HomeMy WebLinkAboutRES.1598.08-21-2000BILL NO. 2000-211
RESOLUTION NO. /,5-79
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE AMENDMENT NO. 7 TO THE PROFESSIONAL
SERVICES AGREEMENT WITH SVERDRUP CIVIL, INC.
FOR THE SANITARY SEWER IMPROVEMENT PROGRAM
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU,
MISSOURI, AS FOLLOWS:
ARTICLE 1. The City Manager, for and on behalf of the City
of Cape Girardeau, Missouri, is hereby authorized to execute
Amendment No. 7 to the Professional Services Agreement, dated
September 7, 1994, with Sverdrup Civil, Inc., for the Trickling
Filter Rehabilitation Design, part of the Sanitary Sewer
Improvement Program. A copy of said Amendment No. 7 is attached
to this Resolution and made a part hereof.
PASSED
2 0 ()C) .
ATTEST:
AND ADOPTED THIS �IS+ DAY OFAQVA-1,
7
GaylejL. Conrad
City Clerk
AMENDMENT NO. 7
to
AGREEMENT BETWEEN THE
CITY OF CAPE GIRARDEAU, MISSOURI
and
SVERDRUP CIVIL, INC.
Dated September 7, 1994
Note: All other terms of the original contract remain unchanged with the exception of the
following:
Article 3 - Compensation and Payment
On page 3 under A. Cost - Replace the second paragraph with:
The total cost (exclusive of fixed fee) is estimated to be $4,618,278.00. The fixed fee
shall be $396,123.00. The total amount to be paid for design and construction services
under this Agreement shall not exceed $5,014,401.00 including cost and fixed fee, without
approval of the Owner. Sverdrup shall notify the Owner when costs incurred and
obligated amount to 95 % of the total estimated cost and shall not incur costs beyond the
estimated cost without prior approval of the Owner. A summary of estimated cost
breakdown is presented in APPENDIX C.
Article 11 - Contract Documents
On page 9 amend Article 11 to read:
This Agreement consists of:
1. Agreement for Professional Services dated September 7, 1994
2. APPENDIX A - Scope of Services
3. AMENDMENT 1 TO APPENDIX A
4. APPENDIX Al - Phase 1 Scope of Work
5. APPENDIX A2 - Phase 2 Scope of Work
6. APPENDIX A3 - Phase I Easements and Miscellaneous Scope of Work
7. APPENDIX A4 - Phase I Projects Construction Program, Phase II Projects
Part 1 Design, Surveying, Smoke Testing and Flow Monitoring
8. APPENDIX A5 - Phase II Projects Easements, Part 2 Design, Cultural Resource
Survey
9. APPENDIX A6 - Additional Scope for Previous Amendments, Phase II Projects
Construction Services
10. APPENDIX A7 - Additional Scope for Previous Amendments, Ranchito Sewer
Improvement Project, Trickling Filter Rehabilitation
11. APPENDIX A8 - Trickling Filter Rehabilitation Design
- 1 -
Amendment 6 continued
t
12. APPENDIX B - Additional Owner Supplied Information and Activities
13. APPENDIX B2 - Additional Owner Supplied Information and Activities
14. APPENDIX B3 - Additional Owner Supplied Information and Activities
15. APPENDIX B4 - Additional Owner Supplied Information and Activities
16. APPENDIX B5 - Additional Owner Supplied Information and Activities
17. AMENDMENT 1 to APPENDIX C
18. AMENDMENT 2 to APPENDIX C
19. AMENDMENT 3 to APPENDIX C
20. AMENDMENT 4 to APPENDIX C
21. AMENDMENT 5 to APPENDIX C
22. AMENDMENT 6 to APPENDIX C
23. AMENDMENT 7 to APPENDIX C
24. AMENDMENT 1 APPENDIX D
25. AMENDMENT 2 APPENDIX D
26. AMENDMENT 3 APPENDIX D
27. AMENDMENT 4 APPENDIX D
28. AMENDMENT 5 APPENDIX D
29. AMENDMENT 6 APPENDIX D
30. AMENDMENT 7 APPENDIX D
Proposed by Sverdrup Civil, Inc.:
Date: &-I-oo
Accepted by City of Cape Girardeau:
-City Manager
Attachments: Appendix A8
Amendment 7 to Appendix C
Amendment 7 Appendix D
(Joe Fiala, P.E.
