HomeMy WebLinkAboutRES.1890.06-02-2003BILL NO. 03-84 RESOLUTION NO. jVC A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT NO. 9 TO THE AGREEMENT BETWEEN THE CITY OF CAPE GIRARDEAU, MISSOURI AND JACOBS CIVIL, INC., FOR THE SANITARY SEWER IMPROVEMENT PROGRAM, IN THE CITY OF CAPE GIRARDEAU, MISSOURI BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute Amendment No. 9 to the Agreement Between the City of Cape Girardeau, Missouri and Jacobs Civil, Inc., for the Sanitary Sewer Improvement Program in the City of Cape Girardeau. A copy of said Amendment No. 9 is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THIS 2cc, DAY OF :a,i,rtE 1 2 0 ()_� . ay Knudtson, Mayor ATTEST: Gayle,L. Conrad, City Clerk ri AMENDMENT NO. 9 to AGREEMENT BETWEEN THE CITY OF CAPE GIRARDEAU, MISSOURI and JACOBS CIVIL INC (SVERDRUP CIVIL, INC.) Dated September 7, 1994 Note: All other terms of the original contract remain unchanged with the exception of the following: Article 3 - Compensation and Payment On page 3 under B. Cost Computation - Replace the third sentence of paragraph 1 with: The provisional overhead rate for Jacobs' (Sverdrup's) fiscal year 2003 is 1.305 for services performed from our offices and 0.96 for resident services performed in the field. On page 4 under B. Cost Computation - Section 3.a - Add the following: The Resident Project Representation shall be reimbursed a per diem rate of $40/day to cover normal travel, subsistence and incidental expenses associated with the work. Article 11 - Contract Documents On page 9 amend Article 11 to read: This Agreement consists of: 1. Agreement for Professional Services dated September 7, 1994 2. APPENDIX A - Scope of Services 3. AMENDMENT 1 TO APPENDIX A 4. APPENDIX Al - Phase 1 Scope of Work 5. APPENDIX A2 - Phase 2 Scope of Work 6. APPENDIX A3 - Phase I Easements and Miscellaneous Scope of Work 7. APPENDIX A4 - Phase I Projects Construction Program, Phase II Projects Part 1 Design, Surveying, Smoke Testing and Flow Monitoring 8. APPENDIX A5 - Phase II Projects Easements, Part 2 Design, Cultural Resource Survey 9. APPENDIX A6 - Additional Scope for Previous Amendments, Phase II Projects Construction Services 10. APPENDIX A7 - Additional Scope for Previous Amendments, Ranchito Sewer Improvement Project, Trickling Filter Rehabilitation 11. APPENDIX A8 - Trickling Filter Rehabilitation Design -1- Amendment 9 continued 12. APPENDIX A9 - Arena Creek Replacement Sewer Design, Arena Creek and Trickling Filter Rehabilitation Construction 13. APPENDIX A 10 - Additional Scope for Previous Amendments, Arena Creek and Construction Phase Services 14. APPENDIX B - Additional Owner Supplied Information and Activities 15. APPENDIX 132 - Additional Owner Supplied Information and Activities 16. APPENDIX B3 - Additional Owner Supplied Information and Activities 17. APPENDIX B4 - Additional Owner Supplied Information and Activities 18. APPENDIX 135 - Additional Owner Supplied Information and Activities 19. AMENDMENT 1 to APPENDIX C 20. AMENDMENT 2 to APPENDIX C 21. AMENDMENT 3 to APPENDIX C 22. AMENDMENT 4 to APPENDIX C 23. AMENDMENT 5 to APPENDIX C 24. AMENDMENT 6 to APPENDIX C 25. AMENDMENT 7 to APPENDIX C 26. AMENDMENT 8 to APPENDIX C 27. AMENDMENT 9 to APPENDIX C 28. AMENDMENT 1 APPENDIX D 29. AMENDMENT 2 APPENDIX D 30. AMENDMENT 3 APPENDIX D 31. AMENDMENT 4 APPENDIX D 32. AMENDMENT 5 APPENDIX D 33. AMENDMENT 6 APPENDIX D 34. AMENDMENT 7 APPENDIX D 35. AMENDMENT 8 APPENDIX D 36. AMENDMENT 9 APPENDIX D Proposed by Sverdrup Civil, Inc.: Date: ' r Accepted by City of Cape Girardeau: Date: C e BY: r 6 Dough K. Leslie Interii-i City Manager Attachments: Appendix A10 Amendment 9 to Appendix C Amendment 9 Appendix D '. Jacobson, P.E. Vice President ATTEST: t. City Clerk -2- SSIP Amendment 9 APPENDIX A10 CITY OF CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM ADDITIONAL