Loading...
HomeMy WebLinkAboutCIP1991-1996[guar I Ni n INS 1!1(�rl M -w 11111.01111 p POOR re, P, 'N. PAR BILL NO. 91-38 RESOLUTION NO. 6 D? A RESOLUTION ADOPTING THE FISCAL 1991 - 1996 - CAPITAL IMPROVEMENT PROGRAM WHEREAS, Article VI, Section 6.04 of the Charter of the City of Cape Girardeau requires a Capital Improvement Program; and WHEREAS, the City Manager has presented a proposed Capital Improvement Program to the City Council; and WHEREAS, proper notice has been published concerning the availability for inspection of the proposed Capital Improvement Program and the time and place for a public hearing on the Capital Improvement Program; and WHEREAS, the City Council has held a public hearing on the proposed Capital Improvement Program. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Council hereby adopts the five-year Capital Improvement Program for fiscal 1991-1996, copies of which are on file in the office of the Citv Clerk. ARTICLE 2. The City Clerk is instructed to attach an executed copy of this resolution to a copy of the Capital Improvement Program for fiscal 199171996 and to retain such copy with the permanent records of the City. PASSED AND ADOPTED THIS (g U- DAY OF 19 pI ancis E. Rhodes, Mayor ATTEST: cyw�'aojD Julie A. Dale Deput,xy City Clerk TABLE OF CONTENTS ITEM PAGES Introduction: City Manager's Letter I Revenue Sources VI Summaries: Revenue Funding Sources By Fiscal Year Graph VII Summary of Funding Sources by Fiscal Year 1991-19.96 VIII Summary of Recommended Capital Improvement Program IX Expenditures 1991-1996 by Program Description and Source of Funds Summary of Funding Sources Graph X Capital Improvement Budget By Program Area Graph XI Capital Improvements Program: Transportation 1 - 35 Environment 36 - 56 Recreation and Leisure 57 - 63 Community Development 64 - 66 March 18, 1991 The Honorable Mayor •and Members of the City Council City of Cape Girardeau Dear Mayor and Council Members: INTRODUCTION In -accordance with Article VI, Section 6.04 of the City Charter, a recommended five year capital program was submitted to the City Council. This five year plan is for the period July 1, 1991, through June 30, 1996. On March 18, 1991, in accordance with the City Charter, the City Council held a public hearing for the Capital Improvement Program. Following public input, the City Council passed a resolution on that day adopting the Capital Improvement Program It should be noted that this final Capital Improvement Program for fiscal years 1991-1996 includes some changes from the proposed document. The material contained within the budget document complies with the requirements of the Charter as to program proposals, cost estimates, methods of financing, projection of revenue sources to meet costs, recommended time schedule for each improvement, and any anticipated impact on the annual operating budget. In reviewing this proposed document, the City Council will give particular emphasis to establishing priorities for projects and realistic financing sources for implementation. The projects included in this document are attainable without additional revenue authorized by the voters in the community with the exception of certain sewer system improvements which will need a revenue bond authorization. Also, while the projects included herein are attainable through available revenue sources, a number of these depend on the cooperation of property owners and other agencies. Each of the major advisory boards to the City Council and department heads were invited to submit proposed projects -for consideration in this program. In addition, a number of projects from the previous five-year capital improvement program are also included. BACKGROUND The Capital Improvement Program should, be considered as an investment in the future of our community. The selection and evaluation of capital projects is a difficult task that involves some speculation and the ability to make estimations which, to some extent, are based on historical perspectives. I The City Council, in 1983, formally considered and adopted a long range Capital Improvement Program for the first time under the current Charter requirement. This budget' document process should provide a relevant approach to identifying and implementing important community -wide projects. PROGRAM AND FINANCING DESCRIPTIONS The major category program areas in which the various projects have been described include Transportation, Environment, Recreation and Leisure Time, and Community Development. These major categories contain the following types of projects: 1. Transportation. The activities in this area provide for the construction of the public streets within the City and Municipal Airport improvements. 2. Environment. The preservation, restoration, and care of the physical resources of the City, including the control of solid waste, wastewater, and stormwater. 3. Recreation and Leisure Time. The programs under this area provide the facilities for citizens to enjoy an opportunity to participate in organized and unorganized leisure time activities. 4. Community Development. Activities under this area include construction of general public facilities and community projects which have citywide effect. We have included the types of revenue sources which are recommended as ways to consider for the financing of the various capital improvements. The following is a brief discussion of what the various revenue sources include. A. General Fund Revenues. These revenues would be included and available on an annual appropriation basis from the City's general fund, which includes the receipt of revenues from many and various sources. B. General Obligation Bonds. These bonds are issued for the financing of general public improvements and must be authorized by a 4/7 majority vote of the citizens. Approval of these bonds by the electorate also authorizes a property tax levy to retire the debt. II C. Revenue/PFA Bonds. These bonds are issued for the financing of self-supporting and general public improvements. Revenue bonds are not included within the limitations of indebtedness by the City and are issued upon the authorization of a majority, voter approval. These bonds are used for enterprise funds such as water, sewer and electric utilities, as well as the Airport and Golf Course operations. PFA Bonds are issued upon City Council approval based on collateralized assets and annual lease/purchase appropriations. Cash flows for debt retirement come from the existing revenue and from new receipts to be generated by the facilities' operations. D. State Grants. The City is eligible to submit grant applications to the State of Missouri for funds that they may have available either from their own revenue sources or, in some cases, from revenue sources that they administer for various federal agencies. E. Motor Fuel Tax Receipts. This fund provides for the receipt and disbursement of the revenues the City receives as its portion of the State Gasoline Tax, State Motor Vehicle Licensing, and State Motor Vehicle Sales Tax. The revenues from this source can be used for capital, as well as annual operating maintenance expenses as they relate to improvements on