Loading...
HomeMy WebLinkAboutRES.1635.01-08-2001BILL NO. 2001-4 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN ADDENDUM TO AN ENGINEERING SERVICES CONTRACT WITH KOEHLER ENGINEERING AND LAND SURVEYING, INC., FOR THE NEW MADRID STREET PROJECT BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute an Addendum to an Engineering Services Contract, dated September 21, 2000, with Koehler Engineering and Land Surveying, Inc. for the New Madrid Street Project. A copy of said Addendum is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THIS DAY OF , 20 C,1 r A. M. Spradling, III, or ATTEST: NEW MADRID STREET PROJECT ADDENDUM TO CONTRACT FOR ENGINEERING SERVICES CITY OF CAPE GIRARDEAU, MISSOURI THIS ADDENDUM TO THE EXISTING CONTRACT dated September 21, 2000, for design services for a waterline along the North line of New Madrid Street from the West line of Henderson Avenue to the East line of West End Blvd., is between the City of Cape Girardeau, hereinafter referred to as the "City" and Koehler Engineering and Land Surveying, Inc., hereinafter referred to as the "Engineer". Except as modified hereafter, all articles and provisions of the original contract shall remain in full force and effect. ARTICLE I — SCOPE OF SERVICES C. ADDITIONAL DESIGN SERVICES 1. At the direction of the City, the Engineer will modify the completed design, to add a 6" diameter waterline along the north line of New Madrid Street, from the west line of Henderson Avenue to the East line of West End Blvd., and provide crossing connections under New Madrid Street for future extensions of lines on Illinois Avenue and Park Street. 2. All aspects of the plans required will be adjusted in accordance with the additional work indicated above. Items to be addressed shall include but not be limited to adjusting of planned improvements to facilitate the construction of the new waterline and the street widening during a single construction project. 3. Additional Easement plats and documents shall be prepared as required for the project in the relocated area. ARTICLE IV — PERIOD OF SERVICE The Engineer will commence work required by the addendum within two days after receiving notice to proceed from the City. The addendum work shall be completed in accordance with the following schedule: A. Plans completed for review by city staff — Within 14 calendar days after receipt of notice to proceed. B. Final Plans revised and Completed — Within 7 calendar days after completion of review of preliminary plans by City. C. Easement plats and documents completed (if required) — Within 7 calendar days of completion of review of preliminary plans by City. The above times are exclusive of review time by other agencies and exclusive of time needed to acquire right-of-way. The City will grant time extensions for unavoidable delays beyond the control of the Engineer. Requests for extensions of time shall be requested in writing by the Engineer, stating fully the reasons for the request. ARTICLE V — STANDARDS For services provided under this addendum, the City will compensate the Engineer as follows: A. For additional design services, including work through the construction contract award the City will reimburse the Engineer for the hours expended and at the hourly rates set forth in Attachment "A" of the original contract. For the basic design services set forth in this addendum, reimbursement to the Engineer shall not exceed $ 2,630.00 which sum includes the field survey and design services for the modification of the completed design covering waterline improvements described herein. ARTICLE XIX This addendum is made and entered into subject to the approval of the City of Cape Girardeau. ARTICLE XX — ATTACHMENTS The following exhibits are attached hereto and are hereby made part of this contract: -None- IN WITNESS WHEREOF, Owner and Engineer have executed this Agreement. OWNER City of Cape Girardeau, Missouri Michael G. Miller City Manager Date: ENGINEER Koehler Engineering and Land Surveying B (�_ 2 Chris Koehler Partner Date: fC— 21—,-,-v