HomeMy WebLinkAboutRES.2114.11-07-2005s
BILL NO. 05-236
RESOLUTION NO. ,
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE AMENDMENT NO. 7 TO THE GENERAL
AGREEMENT FOR ENGINEERING SERVICES WITH
S. H. SMITH & COMPANY, INC., IN THE CITY OF
CAPE GIRARDEAU, MISSOURI
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE
GIRARDEAU, MISSOURI, AS FOLLOWS:
ARTICLE 1. The City Manager, for and on behalf of the City
of Cape Girardeau, Missouri, is hereby authorized to execute
Amendment No. 7 to the General Agreement for Engineering
Services with S. H. Smith & Company, Inc., in the City of Cape
Girardeau. A copy of said Agreement is attached to this
Resolution and made a part hereof.
PASSED AND ADOPTED THIS DAY OF 9>'( 20.
Jay Knudtson, Mayor
Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri
Master Agreement executed on March 4, 2004
AMENDMENT NO. 7
This Amendment modifies and amends the General Agreement for Engineering Services dated March 4,
2004 between The City of Cape Girardeau, hereinafter referred to as the "City" and S.H. Smith& Co.,
Inc., hereinafter referred to as "Engineer".
This amendment shall be for the purpose of conducting a stormwater feasibility study of the
Whitener/Silver Springs — Themis/Silver Springs watershed. The project is generally to consist of
studying areas in the watershed that are prone to flooding and making recommendations as to what
improvements could be made to the drainage system to minimize flooding.
SECTION I: SCOPE OF WORK
GENERAL: The Engineer shall submit detailed design progress reports with each application for
payment.
Engineer shall:
1. Appoint a licensed professional engineer to serve as Project Engineer, who will be responsible for
all technical aspects of the project
2. Develop a map of the watershed and identify problem areas with the city staff.
3. Conduct field observations and measurements to identify problem areas in the field. This will
include looking at flow restrictions in the drainage basin and low areas susceptible to ponding.
Conduct an inventory of the culverts, prepare six to ten cross sections of the drainage ditch, and
perform up to three field visits of the area during heavy precipitation.
4. Compute carrying capacities of the drainage ditch based on the field study and compare them
against a 25 -year storm event. This would include investigations of the storm water detention
basins in the watershed.
5. Study potential improvements that could be made in the watershed and develop a list of work
items. Provide feasibility estimates on the cost of the improvements.
6. Develop a Design Development Report, which will summarize our field observations, contain
photographs of problem areas, and include conceptual cost estimates of solutions and
reconunendations. The report will contain a conceptual drawing of improvements and a map
indicating where improvements are to be made.
7. Attend City Council meetings and/or Public Hearings as required by CITY to provide project
information to City Council and answer questions relating to proposed improvements. The
estimated design cost includes attendance at up to two City Council/Public Hearing meetings.
SECTION II: SCHEDULE
The Engineer will commence work within 3 business days after receiving written Notice to Proceed.
The time to complete the study shall be 60 days from Notice to Proceed to delivery of Design
Development Report.
S:\CONTRACTS\Agreement.Cape Girardeau Amendment 7 - Whitener and Silver Springs -Themis and Silver Springs Watershed Study.docPage 1 of 5
Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri
Master Agreement executed on March 4, 2004
AMENDMENT No. 7
SECTION III — COMPENSATION
The Basis of Payment of this Amendment shall be TIME AND MATERIALS at the rates established in
Exhibit I to this Amendment. Using the procedures set forth in Section E of the Agreement, and for the
scope of services outlined in Section I of this Amendment, CITY shall pay ENGINEER as follows:
1. An amount equal to the actual hours charged to the Project by each class of Engineer's employees
times the standard hourly rates in Exhibit I for each applicable billing class for all services
performed on the Project.