Vice President
ATTEST: � &Yk4Q g4
City Clerk
-2-
Amendment 7 continued
APPENDIX A8
CITY OF CAPE GIRARDEAU
SANITARY SEWER IMPROVEMENT PROGRAM
TRICKLING FILTER REHABILITATION DESIGN
SCOPE OF SERVICES
August 2000
Add:
TRICKLING FILTER REHABILITATION FINAL DESIGN
A. Project Description
A Trickling Filter Rehabilitation Facility Plan was added to the Scope of Services under
Amendment 6. Construction documents to implement the rehabilitation and improvements
recommended in the Facility Plan are added in this Amendment. The major items to be
included in the construction documents are:
• Replace trickling filter media
• Replace trickling filter feed pumps
• Replace the filter feed pump building motor control center (MCC)
• Add a new electrical room to the trickling filter pump station building to house the
new MCC and controls
• Replace the current controls with a programmable logic controller (PLC)
• Replace the filter feed pump building ventilation fan and louvers and provide
appropriate environmental controls for the new electrical room
• Repair of delamination on the interior concrete girders at the bearing of the pre -cast
beams
• Remove all horizontal steel beams and replace them with new reinforced fiberglass
plastic (RFP) type material
• Replace all existing fiberglass wall panels
• Replace all steel secondary columns with FRP
• Sandblast all exterior steel members and apply a zinc rich primer and a finish coat
of epoxy paint.
B. Task Description
1. Visit site to collect additional information needed to complete the final design such as tie in
points for electric and signals sent to other points in the plant. It is not anticipated that
work on this project will extend beyond the immediate area of the trickling filters and the
filter feed pump building.
2. Finalize calculations to size the new filter feed pumps, motor control center, structural
members, HVAC equipment, and other components of the trickling filter upgrade.
A8- 1
Amendment 7 continued
3. Prepare the functional description and logic for the filter feed pump controls.
4. Prepare construction drawings for the trickling filter rehabilitation. Architectural, site,
structural, mechanical, electrical and instrumentation drawings are anticipated.
5. Prepare technical specifications to supplement the construction drawings.
6. Combine the drawings and technical specifications into bid documents. Engineers Joint
Contract Documents Committee up -front documents will be used. These are the same up-
front documents as have been used to date for the Sanitary Sewer Improvement Program.
Three sets of bid documents will be provided to the Owner for review. Five sets of final
bid documents will be provided to the Owner upon completion of the design.
7. Submit the bid documents to the Owner for review. A meeting to review the bid
documents will be held in Cape Girardeau if requested by the owner.
8. Assist the Owner in submitting the bid documents to the Missouri Department of Natural
Resources (DNR) for the DNR construction permit. The estimated cost for this design
effort in Appendix C assumes the DNR will require only minor modifications to the bid
documents as submitted.
9. Prepare a construction cost estimate for implementing the bid documents.
A8- 2
Amendment 7 continued
AMENDMENT 7 TO APPENDIX C
CITY OF CAPE GIRARDEAU
SANITARY SEWER IMPROVEMENT PROGRAM
SUMMARY OF AMENDMENT 7 COST MODIFICATIONS
AUGUST 2000
Amendment 6
Estimated
Cost
ORIGINAL 12 PROJECTS
Phase I Facility Plan
Labor 101,102
91,932
Directs 110
1,862
Fee
11,032
Total
104,826
Phase I Design
Labor 201,221
582,510
Directs 210
300,047
Fee
69,901
Total
952,457
Phase 11 Facility Plan
Labor 103, 123
231,814
Directs 113
123,721
Fee
27,818
Total
383,352
Phase 1 Easement Acquisition
Labor 202
23,077
Directs 212
97,291
Fee
2,769
Total
123,137
Phase II Part I Design
Labor 203
458,532
Directs 213
340,030
Fee
55,525
Total
854,087
Phase I Resident Engineer
Labor 401
143,528
Directs 410
72,331
Fee
17,223
Total
233,083
Phase I Construction Office Services
Labor 301
175,205
Directs 310
5,482
Fee
21,025
Total
201,711
Phase II Part 2 Design
Labor 204
319,250
