Loading...
HomeMy WebLinkAboutRES.1563.05-01-2000RESOLUTION NO. (a A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT WITH ROBINSON MECHANICAL CONTRACTORS D/B/A ROBINSON CONSTRUCTION COMPANY FOR THE SANITARY SEWER IMPROVEMENT PROGRAM, LIFT STATIONS AND FORCE MAIN BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute an Agreement with Robinson Mechanical Contractors d/b/a Robinson Construction Company, for the Sanitary Sewer Improvement Program, Lift Stations and Force Main. A copy of said Agreement is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THIS _1 DAY OF , 20 106). A. M. Spradling, III, Zyr ATTEST: r� Gayle . Conrad, City Clerk 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU AGREEMENT THIS AGREEMENT is dated as of the day of year 19 by and between CITY OF CAPE (hereinafter called OWNER) and GIRARDEAU, _ in the MISSOURI Robinson Mechanical Contractors d.b.a. Robinson Construction Company (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The work is generally described as follows: The work consists of constructing four submersible pump wastewater lift stations and associated mechanical and electrical work, and installing approximately 6,260 lineal feet of 20 -inch force main, 9,515 lineal feet of 24 -inch force main, 2,200 lineal feet of sanitary sewer pipe ranging in size from 8 inches to 24 inches, and 600 lineal feet of 24 -inch storm sewer pipe. The work also includes clearing and grubbing, turfing, removal and placement of pavement, abandoning existing pipes and structures, removing above ground pipe and structures, constructing manholes, and boring and jacking casing pipe. The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: LIFT STATIONS AND FORCE MAIN ARTICLE 2. ENGINEER. The Project has been designed by Sverdrup Civil, Inc. who is hereinafter called ENGINEER and will act as OWNER'S Representative, assume all duties and responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. ARTICLE 3. CONTRACT TIME. 3.1 The Work will be substantially completed within 425 calendar days from the date when the Contract Time commences to run as provided in Paragraph 2.3 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.13 of the General Conditions within 455calendar days from the date when the Contract Time commences to run. 13328 \ LS -00500 00500-1 AGREEMENT 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU 3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.1 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER Five Hundred Dollars ($500.00) for each day that expires after the time specified in Paragraph 3.1 for Substantial Completion until the Work is substantially complete. Such amount being based on penalties to be assessed by the Federal Government and on excess engineering fees. After Substantial Completion if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER Two Hundred Dollars ($200.00) for each day that expires after the time specified in Paragraph 3.1 for completion and readiness for final payment. Such amount being based on excess engineering fees. ARTICLE 4. CONTRACT PRICE. OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents. Total of all unit and lump sum prices. Four million eight hundred ninety-nine thousand six hundred sixty- five dollars and zero cents ($4,899,665.00 ) ARTICLE 5. CHANGES IN THE WORK. The amount of any increases or decreases in the Contract Price which results from a Change Order shall be set forth in the applicable Change Order. ARTICLE 6. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 6.1 Progress Payments. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by ENGINEER, on or about the last day of each month during construction as provided below. All progress payments will be on the basis of the number of units completed. 6.1.1 Prior to Substantial Completion, progress payments will be made, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with Paragraph 14.7 of the General Conditions; less a retained amount in accordance with the following schedule: 13328 \ Ls -00500 00500-2 AGREEMENT 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU 6.1.1.1 10 percent until the Work is 50 percent complete as determined by the ENGINEER. 6.1.1.2 5 percent after the Work is 50 percent complete as determined by the ENGINEER and if the character and progress of the Work have been satisfactory to OWNER and ENGINEER. 6.1.2 Upon Substantial Completion, in an amount sufficient to increase the total payments to CONTRACTOR to 100 percent of the Contract Price, less such amounts as ENGINEER determines is necessary to assure final completion of the Work, or OWNER may withhold in accordance with Paragraph 14.7 of the General Conditions. 6.2 Final Payment. Upon final completion and acceptance of the Work in accordance with Paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said Paragraph 14.13. ARTICLE 7. INTEREST. If the OWNER fails to make payment thirty (30) days after approval by the ENGINEER, in addition to other remedies available to the CONTRACTOR, then shall be added to each such payment interest at the maximum legal rate commencing on the first day after said payment is due and continuing until the payment is received by the CONTRACTOR. The legal rate of interest shall be as specified in Section 34.057 RSMo. (Supp. 1991). ARTICLE 8. CONTRACTOR'S REPRESENTATIONS. In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 8.1 CONTRACTOR has familiarized itself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. 8.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions which are identified in the Supplementary Conditions as provided in Paragraph 4.2 of the General Conditions. 8.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports and studies (in addition to or to supplement those referred to in Paragraph 8.2 above) which pertain to the subsurface or physical conditions at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at 13328 \ LS -00500 00500-3 AGREEMENT 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of Paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by CONTRACTOR for such purposes. 8.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of Paragraph 4.3 of the General Conditions. 8.5 CONTRACTOR has correlated the results of all such observations, examinations, investigations, explorations, tests, reports and studies with the terms and conditions of the Contract Documents and acknowledges Paragraph 4.7 of the Supplementary Conditions. 8.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. ARTICLE 9. CONTRACT DOCUMENTS. The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR concerning the Work consist of the following: 9.1 This Agreement 9.2 Exhibits to this Agreement 9.3 Performance and Payment Bonds 9.4 Notice of Award 9.5 General Conditions 9.6 Supplementary Conditions 9.7 Specifications bearing the title, "Volume 1, Lift Stations and Force main Bidding and Contract Documents for Sanitary Sewer Improvement Program, City of Cape Girardeau, Missouri" 13328 \ LS -00500 00500-4 AGREEMENT 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU 9.8 Specifications bearing the title, "Volume 2 Master Specifications for Phase II Projects Sanitary Sewer Improvement Program, City of Cape Girardeau, Missouri" 9.9 Drawings with each sheet bearing the title, "Sanitary Sewer Improvement Program, Lift Stations and Force Main, Cape Girardeau, MO." 9.10 Addenda numbers 1 9.11 CONTRACTOR's Bid 9.12 Invitation to Bid 9.13 Instruction to Bidders to 2 , inclusive 9.14 Applicable Regulatory requirements 9.15 The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: All Written Amendments and other documents amending, modifying or supplementing the Contract Documents pursuant to Paragraphs 3.5 and 3.6 of the General Conditions. 9.16 The documents listed in Paragraphs 9.2 et. seq. above are attached to this Agreement (except as expressly noted otherwise above) and all are incorporated by reference in this Agreement. There are no Contract Documents other than those listed above in this Article 9. The Contract Documents may only be amended, modified or supplemented as provided in Paragraphs 3.5 and 3.6 of the General Conditions. ARTICLE 10. MISCELLANEOUS. 10.1 Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 10.2 No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 13328 \ LS -00500 00500-5 AGREEMENT 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU 10.3 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents. ARTICLE 11. NON-DISCRIMINATION IN EMPLOYMENT. 11.1 CONTRACTOR will not discriminate against any employee or applicant for employment because of race, creed, color, or national origin. The CONTRACTOR will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, creed, color or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. 11.2 CONTRACTOR will post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this non-discrimination clause. 11.2.1 CONTRACTOR will, in all solicitations or advertisements for employees placed by or on behalf of the CONTRACTOR, state that all qualified applicants will receive consideration for employment without regard to race, creed, color, or national origin. 11.2.2 CONTRACTOR will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice, to be provided by the agency contracting officer, advising the labor union or workers' representative of the CONTRACTOR's commitments under Section 202 of Executive Order No. 11246 of September 24, 1965, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. 11.2.3 CONTRACTOR Executive Order No. rules, regulations, Labor. will comply with 11246 of September and relevant orders all provisions of 24, 1965, and of the of the Secretary of 11.2.4 CONTRACTOR will furnish all information and reports required by Executive Order No. 11246 of September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the contracting agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders. 13328 \ Ls -00500 00500-6 AGREEMENT 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU 11.2.5 In the event of the CONTRACTOR's non-compliance with the non-discrimination clauses of this Contract or with any of such rules, regulations, or orders, this Contract may be cancelled, terminated or suspended in whole or in part and the CONTRACTOR may be declared ineligible for further Government contracts in accordance with procedures authorized in Executive Order No. 11246 of September 24, 1965, and such other sanctions may be imposed and remedies involved as provided in Executive Order No. 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law. 11.2.6 CONTRACTOR will include the provisions of Article 11 in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order No. 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The CONTRACTOR will take such action with respect to any subcontract or purchase order as the contracting agency may direct as a means of enforcing such provisions including sanctions for non-compliance: Provided, however, that in the event the CONTRACTOR becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the contracting agency, the CONTRACTOR may request the United States to enter into such litigation to protect the interests of the United States. 13328 \ LS -00500 00500-7 AGREEMENT 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU IN WITNESS WHEREOF, OWNER and CONTRACTOR hereto have caused this Instrument to be executed in six (6) original counterparts as of the day and year first above written. (Seal) ATTEST: (Seal) City Clerk (Witness (Secretary) (Witness) City of Cape Girardeau, Missouri In (Owner) Michael G. Miller City Manager (Title) Robinson Mechanical Contractors, Inc. d.b.a. Robinson Construction Company (Contractor) By (Title) 2411 Walters Lane Perryville, Missouri, 63775 (Address and Zip Code) (573) 547-8397 (Telephone Number) NOTE: City Clerk of the Owner should attest. If Contractor is a corporation, Secretary should attest. END OF SECTION 00500 13328 \ Ls -00500 00500-8 AGREEMENT 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU BID FORM PROJECT IDENTIFICATION Lift Stations and Force Main Sanitary Sewer Improvement Program City of Cape Girardeau, Missouri CONTRACT IDENTIFICATION AND NUMBER Lift Stations and Force Main THIS BID IS SUBMITTED TO City of Cape Girardeau, Missouri City Hall 401 Independence Street Cape Girardeau, Missouri 63702 1. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the prices stated in the "Unit Price Schedule" and within the Bid Times indicated in this Bid and in accordance with the other terms and Conditions of the Contract Documents. 2. BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders including, without limitation, those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for ninety days after the day of Bid opening. BIDDER will deliver and sign the required number of counterparts of the Agreement with the Bonds and other documents required by the Bidding Requirements within fifteen days after the date of OWNER's Notice of Award. 3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that: (a) BIDDER has examined and carefully studied the Bidding Documents and the following Addenda, receipt of which is hereby acknowledged: (List Addenda by Addendum Number and Date) Addendum No 1 April 3, 2000 Addendum No 2 April 4. 2000 13328 , LSI -00300 00300-1 B I D FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU (b) BIDDER has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance and furnishing of the Work. (c) BIDDER is familiar with and satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, performance and furnishing of the Work. (d) BIDDER has carefully studied all reports of explorations and tests of Subsurface Conditions at or contiguous to the site and all drawings of Physical Conditions and Underground Facilities in or relating to existing surface or subsurface structures at or contiguous to the site as related to Paragraphs 4.2 and 4.3 of the General Conditions and SC -4.7 of the Supplementary Conditions. BIDDER acknowledges that such reports and drawings may not be complete for BIDDER's purposes. BIDDER acknowledges that OWNER and ENGINEER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bidding Documents with respect to Underground Facilities at or contiguous to the site and that BIDDER assumes responsibility for all costs associated with handling Subsurface Conditions, including Groundwater, Physical Conditions, and Underground Facilities issues. BIDDER has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price and other terms and conditions of the Contract Documents. (e) BIDDER is aware of the general nature of Work to be performed by OWNER and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents. (f) BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents. (g) BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER, and the Contract Documents are 13328 \ Ls1-00300 00300-2 B I D FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted. (h) This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; BIDDER has not induced or solicited any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. (i) BIDDER certifies by executing the attached form that his firm or any affiliate is not currently debarred or suspended from doing business on a Federally assisted project in accordance with 40 CFR Part 32, as published in Volume 47 Federal Register, No. 159, page 35940 et. seq. Debarment and Suspension Under EPA Assistance Programs, dated August 17, 1982, and Executive Order 12549, and is not currently listed on the General Services Administration (GSA) publication entitled "Lists of Parties Excluded from Federal Procurement or Non Procurement Programs" pursuant to such regulations. It is further agreed that certifications will be obtained from subcontractors and that such certifications will remain in effect including the date a Notice to Proceed is authorized and will be retained in the files of the undersigned. 4. BIDDER will complete the Work in accordance with the Contract Documents for the following unit prices. 13328 \ XSI-00300 00300-3 B I D FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU C UNIT PRICE SCHEDULE Estimate d Item MOBILIZATION MANHOLES 1. Depth 10'-15' a. Standard 2. Depth 15'-20' a. Standard b. Outside Drop 3. Depth 20'-25' a. Outside Drop 4. Depth 25'-30' a. Standard 5. Depth 40'-45' a. Outside Drop 6. Modifications to Existing MHs SR19 & SR20 GRAVITY SANITARY SEWER PIPE 1. 8" Pipe a. Depth 0-10' b. Depth 10'-15' c. Depth 15'-20' d. Depth 20'-25' 2. 10" Pipe a. Depth 15'-20' 3. 12" Pipe a. Depth 15'-20' b. Depth 20'-25' 4. 15" Pipe a. Depth 0-10' b. Depth 10'-15' c. Depth 15'-20' d. Depth 20'-25' e. Depth 25'-30' f. Depth 30'-35' g. Depth 35'-40' 5. 18" Pipe a. Depth 15'-20' 6. 24" Pipe a. Depth 15'-20' b. Depth 201-25' c. Depth 25'-30' d. Depth 30'-35' 7. Concrete Encasement Granular Bedding & Riprap Backfill at Creek Crossing Quantity Lump Sum Unit Price S.55 V,C4,, /LS Total Estimated 3 EA $ !Z , jZ!Zt --/EA $ 3G>, 3 rn(l - 4 EA $ iS, S 1 f/ EA $ 4 EA $ EA $ G, 7, 2 EA $ / E'. eP,Z - / EA $ � 7 _2&t,, - 2 EA $ /(,,/S-,/ - / EA 1 EA $ 72-,y, p /EA Lump Sum $ 199c,- /LS 52 LF $ � p j_/LF 40 LF $ /03- /LF 212 LF $ /o3- /LF 50 LF $ /03- /LF 46 LF $ / 3y - /LF 95 LF $ /7 - /LF 105 LF $ /77- /LF 50 LF $ .3/y - /LF 179 LF $ �iy- /LF 778 LF $ �/y /LF 265 LF $;y /LF 149 LF $ /LF 25 LF $ z,;Z - /LF 35 LF $ /LF 35 LF $ 3 G -- / LF 43 LF $ /LF 20 LF $ / LF 16 LF $ /LF 63 LF $ /LF Lump Sum $ Z yg Z " /LS $ ;?99o- $ 990- $ $ <//ZC, $ $ $ $ 7 /1r $ 3S,2P, - $ ZY62,- 13128 \ LS1-00300 00300-4 BID FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU Item D. STORM SEWER PIPE 1. 24" Pipe a. Depth 0-10' b. Depth 10'-15' c. Flared End Pipe E. FORCE MAIN 1. 20" Pipe a. Under Turf b. Under Gravel c. Under ACP d. Under PCCP e. Under PCCP w/ACP Overlay 2. 2411 Pipe a. Under Turf b. Under Gravel c. Under ACP d. Under PCCP e. Under PCCP w/ACP Overlay f. Inside Steel Casing 3. Concrete Encasement 4. Cleanouts 5. Manholes with Air Valves 6. 20" Plug Valve F. JACKED CASING PIPE 1. 14" Pipe (min.) 2. 22" Pipe (min.) 3. 30" Pipe (min.) G. LATERAL RECONNECTIONS H. PIPE & MH ABANDONMENT 1. Sewer & Force Main Plugs a. 6"-12" Pipe b. 16"-18" Pipe c. 30" Pipe 2. Fill Pipe w/Sand or Fly Ash Slurry a. 10"-12" Pipe b. 16" Pipe 3. MH Abandonment Estimate d Quantity 332 LF 280 LF 1 EA 1,280 LF 1, 910 LF 900 LF 835 LF 1,335 LF 2, 945 LF 3,575 LF 365 LF 565 LF 1,635 LF 430 LF 100 LF 39 EA 9 EA 1 EA 50 LF 153 LF 430 LF 2 EA 33 EA 7 EA 2 EA 2,520 LF 110 LF 10 EA nninn-S Unit D,-; $� /LF $ �_- /LF $ lo/ S" / EA $ /LF $ (, (� --/ LF $ l/ Z - /LF $ io C- /LF $ i ZL•" /LF $ �S /LF $ 7-Z, _ /LF $ i - /LF $ i l 2. - /LF $ i 1 - /LF $ I I g V /LF /LF $ /EA $ 278 '-/EA $ S3cq./EA $ (� `���� / L F $ /LF $ /LF $ J DEQ.. /EA $ /EA S LLi /EA $ 7 /LF $1_/L-- $ LF$ 3 '3.1 ' / EA Total Estimated Price $ X9,5"£� $ $ $ iD012 y0- $ i2. 