the City's streets. F. Federal Grants. The City is eligible to receive various federal grants on a competitive basis from the appropriate federal agency. This could include the Environmental Protection Agency as it relates to wastewater improvements, the Federal Highway Administration which administers and distributes funds from the Federal Gasoline Tax revenue through the Federal Aid Urban program, or the Federal Aviation Administration for airport improvements. G. Special Assessments. This category provides for the consideration of special assessments which are used for public improvements affecting specific areas. The total or a portion of the cost of an improvement is divided among property owners who benefit from the project. This type of funding can be used for diverse improvements including streets, storm water, sanitary sewer or sidewalk improvement. H. Capital Improvement Sales Tax. A 1/4 cent, 3/8 cent, or 1/2 cent Sales Tax can be issued by the City for various general types of public improvements. Such a tax requires the approval by the electorate with simple majority. In November, 1988, the voters of Cape Girardeau adopted a 1/4 cent sales tax effective January 1, 1990, restricted to flood control projects. III I. Other. This category is used for donations, operating revenues from funds other than the Gener4l Fund, reserves, proceeds from the sale of fixed assets, etc. PROPOSED IMPROVEMENTS The total Capital Improvement Program included here is $34,135,442. This program is $9,656,492.00 more than the program approved last year, primarily due to the inclusion of some major improvements to the older parts of the sewer system identified in the Master Sewer Plan currently being developed. The largest category for funding proposed improvements over the next five years is through Revenue Bonds. This provides for $9,273,551.00 in funding over this period of time. The second largest source of funding for proposed improvements is through the use of Capital Improvement Sales Tax ($7,987,393). This revenue source would be utilized totally for flood control improvements. The third largest funding source is the Special Assessments ($5,183,090), which will be used for street and lateral sewer projects. This area is proposed to be used based on the traditional policy in Cape Girardeau that improvements should be paid by those property owners directly benefiting from a project. The largest program area is Environment ($17,620,498). The most significant projects in this area are the funding of the Corps of Engineers Flood Control on Cape La Croix Creek -Walker Branch and the separation of storm and sanitary sewers in the College/Henderson watershed. The Transportation Program area ($15,813,944) contains the second largest amount of proposed expenditures over the next five year period. This is due to the extensive major street construction and Airport Improvement that is anticipated. The Recreation Program Area ($431,000) includes small improvement projects in the first year and some allocation of remaining funds to construction of new ballfields and soccer improvements in Shawnee Park. The Community Development Program Area ($270,000) includes only one project as presently proposed, an upgrade and expansion of the City's Public Works Center. This is a project that will eliminate the need to relocate the Public Works Center as had previously been discussed. Iv CONCLUSION The capital improvement program adopted by the Council is an ambitious program. However, the implementation of this program will allow for the creation of new job opportunities, an increase in revenues to private businesses, new businesses growing, existing businesses expanding, increased tax revenues to all taxing jurisdictions, and the strengthening of the quality of life in Cape Girardeau and all of Southeast Missouri. It is hoped that this plan will focus attention on community goals, needs and capabilites; reduce scheduling problems and conflicting or overlapping projects; maintain a sound and stable financial program; enhance opportunities for participation in federal or state funded programs; and achieve the highest public benefit fr$m the expenditure of City revenue. The projects proposed in this document are the product of many hours of deliberative thought by a number of people within this community. The Charter requires an annual review and revision of the Capital Improvements Program which assures that the program remains responsive to chancing demands and priorities. We plan to review the various projects and funding proposals contained within this document with City Council members in various work sessions and the public hearing. The final scope of this program as adopted by the City Council following the appropriate public hearing is limited to affordable, achievable, priority projects. The final plan should be regarded as a sound, fiscally responsible working document that can and will be implemented through the annual budget appropriation process of the City Council, support from the citizens of Cape Girardeau for appropriate revenue sources, and diligent action by the City staff. JRF/AMS/jad Respectfully submitted, YRonald Fischer City Manager V Alvin M. Stoverink Assistant City Manager A. B. C. D. E. REVENUE SOURCES General Fund Revenues General Obligation Bonds Revenue/PFA Bonds State Grants Motor Fuel Tax Receipts VI F. Federal Grants G. Special Assessments H. Capital Improvement Sales Tax I. Other Revenue Fund -Ing Sources by Fiscal Year Capital Improvement Budget 10,030,000 $,ODD.ODO 6,030.000 4,ODD.ODD 2,03D.OD0 991-92 1992-93 1953--94. 1994-95 1995-98 VII SUMMARY OF FUNDING SOURCES BY FISCAL YEAR 1991-1996 I SOURCE OF FUNDS J I 1 1991-92 1 I 1 1992-93 1 I 1 1993-94 I I I 1 1994-95 1 I I 1995-96 I I I TOTAL I 1 GENERAL FUND REVENUES J S 197,500 J $ 150,000 I S 200,800 J $ 218,600 1 $ 195,000 I $ 961,900 1 I GENERAL J OBLIGATION BONDS I I I 1 I I I I I I I 1 I I ! I 1 S 1 I 000000 J 1 I J REVENUE t BONDS/PFA I I $1,968,741 t I I 1 $2,872,010 I J J I $1,021,800 1 I $1,141,000 1 t f $2,270,000 I 1 S I I 9,273,551 J t I STATE GRANTS J i J S 466,500 1 I I I $ 185,000 1 I 1 I S 50,800 I I I S 21,550 I I I 1$ I I 723,850 I I MOTOR FUEL TAX RECEIPT J I 1 S 778,880 I I I 1 $1,755,040 J I I I S 587,500 ( J $ 348,750 I 1 S 744,590 I I 154,214,760 1 I I I I FEDERAL GRANTS I 1 $2,265,428 I I I I $ 100,000 1$ 1 1 i 914,600 J J S 523,100 J i J S 622,770 I 1 S J I 4,425,898 I I I SPECIAL I ASSESSMENTS I I $1,016,690 I I I 1 S 549,100 1 I J S 917,000 I ( $1,381,350 I I 1 $1,318,950 I I I S I I 5,183,090 I I J CAPITAL J IMPROVEMENT SALES I TAX 1 $2,172,725 I I I J $3,814,668 I I I $2,000,000 I I I I I I i J S J I 7,987,393 1 I I I OTHER J I 1 $ 287,000 I I I 1 S 532,000 J J I $ 182,000 I 1$ 182,000 J I 1 $ 182,000 I I 1 $ I I 1,365,000 i I I TOTALS J I IS 9,153,464 ► I I 1 S 9,957,8181 I I $5,874,500 I 1 $3,816,350 I I 1 $5,333,310 I I I 1 $34,135,442 J 1 J. SUMMARY OF RECOMMENDED CAPITAL IMPROVEMENT PROGRAM I 1 EXPENDITURES 1991-1996 BY PROGRAM DESCRIPTION AND SOURCE OF FUNDS I GENERAL IGENERAL I REVENUE I IMOTOR FUEL I I I CAPITAL I I I PROGRAM I FUND IOBLIGAT.1 BONDS/ I STATE I TAX I FEDERAL I SPECIAL (IMPROVEMENT( I