SCOPE FOR PREVIOUS AMENDMENTS ARENA CREEK AND CONSTRUCTION PHASE SERVICES May 2003 C:1l1 THE FOLLOWING ARE MODIFICATIONS TO THE SCOPE UNDER CONTRACT THROUGH AMENDMENT 8 A. ARENA CREEK REPLACEMENT SEWER FINAL DESIGN The initial tasks of the Manhole Rehabilitation Program were completed including the inspection of manholes in the area of Arena Creek and the development of recommended rehabilitation repairs. Following the submittal to the City, it was decided to not complete the remaining portion of the task consisting of the development of bid documents. The City elected to complete the repairs with maintenance staff and not develop the bid package. The scope items related to developing the design are therefore eliminated. B. ADDITIONAL CONSTRUCTION PHASE SERVICES Construction phase services for the Phase H Sanitary Sewer Improvement Program projects have been contracted under previous amendments. Additional services are needed during construction of the Arena Creek Replacement Sewer and the South Ramsey Lift Station and Force Main. Amendment 9 extends Resident Project Representative services for the two projects. Resident Project Representative services are estimated under Amendment 8 to continue through June 2003. This Amendment 9 provides contractual funding to extend Resident Project Representative services for 10.5 months from July 2003 through April 15, 2004. A9-1 Amendment 9 continued AMENDMENT 9 TO APPENDIX C CITY OF CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM ESTIMATED COST BASIS May 2003 Amendment 9 adds new scope but also updates the estimated cost and fixed fee for tasks that are already under contract through Amendment 8. Amendment 8 estimates for each task are updated to the currently estimated cost at completion. The estimates in the Appendix C Cost Summary have been increased or decreased as indicated below: Phase I Facility Plan This task is complete. The cost and fee earned through April 2003 is the estimate at completion. Phase I Design This task is complete. The cost and fee earned through April 2003 is the estimate at completion. Phase II Facility Plan This task is complete. The cost and fee earned through April 2003 is the estimate at completion. Phase I Easements This task is complete. The cost and fee earned through April 2003 is the estimate at completion. Phase II Part 1 Design Only the gravity portion of South Ramsey has been constructed. The estimate to complete includes updating the plans and modifying the bid documents for the remaining construction. Work includes the realignment of the force main due to existing and future planned road construction. The revised estimate to complete for work contracted through Amendment 8 plus the Amendment 9 additions increase the estimated cost and maximum fee for Phase II Part 1 Design services. Phase I Resident This task is complete. The cost and fee earned through April 2003 is the estimate at completion. Phase I Office Services This task is complete. The cost and fee earned through April 2003 is the estimate at completion. Phase II Part 2 Design This task is complete. The cost and fee earned through April 2003 is the estimate at completion. The estimate for this task is reduced accordingly. Phase II Easements The only uncompleted easement acquisition contracted through Amendment 8 is some or all of the easements for the unconstructed portion of South Ramsey. The plats and descriptions have been prepared and initial offers made by SiteFinders. All of the documentation and current status has been turned over to the Owner. Any remaining work on these easements will be by Appendix C Basis 1 Amendment 9 continued the Owner. The direct costs listed are allowed should modifications to the plats or descriptions be required of subconsultant Koehler Engineering & Land Surveying, Inc. Ten manhours are allowed to coordinate the work