6, Cc-, C, $ zoo', e Ct7 $ itd6,2/0- $ is $ zS0, $ ZloD. 9 7S $ �3,y3S $ (03. z8� $ 19e1� SSS $ 501710 $ 360o $�o.43y - $ $ $ $ i5 7, Rev $ 30zE $ 34I $ $ 4yL" $ ! In (1 $_�rU3 $ -3 3 7 0 BID FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU Item I. COMPACTION GROUTING 1. Mobilization 2. Core Holes 3. Grout J. LIFT STATIONS 1. Lift Station No. 2. Lift Station No. 3. Lift Station No. 4. Lift Station No. Estimate d Quantity Lump Sum 200 LF 700 CF Unit Price $ / 1' y4 7/LS $ S /LF $ 2-1 - /CF 1 Lump Sum $7LS 2 Lump Sum $ -/LS 3 Lump Sum $4 V WA LS 4 Lump Sum $ _j�S 7bL--/LS Total Estimated Priya $ - 0i, 14,7 an $ S L_ $ 29, 710 $ -3/�-- 7D - K. DEMOLITION 1. Lift Station No. 1 Lump Sum $ 79,ir'/LS $ 2. Lift Station No. 2 Lump Sum $ 7ggy- /LS $ .7 3. Lift Station No. 3 Lump Sum $`7 g -/LS $ 199 4. Lift Station No. 4 Lump Sum $/LS T $ 7 c TOTAL BASE BID > (Total in Words) (Total base bid amount are to be shown in both words and figures. In case of discrepancy, the amount shown in words will govern. In case of error in extension, the unit and lump sum prices under each Pay Item will be considered correct, and these sums when properly extended, shall constitute the Bid.) The above unit prices shall include all labor, equipment, materials and supplies, bailing, shoring, removal, overhead, profit, insurance, etc., to provide a complete system within the intent of these Contact Documents. The below unit price shall be utilized when rock is encountered and must be excavated during construction of the project. ROCK EXCAVATION $100/cubic yard ABBREVIATIONS LF Lineal Feet EA Each CF Cubic Feet ACP Asphaltic Concrete Pavement PCCP Portland Cement Concrete Pavement MH Manhole 13328 \ LS1 00300 00300-6 RM FnRM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU UNIT PRICE SCHEDULE DEFINITIONS A. MOBILIZATION A lump sum payment not to exceed three (3) percent of the total bid amount will be made to the Contractor with the first monthly progress payment as a reasonable amount to start project. INESSEu/_\0Iai]rl� Payment will be based on completed, precast or cast -in-place concrete manhole construction. Such payment shall include all costs of clearing, grubbing and turf replacement; break up and offsite removal of existing pavement and curbs (as required); excavation, sheeting and shoring (as required), forming (as required), dewatering (as required), manhole base, walls, cones, plastering where required, making pipe connections, grout, waterproofing, joint seals, steps, frames, covers, bedding, testing, backfill; and pavement and curb restoration (as required). In addition, payment will be based on which depth category the manhole belongs (10'-15' or 15'-201, as an example). The measurement of depth shall be the vertical feet of manhole from the top of the frame and cover to the invert of the discharge sewer pipe. Payment for modifications to existing manholes SR19 and SR20 will be lump sum cost for break up and offsite removal of existing pavement, excavation, sheeting, and shoring (as required), dewatering (as required); constructing new outside drop in MH-SR19, partially filling outside drop and MH-SR20, waterproofing, joint seals, testing, backfill and pavement restoration. The cost of pavement and curb restoration is not paid as a separate item and shall be included in the cost of manholes. Work activities of pavement and curb restoration include, but are not limited to, sawcutting, forming, procuring and placing wire mesh, procuring and placing portland cement concrete or asphalt, joint construction, including steel reinforcement, finishing operations, prime coat, tack coat, and pavement marking. C. GRAVITY SANITARY SEWER PIPE Payment will be based on lineal feet of installed pipe, measured along the pipe centerline from center to center of manholes or junction chambers. Work activities include, but are not limited to clearing and grubbing and turf replacement; break up and offsite removal of existing pavement and curbs (as required); excavation; removing and replacing fence (as required), sheeting and shoring (as required), forming (as required); dewatering and 13328 , L51-00300 00300-7 B I D FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU bypass pumping (as required); procuring, placing and compacting bedding materials; concrete encasement or saddles (as required); procuring and installing sewer pipe and all appurtenances, including cleanouts at locations shown on plans; connecting to existing structures; placing and compacting backfill, including procuring, hauling, placing and compacting the granular backfill; respreading topsoil (when required); aggregate surface course (as required); restoring pavement and curbs (as required); concrete encasement at creek crossing; compacted granular bedding; and riprap at creek crossing; bypass pumping at creek crossing (as required; testing, and site restoration, all as defined in the Specifications. In addition, payment will be based on the incremental depth of the sewer (10'-15' or 151- 201, as an example). The measurement of depth shall be the vertical feet from ground surface to the installed sewer invert. The cost of pavement and curb restoration is not paid as a separate item and shall be included in the cost of sewer pipe; and the work activities shall be as described above in Section B, Manholes. D. STORM SEWER DRAIN Payment will be based on lineal feet of installed pipe, measured along the pipe centerline from center to center of manholes. Work activities include, but are not limited to, clearing, grubbing, and turf replacement; break up and offsite removal of existing pavement; excavation; sheeting and shoring (as required); forming (as required); dewatering (as required); procuring, placing and compacting bedding materials; concrete encasement or saddles (as required); procuring and installing sewer pipe and all appurtenances; connecting to existing structures; placing and compacting backfill; respreading topsoil (when required); aggregate surface ccurse(as required); testing; pavement restoration; and site restoration, all as defined in the Specifications. In addition, payment will be based on the incremental depth of the sewer (0110' or 10'-151, as an example). The measurement of depth shall be the vertical feet from ground surface to the installed sewer invert. The cost of pavement and curb restoration is not paid as a separate item and shall be included in the cost of storm sewer drain; and the work activities shall be as described above in Section B, Manholes. E. FORCE MAIN Payment for force main will be based on lineal feet of installed pipe, measured along the pipe centerline from Junction Chamber No. 5 in the outfall sewer to the connection with the ductile iron discharge pipe with mechanical coupling at Lift Station No. 1. Work activities include, but are not limited to, clearing, grubbing, and turf replacement; break up and offsite removal of existing pavement and curbs (as required); excavation; removing and replacing fence (as required); sheeting and shoring (as 13328 LSI -00300 00300-8 B I D FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU required); forming (as required); dewatering (as required); procuring, placing and compacting bedding materials; concrete encasement, saddles and thrust blocks (as required); procuring and installing force main pipe and all fittings, thrust blocks and appurtenances (cleanouts and manholes with air valves are paid as separate items as defined later in this Section E); connecting to existing structure and lift station discharge lines; placing and compacting backfill, including procuring, hauling, and compacting the granular backfill; respreading topsoil (when required); aggregate surface course (as required); testing; pavement and curb restoration; and site restoration, all as specified in the specifications. Payment for cleanouts will be based on completed cleanout construction. Such payment shall include excavation; sheeting and shoring (as required); procuring, placing and compacting bedding materials; all concrete work; procuring and installing pipes, fittings, manhole frames and covers; all at locations shown and as detailed on the plans. Payment for manholes with air valves will be based on completed manhole construction. Such payment shall include excavation; sheeting and shoring (as required); forming (as required); manhole base, walls, cones, joint seals, steps, frames, covers, crushed stone bedding and backfill; making all pipe connections; procuring and installing sewage air valves and all accessories; all at locations shown and as detailed on the plans. Payment in the 20 -inch plug valve shall include excavation; sheeting and shoring (as required); procuring, placing, and compacting bedding materials; all concrete work; procuring and installing valve, special fittings, and valve box; backfill; site restoration, all as specified and detailed on the plans. The cost of pavement and curb restoration is not paid as a separate item and shall be included in the cost of force main; and the work activities shall be as described above in Section B, Manholes. F. JACKED CASING PIPE Payment will be based on completed installation of casing pipe. Such payment shall include all costs of procuring and installing casing pipe, excavation, sheeting and shoring (as required), dewatering (as required), boring pits, boring, jacking, casing spacers, and seals, sand or fly ash or grout annular fill (if required), vent pipes and accessories in accordance with the railroad codes and regulations (if required), testing, and placing backfill. G. LATERAL RECONNECTIONS Payment will be based on complete reconnection of existing service lateral. Such payment shall include all costs of excavation, making pipe connections, boring or jacking of pipe under pavement, cleans outs, plugging lateral stub outs from existing sewer, sheeting and shoring (as required), dewatering :3328 \ LS1-00300 00300-9 B I D FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU (as required), procuring and installing sewer pipe and all appurtenances, bedding, backfill, compaction, pavement restoration, and site restoration, all as defined in the plans and specifications. H. PIPE & MH ABANDONMENT Payment will be based on the number of plugs at open ends of sewer pipe and force main, and plugs at pipe openings at manholes that are to remain or to be abandoned; lineal feet of sewer pipe sections that are to be filled with sand or fly ash slurry; and number of manholes to be abandoned. Work includes exposing and removing portions of sewer pipe and force main for filling and plugging, including the materials to complete the work operation such as sand, fly ash, grout and concrete, excavation, sheeting and shoring, dewatering, backfill and compaction, and pavement restoration. Work activities in abandoning manholes include, but are not limited to, break up and offsite removal of pavement and up to the minimum top three feet of the manhole, excavation, filling the remaining portion of the manhole with granular fill, backfill and compaction, and pavement restoration. I. COMPACTION GROUTING Payment will be based on lump sum and by unit prices applied to measured quantities of work performed and accepted for the items of work. The price for each item shall include overhead, profit, and all other costs to the Contractor and the firm to whom subcontract for the work is to be let for performance of all work required by the specifications. Payment for mobilization will be by a lump sum and shall include mobilizing and demobilizing the equipment, materials, and personnel for the performance of the work. It shall include all work, both on- site and off-site, that is necessary for the work but for which specific unit prices are not included herein. Payment for core holes will be based on the unit price for the cumulative length of 3 -inch minimum diameter core holes measured and shall be actual length of holes cored at locations designated by the Engineer. Payment for grout will be based on the measurement of the cubic feet of grout injected and shall be based on the cumulative volume of grout passing the top of the grout pipe and injected into the hole. No payment will be made for any volume injected in the holes lost due to faulty grouting equipment, grout or procedures. J. LIFT STATIONS Payment will be based on the total cost of constructing the lift station with all the appurtenances, including the emergency generator complete with all mechanical and electrical work. Work activities include, but are not limited to clearing and grubbing; embankment construction, including placing subbase material and filter fabric; preloading the site at Lift Station No. 1; pavement removal, excavation; removal of compaction grout 13328 \ L51-00100 00300-10 B I D FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU as required, sheeting and shoring; dewatering; forming; all cast -in-place concrete work, procuring and installing precast lift station and valve vault sections, base slabs and top slabs; backfill; procuring and installing pumps, piping, piping equipment, control panels and other control equipment, emergency generators and their accessories, conduits and wires; all underground ductile iron and other pressure piping and appurtenances, including the manholes for future flow meters and manholes with air valves at the lift station sites, lift station discharge pressure piping connections to the main force main, and the pipe fittings, including the 20 -inch fittings and cleanout at Lift Station No. 1 site; 24 -inch ductile iron pipe between MH Al and the lift station structure at Lift Station No. 1 site (all gravity sewer pipes and manholes are paid as separate items under Sections C and B, respectively); all site work, including grading, site access, painting of all exposed metal piping and conduits and walls and underside of the top slabs in wet wells; grading, surface gravel course, fences and gates; all electrical work, including site lighting, testing, all as defined in the specifications. Preloading the site at Lift Station No. 1 includes furnishing soil materials from an off-site borrow area or excavation, placing and compacting of surcharge fill for preloading; installing and maintenance of piezometer and settlement platforms; and removing the piezometer, settlement platform and surcharge fill at the completion of preloading. K. DEMOLITION Payment will be based on the total cost of decommissioning and abandoning the existing lift stations. Work activities include disconnecting and removing power supply; removing the wastewater pumps and delivering to the Owner for storage as directed by the Engineer; removing and disposing of all other equipment and piping; plugging all inlet and outlet piping; removing and disposing of the above ground portions of the wet wells and dry wells up to 3 feet below grade; breaking the concrete floors of the wet wells and dry wells; filling the wet well and dry well chambers with gravel; and regrading. Work at existing Lift Station No. 1 site also includes removing the aerial pipe and supports at the Sloan Creek Crossing, and installing the valve at the end of lateral from Marina in the existing manhole. Existing Lift Station No. 2 shall remain operational until new Lift Station No. 1 and the new Sloan Relief Sewer are fully operational and accepted by the Owner. 13320 \ LS1-00100 00300-11 BID FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU 5. BIDDER agrees that the Work will be substantially complete within 425 calendar days after the date when the Contract Time commences to run as provided in Paragraph 2.3 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.13 of the General Conditions within 455 calendar days after the date when the Contract Time commences to run. BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement. 6. The name and address of the surety company that will execute performance and payment bonds shall be entered in the spaces provided below. Failure to furnish the information requested may be cause for rejection of Bid. IMPORTANT - Surety companies executing BONDS must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in Missouri. Name of Surety: American Casualty Company of Reading, Pennsylvania Address: CNA Plaza Chicago, IL 60685 7. The following documents are attached to and made a condition of this Bid: (a) Required Bid Security in the form of 5% Bid Bond (b) List of Major Subcontractors required to be identified in this Bid. (c) List of Major Material Suppliers required to be identified in this Bid. (d) Required BIDDER's Qualification Statement with supporting data indicated by "Statement of Bidders Qualifications". (e) EPA Region VII Minority and Women's Business Enterprise Utilization Worksheet (f) Certification regarding Debarment, Suspension and Other Responsibility Matters. 13328 \ LS1-00300 00300-12 BID FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU LIST OF MAJOR SUBCONTRACTORS The names of Subcontractors to be used for the Work shall be entered in the spaces provided below as required by Paragraph SC -6.8.2 of the Supplementary Conditions. Upon award of a contract, the named Subcontractors shall be used. The completed List of Major Subcontractors shall become a part of the Contract Documents. Substitution of Subcontractors shall be as outlined by the provisions of the General Conditions. Substitutions shall be subject to concurrence of the Owner and shall be confirmed by Change Order. Failure to furnish all information requested in the listing may be cause for rejection of the Bid. Area of Work 1. Compaction Grouting 2. Concrete 3. Mechanical 4. Electrical Name of Subcontractor Self Perform Self Perform 7')1'L )�-'I<:I -')L- L(-�� crit ie 13328 \ LSI -00300 00300-13 B I D FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU LIST OF MAJOR MATERIAL SUPPLIERS The names of Major Material Suppliers to be used for the Work shall be entered in the spaces provided below as required by Paragraph SC -6.8.2 of the Supplementary Conditions. Upon award of a contract, the named Suppliers and materials shall be used and furnished. The completed List of Major Material and Equipment Suppliers shall become a part of the Contract Documents. Material substitutions will be permitted only if named material does not meet the requirements of the Contract Documents; the Supplier is unable to meet the delivery requirements of the construction schedule; the Supplier is dilatory in complying with the requirements of the Contract Documents; or for other reason specified in the General Conditions. Substitutions shall be subject to concurrence of the Owner and shall be confirmed by Change Order. Preliminary acceptance of material listed by Supplier's name shall not in any way constitute a waiver of the specifications covering such material; final acceptance will be based on full conformity with the Contract Documents. Failure to furnish all information requested in the listing may be cause for rejection of the Bid. 4. 5. 6 7. 8. 9. 10 Specification Major Material Item Section Supplier 15" Gravity Sanitary Sewer 02700 Mission Clay Products 18" Gravity Sanitary Sewer 02700 Mission Clay Products 24" Gravity Sanitary Sewer 02700 24" Storm Sewer Pipe 02700 Concrete Manholes 02700 Force Main 02700 Precast Manhole Section for Lift Stations 02700 Submersible Pumps 11310 Control Panels 13435 Emergency Generators 16620 :>>=s Ls1-00700 00300-14 BID FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU STATEMENT OF BIDDERS QUALIFICATIONS Each Bidder for the Work included in the Contract Documents shall submit with their Bid the data requested in the following schedule of information. This data must be included in and made a part of each Bid and be contained in the sealed envelope. Failure to comply with this instruction may be regarded as justification for rejecting the Bidder's proposal. Robinson Mechanical Contractors, Inc. (1) NAME OF BIDDER: DBA Robinson Construction Company (2) BUSINESS ADDRESS: P. 0. Box 388 2411 Walters Lane Perryville, MO 63775 (3 ) WHEN ORGANIZED: July, 1979 ( 3A) WHERE INCORPORATED: Missouri (4) IF NOT INCORPORATED, STATE TYPE OF BUSINESS AND PROVIDE YOUR FEDERAL TAX IDENTIFICATION NUMBER: -- (5) Number of years engaged in contracting business under present firm name: 20 vears (6) If you have done business under a different name, please give name and location: No (7) Have you ever failed to complete any work awarded to your Company? If so, where and why?: No (8) Have you ever defaulted on a Contract? No (9 List of Contracts completed within last four years, including value of each: See attached sheet 3328 \ LS1-00700 00300-15 BID FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU (10) List of Projects currently in progress (*); See attached sheet * Attach additional sheets as necessary * (11) Anticipated Percent of sewer installation for this project using: Open Cut Microtunneling Gravity 10% 90% Force Main 100% 0% Uncased Boring 0% 0% (12) List of two projects demonstrating Bidder's technical qualifications to perform the type of sewer construction anticipated. Include: Project Name Lineal feet and size of sewer installed Contract Price Percent of installation, By size, using (If below methods do not apply, describe method(s) on a separate sheet and attach to this Statement of Qualifications): Open Cut: Microtunneling Uncased Boring Contact (name and phone number) Project 1 Project 2 College/Henderson Smith (Nn _Fnrt "T)" SQuer_f'�� 4485 LF 8" 1400 LF 15" 7800 LF 8" 182 LF 18" 7595 LF 10" 600 LF 10" 696 LF 36" 1485 LF 12" 2072 LF 12" $2,971,450.00 $2,180,100.00 8" 2% 10" 00 12" 07. 15" Oo 98% 100% 80% 100% 0% 0% 20% 0% Francis E. Robinson 573-547-8397 8" 10" 12" 18" 36" 307. 0% 81% 100% 100% 69% 99% 18% 0% 0% 1% 1% 1% 0% 0% Francis E. Robinson 573-547-8397 13328 \ Ls1-00300 00300-16 BID FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU EPA REGION VII MINORITY AND WOMEN'S BUSINESS ENTERPRISE UTILIZATION WORKSHEET Grant Applicant Robinson Construction Company Project No. Contractor/ Engineer Robinson Construction Company Address p 0 Box 388 2411 Walters Lane Perryyille, MO 63775 Contact Person Francis E. Robinson Telephone No. 573-547-8397 Amount of Contract MBE Percentage WEE Percentage 1 2 3 :a 5 MBE Subcontractor WEE Address Contact Person Telephone No. Amount of Subcontract Scope of Work MBE Subcontractor WEE Address Contact Person Amount of Subcontract_ Scope of Work MBE Subcontractor WEE Address Contact Person Amount of Subcontract_ Scope of Work MBE Subcontractor WEE Address Contact Person Amount of Subcontract_ Scope of Work MEE Subcontractor WEE Address Contact Person Amount of Subcontract_ Scope of Work 6. MEE Subcontractor WEE Address Contact Person Amount of Subcontract_ Scope of Work Telephone No. Telephone No. Telephone No. Telephone No. Telephone No. 13328 \ LSI -00100 00300-17 B I D FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU Comments &c.