I 1DESCRIPTIONI REVENUES 1_BONDS I PFA I GRANTS I RECEIPTS I GRANTS (ASSESSMENT I SALES TAX I OTHER I TOTAL 1 I I I I I I 1 I I I I i ITRANSPORT. IS 310,900 1 IS 845,451 IS 353,850 IS4,214,760 IS4,225,898 IS4,506,690 1$1,356,395 I IS15,813,9441 j I I I I I I I I I I I I I I I I i I I I I I I 1ENVIRONMENTI I 1$ 8,428,10015 370,0001 1$ 200,000 IS 676,400 IS6,630,998 1$1,315,000 1$17,620,4981 IRECREATION i AND IS 381,000 1 I' I I I I I IS 50,000 1$ 431,0001 I LEISURE I I I I I I I I I I I I I I I I I I I ICOMMUNITY 1$ 270,000 I I I I I i I I IS 270,0001 IDEVELOPMEMTI I I I 1 1 I I I I I I I I I I I I I I I I I TOTALS 1$ 961,9001 IS 9,273,5511E 723,850 1$4,214,760 IS4,425,898 1$5,183,090 IS7,987,393 IS1,650,000 1$34,135,4421 IX Summary of Funding Sources Capital Improvement Budget STATE GRANTS/LOANS 2% MOTOR FUEL TAX RECEIPT 12% FEDERAL GRANTS/LOANS 13r SPECIAL ASSESSMENTS 15% OTHER 4%, RaENUE/PFA BONDS 17% GENERAL FUND REVENUES 3% CAP IWP SALES TA}; 23% Capital Improvement Budget By Program Area EWIRONMENT 52% V.0I i"%L-vI%L -NI MV AND LEISURE 1% TRANS PO RTATI O N 4-69 Transportation Capl.tal Improvement ent Budget 5,090,400 4,ODD,4D0 3,0';10,000 2,496.400. 1991-9a 1992-93 1933-91 1994-95 1995-98 -1- -2- TRANSPORTATION PROPOSED PROJECTS i I I 1991-92 I 1992-93 I 1993-94 I 1994-95 I 1995-96 i IPROJECTI NUMBER I IMPROVEMENT ITEM TOTAL COST FISCAL YEAR I FISCAL YEAR I FISCAL YEAR I FISCAL YEAR FISCAL YEAR I 1 1-1 I Lexington I I I $3,070,000 I $2,120,000 1$ 950,000 I I I I I Street I D,E,F,G I I I D,E,F,G I I E I I I 1 I (- 1 I 1 1-2 ( Hopper Road Bridge & I I I $1,296,110 I I I I i I I$ 665,750 I I I$ 630,360 I I I Extension to I E,F,G I I I I E,G I E,F I I I l I Kave Road I I I I I I I I I I 1 1-3 I Sprigg Street I I I$ 502,640 I$ 502,640 I I I I I Bridge I E,F I E,F I I I I I 1-4 I Street Overlay I $ 750,000 I $ 150,000 I $ 150,000 I $ 150,000 I $ 150,000 I $ 150,000 I E I E I E I E I E I E I 1 1-5 I I I Clark 227,500 I$ I I I I$ 227,500 I I Avenue I G I I I I G I I I 1 1-6 I I Brucher Street I I$ 64,100 I I I I I I I I$ 64,100 I I I I i I I A,G I I I I I I I I A,G I I I 1 1 1 I 1-7 1 311 Asphalt I Paving I I $ 750,000 I I $ 150,000 I I $ 150,000 I I $ 150,000 I I $ 150,000 I I $ 150,000 I I Program I G I G I G I G I G I I 1 1-8 I I N. Corporate I I$ 480,000 I I I I I I I I I I I$ 480,000 ' I ( Circle Drive ( G I I I I I 11-9 I North Sprigg I$ 650,000 I i$ 650,000 I I I I I I Extension I E,G I i E,G 1-10 I Perryville Road I $ 800,000 I ( $ 20,000 I I $ 100,000 I I $ 680,000 I I I I I I E,G I E I E I E,G i I I I I I I I 1 1-11 I I Vantage Drive I I$ 55,000 i I I i S 55,000 I I I I I I I I I I I E I I E I I I 1 1-12 I Silver Springs I$ 500,000 I I$ 25,000 I$ 475,000 I I I I Road I E,G I I E I G I I I Extension I I I I I I -2- TRANSPORTATION PROPOSED PROJECTS IPROJECTI J J 1991-92 J 1992-93 J 1993-94 I 1994-95 J 1995-96 I (NUMBER I IMPROVEMENT ITEM I TOTAL COST I FISCAL YEAR I FISCAL YEAR I FISCAL YEAR I FISCAL YEAR I FISCAL YEAR I I I 11-13 I Whitener St. I I S 24,790 I I $ I 24,790 I I I I I I I I I I I j I I I G I J G I I I I I I I I I I I I 11-14 I Good Hope I I S 38,720 I I S 38,720 I I I I I I I Bridge I E I E I I I I I I J 1-15 I Morgan Oak I I S 32,540 I I I I I S 32,540 I I I I I I I I J L I Bridge I I E I I 1 I E I I I J I I I I 11-16 I North Main I S 53,300 J S 53,300 J I I I I I I j I Widening J I E I I E I I I J I I I I I I I I 11-17 I Bloomfield I J S 31,200 I I S 31,200 I J I I I I I I I I J I I Widening J 1 E I J E I I J J I I I I I 1 I I 11-18 I S. West End I J S 665,000 I I I I I I I I S 63,000 I I I S 602,000 I I I I I Boulevard I I E,G I I I I I j I E I I E,G I I I I 11-19 I Sidewalks and I I $ 250,000 I I S 50,000 I I $ 50,000 I J S 50,000 I J S 50,000 I I S 50,000 J I I Curbs I A,G J A,G I A,G I A,G I A,G J A,G I I I J 1-20 I Mt. Auburn I I $ 387,000 I I I I S 30,000 I J I J $ 176,300 I I J S 180,700 I I I 1 I Extension I I G I I I G I I I I G j I G I I I I I 11-21 I Lorimier I I S 200,350 I J I J $ 20,000 I I I 15 78,600 I I J $ 101,750 I I 1 I Extension I j G I J I G I I I I G 1 I G I I I I J 1-22 I Flood Project I I $ 1,356,395 I I S 120,225 I I $1,236,170 i J I J I I I J I I J I Bridges I j H J I H H J I I I I I I I I I 11-23 I Airport I I $ 130,000 I I S 130,000 I I I I I I I I I I I I j I Fuel Depot J I A,D,F I j A,D,F J I I I I I I I I I -3- TRANSPORTATION PROPOSED PROJECTS IPROJECTI (NUMBER I 1 IMPROVEMENT ITEM I 1 TOTAL COST I 1991-92 FISCAL YEAR 1 1992-93 1 FISCAL YEAR 1 1993-94 I FISCAL YEAR I 1994-95 1 I FISCAL YEAR I 1995-96 1 FISCAL YEAR I 1 1-24 I Hangars I S 300,000 I i S 300,000 I I I 1 I I 1 I I I C I I I C J I 1 I I I I I I I I 1 1-25 1 I Ramp and 1 5 862,400 I 1 I I I 1 S 431,200 I I 1 5 431,200 I I I I I 1 I Taxiway 1 i A,D,F 1 i I I I A,D,F I I A,D,F I I I I I I I i 1-26 1 I Airport Land I $ 175,000 I I I I I i I I 1 I I $ 175,000 1 I I Acquisition 1 A,F I I I I I A•F I Airport 11-27 ( Terminal 1 5 1,076,899 I $ 1,076,899 I 1 Building 1 C,F I C,F I I I I I I I 1 1-28 1 I Airport Water 1$ 350,000 I 1$ 350,000 I I I I i I I System 1 A,F 1 A,F I I I I I I I Airport 1-29 I Sewer 1$ 195,000 I I I $ 195,000 I ( I I I 1 I Extension I I A,D,F I I I I I A,D,F J I I 1 I I I I I 11-30 1 I Airport Road 1 5 390,000 I 1 I I I I $ 390,000 i I I 1 I I I I I I Extension I I A,D,F I I I I I A,D,F I I I I I I i I I 11-31 I I Fire and I S 150,000 I I I i I I I I I $ 150,000 I I I I I J I Rescue I 1 A, F I 1 I J I I I A. F I I i I t I I I I i I TOTALS 1 i $15,813,944 I 1 $4,817,774 I I 1 $3,748,710 I I 1 $2,521,200 I I I I 52,206,450 i I I $2,519,810 1 I I I I I I 1 I I I 1 I I J I I J i I l I I I I I I I I l A I GENERAL FUND. I $ 310,900 1$ 66,500 1$ 25,000 I $ 75,800 1$ 93,600 1$ 50,000 1 B I GEN. OBL. FUNDS I, i I 1 I I I 1 C I REV/PFA BONDS 1$ 845,451 1$ 545,451 1 $ 300,000 1 I I I 1 D 1 STATE GRANTS, LOANSI $ 353,850 1$ 281,500 1 1$ 50,800 1$ 21,550 1$ 1 l E I MOTOR FUEL TAX 1 $ 4,214,760 1 $ 778,880 1 $ 1,755,040 1 $ 587,500 I $ 348,750 I $ 744,590 i F 1 FED. GRANTS, LOANS I $ 4,225,898 1$ 2,165,428 I 1$ 914,600 I $ 523,100 I S 622,770 1 I G 1 SPEC. ASSESSMENTS I $ 4,506,690 1 $ 859,790 1$ 432,500 1 5 892,500 1 $1,219,450 1 $1,102,450 1 I H I CAP. IMP. SALES TAXI S 1,356,395 1$ 120,225 1$ 1,236,170 1 I 1 1 I I I OTHER J I I 1 1 J 1 I I I I I I I I I I I I I I I I -4- PROJECT TITLE: LEXINGTON STREET LOCATION: KINGSHIGHWAY TO ROUTE 177 PURPOSE: PROVIDE FOR THE DEVELOPMENT OF LEXINGTON AS AN ARTERIAL STREET RUNNING EAST AND WEST ACROSS THE NORTH PART OF THE CITY. PHYSICAL DESCRIPTION: 17,424 LINEAR FEET OF CONCRETE AND ASPHALT PAVEMENT 44 FEET WIDE WITH CURBS. CONSTRUCTION OF BRIDGE OVER CAPE LACROIX CREEK. UNIT OF WORK: DESIGN, ACQUIRE RIGHT OF WAY, AND CONSTRUCT JUSTIFICATION: PER COMPREHENSIVE PLAN FOR ORDERLY TRAFFIC FLOW EAST/WEST THROUGH THE NORTH PART OF THE CITY. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $ 275,000 STATE GRANTS (D) $1,310,000 MOTOR FUEL TAX RECEIPTS (E) $ 825,000 FEDERAL GRANTS (F) $ 660,000 SPECIAL ASSESSMENTS (G) -5- PROJECT TITLE: HOPPER ROAD BRIDGE AND EXTENSION TO KAGE ROAD LOCATION: HOPPER ROAD PURPOSE: PROVIDE FOR THE REPLACEMENT OF THE BRIDGE ON HOPPER ROAD EAST OF MOUNT AUBURN ROAD AND THE RECONSTRUCTION OF HOPPER ROAD FROM JUST WEST OF THE HAWTHORNE SCHOOL PROPERTY TO MOUNT AUBURN ROAD. PROVIDE HOPPER ROAD EXTENSION TO KAGE ROAD. PHYSICAL DESCRIPTION: 110 LINEAR FOOT BRIDGE OVER CAPE LACROIX CREEK WITH A MINIMUM OF TWO LANES. 