSE: RENOVATION OF FIRST FLOOR OFFICE AREAS AND REPLACEMENT OF CARPETING IN UPSTAIRS TRAINING ROOM AND LIVING AREAS. PHYSICAL DESCRIPTION: FINISH REPLACEMENT OF CARPETING, WALLPAPER AND OTHER RELATED AESTHETICS. UNIT OF WORK: RENOVATION JUSTIFICATION: SOME RENOVATION TO OFFICE AREA WAS COMPLETED BY STAT ION PERSONNEL. FUNDING WILL ALLOW REPLACEMENT OF 17 -YEAR-OLD DECORATING/CARPETING IN GREAT NEED OF REPLACEMENT. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 7,400 GENERAL FUND (A) $ 7,400 T OTAL 131 4-4 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 1 SPRINKLER/EXHAUST RETROFIT LOCATION: FIRE STATION NO. 1, SOUTH SPRIGG STREET PURPOSE: RETROFIT FIRE STATION NO. 1 WITH BOTH AUTOMATIC SPRINKLER AND VEHICLE EXHAUST EMISSION REMOVAL SYSTEMS. PHYSICAL DESCRIPTION: MONITORED WET SPRINKLER SYSTEM PER NFPA STANDARDS; EXHAUST REMOVAL SYSTEM THAT LOWERS CARBON MONOXIDE LEVELS TO ACCEPTABLE LIMITS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT NFPA 1500 (OCCUPATIONAL SAFETY AND HEALTH) STANDARDS RECOMMEND BOTH MODIFICATIONS. OSHA/EPA GUIDELINES MANDATE EXHAUST EMISSION VENTING SYSTEMS. IMPACT ON OPERATING BUDGET: FINANCING: 4-5 NO SIGNIFICANT IMPACT $ 60,200 GENERAL OBLIGATION BONDS: PENDING (J) $ 60,200 TOTAL 132 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 3 RELOCATION LOCATION: NORTH SPRIGG STREET EXTENSION PURPOSE: TO UPGRADE STATION FACILITIES AND IMPROVE LOCATION. PHYSICAL DESCRIPTION: ONE-STORY MASONRY THREE -BAY DRIVE- THROUGH FIRE STATION. ONE BAY TO BE USED AS SHOP BAY. BASEMENT UNDER LIVING ARE: � OF STATION. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT BUILDING IS OBSOLETE IN DESIGN, FUNCTION AND LOCATION. IMPACT ON OPERATING BUDGET: ENLARGED FACILITY WILL REQUIRE ADDITIONAL MANPOWER AND EQUIPMENT. FINANCING: 966,000 GENERAL OBLIGATION BONDS: PENDING (J) $ 966,000 TOTAL 4-6 133 4-7 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 2 SPRINKLER/EXHAUST RETROFIT LOCATION: FIRE STATION NO. 2, SOUTH MOUNT AUBURN ROAD PURPOSE: RETROFIT FIRE STATION NO. 2 WITH BOTH AUTOMATIC SPRINKLER AND VEHICLE EXHAUST EMISSION REMOVAL SYSTEMS. PHYSICAL DESCRIFTION: MONITORED WET SPRINKLER SYSTEM PER NFPA STANDARDS; EXHAUST REMOVAL SYSTEM THAT LOWERS CARBON MONOXIDE LEVELS TO ACCEPTABLE LIMITS. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT NFPA 1500 (OCCUPATIONAL SAFETY AND HEALTH) STANDARDS RECOMMEND BOTH MODIFICATIONS. OSHA/EPA REGULATIONS MANDATE EXHAUST EMISSION VENTING SYSTEMS. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 9-4,500 GENERAL OBLIGATION BONDS: PENDING (J) $ 54,500 TOTAL 134 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 1 RENOVATION OF OFFICE AND ADMINISTRATIVE AREAS LOCATION: FIRE STATION NO. 1, SOUTH SPRIGG STREET PURPOSE: TO PROVIDE OFFICE AND SUPPORT AREAS THAT WILL MEET THE NEEDS OF THE FIRE DEPARTMENT FOR THE NEXT 10 TO 15 YEARS. PHYSICAL DESCRIPTION: TOTAL REDESIGN AND REMODELING OF FIRE DEPARTMENT FIRST FLOOR ADMINISTRATIVE OFFICE AREAS, TO INCLUDE ADDITIONAL EMS OFFICE SPACE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: PRESENT AREA IS INEFFICIENTLY DESIGNED FOR CURRENT AND EXPANDING FUNCTIONS. SPECIAL SERVICES AND EMS DIVISIONS NEED SEPARATE OFFICE SPACE. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 183,800 GENERAL OBLIGATION BONDS: PENDING {J} $ 183,800 TOTAL HR 135 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 4 RELOCATION LOCATION: VICINITY OF LEXINGTON AVENUE AND NORTH KINGSHIGHWAY PURPOSE: UPGRADE STATION FACILITIES AND IMPROVE LOCATION. PHYSICAL DESCRIPTION: ONE-STORY MASONRY THREE -BAY DRIVE- THROUGH FIRE STATION. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT STRUCTURE IS UNDERSIZED AND POORLY LOCATED TO COPE WITH CURRENT AND FUTURE GROWTH IN NORTHERN AND WESTERN PARTS OF CITY. IMPACT ON OPERATING BUDGET: ENLARGED FACILITY WILL REQUIRE ADDITIONAL MANPOWER AND EQUIPMENT. FINANCING: $1,023,200 GENERAL OBLIGATION BONDS: PENDING (J) $1,023,200 TOTAL 136 I COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE/POLICE REGIONAL TRAINING CENTER LOCATION: UNKNOWN AT THIS TIME PURPOSE: TO PROVIDE FOR LIVE -FIRE TRAINING, CLASSROOMS, TRAINING TOWER, TRANSPORTATION SCENARIOS, FIRING RANGE, AND NECESSARY SERVICE/SUPPORT FACILITIES. PHYSICAL DESCRIPTION: CONSTRUCTION OF NEW FACILITY UNIT OF WORK: PROPERTY ACQUISITION, DESIGN AND CONSTRUCT JUSTIFICATION: PROPOSED FACILITY WOULD PROVIDE A REGIONAL CENTER FOR THE TRAINING OF FIRE, POLICE, AND INDUSTRIAL PERSONNEL THROUGHOUT SOUTHEAST MISSOURI. IMPACT ON OPERATING BUDGET: ADDITIONAL OPERATING, MAINTENANCE, AND EQUIPMENT COSTS. FINANCING: $1,362,900 GENERAL OBLIGATION BONDS: PENDING (J) $1,362,900 TOTAL 4-10 137 4-11 COMMUNITY DEVELOPMENT PROJECT TITLE: FIRE STATION NO. 1 PARKING EXPANSION LOCATION: FIRE STATION NO. 1, SOUTH SPRIGG STREET PURPOSE: PROVIDE ADDITIONAL PARKING NEEDED AT FIRE STATION NO. 1. PHYSICAL DESCRIPTION: ACQUIRE APPROXIMATELY 15,000 SQ. FT. OF PROPERTY AND EXPAND PARKING LOT. UNIT OF WORK: ACQUIRE PROPERTY AND CONSTRUCT JUSTIFICATION: PARKING AT REAR OF FIRE STATION NO. 1 (HEADQUARTERS) IS SEVERELY LIMITED DUE TO ABUTTING SMALL HOME AND BUSINESS. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 42,000 GENERAL OBLIGATION BONDS: PENDING (J) $ 42,000 TOTAL 138 COMMUNITY DEVELOPMENT PROJECT TITLE: NEW CONVENTION AND VISITORS BUREAU CENTER LOCATION: OSAGE PARK OR ALTERNATIVE SITE PURPOSE: PROVIDE NEW BUILDING WITH ADEQUATE SPACE FOR CVB OPERATIONS. PHYSICAL DESCRIPTION: 3,000 SQ. FT. BUILDING ALL ON ONE LEVEL WITH ADEQUATE STORAGE. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: PROVIDE THE BEST VISIBILITY FOR THE CONVENTION AND VISITORS BUREAU AND ESTABLISH IT AS A VITAL PART OF THE COMMUNITY. IMPACT ON OPERATING BUDGET: ADDITIONAL OPERATING AND MAINTENANCE COSTS. FINANCING: $ 250,000 OTHER (CVB FUNDS) (1) $ 250,000 TOTAL 4-12 139 4-13 140 i COMMUNITY DEVELOPMENT PROJECT TITLE: CITY HALL ELEVATOR LOCATION: CITY HALL lit PURPOSE: PERMIT ACCESS, INCLUDING ACCESS FOR Ij MOBILITY—IMPAIRED PERSONS, TO ALL THREE LEVELS FOR SERVICES OFFERED. TO BE IN ! COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT. ((; PHYSICAL DESCRIPTION: ELEVATOR MEETING ALL HANDICAPPED— I� ACCESSIBILITY REQUIREMENTS INTER- i CONNECTING ALL THREE FLOORS OF CITY HALL. UNIT OF WORK: i DESIGN AND CONSTRUCT i JUSTIFICATION: CONVENIENCE AND SAFETY OF PUBLIC AND i COMPLIANCE WITH AMERICANS WITH DISABILITIES ACT. a IMPACT ON OPERATING BUDGET: ADDITIONAL OPERATING AND MAINTENANCE COSTS. j FINANCING: $ 200,000 GENERAL FUND (A) $ 200,000 TOTAL 4-13 140 LONG-RANGE CAPITAL IMPROVEMENT PROGRAM Unfunded Needs List The following list of Capital Improvement Program Needs consists of those projects which have been identified as major long-range facility improvements for which funding is currently not available. These orojects are not listed in any order of priority. TRANSPORTATION AND PUBLIC WORDS 1) Bloomfield Road - I-55 to Benton Hill Road 2) Broadview from Independence to North Kingshighway (at Maria Louise Lane) 3) Broadway - Perry to West End Boulevard or Henderson (widening) and West End Boulevard or Henderson to Main Street (general improvements) 4) Cape Rock Drive - Big Bend Road to Cape Rock Park - widening with curb and gutter 5) Clark Avenue - Lombardo to Marietta connection 6) Edgewood Drive - Bloomfield to William Street 7) Gordonville Road - Independence to Mount Auburn - widening with curb and gutter 8) Hopper Road (existing) - Mt. Auburn to Kage - widening with curb and gutter 9) Howell Street low-water crossing improvements at Scivally Branch 10) Independence Street - Kingshighway to West End (widening) and from West End Boulevard to Water Street (general improvement) 11) Linden Street - widening/upgrade to collector status 11) Lombardo Street - box culvert additions and realignment 