•)c-L i- ( );I i',L r i = 1"/"1f: (, A rptepared By 573-547-8397 Telephone No. 4-11-00 Date 13328 \ LS3-00300 00300-18 B I D FORM A �A C«wd r4�bv vE PA L*Wled sttbm,., ccX-6eo Gar cation Regarding Debarment, Suspension, and Other Responsibility. Matters The p partkdpant cerfff to the best of Its �a�adze and be6d tt= I and its pr 1s • • t •:r. :• suspeded, • ••A:• for •:•: •:•.: :• •: or • LA ex,duded frm covered •. • . by :•a •z.r: • cr .•: not �f • •' •• precadlin • • ••A'•:• been =Nicted • • Ma a • Judgement •forgery,brbery, fals5cabcnor • :.C•• M • of : •• •.: • • faise staterrwlz, stateor : •: lnN • • ••' 60 ►• f•' h•t • • • transac6ormorf: or •K •.1:• for came or •:... '•►. • t -:1 a fzLse '•1+.1 i on tis c:. • ti • • may • : 7cux13 • rejecben of Na• • • M" or terrr*%atcnof Iaward. In a6d]bcri,•1001,r..� staternert• •• to $10, 000 or irrprLs�� for up to 5 yeam or bc&L Francis E. Robinson President Typed film• & 7iw of AL*xx zad Papn—:tl e 4-11-00 of Audxxtz.d F�pfwf••trlr• EPA For" 5700-0 i»-" 00300-L9 Instructions Under Execuiive Order 12549, an individt2l or organization debarred or excluded from participation In Federal assistance or benefit programs may not receive anv assistance award under a Federal program, or a subagreement thereunder for S25,CC0 or more. Accordingly, each prospective recipient of an EPA grant, loan, or cocperattve agreement and any contract or subagreemerrt participant thereunder must complete the attached Ce rtor provide an explanation why they cannot. Fcr further details, see 40 CFR 32.510, Participants' responsibilities, in the attached regulation. Where To Submit The prospective EPA grant, loan, or cooperative agreement recipient must return the signed certification or explanation with its application to the appropriate EPA Headquarters or Regional office, as required in the application instructions. A prosped}ve prime contractor must submit a completed certificzakon or explanation to the Individual or organization awarding the contract - Each prospective subcontractor must submit a completed certification or explanat}on to the prime contractor for the project. How To Obtain Forms: EPA Inducles the certification form, instructor , and a copy of Its Implementing regJatlon (40 CPR Part 32) in each application ktL' Applicants may reproduce thobse materals as needed and provide them to their prospective prime contractor, who, In tum, may reproduce and provide them to prospective srubcomactom •IPPS• ►�� ..�.r 11 11111 ►: •• :• :• •s C.CrTiQl12r Branch Grants Ad ct L Cly CPU -216F) U.S_ Envfrormontai FrCtOcbw A4W-f--y 401 M Street, SW - Wast hr,5;&M DC 204W (Fste0ac- 202 jt7'S-8=)_ ftT-ai 00300-20 c. 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARD.EAU A CORPORATION Robinson Mechanical Contractors, Inc. By DRA Robinson Cnnstniction Campan3r (SEAL) (Corporati.on Name) Missouri By (27,- ---- L ( Name State of Incorporation) 7 of Person Authorized to Sign Francis E. Robinson President (Title) r r +Corporate real) r (Secretary) Business Address: P. 0. Box 388 2411 Walters Lane Perryville, MO 63775 Phone No.: 573-547-8397 Fax 573-547-8398 A JOINT VENTURE (SEAL) By - (SEAL) (Name) (Address By (SEAL) (Name) (Address) Phone Number and Address for receipt of official communications (Each joint venturer must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above). 13328 \ L51-00100 00300-22 BID FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU 8. Communications concerning this Bid shall be addressed to: P. 0. Box 388 2411 Walters Lane Perryville, MO 63775 9. Terms used in this Bid which are defined in the General Conditions or Instructions will have the meanings indicated in the General Conditions or Instructions. SUBMITTED on April 11 If BIDDER is: AN INDIVIDUAL By 1X9 2000 (Individual's Name) doing business as Business Address: Phone No.: A PARTNERSHIP By (Firm Name) General Partner) Business address: Phone No.: (SEAL) (SEAL) 13328 \ [s1-00300 00300-21 BID FORM 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU BIDDER'S BOND STATE OF MISSOURI COUNTY OF CAFE GIRARDEAU KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned Robinson Mechanical Contractors, Inc. DBA Robinson Construction Company of 2411 Walters Lane, Perryville, Missouri 63775 hereinafter called "Principal," and American Casualty Company of Reading, Pennsylvania of CNA Plaza, Chicago , State of Illinois 60685 hereine the "Surety, 11 are A anunto--THF, 'lrm y oun a ter ca CITY OF CAPE C1IPJ.RDP-AU, MISSOURI, hereinafter called "Obligee, " in the penal sum of Five Percent of the amount bid ------------------------ ---------------------- ($ 5% Amt. Bid ) or five percent (5%) of the grosa num name n t e inaw ul money of the United States, to be paid in Cape Girardeau County, Missouri, for the payment of which aura well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION is such that WHEREAS, the Principal has submitted or is about to nubmit a proposal, to the Obligee on a contract for Lift Stations a NOW, THEREFORE, if the bid of the Principal is accepted by Obligee and if the Principal has entered into a contract with the Obligee within fifteen (15) days after being given notice of such acceptance and has furnished within said fifteen (15) days an acceptable contract bond for the faithful performance of the contract, then these presents shall be void; otherwise, if the Principal shall fail to perform any part of the conditions set out herein, the amount of this bond shall be paid immediately upon notification of Obligee to Surety of Principal's failure to timely perform the terms of this Bidder's Bond. PROVIDED FURTHER, that if any legal action be filed upon this bond, venue shall lie in Cape Girardeau County, State of Missouri. IMPORTANT - Surety companies executing BONDS must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in Missouri. IN WITNESS WHEREOF, this instrument is executed in One counterparts, each one of which shall be deemed an origins., this the 11th day of April )J)� 2000 1"22 � [.ei.onsoo 00300-23 BID FORM POWER OF ATTORNEY APPOIN I INV INI.JIVILWAL A l I t.Jt',NtY-IN-f-ACT Know All Men By These Presents, That CONTINENTAL CASUALTY COMPANY, an Illinois corporation, NATIONAL FIRE INSURANCE COMPANY OF HARTFORD, a Connecticut corporation, AMERICAN CASUAL T Y COMPANY OF READING, PENNSYLVANIA, a Pennsylvania corporation (herein ccllectively c--Iled'the CCC Surety Companies'), are duly crgar.¢ed and existing corporations having their principal offices in the City of Chicago, and State of Illinois, and that they do by virtue cf the s:cnature and seals herein affixed hereby make, constitute and appoint Thcmas R We!s h Dennis Lutz Dennis Flatness Earbara fvi_ Stub, Ta a S. Holman, Rebec---3 L. Liffey, Susan M. Steianski, Indrriduaily of SL Louis, Missouri their true and lawful A:temey(s)-in-Fact with full power and authcry hereby c: nferred to sicn, seal and execute for and on their behalf bends, undertakings and other obligatory instruments of similar nature - In Unlimited Amounts - and to bind them thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of their corporations and all the acts of said A tcmey, pursuant to the authority hereby given are hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the By -Laws and Resolutions, printed on the reverse hereof, duly adopted, as indicated, by the Boards of Directors of the corporations. In Witness Whereof, the CCC Surety Companies have caused these Presents to be signed by their Group Vice President and their corporate seals to be hereto affixed on this 1st day of February 1.999 CONTINENTAL CASUALTY COMPANY � ��T 1Kst1A ty C., NATIONAL FIRE INSURANCE COMPANY OF HARTFORD k% ��� AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA �arrnaaT� b s L) SEAL ���. �, < �yT• Marvin J. Cashion Group Vice President State of Illinois, County of Cook, ss: On this 1st day of February1999 , before me personally come Marvin J. Cashion, to me known, who, being by me duly swam, dd depose and say. that he resides to the City of Chicago, Sete of Illinois; that he is a Group Vice President of CONTINENTAL CASUALTY COMPANY, NATIONAL FIRE INSURANCE COMPANY OF HARTFORD, and AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA described in and which executed the above instrument; that he knows the seals of said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed pursuant to authority given by the Boards of Directors of said corporations and that he signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said corporations. Jo r NOTARY pugifc c�k��� My Commission Expires March 6, 2000 Mary Jo Abel Notary Public CERTIFICATE 1, Mary A. Ribikawskis, Assistant Secretary of CONTINENTAL CASUALTY COMPANY, NATIONAL FIRE INSURANCE COMPANY OF HARTFORD, and AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA do hereby certify that the Power of Attorney herein above set forth is still in force, and further certify that the By -Law and Resolution of the Board of Directors of each corporation printed on the reverse hereof are stiil in force. In testimony whereof I have hereunto subscnled my name and affixed the seals of the said corporations this 11th day of April 2000 CONTINENTAL CASUALTY COMPANY �e�su��T wRr o�axre�� NATIONAL FIRE INSURANCE COMPANY OF HARTI=ORQ ,: AMERICAN CASUALTY COMPANY OF READ VAN c' f� 3 y � � NL7 ]I, a•ca� SEAL < sf b72 ar I . 1897 HAPn MaryA Ribikawskis Assistant Secretary (Rev.1011 /97) Authorizing try -Laws anu mesuruLiu' ls ADOPTED BY THE BOARD OF DIRECTORS OF CONTINENTAL CASUALTY COMPANY: This Power of Attorney is made and executed pursuant to and by authorty of the following By -Law duly adopted by the Board of Directors of the Company. "Article IX—Execution of Documents Section 3. Appointment of Attomey-in-fact The Chairman of the Board of Directors, the President or any Executive, Senior or Group Vice President may, from time to time, appoint by written cer�uflcates attcmeys4n-fact to act. in behalf of the Company in the execution of policies of insurance, bonds, undertakings and other obligatory instruments of like nature. Such attomeys-in-fact, subject to the limitations set forth in their respective certificates of authority, shall have full power to bind the Company by their signature and execution of any such instruments and to attach the seal of the Company thereto. The Chairman of the Board of Directors, the President or any Executive, Senior or Group Vice President or the Board of Directors, may, at any time, revoke all power and authority previously given to any attorney -in -fact - This Power of Attorney is signed and sealed by facsimile under and by the authority of the following Resolution adcoted by the Board of Direct orsof the Company at a meeting duly called and held on the 17th day of February, 1993. 'Resolved, that the signature of the President or any Executive, Senior or Group Vice President and the seal of the Company may be affixed by facsimile on any power of attorney granted pursuant to Section 3 of Article IX of the By -Laws, and the signature of the Secretary or an Assistant Secretary and the seal of the Company may be aff xed by facsimile to any certificate of any such power and any power or certificate bearing such facsimile signature and seal shall be vaLd and binding on the Company. Any such power so executed and sealed and certified by certificate so executed and sealed shall, with respect to any bond or undertaking to which it is attached, continue to be valid and binding on the Company.' ADOPTED BY THE BOARD OF DIRECTORS OF AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA: This Power of Attorney is made and executed pursuant to and by authority of the following By -Law duly adopted by the Board of Directors of the Company. "Article VI—Execution of Obligations and Appointment of Attorney4n-Fact Section 2. Appointment of Attorney-in-fact The Chairman of the Board of Directors, the President or any Executive, Senior or Group Vice President may, from time to time, appoint by vaitten certificates attomeys-in-fact to act in behalf of the Company in the execution of policies of insurance, bonds, undertakings and other obligatory instruments of like nature. Such attomeys-in-fact, subject to the limitations set forth in their respective certific--tes of authority, shall have full power to bind the Ccmpany by their signature and execution of any such instruments and to attach the seal of the Company thereto. The President or any Executive, Senior or Group Vice President may at any time revoke all power and authority previously given to any attorney -in -;act' This Power of Attorney is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of the Company at a meeting duly called and held on the 17th day of February, 1893. 'Resolved, that the signature of the President or any Executive, Senior or Group Vice President and the seal of the Company may be affixed by facsimile on any power of attorney granted pursuant to Section 2 of Article Vl of the By -Laws, and the signature of the Secretary or an Assistant Secretary and the seal of the Company may be affixed by facsimle to any certificate of any such power and any power or certificate bearing such facsirnile signature and seal shall be valid and binding on the Company. Any such power so executed and sealed and certified by certificate so executed and sealed shall, with respect to any bond or undertaking to which it is attached, continue to be valid and binding on the Company.' ADOPTED BY THE BOARD OF DIRECTORS OF NATIONAL FIRE INSURANCE COMPANY OF HARTFORD: This Power of Attorney is made and executed pursuant to and by authority of the following Resolution duly adopted on February 17, 1993 by the Board of Directors of the Company. 'RESOLVED: That the President, an Executive Vice President, or any Senior or Group Vice President of the Corporation may, from time to time, appoint, by written certificates, Attemeys-in-Fact to act in behalf of the Corporation in the execution of policies of insurance, bonds, undertakings and other obligatory instruments of like nature. Such Attomey-in-Fad, subject to the limitations set forth in their respective certificates of authority, shall have full power to bind the Corporation by their signature and execution of any such instrument and to attach the seal of the Corporation thereto. The President, an Executive Vice President, any Senior or Group Vice President or the Board of Directors may at any time revoke all pourer and authority previously given to any Attcmey-in-Fact' This Pourer of Attorney is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of the Company at a meeting duly called and held on the 17th day of February, 1993. 'RESOLVED: That the signature of the President, an Executive Vice President or any Senior or Group Vice President and the seal of the Corperadcn may be affixed by facsimile on any power of attorney granted pursuant to the Resolution adopted by this Board of Directors on February 17, 1993 and the signature of a Secretary or an Assist3nt Secretary and the seat of the Corporation may be affixed by facsimile to any ger tific3te of any such power, and any power or certificate bearing such facsimile signature and seal shall be valid and binding on the Corporation. Any such power so executed and sealed and certified by certificate so executed and sealed, shall with rescect to any bond or undertaking to which 4 is attached, continue to be valid and binding on the Corporation.' 1332$ SANITARY SMER IMPROVEMENT PROGRAM LIFT -STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU Attest: a n "3 Secretary Y y 1.-4, s !as to Prrncipal /2.4`1'f `Walters Lane Perryville, MO 63775 Address Attest: Surety Secretary (SEAL) j /'/"� i gess s to -Sur-etly P.O. Box 66753 St. Louis, MO 63166-6753 Aaaress, Robinson Mechanical Contractors, Inc DBA Robinson Construction Company Pxincipa Sy 2411 Walters Lane Perryville, MO 63775 Address American IIUxety By: . Stefanski, Atto P.O. Box 66753, St. 5,dcireE6 NOTE: If Bidder is Partnership, all partners should execute bond. END OF SECTION 00300 13128 \ L81.00300 00300-24 SID FORM Item No. 9 LIST OF COMPLETED PROJECTS WITHIN THE PAST FOUR YEARS, INCLUDING NAME OF PROJECT, OWNER, ENGINEER, CONTRACT AMOUNT, DATE OF COMPLETION Cape Sewer Projects City of Cape Girardeau Sverdrup Civil Engineering Mr. Rich Vedder Contract Amount $ 11,000,000 Completed November 30, 1998 Searcy Water Treatment Plant City of Searcy, Arkansas Garver & Garver Engineers Mr. Gary Bennett Contract Amount $ 4,000,000 Completed December 1997 Wastewater Treatment Plant City of Branson West Allgeier, Martin & Associates Mr. Glen Davidson Contract Amount $ 2,700,000 Completed July 1998 Procter & Gamble Paper Machine Procter & Gamble New Site Construction Mr. Ron Funk Contract Amount $ 7,000,000 Completed December 1998 Water Intake Structure Procter & Gamble Paper Products Co. Archer Engineer/Design-Build Project Contractor — New Site Construction Mr. Ron Funk Contract amount $ 5,739,612 Completion date 9/01/99 Perryville Sewer Plant City of Perryville Burns & McDonnell Mr. Jim McCleish Contract Amount $ 5,500,000 Completed May 1997 Benton Water Treatment Plant City of Benton, Kentucky Florence & Hutchinson Mr. Roger Colburn Contract Amount $ 2,300,000 Completed December 1998 Miscellaneous Projects TG (USA) Corporation Mr. Dean Link Contract Amount $10,000,000 Completed November, 1998 Cape Main CSO Sewer City of Cape Girardaeu Sverdrup Civil, Mr. Rich Vedder Contract Amount $ 3,925,111 Completed December, 1999 Connecting Corridor 50 Procter & Gamble Paper Products Co. New Site Construction Mr. Charlie Bowers Contract Amount $1,400,000 Completion Date: 9/01/99 Water & Wastewater Treatment Plant Procter & Gamble Paper Products Co. New Site Construction Mr. Mark Dunaway Contract Amount $ 1,195,180 Completion date 9/01/99 Item No. 9 Structural & Miscellaneous Metals Procter & Gamble Paper Products Co New Site Construction Mr. Don Sowell Contract Amount $ 1,500,000 Completion date: 12/01/99 Item No. 10 LIST OF PROJECTS UNDER CONSTRUCTION, INCLUDING NAME OF PROJECT, OWNER, ENGINEER, CONTRACT AMOUNT, PERCENT COMPLETE Piping Tie-ins Biokyowa, Inc. Mr. Van Smith Contract Amount $ 3,000,000 80% complete Procter & Gamble Paper Products Co Piping Mr. Paul Schenkelberg Contract Amount $23,000 0% Complete Start Date: 4/17/00 Water Intake System LSP Energy Limited Partnership Archer Engineer/Design-Build Project Contract Amount $ 4,995,000 99% Complete TG (USA) Inc. Plant Expansion Mr. Randy Georger Contract Amount $750,000 80% Complete Hi Tech Control Systems Mechanical Mr. Steve Deitzer Contract Amount $480,000 0% Complete Start Date: August, 2000 CHANGE ORDER (Instructions on reverse side) No. LS -01 PROJECT Lift Stations and Force Main DATE OF ISSUANCE EFFECTIVE DATE OWNER Citv of Cape Girardeau Missouri OWNER's Contract No. 3521 Lift Stations and Force Main CONTRACTOR Robinson Construction Co. ENGINEER Sverdrup Civil, Inc. You are directed to make the following changes in the Contract Documents: Description: Change the amount shown on the Contractor's Bid Form, "Item A — Mobilization" from $354,000.00 to $146,999.00. Add Items J. La, J.2.a, J.3.a and J.4.a to the Contractor's Bid Form Avith proportionate amounts for mobilization as shown on attached "EXHIBIT C'. Reason for Change Order: Paragraph 00300.A, Unit Price Schedule Definitions stipulates that Item A Mobilization shall not exceed three (3) percent of the total bid amount. Attachments: Exhibit A -Contractor's Bid Form, Exhibit B -Unit Price Schedule Definitions and Exhibit C -Schedule of Values Revision. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times Substantial Completion: 425 Calendar days $ 4,899,665.00 Ready for final payment: 455 Calendar days days or dates Net changes from previous Change Orders No. to No. Net change from previous Change Orders No. - to No. S -0- -0- days Contract Price prior to this Change Order Contract Times prior to this Change Order Substantial Completion: 425 Calendar days $ 4,899,665.00 Ready for final payment: 455 Calendar dans days or dates Net Increase (decrease) of this Change Order Net Increase (decrease) of this Change Order S -0- -0- days Contract Price with all approved Change Orders Zeady imes with all approved Change Orders l Completion: 425 Calendar dans S 4,899,665.00 final payment: 455 Calendar days days or dates RECOMMENDED: APPRO ACCEPTED: ' / Engineer (Authorized Signature) Owner Michael G. Miller, City Manager Contracto Authorized Signature) Date: 7// v—o C Date: U - 'q -6 0 Date: 7/1,y/00 EJCDC No. 1910-8-B (1990 Edition) t, o_, A by thr Fnoinr­ t, ............. ....., ....... h.. Thr Acsoi fated General Contractors of America 1_3328-12.42a.doc 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU UNIT PRICE SCHEDULE Item Estimate d Quantity Unit Price Total Estimated Price A. MOBILIZATION Lump Sum $.j, �{C:� /LS $ B. MANHOLES -- 1. Depth 10'-15' a. Standard 3 EA $ 1z, 1Z (.-t EA $- 2. Depth 15'-20' a. Standard 4 EA $ iS�S 3y/EA $ &z, b. Outside Drop 4 EA $ i(. c;y�'/EA $ 3. Depth 20'-25' a. Outside Drop 2 EA $ /� �' ,Z=/EA $ 4. Depth 25'-30' a. Standard 2 EA $ i(o,�.