7,650 LINEAR FEET OF CONCRETE OR ASPHALT PAVEMENT WITH CURBS; 36 FEET WIDE. UNIT OF WORK: DESIGN, ACQUIRE RIGHT OF WAY, AND CONSTRUCT JUSTIFICATION: BRIDGE IS FUNCTIONALLY OBSOLETE, TOO NARROW FOR EXISTING TRAFFIC VOLUME. EXTEND EXISTING HIGH TYPE PAYVEMENT ON HOPPER ROAD TO HANDLE INCREASED TRAFFIC AND TO MATCH BRIDGE REPLACEMENT. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $293,340 MOTOR FUEL TAX RECEIPTS (E) $472,770 FEDERAL GRANTS (F) $530,000 SPECIAL ASSESSMENTS (G) PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: SPRIGG STREET PHASE.III SPRIGG STREET PROVIDE FOR THE REPLACEMENT OF THE_CAPE LA CROIX BRIDGE AT SOUTH SPRIGG STREET. APPROXIMATELY 110 LINEAR FOOT TWO-LANE BRIDGE AND APPROACHES. DESIGN, ACQUIRE RIGHT OF WAY BRIDGE IS FUNCTIONALLY OBSOLETE, NEARING STRUCTURAL OBSOLESCENCE. IT SERVES SEVERAL MAJOR INDUSTRIES AND WILL SERVE THE WASTE TRANSFER SITE FOR THE CITY. NO SIGNIFICANT IMPACT. $125,660 MOTOR FUEL TAX RECEIPTS (E) $376,980 FEDERAL GRANTS (F) -7- PROJECT TITLE: STREET OVERLAY LOCATION: CITYWIDE PURPOSE: PROVIDES FOR CONTINUING MAJOR STREET MAINTENANCE PROGRAM TO PROVIDE FOR THE OVERLAY OF 7 MILES OF LOCAL AND COLLECTOR ASPHALT STREETS. PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: MILLING OR OTHER SURFACE PROFILING METHOD AND ASPHALT OVERLAY. CONSTRUCT COST EFFECTIVE MAINTENANCE TO PREVENT NEED FOR FUTURE RECONSTRUCTION OF ENTIRE PAVEMENT. NO SIGNIFICANT IMPACT. $750,000 MOTOR FUEL TAX RECEIPTS (E) -8- PROJECT TITLE: CLARK AVENUE LOCATION: FROM LOMBARDO DRIVE TO MARIETTA STREET PURPOSE: TO PAVE A SECTION OF STREET PREVIOUSLY PLATTED. PHYSICAL DESCRIPTION: PAVING APPROXIMATELY 1640 FEET FROM LOMBARDO DRIVE TO MARIETTA STREET WITH ASSOCIATED DRAINAGE STRUCTURES. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: WILL CONNECT TWO ENDS OF CLARK.STREET, PROVIDING A SUB -COLLECTOR ROUTE NORTH AND SOUTH. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $227,500 SPECIAL ASSESSMENTS (G) PROJECT TITLE: BRUCHER STREET LOCATION: BERTLING STREET TO BUTLER STREET PURPOSE: PAVE AN EXISTING GRAVEL STREET PHYSICAL DESCRIPTION: PAVING, 20' WIDE FOR 915' AND STORM DRAINAGE IMPROVEMENTS. UNIT OF WORK: DESIGN AND CONSTRUCT. JUSTIFICATION: LOWER THE MAINTENANCE COSTS FOR THIS STREET AND IMPROVE THIS STREET TO A LEVEL SIMILAR TO THE SURROUNDING -AREA. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $ 32,050 SPECIAL ASSESSMENTS (G) $ 32,050 GENERAL FUND REVENUES (A) -10- PROJECT TITLE: 3" ASPHALT PAVING PROGRAM LOCATION: VARIOUS CITY STREETS PURPOSE: TO SURFACE EXISTING RESIDENTIAL GRAVEL STREETS. PHYSICAL DESCRIPTION: TWENTY FOOT (20') WIDE HOT MIX ASPHALTIC CONCRETE SURFACING ON EXISTING GRAVEL STREET BASE WHERE ADEQUATE DRAINAGE CAN BE ASSURED. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: REDUCE GRAVEL STREET MAINTENANCE COSTS. ENHANCE NEIGHBORHOOD QUALITY. IMPACT ON OPERATING BUDGET: REMOVAL OF APPROXIMATELY 7 MILES OF GRAVEL STREETS WILL SIGNIFICANTLY REDUCE COSTS OF GRADING AND ROCK REPLACEMENT. FINANCING: $750,000 SPECIAL ASSESSMENTS (G) -11- PROJECT TITLE: NORTH CORPORATE CIRCLE LOCATION: HIGHWAY 74 TO RUSMAR AVE. PURPOSE: TO REPLACE MINNESOTA AVENUE AS A LOCAL STREET SERVING AN INDUSTRIAL/COMMERICAL AREA. PHYSICAL DESCRIPTION: 2400 LINEAR FEET OF 40 FOOT WIDE ASPHALT OR CONCRETE PAVEMENT. UNIT OF WORK: DESIGN AND CONSTRUCT. JUSTIFICATION: ADDITIONAL NORTH/SOUTH CONNECTOR IS NEEDED FOR PRIVATE INDUSTRIAL DEVELOPMENT CURRENTLY PLANNED AND TO PROVIDE ADDITIONAL ACCESS TO SHAWNEE PARK SOCCER FIELD. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $480,000 SPECIAL ASSESSMENTS (G) -12- PROJECT TITLE: NORTH SPRIGG EXTENSION LOCATION: NORTH SPRIGG STREET PURPOSE: PROVIDE A NORTH -SOUTH LINK FOR VARIOUS EAST - WEST ARTERIAL STREETS TO THE DOWNTOWN AREA. EXTEND NORTH SPRIGG FROM BERTLING TO CONNECT WITH THE LEXINGTON/MELODY LANE ARTERIAL. PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: 4,150 LINEAR FEET OF CONCRETE OR ASPHALT PAVEMENT, 44 FEET WIDE WITH CURBS. DESIGN, ACQUIRE RIGHT OF WAY, AND CONSTRUCT PER COMPREHENSIVE PLAN FOR ORDERLY FLOW OF TRAFFIC IN THE COMMUNITY. NO SIGNIFICANT IMPACT. $207,500 SPECIAL ASSESSMENTS (G) $442,500 MOTOR FUEL TAX (E) -13- PROJECT TITLE: PERRYVILLE ROAD LOCATION: PERRYVILLE ROAD PURPOSE: PROVIDE FOR CONTINUED DEVELOPMENT OF PERRYVILLE ROAD AS COLLECTOR STREET NORTH TO THE CITY LIMITS. PHYSICAL DESCRIPTION: THIS PROJECT IS 1 MILE AND INCLUDES WIDENING AND ADDING CURBS AND GUTTERS. UNIT OF WORK: DESIGN, ACQUIRE RIGHT OF WAY, AND CONSTRUCT JUSTIFICATION: INCREASE THE SERVICE LEVEL OF THE ROADWAY TO HANDLE ADDITIONAL TRAFFIC VOLUME. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $242,500 SPECIAL ASSESSMENTS (G) $557,500 MOTOR FUEL (E) -14- PROJECT TITLE: VANTAGE DRIVE LOCATION: MO RTE. K NORTHERLY TO U.S. HIGHWAY 61 PURPOSE: PROVIDE AN OUTER ROAD BELT ALONG 1-55 AND CONNECTING NORTHERN ARTERIAL ROUTES. PHYSICAL DESCRIPTION: PRELIMINARY ENGINEERING TO ESTABLISH A RIGHT-OF-WAY CORRIDOR FOR VANTAGE DRIVE AS SHOWN ON THE CITY'S MASTER STREET PLAN. UNIT OF WORK: SURVEY, LEGAL AND ENGINEERING JUSTIFICATION: ORDERLY GROWTH ACCORDING TO THE ADOPTED 1987 COMPREHENSIVE PLAN IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $55,000.00 MOTOR FUEL TAX RECEIPTS (E) -15- PROJECT TITLE: SILVER SPRINGS ROAD LOCATION: SILVER SPRINGS ROAD PURPOSE: PROVIDE FOR THE CONTINUED DEVELOPMENT OF SILVER SPRINGS ROAD AS A COLLECTOR STREET. CONSTRUCTION NORTH FROM ROUTE K TO THE COMPLETED SECTION SOUTH OF INDEPENDENCE. PHYSICAL DESCRIPTION: 2,100 LINEAR FEET OF CONCRETE OR ASPHALT PAVEMENT 40 FEET WIDE WITH CURBS. UNIT OF WORK: DESIGN, ACQUIRE RIGHT OF WAY, AND CONSTRUCT JUSTIFICATION: TO EXTEND PER COMPREHENSIVE PLAN FOR ORDERLY TRAFFIC FLOW. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $475,000 SPECIAL ASSESSMENTS (G) $ 25,000 MOTOR FUEL TAX (E) . -16- PROJECT TITLE: WHITENER STREET LOCATION: FROM WESTERLY END TO SILVER SPRINGS ROAD PURPOSE: NEW CONSTRUCTION PHYSICAL DESCRIPTION: CONSTRUCT 30 FOOT WIDE PAVEMENT WITH CURBS AND DRAINAGE APPROXIMATELY 200' LONG. UNIT OF WORK: CONSTRUCTION JUSTIFICATION: CONNECTION TO SILVER SPRINGS ROAD NEEDED FOR. EMERGENCY VEHICLE AND OTHER ACCESS TO DENSELY DEVELOPED MULTI -FAMILY AREA. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $ 24,790 SPECIAL ASSESSMENTS (G) -17- PROJECT TITLE: GOOD HOPE/FOUNTAIN BRIDGE REMOVAL LOCATION: INTERSECTION OF GOODHOPE AND FOUNTAIN PURPOSE: REPLACEMENT PHYSICAL DESCRIPTION: DEMOLISH STRUCTURE, FILL ACROSS FOUNTAIN AND REPLACE GOOD HOPE PAVEMENT. PROTECT ADJACENT SANITARY SEWER. UNIT OF WORK: DESIGN AND CONSRUCT JUSTIFICATION:' USE OF BRIDGES BY RAILROAD HAS BEEN ABANDONED. AGE OF BRIDGES AND DETERIORATION REQUIRE ACTION TO MAINTAIN SAFETY OF GOOD HOPE. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $ 38,720 MOTOR FUEL TAX RECEIPTS (E) -18- PROJECT TITLE: MORGAN OAK/FOUNTAIN BRIDGE REMOVAL LOCATION: INTERSECTION OF MORGAN OAK AND FOUNTAIN PURPOSE: REPLACEMENT PHYSICAL DESCRIPTION: DEMOLISH STRUCTURE, FILL ACROSS FOUNTAIN AND REPLACE MORGAN OAK PAVEMENT. UNIT OF WORK: DESIGN AND CONSRUCT JUSTIFICATION: USE OF BRIDGES BY RAILROAD HAS BEEN ABANDONED. AGE OF BRIDGES AND DETERIORATION REQUIRE ACTION TO MAINTAIN SAFETY OF MORGAN OAK. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $ 32,540 MOTOR FUEL TAX RECEIPTS (E) -19- PROJECT TITLE: N. MAIN STREET WIDENING LOCATION: FROM MILL STREET TO MASON STREET PURPOSE: REHABILITATION PHYSICAL DESCRIPTION: REDUCE THE DEGREE OF CURVATURE OF NORTH MAIN AT MILL AND WIDEN PAVEMENT FROM MILL TO MASON STREET TO 38', MODIFY DRAINAGE, OVERLAY ENTIRE PAVEMENT. UNIT OF WORK: DESIGN AND CONSRUCT JUSTIFICATION: IMPROVE TRAFFIC FLOW AND SAFETY. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $ 53,300 MOTOR FUEL TAX RECEIPTS (E) -20- PROJECT TITLE: BLOOMFIELD ROAD WIDENING LOCATION: FROM U.S. 61 TO MOUNT AUBURN RD. PURPOSE: TO DEVELOP A PLAN OF IMPROVEMENTS TO ACCOMMODATE INCREASING TRAFFIC FLOWS. PHYSICAL DESCRIPTION: UNIT OF WORK: PRELIMINARY ENGINEERING JUSTIFICATION: TRAFFIC SAFETY IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $ 31,200 MOTOR FUEL TAX RECEIPTS (E) -21- PROJECT TITLE: SOUTH WEST END BLVD. LOCATION: FROM PROPOSED MO. RT. 74 TO SOUTHERN EXPRESSWAY PURPOSE: RECONSTRUCTION PHYSICAL DESCRIPTION: PAVE 4490' INCLUDING MEDIAN AND STORM DRAINAGE UNIT OF WORK: DESIGN, RIGHT OF WAY ACQUISITION, CONSTRUCT. JUSTIFICATION: ENHANCE TRAFFIC FLOW TO DEVELOPING INDUSTRIAL AND RECREATIONAL AREAS. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $ 500,000 MOTOR FUEL TAX RECEIPTS (E) $ 165,000 SPECIAL ASSESSMENTS (G) -22- PROJECT TITLE: SIDEWALKS AND CURBS LOCATION: CITY WIDE PURPOSE: NEW CONSTRUCTION PHYSICAL DESCRIPTION: REPLACEMENT OF CONCRETE SIDWALKS AND CURB SECTIONS AND CONSTRUCTION OF NEW SIDEWALKS.• UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: SAFETY AND MAINTENANCE IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $ 125,000 GENERAL FUND REVENUES (A) $ 125,000 SPECIAL ASSESSMENTS (G) -23- PROJECT TITLE: MT. AUBURN EXTENSION LOCATION: FROM BLOOMFIELD SOUTH TO PROPOSED MO HWY 74 PURPOSE: NEW CONSTRUCTION PHYSICAL DESCRIPTION: APPROXIMATELY WITH CURBS AND DRAINAGE 44' WIDE UNIT OF WORK: PRELIMINARY ENGINEERING AND CONSTRUCTION JUSTIFICATION: TO CONNECT MT. AUBURN, A WEST SIDE ARTERIAL STREET, WITH THE PROPOSED MO HWY 74 IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $ 387,000 SPECIAL ASSESSMENTS (G) -24- PROJECT TITLE: LORIMIER STREET EXTENSION LOCATION: FROM MORGAN OAK SOUTH TO PROPOSED MO HWY 74 PURPOSE: NEW CONSTRUCTION PHYSICAL DESCRIPTION: PAVING WITH CURBS 40 FEET WIDE APPROXIMATELY 1925 LINEAL FEET UNIT OF WORK: PRELIMINARY ENGINEERING, DESIGN AND CONSTRUCT JUSTIFICATION: TO PROVIDE A DIRECT ACCESS FROM THE PROPOSED MO HWY 74 TO THE DOWNTOWN BUSINESS DISTRICT OF THE CITY IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $ 200,350 SPECIAL ASSESSMENTS (G) -25- PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: BRIDGE REPLACEMENT - FLOOD PROJECT THEMIS ST. MERRIWTHER ST. GOOD HOPE ARBY'S BRIDGE BESSIE ST. MARIETTA ST. LINDA ST. BLOOMFIELD ST. REPLACEMENT (REALIGNMENT) REMOVE AND REPLACE BRIDGE AND APPROACHES DESIGN AND CONSTRUCT FLOOD CONTROL NO SIGNIFICANT IMPACT $1,356,395 CAPITAL IMPROVEMENT SALES TAX(H)- -26- PROJECT TITLE: FUEL DEPOT LOCATION: CAPE GIRARDEAU MUNICIPAL AIRPORT PURPOSE: TO UPDATE AND SECURE FUELING PIT PHYSICAL DESCRIPTION: BUILD NEW FUEL STORAGE AREA AND FUEL FLOW MONITORING. UNIT OF WORK: DESIGN, CONSTRUCT JUSTIFICATION: TO BECOME FUEL DISTRIBUTING POINT FOR ALL AIRPORT USERS AND SURROUNDING COMMUNITY AIRPORTS; IMPROVE THE SAFETY OF THIS FACILITY. IMPACT ON OPERATING BUDGET: INCREASE REVENUES TO AIRPORT OPERATING FUND. FINANCING: $117,000 FEDERAL GRANTS (F) $ 6,500 STATE GRANTS (D) $ 6,500 GENERAL FUND REVENUES (A) -27- PROJECT TITLE: HANGARS LOCATION: CAPE GIRARDEAU MUNICIPAL AIRPORT PURPOSE: TO ADD STORAGE FACILITIES AND OFFICE SPACE. PHYSICAL DESCRIPTION: CONSTRUCT ONE (1) CORPORATE HANGAR WITH ASSOCIATED OFFICE SPACE FOR RENTAL. UNIT OF WORK: DESIGN, CONSTRUCT JUSTIFICATION: FOR EVENTUAL REVENUES DERIVED FROM RENTALS AND TO ATTRACT ADDITIONAL BASED AIRCRAFT AND RELATED BUSINESS FOR THE AIPORT. IMPACT ON OPERATING BUDGET: INCREASE REVENUES TO AIRPORT OPERATING FUND. FINANCING: $300,000 REVENUE/PFA BONDS (C) -28- PROJECT TITLE: RAMP AND TAXIWAY CONSTRUCTION LOCATION: CAPE GIRARDEAU MUNICIPAL AIRPORT PURPOSE: INCREASE PARKING SPACE FOR AIRCRAFT - BETTER TRAFFIC FLOW. PHYSICAL DESCRIPTION: INCREASE GENERAL AVIATION RAMP -SOUTH BY APPROXIMATELY 1501; INSTALL TAXIWAY CONNECTING RAMP TO TAXIWAY C. UNIT OF WORK: DESIGN, CONSTRUCT JUSTIFICATION: TO ADD MORE EASE AND SAFETY IN HANDLING OF AIRCRAFT ON THE GROUND. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $776,200 FEDERAL GRANTS (F) $ 43,100 STATE GRANTS (D) $ 43,100 GENERAL FUND REVENUES (A) -29- PROJECT TITLE: LAND ACQUISITION LOCATION: CAPE GIRARDEAU MUNICIPAL AIRPORT PURPOSE: FOR AIRPORT INDUSTRIAL PARK, FUTURE TERMINAL AREA AND LAND USE CONTROLS PHYSICAL DESCRIPTION: PURCHASE OF APPROXIMATELY 115 ACRES OF LAND UNIT OF WORK: ACQUIRE LAND JUSTIFICATION: TO HAVE AMPLE AREA FOR AIRPORT IMPROVEMENTS AND AIRPORT DEVELOPMENT AS WELL AS PROVIDE A MEANS OF CONTROLLING DEVELOPMENT IN ADJACENT AREAS TO INSURE COMPATIBILITY WITH AVIATION ACTIVITY IMPACT ON OPERATING BUDGET: INCREASE REVENUE TO AIRPORT OPERATING FUND. FINANCING: $ 150,000 FEDERAL GRANTS (F) 25,000 GENERAL FUND (A) -30- PROJECT TITLE: RENOVATE TERMINAL BUILDING LOCATION: CAPE GIRARDEAU,MUNICIPAL AIRPORT PURPOSE: TO BETTER USE EXISTING SPACE AND TO MAKE THE FACILITY MORE EYE APPEALING AND ECONOMICALLY SOUND PHYSICAL DESCRIPTION: RENOVATE BUILDING TO FACILITATE TWO OR THREE AIRLINES; EXPAND THE RESTAURANT AND CREATE MEETING AND EXECUTIVE LOUNGES. UNIT OF WORK: DESIGN AND CONSTRUCT. JUSTIFICATION: ONGOING PUBLIC USE OF BUILDING WILL NECESSITATE ITS RENOVATION TO BECOME MORE ACCESSIBLE. IMPACT ON OPERATING BUDGET: REDUCE UTILITIES AND BUILDING MAINTENANCE; INCREASE REVENUES TO AIRPORT OPERATING FUND. FINANCING: $545,451 REVENUE/PFA BONDS (C) $531,448 FEDERAL GRANTS (F) -31- PROJECT TITLE: WATER SYSTEM LOCATION: CAPE GIRARDEAU MUNICIPAL AIRPORT PURPOSE: TO FACILITATE FIRE PROTECTION CAPABILITIES AND INCREASE POTABLE WATER ACCESS FOR FUTURE INDUSTRIAL DEVELOPMENT PHYSICAL DESCRIPTION: CONSTRUCTION OF A 100,000 GALLON WATER STORAGE FACILITY AND INSTALLATION OF MAINS, HYDRANTS, AND WELL CHLORINATION. UNIT OF WORK: DESIGN AND CONSTRUCT. JUSTIFICATION: TO INSURE PROPERTY FIRE PROTECTION FOR AIRPORT AND SURROUNDING INDUSTRIAL DEVELOPMENTS IMPACT ON OPERATING BUDGET: NO SIGNIFICANT.IMPACT. FINANCING: $315,000 FEDERAL GRANTS (F) $ 35,000 GENERAL FUND (A) -32- PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: SEWER EXTENSION AIRPORT SUPPLY SEWER FACILITIES TO ENTIRE AIRPORT DESIGN OF ENTIRE AIRPORT SEWER SYSTEM ,FOR AIRPORT AND AIRPORT INDUSTRIAL SITES. DESIGN, LAYOUT, CONSTRUCT ALLOW FOR COMPLETE SEWAGE DISPOSAL NO SIGNIFICANT IMPACT. $175,500 FEDERAL GRANTS (F) $ 9,750 GENERAL FUND REVENUES (A) $ 9,750 STATE GRANTS (D) mcgla PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: ROAD EXTENSION TO SERVE CORPORATE PARCELS AIRPORT TO SERVE AS ACCESS TO SOUTHSIDE OF RAMP EXTEND AIRPORT ACCESS ROAD AROUND EAST END OF RAMP. LEVEL AND DRAINAGE, FENCING DESIGN, CONSTRUCT TO ALLOW FOR ACCESS TO CORPORATE TRACTS ON. SOUTH SIDE OF RAMP NO SIGNIFICANT IMPACT. $351,000 FEDERAL GRANTS (F) $ 19,500 GENERAL FUND REVENUES (A) $ 19,500 STATE GRANTS (D) -34- PROJECT TITLE: FIRE AND RESCUE LOCATION: MUNICIPAL AIRPORT PURPOSE: TO PROVIDE FACILITY FOR FIRE FIGHTING AND RESCUE OPERATIONS PHYSICAL DESCRIPTION: CONSTRUCT DOUBLE BAY BUILDING WITH OFFICE AND STORAGE SPACE. UNIT OF WORK: DESIGN AND CONSTRUCT. JUSTIFICATION: FIRE PROTECTION AND RESCUE FACILITIES FOR EMERGENCY RESPONSE IN CASE OF AN ACCIDENT CURRENTLY DO NOT EXIST ON THE AIRPORT PROPERTY IMPACT ON OPERATING BUDGET: INCREASED BUILDING MAINTENANCE AND ADDITIONAL PERSONNEL TRAINING, EQUIPMENT, ETC. WILL BE REQUIRED. FINANCING: $ 135,000 FEDERAL GRANTS (F) $ 15,000 GENERAL FUND REVENUES (A) -35- Environment Capital Improvement Budget 6.25D.000 S,ODD.ODO 3,750.000 .50D.4D0 i ,25D.ODt 1991-92 1992-93 1933-34. 