Loading...
HomeMy WebLinkAboutRES.1872.03-03-2003BILL NO. 03-37 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO SUBMIT A STORMWATER MANAGEMENT PROGRAM TO THE MISSOURI DEPARTMENT OF NATURAL RESOURCES BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to submit a Stormwater Management Program to the Missouri Department of Natural Resources. A copy of said Stormwater Management Program is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THIS �� DAY OF 1 20 & ATTEST: Gayle Conrad, City Clerk Jay Knudtson, Mayor CITY OF CAPE GIRARDEAU STORM WATER MANAGEMENT PROGRAM THE CITY OF CAPE GIRARDEAU STORM WATER MANAGEMENT PROGRAM INDEX PAGE I. BACKGROUND I IL INTRODUCTION 1 III. PERMITTING AND REPORTING 2 IV. STORM WATER MANAGEMENT PROGRAM A. PUBLIC EDUCATION AND OUTREACH 2 B. PUBLIC PARTICIPATION/INVOLVEMENT 5 C. CONSTRUCTION SITE RUNOFF CONTROL 7 D. POST -CONSTRUCTION RUNOFF CONTROL 9 E. ILLICIT DISCHARGE DETECTION AND ELIMINATION 10 F. POLLUTION PREVENTION / GOOD HOUSEKEEPING 12 V. TIME TABLES 16 ATTACHMENT 1 20 ATTACHMENT 2 21 City of Cape Girardeau ITA Phase II Sturm \eater Management Program Final Draft I- BACKGROUND The City of Cape Girardeau was established in 1871. The City has a population of 36,687 according to the 2000 Census information, with a total area of 26.41 square miles (City of Cape Girardeau GIS information). The City of Cape Girardeau has a council-manager form of government. The City council consists of a mayor and six council members (see attachment 1 for their names, terms and addresses). The major water sheds of the City are Juden Creek, Sloan Creek, Cape La Croix Creek, Ramsey branch and the Headwater diversion channel, all of which discharge into the Mississippi River (see attachment 2). The City of Cape Girardeau has a storm water ordinance that was adopted in 1989. The storm water ordinance aims at controlling the rate of discharge from new development and enforcing erosion control measures to reduce the amount of silt deposited into waterways. The City Engineer's office has a set of erosion and sediment control standards that have been enforced on all construction projects within the City limits of the City of Cape Girardeau regardless of the area of land disturbed. In 2002 the Development Services department began requiring developers to submit proposed erosion control plans and notes for review and approval with their grading and storm water management plans. The City of Cape Girardeau City Council is in the process of presenting a proposed storm water utility charge to the voters in the upcoming April 2003 election, as recommended by the citizens task force. This charge will go toward hiring a storm water coordinator whose main responsibility will be to oversee the execution of the phase II stormwater management plan. The storm water utility charge would also pay for several storm water projects to improve and enhance the storm water sewer system and help maintain the different creeks that flow through town. However, if the storm water utility does not get approved, the Storm -water Management Program will have to be re-evaluated at that time. The City of Cape Girardeau has been and still is committed to reducing the levels of contaminants, silt and other deposits from the storm water going through the City. However, the City has little or no control on what occurs outside the City limits. Therefore, the City will continue to coordinate with the county, City of Jackson and regional agencies. II- INTRODUCTION The City of Cape Girardeau has formed a Storm Water Management (SWM) team that shall oversee the development and implementation of the Storm Water Management Program (SWMP). The SWM team shall meet on a regular basis to review reports, address storm water management issues and to monitor the progress of the SWMP implementation. The team is comprised of individuals from Planning, Engineering, Inspection Services and Public Works. The Storm Water coordinator shall consult the team on storm water issues and problems and submit progress reports for the team's review and recommendations. Page I of 21 02/03/03 City of Gape Girardeau EPA Phase II storm Water Management Program Final lhati This SWMP shall identify specific objectives for each of the required control measures and which department or division shall be responsible for the implementation and enforcement of that measure. The plan will set forth a guideline for inspection and enforcement of all approved storm water management plans, and erosion and sediment control plans in accordance with existing ordinances. It will also make proposals for recommended changes and addendums to existing ordinances. This SWMP will be reviewed and updated annually in conjunction with annual reporting requirements, or as required