of the subconsultant. Phase I Record Drawings This task is complete. The cost and fee earned through April 2003 is the estimate at completion. Phase I Follow-up Phase I Follow-up Services were previously eliminated from the scope of work and the estimate to complete. Phase II Office Services This category includes services to support construction, not otherwise listed in the cost estimate. Construction phase office services are ongoing for the Arena Creek Sewer and are anticipated for the South Ramsey construction. Completion of record drawings for the Trickling Filter Rehabilitation and the Arena Creek Sewer projects are also included in the Phase II Office Services. The estimate assumes: • South Ramsey construction phase office services are completed by April 15, 2004 • John Bennett remains as the resident representative through April 15, 2004 The revised estimate to complete for work contracted through Amendment 8 decreases the estimated cost and fixed fee for construction office services. Phase II Record Drawings Record Drawings are being completed for the Lift Stations, Force Main, and Sloan Relief projects. The South Ramsey project also remains to be completed. The estimate to complete has been revised to allow for an additional 85 manhours. The net impact is an overall increase in the estimate to complete Phase II Record Drawings. Lift Station O&M Manuals The O&M Manuals for the Lift Stations have been completed. An O&M Manual remains to be generated for the South Ramsey Lift Station. The estimate to complete has been revised to allow for an additional 80 manhours. The net impact is an overall increase in the estimate to complete Lift Station O&M Manuals. Main Suspicious Material This task is complete. The cost and fee earned through April 2003 is the estimate at completion. Phase II Resident The time period for Resident Representative services contracted through Amendment 8 ends on June 30, 2003. The estimated cost at completion for those services is significantly less than the Amendment 8 estimated cost. The Amendment 9 estimate for resident services includes the reduced estimate for services through Amendment 8 plus the extension of resident services from June 30, 2003 through April 15, 2004. The net result is an increase in the Phase II Resident cost and maximum fee for Amendment 9. Appendix C Basis 2 Amendment 9 continued Phase II Resident Program Management (PM) This task is complete. The cost and fee earned through April 2003 is the estimate at completion. Phase II Follow-up Services The estimate for this work remains the same as for Amendment 8. Ranchito Area Facility Plan This task is complete. The cost and fee earned through April 2003 is the estimate at completion. The estimate for this task is reduced accordingly. Trickling Filter Rehab Facility Plan This task is complete. The cost and fee earned through April 2003 is the estimate at completion. The estimate for this task is reduced accordingly. Trickling Filter Rehab Design This task is complete. The cost and fee earned through April 2003 is the estimate at completion. The estimate for this task is reduced accordingly. Arena Creek Design This task is complete. The cost and fee earned through April 2003 is the estimate at completion. The estimate for this task is reduced accordingly. Trickling Filter O&M Manual The estimate for this work remains the same as for Amendment 8. Trickling Filter Rehab Follow-up The estimate for this work remains the same as for Amendment 8. Estimated Totals through Amendment 9 The reductions in existing tasks and the additional efforts balance, resulting in a net $0 impact to the authorized project costs. Appendix C Basis 3 Amendment 9 continued AMENDMENT 9 TO APPENDIX C CITY OF CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM SUMMARY OF AMENDMENT 8 COST MODIFICATIONS May 2003 Appencix C Cost