� y' /EA $ 3 �3oe - 5. Depth 40'-45' _ a. Outside Drop 1 EA $ 72-,ytiO VEA $ 7L, 9S-0 6. Modifications to Existing MHs SR19 & _ SR20 Lump Sum $ 7996" /LS $ 7990 C. GRAVITY SANITARY SEWER PIPE 1. 8" Pipe a. Depth 0-10' b. Depth 101-151 52 LF $ /LF $ S $ 411z0 " c. Depth 151-201 40 LF $ /LF d. Depth 20'-25' 212 LF $ /03" /LF 2. 10" Pipe 50 LF $ /0 3" /LF 3. a. Depth 151-201 12" Pipe 46 LF $, 3y - /LF a. Depth 151-201 b. Depth 201-251 95 LF $ 1-72- /LF $ /�, F-3 15 " 4. 15" Pipe 105 LF $ /77- /LF a. Depth 0-10' $ 15-,260.- b. Depth 101-15' 50 LF $ 3/y" /LF $ S-,7-0 - c. Depth 151-20' 179 LF $ 3/y/LF $ 2yy. z9Z - d. Depth 20'-25' 778 LF $ 3/y -_/LF $ e. Depth 25'-30' 265 LF $ 3/y' /LF $ f. Depth 301-35' 149 LF $ LF $ 7, g. Depth 35'-40' 25 LF $ �/Z" / / F $ , l —T— S. 1811 Pipe 3S LF $ 3/ Z- a. Depth 151-20' 35 LF _ $ 3(�[ /LF $ 1z 4�/0' =— 6. 24" Pipe a. Depth 15'-20' b. Depth 201-25' 43 LF $ LF $ ,S g 7- c. Depth 251-30' 20 LF $/LF - /LF $ T 7-V_ - d. Depth 30'-35' 16 LF $ V- $ 3 7. Concrete Encasement 63 LF $ S (�,v' /LF Granular Bedding & Riprap Backfill at /LS $ Z y g Creek Crossing Lump Sum $ Zyg2 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU Item STORM SEWER PIPE 1. 24" Pipe a. Depth 0-10' b. Depth 10'-15' c. Flared End Pipe FORCE MAIN 1. 20" Pipe a. Under Turf b. Under Gravel c. Under ACP d. Under PCCP e. Under PCCP w/ACP Overlay 2. 24" Pipe a. Under Turf b. Under Gravel c. Under ACP d. Under PCCP e. Under PCCP w/ACP Overlay f. Inside Steel Casing 3. Concrete Encasement 4. Cleanouts 5. Manholes with Air Valves 6. 20" Plug Valve F. JACKED CASING PIPE 1. 14" Pipe (min.) 2. 22" Pipe (min.) 3. 30" Pipe (min.) G. LATERAL RECONNECTIONS H. PIPE & MH ABANDONMENT 1. Sewer & Force Main Plugs a. 6"-12" Pipe b. 16"-18" Pipe c. 30" Pipe 2. Fill Pipe w/Sand or Fly Ash Slurry a. 1011-12" Pipe b. 16" Pipe 3. MH Abandonment Estimate d Quantity 332 LF 280 LF 1 EA 1,280 LF 1,910 LF 900 LF 835 LF 1,335 LF 2,945 LF 3,575 LF 365 LF 565 LF 1,635 LF 430 LF 100 LF 39 EA 9 EA 1 EA 50 LF 153 LF 430 LF 2 EA 33 EA 7 EA 2 EA 2,520 LF 110 LF 10 EA Unit Price $ �N - / L F $ f22 - /LF $ 6,/S- ' / EA $=/LF $ /LF $ --/LF $ /t>C- /LF $ 17-6- /LF $ 4S --/LF $ 7 3 - /LF $ 119- /LF $ i17 - /LF /LF $ i30L�/EA $ Z768 /EA $_5_3 q� _ /EA $ logj- /LF $ /LF $ -367-/L7 $ 15jy- /Ey $ 1 C)C,- /EA $ 1L12:; - /EA $ zZ..i - /!A $ 7 - /LF $ r 3 _ /LF $ 3 -S-1 ' / EA Total Estimated n,-, -- $ 19, SIP, $- $ /.r - $ %DIo.ZS�G�- $ $ $ zSo, 3Z� $ 'Z 20,9 75 " $ y" . Si 3S $ 63, 2- 8.0 $ 19y , S $ $ IS 7, 8i0 $ 5(19 6-- $ 0 S $ $�ti 0O $ I W 30 $ 3 3 7D 13328 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU The above unit prices shall include all labor, equipment, materials and supplies, bailing, shoring, removal, overhead, profit, insurance, etc., to provide a complete system within the intent of these Contact Documents. The below unit price shall be utilized when rock is encountered and must be excavated during construction of the project. ROCK EXCAVATION $100/cubic yard ABBREVIATIONS LF Lineal Feet EA Each CF Cubic Feet ACP Asphaltic Concrete Pavement PCCP Portland Cement Concrete Pavement MH Manhole Estimate Total d Unit Estimated Item Quantity Price Price _. COMPACTION GROUTING 1. Mobilization Lump Sum $ y4 7/LS $ t1F Vq 7 2. Core Holes 200 LF $ -S-q- /LF $/�, f3 3. Grout 700 CF $ 2 1 - /CF $ J. LIFT STATIONS 1. Lift Station No. 1 Lump Sum $,�3-Z%LS $�� 2. Lift Station No. 2 Lump Sum $' LL $ V9, 147 - 3. Lift Station No. 3 Lump Sum =_/LS $&-/LS $29, 790 _ 4. Lift Station No. 4 Lump Sum $,31E 70L7 / LS $ _3/,� 70L �t5T2\�yTE Z 17� .0 j�RoPoiLT�c.sATEL�/ FRowl ITEM R MOBt�►zas+oa To N tTEMS S.l.c,- J, Z,cs. ► T,3.a s�,�p J, •F.c�. K. DEMOLITION 1. Lift Station No. 1 Lump Sum $ '799.y ./LS $ 79gy 2. Lift Station No. 2 Lump Sum $ 7yqv- /LS $ -19C1y 3. Lift Station No. 3 Lump Sum $icy '/LS $ "7 �9 U 4. Lift Station No. 4 Lump Sum /LS $' TOTAL BASE B I D (Total in Words) (Total base bid amount are to be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.' In case of error in extension, the unit and lump sum prices under each Pay Item will be considered correct, and these sums when properly extended, shall constitute the Bid.) The above unit prices shall include all labor, equipment, materials and supplies, bailing, shoring, removal, overhead, profit, insurance, etc., to provide a complete system within the intent of these Contact Documents. The below unit price shall be utilized when rock is encountered and must be excavated during construction of the project. ROCK EXCAVATION $100/cubic yard ABBREVIATIONS LF Lineal Feet EA Each CF Cubic Feet ACP Asphaltic Concrete Pavement PCCP Portland Cement Concrete Pavement MH Manhole 133208 SANITARY SEWER IMPROVEMENT PROGRAM LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU EXN�atT UNIT PRICE SCHEDULE DEFINITIONS A. MOBILIZATION A lump sum payment not to exceed three (3) percent of the total bid amount will be made to the Contractor with the first monthly - progress payment as a reasonable amount to start project. B. MANHOLES Payment will be based on completed, precast or cast -in-place concrete manhole construction. Such payment shall include all costs of clearing, grubbing and turf replacement; break up and offsite removal of existing pavement and curbs (as required); excavation, sheeting and shoring (as required), forming (as required), dewatering (as required), manhole base, walls, cones, plastering where required, making pipe connections, grout, waterproofing, joint seals, steps, frames, covers, bedding, testing, backfill; and pavement and curb restoration (as required). In addition, payment will be based on which depth category the manhole belongs (10'-15' or 15'-201, as an example). The measurement of depth shall be the vertical feet of manhole from the top of the frame and cover to the invert of the discharge sewer pipe. Payment for modifications to existing manholes SR19 and SR20 will be lump sum cost for break up and offsite removal of existing pavement, excavation, sheeting, and shoring (as required), dewatering (as required); constructing new outside drop in MH-SR19, partially filling outside drop and MH-SR20, waterproofing, joint seals, testing, backfill and pavement restoration. The cost of pavement and curb restoration is not paid as a separate item and shall be included in the cost of manholes. Work activities of pavement and curb restoration include, but are not limited to, sawcutting, forming, procuring and placing wire mesh, procuring and placing portland cement concrete or asphalt, joint construction, including steel reinforcement, finishing operations, prime coat, tack coat, and pavement marking. C. GRAVITY SANITARY SEWER PIPE Payment will be based on lineal feet of installed pipe, measured along the pipe centerline from center to center of manholes or junction chambers. Work activities include, but are not limited to clearing and grubbing and turf replacement; break up and offsite removal of existing pavement and curbs (as required); excavation; removing and replacing fence (as required), sheeting and shoring—(as required), forming (as required); dewatering and Project: Submittal No. LS -41 Sverdrup Civil, Inc. Lift Stations and Forcemain Review Comments by: Cape Girardeau Field Office Cape Girardeau, Missouri John R. Bennett June 29, 2000 ITEM ICONTRACTOR's Schedule of Values Work Com leted Bid Amount JAdjusted Unit -Pricel Quantity I Unit Amount A. MOBILIZATION $ 354,000.00 $ 146,990.00 1 LS $ 146,990.00 B. MANHOLES ETC. ETC. ETC. ETC. ETC. J. LIFT STATIONS 1. Lift Station No. 1 a. Mobilization b. Construction 2. Lift Station No. 2 a. Mobilization b. Construction 3. Lift Station No. 3 a. Mobilization b. Construction 4. Lift Station No. 4 a. Mobilization b. Construction Subtotals: Other Bid Items: PROJECT TOTALS: REVIEW COMMENTS: Submittal No. LS -41 recognizes the mobilization amount in excess of the 3% allowed by paragraph 00300.A "UNIT PRICE SCHEDULE DEFINITIONS" and places the proportionate mobilization amounts in Bid Item "J. LIFT STATIONS." For clarity the mobilization amounts should be itemized as shown above. When the Contractor has a clear definition of the Construction Costs for each phase of Lift Stations construction, Items J.1.b, J.2.b, J.3.b and J.4.b should be resubmitted on a new Schedule of Values. $ 658,237.00 $ 79,127.00 1 LS $ 79,127.00 $ 658,237.00 1 LS $ 658,237.00 $ 318,327.00 $ 38,266.00 1 LS $ 38,266.00 $ 318,327.00 1 LS $ 318,327.00 $ 429,790.00 $ 51,666.00 1 LS $ 51,666.00 $ 429,790.00 1 LS $ 429,790.00 $ 315,706.00 $ 37,951.00 1 LS $ 37,951.00 $ 315,706.00 1 LS $ 315,706.00 $ 2,076,060.00 $ 2,076,060.00 $ 2,076,060.00 $ 2,823,605.00 $ 2,823,605.00 $ 2,823,605.00 $ 4,899,665.00 $ 4,899,665.00 $ 4,899,665.00 1 • _ APPROVED 6. X MAKE CORRECTIONS NOTED 2. — APPROVED AS NOTED 7 RESUBMIT 3..�i NOT APPROVED 8. , DO NOT RESUBMIT 4. _ WORK MAY PROCEED 9. SUBMIT RWCERTUVD 5....� DO NOT PROCEED WITH WORK 10. REVIEW NOT REQUIRED BY CONTRACT DOCUMENTS SEE TMNSMiTTAL FOR ADDITIONAL INFORMATION AS APPLICABLE. ACTION SHOWN ABOVE IS ONLY FOR CONFORMANCE Ih9TH THE CONCEPT OF THE WORK AND WITH THE INFORMATION IN THE CON' G ; DOCUMENTS BY APPROVAL AND SU5', SSION, CONTRACTOR REPRESENTS THA' t -.E HAS OETERMINF," {c_, Ei.: MATERIALS, FIELD MEASUREMENTS ,IND CONSTRUCTION �:Sif r:,r,, %EC;FIEU PERFORMANCE AND DESIGN CRiTFRIA AND SMiI F„ ,,,:A DEVIATIONS FROM GONTRAGT DOCUMENTS ARE NOT REVIEWED UNLESS SPECIFICALLY RF(AIESTED IN WRITING BY CONTRACTOR. REVIEW CY RFSUBMISSION W'LL COVER ONLY DESIGNATED CHANGES ON THIS Si1P%IITTAL AND OTHER CHANGES CLEARLY IDENTIFIED BY CONTRACTOR WITH N ENCIRLEYENT. -Z9–Go R c IEC BY DATE SVERDRUP Ex��1�IT C �CN�fl-E of VAUO-V--S�V�S�t��.] CITY HALL CITY OF CAPE GIRARDEAU P.O. BOX 617 OFFICE OF THE CAPE GIRARDEAU, MO 63702-0617 CITY MANAGER TELEPHONE (573) 334-1212 FAX (573) 335-7946 COUNTY OF CAPE GIRARDEAU ) ) SS. STATE OF MISSOURI ) I, Gayle L. Conrad, duly qualified and acting City Clerk for the City of Cape Girardeau, Missouri, a Missouri municipal corporation, hereby certify that the attached is a true copy of a document entitled "Robinson Mechanical Contractors, Inc., Resolution of Board of Directors" which states that it was adopted on the 15' day of July, 2000, as certified by the Corporate Secretary and attested to by Paul Findlay, Vice President. An original signed and sealed copy of said Resolution is on file with the original contract between Robinson Mechanical Contractors, Inc. and the City of Cape Girardeau, Missouri, for the Lift Stations and Force Main Project, Sanitary Sewer Improvement Program. IN WITNESS WHEREOF, I have hereunto set my hand this 7' day of August, 2000. .r\ v� 1 Gayle 10 Conrad, City Clerk r 0 "HOME OF MISSOURI STATE FLAG" IF �� * TEV >>Z .r\ v� 1 Gayle 10 Conrad, City Clerk r 0 "HOME OF MISSOURI STATE FLAG" ROBINSON MECHANICAL CONTRACTORS, INC. RESOLUTION OF BOARD OF DIRECTORS I HEREBY CERTIFY that I am the duly elected and qualified Secretary of Robinson Mechanical Contractors, Inc., d/b/a Robinson Construction Co., and the keeper of the records and corporate seal of said Corporation and that the following is a true and correct copy of a resolution duly adopted at a regular meeting of the Board of Directors of said Corporation held in accordance with the Bylaws of said Corporation at its offices at Perryville, Missouri on Saturday, the 15th day of July, 2000. BE IT RESOLVED, that Chris Cissell be, and is hereby appointed by this Board as an assistant project manager for the Lift Station and Force Main Sanitary Improvement Program for the City of Cape Girardeau, Missouri. BE IT FURTHER RESOLVED, that said Chris Cissell shall for the aforesaid project have all the powers, duties and responsibilities of project manager for said project, including, but not limited to, the authority to execute and enter into change orders on behalf of the Company. IN WITNESS WHEREOF, I have hereunto affixed my name as Corporate Secretary and have caused the corporate seal of said Corporation to be hereto affixed this 15th day of July, 2000. ROBINSON MECHANICALi CONTRACTORS, INC., D/B/A-�o o ROBINSON CONSTRUCTION[ 00p Dolores Buehler, Corporate Secr'e , �.f [ SEAL ] I, Paul Findlay, a Director of said Corporation do hereby certify that the foregoing is a correct copy of a resolution adopted as above set forth. PO i y, a or/Vi President Bob Holden X,Cxyq,&q��, Governor . Stephen M. Mahfood, Director T OF NATURAL RESOURCES DMSION OF ENVIRONMENTAL QUALITY P.O. Box 176 Jefferson City, MO 65102-0176 January 12, 2001 Mr. Mark Lester City of Cape Girardeau P.O. Box 617 Cape Girardeau, MO 65702 RE: C295229-02 Cape Girardeau, Missouri Lift Stations and Force Main Project Change Order No. LS -02 Dear Mr. Lester: Enclosed is approved Change Order Number LS -02 to the approved plans and specifications for the Lift Stations and Force Main Project. This change order increases the eligible cost of construction by the amount of $93,915.00. This change order has no effect on the time of construction. Invoices from your engineer should clearly separate eligible and ineligible costs. We suggest the invoice refer to the date of this letter for eligibility purposes. Failure to clearly separate eligible and ineligible costs may result in the disallowance of project costs should the project be audited after project closeout. Financial assistance on this project is limited to the amount of the loan.aiid cannot be increased. This change order is for your official project records and should be maintained on file for a minimum of four years following the completion of disbursement. This date may be found in the financing documents of your loan agreement. Sincerely, WATER POLLUTIONCONTROLPROGRAM /a/fG% / Kent Peetz Project Engineer KP:lsm Enclosure c: John R. Bennet, Sverdrup Civil, Inc. Doug Garrett, Financial Services Southeast Regional Office 0 FA CHANGE ORDER (Instructions on reverse side) PROJECT Lift Stations and Force Main DATE OF ISSUANCE EFFECTIVE DATE OWNER City of Cape Girardeau Missouri OWNER's Contract No. 3521 Lift Stations and Force Main No. LS -02 CONTRACTOR Robinson Mechanical Contractors, Inc. ENGINEER Sverdrup Civil, Inc. d b.a. Robinson Construction Company You are directed to make the following changes in the Contract Documents: Description: Increase the Contract Price and modify the Contract Documents to incorporate the changes set forth in the attached Work Change Directives and Field Orders. Reason for Change Order: The accumulated total of Work Change Directive amounts exceed the $50,000.00 limitation in Supplementary Condition SC -10.6. Change in Contract Price due to actual quantities of work performed and units measured to date for previously authorized Work Change Directives. Attachments: List of Additions and Deletions, Work Change Directive Nos. LS -01 through LS -04 and Field Order Nos. LS -01 through LS -06. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times Substantial Completion: 425 Calendar days $ 4".665.00 Ready for final payment: 455 Calendar days days or dates Net changes from previous Change Orders No. to No. LS -01 Net change from previous Change Orders No. =to No. LS -01 $ -0_ rN -0- Un THOT AUfuns, days Contract Price prior to this Change Order 0(�t 0Times prior to this Change Order J/�lV 2 hal Completion: 425 Calendar days Mfor $ 4,8",665.00 final payment: 455 Calendar days days or dates Net Increase () of this Change Order Net Increase (decrease) of this Change Order $ 93 915.50 -0- days Contract Price with all approved Change Orders Contract Times with all approved Change Orders / Substantial Completion: 425 Calendar days $ 4 993.58050 Ready for final payment: 455 Calendar days days or dates I RECOMMENDED: ACCEPTED: BY: X C/ CII/ \ Y: B Engineer Authorized Signature) Owner ae er, City Manager nt for (Authorized Signature) Date: IV $/o, Date: 2 '7 �' Date: _%?�� DD EJCDC No. 1910-8-B (1990 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America [3328-12.42c.doc :b CHANGE ORDER (Instructions on reverse side) No. LS -03 PROJECT Lift Stations and Force Main DATE OF ISSUANCE EFFECTIVE DATE OWNER City of Cape Girardeau, Missouri OWNER's Contract No. 3521, Lift Stations and Force Main CONTRACTOR Robinson Mechanical Contractors, Inc. ENGINEER Sverdrup Civil, Inc. d,b.a. Robinson Construction Company You are directed to make the following changes in the Contract Documents: Description: Reduce the Contract Price and modify the Contract Documents to incorporate the changes set forth in the attached Work Change Directives and Field Orders. Increase the Contract Time in accordance with the attached Work Change Directive No. LS -07. Reason for Change Order: Change in Contract Price is due to actual quantities of work performed and/or authorized by the attached Work Change Directives. Change in Contract Time is due to delays and added work authorized by Work Change Directive No. LS -07. Attachments: List of Additions and Deletions, Work Change Directive Nos. LS -05 through LS -07 and Field Order Nos. LS -07 through LS -13. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ 4,899,665.00 Original Contract Times Substantial Completion: 425 Calendar days Ready for final payment: 455 Calendar days days or dates Net changes from previous Change Orders No.LS-01 to No.LS-02 Net change from previous Change Orders No.LS-01 to No.LS-02 $ + 93,915.50 -0- days Contract Price prior to this Change Order $ 4,993,580.50 Net I (decrease) of this Change Order $ (68503.78) Contract Price with all approved Change Orders RECOMMENDED: BY• Etigineer (Authorized Signature) Date: -715101 Contract Times prior to this Change Order Substantial Completion: 425 Calendar days Ready for final payment: 455 Calendar days days or dates Net Increase () of this Change Order 122 Calendar days days Times with all approved Change Orders Substantial Completion: 547 Calendar days Ready for final payment: 577 Calendar days days or dates ;APPRO ED "" CCEP D: BY: Owner Michael G. Miller, City Manager Contractor (Authorized Signature) Date: Date:/23/fJ/ EJCDC No. 1910-8-B (1990 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America L3328-12.42e.doc ATTACHMENT 1 CHANGE ORDER NO. LS -03 TO CONTRACT NO. 3521 LIFT STATIONS & FORCE MAIN PROJECT CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM LIST OF ADDITIONS AND DELETIONS The following changes are hereby made to the Contract Documents: DELETE: AMOUNT A. Adjust the quantities gravity sewer pipe and 24 -inch diameter Force Main to reflect the actual quantities of work performed. Adjust the Contract Price in accordance with the Unit Price Schedule and Work Change Directive No. LS -05, dated December 11, 2000 $ (44,838.19) B. Adjust the quantities of 20 -inch diameter Force Main, Compaction Grouting Core Holes and Grout Volume to the actual quantities of work performed. Adjust the Contract Price in accordance with the Unit Price Schedule and Work Change Directive No. LS -06, dated March 8, 2001 $ (19,776.94) C. Adjust the Contract Time and Contract Price in accordance with Work Change Directive No. LS -07, dated June 20, 2001 $ (3,888.65) TOTAL DECREASE IN CONTRACT PRICE: S (68.503.78) Note: Also attached are Field Order Nos. LS -07 through LS -13 that detail various changes to the Contract Documents that do not involve a change in the Contract Price or Contract Times. L3328-12.42e.doc } STATE OF MISSOURI DEPARTMENT ��t.I S..11�,,-ry✓ September 12, 2001 Mr. Mark Lester City of Cape Girardeau P.O. Box 617 Cape Girardeau, MO 65702 Bob Holden, Governor • Stephen M. Mahfood, Director OF NATURAL RESOURCES — DIVISION OF ENVIRONMENTAL QUALITY P.O. Box 176 Jefferson City, MO 65102-0176 RE: C295229-03 Cape Girardeau, Missouri Lift Stations and Force Main Project Change Order No. LS -03 Dear Mr. Lester: Enclosed is approved Change Order Number LS -03 to the approved plans and specifications for the Lift Stations and Force Main Project. This change order decreases the eligible cost of construction by the amount of $68,503.78. This change order increases the time of construction by 122 days. Invoices from your engineer should clearly separate eligible and ineligible costs. We suggest the invoice refer to the date of this letter for eligibility purposes. Failure to clearly separate eligible and ineligible costs may result in the disallowance of project costs should the project be audited after project closeout. Financial assistance on this project is limited to the amount of the loan and cannot be increased. This change order is for your official project records and should be maintained on file for a minimum of four years following the completion of disbursement. This date may be found in the financing documents of your loan agreement. Sincerely, WATER POLLUTION CONTROL PROGRAM �L— IZ3� Kent Peetz Project Engineer KP:lsm Enclosure c: John R. Bennet, Sverdrup Civil, Inc. Doug Garrett, Financial Services Southeast Regional Office 0 RECYCLED PAPER SEP I r' ?ntnt CHANGE ORDER (Instructions on reverse side) PROJECT DATE OF ISSUANCE EFFECTIVEUe''`6' No. LS -03 OWNER City of Cape GirardeauMissouri OWNER's Contract No. 3521 Lift Stations and Force Main <2 LV CFf CONTRACTOR Robinson Mechanical Contractors, Inc. ENGINEER Sverdrup Civil, Inc. d b.a. Robinson Construction Company You are directed to make the following changes in the Contract Documents: Description: Reduce the Contract Price and modify the Contract Documents to incorporate the changes set forth in the attached Work Change Directives and Field Orders. Increase the Contract Time in accordance with the attached Work Change Directive No. LS -07. Reason for Change Order: Change in Contract Price is due to actual quantities of work performed and/or authorized by the attached Work Change Directives. Change in Contract Time is due to delays and added work authorized by Work Change Directive No. LS -07. Attachments: List of Additions and Deletions, Work Change Directive Nos. LS -05 through LS -07 and Field Order Nos. LS -07 through LS -13. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ 4,899,665.00 Net changes from previous Change Orders No.LS-01 to No.LS-02 $ + 93 915.50 Contract Price prior to this Change Order $ 4,"3,580.50 Net 1 (decrease) of this Change Order Original Contract Times Substantial Completion: 425 Calendar days Ready for final payment: 455 Calendar days days or dates Net change from previous Change Orders No.LS-01 to No.LS-02 days Contract Times prior to this Change Order Substantial Completion: 425 Calendar days Ready for final payment: 455 Calendar days days or dates Net Increase () of this Change Order $ (68 503.78) 122 Calendar days days Contract Price with all approved Change Orders $ 4,925,076.72 RECOMMENDED: BY:/ �&'-11 / GIr. C1 Engineer (Authorized Signature) Date: 7/5�a Contract Times with all approved Change Orders Substantial Completion: 547 Calendar days Ready for final payment: 577 Calendar days days or dates Owner Michael G. Miller, City Manager Date: ACCEPTE BY: Contractor (Authorized Signature) Date:/2L01 EJCDC No. 1910-8-B (1990 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America 1.3328-12.42e.doc CHANGE ORDER INSTRUCTIONS A. GENERAL INFORMATION This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into a subsequent Change Order if they affect Contract Price or Times. Changes that affect Contract Price or Contract Times should be promptly covered by a Change Order. The practice of accumulating change order items to reduce the administrative burden may lead to unnecessary disputes. If Milestones have been listed any effect of a Change Order thereon should be addressed. For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Times, a Field Order may be used. B. COMPLETING THE CHANGE ORDER FORM Engineer initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from Owner, or both. Once Engineer has completed and signed the form, all copies should be sent to Contractor for approval. After approval by Contractor, all copies should be sent to Owner for approval. Engineer should make distribution of executed copies after approval by Owner. If a change only applies to Contract Price or to Contract Times, cross out the part of the tabulation that does not apply. ATTACHMENT 1 CHANGE ORDER NO. LS -03 TO CONTRACT NO. 3521 LIFT STATIONS & FORCE MAIN PROJECT CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM LIST OF ADDITIONS AND DELETIONS The following changes are hereby made to the Contract Documents: DELETE: AMOUNT A. Adjust the quantities gravity sewer pipe and 24 -inch diameter Force Main to reflect the actual quantities of work performed. Adjust the Contract Price in accordance with the Unit Price Schedule and Work Change Directive No. LS -05, dated December 11, 2000 $ (44,838.19) B. Adjust the quantities of 20 -inch diameter Force Main, Compaction Grouting Core Holes and Grout Volume to the actual quantities of work performed. Adjust the Contract Price in accordance with the Unit Price Schedule and Work Change Directive No. LS -06, dated March 8, 2001 $ (19,776.94) C. Adjust the Contract Time and Contract Price in accordance with Work Change Directive No. LS -07, dated June 20, 2001 $ (3,888.65) TOTAL DECREASE IN CONTRACT PRICE: S (68,503.78) Note: Also attached are Field Order Nos. LS -07 through LS -13 that detail various changes to the Contract Documents that do not involve a change in the Contract Price or Contract Times. L3328-12.42e.doc (Instructions on reverse side) WORK CHANGE DIRECTIVE PROJECT: L13328 Lift Stations and Force Main Sanitary Sewer Improvement Program DATE OF ISSUANCE: December 11, 2000 OWNER:. City of Cape Girardeau, Missouri OWNER's Contract No.: 3521, Lift Stations and Force Main CONTRACTOR: Robinson Construction Co. You are directed to proceed promptly with the following change(s): No. LS -05 EFFECTIVE DATE: December 11, 2000 ENGINEER: Sverdrup Civil, Inc. Description: Adjust the Contract Quantities in accordance with the attached "List of Additions and Deletions". This Work Change Directive will subsequently be submitted as part of Change Order No. LS -03 to be approved by the City, Contractor, Engineer and Missouri Department of Natural Resources. Purpose of Work Change Directive: Add and Delete appropriate quantities of Unit Price Items to reflect actual quantities of work performed under the terms of the Contract. Attachments: List of Additions and Deletions, Spreadsheet calculation of 24 -inch Force Main Quantities and Inspector's Spreadshe calculation of Rock Excavation Quantities. Ka claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: IN Unit Prices ❑ Lump Sum ❑ Other Estimated ifieFesse (decrease) in Contract Price: $ (44 838 19) If the change involves an increase, the estimated amount is not to be exceeded without further authorization. RECOMMENDED: Sverdrup Civil, Inc. ENGINEER Method of determining change in Contract Times: ❑ Contractor's records ❑ Engineer's records ❑ Other Not Applicable - Estimated increase (decrease) in Contract Times: Substantial Completion: -0- days: Ready for final payment: -0-_days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. AUTHORIZED: City of Cane Girardeau OWNER ( signature) EJCDC No. 1910-8-F (1990 Edition) f'W$29-12: iL&c Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated Gencral Contractors of America. WORK CHANGE DIRECTIVE INSTRUCTIONS A. GENERAL INFORMATION This document was developed for use in situations involving changes in the Work which, if not processed expeditiously, might delay the Project. These changes are often initiated in the field and may affect the Contract Price or the Contract Times. This is not a Change Order, but only a directive to proceed with Work that may, be included in a subsequent Change Order. l For supplemental instructions and minor changes not involving a possible change in the Contract Price or the Contract Times a Field Order may be used. B. COMPLETING THE WORK CHANGE DIRECTIVE FORM Engineer initiates the form, including a description of the items involved and attachments. Based on conversations between Engineer and Contractor, Engineer completes the following: METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT PRICE: Mark the method to be used in determining the final cost of Work involved and the estimated net effect on the Contract Price. If the change involves an increase in the Contract Price and the estimated amount is approached before the additional or changed Work is completed, another Work Change Directive must be issued to change the estimated price or Contractor may stop the changed Work when the estimated price is reached. If the Work Change Directive is not likely to change the Contract Price, the space for estimated increase (decrease) should be marked "Not Applicable". METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT TIMES: Mark the method to be used in determining the change in Contract Times and the estimated increase or decrease in Contract Times. If the change involves an increase in the Contract Times and the estimated times are approached before the additional or changed Work is completed, another Work Change Directive must be issued to change the times or Contractor may stop the changed Work when the estimated times are reached. If the Work Change Directive is not likely to change the Contract Times, the space for estimated increase (decrease) should be marked "Not Applicable". Once Engineer has completed and signed the form, all copies should be sent to Owner for authorization because Engineer alone does not have authority to authorize changes in Price or Times. Once authorized by Owner, a copy should be sent by Engineer to Contractor. Price and Times may only be changed by Change Order signed by Owner and Contractor with Engineer's recommendation. Once the Work covered by this directive is completed or final cost and times are determined, Contractor should submit documentation for inclusion in a Change Order, THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT PRICE OR THE CONTRACT TIMES. A CHANGE ORDER, IF ANY, SHOULD BE CONSIDERED PROMPTLY. ATTACHMENT 1 WORK CHANGE DIRECTIVE NO. LS -05 LIFT STATIONS AND FORCE MAIN PROJECT CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM LIST OF ADDITIONS AND DELETIONS The following changes are hereby made to the Contract Documents: ADD: A. Bid Item C.Ld, 8 -inch Gravity Sanitary Sewer Pipe (Depth 20'-25') is increased to 62.75 lineal feet with additional footage over the original contract amount: +$ 1,313.25 12.75 lineal ft. at $103.00 per L.F. _ B. Bid Item CA.e, 15 -inch Gravity Sanitary Sewer Pipe (Depth 25'-30') is increased to 151 lineal feet with additional footage over the original contract amount: + 628.00 2.00 lineal ft. at $314.00 per L.F. _ C. Bid Item E.2.c, 24 -inch Force Main (Under ACP) is increased to 1,712.9 lineal feet with additional footage over the original contract amount: 1,712.91.f. — 4791.f. (WCD # 4) — 3651.f. (Bid) _ +103,399.10 868.9 lineal ft. at $119.00 per L.F. _ D. Bid Item E.2.d, 24 -inch Force Main (Under PCCP) is increased to 568 lineal feet with additional footage over the original contract amount: + 336.00 3 lineal ft. at $112.00 per L.F: E. 154.24 cubic yards of rock excavation at the contract + 15,424.00 unit price of $100.00 per c.y. _ - DELETE: F. Bid Item C.l.a, 8 -inch Gravity Sanitary Sewer Pipe is decreased to -0- lineal feet with a reduction in footage below the original contract amount: 5,356.00 52 lineal ft. at $103.00 per L.F. _ - G. Bid Item C.l.c 8 -inch Gravity Sanitary Sewer Pipe is Decreased to 79.82 lineal feet with a reduction in foot- age below the original contract amount: _ 13,614.54 132.18 lineal ft. at $103.00 per L.F. _ L3328-12.34m.doc Pagel of 2 I W. C. D. No. LS -05 List of Additions and Deletions (Cont.) H. Bid Item C.4.b, 15 -inch Gravity Sanitary Sewer Pipe is decreased to 168 lineal feet with a reduction in foot- age below the original contract amount: 11 lineal ft. at $314.00 per L.F. _ -$ 3,454.00 I. Bid Item E.2.e, 24 -inch Force Main (Under PCCP with ACP overlay) is decreased to 429 lineal feet with a reduction in footage below the original contract amount: 1,206 lineal ft. at $119.00 per L.F. _ - 143,514.00 TOTAL DECREASE IN CONTRACT PRICE: Page 1 of 2 44.838.19 L3328-12.34m.doc Lift Stations and Force Main 24" Force Main Installation Date 11/30/2000 Cape Girardeau Begin Station 0+00 Sanita Sewer End Station 5+11.5 im rovernenR Length (L. F.) 511.50 r1Ut41C1111 Under Turf Item E.2.a (L.F.) 511.50 Under Gravel Item E.2.b (L.F.) Under ACP Item E.2.c (L.F.) Under PCCP Item E.2.d (L.F.) Under PCCP w/ACP Item E.2.e (L.F.) n Steel Casing (L.F.) 5+11.5 5+36.5 25.00 1 25.00 5+36.5 7+05.0 168.50 168.50 7+05.0 8+10.0 105.00 105.00 8+10.0 10+93.0(+/-) 283.00 283.00 10+93.0(+/-) 12+23.0(+/-) 130.00 130.00 12+23.0(+/-) 13+13.0 90.00 90.00 13+13.0 13+55.0 42.00 42.00 13+55.0 16+52.0 297.00 297.00 16+52.0 24+33.0 781.00 781.00 24+33.0 28+66.0 433.00 433.00 28+66.0 44+90.84 1,624.84 1,624.84 44+90.84 45+20.84 30.00 30.00 45+20.84 45+88.0 67.16 67.16 45+88.0 46+88.0 100.00 ` 100.00 46+88.0 50+00.0(+/-) 312.00 312.00 50+00.0(+/-) 51+35.0(+/-) 135.00 135.00 51+35.0(+/-) 57+03 568.00 568.00 57+03 57+33 30.00 30.00 57+33 63+70 637.00 637.00 63+70 65+15 145.00 145.00 "Concrete encased pipe under gravel surface. DSI #LS -04 (continuation/revision) RFI LS -04 Attachment.A3 1 of 2 24.11-30-00 Lift Stations and Force Main 24" Force Main Installation Date 11/30/2000 Cape Girardeau Begin Station zianitary Sewer End Station improve Length (L. F.) enE rryiam Under Turf Item E.2.a (L.F.) Under Gravel Item E.2.b (L.F.) Under ACP Item E.2.c (L.F.) Under PCCP Item E.2.d (L.F.) Under PCCP w/ACP Item E.2.e (L.F.) In bteel Casing (L.F.) 65+15 65+46 31.00 31.00 65+46 66+65 119.00 119.00 66+65 71+44(R) 479.00 479.00 71+44(R) 75+76(R) 78+15(R) 432.00 239.00 239.00 432.00 75+76(R) 78+15(R) 80+49.9(R) =80+68 Plan 234.90 234.90 80+49.9(R) =80+68(P) 84+81.9(R) =85+00(P) 432.00 432.00 84+81.9(R) =85+00(P) 90+64.9(R) =90+83 P 583.00 583.00 90+64.9(R) =90+83(P) 94+93.9(R) =95+12(P) 429.00 429.00 Project Totals: 9,493.9,0.11/2,286.00 4,068.00 1,712.90 568.00 429.00 430.00 R = Revised; P = Plan DSI #LS -04 (continuation/revision) RFI LS -04 Attachment.As 2 of 2 24"11-30-00 Lift Stations & Force Main 3521 Volume of Trench Rock Excavation r% 6- ef�fl^., niefnnen Rnck inanth Averaae Rock Depth Trench Width By: Marty Platz Cubic Yards Sverdrup Corporation Stas. 83+24 to 87+52 (11-16-00) Page 1 of 2 12/07/2000 - 3.00 0 3.50 0 11/13/00 83+41 to 83+61 20.00 4.00 3.50 3.50 9.074074074 11/13/00 83+61 to 83+81 20.00 4.00 4.00 3.50 10.37037037 11/13/00 83+81 to 84+01 20.00 4.00 4.00 3.50 10.37037037 11/13/00 84+01 to 84+21 20.00 4.50 4.25 3.50 11.01851852 11/14/00 84+21 to 84+41 20.00 4.00 4.25 3.50 11.01851852 11/14/00 84+41 to 84+61 20.00 4.00 4.00 3.50 10.37037037 11/15/00 84+61 to 84+81 20.00 3.50 3.75 3.50 9.722222222 11/15/00 84+81 to 85+01 20.00 3.50 3.50 3.50 9.074074074 11/15/00 85+01 to 85+21 20.00 4.00 3.75 3.50 9.722222222 11/15/00 85+21 to 85+31 10.00 1.00 2.50 3.50 3.240740741 11/15/00 85+31 to 85+51 20.00 1.50 1.25 3.50 3.240740741 11/15/00 85+51 to 85+71 20.00 1.00 1.25 3.50 3.240740741 11/16/00 85+71 to 85+91 20.00 1.00 1.00 3.50 2.592592593 11/16/00 85+91 to 86+09 18.00 2.50 1.75 3.50 4.083333333 11/16/00 86+09 to 86+29 20.00 2.50 2.50 3.50 6.481481481 11/16/00 86+29 to 86+49 20.00 2.00 2.25 3.50 5.833333333 11/16/00 86+49 to 86+69 20.00 2.00 2.00 3.50 5.185185185 11/16/00 86+69 to 86+89 20.00 2.50 2.25 3.50 5.833333333 11/16/00 86+89 to 87+09 20.00 2.00 2.25 3.50 5.833333333 11/16/00 87+09 to 87+29 20.00 2.00 2.00 3.50 5.185185185 11/16/00 87+29 to 87+49 20.00 2.00 2.00 3.50 5.185185185 Sverdrup Corporation Stas. 83+24 to 87+52 (11-16-00) Page 1 of 2 12/07/2000 Lift Stations & Force Main 3521 By: Marty Platz Volume of Trench Rock Excavation Date Station Distance Rock De th Average Rock Depth Trench Width Cubic Yards 11/16/00 87+49 to 87+69 20.00 1.50 1.75 3.50 4.537037037 11/16/00 87+69 to 87+86 17.00 1.25 1.38 3.50 3.030092593 Total 154.2430556 Sverdrup Corporation Stas. 83+24 to 87+52 (11-16-00) Page 2 of 2 12/07/2000 (Instructions on reverse side) DATE OF ISSUANCE: March 8, 2001 WORK CHANGE DIRECTIVE No. LS -06 PROJECT: L13328 Lift Stations and Force Main Sanitary Sewer Improvement Program EFFECTIVE DATE: March 8, 2001 OWNER:. City of Cape Girardeau, Missouri OWNER's Contract No.: 3521, Lift Stations and Force Main CONTRACTOR: Robinson Construction Co. ENGINEER: Sverdrup Civil, Inc. You are directed to proceed promptly with the following change(s): Description: Adjust the Contract Quantities in accordance with the attached "List of Additions and Deletions". This Work Change Directive will subsequently be submitted as part of Change Order No. LS -03 to be approved by the City, Contractor, Engineer and Missouri Department of Natural Resources. Purpose of Work Change Directive: Add and Delete appropriate quantities of Unit Price Items to reflect actual quantities of work performed under the terms of the Contract. Attachments: List of Additions and Deletions, Spreadsheet calculation of 20 -inch Force Main Quantities and Compaction Grouting Report for Lift Station No. 2, prepared by L. Larsen, TCDI Division of Hayward Baker, Inc. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: N Unit Prices ❑ Lump Sum ❑ Other Estimated ififfO se (decrease) in Contract Price: $ (19,776.94) If the change involves an increase, the estimated amount is not to be exceeded without further authorization. RECOMMENDED: Sverdrup Civil, Inc. ENGINEER Method of determining change in Contract Times: ❑ Contractor's records ❑ Engineer's records ❑ Other Not Applicable Estimated increase (decrease) in Contract Times: Substantial Completion: -0- days; Ready for final payment: -0- days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. AUTHORIZED: City of Cape Girardeau OWNER By: 262:: By: (Authorized Signature) (Authorized Signature) EJCDC No. 1910-8-F (1990 Edition) 1 1.3328-12.34p.6 Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America. WORK CHANGE DIRECTIV' INSTRUCTIONS A. GENERAL INFORMATION This document was developed for use in situations involving changes in the Work which, if not processed expeditiously, might delay the Project. These changes are often initiated in the field and may affect the Contract Price or the Contract Times. This is not a Change Order, but only a directive to proceed with Work that may be included in a subsequent Change Order. For supplemental instructions and minor changes not involving a possible change in the Contract Price or the Contract Times a Field Order may be used. B. COMPLETING THE WORK CHANGE DIRECTIVE FORM Engineer initiates the form, including a description of the items involved and attachments. Based on conversations between Engineer and Contractor, Engineer completes the following: METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT PRICE: Mark the method to be used in determining the final cost of Work involved and the estimated net effect on the Contract Price. If the change involves an increase in the Contract Price and the estimated amount is approached before the additional or changed Work is completed, another Work Change Directive must be issued to change the estimated Brice or Contractor may stop the changed Work when the estimated price is reached. If the Work Change Directive is not likely to change the Contract Price, the space for estimated increase (decrease) should be marked "Not Applicable". METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT TIMES: Mark the method to be used in determining the change in Contract Times and the estimated increase or decrease in Contract Times. If the change involves an increase in the Contract Times and the estimated times are approached before the additional or changed Work is completed, another Work Change Directive must be issued to change the times or Contractor may stop the changed Work when the estimated times are reached. If the Work Change Directive is not likely to change the Contract Times, the space for estimated increase (decrease) should be marked "Not Applicable". Once Engineer has completed and signed the form, all copies should be sent to Owner for authorization because Engineer alone does not have authority to authorize changes in Price or Times. Once authorized by Owner, a copy should be sent by Engineer to Contractor. Price and Times may only be changed by Change Order signed by Owner and Contractor with Engineer's recommendation. Once the Work covered by this directive is completed or final cost and times are determined, Contractor should submit documentation for inclusion in a Change Order. THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT PRICE OR THE CONTRACT TIMES. A CHANGE ORDER, IF ANY, SHOULD BE CONSIDERED PROMPTLY. WORK CHANGE DIRECTIVE NO. LS -06 LIFT STATIONS AND FORCE MAIN PROJECT CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM LIST OF ADDITIONS AND DELETIONS The following changes are hereby made to the Contract Documents: ADD: A. Bid Item E. La, 20 -inch Force Main (Under Turf) is increased to 1,609.38 lineal feet with additional footage over the original contract amount: 329.38 lineal ft. at $83.00 per L.F. _ +$ 27,338.54 B. Bid Item E.l.b, 20 -inch Force Main (Under Gravel) is increased to 2,588.72 lineal feet with additional footage over the original contract amount: 678.72 lineal ft. at $66.00 per L.F. _ +$ 44,795.52 C. Bid Item I.2, Compaction Grouting Core Holes is increased to 381 lineal feet with additional footage over the original contract amount: 181 lineal ft. at $54.00 per L.F. _ +$ 9,774.00 D. Bid Item I.3, Compaction Grouting -Grout Volume is increased to 1,229 cubic feet with additional footage over the original contract amount: 529 cu. ft. at $21.00 per C.F.