by the director of the U.S. Environmental Protection Agency and Missouri Department of Natural Resources (MODNR), in accordance with statutory provisions of section 402(p)(3)(B) of the Clean Water Act. III- PERMITTING AND REPORTING The operating permit issued by the permitting authority will contain the approved SWMP in which the objectives are: 1) to reduce the discharge of pollutants to the "Maximum Extent Possible" (MEP), 2) to protect water quality and 3) To satisfy the water quality requirements of the Clean Water Act. In order to meet these objectives, the City will work to successfully implement the Best Management Practices (BMPs) in the approved SWMP in compliance with the technical standard of the MEP. A report will be prepared semi-annually detailing the status of compliance with permit conditions, including an assessment of the appropriateness of the selected BMPs and progress toward achieving the selected measurable goals for each minimum measure. The report will also provide results of any information collected and analyzed such as monitoring data (if any), if collected as well as any recommended changes in the BMPs and measurable goals for any of the required minimum measures. The City's annual report to the permitting authority will include a summary of the semi-annual reports as well as a summary of the storm water activities planned for the next reporting cycle. All records and reports will be maintained for a minimum of three years and will be made accessible to the public. Upon request, copies of records and reports will be submitted to the permitting authority. IV- STORM WATER MANAGEMENT PROGRAM A. Public Education and Outreach The City of Cape Girardeau believes that educating the public is an essential part of incorporating the new phase II changes into permanent practice. Due to the complexity of the changes the City would attempt to create a volunteer organization that would be made up of citizens from the City of Cape Girardeau. The Citizens Storm Water Committee would have the following objectives: • Develop educational resources Page 2 of 21 02/03/03 City of Cape Oraldcau EPA Phase II Storm l'`'ater hlananennnt Program Final Draft • Develop an infrastructure resource to support the public education and outreach program. • Develop brochures to support the Public Meetings. • Identify and train volunteer educators to be used for a Public Education Task Force. The volunteer organization would work hand in hand with the Stormwater Team that the City already has in place. Between these two teams, Best Management Practices would be adopted and enforced by the City. The following educational resources would be utilized: 1. Utility Bill Insert- The City is able to add information to the monthly statement that is mailed to customers that receive City services. Information concerning the new laws and regulations would be attached to the statements. Target Date: Permit Years: Year 1: X Year 2: X Year 3: X Year 4 X Year 5 Start Date: July 2004 End Date: July 2008 Responsibility: Public Information Officer, Storm Water Management Team' and the Volunteer Citizens Committee. 2. Web Site- The City of Cape Girardeau's current web site will be modified to have storm water and pollution prevention links, such as DNR and EPA sites, that contain information about the changes. Target Date: Permit Years: Year 1: X Year 2: X Year 3: XYear4 X Year 5 Start Date: July 2004 End Date: July 2008 Responsibility: Public Information Officer, Storm Water Management Team and the Volunteer Citizens Committee. 3. Channel 5 -This cable television station is owned and operated by the City of Cape Girardeau. This channel would be used to broadcast informational messages about the changes as well as interviews with different people who will talk about the importance of the new changes and how these changes affect the citizens of the City. Target Date: Permit Years: Year 1: X Year 2: X Year 3: X Year 4 X Year 5 Start Date: July 2004 End Date: July 2008 Responsibility: Public Information Officer, Storm Water Management Team and Volunteer Citizens Committee. 4. Storm drain stenciling- Continue with the current programs to stencil all the storm drains across the City. The City will solicit different organizations that may be willing to participate in this task. ' In many instances the Stormwater Coordinator would replace the Storm Water Management Team. Page 3 of 21 02/03/03 Oth of ('ape Girardeau FI'A Phase II Storm Water N1anagement Program final Draft Target Date: Permit Years: X Year 1: X Year 2: X Year 3: Year 4 Year 5 Start Date: July 2003 End Date: July 2006 Responsibility: Public Works Department and the Volunteer Citizens Committee. 