Summary 1 Estimated Estimates Adjustments Amendment 8 Costs Cost To for to Amendment 9 Estimated thru Complete Amendment 9 Amendment 8 Estimated Cost (1) April 2003 (2) Amendment 8 (3) Added Scope (4) Estimates (5) Cost (6) ORIGINAL 12 PROJECTS Phase I Facility Plan Labor 101,102 91,932 91,932 91,932 Directs 110 1,862 1,862 1,862 Fee 11,032 11,032 11,032 Total 104,826 104,826 104,826 Phase I Design Labor 201,221 581,113 581,113 581,113 Directs 210 300,047 300,047 300,047 Fee 69,734 69,734 69,734 Total 950,893 950,893 950,893 Phase II Facility Plan Labor 103,123 231,783 231,783 231,783 Directs 113 123,721 123,721 123,721 Fee 27,814 27,814 27,814 Total 383,317 383,317 383,317 Phase I Easement Acquisition Labor 202 23,077 23,077 23,077 Directs 212 97,291 97,291 97,291 Fee 2,769 2,769 2,769 Total 123,137 123,137 123,137 Phase II Part I Design Labor 203 462,522 446,786 15,736 - 462,522 Directs 213 342,184 340,684 1,500 2,500 344,684 Fee 56,125 53,764 2,361 - 56,125 Total 860,831 841,234 19,597 860,831 Phase I Resident Engineer Labor 401 142,790 142,790 142,790 Directs 410 72,331 72,331 72,331 Fee 17,135 17,135 17,135 Total 232,257 232,257 232,257 Phase I Construction Office Services Labor 301 174,184 174,184 174,184 Directs 310 5,482 5,482 5,482 Fee 20,902 20,902 20,902 Total 200,568 200,568 200,568 Phase II Part 2 Design Labor 204 318,130 316,910 (1,220) 316,910 Directs 214 50,963 50,963 - 50,963 Fee 38,600 38,417 (183) 38,417 Total 407,692 406,290 (1,402) 406,290 Phase II Easements Labor 205 39,906 38,651 1,255 39,906 Directs 215 172,069 170,069 2,000 172,069 Fee 4,821 4,633 188 4,821 Total 216,796 213,353 3,443 216,796 Appencix C Cost Summary 1 Amendment 9 continued AMENDMENT 9 TO APPENDIX C CITY OF CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM SUMMARY OF AMENDMENT 8 COST MODIFICATIONS May 2003 Appencix C Cost Summary 2 Estimated Estimates Adjustments Amendment 8 Costs Cost To for to Amendment 9 Estimated thru Complete Amendment 9 Amendment 8 Estimated Cost (1) April 2003 (2) Amendment 8 (3) Added Scope (4) Estimates (5) Cost (6) Phase I Record Drawings Labor 302 20,081 20,081 - 20,081 Directs 312 2,869 2,869 2,869 Fee 2,410 2,410 2,410 Total 25,359 25,359 25,359 Phase I Follow-up services Labor 501 0 0 0 Directs 510 0 0 0 Fee 0 0 0 Total 0 0 0 Phase 11 Construction Office Services Labor 304 578,216 408,891 136,783 (32,542) 545,674 Directs 314 28,148 6,775 6,236 (15,137) 13,011 Fee 81,677 56,283 20,517 (4,877) 76,800 Total 688,042 471,949 163,536 (52,556) 635,486 Phase II Record Drawings Labor 305 29,117 29,046 6,491 6,420 35,537 Directs 315 4,917 2,917 2,000 - 4,917 Fee 3,916 3,905 971 960 4,876 Total 37,950 35,868 9,462 7,380 45,330 Lift Station O&M Manual Labor 306 13,802 11,757 7,105 5,060 18,862 Directs 316 108 0 108 - 108 Fee 2,070 1,764 1,067 760 2,830 Total 15,981 13,521 8,280 5,820 21,801 Main Suspicious Material Labor 307 17,428 17,428 - 17,428 Directs 317 82 82 82 Fee 2,091 2,091 2,091 Total 19,601 19,601 - 19,601 Phase II Resident Engineer Labor 402 494,929 440,488 21,036 100,980 67,574 562,504 Directs 412 273,282 232,346 10,000 52,920 21,984 295,266 Fee 68,601 60,433 3,155 15,150 10,138 78,739 Total 836,812 733,267 34,191 169,050 99,697 936,508 Phase II Resident Engineer PM Labor 403 47,384 47,248 136 - 47,384 Fee 6,426 6,406 20 6,426 Total 53,810 53,654 156 53,810 Phase II Follow-up Services Labor 502 10,780 52 10,728 10,780 Directs 512 55 0 55 55 Fee 1,617 6 1,611 1,617 Total 12,452 58 12,394 12,452 Appencix C Cost Summary 2 Amendment 9 continued AMENDMENT 9 TO APPENDIX C CITY OF CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM SUMMARY OF AMENDMENT 8 COST MODIFICATIONS May 2003 Total 12,060 Estimated Estimates Adjustments - Amendment 8 Costs Cost To for to Amendment 9 Estimated thru Complete Amendment 9 Amendment 8 Estimated Cost (1) April 2003 (2) Amendment 8 (3) Added