= +$ 11,109.00 DELETE: E. Bid Item E.l.c, 20 -inch Force Main (Under ACP) is decreased to 208.50 lineal feet with a reduction in = footage below the original contract amount: 691.5 lineal ft. at $112.00 per L.F. _ -$ 77,448.00 F. Bid Item E. Ld, 20 -inch Force Main (Under PCCP) is decreased to 775.30 lineal feet with a reduction in footage below the original contract amount: 59.7 lineal ft. at $106.00 per L.F. _ -$ 6,328.20 G. Bid Item E. Le, 20 -inch Force Main (Under PCCP w/ACP Overlay) is decreased to 1,104.70 lineal feet with a reduction in footage below the original contract amount: 230.3 lineal ft. at $126.00 per L.F. _ -$ 29,017.80 TOTAL DECREASE IN CONTRACT PRICE: -S 19,776.94 L3328-12.34p.doc Lift Stations and Force Main 20" Force Main Installation Date 03/08/2001 Ua a ujiraraeau Mannar ouwu 1111 I uvul1 tct Length I FI V%41 ai I I Under I urf Under Gravel UnderAGHUnder PCCP Under PCCP w Begin Station End Station (L.F.) Item E.1.a (L.F.) Item E.1.b (L.F.) Item E.1.c (L.F.) Item E.1.d (L.F.) Item E.1.e (L.F.) 94+93.9(R) 96+82.9(R) =95+12(P) =97+01 P 189.00 189.00 96+82.9(R) 101+83.7(R) =97+01 P =102+01.8(P) 500.80 500.80 101+83.7(R) 107+81.9(R) =102+01.8(P) =108+00.0(P) 598.20 598.20 107+81.9(R) 112+88.4(R) =108+00.0(P) =113+06.5 P 506.50 506.50 112+88.4(R) 127+80.97(R) =113+06.5 P =127+99.07(P) 1,492.57 1492.57 127+80.97(R) 135+48.81(R) =127+99.07(P) =135+66.91 P 767.84 562.84 205.00 135+48.81(R) 136+08.4(R) =135+66.91 P =136+41.45(P) 59.59 59.59 136+08.4(R) 136+87.05(R) =136+41.45(P) =142+66.81(P) 78.65 78.65 136+87.05(R) 142+31.99(R) =142+66.81(P) =142+62.78(P) 544.94 544.94 142+31.99(R) 142+44.68(R) =142+62.78(P) =142+85+/-(P) 12.69 12.69 142+44.68(R) 145+68.68(R) =142+85+/-(P) =146+09+/- P 324.00 324.00 145+68.68(R) 149+06.00(R) =146+09+/ P =149+46+/-(P) 337.32 82.82 254.50 149+06.00(R) 150+76.00(R) =149+46+/4P) =151+16+/-(P) 170.00 170.00 150+76.00(R) 151+23.3(R) =151+16+/7(P) =151+63.3(P) 47.30 47.30 151+23.3(R) 151+30.55(R) =151+63.3(P)_=151+70.55(P 7.25 7.25 151+30.55(R) 153+86.76(R) --151+70.55(P) =153+96.7 P 256.21 256.21 153+86.76(R) 154+06.76(R) =153+96.7 P =154+16.7 P 20.00 20.00 154+06.76(R) 154+16.82(R) =154+16.7(P) =154+26.76(P) 10.06 10.06 UJI FLS -U4 Lift Stations and Force Main 20" Force Main Installation Date 03/08/2001 V -,a a vitarueau Begin Station aauuai %3=rvU End Station ,,,, en9�,,.c"" th (L.F.) '-4-111 Under I urf Item E.1.a (L.F.) Under Gravel Item E.1.b (L.F.) Under AGP Item E.1.c (L.F.) Under Item E.1.d (L.F.) Under w Item E.1.e (L.F.) 154+16.82(R) =154+26.76 P 155+23.82(R) = N/A 107.00 107.00 155+23.82(R) = N/A 155+62.27(R) = N/A 38.45 38.45 155+62.27(R) = N/A 155+72.27(R) = N/A 10.00 10.00 155+72.27(R) = N/A 157+07.97(R) =157+02.05(P) 135.70 119.70 *16.00 157+07.97(R) =157+02.05 P 157+17.97(R) =157+12.05(P) 10.00 10.00 157+17.97(R) =157+12.05 P 157+80.5(R) =157+74.58(P) 62.53 43.03 19.50 Project Totals: 6,286.60 1,609.38 2,588.72 208.50 775.30 1,104.70 R = Revised; P = Plan * Driveway DSI #LS -04 DAILY PROGRESS REPORT ED' t'AU C 1 v TIME FAX t DATE: _Ic)B NAME: 1-2 DAY FUTURE PLANS: R & M NOTES: PREPARED BY: 121 ^ P n .. UTRIBUTION: ED STEVE SHOP MANAGER PRODUCTION MANAGER: JOHN DAN WHITE-Attg Copy YELLOW -Field Copy PINK -Job File CIRCLE APPROPRIATE DESCKIP 1 wn: WE/,THCR 6RITE CLEAR "OVER- MIN \ ' 5 SUN CAST TEMrVtATUM TO 32 32-60 60.70 70-66 6 VW 40 MODER . HIGH REPORT NO 11"DITY DRY MODER HUMID S:F: DLYI Rev: 6/97 WORK CHANGE DIRECTIVE (Instructions on reverse side) PROJECT: L13328 Lift Stations and Force Main Sanitary Sewer Improvement Program DATE OF ISSUANCE: June 20, 2001 OWNER: City of Cape Girardeau, Missouri OWNER's Contract No.: 3521, Lift Stations and Force Main CONTRACTOR: Robinson Construction Co. You are directed to proceed promptly with the following change(s): No. LS -07 EFFECTIVE DATE: June 20, 2001 ENGINEER: Sverdrup Civil, Inc. Description: Change the pump guide rails at all four (4) Lift Stations from Galvanized Steel Pipe to 304L Stainless Steel Pipe; construct 800 cu. yds. of sand blanket with 120 l.f. of French Drain in accordance with R.F.P. No. LS -04; change the air release val\ piping at Lift Station No. 1 in accordance with R.F.P. No. LS -05 and increase the contract time as indicated below. Purpose of Work Change Directive: The current contract time in relation to work remaining does not allow sufficient time for consolidation of soils after embankment construction and preloading. The sand blanket and drain reduces the contract amount and could accelerate consolidation. Contractor's claim for additional time due to unanticipated rock excavation is justified. Attachments: List of Additions and Deletions; Requests for Proposal Nos. LS -04 and LS -05; Contractor's Proposals and Engineer Estimates. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: ED Unit Prices ❑ Lump Sum 0 Other Contractor's Proposals Estimated (decrease) in Contract Price: $ (3,888.65) If the change involves an increase, the estimated amount is not to be exceeded without further authorization. RECOMMENDED: Sverdrup Civil Inc. ENGINEER Method of determining change in Contract Times: ® Contractor's records ® Engineer's records ® Other Contractor's Proposals Estimated increase (decrease) in Contract Times: Substantial Completion: 122 days; Ready for final payment: 122 days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. AUTHORIZED: City of Cape Girardeau OWNER By: By:-> L (Authorized Signature) (Authorized Signature) EJCDC No. 1910-8-F (1990 Edition) L3328-12.34r.r Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America. WORK CHANGE DIRECTIVE INSTRUCTIONS A. GENERAL INFORMATION This document was developed for use in situations involving changes in the Work which, if not processes expeditiously, might delay the Project. These changes are often initiated in the field and may affect the Contrac Price or the Contract Times. This is not a Change Order, but only a directive to proceed with Work that may be included in a subsequent Change Order. For supplemental instructions and minor changes not involving a possible change in the Contract Price or t}hc Contract Times a Field Order may be used. B. COMPLETING THE WORK CHANGE DIRECTIVE FORM Engineer initiates the form, including a description of the items involved and attachments. Based on conversations between Engineer and Contractor, Engineer completes the following: METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT PRICE: Mark the method to be used in determining the final cost of Work involved and the estimated net effect on the Contract Price. If the change involves an increase in the Contract Price and the estimated amount is approached before the additional or changed Work is completed, another Work Change Directive must be issued to change the estimated Brice or Contractor may stop the changed Work when the estimated price is reached. If the Work Change Directive is not likely to change the Contract Price, the space for estimated increase (decrease) should be marked "Not Applicable". METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT TIMES: Mark the method to be used in determining the change in Contract Times and the estimated increase or decrease in Contract Times. If the change involves an increase in the Contract Times and the estimated times are approached before the additional or changed Work is completed, another Work Change Directive must be issued to change the times or Contractor may stop the changed Work when the estimated times are reached. If the Work Change Directive is not likely to change the Contract Times, the space for estimated increase (decrease) should be marked "Not Applicable". Once Engineer has completed and signed the form, all copies should be sent to Owner for authorization because Engineer alone does not have authority to authorize changes in Price or Times. Once authorized by Owner, a copy should be sent by Engineer to Contractor. Price and Times may only be changed by Change Order signed by Owner and Contractor with Engineer's recommendation. Once the Work covered by this directive is completed or final cost and times are determined, Contractor should submit documentation for inclusion in a Change Order. THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT PRICE OR THE CONTRACT TIMES. A CHANGE ORDER, IF ANY, SHOULD BE CONSIDERED PROMPTLY. WORK CHANGE DIRECTIVE NO. LS -07 LIFT STATIONS AND FORCE MAIN PROJECT CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM LIST OF ADDITIONS AND DELETIONS The following changes are hereby made to the Contract Documents: ADD: A. 504 L.F. 3" dia. 304L Stainless Steel pipe for pump guide rails and 252 L.F. of 2" dia. 304L Stainless Steel pipe for pump guide rails in accordance with the Contractor's Proposal dated May 21, 2001 B. Labor and Contractor's Fee to change the discharge piping in accordance with R.F.P. No. LS -05 and the Contractor's Proposal dated May 30, 2001 C. 48.58 Cubic Yards of rock excavation at the contract unit price of $100.00 per cubic yard = DELETE: D. 1,200 Cubic Yards of subbase material with 4,800 square yards of Filter Fabric as specified in Section 02200.3.14.C.6 and construct 800 cubic yards of "Sand Blanket" with embankment toe drain in accordance with R.F.P. No. LS -04 and the Contractor's Proposal dated May 15, 2001 TOTAL DECREASE IN CONTRACT PRICE: +$ 5,410.57 +$ 103.88 +$ 4,858.00 -$ 14 261.10 1,3328-12.34r.doc s -J. SVERDRUP CIVIL, INC. REQUEST FOR PROPOSAL DATE: January 24, 2001 PROJECT NO.: L13328 City Project No.: 3521 PROJECT TITLE: Lift Stations and Force Main Sanitary Sewer Improvement Program Cape Girardeau, Missouri CONTRACTOR: Robinson Construction Company P.O. Box 388 Perryville, MO 63775 OWNER: City of Cape Girardeau, Missouri c/o City Engineer's Office 401 Independence Street Cape Girardeau, MO 63701 R.F.P. No. LS -04 Proposals for each item of work, as described below, shall be in strict accordance with Article 10 — CHANGES IN THE WORK of the General Conditions of the Contract. ITEM DESCRIPTION: DELETE: Specification 02200.3.14.C.6 (1,200 cubic yards of subbase material and 4,800 square yards of filter fabric). ADD: Approximately 800 cubic yards of clean Mississippi River sand placed on the prepared subgrade at Lift Station No. 1 to the limits shown on the attached drawing. Construct the 1.0 ft. thick sand blanket prior to placement of consolidation/embankment fill and after installing the Settlement Platforms specified in Section 02201.2.2.A. Compaction of the "Sand Blanket" shall be accomplished by successive passes of a vibratory roller and final proof rolling to assure consolidation. Construct embankment toe drains as shown on the attached MIRAFITm Technical Data with Non Woven filter fabric. Authorized by: Mar ester City Engineer ocig nal: conaactor copy: Caoshvct;on Inspator & rrojed Eagin— Requested by: 0 holin R. Bennett Resident Project Rep. FM32912350oc ..,...,..__....: ..: 3ffMUk, r, .. v;:. n.lo J.:•u/i1Wky„•,,: .. ..,a:. _ ...: u......,... ,. •,1 .,, _ ., .,, I tO SS MH (TBA B YTRAIC TOR) \ \ y ` A2 O _ # N .AB 358.741 \ STUB OU V) J W \ C19 z • — m \► \ Q \ , \ RELIEF CON 3 A- '\ \ RACT 6 \ \ I- a L: A L 3 \ I lu \ \ 356 21 'o LSI U I DuRln►(G 1 q r PRE-COAD MH AI \ --___- TOP \ Q% 358.6 Q j f 358.24±�i ' �a I Sc _ aAb D oa C-S EE Lo I SA N p / I / M �Pe� L51 AFT . AZ y I, I 349 V C3¢8 DuziNG F ro r / NT,,►Fly , 350 .`S. AFMia `35 3(4 8 ! I l I TOP 358.2 _ ' = 358.251 EXE GRATE INLET ADJ UST T�}R -ZO GRADE ---- _ I TOP 347.00- AFTER PRS - LoAD — APPROXIMATE I SETTLE �'-�. \\ I Q / Q Fic NOTES: A, u5E SuRCN AR6E MLL `Z-o p�NSH EAST SIDE I • CONSTRUCT EMBANKMENT 6 �fI FINAL ELEVATION SHOWN AND NCEHES HIGHER THAN�THET� SURCHARGE FILL ABOVETHETOP OFAD WITH 10 FEET OF A MINIMUM OF ABOUT HE EMBANKMENT FOR STATION NO. I CONSTRU MON oFS BEFORE START OF LIFT I 1 ' P CE MEcµa,,, �cd�lE,cEctkeea�.. � r I � 2' 811 LAYER OF MATE U I LAYERS MATERIAL WITHIN 2 SUBGRADE PRFPA P A T I nn/ F EMBANKMENT A CTrI� I 1- LIFT STATI c," +i CAPE GIkARtE.AU 5 jZP R.F.P. two' �� TA 0-1,4"L f -YT Z product Engineered Solutions for an lnr. Mirafi® N -Series NonWove Polypropylene Geotextiles for Soil Separation, Filtration, and Protection Property / Test Method Units 14ONL 14ONC 14ON 160N 170N 18ON 1100N 1120N 11601 MECHANICAL PROPERTIES 75 (165) 83 (184) 91 (200) Area m'(yd� 418 (500) 418 (500) 418 (500) 501 (600) Grab Tensile Strength .501(600) ASTM D 4632 Strength 0 Ultimate kN (lbs) 0.40 (90) 0.45 (100) 0.53 (120) 0.71 (160) 0.80 (180) 0.9(205) 1.11(250) 1.34 (300) 1.69(3 Elongation 0 Ultimate % 50 60 50 50 50 50 50 50 50 Mullen Burst Strength kPa 1309 1550 1654 2239 2412 2756 3514 4134 5167 ASTM D 3786 (psi) (190) (225) (240) (325) (350) (400) (510) (600) (750) Trapezoidal Tear Strength kN 0.16 0.20 0.22 0.27 0.33 0.36 0.45 0.51 0.62 ASTM D 4355 (lbs) (35) (45) (50) (60) (75) (80) (100) (115) (140) Puncture Strength kN 0.24 0.30 0.31 0.42 0.46 0.58 0.69 0.78 1.05 ASTM D 4833 (lbs) (55) (65) (70) (95) (105) (130) (155) (175) (235) UV Resistance after 500 hrs. % strength 70 70 70 70 70 70 70 70 70 ASTM D 4355 HYDRAULIC PROPERTIES Apparent Opening Size (AOS) US Sieve 70 70 70 70 80 80 100 100 100 ASTM D 4751 mm 0.212 0.212 0.212 0.212 0.180 0.180 0.150 0.150 0.150 Peninfttivity sec-' 2.0 1.9 1.8 1.4 1.4 1.2 1.0 0.8 0.7 ASTM D 4491 Flow Rate Vmir1/m2 6111 5698 5500 4477 4278 3866 (95) 3056 (75) 2648 (65) 2037 (50) ASTM D 4491 (gal/min/ftj (150) (140) (135) (110) (105) Packaging Roll Width m(ft) 3.8 (12.5) 3.8 (12.5) 3.8 (12.5) 4.5 (15.0) 4.5 (15.0) 45 (15.0) 4Z(15.0) 4b (15.0) 45 (15. 915 (300) 91 b (1300) 91 b (300) 91.5 P) 915 (;3M 45.7 (1E 98 (215) 10C)= 122 (270)) 150 PM 179 (393) 122 (2E 418 PM 418 (500) 418 (5500) 418 (500) 418 (500) 209 (2` NOTE: All Mechanical Properties and Hydraulic Properties shown are Minimum Average Roll Values (MARV). French drain without pipe MIRAFI _SANo f3LAaKE�' CM8ANKMEiJT F1( 2 ea, FRErSCN DRA(t.5 S AS SHowN ow ATTACHMet4T a. (To Ic-K.) X 3,0 bI- X 4Co.O .F'T. L.oaG At�D K 3.0 r -T, OVIDE) )( 80,0 FT. Lo --JG from defects in material and worknansh p When derwec x customer gNes notice to TC "rafi before rtste rg the i- _----• . - ....._....... IeIu iu (Iva twrcnase Pnce at I U Mirafi's election. RepiacN the product or obtaining a refund are the buyer's sole remedy for a breach and TC M'raft will not be liable fo consequential damage attributed to a defective product. THIS WARRANTY IS GIVEN IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING THE IMP' WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE THERE ARE No WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION OF Roll Length m(ft) 109.7 (39Q 109.7 (36Q 109.7 (360) Est. Gross Weight kg(lbs) 63 (138) 70 (154) 76 (167) 75 (165) 83 (184) 91 (200) Area m'(yd� 418 (500) 418 (500) 418 (500) 501 (600) 501 (600) .501(600) 915 (300) 91 b (1300) 91 b (300) 91.5 P) 915 (;3M 45.7 (1E 98 (215) 10C)= 122 (270)) 150 PM 179 (393) 122 (2E 418 PM 418 (500) 418 (5500) 418 (500) 418 (500) 209 (2` NOTE: All Mechanical Properties and Hydraulic Properties shown are Minimum Average Roll Values (MARV). French drain without pipe MIRAFI _SANo f3LAaKE�' CM8ANKMEiJT F1( 2 ea, FRErSCN DRA(t.5 S AS SHowN ow ATTACHMet4T a. (To Ic-K.) X 3,0 bI- X 4Co.O .F'T. L.oaG At�D K 3.0 r -T, OVIDE) )( 80,0 FT. Lo --JG from defects in material and worknansh p When derwec x customer gNes notice to TC "rafi before rtste rg the i- _----• . - ....._....... IeIu iu (Iva twrcnase Pnce at I U Mirafi's election. RepiacN the product or obtaining a refund are the buyer's sole remedy for a breach and TC M'raft will not be liable fo consequential damage attributed to a defective product. THIS WARRANTY IS GIVEN IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING THE IMP' WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE THERE ARE No WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION OF SVERDRUP CIVIL, INC. REQUEST FOR PROPOSAL DATE: May 3, 2001 PROJECT NO.: L13328 City Project No.: 3521 PROJECT TITLE: Lift Stations and Force Main Sanitary Sewer Improvement Program Cape Girardeau, Missouri CONTRACTOR: Robinson Construction Company P.O. Box 388 Perryville, MO 63775 OWNER: City of Cape Girardeau, Missouri c/o City Engineer's Office 401 Independence Street Cape Girardeau, MO 63701 R.F.P. No. LS -05 Proposals for each item of work, as described below, shall be in strict accordance with Article I u — CHANGES IN THE WORK of the General Conditions of the Contract. ITEM DESCRIPTION: DELETE: 1/2 -inch diameter discharge piping from the Sewage Air Release Valves and 1/2" valve shown on Plan Sheet No. LS -M01, SECTION A -A. ADD: 2 -inch diameter galvanized steel pipe in place of the'/2-inch diameter discharge pipe shown on Plan Sheet No. LS -MOI- Install four (4) each 2 -inch diameter discharge pipes without valves as indicated on drawing. 2 -inch pipe and fittings shall be installed to discharge directly into the Lift Station No. 1 Wet Well. Authorized by: C� Requested by: Marc ster City Engineer o R. Bennett Resident Project Rep. Original: Contractor Copy: Congnict on ►nspe w & Project Engines X328-123$ dOC obinson construction "Delivering Experience" May 21, 2001 Mr. John Bennett Sverdrup Civil, Inc. 401 Independence Street P.O. Box 1604 Cape Girardeau, MO 63702-1604 Re: Lift Stations & Force Main Project City of Cape Girardeau, MO Dear John, 2411 Walters Lane P. O. Box 388 Perryville, Missouri 63775 Phone: 573/547-8397 Fax: 573/547-8398 Reference is made to our recent conversation regarding the price difference for substituting stainless steel for galvanized pipe for the pump guide rails in all four lift stations on this project. The following will detail our cost proposal to use stainless steel pipe in place of the specified galvanized pipe: Additions: Unit Total Description Quantfty Cost Cost 3" SCH 40 Stainless Steel 304 Pipe 504 LF $10.31/LF $5196.24 2" SCH 40 Stainless Steel 304 Pipe 252 LF $ 5.01 /LF $1262.52 $6458.76 Deductions: Unit Total Description Quantfty Cost Cost 3" SCH 40 Galvanized Steel Pipe 504 LF $ 2.78/1-F $1401.12 2" SCH 40 Galvanized Steel Pipe 252 LF $ 1.40/LF 352.80 $1753.92 Total Material Cost Increase this Item = $4,704.84 15% Contractor's Fee Per General Condition 11.6.2.1 = $ 705.73 Total Price Adjustment this Item = $5,410.57 John, as you are aware, we are ready to begin installation of these rails at Lift Station No. 1 and Lift Station No. 4 later this week. In anticipation of a normal processing time for this change, we request an extension to the Contract Time in the amount of 7 calendar days. Your consideration of this proposal will be greatly appreciated. DELIVERING EXPERIENCE F; r;c ie;mr:b!,c;.j;,l� lilt rT.