5. Employee Education- The first group that would need to be educated on the new laws and regulations would be the employees of the City. This would be accomplished by Citywide emails, general meetings that would outline the changes, and articles in the monthly newspaper. Target Date: Permit Years: X Year 1: X Year 2: X Year 3: X Year 4 XYear 5 Start Date: July 2003 End Date: July 2008 Responsibility: Storm Water Management Team. 6. Contractors/Engineers/Architects Meetings- The City of Cape Girardeau would attempt to sponsor storm water management seminars through grants or other sources. These meetings would be targeted at the people that deal with designing or construction of stormwater utilities. These meetings will discuss the new regulations as well as demonstrate the most efficient way of installing erosion and sediment control measures Target Date: Permit Years: Year 1: X Year 2: X Year 3: Year 4 Year 5 Start Date: July 2004 End Date: July 2005 Responsibility: Storm Water Management "beam and the Volunteer Citizens Committee. 7. Public Meetings- The City would host public meetings that would be targeted at the citizens of the City. These meetings would inform the public of the EPA regulations and the impact they would have on the community and its residents. The meetings would also discuss BMP's and the way residents could be involved in enforcing the new requirements. Brochures produced by volunteer groups and approved by the Storm Water Management team would be available to the public at many different locations as well. The first year the City will target civic groups with power point presentations. Target Date: Permit Years: X Year 1: X Year 2: X Year 3: X Year 4 X Year 5 Start Date: July 2003 End Date: July 2008 Responsibility: Public Information Officer, Storm Water Management Team and the Volunteer Citizens Committee. Page 4 of 21 02/03/03 Cm of Cape Girardeau GPA Phase It Storni Water Management Program Final Draft B. Public Participation/Involvement An essential part of the phase Il changes will be involving the public with the program. The Citizens Storm Water committee would govern the basis and demand for the programs. Measure Objectives: • Develop educational resources and an infrastructure resource to support the public education and outreach program • Education program in place and making presentations in the schools. Volunteer educators/Speakers giving workshops. • Public Meetings in several different locations Citywide, information available to the public in the form of flyers or brochures. Volunteer Group organized and educated. • Part of the City actively taking part in the community clean-ups. • "Adopt A Storm Drain" program in place. • Citizens watch groups in place. The following items are the suggested programs that may be implemented: 1- Public Meetings -Setting up various public meetings Citywide in order to educate as well as generate feedback from the citizens. Target Date: Permit Years: Year 1: Year 2: X Year 3: X Year 4 Year 5 Start Date: July 2005 End Date: July 2007 Responsibility: Public Information Officer, Storm Water Management Team and the Volunteer Citizens Committee. 2- Train Volunteer educators/Speakers to conduct workshops. Target Date: Permit Years: Year 1: Year 2: X Year 3: X Year 4 Year 5 Start Date: July 2005 End Date: July 2007 Responsibility: Storm Water Management Team and the Volunteer Citizens Committee. 3- Setup Student Education Programs for the area schools. Target Date: Permit Years: Year 1: Year 2: Year 3: X Year 4 X Year 5 Start Date: July 2006 End Date: July 2008 Page 5 of 21 02/03/03 Cm of C'ape ("ITa;LICan FPA Phase 11 Storm Water Nianagenxnt Program Final Draft Responsibility: Storm Water Management Team and the Volunteer Citizens Committee. 4- Dorm Citizens Watch Groups. Target Date: Permit Years: Year 1: Year 2: Year 3: X Year 4 X Year 5 Start Date: July 2006 End Date: July 2008 Responsibility: The Volunteer Citizens Committee. 5- Storm Drain Stenciling -Contacting organizations to see if they would be willing to continue the program started by the City. Target Date: Permit Years: Year 1: Year 2: X Year 3: X Year 4 Year 5 Start Date: July 2005 End Date: July 2007 Responsibility: The Volunteer Citizens Committee. 6- Volunteer Water Quality Monitoring -Gives citizens first-hand knowledge of the quality of local water bodies and provides a cost-effective means of collecting water quality data. Target Date: Permit Years: Year 1: Year 2: Year 3: X Year 4 X Year 5 Start Date: July 2006 End Date: July 2008 Responsibility: The Volunteer Citizens Committee. 7- Volunteer educators/Speakers-Who can conduct workshops, encourage public participation, and staff special events. Target Date: Permit Years: Year 1: Year 2: Year 3: X Year 4 X Year 5 Start Date: July 2006 End Date: July 2008 Responsibility: The Volunteer Citizens Committee. 