Scope (4) Estimates (5) Cost (6) NEW PROJECTS AMENDMENT 6 MARCH 2000 650 0 650 Fee Ranchito Area Facility Plan (Amendment 6) 0 310 0 310 Labor 1,400 43,394 41,087 0 (2,307) 41,087 Directs 1,440 31,147 31,297 150 31,297 Fee 6,509 6,163 (346) 6,163 Total 81,050 78,547 (2,503) 78,547 Trickling Filter Rehab Facility Plan (Amendment 6) Labor 1,500 40,871 40,648 (223) 40,648 Directs 1,550 449 449 (0) 449 Fee 6,131 6,097 (34) 6,097 Total 47,451 47,194 (257) 47,194 Trickling Filter Rehab Design (Amendment 7) Labor 2500 111,030 98,322 (12,708) 98,322 Directs 2550 1,380 2,422 1,042 2,422 Fee 16,650 14,748 (1,902) 14,748 Total 129,060 115,492 (13,568) 115,492 Arena Creek Design (Amendment 8) Labor 2400 116,150 86,022 (30,128) 86,022 Directs 2440 73,550 65,584 (7,966) 65,584 Fee 17,420 12,903 (4,517) 12,903 Total 207,120 164,509 (42,611) 164,509 Trickling Filter O & M Manual (Amendment 8) Labor 3540 10,050 8,139 1,911 10,050 Directs 3541 500 0 500 500 Fee 1,510 1,221 289 1,510 Total 12,060 9,360 2,700 - 12,060 Trickling Filter Follow-up (Amendment 8) Labor 3560 2,080 0 2,080 0 2,080 Directs 3561 650 0 650 0 650 Fee 310 0 310 0 310 Total 3,040 0 3,040 0 3,040 Estimated Totals thru Amendment 8 5,650,104 5,224,255 256,800 169,050 Cost Totals 5,183,835 4,803,624 226,311 153,900 Fixed Fee Totals 466,269 420,631 30,489 15,150 5,650,104 5,183,835 466,269 1. Estimated cost basis for Amendment 8 2. Actual project cost through April 2003 3. Estimated cost to complete contract scope through Amendment 8 4. Estimated cost for additional scope added under Amendment 9 5. Additions or deductions to Amendment 8 estimated costs that are the basis for the Amendment 9 estimated cost. (April 2003 actual cost (2) plus estimate to complete (3) plus estimatd cost for additional scope (4)) 6. Basis for total estimated project cost through Amendment 9 (Amentment 8 estimated task costs plus additional cost added as with Amendment 9) Appencix C Cost Summary 3 Amendment 8 continued AMENDMENT 9 TO APPENDIX C CITY OF CAPE GIRARDEAU SANTIARY SEWER IMPROVEMENT PROGRAM 0 85 ESTIMATED COST FOR ADDITIONAL EFFORT / NEW SCOPE 1,840 May 2003 Average Rate, $/Hr $28.15 203 305 306 402 Phase II Phase II Lift Additional Increase Part 1 Record Station Resident Design Drawings O&M Services Totals Labor Estimated Cost Estimated Manhours 0 85 80 1,840 2,005 Average Rate, $/Hr $28.15 $32.80 $27.50 $28.00 Overhead Factor 2.5097 2.301 2.301 1.96 Labor Cost Total $0 $6,420 $5,060 $100,980 $112,460 Subcontracts 0 Geotechnical borings 0 Surveys (Koehler Engr.) 2500 Other Reimbursable Estimated Cost Reproduction Specifications 0 $0 Drawings 0 0 Miscellaneous 0 0 0 Postage/Shipping 0 0 1,050 Travel 0 0 0 Automobile Charges 0 9,240 Field Secretary 23,529 Field Rent 15,400 Field Telephone 550 Miscellaneous 0 0 3,150 Reimbursable Total $2,500 $0 $0 $52,920 $55,420 Estimated Cost Total 2,500 6,420 5,060 153,900 167,880 Fixed Fee 0 960 760 15,150 16,870 Estimated Total Cost for Amendment 9 services $2,500 $7,380 $5,820 $169,050 $184,750 Appendix C New Wokk summary 1 Amendment 9 continued AMENDMENT 9 APPENDIX D CITY OF CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM SCHEDULE May 2003 Add: The schedule for completing new and currently active segments of work is: (Dates assume Amendment 9 approval by mid June 2003 and DNR reviews completed by the dates indicated) South Ramsey Lift Station and Force Main design approved by DNR South Ramsey Lift Station and Force Main construction bids received South Ramsey Lift Station and Force Main notice to proceed Trickling Filter Rehabilitation follow-up services complete Arena Creek construction contract closed South Ramsey Lift Station and Force Main Contract Close July 2003 August 2003 September 2003 January 2004 February 2004 April 2004 South Ramsey Lift Station and Force Main Follow-up services complete March 2005 D-1