2. Actual direct reimbursable expenses incurred plus 15% of the actual expense. Reimbursable
expenses shall be limited to express mailing or courier services, special copying services, legal
documents or other charges requested by CITY. Reimbursable expenses are not expected to
exceed $250 on this project.
3. Mileage at a rate of $0.40 per mile.
4. The total compensation for services and reimbursable expenses for this task is estimated to be
$8,440. ENGINEER shall not exceed the amounts shown without prior Written by OWNER'S
authorized representative.
5. ENGINEER shall not begin any work nor obligate CITY for any fee prior to the date of
WRITTEN NOTICE TO PROCEED by CITY.
6. ENGINEER shall issue monthly statements during the course of the work, based on the actual
hours charged to the Project during the month. CITY shall pay undisputed portions of the invoice
within 30 days after the date of the invoice.
S:\CONTRACTS\Agreement.Cape Girardeau Amendment 7 - Whitener and Silver Springs -Themis and Silver Springs Watershed Study.docPage 2 of 5
Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri
Master Agreement executed on March 4, 2004
AMENDMENT No. 7
SECTION IV: AUTHORIZATION
CITY and ENGINEER agree to the specific work scope, schedule, and compensation described in this
Amendment to the Agreement.
CITY: City of Cape Girardeau, MO ENGINEER: S.H. Smith&Company, Inc.
By:
Dougl K. Leslie
City Manager
te: I/- q-0.,
Date: /j 9 ""(�
By(:�, :):
Paul W. Ridlen, P.E.
President
Date: << Zo oS
ATTEST:Y��
49'+'
(SEAL) �- l t �.i C
By����
Robert P. MacDonald
Secretary
Date: /l- / _ '-2oa,s
S;\CONTRACTS\Agreement.Cape Girardeau Amendment 7 - Whitener and Silver Springs -Themis and Silver Springs Watershed Study.docPage 3 of 5
Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri
Master Agreement executed on March 4, 2004
AMENDMENT No. 7
EXHIBIT 1
STANDARD HOURLY RATES
LABOR CATEGORY
PROPOSED STAFF
HOURLY RATE
NAMES
INITIALS
Principal
Samuel Smith
SHS
$150
Engineer IX
Paul Ridlen
PWR
$120
Engineer VII
Chris Layton
Dan Klaproth
CAL
DEK
$105
Engineer IV
Billy Cobb
Shannon Todd
WJC
SMT
$75
Engineer II
Rodger Williams
Greg Bell
RGW
GCR
$65
Engineer I
Jacob Buenin
JMB
$60
Tech V (Sr. Drafter)
Rodney Simpson
RDS
$55
Tech V (Drill Operator)
Dwayne Ormsby
LDO
Tech IV (Drafter)
Adam Burger
ARB
$50
Tech III
Derek Melton
DWM
$45
Chief Surveyor
Randy Thurman
RKT
$80
LSIT Surveyor
Joe Pulliam
JRP
$65
Survey Crew (2 Man)
„Ask"
$85
Admin
Miranda Inman
Julie Elwood
MAI
JME
$35
S:\CONTRACTS\Agreement.Cape Girardeau Amendment 7 - Whitener and Silver Springs -Themis and Silver Springs Watershed Study.docPage 4 of 5
Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri
Master Agreement executed on March 4, 2004
AMENDMENT No. 7
EXHIBIT 2
ESTIMATED HOURS AND COSTS
LABOR CATEGORY
HOURLY
RATE
PRELEVIINARY DESIGN
Hours Cost
Principal
$150
0 $0
Engineer IX
$120
2 $240
Engineer VII
$105
24 $2,520
Engineer III
$75
48 $3,600
Engineer II
$65
10 $650
Tech V
$55
0 $0
Tech IV
$50
24 $1,200
Chief Surveyor
$80
0 $0
LSIT Surveyor
$65
0 $0
Admin
$35
2 $70
Survey Crew (2 Man)
$85
0 $0
Reimbursable Expense
$160
TOTALS
110 $8,440