8- Community Clean -Ups along local waterways and around storm drains. Target Date: Permit Years: Year 1: Year 2: X Year 3: X Year 4 X Year 5 Start Date: July 2005 End Date: July 2008 Responsibility: The Volunteer Citizens Committee. 9- Setup an "Adopt A Storm Drain" program -Encourage individuals or groups to keep storm drains free of debris and to monitor what is entering local waterways through storm drains. Page 6 of 21 02/03/03 CaN of tape liirardcau ITA Phase II Stone Water Management Program Final Draft Target Date: Permit Years: Year 1: Year 2 Start Date: July 2006 End Date: July 2008 Responsibility: The Volunteer Citizens Committee. C. Construction Site Runoff Control Year 3: X Year 4 X Year 5 The City of Cape Girardeau had been enforcing the existing stormwater ordinance that controls construction site runoff and illicit discharge of pollutants into local rivers, lakes and streams. Existing City of Cape Girardeau regulations and best management practices: ❑ Stormwater ordinance that regulates mechanism requiring the implementation of proper erosion and sediment control on construction sites of any size. ❑ Have procedures for site plan review of all commercial construction plans. ❑ Have procedures for City and commercial projects inspections and enforcement of control measures. ❑ Have sanctions to ensure compliance (established in the stormwater ordinance). For this measure the City' Storm Water Management team would have the following objectives: • Review the current stormwater ordinance. • Outline a procedure for site plan review of construction plans that have potential �v atcr quality impacts. • Develop procedures for site inspection and enforcement. • Setup sanctions to ensure compliance. • Identify sediments and commonly discharged pollutants. The volunteer organization and the City's Storm Water Team would work together to compile the following Best Management Practices that would be adopted and enforced by the City's different depart►nents as indicated. 1. Stormwater Ordinance — The City would evaluate updating the current stormwater ordinance to reflect stricter erosion and sediment controls for construction sites. Target Date: Permit Years: Year 1: X Year 2: Year 3: Year 4 Year 5 Start Date: July 2004 End Date: July 2005 Page 7 of 21 02/03/03 City of Cape Girardeau ITA Phase Il Storni AVater Management Program Final Draft Responsibility: Storm Wates- Management Team and Storm Water Coordinator. Enforcement: Development Services, Inspection Services and Public Works Department. 2. Site Plan Review — This would involve adding another step in the City's current site plan review sessions that would look at the water quality impacts that the new construction will have on the surrounding stormwater relief points. Target Date: Permit Years: X Year 1: X Year 2: X Year 3: X Year 4 X Year 5 Start Date: July 2003 End Date: July 2008 Responsibility: Storm Water Management Team. Enforcement: Development Services, Inspection Services and Public Works Department. 3. Site inspection and enforcement responsibility assignment. Target Date: Permit Years: Year 1: X Year 2: X Year 3: X Year 4 X Year 5 Start Date: July 2005 End Date: July 2008 Responsibility: Storm Water Management.Team. Enforcement: Development Services, Inspection Services and Public Works Department. 4. Establish procedures for the receipt and consideration of information submitted by the public. Target Date: Permit Years: Year 1: Year 2: X Year 3: X Year 4 X Year 5 Start Date: July 2005 End Date: July 2008 Responsibility: Storm Water Coordinator. 5. Establish new procedures to deal with each common type of pollutant and sediment discharged from construction, residential and maintenance type -sites. Most common types of discharges are: Silt Solid and sanitary wastes Phosphorous (fertilizer) Nitrogen (fertilizer) Pesticides Oil and grease Concrete truck washout Target Date: Permit Years: Year 1: Year 2: Year 3: X Year 4 Year 5 Start Date: July 2006 End Date: July 2007 Responsibility: Storm Water Management Team. Page 8 of 21 02/03/03 01v of ('ape Girardeau ITA Phase II Storm Watcr Management Program Filial Ihalt D. Post -Construction Runoff Control The Phase II Final Rule requires an operator of a regulated small Municipal Separate Storm Sewer System (MS4) to develop, implement, and enforce a program to reduce pollutants in post -construction runoff to their MS4 from new development and redevelopment projects that result in the land disturbance of greater than or equal to 1 acre. The small MS4 operator is required to: • Develop and implement strategies that include a combination of structural and/or non- structural Best management practices (BMPs). • Have an ordinance or other regulatory mechanism requiring the implementation