199.4-95 1995-98 -36- -37- ENVIRONMENT I PROPOSED PROJECTS I IPROJECTI J J 1991-92 I 1992-93 I 1993-94 J 1994-95 J 1995-96 I 1NUMBER I IMPROVEMENT ITEM I TOTAL COST I FISCAL YEAR I FISCAL YEAR I FISCAL YEAR I FISCAL YEAR I FISCAL YEAR I I I I I I I I I I J 2-1 I Middle Street I S 175,200 J J 8 175,200 J I J J J J L i Drainage Project J I H J J J I H J I J I I I I I I I J 2-2 I I Cape LaCroix - J I $6,000,000 J I 82,000,000 J I $2,000,000 J I 52,000,000 J I J i J I J Walker Creek J H J H J H J H J J J J I Flood Control I I 12-3 J I Upper Cape La J I 52,625,000 J I 81,250,000 I I 81,375,000 J I I I J I I I Croix - Phase IV J C,D,F J C,D,F J C,D,F j I Trunk Sewers I J I I I I I I I J 2-4 J I S. Kingshighway J I 8 110,000 I I $ 20,000 i$ I 90,000 J I J I J I J J I Sewer I G J G I G I I J I I I 12-5 I I N. Kingshighway I I $ 285,000 I I $ 285,000 J I J I J I I I J J J Sewer I C,G I C,G J J J J I I I J 2-6 I I Walker Branch J I S 455,798 J I 8 52,500 i I 5 403,298 I I I J J Sewer I H J H I H I J I I I I J 2-7 J I Belleridge Sewers J I 8 242,600 I I I I J 8 10,400 I J S 15,700 I I J S 216,500 I J J I I Phase I& 11 J I G J I J J J G 1 J G I J G J I l I I J 2-8 J I Gerhardt Lift J$ 33,500 I I J S 6,900 J S 26,600 I J I J I I J I I J Station J G J G J G I J J I j I Intercepter I J I I I I I I J 12-9 J Sloan Creek I J $ 461,000 I i I I I I I J S 41,000 I I S 420,000 J J 1 I Sewer Extension J C I J J I I J I J C I J C I I I I I J 2-10 I Lakeshore Drive I J S 160,300 I J I J I J $ 14,100 I J 8 146,200 I I J I J J I Sewer J G I J I J I I G l J G t J J 1 I I 12-11 I J Infiltration and I J 8 910,000 I J S 182,000 I J S 182,000 I J $ 182,000 I I S 182,000 I I J 8 182,000 J J inflow Program J I J 1 I I J 1 J I I I I I J 2-12 I I Clark Avenue I J 8 471,000 I I I J $ 94,200 I J $ 376,800 I J I I J J J J I Relief I J C I J I I C I I C I I I I I 1 I -37- Qc%19 ENVIRONMENT I I PROPOSED PROJECTS jPROJECTj LUMBER I I IMPROVEMENT ITEM I j TOTAL COST 1991-92 1 FISCAL YEAR 1992-93 I FISCAL YEAR 1993-94 j FISCAL YEAR 1994-95 j FISCAL YEAR 1995-96 j FISCAL YEAR I I I I I I I I I 1 2-13 I Outfall Relief 1 5 201,000 1 5 40,200 1 5 160,800 I I I I I I I I I C I I C 1 I C I ► I I I I I I 1 1 2-14 1 West Side Relief 1$ 940,100 1 5 188,090 j $ 752,010 j I I 1 I Sewer I I C I I C 1 j C I I I I I I I I I I 1 2-15 I I I I I Landfill I Expansion I I S I 550,000 1 C 1 I I 1$ I I I 50,000 1 C 1 5 50,000 C I I i S 250,000 I C I I I j S 200,000 j I C I I 1 1 2-16 I Pneumatic Lime 1$ 500,000 1 5 75,000 i S 425,000 1 I I I I Add. Station 1 I C I I C I I C I I I I I I I I I I j 2-17 1 I I I College/Henderson 1 Sewer Segregation I I $2,650,000 1 I,C 1 I S 55,000 1$ I I 350,000 I I 1 5 595,000 I C I j 5 750,000 I C I I j 5 900,000 1 I C 1 2-18 I I I 1 I Walnut/Henderson 1$ Sewer Segregation ( j 850,000 I C I I 1 I I j I I 1$ 100,000 I C I j S 750,000 j I C I i I I I I 1 I I I TOTALS i I I I I $17,620,498 I 1 $4,154,690 I I I 1 $6,084,108 I I I j $3,228,300 I I I 1 $1,484,900 I I I I i 52,688,500 1 I I i i I i I I I I I I I I I I I I I I I I I I I I I I I I I I A I GENERAL FUNDS 1 B I C 1 GEN. OBL. FUNDS j REV/PFA BONDS 1$ 8,428,100 1 $1,423,290 1 52,572,010 1 $1,021,800 j 51,141,000 i 52,270,000 1 1 D I STATE GRANTS/LOANS 1$ 370,000 1$ 185,000 1 5 185,000 I E I MOTOR FUEL TAX I I I I I I I 1 F 1 G 1 FED. GRANTS/LOANS I SPEC. ASSESSMENTS 1 5 l S 200,000 676,400 j$ 100,000 1 5 156,900 1 5 100,000 1$ 116,600 1 j 5 24,500 I 1$ 161,900 I I 1 5 216,500 j 1 H J 1 J CAP IMP SALES TAX I OTHER 1$ 1$ 6,630,998 1,315,000 1 $2,052,500 I $ 237,000 1 $2,578,498 1 $ 532,000 1 $2,000,000 I $ 182,000 1 I $ 182,000 I I I$ 182,000 I I i I I I i I I I I I I I I I I I I I I I I I I I I I I I i I I I I I 1 I I I j I I I I i I I I I I I I I I I I I I I I I I I I I I I I I I I I Qc%19 PROJECT TITLE: MIDDLE STREET DRAINAGE SYSTEM LOCATION: MIDDLE STREET PURPOSE: TO ALLEVIATE FLOODING AT THE INDEPENDENCE AND MIDDLE STREET INTERSECTION. PHYSICAL DESCRIPTION: CONSTRUCT DETENTION BASIN WITH STORM SEWER LINES. UNIT OF WORK: CONSTRUCT JUSTIFICATION: PHASES 2 AND 3 OF A PLAN TO REDUCE STREET AND PROPERTY FLOODING. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 175,200 CAPITAL IMPROVEMENT SALES TAX (H) -39- PROJECT TITLE: CAPE LA CROIX - WALKER BRANCH FLOOD CONTROL LOCATION: CAPE LA CROIX AND WALKER CREEKS PURPOSE: TO REDUCE FLOODING PHYSICAL DESCRIPTION: THREE MILES CHANNELIZATION; 157 ACRE DETENTION FACILITY; PARKS AND RECREATION FACILITIES UNIT OF WORK: DESIGN, ACQUIRE RIGHT OF WAY, AND CONSTRUCT JUSTIFICATION: FLOODING IN THE CAPE LA CROIX-WALKER CREEK WATERSHED IS CREATING SERIOUS DAMAGE TO PROPERTY AND ENDANGERS THE LIVES OF CAPE GIRARDEAU CITIZENS IMPACT ON OPERATING BUDGET: ADDITIONAL PERSONNEL AND MAINTENANCE EQUIPMENT PER YEAR WILL BE REQUIRED FOR ON-GOING MAINTENANCE OF THESE FACILITIES. FINANCING: $6,000,000* CAPITAL IMPROVEMENT SALES TAX (H) *INCLUDES REMAINING LOCAL SPONSOR SHARE ONLY. BRIDGE RELOCATIONS REQUIRED FOR THIS PROJECT ARE SHOWN IN TRANSPORTATION SECTION. -40- PROJECT TITLE: UPPER CAPE LA CROIX - PHASE IV LOCATION: RT. W TO SAN DANGARO SUBDIVISION, GOLF COURSE, AND CORPS DETENTION AREA PURPOSE: TO EXTEND SEWER SERVICE TO NORTHWEST PART OF CITY. PHYSICAL DESCRIPTION: CONSTRUCTION OF APPROXIMATELY 4.5 MILES OF SANITARY TRUNK SEWERS UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: EXTENDS CITY SEWER SERVICES IN NORTHWEST PART OF CITY AND WOULD ELIMINATE FOUR SEWAGE LAGOONS AND TWO PACKAGE TREATMENT PLANTS IMPACT ON OPERATING BUDGET: INCREASED DEPRECIATION EXPENSE. FINANCING: $ 370,000 STATE GRANTS (D) $ 200,000 CORPS OF ENGINEERS (F) $2,055,000 REV BOND/SEWER FEES__(C) -41- PROJECT TITLE: S. KINGSHIGHWAY SEWER LOCATION: BOTH SIDES OF HWY 61 SOUTH FROM SOUTHERN EXPRESSWAY PURPOSE: NEW CONSTRUCTION PHYSICAL DESCRIPTION: CONSTRUCTION OF APPROXIMATELY 1680 FEET OF SANITARY SEWER AND APPURTENANCES UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: REPLACEMENT OF SEPTIC SYSTEMS IN RESIDENTIAL AND COMMERCIAL/INDUSTRIAL AREAS. SOIL CONDITIONS ARE POORLY SUITED TO SEPTIC SYSTEMS. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $ 110,000 SPECIAL ASSESSMENTS (G) -42- PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: NORTH KINGSHIGHWAY SEWER NORTH KINGSHIGHWAY NEW CONSTRUCTION 2800 FEET OF 8' SANITARY SEWER; 2100 FEET OF 27" SANITARY SEWER DESIGN AND CONSTRUCT PUBLIC HEALTH AND ECONOMIC DEVELOPMENT INCREASE DEPRECIATION EXPENSE $ 130,000 SPECIAL ASSESSMENTS (G) $ 155,000 REVENUE BONDS/SEWER FEES (C) -43- PROJECT TITLE: WALKER BRANCH SEWER RELOCATIONS LOCATION: VARIOUS BETWEEN PERRYVILLE RD AND JUNCTURE OF CAPE LA CROIX CREEK PURPOSE: RELOCATION PHYSICAL DESCRIPTION: REMOVAL AND RELOCATION OF VARIOUS SEGMENTS OF SANITARY SEWER UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: REQUIRED IN CONJUNCTION WITH FLOOD CONTROL PROJECT IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $ 455,798 1/2 CENT CAP IMPROVEMENT SALES TAX (H) -44- PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: BELLERIDGE SEWERS PHASES I & II BELLERIDGE SEWERS PHASES I & II NEW CONSTRUCTION APPROXIMATELY 6800 LINEAR FEET OF 8" SEWER WITH WYES AND MANHOLES DESIGN AND CONSTRUCT REPLACE INDIVIDUAL SEPTIC SYSTEMS WITH CITY SANITARY SEWER INCREASE DEPRECIATION EXPENSE $ 242,600 SPECIAL ASSESSMENTS (G) -45- PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: GERHARDT LIFT STATION INTERCEPTER FROM ACESS STREET TO SOUTHERN EXPRESSWAY NEW CONSTRUCTION APPROXIMATELY 1200 FEET OF SANITARY SEWER, ELIMINATING THE GERHARDT LIFT STATION DESIGN AND CONSTRUCT REDUCE MAINTENANCE COST OF SEWER SYSTEM, ELIMINATE A FEW RESIDENTIAL AND COMMERCIAL SEPTIC TANKS NO SIGNIFICANT IMPACT $ 33,500 SPECIAL ASSESSMENTS (G) -46- PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: SLOAN CREEK SEWER EXTENSION FROM BERTLING TO LEXINGTON NEW CONSTRUCTION EXTENSION OF SANITARY SEWER TRUNK LINE APPROXIMATELY 4500 FEET DESIGN AND CONSTRUCT ECONOMIC DEVELOPMENT AND HEALTH NO SIGNIFICANT IMPACT $ 461,000 REVENUE BOND/SEWER FEES (C) -47- PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: LAKESHORE DRIVE SANITARY SEWER LAKESHORE DRIVE REPLACE OLD EXISTING SEPTIC SYSTEMS WITH A NEW SANITARY SEWER 4780 FEET OF 8" SANITARY SEWER WITH 40 WYE CONNECTIONS DESIGN ENGINEERING AND CONSTRUCT PUBLIC HEALTH NO SIGNIFICANT IMPACT $ 160,300 SPECIAL ASSESSMENTS (G) -48- PROJECT TITLE: INFILTRATION AND INFLOW PROGAM LOCATION: VARIOUS PURPOSE: MAJOR REPAIR AND REPLACEMENT OF DETERIORATING INFRASTRUCTURE IN SEWWER SYSTEM PHYSICAL DESCRIPTION: INVESTIGATE AND ANALYZE COLLECTION SYSTEM FOR INFLOW AND INFILTRATION AND TAKE CORRECTIVE MEASURES TO LIMIT UNIT OF WORK: DATA COLLECTION, ENGINEERING, REPAIR, CONSTRUCTION JUSTIFICATION: RECLAIM SANITARY SEWER CAPACITY AND REDUCE OPERATION COSTS OF TREATMENT PLANT TREATING STORM AND GROUND WATER ELIMINATE SURCHARGING AND BUILDING SEWER BACK-UPS. IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT $ 910,000 SEWER REVENUES (I) -49- PROJECT TITLE: CLARK AVENUE RELIEF LOCATION: ALONG WALKER BRANCH FROM HOWELL ST. TO PARKSITE DR. PURPOSE: RELIEF LINE PHYSICAL DESCRIPTION: APPROXIMATELY 5000 FEET OF 15" DIAMETER SANITARY SEWER LINE UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: RELIEVE EXISTING OVERLOAD AND PERMIT COMPLETE DEVELOPMENT OF THE DRAINAGE BASIN. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 471,000 REV. BOND/SEWER FEE (C) -50- PROJECT TITLE: OUTFALL RELIEF SEWER LOCATION: IMMEDIATELY UPSTREAM OF WASTEWATER TREATMENT PLANT PURPOSE: RELIEF LINE PHYSICAL DESCRIPTION: APPROXIMATELY 550 FEET OF 36" DIAMETER SANITARY SEWER LINE UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: ALLOW THE PLANT TO ACCEPT THE FULL PUMPING CAPACITY OF THE FOUR LIFT STATIONS ALONG THE MISSISSIPPI, REDUCING WET WEATHER BYPASSES AT THOSE POINTS IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 201,000 REV.BONDS/SEWER FEES (C) -51- PROJECT TITLE: WEST SIDE RELIEF SEWER LOCATION: SOUTH OF BRINK SUBDIVISION ALONG CAPE LA CROIX CREEK TO WEST END BLVD. PURPOSE: RELIEF LINE AND REPLACEMENT PHYSICAL DESCRIPTION: REPLACE A SEGMENT OF 21" DIAMETER PIPE WITH 36" DIAMETER PIPE APPROXIMATELY 5000 FEET UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: RELIEVE UPSTREAM SURCHARGING PROBLEMS AND PROVIDE CAPACITY FOR FUTURE GROWTH GENERATED BY THE EXTENSION OF UPSTREAM TRUNK LINES IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT FINANCING: $ 940,100 REV BONDS/SEWER FEES (C) -52- PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: LANDFILL EXPANSION LANDFILL TO PROVIDE LAND FOR NECESSARY EXPANSION ACQUIRE AND DEVELOP SPACE TO MEET PERMITTING REQUIREMENTS FOR A RESERVE LANDFILL. DESIGN, LAND ACQUISITION, CONSTRUCTION CURRENT LANDFILL SITE NEAR CAPACITY RESERVE LANDFILL WILL BE NEEDED ON CONTINUING BASIS TO GO WITH RECYCLING AND TRANSFER STATION OPERATIONS. NO SIGNIFICANT IMPACT; FAILURE TO COMPLETE THIS PROJECT COULD RESULT IN SIGNIFICANT OPERATING COST INCREASES. $ 550,000 SOLID WASTE FUND REV/ PFA (C) -53- PROJECT TITLE: PNEUMATIC LIME ADDITION STATION LOCATION: WASTEWATER PLANT PURPOSE: TO MEET EPA REQUIREMENTS FOR SLUDGE DISPOSAL. PHYSICAL DESCRIPTION: INSTALL EQUIPMENT TO APPLY LIME TO SLUDGE. UNIT OF WORK: DESIGN AND CONSTRUCT. JUSTIFICATION: TO KILL PATHOGENIC BACTERIA IN THE CITY SLUDGE. THE PRESENT REGULATIONS REQUIRE THIS. IMPACT ON OPERATING BUDGET: ADDED COSTS WILL OCCUR FOR DEPRECIATION EXPENSE AND LIME IN THE TREATMENT PLANT OPERATIONS. FINANCING: $ 500,000 REVENUE BONDS/SEWER FEES (C) -54- n PROJECT TITLE: COLLEGE/HENDERSON SEWER SEGREGATION LOCATION: SEWER DISTRICT 5 PURPOSE: RECONSTRUCTION PHYSICAL DESCRIPTION: SEGREGATION OF COMBINED STORM AND SANITARY SEWERS DOWNSTREAM OF ALL STORMWATER INLETS UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: PUBLIC HEALTH CONCERNS, COMPLIANCE WITH EPA STORMWATER QUALITY, AND WITH MISSOURI DNR AND EPA CSO REGULATIONS. IMPACT ON OPERATING BUDGET: WILL REDUCE OPERATING COST BY ELIMINATING GRIT/PUMPING STATION, BUT WILL ADD DEPRECIATION EXPENSE. FINANCING: $2,245,000 REVENUE BONDS/SEWER FEES (C) $ 405,000 OTHER (I) -55- PROJECT TITLE: WALNUT/HENDERSON SEWER SEGREGATION LOCATION: SEWER DISTRICT 5 PURPOSE: RECONSTRUCTION PHYSICAL DESCRIPTION: SEGREGATION OF COMBINED STORM AND SANITARY SEWERS BY INSTALLING NEW SANITARY SEWERS DOWNSTREAM OF ALL STORMWATER INLETS UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: PUBLIC HEALTH CONCERNS COMPLIANCE WITH EPA STORM WATER QUALITY AND WITH MISSOURI DNR AND EPA CSO REGULATIONS. IMPACT ON OPERATING BUDGET: WILL REDUCE OPERATING COST BY ELIMINATING A GRIT STATION, BUT WILL INCREASE DEPRECIATION EXPENSE. FINANCING: $ 850,000 REVENUE BONDS/SEWER FEES (C) -56- Recreation & Leisure Capital Improvement Budget 135.00 120.000 105.000 X0.000 75.000 60.000 1991-52 1992-93 19'33-91 1994--;98 1595-96 -57- RECREATION AND LEISURE PROPOSED PROJECTS 1PROJECTI 1 1 1991-92 1 1992-93 1 1993-94 1 1994-95 I 1995-96 1 NUMBER I IMPROVEMENT ITEM I TOTAL COST I FISCAL YEAR 1 FISCAL YEAR I FISCAL YEAR I FISCAL YEAR I FISCAL YEAR I I I I I I I I I I 1 3-1 I Capaha Park I S 40,500 1 S 40,500 1 I I I 1 I I Shelter 1 A 1 A I I I 1 3-2 I Arena Storage I I S 20,000 I I S. 20,000 I I I I I I I i I I I I j I Building I I 1 I I I I I I 1 3-3 I Bandshell I 1 S 45,500 I 1 $ 45,500 I 1 I I I I I I 1 1 i I Seating 1 A,I 1 A,I I I 1 3-4 1 Arena Park I I $ 25,000 I I S 25,000 I 1 I I I 1 I I I I I I 1 I Shelter 1 I A I 1 A I I I 1 I I I I ! I 1 3-5 I Various I $ 300,000 I I $ 75,000 1 $ 75,000 1 $ 75,000 I $ 75,000 1 I I Projects I A I 1 A I A I A I A I I I I I I TOTALS I I $ I 431,000 I I S I 131,000 I I $ 75,000 I I I $ 75,000 I I I $ 75,000 I I I I $ 75,000 1 I I I I I I I I I I I I I I I I I I I I 1 i L 1 I I 1 1 1 1 A I GENERAL FUNDS I S 381,000 I S 81,000 I S 75,000 1 $ 75,000 1 S 75,000 I S 75,000 1 1 B I GEN. OBL. FUNDS I I I I 1 I I C I REV/PFA BONDS I I I I I I I D 1 STATE GRANTS/LOANS I I I I I I E 1 MOTOR FUEL TAX I 1 I I I I I F 1 FED. GRANTS/LOANS I I I I I I I G I SPEC. ASSESSMENTS I I I I I I I I H I CAP IMP SALES TAX I I I 1 I I I 1 I j OTHER I S 50.000 I S 50,000 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I 1 I I 1 I I I I I I I I I I I I I I I I I 1 I I I 1 I I I I I I I I I I I I I I I I I I I i I 1 I I I I I 1 i 1 PROJECT TITLE: CAPAHA SHELTER LOCATION: CAPAHA PARK - NORTHEAST CORNER PURPOSE: REPLACE TWO DETERIORATED SHELTERS WITH ONE LARGE SHELTER; UPGRADE BASKETBALL COURT AND PLAYGROUND EQUIPMENT. PHYSICAL DESCRIPTION: CONSTRUCTION OF LARGE SHELTER, 30' X 601, AND INSTALL LARGE PLAY- GROUND UNIT. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: REDESIGN PARK AREA TO PROVIDE BETTER PICNIC AND RECREATIONAL FACILITIES. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $ 40,500 GENERAL FUNDS (A) -59- PROJECT TITLE: STORAGE BUILDING LOCATION: ARENA BUILDING PURPOSE: PROVIDE ADDITIONAL STORAGE FOR RENTAL TABLES, CHAIRS AND RISERS PHYSICAL DESCRIPTION: CONSTRUCT MASONARY BUILDING ATTACHED TO THE ARENA BUILDING, 30' X 55' WITH OVERHEAD DOOR AND CONCRETE FLOOR. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: WITH ADDITIONAL USE OF ARENA BUILDING AS A RECREATIONAL COMMUNITY CENTER, THERE IS A"CONSIDERABLE AMOUNT OF ADDITIONAL EQUIPMENT THAT THERE IS NOT ADEQUATE STORAGE SPACE FOR IMPACT ON OPERATING BUDGET: FINANCING: NO SIGNIFICANT IMPACT. $ 20,000 DONATION (I) .= PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: BANDSHELL SEATING CAPAHA PARK PROVIDE ADEQUATE SEATING FOR BANDSHELL SPECTATORS INSTALL SEATING, CONCRETE APRON AND WALKWAYS, NEW LIGHTING, AND RELOCATE POWER CONTROL SOURCE DESIGN AND CONSTRUCT MUNICIPAL BAND ATTRACTS 300-500 SPECTATORS'EACH WEEK DURING SUMMER MONTHS. PRESENT SEATING IS INADEQUATE. NO SIGNIFICANT IMPACT. $ 30,000 DONATION 15,500 GENERAL FUND (A) -61- PROJECT TITLE: ARENA PARK SHELTERS LOCATION: ARENA PARK PURPOSE: PROVIDE ADDITIONAL PICNIC FACILITIES AND REPLACE OLD SHELTER. PHYSICAL DESCRIPTION: CONSTRUCTION OF PARK SHELTER RANGING IN SIZE FROM 20' X 20' TO 30' X 60' UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: OLD SHELTER DETERIORATED AND DOES NOT FIT NEW DEVELOPMENT PLANS. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: 1$ 25,000 GENERAL FUNDS (A) -62- PROJECT TITLE: LOCATION: PURPOSE: PHYSICAL DESCRIPTION: UNIT OF WORK: JUSTIFICATION: IMPACT ON OPERATING BUDGET: FINANCING: VARIOUS PROJECTS SHAWNEE PARK PROVIDE ADDITIONAL ADULT SOFTBALL FIELDS NOT IN FLOOD AREA AND EXPAND SOCCER COMPLEX DEVELOP A SOFTBALL COMPLEX AND EXPAND SOCCER COMPLEX WITH ADDITIONAL FIELDS, PARKING AND ACCESS DESIGN AND CONSTRUCT CURRENTLY AVAILABLE SOFTBALL AND SOCCER FIELDS ARE INADEQUATE IN NUMBER -AND QUALITY. NEW FIELDS, INCLUDING A CONCESSION AREA, WOULD PROVIDE ADDITIONAL REVENUE AND CREATE A POSITIVE ECONOMIC IMPACT ON THE COMMUNITY ADDITIONAL MAINTENANCE COSTS WILL BE INCURRED, BUT CAN BE OFFSET WITH FACILITY GENERATED REVENUES. $300,000 GENERAL FUNDS (A) "le Community Development Capitsl Improvement Budget X0,000 65,000 60,000 55.000 50,060 45.400 y99t-93 1592-93 191391. 1994-9� 1955-99 -64- COMMUNITY DEVELOPMENT PROPOSED PROJECTS 1PROJECTI (NUMBER I 1 IMPROVEMENT ITEM I TOTAL COST 1 1991-92 I I FISCAL YEAR I 1992-93 1 FISCAL YEAR I 1993-94 FISCAL YEAR I 1994-95 1 I FISCAL YEAR I 1995-96 1 FISCAL YEAR I I I I I I I I I I 14-1 I Public Works I E 270,000 I E 50,000 I S 50,000 I S 50,000 I S 50,000 i S 70,000 I I I j I Center I I A I A I I I A I 1 A I A I I I A I I I I j I TOTALS 1 I S 270,000 1 S 50,000 I I I S 50,000 1 I S 50,000 I $ 50,000 I I I S 70,000 1 I I I I I I I j I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I A 1 GENERAL FUNDS 1 $ 270,000 I $ 50,000 I $ 50,000 I S 50,000 I S 50,000 I S 70,000 I I B 1 GEN. OBL. FUNDS I 1 ( I 1 I 1 I C I REV/PFA BONDS 1 I I I I I I I D I STATE GRANTS,LOANS I I I I I I I I E I MOTOR FUEL TAX I I I I I I I I F I FED. GRANTS,LOANS 1 I I I I I I I G I SPEC. ASSESSMENTS I I 1 I I I I I H I CAP IMP SALES TAX I I I I I OTHER I I I i I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I -65- PROJECT TITLE: PUBLIC WORKS CENTER LOCATION: 219 N. KINGSHIGHWAY PURPOSE: EXPANSION AND IMPROVEMENT DESCRIPTION: COMPLETE MISCELLANEOUS IMPROVEMENTS TO PUBLIC WORKS CENTER, INCLUDING INSULATION, EQUIPMENT SHELTERS, PAVING, MATERIAL STORAGE FACILITIES, LANDSCAPING, ETC. UNIT OF WORK: DESIGN AND CONSTRUCT JUSTIFICATION: CURRENT BUILDINGS INEFFICIENT AND INADEQUATE SPACE AVAILABLE FOR INSIDE STORAGE OF EQUIPMENT. IMPACT ON OPERATING BUDGET: NO SIGNIFICANT IMPACT. FINANCING: $270,000 GENERAL FUND (A) LONG RANGE CAPITAL IMPROVEMENT PROGRAM Unfunded Needs List March 18, 1991 The following list of Capital Improvement Program Needs consists of those projects which have been identified as major long range facility improvements for which funding is currently not available. No preliminary engineering or cost estimating has been done on these projects. These projects are not listed in any order of priority. TRANSPORTATION 1) West End Boulevard - Cape Rock Road to Rte. 74 2) N. Sprigg - Lexington to Rt. 177 3) Mt. Auburn Rd. - Rte. 74 to Southern Expressway 4) Southern. Expressway to Mt. Auburn Rd. 5) Silver Springs Rd. - Bloomfield to Southern Expressway 6) Siemers Dr. - Bloomfield to Rte. 74 7) Hopper Rd. - Kage Rd. to I-55 8) Broadway - Clark to West End Blvd. 9) Bloomfield Rd. - Kingshighway to City Limits 10) New Madrid St. - Henderson to Perry Ave. (incl. intersection realignment at Henderson) 11) Vantage Dr. - Percy St. to Rt. N 12) Additional Streets per major Street Plan 13) Sidewalks - Through -out the City 14) Traffic Signalization Upgrade 15) Airport Improvement Program per Airport Master Plan 16) Airport Industrial Park 17) Airport Runway Extension - Main Runway 10-28 18) Airport Terminal Area Relocation 19) Street Lighting Improvements 20) Kingshighway/Maria Louise/Cape Rock Road Intersection 21) Additional Overlay Programs ENVIRONMENT 1) Sewer Improvement Program per Sewer Master Plan 2) Stormwater/Flood Control Projects per Stormwater Master Plan* *currently being developed PARRS & RECREATION 1) Land Acquisition (Floodplain areas 2) Park Restroom Facilities 3) Capaha Lagoon 4) Capaha Baseball Diamond 5) Softball Complex 6) Soccer Complex 7) Maintenance Facilities 8) Parking Facilities 9) Shelters 10) Community Center 11) Fort D Renovation 12) Golf, Course Club House 13) Golf Course Development 14) Fair Exposition Facility 15) Capaha Pool Replacement 16) Central Pool Bubble Replacement 17) Senior Citizens Center 18) Park Lighting 19) Shawnee Park Footbridge 20) Capaha Municipal Band Shelter 21) Multi-lise Play Courts 22) Park Concession Stands 23) Park Road improvements COMMUNITY DEVELOPMENT Growth areas) 1) Public Safety Annex/EOC/ Communications Center 2) Neighborhood & Downtown Redevelopments 3) Historic Preservation