•i30 Cape Lift Stations & Force Mam''01A - Change Orders.430 prlc, r:'tj, re nce betwee//n gaiv- :. # t Page 2 If you have any questions please do not hesitate to call. Sincerely, ROBINSON CONSTRUCTION COMPANY Chris issell Assistant Project Manager DELIVERING EXPERIENCE R `.Construction'%job files\430 - Cape Lift Stations & Force Main`01 A - Change Orders\430 price difference between gaiv. & ss guide rails 5-21-01.doc obinson construction "Delivering Experience" May 30, 2001 Mr. John Bennett Sverdrup Civil, Inc. 401 Independence Street P.O. Box 1604 Cape Girardeau, MO 63702-1604 Re: Lift Stations & Force Main Project City of Cape Girardeau, MO Dear John, 2411 Walters Lane P. O. Box 388 Perryville, Missouri 63775 Phone: 573/547-8397 Fax: 573/547-8398 Reference is made to your Request for Proposal No. LS -05 dated May 3, 2001. The referenced RFP requests revised pricing to change the air release valve discharge piping from the specified 1/2" diameter to 2" diameter galvanized steel pipe. In accordance with your request, I propose the following price changes to account for the necessary changes to the contract requirements that are detailed on the following sheet: Total Cost Increase this Item = $ 90.33 15% Contractor's Fee Per General Condition 11.6.2.1 = $ 13.55 Total Price Adjustment this Item = $ 103.88 John, as you are aware, we are ready to begin installation of this discharge piping at Lift Station No. 1. In anticipation of a normal processing time for this change, we request an extension to the Contract Time in the amount of 7 calendar days. Your consideration of this proposal will be greatly appreciated. If you have any questions please do not hesitate to call. Sincerely, ROBINSON CONSTRUCTION COMPANY Chris Cissell Assistant Project Manager DELIVERING EXPERIENCE �33a8-ia.35 EOEHRuu �u► -3/-01 SvCrj5161ZOF Cape, t_.11 Stations & Force Main,01A Change, Qidcrs.4;i0lctter Icy john 01) Is G5 5-, cl�x- Deletions MH Material Material Descriptio. Cl[ Unit Cos Extended 1/2" Galvanized Nipple - 6" Long 8 $0.55 $4.40 1/2" Galvanized 90 Bend 8 $0.55 $4.40 1/2" Brass Ball Valve w/ Lever Handle 4 $6.98 $27.92 1/2" Dielectric Unions (Gals/Brass) - 8 $5.40 $43.20 Threaded Both Ends 4 $0.00 $0.00 1/2" Brass Nipple - 6" Long 8 $4.00 $32.00 1/2" Galvanzied Nipple - 24" Long 4 $5.00 $20.00 3" Core Drill 4 $0.00 $0.00 /3/. SZ Additions MH Material Material Description Qty Unit Cost Extended 2" Galvanized Nipple - 6" Long 8 $1.90 $15.20 2" Galvanized 90 Bend 8 $4.50 $36.00 2" Galvanized Unions 4 $7.50 $30.00 2" Galvanized Nipple - 24" Long 4 $13.00 $52.00 4" Core Drill 4 $0.00 $0.00 /33 2 0 MH/ MH Cost This Cost This Unit Entended /MH lt_em 0.0635 0.508 $41.00 0.889 $25.23 0.533 4.264 $41.00 3.764 $179.22 0.364 1.456 $41.00 $41.00 $87.62 0.571 4.568 $41.00 $230.58 $230.49 0.0835 0.668 $41.00 $59.39 0.254 1.016 $41.00 $61.66 1.212 4.848 $41.00 $198.77 $842.37 MH/ MH Cost This tail Entended $/MH IWM 0.125 1.000 $41.00 $56.20 0.889 7.112 $41.00 $327.59 0.941 3.764 $41.00 $184.32 0.50 2.000 $41.00 $134.00 1.406 5.624 $41.00 $230.58 $932.70 Total Cost Change This Proposal = $90.33 obinson construction "Delivering Experience" To: Mr. John Bennett P.O. Box 388 2411 Walters Lane Perryville, Missouri 63775 573-547-8397 Fax: 573-547-8398 From: Chris Cissell Company: Sverdrup Civil, Inc. Phone #: 573-334-9020 Date: 6-8-01 Fax #: 573-334-3361 Re: Lift Stations & Force Main Project Cape Girardeau, MO Number of Pages (including cover sheet): 3 Comments: John, As discussed earlier, I have only requested payment for the 4.44 CY of rock removed at Lift Station No. 4. Mike Schremp was not involved with that portion of the work during rock removal. Therefore, I believe the measurements on the following sheet to be somewhat inaccurate measurements for payment per the specifications. If you have any questions or concems please let me know. Regards, Chris DELIVERING EXPERIENCE DrE�IEWED Sv C �/ Fi ESD b FFlCE IZ.3� Jr -ciao RAConstruction',job filesj430 - Cape lift Stations & Force Main\03 - Correspondence\430 fax to john bennett re rock removal time extension 6-8-01.doc Io inson construction "Delivering Experience" June 8, 2001 Mr. John R. Bennett Sverdrup Civil, Inc. Field Office 401 Independence St. P.O. Box 1604 Cape Girardeau, MO 63702-1604 RE: Lift Stations and Force Main City of Cape Girardeau, Missouri Dear John: 2411 Walters Lane P. O. Box 388 Perryville, Missouri 63775 Phone: 573/547-8397 Fax: 573/547-8398 As you are aware we have experienced considerable cost and delay associated with rock removal at Lift Station No. 1, Lift Station No. 4 and the gravity sewer between LS1 MH A1.1 and Lift Station No. 1 Wet Well. At Lift Station No. 1 we have concluded that although considerable costs and delay were encountered the actual quantity of rock removed, as calculated in accordance with the specifications, is small and we do not intend to make a claim for additional compensation. We calculate a quantity of 4.44 CY of rock removal for Lift Station No. 4 Wet Well and 44.14 CY of rock removal associated with the gravity sewer at Lift Station No. 1 for a total of 48.58 CY of rock removal and request this quantity be paid at the unit price of $100/CY as allowed in the Contract Documents. The delay in construction associated with the rock removal is itemized below for each site: Lift Station No. 1 - December 12, 2000 through February 3, 2001 = 54 calendar days Lift Station No. 4 - April 24, 2001 through May 5, 2001 = 12 calendar days Gravity Sewer between LS1 MH A1.1 and Lift Station No. 1 Wet Well - April 30, 2001 through June 4, 2001 = 36 calendar days Therefore, we are requesting an extension to the Contract Time in the amount of 102 calendar days. Your consideration of this request will be greatly appreciated. Sincerely, ROBINSON CONSTRUCTION COMPANY 6V� �4�� Chris Cissell Assistant Project Manager DELIVERING EXPERIENCE R''%Construction'+,job files\430 - Cape Lift Stations & Force Main101A - Change Orders1430 proposal john benneti re time extension due to rock removal 6-8-2001.doc FROM Robinson Construc -)n PHONE NO ROBINSON CONSTRUCTION CO. P.O. Box 388 2411 Wa11ees lane PERRYVILLE, MISSOURI 63775 (573) 547-8397 573 335 ' '3 l� Jun. 06 2001 08:13AM f Joe SHEE7N0..__ OF CALCAATEDBY CHECKED BY DATE SCALE obinson construction "Delivering Experience" May 15, 2001 Mr. John R. Bennett Sverdrup Civil, Inc. Field Office 401 Independence St. P.O. Box 1604 Cape Girardeau, MO 63702-1604 RE: Lift Stations and Force Main City of Cape Girardeau, Missouri Deal -John: 2411 Walters Lane P. O. Box 388 Perryville, Missouri 63775 Phone: 573/547-8397 Fax: 573/547-8398 Reference is made to your R.F.P. No. LS -04 dated January 24, 2001 relative to the Lift Station No. 1 site of the above-mentioned project. In accordance with your request, I propose the following price changes to account for the necessary changes to the contract requirements: Delete 1200 CY of Subbase Material 9$18.40 = $(22,080.00) Delete 4800 SY of Filter Fabric @ $ 2.25 = $(10,800.00) Add 800 CY of Sand Blanket @ $17.00 = $ 13,600.00 Add 400 CY of Earth Embankment @ $ 7.00 = $ 2,800.00 Add 120 LF of French Drain @ $24.15 = $ 2,898.00 Total Cost Impact - Subcontractor Cost $(13,582.00) 5% Contractors Fee Per GC 11.6.2.2 $( 679.10) Total Price Change this Proposal $(14,261.10) John, we also request an extension to the contract time in the amount of 7 calendar days to construct the French Drains and to deal with the additional earth embankment in lieu of crushed stone. Your consideration of this proposal will be greatly appreciated. Sincerely, ROBINSON CONSTRUCTION COMPANY RD D Ir�C`i�E C7CT�S Tc David Monier SEE,SEO L. _ LoG oe����A Construction ManagerE�, DM DELIVERING EXPERIENCE R 'tConstruction'%job files\430 - Cape Lift Stations & Force Main101 A - Change Ordersi430 proposal john bennett re rip Is- } 04 5-15-2001.doc Prepared by: John R. Bennett Sverdrup Civil, Inc. ENGINEER'S ESTIMATE IN RE: RFP NO. LS -04 WORK CHANGE DIRECTIVE NO. LS -07 Lift Stations and Force Main Project Cape Girardeau Sanitary Sewer Improvement Program Spreadsheet Report LS1 SANDBLANKET Page 1 615101 10:36 AM 02000 Sltework 102220 Excav Backfill _ _ _ Dike Earth - 400.00 CuYd 0.78 ICuYd0.78 /CuYd 3121 7.63 10uYd 3,052 1.30 /CuYd 644 9.77 ICuYd 3,908: 02230 ease Courses Sand 800.00 C.Y. 3.59 ICY. 3.58 rC.Y. 2872 14.63 ICY. 118.24 1.42 ICY. 1,138 19.54 /C.Y. 15,632 ELEV.346,347.5 02710 Subdrainage Systems Drain, Trench 120.00 LnFt 2.50 A-nFt 2.50 A.nFt 300 18.13 MFt 2,178 1.57 A-nFt 188 22.20 MFt 2 664' Labor 3,484 Material 16,852 Equipment 1,868 Total 22,204 Estimate Totals Spreadsheet Report -S1 SUBBASE&FlLTFAB Estimate Totals Labor 5,844 Materiel 26,412 Equipment 1,704 Total 33,960 Page 1 6/5/0111:26 AM ADD: LS 1 Sandblanket $22,204 DELETE: LSI _Subbase & Filtfab (33,960) NET REDUCTION: This Estimate $ 11,756 ENGINEER'S ESTIMATE IN RE: STAINLESS STEEL vs. GALV. GUIDERAILS WORK CHANGE DIRECTIVE NO. LS -07 Lift Stations and Force Main Project Prepared by: John R. Bennett Cape Girardeau Sanitary Sewer Improvement Program Sverdrup Civil, Inc. Spreadsheet Report Page 1 615101 2:37 PM Estimate Totals Labor 7303 Material 9:W8 Total 17,191 Spreadsheet Report Page I LSFU PUMP GUIDERAILS &WI 2:13 PM Estimate Totals Labor 5315 Materia! 2:996 Total 8,311 ADD: LSFM — SS — Pump_Guideraits $17,191 DELETE: LSFM — Galv.— Guiderails (8,311) NET INCREASE: This Estimate $ 8,880 g: i sp- -$ 11—I'M dubU1 flnt- q* P - -- W W -0, !V N �"- -A nu Elti W K nt Um , 10M Balm 02000 Sitework --------- . ..... . 02610 Pipe and Fittings Pipe. NicW 0", wY FiOngs, hangers, and valves, 2- 252.00 LnPt 8.76 A-nPt &76 AnFt —268A 6.80 /LnFt 1,714 -. 15.56 A-nFt 3,921 3. --- ---- LS NOS. 2&4 Pipe, Nickel affoy. w/ FftVs. hangem,and vafv*$. 3" 504.00 LnFt 10.11 /LnF( 10.11 AnFt 5.095! 16.22 A-nFt 8,175 7 26.33 /LnFt 13,270 � LS NOS. 163 Estimate Totals Labor 7303 Material 9:W8 Total 17,191 Spreadsheet Report Page I LSFU PUMP GUIDERAILS &WI 2:13 PM Estimate Totals Labor 5315 Materia! 2:996 Total 8,311 ADD: LSFM — SS — Pump_Guideraits $17,191 DELETE: LSFM — Galv.— Guiderails (8,311) NET INCREASE: This Estimate $ 8,880 FIELD ORDER FIELD ORDER NO: LS -07 PROJECT NO: L13328 DATE: December 26, 2000 This form is to be used only for emergency instructions to a contractor where the time requirea ror preparauon aiiu cxccunUu .,. a formal Change Order would result in delay or stoppage of the work, in accordance with Articles 1.19 and 9.5 of the General Conditions of the Contract. PROJECT: Lift Stations and Force Main Cape Girardeau Sanitary Sewer Improvement Program TO CONTRACTOR: Robinson Construction Co. CONTRACT DATE: June 27, 2000 You are hereby ORDERED to make the following changes in your contract for the above project: Discontinue all pipeline installation work for the 20 -inch Force Main and all other work requiring backfill of soil materials and/or granular backfill until such time when the backfill materials no longer contain frozen matter. Satisfactory materials as described in Specification Section 02200.2. LB "free of ...... debris, waste, frozen materials..." may be installed in trench excavations only after receiving written notification and approval of backfill materials inspected by the Engineer prior to the resumption of Force Main construction. The subsequent delay resulting from the above described condition is beyond the control of the Contractor and shall be documented as a condition caused by unusually severe adverse weather in accordance with Supplementary Condition SC -12.3.1. Any adjustment of Contract Time will be made by an appropriate Change Order with baseline data shown in SC -12.3.1. The foregoing field order is issued in accordance with Section 9.5 of the Contract and does not involve an adjustment in the contract price or the contract times and is compatible with the design concept of the completed project as a functioning whole as indicated by the contract documents. F HE ENGINEER DISTRIBUTION: M�10,*U*l z FOR T CITY OF CAPE GIRARDEAU City of Cape Girardeau Engineer Contractor Inspector FOR THE CONTRACTOR L3328-12.33r.doc FIELD ORDER FIELD ORDER NO: LS -08 PROJECT NO: L13328 DATE: January 8, 2001 This form is to be used only for emergency instructions to a contractor where the time required for preparation and execution of a formal Change Order would result in delay or stoppage of the work, in accordance with Articles 1.19 and 9.5 of the General Conditions of the Contract. PROJECT: Lift Stations and Force Main Cape Girardeau Sanitary Sewer Improvement Program TO CONTRACTOR: Robinson Construction Co. CONTRACT DATE: June 27, 2000 You are hereby ORDERED to make the following changes in your contract for the above project: Resume pipeline installation work for the 20 -inch Force Main and all other work requiring backfill of soil materials and/or granular backfill. Satisfactory materials as described in Specification Section 02200.2.1.B "free of ...... debris, waste, frozen materials..." may be installed in trench excavations only after receiving this written notification and approval of backfill materials inspected by the Engineer. The foregoing field order is issued in accordance with Section 9.5 of the Contract and does not involve an adjustment in the contract price or the contract times and is compatible with the design concept of the completed project as a functioning whole as indicated by the contract documents. FO ENGINEER F CITY OFC E GIRARDEAU FOR THE CONTRACTOR DISTRIBUTION: City of Cape Girardeau Engineer Contractor Inspector W328-12.33u.doo FIELD ORDER FIELD ORDER NO: LS -09 PROJECT NO: L13328 DATE: January 10, 2001 This form is to be used only for emergency instructions to a contractor where the time required for preparation and execution of a formal Change Order would result in delay or stoppage of the work, in accordance with Articles 1.19 and 9.5 of the General Conditions of the Contract. PROJECT: Lift Stations and Force Main Cape Girardeau Sanitary Sewer Improvement Program TO CONTRACTOR: Robinson Construction Co. CONTRACT DATE: June 27, 2000 You are hereby authorized to make the following changes in your contract for the above project: Adjust the alignment and location of Points of Intersection (P.I.) for the 20 -inch Force Main as indicated on the two (2) attachments designated ATTACHMENT "A" and ATTACHMENT "B". (Reference Plan Sheet No. LS -C 13 for Attachment "A" and Plan Sheet No. LS -C 14 for Attachment "B".) Any changes in unit price quantities resulting from this Field Order will be accounted for by Change Order. The foregoing field order is issued in accordance with Section 9.5 of the Contract and does not involve an adjustment in the contract price or the contract times and is compatible with the design concept of the completed project as a functioning whole as indicated by the contract documents. ENGINEER FOR h4E CrrY OF CAPE 6MARDEAU DISTRIBUTION: City of Cape Girardeau Engineer Contractor Inspector FOR THE CONTRACTOR L3328 -12.33y -doe ?T C.0 0 ATE N E E 112,539800.281,1106261.268,342.409,pi-59r 113,539846.604,1106223.780,341.988,pi-b2 r 114,540438.215,1106420.903,342.273,pi-65r 115,540450.395,1106417.337,341.735,pi-66r �9 _ Ccrr��-QCT # CLEAnI DUT q1�Q ARFA /�ft,ET ti ExISTI�G SfoRMW q Pau -re pL.An/NED FORE MAI'J P.L.t�S� _ P.t. #66R 1--20 " � FORCE MA/� DEFLECTEo To WEST 1-SM/7- 0f PERn4,9nJEivT E4SE14EM7 jV4.At4m" P =, A 65' PE, #63 'SURVEY ��NE BY Clay SvRvEy CR-cW 1-9-a1 No ScAt.E R : �tEY15E�lRELOG. Pr. #s'9R t-IFT PI, �62R! F/ELD ORDER A/10, L -S —09 AT TACIIN16N/T � Io.oS t A r ¢nil A 2,540804.060,1105563.840,-99999,PI 72 5,540939.440,1105549.470; 99999,PI 74R 6,540947.020,1105542.940; 99999,PI 75R 7,540970.310,1105409.250; 99999,PI 77 = R 8,540832.010,1105543.660,-99999,. P2 - 3 9,540939.010,1105560.360,-99999,. 10,540947.240,1105554.410,-99999,. pZ rs 11,541039.670,1105416.470,-99999,. pr -7S 12,540978.501,1105403.514,-99999,. Pi -7-7F- 13,540807.910,1105539.143,-99999,72R 7-7R13,540807.910,1105539.143;99999,72R 14,540820.381,1105530.889,-99999,73R F1cr:1.1) D q UEP- /JO, 4,S-09 ,�0-/NCS FO2.42E +-AIA REI-OCATlDAJ ArrAoIf,qF_,t1?- '84 ... )CATeb FIELD ORDER FIELD ORDER NO: LS -10 PROJECT NO: L13328 DATE: February 6, 2001 This form is to be used only for emergency instructions to a contractor where the time required for preparation and execution of a formal Change Order would result in delay or stoppage of the work, in accordance with Articles 1.19 and 9.5 of the General Conditions of the Contract. PROJECT: Lift Stations and Force Main Cape Girardeau Sanitary Sewer Improvement Program TO CONTRACTOR: Robinson Construction Co. CONTRACT DATE: June 27, 2000 You are hereby ORDERED to make the following changes in your contract for the above project: Discontinue all structural concrete and foundation work on Lift Station Number 1 until such time as a structural evaluation and instructions for corrective work has been issued by the Design Engineer, Sverdrup Civil, Inc. The structural evaluation and instructions are contingent on a timely response and Engineering Report from the Contractor's Geotechnical Consultant, Mr. Dale Smith, P.E., Project Manager for Geotechnology, Inc. This Order is based on non-compliance with Specifications prepared by Kuhlmann Design Group, Inc. submitted by David Monier, Robinson Construction Co., Inc. on October 27, 2000 and the specification requirements stipulated in P. K. Mathai's response to R. F. I. No. LS -05 dated November 27, 2000. Non-compliance is stipulated factually on the observed and measured deviation from specified "Driving Tolerances" on page 02360-3 of the Kuhlmann Design Group Specifications and the driving tolerances specified in Missouri Standard Specifications for Highway Construction — 1999 in paragraph 702.4.4 of Section 702. Resumption of work at Lift Station Number I is entirely contingent on a timely response from the Contractor's consultants, Geotechnology, Inc. and Kuhlmann Design Group, Inc. with their recommendations for corrective measures. The foregoing field order is issued in accordance with Section 9.5 of the Contract and does not involve an adjustment in the contract price or the contract times and is compatible with the design concept of the completed project as a functioning whole as indicated by the contract documents. CC4�1 1�1 6 - - O HE ENGINEER F CITY OF CAPE GIRARDEAU DISTRIBUTION: City of Cape Girardeau Engineer Contractor Inspector FOR THE CONTRACTOR L3328-12.338b.doc FIELD ORDER FIELD ORDER NO: LS -11 PROJECT NO: L13328 DATE: February 22, 2001 This form is to be used only for emergency instructions to a contractor where the time required for preparation ana execution 01 a formal Change Order would result in delay or stoppage of the work, in accordance with Articles 1.19 and 9.5 of the General Conditions of the Contract. PROJECT: Lift Stations and Force Main Cape Girardeau Sanitary Sewer Improvement Program TO CONTRACTOR: Robinson Construction Co. CONTRACT DATE: June 27, 2000 You are hereby authorized to make the following changes in your contract for the above project: Resume foundation work on Lift Station No. 1 conditioned on providing the following corrective measures for H -Pile deficiencies as outlined in Field Order No. LS -10: 1. Stabilize tops of driven steel piles with #8 rebar welded between each pile in both directions. 2. Increase bearing surface contact between the bottom of the pile cap and the bedrock pinnacles (where piles have been eliminated) by removing crushed stone and/or soil to elevation 311.5 ft. for a distance of 3 feet in both directions from the edge of the exposed bedrock towards the remaining piles. 3. Install #8 rebar running East-West across the Easternmost mud seam at 18 inches center to center spanning the eliminated pile locations (6 ft. minimum length of 48 rebar). Item 3 is per Mark A. Lester, City Engineer. All of the above shall be in accordance with the attached documentation from Robert G. Kolf, P.E., Engineer of Record for the H -Piles and pile cap, Geotechnology, Inc. and Sverdrup Civil, Inc. The foregoing field order is issued in accordance with Section 9.5 of the Contract and does not involve an adjustment in the contract price or the contract times and is compatible with the design concept of the completed project as a functioning whole as indicated by the contract documents. I bR'tHE ENGINEER 4F THE CITY OF CAPE EAU DISTRIBUTION: City of Cape Girardeau Engineer Contractor Inspector FOR THE CONTRACTOR 13328-12.33ae.doc FEB -19-2001 13:14 FROM:ROBINSON 15735GN 5447 49 FEB -19-2001 10:56 W KdG February 19, 2001 Mr, Dale Smith Gootccbnalogy, Inc. 2258 Grissom St: Lod* M.iswuri 63146 Re: City of Cape Girardeau Lift Statim Na I K.''3 P:.,j= 14o. =I i Dcar Mr. Smith: TO: 573 334 3.361 P. 002 3114346280 P.02 46 rra} — PazkwAy T4efhM%. 514A34.W94 Sc L,"It. M4*.mi W45-5706 Fac 614.4S4.a2eO This is in responae to the lcvxr you forwarded me from Mr. John R Bennett to Robinson CmKfmction Compllay datod February 16,200 1 . "— I agacee that the taps of the driven steel piles should be stabilized Brom movement due to consuuctlon activities I would recomm=d that one 4 8 rioar be welded between each pilo is both diroctians. In md!tT to tic The b arizg surfiw errrtactYrc`twesa$icbotSem of the pus cap and ins bedrock pimmacles (where pit= bare been eliminated), I mco==d dmt the gravcl ad&or soil be mmoved To elevation 31 I.5' for a diatamce of 3 feet in both the Nocth-SoMh ens! the F.yst Wcst d^ retj= from tht c4e of the W osed bcdrack towards 9se remaining Pile(s). r Should you havc any questions or camment8, please do not hesitate to call. r n Sincerely, �pllHfk/� Kr—ulm=n d-'4`ts Grotip, Inc. `�*��e►`- �e � ROBERT G. Ktri.F Robert G. Kolf, P.E., S.E.RUMBER Vice Premdea[ E 2 4T2 Sftucwml Engineering yS►.