HomeMy WebLinkAboutRES.1598.08-21-2000BILL NO. 2000-211 RESOLUTION NO. /,5-79 A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT NO. 7 TO THE PROFESSIONAL SERVICES AGREEMENT WITH SVERDRUP CIVIL, INC. FOR THE SANITARY SEWER IMPROVEMENT PROGRAM BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute Amendment No. 7 to the Professional Services Agreement, dated September 7, 1994, with Sverdrup Civil, Inc., for the Trickling Filter Rehabilitation Design, part of the Sanitary Sewer Improvement Program. A copy of said Amendment No. 7 is attached to this Resolution and made a part hereof. PASSED 2 0 ()C) . ATTEST: AND ADOPTED THIS �IS+ DAY OFAQVA-1, 7 GaylejL. Conrad City Clerk AMENDMENT NO. 7 to AGREEMENT BETWEEN THE CITY OF CAPE GIRARDEAU, MISSOURI and SVERDRUP CIVIL, INC. Dated September 7, 1994 Note: All other terms of the original contract remain unchanged with the exception of the following: Article 3 - Compensation and Payment On page 3 under A. Cost - Replace the second paragraph with: The total cost (exclusive of fixed fee) is estimated to be $4,618,278.00. The fixed fee shall be $396,123.00. The total amount to be paid for design and construction services under this Agreement shall not exceed $5,014,401.00 including cost and fixed fee, without approval of the Owner. Sverdrup shall notify the Owner when costs incurred and obligated amount to 95 % of the total estimated cost and shall not incur costs beyond the estimated cost without prior approval of the Owner. A summary of estimated cost breakdown is presented in APPENDIX C. Article 11 - Contract Documents On page 9 amend Article 11 to read: This Agreement consists of: 1. Agreement for Professional Services dated September 7, 1994 2. APPENDIX A - Scope of Services 3. AMENDMENT 1 TO APPENDIX A 4. APPENDIX Al - Phase 1 Scope of Work 5. APPENDIX A2 - Phase 2 Scope of Work 6. APPENDIX A3 - Phase I Easements and Miscellaneous Scope of Work 7. APPENDIX A4 - Phase I Projects Construction Program, Phase II Projects Part 1 Design, Surveying, Smoke Testing and Flow Monitoring 8. APPENDIX A5 - Phase II Projects Easements, Part 2 Design, Cultural Resource Survey 9. APPENDIX A6 - Additional Scope for Previous Amendments, Phase II Projects Construction Services 10. APPENDIX A7 - Additional Scope for Previous Amendments, Ranchito Sewer Improvement Project, Trickling Filter Rehabilitation 11. APPENDIX A8 - Trickling Filter Rehabilitation Design - 1 - Amendment 6 continued t 12. APPENDIX B - Additional Owner Supplied Information and Activities 13. APPENDIX B2 - Additional Owner Supplied Information and Activities 14. APPENDIX B3 - Additional Owner Supplied Information and Activities 15. APPENDIX B4 - Additional Owner Supplied Information and Activities 16. APPENDIX B5 - Additional Owner Supplied Information and Activities 17. AMENDMENT 1 to APPENDIX C 18. AMENDMENT 2 to APPENDIX C 19. AMENDMENT 3 to APPENDIX C 20. AMENDMENT 4 to APPENDIX C 21. AMENDMENT 5 to APPENDIX C 22. AMENDMENT 6 to APPENDIX C 23. AMENDMENT 7 to APPENDIX C 24. AMENDMENT 1 APPENDIX D 25. AMENDMENT 2 APPENDIX D 26. AMENDMENT 3 APPENDIX D 27. AMENDMENT 4 APPENDIX D 28. AMENDMENT 5 APPENDIX D 29. AMENDMENT 6 APPENDIX D 30. AMENDMENT 7 APPENDIX D Proposed by Sverdrup Civil, Inc.: Date: &-I-oo Accepted by City of Cape Girardeau: -City Manager Attachments: Appendix A8 Amendment 7 to Appendix C Amendment 7 Appendix D (Joe Fiala, P.E. Vice President ATTEST: � &Yk4Q g4 City Clerk -2- Amendment 7 continued APPENDIX A8 CITY OF CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM TRICKLING FILTER REHABILITATION DESIGN SCOPE OF SERVICES August 2000 Add: TRICKLING FILTER REHABILITATION FINAL DESIGN A. Project Description A Trickling Filter Rehabilitation Facility Plan was added to the Scope of Services under Amendment 6. Construction documents to implement the rehabilitation and improvements recommended in the Facility Plan