of post - construction Runoff controls to the extent allowable under State, Tribal or local law. • Ensure adequate long-term operation and maintenance of controls. • Determine the appropriate best management practices (BMPs) and measurable goals for this minimum control measure. The volunteer organization and the City Stormwater Team would work together to compile the following Best Management Practices that would be adopted and enforced by the City. 1. Identify Best Management Practices for this measure. Realize and develop a mix of Structural and Non -Structural BMPs that are appropriate for this geographic area. This -BMP list will include BMPs suited for both redevelopment and new development and will also be used in the 'Construction Site Runoff Control'. Target Date: Permit Years: Start Date: July 2004 End Date: July 2005 Year 1: X Year 2: Year 3: Year 4 Year 5 Responsibility: Storm Water Management Team. 2. Publication of BMPs. Codify the BMPs identified above through modifying existing stormwater ordinance or creating a new ordinance. Publish the regulations and make them available to developers, citizens and staff. Target Date: Permit Years: Year 1: X Year 2: Year 3: Year 4 Year 5 Start Date: July 2004 End Date: July 2005 Responsibility: Storm Water Management Team and the Volunteer Citizens Committee. 3. Enforcement. Identify City entities responsible for enforcing the new regulations. Target Date: Permit Years: Year 1: X Year 2: X Year 3: X Year 4 X Year 5 Start Date: July 2004 End Date: July 2008 Responsibility: Storm Water Management Team. Page 9 of 21 02/03/03 Otv of Cape Giranicau IiPA Phase II Stone \\atcr Management Program Final Draft E. Illicit Discharge Detection and Elimination Plan The city of Cape Girardeau performs several tasks to reduce illicit discharges. ❑ Annual Collection of Household Hazard Waste Every October the city of Cape Girardeau conducts a Household Hazardous Waste Collection Day. In October 2002, 245 residents participated in this event. A total of 22,095 pounds of hazardous waste was collected. ❑ Storm Sewer Inlet Stenciling Program Community groups have stenciled storm sewer inlets with "Do not dump waste — goes to stream." Currently approximately 25% of storm sewer inlets have been stenciled. ❑ Storm Sewer System Mapping Program Approximately 20% of the City's Storm Sewer System has been entered in the City's Graphic Information System (GIS). Most of the remaining data is on engineering drawings. ❑ City of Cape Girardeau Ordinances The City has several ordinances addressing runoff and polluting streams. Proposed 5 -Year Illicit Discharge Detection and Elimination Plan Continue current illicit discharge and detection activities and: 1. Acquire GIS equipment to complete entering Storm Sewer System information into the GIS so the information will be easily accessible to City Personnel and residents. Target Date: Permit Years: Year 1: X Year 2: X Year 3: X Year 4 X Year 5 Start Date: July 2004 End Date: July 2008 Responsibility: GIS Coordinator, Stormwater Team 2. Create Stormwater Utility funded by user fees to procure funding for inspection and enforcement of stormwater ordinances. Target Date: Permit Years: X Year 1: X Year 2: X Year 3: X Year 4 X Year 5 Start Date: July 2003 End Date: July 2008 Responsibility: Stormwater Team 3. Inform City residents through utility bill inserts concerning: ♦ City ordinances prohibiting discharging materials into the stormwater system ♦ What can be legally discharged ♦ The effect of detrimental discharges on the environment ♦ What to do if they observe residents or companies discharging illegally. Page 10 of 21 02/03/03 Cit) ot'Capc (�irardrui ITA Phase II Stone Water Manaecment Program Final (haft Target Date: Permit Years: X Year 1: X Year 2: X Year 3: X Year 4 X Year 5 Start Date: July 2003 End Date: July 2008 Responsibility: Public Information Officer and Stormwater Team 4. Stormwater Coordinator to inspect for illicit discharges and enforce ordinances. Target Date: Permit Years: Year 1: X Year 2: X Year 3: X Year 4 X Year 5 Start Date: July 2004 End Date: July 2008 Responsibility: Stormwater Coordinator 5. Stormwater Coordinator to train building inspectors, public works personnel, police and fire personnel in: ♦ Illicit discharge prevention ♦ City Ordinances concerning illicit discharges Target Date: Permit Years: Year 1: X Year 2 Start Date: July 2004 End Date: July 2008 Responsibility: Stormwater Coordinator X Year 3: X Year 4 X Year 5 6. Start a semiannual inspection program on major streams to help detect any illicit discharges taking place on a regular basis. If inspections detect sources of illicit discharge, contact those responsible to resolve the problem. Target Date: Permit Years: Year 1: Year 2: X Year 3: X Year 4 X Year 5 Start Date: July 2005 End Date: July 2008 Responsibility: Stormwater Team, Stormwater Coordinator and Public Works Department. 