13) Main Street - Realignment from Mason Street to Second Street and New Sloan Creek Bridge 14) Main Street - widening from Mill to Mason 15) New Madrid Street - Clark to Perry Avenue -widening with curb and gutter. .16) North Sprigg Street - Lexington to Route 177 extension 17) Old Sprigg Street Road/Lexington Avenue intersection improvements 18) Silver Springs Road (Shawnee Parkway to Southern Expressway extended) - general improvements 19) Sprigg Street - New Madrid to Southern Expressway - general improvements and/or widening 20) Vantage Drive - Percy Drive to Kingshighway at Boulder Crest (west) 21) West End Boulevard - Southern Expressway to Shawnee Parkway to Bloomfield to Bertling and Extended to Lexington - general upgrade 22) Street lighting improvements 23) Additional streets per Major Street Plan 24) Airport - Additional Airport Improvement Program projects per Airport Master Plan 25) Airport - Corporate parcel and utility road extensions 26) Airport - land acquisition 27) Airport - Development of an Airport Industrial Park 28) Airport - New wastewater treatment facilities 29) Public Works ADA upgrade 30) Public Works free-standing communications antenna 141 ENVIRONMENT 1) N. Sprigg Street (Upper Sloan Creek) trunk sewer extension. 2) Cape Rock Village/Tanglewood Estates main lift station and force main 3) Ramsey Branch trunk sewer (I-55 to north City limits) 4) Highland Drive -Oakland Street -Engram Street trunk sewer 5) Sewer Improvement Program Projects per Sewer Master Plan 6) Water System Improvement Program Projects per Nater Master, Plan 7) Public Works property acquisition - new recycling center - compost site 8) "Arena" creek realignment - Arena Park 9) Stormwater, detention basins/major stormwater channel projects 10) Water Plant No. 1 Phase III expansion 11) Storage facility west of I-55 (additional) 12) Bloomfield Road pump station 13) Emergency back-up power 14) Kingsway booster pump station 15) Water Plant No. 2 expansion 16) 20 -inch main extension (Plant 2 to Highway 61) 17) 16 -inch main extension (Plant 2 to Highway 61) 18) 1-55 and William Street 14 -inch upgrade 19) 14 -inch main extension (North Sprigg) 20) 12 -inch main extension (Kingshighway) 21) 12 -inch main extension (Highway 177 to Cape Rock) 22) 12 -inch main extension (Lexington) 23) 12 -inch main extension on Perryville Road 24) 12 -inch main extension Plant 2 to Industrial Park/Airport 25) 8 -inch main extension (Meadowbrook) 26) 8 -inch main extension (Mt. Auburn and Hopper Road) 27) Main replacement (Downtown) 28) 4 -inch main replacement (City wide) 29) 2 -inch main replacement (City wide) 30) Fire protection upgrade (Kingshighway) 31) Fire hydrant replacement (City wide) 32) Nater rehabilitation (4 tanks) 33) Water tank seismic protection. 34) North County Park water improvements 35) North County Park sewer system and lift station 142 PARKS AND RECREATION 1) Basketball Court Washington Park 2) Capaha Park Gazebo 3) Cherokee Park Shelter Parking Lot Paving 4) Indian Park Improvements . S) Capaha Park Basketball Court (lighted, fenced, regulation court) 6) Arena Park Paving Off Street Parking #5, #10, #11 7) Arena Park Ballfield Spectator Paving 8) Arena Park Road Paving by Fields #12, #13, #14, #15 9) Tennis Court Renovation (lights, fence_, windscreen calor. coating) 10) New Bandshell Restroom 11) Arena Park Restroom (replace brick restroom) 12) Capaha Ballfield Restroom/Concession Facility 13) Golf Course Pro Shop 14) Bent Grass Greens at Golf Course 15) Driving Range 16) Par 3 Golf Course 17) General Golf Course Development 18) Riverfront Trail Project COMMUNITY DEVELOPMENT 1) Public Safety Annex/Emergency Operations Center/Communications Center - Police Station area 2) City Hall Standby Power System 3) Neighborhood and downtown redevelopments 4) Historic preservation 343 This page intentionally left blank. 144