are added in this Amendment. The major items to be included in the construction documents are: • Replace trickling filter media • Replace trickling filter feed pumps • Replace the filter feed pump building motor control center (MCC) • Add a new electrical room to the trickling filter pump station building to house the new MCC and controls • Replace the current controls with a programmable logic controller (PLC) • Replace the filter feed pump building ventilation fan and louvers and provide appropriate environmental controls for the new electrical room • Repair of delamination on the interior concrete girders at the bearing of the pre -cast beams • Remove all horizontal steel beams and replace them with new reinforced fiberglass plastic (RFP) type material • Replace all existing fiberglass wall panels • Replace all steel secondary columns with FRP • Sandblast all exterior steel members and apply a zinc rich primer and a finish coat of epoxy paint. B. Task Description 1. Visit site to collect additional information needed to complete the final design such as tie in points for electric and signals sent to other points in the plant. It is not anticipated that work on this project will extend beyond the immediate area of the trickling filters and the filter feed pump building. 2. Finalize calculations to size the new filter feed pumps, motor control center, structural members, HVAC equipment, and other components of the trickling filter upgrade. A8- 1 Amendment 7 continued 3. Prepare the functional description and logic for the filter feed pump controls. 4. Prepare construction drawings for the trickling filter rehabilitation. Architectural, site, structural, mechanical, electrical and instrumentation drawings are anticipated. 5. Prepare technical specifications to supplement the construction drawings. 6. Combine the drawings and technical specifications into bid documents. Engineers Joint Contract Documents Committee up -front documents will be used. These are the same up- front documents as have been used to date for the Sanitary Sewer Improvement Program. Three sets of bid documents will be provided to the Owner for review. Five sets of final bid documents will be provided to the Owner upon completion of the design. 7. Submit the bid documents to the Owner for review. A meeting to review the bid documents will be held in Cape Girardeau if requested by the owner. 8. Assist the Owner in submitting the bid documents to the Missouri Department of Natural Resources (DNR) for the DNR construction permit. The estimated cost for this design effort in Appendix C assumes the DNR will require only minor modifications to the bid documents as submitted. 9. Prepare a construction cost estimate for implementing the bid documents. A8- 2 Amendment 7 continued AMENDMENT 7 TO APPENDIX C CITY OF CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM SUMMARY OF AMENDMENT 7 COST MODIFICATIONS AUGUST 2000 Amendment 6 Estimated Cost ORIGINAL 12 PROJECTS Phase I Facility Plan Labor 101,102 91,932 Directs 110 1,862 Fee 11,032 Total 104,826 Phase I Design Labor 201,221 582,510 Directs 210 300,047 Fee 69,901 Total 952,457 Phase 11 Facility Plan Labor 103, 123 231,814 Directs 113 123,721 Fee 27,818 Total 383,352 Phase 1 Easement Acquisition Labor 202 23,077 Directs 212 97,291 Fee 2,769 Total 123,137 Phase II Part I Design Labor 203 458,532 Directs 213 340,030 Fee 55,525 Total 854,087 Phase I Resident Engineer Labor 401 143,528 Directs 410 72,331 Fee 17,223 Total 233,083 Phase I Construction Office Services Labor 301 175,205 Directs 310 5,482 Fee 21,025 Total 201,711 Phase II Part 2 Design Labor 204 319,250 Directs 214 49,469 Fee 38,811 Total 407,530 Phase II Easements Labor 205 44,429 Directs 215 195,522 Fee 5,499 Total 245,450 Phase I Record Drawings Labor 302 20,169 Directs 312 2,869 Fee 2,420 Total 25,458 Phase I Follow-up services Labor 501 3,581 