7. Train and equip fire personnel to remove liquid waste after car accidents. Target Date: Permit Years: Year 1: Year 2: Year 3: X Year 4 Year 5 Start Date: July 2006 End Date: July 2007 Responsibility: Stormwater Coordinator 8. Train remaining city personnel in: ♦ Illicit discharge prevention ♦ Stepped up enforcement of City Ordinances concerning illicit discharges Page I 1 of 2l 02/03/03 0t\ of Gape Girardeau I PA Phase II Storm \Vater Management Program Final I)rait ♦ What City employees should do if they observe residents or companies discharging illegally into storm inlets or streams Target Date: Permit Years: Year 1: Year 2: Year 3: X Year 4 X Year 5 Start Date: July 2006 End Date: July 2008 Responsibility: Stormwater Coordinator 9. Inspect inlet stencils, re -stencil as necessary. Target Date: Permit Years: Year 1: Year 2: Year 3: Year 4 X Year 5 Start Date: July 2007 End Date: July 2008 Responsibility: Stormwater Coordinator and Citizen's Committee 10. Evaluate the effectiveness of Years 1- 4 Plan through measurable standards. Target Date: Permit Years: Year 1: Year 2: Year 3: Year 4 X Year 5 Start Date: July 2007 End Date: July 2008 Responsibility: Stormwater Coordinator and Stormwater Team F. Pollution Prevention/ Good Housekeeping Current Pollution Prevention/Good Housekeeping performed by City of Cape Girardeau: ❑ Street sweeping and disposal of street sweeper debris. Normally the City operates two street sweepers on designated routes. All city streets are swept at least 10 times per year. The inorganic materials are separated and recycled (rocks, sand etc.) with the remaining trash disposed in a licensed landfill. ❑ Disposal of vehicle waste liquids at City garage. All vehicle lubricants, antifreeze and other waste liquids are collected and disposed of by a licensed contractor. ❑ Disposal of parts cleaning solvents. Parts cleaning solvents are stored properly and disposed of by a licensed contractor. ❑ Vehicle Battery Disposal The city's vehicle batteries are transported to a recycling company. ❑ The City's Wastewater Treatment Plant Gear Oil Disposal Gear oil is transported to the city garage for proper disposal. ❑ Disposal of used tires. Page 12 of 21 02/03/03 0ty of Cape Uirardcau FI'A Phase II Storm WaM Nall agemcnt Program Final (haft Tile city's used tires are collected and shredded by a state approved tire shredder. ❑ Covered salt storage. The city's road deicing chemicals are covered to reduce the amount of contamination to area streams. ❑ Covered solid waste transfer facility. All unloading of solid waste and subsequent loading is performed under roof. All drains from the tipping floor and operations area are collected in a sump and disposed of' at the wastewater treatment plant. All city solid waste is hauled to a Subtitle D approved landfill in Dexter under a contractual arrangement. ❑ Fleet Equipment Wash Bay The fleet equipment wash bay is equipped with an oil separator to prevent wash water runoff from contaminating surrounding streams. ❑ Oil and Fuel Spills Any oil or fuel spills are contained and cleaned up with absorbent material for proper disposal. ❑ Fuel Storage Tanks The pipe gallery is inspected regularly and is equipped With the latest leak detection equipment and meets all storage tank regulations. ❑ Environmental Study of Public Works Maintenance Facility and City Maintenance Garage Contracted with an environmental engineer for soil testing and analysis. No problems were detected but additional testing was recommended. ❑ City leaf collection program In 2002 approximately 1,200 tons were collected city-wide and recycled to area farms preventing organic contamination of streams. ❑ City-wide clean up program Last year this annual program collected 191 tons of refuse and 234 appliances from City residents free -of -charge. The refuse was disposed of in a licensed landfill and any compressor oil and refrigerant was removed from appliances before disposal. ❑ City-wide household hazardous waste collection Every October the City of Cape Girardeau conducts a Household Hazardous Waste Collection Day. In October 2002 - 245 residents participated in this event. A total of 22,095 pounds of hazardous waste was collected. ❑ Preventative maintenance program for city vehicles This program results in early detection and correction of fluid leaks thus preventing contamination of parking areas. ❑ Plant Two water treatment by-product disposal Iron and manganese sludge from the Plant II water treatment processes is stored in non - discharge lagoons, which are pumped out each year. It is then taken to wastewater treatment plant for proper disposal. Page 