A RESOLUTION APPROVING THE MASTER PLAN FOR
THE CAPE GIRARDEAU REGIONAL AIRPORT
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU,
MISSOURI, AS FOLLOWS:
ARTICLE 1. The City Manager, for and on behalf of the City
of Cape Girardeau, Missouri, hereby approves the Master Plan for
the Cape Girardeau Regional Airport. A copy of said Master Plan
is attached to this Resolution and made a part hereof.
PASSED AND ADOPTED THIS �t�� DAY OF ���Y1.� 20 t ='
C�
Jay . Knudtson, Mayor
ATTEST:
Gayle` .. Conrad, City Clerk
MASTER PLAN • EXECUTIVE SUMMARY
ture baggage handling needs and a
second airline.
Northwest Quadrant - Available
site development space has become
increasingly limited in the airport's
current terminal area. A primary
objective of the study was to identify
an alternative development area to
accommodate future landside de-
velopment functions and promote
economic development. North of
the airport and adjacent to the Nash
Road Industrial Park, the proposed
Northwest Quadrant contains ap-
proximately 126 acres for aviation
and other potential inter -modal
development opportunities. Specific
development items highlighted in
this area include the development
of air cargo facilities and a future
development area for corporate avia-
tion expansion. Support facilities,
including an on-site Airport Rescue
and Firefighting (ARFF) facility and
a co -located Snow Removal Equip-
ment (SRE) building, are also sited in
the Northwest Quadrant.
Funding
Approximately $30 million in capital
improvements and land acquisition
have been identified for the 20 -year
planning period. Most of these proj-
ects are eligible for federal grants
through the Federal Aviation Ad-
ministration's Airport Improvement
Program (AIP). Aviation user fees,
fuel taxes and other revenue sources
support these funds. The Missouri
Capital Improvement Plan ($ millions)
Department of Transportation has
programs available from taxes on
aviation fuel sales that also provide
up to 90% funding for eligible proj-
ects. Based on these and other non -
local sources, the proposed Capital
Improvement Plan (CIP) for the
Cape Girardeau Regional Airport
shows a local contribution of 18 to
20 cents on the dollar. Updates to the
Capital Improvement Plan will oc-
cur on an annual basis to reflect that
year's current priorities and/or fund-
ing availability.
Aviation Forecasts Summary
irl�y
r
IL"
s."M
Short Term (2003-2007)
8.66
5.87
1.27
1.52
Intermediate (2008-2012)
10.33
6.90
1.18
2.25
Long Term (2013-2023)
11.16
8.41
1.09
1.67
Total
30.15
21.18
3.54
5.44
Aviation Forecasts Summary
r•.
2005
2010
2020
Enplaned Passengers
7,349
11,775
15,338
19,471
Aircraft Operations
29,562
34,002
39,618
52,658
• Commuter Airlines
2,089
2,142
2,818
3,494
• General Aviation
26,754
31,016
35,956
48,320
• Military
709
200*
200 *
200
• Air Cargo
---
634
634
634
• Air Carrier Charters
10
10
10
10
Total Based Aircraft
54
60
65
74
* Approximate historical average of military operations over a 10 -year period (1990-2000)
REGIONAL AIRPORT
For additional information, contact:
Mr. Bruce Loy - Airport Manager
Cape Girardeau Regional Airport
860 Rush H. Limbaugh Jr. Memorial Drive
Cape Girardeau, MO 63701
(573)334-6230
1
MASTER PLAN • EXECUTIVE SUMMARY
REGIONAL AIRPORT
Background
The Cape Girardeau Regional Air-
port, owned and operated by the
City of Cape Girardeau, plays a
significant role in serving the com-
mercial, military, cargo, general, and
corporate aviation demands of the
southeastern Missouri region. The
airport is located in Scott County
approximately five (5) miles to the
southwest of central Cape Girardeau.
Its location adjacent to Interstate 55
allows convenient access to both St.
Louis to the north and Memphis to
the south.
The Cape Girardeau Regional Air-
port can trace its historical roots back
to 1942, when it was known as Har-
ris Field and used as a training base
for U.S. Army Air Force pilots. The
City of Cape Girardeau acquired the
property in 1947 after the training
school was closed and the facility
reverted to surplus property status.
Since that time the airport has been
expanding its facilities to accommo-
date the growing needs of the avia-
tion community and the public that
utilizes its services.
Today the Cape Girardeau Regional
Airport encompasses approximately
557 acres of land. Primary airfield fa-
cilities consist of a 6,500 -foot by 150 -
foot primary runway and a 4,000 -
foot by 100 -foot secondary crosswind
runway. A Category I Instrument
Landing System on Runway 10 pro-
vides precision approach minimums
of 200 -foot ceilings and 1/2 mile visi-
bility. Primary landside facilities con-
sist of a passenger terminal facility,
Fixed Base Operator (FBO) to service
the general aviation activities of the
airport, and various other hangars
for storage of aircraft.