Directs 510 53 Fee 537 Total 4,170 Phase II Construction Office Services Labor 304 336,801 Directs 314 13,358 Fee 45,713 Total 395,872 C-1 Adjustments Amendment 7 Amendment 6 Estimated Estimates Cost 91,932 1,862 11,032 104,826 0 582,510 300,047 69,901 952,457 0 231,814 123,721 27,818 383,352 0 23,077 97,291 2,769 123,137 0 458,532 340,030 55,525 854,087 0 143,528 72,331 17,223 233,083 0 175,205 5,482 21,025 201,711 0 319,250 49,469 38,811 407,530 0 44,429 195,522 5,499 245,450 0 20,169 2,869 2,420 25,458 0 3,581 53 537 4,170 0 336,801 13,358 45,713 395,872 Amendment 7 continued AMENDMENT 7 TO APPENDIX C CITY OF CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM SUMMARY OF AMENDMENT 7 COST MODIFICATIONS AUGUST 2000 C-2 Amendment 6 Adjustments Amendment 7 Estimated Amendment 6 Estimated Cost Estimates Cost Phase II Record Drawings 0 Labor 305 25,848 25,848 Directs 315 16,468 16,468 Fee 3,514 3,514 Total 45,831 45,831 Lift Station O&M Manual 0 Labor 306 13,802 13,802 Directs 316 108 108 Fee 2,070 2,070 Total 15,981 15,981 Main Suspicious Material 0 Labor 307 17,490 17,490 Directs 317 82 82 Fee 2,099 2,099 Total 19,671 19,671 Phase II Resident Engineer 0 Labor 402 362,857 362,857 Directs 412 226,831 226,831 Fee 48,866 48,866 Total 638,555 638,555 Phase II Resident Engineer PM 0 Labor 403 53,494 53,494 Fee 7,343 7,343 Total 60,837 60,837 Phase II Follow-up Services 0 Labor 502 10,780 10,780 Directs 512 55 55 Fee 1,617 1,617 Total 12,452 12,452 0 NEW PROJECTS STARTED MARCH 2000 0 Ranchito Area Facility Plan 0 Labor 1,400 42,080 42,080 Directs 1,440 38,890 38,890 Fee 6,310 6,310 Total 87,280 87,280 Trickling Filter Rehab Facility Plan 0 Labor 1,500 62,510 62,510 Directs 1,550 1,710 1,710 Fee 9,380 9,380 Total 73,600 73,600 Trickling Filter Rehab Design Labor 2,500 111,030 111,030 Directs 2,550 1,380 1,380 Fee 16,650 16,650 Total 129,060 129,060 Estimated Totals thru Amendment 7 4,885,341 129,060 5,014,401 Cost Totals 4,505,868 112,410 4,618,278 Fixed Fee Totals 379,473 16,650 396,123 C-2 Amendment 7 continued AMENDMENT 7 TO APPENDIX C CITY OF CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM COST CALCULATION August 2000 Additional Labor Estimated Cost Estimated Manhours Average Rate, $/Hr Base Salary cost Salary -Related Expense Factor Office @ 1.60 Field 1.05 Labor Total Other Reimbursable Estimated Cost Postage/Shipping Reproduction Specifications/Facility Plans Drawings Full Size DrawingsHalf Size Miscellaneous Travel Meals Auto Mileage Miscellaneous Fixed Fee Reimbursable Total TOTALS C-3 Ttickling Filter Rehab Design 1294 33.00 42,702 68,323 $111,030 150 360 84 26 50 100 413 200 $1,380 $16,650 $129,060 Amendment 7 continued AMENDMENT 7 TO APPENDIX C CITY OF CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM ESTIMATED MANHOURS AUGUST 2000 C-4 Program Project Design/ Task Manager Manager Engineer Technician Clerical Total Total 250OTrickling Filter Rehabilitation Design 1. Visit Site to collect additional information 16 24 8 48 48 2. Finalize design calculations 12 116 24 152 152 3. Prepare pump control logic 8 24 32 32 4. Prepare construction drawings Architectural 1 8 28 24 61 Site 1 8 36 45 Structural 8 128 148 284 Mechanical 2 52 56 110 Electrical & Instrumentation 2 8 80 48 138 638 5. Prepare technical specifications 8 8 120 24 160 160 6. Combine into bid documents 24 32 40 96 96 7. Submit documents and meet with Owner 8 16 8 32 32 8. Assist with DNR construction permit 16 8 24 24 9. Prepare construction cost estimate 8 16 24 24 10. Program and project management 40 32 16 88 88 2500 Total 78 216 612 308 80 1,294 1,294 C-4 Amendment 7 continued AMENDMENT 7 APPENDIX D CITY OF CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM SCHEDULE August 2000 A submittal of the Trickling Filter Rehabilitation Design documents to DNR in October 2000 is anticipated if Sverdrup receives contract approval by August 4, 2000.