13 of 21 02/03/03 C aN of C'apr C nnardeau PPA Phase II Storm \Pater :Management Pi -op arn Final Draft ❑ Collection of inlet debris and subsequent disposal The Stormwater/Sewer Maintenance personnel routinely clean storm inlets and catch basins and haul the collected material to the wastewater treatment plant for proper disposal. ❑ City landfill closure and monitoring The solid waste landfill was closed in accordance with Subtitle D Regulations in 1989. The leachate collection system and lagoon were eliminated in 1999 in compliance with Missouri DNR requirements. There is no off-site discharge of leachate, although the closed landfill continues to be inspected regularly by DNR and city staff. ❑ Weed control near streams. Public Works personnel use Rodeo (EPA approved) herbicide for weed control near streams. Department licensed employees apply the herbicide using recommended application techniques and quantities. ❑ Park Department herbicide application In the Parks Department herbicide and fertilizer is applied by two employees who hold herbicide and fertilizer application licenses. They apply the herbicide and fertilizer using recommended application techniques and quantities. The herbicide is stored inside a building under lock and key. :j Airport herbicide application Herbicide is applied by licensed Public Works employees for the City of Cape Girardeau Municipal Airport. Fuel tanks and loading facilities have berms to contain major fuel spills. Airport employees are trained and have absorbent material to clean up small spills. Proposed 5 -Year Pollution Prevention/ Good Housekeeping Plan Continue current Pollution Prevention/ Good Housekeeping activities and: 1. Develop training materials to educate city maintenance personnel in reducing runoff pollution. Target Date: Permit Years: X Year 1: Year 2: Year 3: Year 4 Year 5 Start Date: July 2003 End Date: July 2004 Responsibility: Stormwater Coordinator and Public Works Department 2. Train city maintenance personnel in ways to reduce runoff pollution while performing repair and maintenance activities. Target Date: Permit Years: Year 1: X Year 2: Year 3: Year 4 Year 5 Start Date: July 2004 End Date: July 2005 Responsibility: Stormwater Team, Public Works Department Directly connect Water Plant II sludge discharge to the sanitary sewer system and close the existing lagoon within the next 3 years. Page 14 of 21 02/03/03 City of Cape Girardeau I PA Phase 11 Storm Watcr Management Program final I)raft Target Date: Permit Years: Year 1: X Year 2: X Year 3: X Year 4 X Year 5 Start Date: July 2004 End Date: July 2008 Responsibility: Alliance Water Resources and the Wastewater Treatment Division 4. Add computerized metering equipment as a standard item when chemical spreader boxes are replaced. This will minimize the use of chemicals for ice control. Target Date: Permit Years: Year 1: X Year 2: X Year 3: X Year 4 X Year 5 Start Date: July 2004 End Date: July 2008 Responsibility: Street Division 5. More systematic cleaning of storm sewer inlets utilizing GIS stormwater system maps. Target Date: Permit Years: Year 1: X Year 2: X Year 3: X Year 4 X Year 5 Start Date: July 2004 End Date: July 2008 Responsibility: Wastewater and Stornlwater Collection Division 6. Incorporate sand filters and a detention basin in the design of a proposed public works facility. Study other measures including vegetative berms to reduce runoff of paved surfaces of the new facility. Target Date: Permit Years: Year 1: X Year 2: X Year 3: X Year 4 X Year 5 Start Date: July 2004 End Date: July 2008 Responsibility: Public Works 7. Evaluate recycling used motor oil and antifreeze at the City recycling drop-off center. If markets are available, start program. Target Date: Permit Years: Year 1: Year 2: Year 3: Year 4 X Year 5 Start Date: July 2007 End Date: July 2008 Responsibility: Stormwater Coordinator and Solid Waste Coordinator 8. Amend subdivision regulations to require developers to mark inlets with "Do not dump waste — goes to stream" in new subdivisions. Target Date: Permit Years: Year 1: Year 2: Year 3: X Year 4 Year 5 Start Date: July 2006 End Date: July 2007 Responsibility: Engineering Department, Stormwater Coordinator, City Council Page 15 of 21 02/03/03 THE CITY OF CAPE GIRARDEAU STORM WATER MANAGEMENT PROGRAM TIME TABLE START YEAR FOR MEASURES SET OUT IN THE SWMP CONTROL MEASURE 1 2 3 4 5 6 7 s 9 10 A PUBLIC EDUCATION AND OUTREACH YR2 YR2 YR2 YRI YRI YR2 YRI B PUBLIC PARTICIPATION / INVOLVEMENT YR3 YR3 YR4 YR4 YR3 YR4 YR4 YR3 YR4 c CONSTRUCTION SITE RUNOFF CONTROL YR2 YRI YR2 YR3 YR4 D POST -CONSTRUCTION RUNOFF CONTROL YR2 YR2 YR2 E ILLICIT DISCHARGE DETECTION AND ELIMINATION YR2 YRI YRI YR2 YR2 YR3 YR4 YR4 YR5 YR5 F POLLUTION PREVENTION / GOOD HOUSEKEEPING YR1 YR2 YR2 