The Cape Girardeau Regional
Airport is designated as a non -pri-
mary commercial service airport
accommodating upwards of 10,000
enplaned passengers per year. It
is presently served by American
Connection and provides regularly
scheduled connecting service to
American Airlines' hubsite at Lam-
bert International Airport in St.
Louis, Missouri. The airport also con-
tinues to play an expanding role in
serving the corporate aviation needs
of southeast Missouri. In particular,
the airport has experienced strong
demand for hangars to house the
growing fleet of corporate aircraft
based at the airport.
In addition to new hangar con-
struction, a new 48,000 -square -foot
aircraft manufacturing facility for
Renaissance Aircraft LLC was re-
cently built. This business, which is
expected to create up to 200 new jobs
for the community, is representative
of the type of successful economic
development achievements the air-
port desires to position itself for into
the long-term future.
The Airport Master Plan Update was
undertaken by the City of Cape Gi-
rardeau to provide a framework for
long-term development and identify
specific facility improvements need-
ed over the next twenty years. This
plan updates the previous Master
Plan approved by the FAA in 1991.
Developing the new plan required
the investigation of existing facili-
ties, projection of future growth and
requirements, and development of
a range of alternatives. The FAA -ap-
proved Airport Layout Plan (ALP)
depicts the proposed long-term de-
velopment.
The City established a Planning Ad-
visory Team as an informal advisory
group to review and comment on
the findings and recommendations
of the study. The team, represented
by a cross section of nine individuals
from the community and the airport,
met at key milestones during the
project. The general public was also
invited to a public information open
house to obtain information and pro-
vide feedback on the plan.
Airport
Development Program
Airfield - The existing 6,500 -foot by
150 -foot primary runway (10/28) is
generally sufficient to accommodate
the takeoff requirements of aircraft
anticipated to utilize the airport over
the 20 -year planning period on a
regular basis. A 500 -foot extension
is included on the Airport Layout
Plan to reflect the airport's objective
of preserving opportunities for other
potential operational scenarios, such
as larger aircraft and/or longer stage
length flights, which require longer
runway length.
Lengthening the crosswind runway
(2/20) to 5,000 feet is necessary to
provide a secondary runway capable
of accommodating the requirements
of regularly scheduled commercial
aircraft. This increases the airport's
availability during various wind and
weather conditions and during times
when the primary runway would be
closed or otherwise unusable.
Other airfield projects include pave-
ment rehabilitations, reorientation of
a portion of Taxiway "A", and exten-
sion of Taxiway "D".
Passenger Terminal - Although the
size of the passenger terminal build-
ing is adequate to meet passenger
activity throughout the planning
period, recent modifications to meet
new security requirements have
encroached on areas previously
reserved for a potential second air
carrier. The Master Plan depicts a
modest expansion to incorporate fu -
Short Term (2003.2007)
• Relocate Taxiway A (between D & B)
• Land Acquisition -Northwest Quad-
rant
• Terminal Area Security Fencing/
Access Control
• Runway 10 Safety Area Enhance-
ment
• New Aircraft Rescue and Firefighting
(ARFF) and Snow Removal Equip-
ment (SRE) Facility
• Construct North Quad Corporate
Roadways and Taxiways
• FBO/GA Terminal Expansion
• T -Hangar Development
• Various Taxiway and Apron Rehabili-
MW tations
Future
Airport Rescue
Fire Fighting Facility
Future Corporate
Aviation Development
Intermediate Term (2008.2012)
• Terminal Security Enhancements/
Expansion
• Taxiway D Extension
• Runway 10 Extension and associ-
ated development, including land
acquisition
• Avigation Easement Acquisition
• Air Cargo Facility Development
• T -Hangar Development
• Runway 2/20 Rehabilitation
• Various Taxiway and Apron Rehabili-
tations
Term (2013-2023)
• Runway 2 Extension and associated
development, including land acquisi-
tion
• Avigation Easement Acquisition
• Terminal Parking Expansion
• Relocate Air Traffic Control Tower
• Fuel Farm Relocation
• T -Hangar Development
• Various Taxiway Rehabilitations
Air Traffic
Control Tower A
Fuel Farm
Relocation
FBO
Runway 2
1000' Extension
Runway 10
500' Extension
LEGEND
_
EXISTING PROPERTY
«...MI
EXISTING AVIGATION EASEMENT
SHORT TERM
INTERMEDIATE
LONG TERM
_
IMPROVEMENT
LAND ACQUISITION
\ :\
AVIGATION EASEMENT