HomeMy WebLinkAboutRES.2654.11-07-2011BILL NO. 11-161 RESOLUTION NO. C- `2& v
A RESOLUTION AUTHORIZING THE CITY
MANAGER TO EXECUTE AMENDMENT NUMBER 3
TO ADDENDUM NUMBER 2 TO THE GENERAL
ENGINEERING SERVICES AGREEMENT WITH
WATERS ENGINEERING, INC., FOR THE
CITY'S WATER SUPPLY AND DISTRIBUTION
SYSTEM, IN THE CITY OF CAPE GIRARDEAU,
MISSOURI
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE
GIRARDEAU, MISSOURI, AS FOLLOWS:
ARTICLE 1. The City Manager, for and on behalf of the
City of Cape Girardeau, Missouri, is hereby authorized to
execute Amendment Number 3 to Addendum Number 2 to the
General Engineering Services Agreement with Waters
Engineering, Inc., for the City's water supply and
distribution system, in the City of Cape Girardeau,
Missouri. A copy of said Amendment Number 3 is attached to
this Resolution and made a part hereof.
PASSED AND ADOPTED THIS DAY OF
20 0/
Harry E. edi-ga4, Mayor
ATTF..qT
AMENDMENT NUMBER 3
TO ADDENDUM NUMBER 2
TO THE GENERAL ENGINEERING SERVICES AGREEMENT
The following items comprise Amendment Number 3 to Addendum Number 2 to the
General Engineering Services Agreement by and between the CITY OF CAPE
GIRARDEAU, MISSOURI, (the OWNER), and WATERS ENGINEERING, INC., Sikeston,
Missouri, (the ENGINEER); the items contained herein shall be in addition to the General
Agreement dated August 31, 2005 and Addendum Number 2 dated December 9, 2005,
and shall become a part thereof upon approval by the parties of the General Agreement.
The OWNER and the ENGINEER agree to the following:
The Engineer agrees to provide the following engineering services for the Project:
B. CONSTRUCTION PERIOD SERVICES. The following scope of work shall be added
to that provided in Addendum Number 2.
Engineer shall assist the OWNER in the construction engineering of the Raw Water
Line, Supply Wells, and Fiber Optic Controls under MoDNR Drinking Water SRF Loan No.
DW291010. Work to be performed shall include; attending the bid opening and make
recommendations for awarding contracts for construction; make all necessary
interpretations or clarifications of the contract documents subject to final approval of the
OWNER; review, comment on, and approve shop drawings; review of equipment and
materials; preparation and processing of any required change orders subject to final
approval of the OWNER; disapprove or reject work which the ENGINEER believes is
defective and order special testing when deemed necessary; review and process
CONTRACTOR'S applications for periodic payments; provide consultation, advice, and
make periodic reports to the OWNER on the progress and character of the work; and upon
completion of the construction work conduct a final inspection and prepare a final
certification with the final estimate for payment of the CONTRACTOR.
IV. The OWNER agrees to pay the ENGINEER as follows for work as follows:
B. CONSTRUCTION PERIOD SERVICES. Under Section 1-B of the General
Agreement, the Owner will reimburse the Engineer for time and materials at the
hourly rates set forth in Attachment "A" affixed hereto with the revised fees not to
exceed NineteenThousand Five Hundred Dollars ($19,500.00) an increase of Ten
Thousand Dollars ($10,000.00) over Amendment No. 1 to Addendum Number 2.
Page 1 of 4
It witness whereof, the duly authorized representatives of the OWNER and the ENGINEER
have this 6th day of July , 2011, hereunto subscribed their names.
The Engineer:
WATERS ENGINEERING, INC.
By: _ (;; (44/
Jo f Chittenden, President
The Owner- CITY OF CAPE
Richard Cochran, Jr., Vice President
GIRARDEAU, MISSOURI
r. Scott Byer, q4ty Manager
Ms. yle Conrad, City Clerk
Page 2 of 4
ATTACHMENT A
CHARGE OUT RATES
Direct Payroll. The direct payroll basic rates shown are estimated rates and actual
rates to be paid will be those rates actually experienced during the period of
performance of the contract and agreed upon by both parties. The current payroll
rates are as follows:
Hourly
Personnel Rate
Officer of Firm
$50.00
Senior Engineer
48.00
Land Surveyor
18.00
Senior Technician
17.00
Junior Technician
15.00
2. Overhead & Profit. The overhead and profit rate shown are those actual rates
calculated for the previous fiscal year.
Overhead & Profit Rate 2.15
3. Reimbursable Expenses. The OWNER shall pay the ENGINEER the actual cost
of all reimbursable expenses incurred. Reimbursable expenses shall mean the
actual cost for services of special consultants such as soils and materials testing,
special seismic design and photogrammetric consultants; electrical consultants,
expenses of transportation and subsistence of principals, employees and
consultants; expenses of furnishing and maintaining field office facilities; assistants,
and similar PROJECT -related items not covered by the overhead item.
Transportation Expenses shall be charged out at $0.45 per mile
4. Billing Invoices. The billing invoices shall be calculated using the sum of the direct
payroll, the direct payroll multiplied by the overhead and profit rate, and the actual
costs for all reimbursible expenses.
Page 3 of 4
5. Cost Estimate. The estimated additional hourly charges and reimbursable
expenses for engineering services are as follows:
B. CONSTRUCTION PERIOD SERVICES.
The estimated additional cost for reimbursable expenses are given below:
Expense
Materials Testing & Suppliers
Subcontracts
Transportation at $0.45 per
mile
TOTAL
Estimated Cost
$0.00
$0.00
$135.00
$135.00
The estimated additional design period costs are as follows:
Expense
Total Hourly Charges
Reimbursable Expenses
Overhead & Profit
TOTAL
Page 4 of 4
Estimated Cost
$3,152.00
$135.00
$6,776.80
$10,063.80
Estimated
Hourly
Personnel
Manhours
Rate
Total
Officer of Firm
0
$50.00
$0.00
Senior Engineer
60
$48.00
$2,880.00
Land Surveyor
0
$18.00
$0.00
Senior Technician
16
$17.00
$272.00
Junior Technician
0
$15.00
$0.00
Total Hourly Charges
$3,152.00
The estimated additional cost for reimbursable expenses are given below:
Expense
Materials Testing & Suppliers
Subcontracts
Transportation at $0.45 per
mile
TOTAL
Estimated Cost
$0.00
$0.00
$135.00
$135.00
The estimated additional design period costs are as follows:
Expense
Total Hourly Charges
Reimbursable Expenses
Overhead & Profit
TOTAL
Page 4 of 4
Estimated Cost
$3,152.00
$135.00
$6,776.80
$10,063.80