YR2 YR2 YR2 YR5 YR4 A. PUBLIC EDUCATION AND OUTREACH TIME TABLE B. PUBLIC PARTICIPATION - INVOLVEMENT TIME TABLE DESCRIPTION START DATE END DATE 1 Utility Bill Insert July 2004 July 2008 2 Web Site July 2004 July 2008 3 1Channel5 July 2004 July 2008 4 Storm drain stenciling July 2003 July 2006 5 lEmployee Education July 2003 July 2008 6 Contractors/Engineers/Architects Meetings July 2004 July 2005 7 Public Meetings July 2003 July 2008 B. PUBLIC PARTICIPATION - INVOLVEMENT TIME TABLE Page 17 of 2I DESCRIPTION START DATE END DATE 1 Public Meetings July 2005 July 2007 2 Train Volunteer educators/Speakers July 2005 July 2007 3 Setup Student Education Programs July 2006 July 2008 4 Form Citizens Watch Groups July 2006 July 2008 5 Storm Drain Stenciling July 2005 July 2007 6 Volunteer Water Quality Monitoring July 2006 July 2008 7 Volunteer educators/Speakers July 2006 July 2008 8 Community Clean -Ups July 2005 July 2008 9 Setup an "Adopt A Storm Drain" Program July 2006 July 2008 Page 17 of 2I C. CONSTRUCTION SITE RUNOFF CONTROL TIME TABLE D. POST -CONSTRUCTION RUNOFF CONTROL TIME TABLE DESCRIPTION START DATE END DATE 1 Stormwater Ordinance July 2004 July 2005 2 Site Plan Review July 2003 July 2008 3 Site Inspection and Enforcement July 2005 July 2008 4 Public Information Processing July 2005 July 2008 5 Establish Pollutant and Sediment Controls July 2006 July 2007 D. POST -CONSTRUCTION RUNOFF CONTROL TIME TABLE Page 18 of 21 DESCRIPTION START DATE END DATE 1 Identify Best Management Practices July 2004 July 2005 2 Publicize Best Management Practices July 2004 July 2005 3 Enforcement July 2004 July 2008 Page 18 of 21 E. ILLICIT DISCHARGE DETECTION AND ELIMINATION PLAN TIME TABLE F. POLLUTION PREVENTION/GOOD HOUSEKEEPING TIME TABLE DESCRIPTION START DATE END DATE 1 Acquire GIS Equipment July 2004 July 2008 2 Create Stormwater Utility July 2003 July 2008 3 Utility Bill Inserts July 2003 July 2008 4 Inspect and Enforce Ordinances July 2004 July 2008 5 Train Employees in Prevention July 2004 July 2008 6 Seminannual Inspections Program July 2005 July 2008 7 Train and Equip Personnel on Spills July 2006 July 2007 9 Train City Personnel July 2006 Jule 2008 11 Inspect inlet Stencils July 2007 July 2008 12 Evaluate Plan July 2007 July 2008 F. POLLUTION PREVENTION/GOOD HOUSEKEEPING TIME TABLE Page 19 of 21 DESCRIPTION START DATE END DATE 1 Develop Training Material July 2003 July 2004 2 Train City Maintenance Personnel July 2004 July 2005 3 Water Plant II to Sanitary Sewer System July 2004 July 2008 4 Add Computerized Metering Equipment July 2004 July 2008 5 Systematic Cleaning of Storm Sewer Inlets July 2004 July 2008 6 Study New Ways to Reduce Runoff July 2004 July 2008 7 Evaluate Motor Fuel and Antifreeze Recycling July 2007 July 2008 8 Amend Subdivison Regulations July 2006 July 2007 Page 19 of 21 ATTACHMENT I City of Cape Girardeau, Missouri City Council Members Jay Bradley Knudtson Mayor 4/02 elected to Council 4/06 term expires Evelyn Delores Boardman Ward 1 4/02 elected to Council 4/06 term expires Charles J. Herbst III NVard 2 4/02 elected to Council 4/06 term expires Jay C. Purcell Ward 3 4/04 term expires B. Hugh White Ward 4 4/00 elected to Council 4/04 term expires Matthew Hopkins Ward 5 4/00 elected to Council 4/04 term expires Marcia Kay Ritter Ward 6 4/02 elected to Council 4/06 term expires Citizen Contact Information 815 Pheasant Cove Cape Girardeau, MO 63701 573-334-9000 lknudtson(o)cilyofcapegirardeau.org 11 Rivercrest Apt. 201 Cape Girardeau, MO 63701 573-335-3529 eboardman(2D,cityofcapegirardeau.org 9 N. Benton Cape Girardeau, MO 63702 X73-334-3297 cherbst(c�cityofcapesJirardeau.01- 136 S. Louisiana 573-651-1695 j aypurcell(a,chartennet 2069 Steven Drive Cape Girardeau, MO 63701 573-651-3464 hwhite(c)cityofcapegirardeau.or 2532 Tulip Lane Cape Girardeau, MO 63701 573-339-1393 mhoppy(,�),chartennet 24 Schonhoff Ln. Cape Girardeau, MO 637031 573-334-7411 or 573-334-8439 mritterCc�cityofcapegirardeau.ori Page 20 of 21 2/()3/()-1 b ATTACHMENT 2 RAMSEY BRANCH CAPE LA CROIX CREEK AREA WITH UNDERGROUND DRAINAGE SYSTEM Noted Highwater Area (City Memo of '99) Identified Structure (City Inspection and Photos) Detention Basin - - Creek Watershed Boundary Sub—Watershed Boundary Major Streets Cape Girardeau City Limits CSO Project Area Home Flooding/Erosion (Stormwater Questionnaire) Street Flooding (Stormwater Questionnaire) Hydrologic and Hydraulic Modeling Results 1.36 River Stations NOTE: RIVER STATIONING IS IN MILES. RAMSEY BRANCH STATIONING BEGINS AT 1-55. sm HORNER 8. -r Koehler CITY OF CAPE GIRARDEAU, MISSOURI Z ■ SHIFRIN, INC. Engineering CAPE GIRARDEAU STORMWATER MASTER PLAN >� Z=■n� rKV and WATERSHED MAP g o �oowrl.a x [a�.►�ar�tto 0 6 141MN eFL31LXGft d�wHOOK Us* Q= Surveying HYDROLOGIC BOUNDARIES