Directs 214
49,469
Fee
38,811
Total
407,530
Phase II Easements
Labor 205
44,429
Directs 215
195,522
Fee
5,499
Total
245,450
Phase I Record Drawings
Labor 302
20,169
Directs 312
2,869
Fee
2,420
Total
25,458
Phase I Follow-up services
Labor 501
3,581
Directs 510
53
Fee
537
Total
4,170
Phase II Construction Office Services
Labor 304
336,801
Directs 314
13,358
Fee
45,713
Total
395,872
C-1
Adjustments Amendment 7
Amendment 6 Estimated
Estimates Cost
91,932
1,862
11,032
104,826
0
582,510
300,047
69,901
952,457
0
231,814
123,721
27,818
383,352
0
23,077
97,291
2,769
123,137
0
458,532
340,030
55,525
854,087
0
143,528
72,331
17,223
233,083
0
175,205
5,482
21,025
201,711
0
319,250
49,469
38,811
407,530
0
44,429
195,522
5,499
245,450
0
20,169
2,869
2,420
25,458
0
3,581
53
537
4,170
0
336,801
13,358
45,713
395,872
Amendment 7 continued
AMENDMENT 7 TO APPENDIX C
CITY OF CAPE GIRARDEAU
SANITARY SEWER IMPROVEMENT PROGRAM
SUMMARY OF AMENDMENT 7 COST MODIFICATIONS
AUGUST 2000
C-2
Amendment 6
Adjustments
Amendment 7
Estimated
Amendment 6
Estimated
Cost
Estimates
Cost
Phase II Record Drawings
0
Labor 305
25,848
25,848
Directs 315
16,468
16,468
Fee
3,514
3,514
Total
45,831
45,831
Lift Station O&M Manual
0
Labor 306
13,802
13,802
Directs 316
108
108
Fee
2,070
2,070
Total
15,981
15,981
Main Suspicious Material
0
Labor 307
17,490
17,490
Directs 317
82
82
Fee
2,099
2,099
Total
19,671
19,671
Phase II Resident Engineer
0
Labor 402
362,857
362,857
Directs 412
226,831
226,831
Fee
48,866
48,866
Total
638,555
638,555
Phase II Resident Engineer PM
0
Labor 403
53,494
53,494
Fee
7,343
7,343
Total
60,837
60,837
Phase II Follow-up Services
0
Labor 502
10,780
10,780
Directs 512
55
55
Fee
1,617
1,617
Total
12,452
12,452
0
NEW PROJECTS STARTED MARCH 2000
0
Ranchito Area Facility Plan
0
Labor 1,400
42,080
42,080
Directs 1,440
38,890
38,890
Fee
6,310
6,310
Total
87,280
87,280
Trickling Filter Rehab Facility Plan
0
Labor 1,500
62,510
62,510
Directs 1,550
1,710
1,710
Fee
9,380
9,380
Total
73,600
73,600
Trickling Filter Rehab Design
Labor 2,500
111,030
111,030
Directs 2,550
1,380
1,380
Fee
16,650
16,650
Total
129,060
129,060
Estimated Totals thru Amendment 7
4,885,341
129,060
5,014,401
Cost Totals
4,505,868
112,410
4,618,278
Fixed Fee Totals
379,473
16,650
396,123
C-2
Amendment 7 continued
AMENDMENT 7 TO APPENDIX C
CITY OF CAPE GIRARDEAU
SANITARY SEWER IMPROVEMENT PROGRAM
COST CALCULATION
August 2000
Additional Labor Estimated Cost
Estimated Manhours
Average Rate, $/Hr
Base Salary cost
Salary -Related Expense Factor
Office @ 1.60
Field 1.05
Labor Total
Other Reimbursable Estimated Cost
Postage/Shipping
Reproduction
Specifications/Facility Plans
Drawings Full Size
DrawingsHalf Size
Miscellaneous
Travel Meals
Auto Mileage
Miscellaneous
Fixed Fee
Reimbursable Total
TOTALS
C-3
Ttickling
Filter
Rehab
Design
1294
33.00
42,702
68,323
$111,030
150
360
84
26
50
100
413
200
$1,380
$16,650
$129,060
Amendment 7 continued
AMENDMENT 7 TO APPENDIX C
CITY OF CAPE GIRARDEAU
SANITARY SEWER IMPROVEMENT PROGRAM
ESTIMATED MANHOURS
AUGUST 2000
C-4
Program
Project
Design/
Task
Manager
Manager
Engineer
Technician
Clerical
Total
Total
250OTrickling Filter Rehabilitation Design
1. Visit Site to collect additional information
16
24
8
48
48
2. Finalize design calculations
12
116
24
152
152
3. Prepare pump control logic
8
24
32
32
4. Prepare construction drawings
Architectural
1
8
28
24
61
Site
1
8
36
45
Structural
8
128
148
284
Mechanical
2
52
56
110
Electrical & Instrumentation
2
8
80
48
138
638
5. Prepare technical specifications
8
8
120
24
160
160
6. Combine into bid documents
24
32
40
96
96
7. Submit documents and meet with Owner
8
16
8
32
32
8. Assist with DNR construction permit
16
8
24
24
9. Prepare construction cost estimate
8
16
24
24
10. Program and project management
40
32
16
88
88
2500 Total
78
216
612
308
80
1,294
1,294
C-4
Amendment 7 continued
AMENDMENT 7 APPENDIX D
CITY OF CAPE GIRARDEAU
SANITARY SEWER IMPROVEMENT PROGRAM
SCHEDULE
August 2000
A submittal of the Trickling Filter Rehabilitation Design documents to DNR in October
2000 is anticipated if Sverdrup receives contract approval by August 4, 2000.