�iAr..wr�1GF�� ce: Mr. Dave Moni�--,1}obim-- Cor mrxo.rn Co. l�t�(1148.9G3711nd>ff ib..boo Cct421timoo 5 rowR� TnTrj P . x nSverdrup Sverdrup Civil, Inc. Field Office 401 independence St. P.O. Box 1604 Cape Girardeau, MO 65702-1604 Memorandum Letter No.: L13328-1564 To: Dave Monier, Project Manager Robinson Construction Company From: John R. Bennett Resident Project Representative Date: February 16, 2001 Subject: Cape Girardeau LS/FM Project Lift Station No. 1, H -Pile Deficiencies In reference to Field Order No. LS -10 ordering all foundation work suspended on the subject project, the concerns of Owner, City of Cape Girardeau and Sverdrup Civil, Inc. have been reviewed by various staff members of each organization. We have further reviewed the letters submitted from your consultants, Geotechnology, Inc. and Kuhlmann Design Group, Inc. The two main concerns are that the piles are out of tolerance in regards to plan location and plumbness. Robert Kolf, P.E. designer of the H -piles and pile cap for Kuhlmann Design Group, Inc. has reviewed his design calculations and accepted the pile locations as submitted to him based on field measurements by Robinson Construction Company personnel. Regarding the out of tolerance plan location, it is important that the piles not become overstressed due to their being significantly out of location. We are of the opinion that the piles will not be overstressed if they remain near vertical and the pile tips are stable. In regards to pile plumbness, the primary concern is due to the short pile lengths in place. The short piles do not have much confinement and are prone to disturbance from construction activities. We agree that the loading, out of plumbness and the arrangement of piles are probably not enough to overturn the structural H -beam piles. In order to keep the pile tips adequately seated in the bedrock, we consider it imperative that the piles be secured to prevent them from being disturbed during construction activities. Consideration should be given to welding rebar between the pile tops prior to doing any more work in the excavation bottom. In order to effectively transmit the loads, consideration should also be given to increasing the contact between the bottom of the reinforced concrete pile cap and the underlying bedrock at locations where piles were eliminated. L3328-12.32p.doc Memo to: Dave Monier Page 2 02/16/01 Robinson Construction Company is ultimately responsible for the structural design related to the piles and the pile cap as they chose to deviate from the original design. Robert Kolf of Kuhlmann Design Group, Inc. is the engineer of record and is responsible for the structural integrity of the piles and pile cap design. Sverdrup's role is to observe construction compliance with the drawings and specifications prepared by Robert Kolf and the additional conditions stipulated in P. K. Mathai's response to R. F. I. No. LS -05. The piles, as installed, do not comply with those drawings, specifications and conditions. Sverdrup's position is that based on the information available to us, we cannot dispute Robert Kolf s claim that the piles, as installed, will provide adequate support for the pump station foundation. We assume from the report prepared by Dale Smith of Geotechnology, Inc. that the piles are firmly seated in the bedrock at specified penetration. We are of the opinion that the slope of the bedrock and pinnacle formation makes it almost impossible to drive piles to meet the planned arrangement and specified driving tolerances. To keep the piles firmly seated in the bedrock, we need to confirm the locations previously measured by Marry Platz, City Inspector and myself on February 6, 2001. Then adequate bracing should be installed with the concurrence of the engineer of record, Robert Kolf. The adequacy of the bearing area for pile cap segments where piles were eliminated should also be addressed by Mr. Kolf. Please discuss these matters with your design consultants and submit their recommendations. c: P.K. Mathai Mark Lester Marty Platz Rich Vedder L3328-12.32p.doe 'Fl 8-14-2001 08:18 FROM: ROBR694 5735476649 GgO L'C 7 4 02/14/2001 07:61 FAX 314 991 2067 GY FED -13-2001 15140 KU11 AhNN DESIGN Com' atsaan+uw tcr�rc trzo.� Ino KdG February 13, 2001 Mr. Data Smith Gootochnology, Inc. 2258 Grlsaom St. Louis, Missouri 63146 Ra: Quy of Capc Gizueau Li4 Swim Na.1 . KdO PrujcctWO. 000146 -MOI TCJ: 5- 3 .334 3361 "r; Oud` ed.s 3144343222 P.02- 66 .02-66 pr*gom pae-ver TckO m-- 814.434.881 Dear Mr. Smith: . r -Based tm younr request we have takea afresh look atm calculatioue for the fbimdatiosa an dtc abave•referoaetd job. Das to t "&& tfl2nvsYiitiorl" aS Soma of the phos be3ag 6 to 12 -taches from 8ieir i o=dod-dedga Wattion (see rttseiKQ ala 2tea fmm E of sats f3o:j,�ocac�f dzPika axe piz king up a a wll amotmt of edditlwA exial Ioad VhK atltc °are uF shg1 ;lass. pUS iso SO a4N=te, eym with tea c cWnal conservative kmd_wdmabm The alse0r strrasce (bath ouc way andpuacbiotg shear) are sko a>i6dY hig = in areas where the spachg betnneeapfles hoe lbcrcaeed; tbaae, howvvrx. *m not cwugh to aarssunss the cot =W' I3kvwiee% ft flcxuml .t w=% have also tncremed slightly in these lenger spaas, bet not enough too overs=ss the aaighw co==m and rciufarzfug stzni. M shoum ym hive c::y gar 60as OriXT=IIc=, plcaso do"hesitate to Coil. Smotraly, � iwt WIti�hA. Kuhimann dalgr Group, Yam7 `r_ � �;�� j RGREU R,Kau RUMER Robot G. KoX PB- S.R. E-2 47" )4 Vico P[Csi&=t Structural Brtgiaoeting '',���aNl' RGKtmco- cc: Chris Crush, Rabinsou Coast. Co, Eudome CQLEPRATMO2 *CP-wR8 FE8-14-2001 08:18 FROM:ROBIMSON 573547b649 IU:S�S SS4 iSbl N.b05'�S PFS W. 573 335 6933 Feb. 06 2661 02:41PM PI •�� 420b1n�t C�s�struatian .. JOB.r—_'�"`-. ..._.--•-^— • - ROB1'NSON c8xsTRU0,10N Co. G- 215 lei. Wecrt stCALCVLATwov- attE PrRR` vjLi-F, t f.SS801 R' 63775 irz-vii M7-8397 ----- AS=GECHNOLOGYNC 1W ENGINEERING AND ENVIRONMENTAL SERVICES SAINT LOUIS • COLLINSVILLE February 6, 2001 Mr. Dave Monier Robinson Construction P.O. Box 288 Perryville, Missouri 63775 Re: Construction Observation Pile Driving Lift Station No. 1, Sanitary Sewer Improvements Cape Girardeau, Missouri Dear Mr. Monier: 0400609.1114 This letter is a summary of our observations during pile driving for the referenced project. Our services included observing pile driving and probe hole drilling. The purpose of our services was to observe foundation conditions for general consistency with the recommendations made in the subsurface exploration report' and the project plans and specifications. The lift station excavation was retained by sheet piling that was driven to refusal on limestone bedrock. The sheet piling was laterally supported by a three-level whaler system inside the excavation with no cross bracing. Limestone bedrock was exposed in portions of the bottom of excavation at approximately El 311.5 2 Bedrock was also exposed approximately 3 to 5 feet above El 311.5 in portions of each side of the excavation and had been excavated to achieve the bottom of excavation grade. According to the structural plana and pile location marks placed by Robinson Construction personnel, Lift Station No. 1 required 20 piles (four rows of five piles each). Steel BP14-73 piles with Pruyn driving points were driven to refusal at 12 of the 20 design pile locations. At the remaining 8 pile locations limestone bedrock suitable for foundation bearing was exposed. Robinson performed pile driving using a Delmag D12-32 diesel pile hammer with a rated energy of 20,571 foot pounds of energy. Geotechnology observed pile driving activities on January 31 and February 1, 2001. Field records of pile driving activities are attached. The piling was driven to refusal with a minimum driving resistance of five blows for the final one-quarter inch of penetration. 1 Subsurface Exploration, Redesign of Proposed Lift Station No. 1, Cape Girardeau Sanitary Sewer Improvements, Cape Girardeau, Missouri; Prepared for Robinson Construction; Geotechnology, Inc. Report No. 0400606.0111; Dated August 15, 2000. 2 Elevations used herein are in units of feet and refer to mean sea level datum 1 Lift Station #1, Foundation Sections and Details, Sheet No. S1.1. Prepared by Kuhlmann design Group and dated September 25, 2000 with Revision 1. ca. Robinson Construction February 6, 2001 Page 2 0400609.1114 A 2 -inch diameter by 3 -foot deep probe hole was drilled at seven of the eight locations where rock bearing replaced a pile. The probe holes encountered fresh limestone for the full depth. The as -built locations of the driven piles were reviewed with Mr. Bob Kolf, the structural engineer for the lift station foundation, and he concurs that the locations are acceptable. In our professional opinion, the foundation conditions observed by Geotechnology personnel were in general accordance with the referenced report. Please call if you have any questions. Very truly yours, GEOTECHNOLOGY, INC. Dale M. Smith, P.E. Project Manager DMS/JAB:dms/bjs Enclosures: N% pMI*d OA MCYCI"PWP•f Pile Driving Records dated January 31, and February 1, 2001 t G GOTECHNOOINC.INEERING & ENVIRONMENTALSPILE DRIVING RECORD sr. LoUs iciwsAs cmr iHau+Arous JOB NO. �f�� (t(`�` PROJECT NAMEc Pt G'RA.POc.� CONTRACTOR —0 r3—"YS0—/ , DATE PREPARED BY ---L,-1,1/ HAMMER, 41 42 ACCESSORIES: 43 24 & MODEL «Q 25 HAMMER CUSHION, DIMENSIONS MATERIAL 46 MAKE Z Z O LB. PILE DRIVING CAP., MAKE WT. LB. RAM Vim, z LB. PILE CUSHION, DIMENSIONS MATERIAL. 51 ANVIL WT. STROKE. RATED IN., MEASURED IN, ADAPTER TYPE WT.. LB. S4 ENERGY RATED ZO,C�-7 � FT -LB, DELIVERED FT -LB MANDREL DESCRIPTION 56 37 57 SPEED RATED aLowS/Mw, MEASURED SLOWSrM(N DIMENSIONS WT. LB. STEAM OR AIR PRESS., HAMMER BOILER FOLLOWER DESCRIPTION BOUNCE CHAMBER PRESS., RATED .MEASURED DIMENSIONS WT. LB. PILE: PILE NUMBER LOCATION TYPE VfPl C(X LB/FT DIMENSIONS CROSS-SECTIONAL I • G )< UNIT WEIGHT VERTICAL ✓ BATTER 1 ON ELEVATION OF GROUND 3 (�• FT. ELEVATION OF CUT-OF —FT. ELEVATION OF PILE TIP 30�' FT. ELEVATION OF SPLICES n- 4r\ . FT. JETTING PRESSURE & ELEVATIONS PRE EKG G'T FT 1 2 3 4 s 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 NUMBER OF BLOWS `� I DRIVING RESISTANCE NUMBER NUMBER NUMBER NUMBER FT' OF BLOWS FT' OF BLOWS FT. OF BLOWS FT' OF BLOWS 21 22 41 42 23 43 24 '4 25 45 26 46 27 47 28 48 29 49 30 50 31 51 32 52 33 53 34 S4 35 55 36 56 37 57 38 58 39 59 40 60 LAS I rvv i BLOWSAN. 61 81 ( U ' — 2„ ' 3„ - 4f' 1 - 5J. 1 1 ,-6„ ' — 10„ — 12„ — 62 82 63 83 64 &I 65 85 86 67 87 68 88 69 89 70 90 71 91 72 92 73 93 74 94 75 95 76 96 77 97 78 98 79 99' 80 100 TIME: START TIME ��' FINISH DRIVING (O; o o DRIVING TIME TN INTERUPTIONS (TIME, TIP ELEV. & REASON)5-1-eA("(�g7E,v ��Ael N�Ao 7—rc �A 7Uw D ,c,�F REMARKS: ALIGNMENT, PLUMBNESS, WATER, CLEANNESS, CONCRETING, DELAYS AND UNUSUAL DRMNG.-____._. F1WAYNLv- m- -6 GEOTEG &ENO NOGA SERVICESENGINPILE DRIVING RECORD ST. LOUIS KANSAS CRY INDIANAPOUS JOB NO. Udo Owl /l /V PROJECT NAME CONTRACTOR r?o0/NSon/ DATE ( lo PREPARED BY A� HAMMER: FT. ACCESSORIES: 41 42 23 / MAKE &MODEL / el" `J / HAMMER CUSHION, DIMENSIONS MATERIAL. 45 RAM WT Z `U LB. PILE DRIVING CAP., MAKE WT. LB. ANVIL WT. CLB. 29 PILE CUSHION, DIMENSIONS MATERIAL. 50 STROKE RATED IN., MEASURED IN. ADAPTER TYPE WT. LB. 53 ENERGY RATED 20/6'-? ( FT -LB, DELIVERED FT -LB MANDREL DESCRIPTION 55 36 56 37 SPEED RATED BLOWS/Mw, MEASURED BLOWSIMIN DIMENSIONS WT. LB. STEAM OR AIR PRESS., HAMMER BOILER 60 FOLLOWER DESCRIPTION BOUNCE CHAMBER PRESS., RATED MEASURED DIMENSIONS , WT. LB. PILE: PILE NUMBER ; LOCATION a 4 TYPE 9P 3 LB/FT DIMENSIONS CROSS-SECTIONAL_l 3.6 x r y. 6 UNIT WEIGHT 1 ON V fi? ((CAL VERTICAL �/ BATTER -313 FT. ELEVATION OF GROUND 311. 5- FT. ELEVATION OF CUT-OFF ELEVATION OF PILE TIP 3 oS= S FT. ELEVATION OF SPLICES a • FT. JETTING PRESSURE & ELEVATIONS e-'-- -tiPRE PRE FT 1 2 3 4 5 6 7 s 9 10 11 12 13 14 15 16 17 18 NUMBER OF BLOWS OI 19 20 TIME 1/r DRIVING RESISTANCE NUMBER FT. BLOWS FT. 21 22 41 42 23 43 24 44 25 45 26 46 27 47 28 48 29 49 30 50 31 51 32 52 33 53 34 54 35 55 36 56 37 57 38 58 39 59 40 60 NUMBER NUMBER OF BLOWS FT' OF BLOWS NUMBER FT- OF BLOWS LAST FOOT BLOWSAN. 61 81 ' -311 1 -411 i1 1 1 �{ 1- 5'f 611 ' -7 - 911 62 82 63 83 64 84 65 85 66 86 67 87 68 68 69 89 70 90 71 91 2 92 3 93 175 4 94 95 76 77 ;97 78 79 so 100 START TIME S FINISH DRIVING � Se DRIVING TIME INTERUPTIONS (TIME, TIP ELEV. & REASON) REMARKS: ALIGNMENT, PLUMBNESS, WATER, CLEANNESS, CONCRETING, DELAYS AND UNUSUAL DRIVING. . F:\WAYNE%FOR MSu-i Li -L-. GEOTECHNOLOGY, INC. ENGINEERING 4 ENVIRONMENTAL SERVICES ST. LOUIS KANSAS CITY INOIANAPOUS PILE DRIVING RECORD JOB NO. gy,)7,o02. 12 PROJECT NAM7 J7K CONTRACTOR Rob/NSonl DATE PREPARED BY AMI HAMMER: \ MAKE & MODEL vp r RAM WT 2 8 2 O LB. ACCESSORIES: HAMMER CUSHION, DIMENSIONS MATERIAL. PILE DRIVING CAP., MAKE WT.—LB. PILE CUSHION, DIMENSIONS MATERIAL. ADAPTER TYPE WT. LB. MANDREL DESCRIPTION DIMENSIONS WT. LB. FOLLOWER DESCRIPTION DIMENSIONS WT. LB. ANVIL WT %t D LB. STROKE RATED IN., MEASURED IN. ENERGY RATED204 & 77 (_FT -LB, DELIVERED FT -LB SPEED RATED sLowsnnlN, MEASURED BLOWSrMIN STEAM OR AIR PRESS., HAMMER BOILER BOUNCE CHAMBER PRESS., RATED MEASURED PILE: PILE NUMBER UNIT WEIGHT %3 VERTICAL t✓ ELEVATION OF GROUND .3I 1- S ELEVATION OF PILE TIP 300• i- JETTING PRESSURE & ELEVATIONS A a LOCATION A'C TYPE 9p/U n -73 LB/FT DIMENSIONS CROSS-SECTIONAL 3• �X �/• ( BATTER 1 ON V FT. ELEVATION OF CUT-OFF 3 / 3 FT. FT. ELEVATION OF SPLICES 1. A • FT. •, DRIVING RESISTANCE NUMBER NUMBER FT.OF BLOWS FT.OF.BLOWS FT. NUMBER NUMBER NUMBER BLOWS FT. BLOWS �' OF BLOWS LAST FOOT BLOWSAN. 1 21 41 61 81 2 22 42 62 .8263 3 23 `3-7 63 ' - 2" 4 24 44 845 4565 85 6 26 46 867 P 27 47 87 8 28 48 68 68 9 29 49 69 89 ' 10 30 50 70 90 - 6" 11 31 51 71 91 1- 7" 12 32 52 72 92 13 33 53 73 93 - 811 14 34 54 74 94 15 35 55 75 95 ' - 1011 16 36 56 76 96 17 37 57 77 97 18 38 58 78 98 - 11" 19 39 59 79 99 ' - 1211 20 40 60 80 1o0 TIME: START TIME FINISH DRIVING DRIVING TIME INTERUPTIONS (TIME, TIP ELEV. & REASON) REMARKS: ALIGNMENT, PLUMBNESS, WATER, CLEANNESS, CONCRETING, DELAYS AND UNUSUAL DRMNG., f T� SlEA 'T(NG P JLLEO N EAI) 01c Pr L � 7Zo Abp T -H � �ESEA--f-rD w/ S- plLowl , T�cN S oti/D iZES EjO+ 7 YNG w/ S GOc✓S ��G E �EAO Tri -T-e4 - 31R GEOTECHNOLOGY, INC. PILE DRIVING RECORD ENGINEERING a. ENVIRONMENTAL SERVICES ST. LCUIS KANSAS CITY INDIANAPOUS JOB NO. Uoow off. iii Y PROJECT NAMEC (r,P ow G�F7 TT 4. CONTRACTOR FoB/NSoN DATE PREPARED BY AMf HAMMER: ACCESSORIES: MAKE & MODEL D e '`^� a ^3,- HAMMER CUSHION, DIMENSIONS MATERIAL. RAM WT Ze20 LB. PILE DRMNG CAP., MAKE PILE CUSHION, DIMENSIONS ADAPTER TYPE WT. LB. MATERIAL. WT. LB. ANVIL WT G?- 0 LB. STROKE RATED IN., MEASURED IN. ENERGY RATED �f �/ FT -LB, DELIVERED FT -LB MANDREL DESCRIPTION SPEED RATED BLowsnlw, MEASURED BLOWS/MN DIMENSIONS WT. LB. STEAM OR AIR PRESS., HAMMER BOILER FOLLOWER DESCRIPTION BOUNCE CHAMBER PRESS., RATED MEASURED DIMENSIONS , WT. LB. PILE: PILENUMBER y LOCATION A TYPE 9PIV X73 UNIT WEIGHT -7 3 LB/FT DIMENSIONS CROSS-SECTIONAL (� L - X Sf• 0" VERTICAL ✓ BATTER 1 ON LJt R7-(C�L ELEVATION OF GROUND FT. ELEVATION OF CUT-OFF 313 FT. ELEVATION OF PILE TIP FT. ELEVATION OF SPLICES n - A . FT. JETTING PRESSURE & ELEVATIONS DRIVING RESISTANCE NUMBER NUMBER FT. FT' FT' NUMBER NUMBER NUMBER FT' OF BLOWS FT' OF BLOWS LAST FOOT BLOWS/lN. OF BLOWS OF BLOWS OF BLOWS 1 1 21 41 61 81 I �, 82 /c) 0 2 ( 22 42 62 3 Z9 23 43 63 83 4 24 44 64 84 5 25 45 65 85 ' - 3' I 6 26 46 66 66 1-411 7 27 47 67 87 I 28 48 68 88 ' _ 5" 29 49 69 89 50 Flo, 70 90'-g" 51 71 91 ' - 7" 12 52 r32 72 92 13 53 73 93 ' - 8" 14 34 54 74 94 g 15 35 55 75 95 _ 16 36 56 76 96 17 37 57 77 97 18 38 58 78 98 19 39 59 79 99 ' - 1 2" 20 40 60 80 100 I TIME: START TIME -2;3c) FINISH DRIVING uo DRIVING TIME INTERUPTIONS (TIME, TIP ELEV. & REASON) REMARKS: ALIGNMENT, PLUMBNESS, WATER, CLEANNESS, CONCRETING, DELAYS AND UNUSUAL DRIVING. __ F \WAYNFFORMS%F-IEu-"-JJ. rn GOTECHNINEERING & �OLOGA SINC. ST. LOVAS KANSAS CITY M01M APOUS PILE DRIVING RECORD i JOB NO.11ccX,C)• (// PROJECT NAME CA F G/E�MOI—!4y LtF7- STi4. i CONTRACTOR �o?,' NSON DATE -2 // of PREPARED BY l HAMMER- / MAKE &MODEL `-�+ 'b la -3a RAM WT �U LB. ACCESSORIES: HAMMER CUSHION, DIMENSIONS PILE DRIVING CAP., MAKETWT. PILE CUSHION, DIMENSIONS ADAPTER TYPE MANDREL DESCRIPTION DIMENSIONS FOLLOWER DESCRIPTION DIMENSIONS MATERIAL. LB. MATERIAL. WT. LB. WT. LB. ANVIL WT Cllr�r LB. STROKE RATED IN., MEASURED IN. ENERGY RATED ZO % FT -LB, DELIVERED FT -LB SPEED RATED I3L0WSWIN, MEASURED BLowsnmiN STEAM OR AIR PRESS., HAMMER BOILER BOUNCE CHAMBER PRESS., RATED MEASURED PILE: PILE NUMBER S UNIT WEIGHT -73 VERTICAL ✓ ELEVATION OF GROUND 3 / /, 'i- ELEVATION OF PILE TIP 30.5--5- JETTING PRESSURE & ELEVATIONS h.F P8F FX( Al/ATInN TYpE' ^��FTTINC�.zT LOCATION TYPE LB/FT DIMENSIONS CROSS-SECTIONAL BATTER 1 ON FT. ELEVATION OF CUT-0FF -?/3' FT. ELEVATION OF SPLICES n S EaAnA —+U 'ons n�v nolt���A�^ �IGL- f"P SVA -73 FT. FT. FT. DRIVING RESISTANCE FT NUMBER NUMBER OF BLOWS FT. NUMBER NUMBER NUMBER OF BLOWS FT. NUMBER BLOWS �' NUMBER OF BLOWS LAST FOOT BLOWS/IN. 1 6(4 21 41 61 S1 2 22 42 62 82 v V 3 23 43 63 83 ' -211 4 24 4,4 64 64 5 25 45 65 85 6 26 46 66 86 4" 7 27 47 67 87 8 28 48 68 88 1 -511 9 29 49 69 89 10 30 so 70 so -6 11 31 51 71 91 12 32 52 72 92 13 33 53 73 93 14 34 54 74 94 15 35 55 75 95 1s 36 56 76 96 -- 17 37 57 77 97 18 38 58 78 98 19 3s 59 79 ss' -1211 — 20 40 60 so ADO TIME: START TIME 2 6 FINISH DRIVING —p • s -c DRIVING TIME INTERUPTIONS (TIME, TIP ELEV. & REASON) REMARKS: ALIGNMENT, PLUMBNESS, WATER, CLEANNESS, CONCRETING, DELAYS AND UNUSUAL DRIVING. .-...... vu� r_rn u Gul Fl D003. F GEOTEGHN/OLOGYIRONMENTAL SEINC.ENGINEERINVICES PILE DRIVING ST. LOUIS KANSAS CITY INOIANAPOUS JOB NO. PROJECT NAMEC c- C CONTRACTOR ?oRINSON DATE I l (o l PREPARED BY. RECORD A U c_ I FT S 1141, HAMMER: ACCESSORIES: / I�c �'� HAMMER CUSHION, DIMENSIONS MATERIAL. NUMBER FT. OF BLOWS MAKE & MODEL y 121 LB. RAM WT. ZBZQ LB. PILE DRIVING CAP., MAKE WT. 2 ANVIL WT 6 LB. PILE CUSHION, DIMENSIONS MATERIAL. Id STROKE RATED IN., MEASURED IN. ADAPTER TYPE , WT. LB. 83 ENERGY RATED Zplb-1l FT -LB, DELIVERED FT -LB MANDREL DESCRIPTION 44 64 84 SPEED RATED BIAWS/MIN, MEASURED BLOWS/M(N DIMENSIONS WT. LB. STEAM OR AIR PRESS., HAMMER BOILER 8 FOLLOWER DESCRIPTION 46 66 86 ' 4" BOUNCE CHAMBER PRESS., RATE//D MEASURED DIMENSIONS , WT. LB. 87 PILE: PILE NUMBER t0 LOCATION a�- TYPE -I1PIC/X-23 68 88' - 511 -73 LBIFT DIMENSIONS CROSS-SECTIONAL 69 UNIT WEIGHT ' v.�ffR T(C AL 30 50 VERTICAL L�-- 90 BATTER 1 ON 3/3 11 FT. ELEVATION OF GROUND 3//-57 FT. ELEVATION OF CUT-OFF 711 12 32 ELEVATION OF PILE TIP -S05-'57 FT. ELEVATION OF SPLICES fl -G FT. 33 JETTING PRESSURE & ELEVATIONS lil.G 73 93 14 34 54 74 94 , - 911 15 35 55 DRIVING RESISTANCE NUMBER NUMBER OF BLOWS FT' OF.BLOWS NUMBER FT' OF BLOWS NUMBER FT. NUMBER BLOWS NUMBER FT. OF BLOWS LAST FOOT BLOWSAN. 121 41 61 81 2 22 42 62 .82 Id 3 23 43 63 83 ' - 2" 4 24 44 64 84 5 25 45 65 85 ' - 311 8 26 46 66 86 ' 4" 7 27 47 67 87 - 8 28 48 68 88' - 511 9 29 49 69 ss ' 10 30 50 70 90 - 611 11 31 51 71 91 711 12 32 52 72 92 13 33 53 73 93 14 34 54 74 94 , - 911 15 35 55 75 95 16 36 56 76 96 ' - 1 011 17 37 57 77 97 18 38 58 78 98 19 39 59 79 99 ' - 1 211 20 40 60 80 100 TIME: STARTTIME /0•"5 FINISH DRIVING INTERUPTIONS (TIME, TIP ELEV. & REASON) /0 !% DRIVING TIME - REMARKS: ALIGNMENT, PLUMBNESS, WATER, CLEANNESS, CONCRETING, DELAYS AND UNUSUAL DRIVING. 7/ L % �y �F 7- To wA e A S W ES 7- - FAWAYNf-�F-0RMS%REL-7)oM R GEOTECHNOLOGY, INC. PILE DRIVING RECORD ENGINEERING A ENVIRONMENTAL SERVICES 5T. LOVIS KANSAS GN INDIAN MOUS JOB NO. 14006,0 • l/ /Y PROJECT NAME CA PS CONTRACTOR eo $l"S oN DATE—2 PREPARED BY pMI HAMMER: ACCESSORIES: MAKE & MODEL 'b�2 I / C -Ir -a HAMMER CUSHION, DIMENSIONS MATERIAL. RAM WT. a 9aLo LB, PILE DRIVING CAP., MAKE WT. LB. PILE CUSHION, DIMENSIONS MATERIAL. ADAPTER TYPE WT., LB. AtML WT (D') -U LB. STROKE RATED IN., MEASURED IN. ENERGY RATED ZU (,7 1. FT -LB, DELIVERED FT -LB MANDREL DESCRIPTION SPEED RATEDBLowsn/IN, MEASURED sw uow�M DIMENSIONS WT. LB. STEAM OR AIR PRESS., HAMMER BOILER FOLLOWER DESCRIPTION BOUNCE CHAMBER PRESS., RATED_ MEASURED DIMENSIONS , WT. LB. 6r TYPE ><�P X-3 PILE: PILE NUMBER / LOCATION UNIT WEIGHT -73 LB/FT DIMENSIONS CROSS-SECTIONAL VERTICAL ✓ BATTER 1 ON VE ''-7-(C "�' L ELEVATION OF GROUND 3 / �- S- FT. ELEVATION OF CUT-OFF__3 / 3 FT. ELEVATION OF PILE TIP 3�• FT. ELEVATION OF SPLICES N -A - FT. JETTING PRESSURE & ELEVATIONS DRIVING RESISTANCE NUMBER NUMBER FT. NUMBERFT. BLOWS FT. NUMBER NUMBER NUMBER NUMBER NUMBER BLOWS FT. NUMBER BLOWS OF BLOWS LAST FOOT BLOWS/IN. 1 aN21 41 61 81 62 82 2 22 42 3 23 43 63 83 4 24 44 64 84 5 -7 25 45 65 85 ' - 3" i 6 26 46 &G 86 ' 4" 7 27 47 67 87 - , _ 51f 8 28 48 68 88 29 49 6989 , C „ 30 50 F11 70 90 — V 31 51 7191-7„ 32 52 72 92 13 33 53 73 9314 34 54 74 94,_g„15 35 55 75 95 16 36 56 76 96 ' - 1 off 37 57 77 97 38 58 r1917 78 98 39 59 79 99 40 60 80 100 TIME: START TIME 11,00 FINISH DRMNG 1 - d S DRIVING TIME INTERUPTIONS (TIME, TIP ELEV. & REASON) REMARKS: ALIGNMENT, PLUMBNESS, WATER, CLEANNESS, CONCRETING, DELAYS AND UNUSUAL DRMNG. ST2A((rl--76 YC -0 lbTHP�E T '7 Foo r IIJ tito2TR So'/7N r „N e vr.,r-�rt�t7 M S1Fl E1D003. FF ENGINEERING SERN� . ST. LOUIS KANSAS CITY INDIANAPOLIS PILE DRIVING RECORD JOB N0.cf-6X2200. i /y _ PROJECT NAME A Af cr(r Apt) CA 4(FT ST • I CONTRACTOR i2o 3/N SoN DATE Z // (o / PREPARED BY SMS HAMMER: I \\ 1 MAKE- & MODEL �Q `� _-� J RAM WT. 2 020 LB. ACCESSORIES: HAMMER CUSHION, DIMENSIONS MATERIAL, PILE DRIVING CAP., MAKE WT. LB. PILE CUSHION, DIMENSIONS MATERIAL. ADAPTER TYPE WT. -LB. MANDREL DESCRIPTION DIMENSIONS WT. _LB. FOLLOWER DESCRIPTION DIMENSIONS , WT. LB. ANVIL WT. %ZO LB. STROKE RATED IN., MEASURED IN. ENERGY RATEDI FT-LB, DELIVERED FT-LB SPEED RATED—BLOWS/MIN, MEASURED BLOWSWIN STEAM OR AIR PRESS., HAMMER , BOILER BOUNCE CHAMBER PRESS., RATED MEASURED PILE: PILENUMBER 8 UNIT WEIGHT -73 VERTICAL f ELEVATION OF GROUND �- S- ELEVATION OF PILE TIP a 306. '5- JETTING PRESSURE & ELEVATIONS r,.- LOCATION I TYPE LB/FT DIMENSIONS CROSS-SECTIONAL / �4 `�x ��•� `� BATTER 1 ON vE P �l C rq c FT. ELEVATION OF CUT-OFF S / 3 FT. FT. ELEVATION OF SPLICES h • ti FT. DRIVING RESISTANCE NUMBER NUMBER FT.OF BLOWS FT.OF.BLOWS FT. NUMBER NUMBER NUMBER BLOWS FT. NUMBER BLOWS FT. OF BLOWS LAST FOOT BLOWSAN. 1 Wo (4 2141 61 81 1� v y 2 22 42 62 82 S - 3 23 43 63 83 ' - 2rr 4 24 44 64 64 s 2s 45 CIS 65 , _ 3.. 6 1 y S- Irl " 26 46 66 86 41r 7 27 47 67 87 8 28 48 68 88 ' - 5 1 9 29 49 69 89 ' 10 30 50 70 90 - 6r. 11 31 51 71 91 ' - 7u 12 32 52 72 92 13 33 53 73 93 ' - 8" 14 34 54 74 94 , 91r 15 35 55 75 95 - 16 36 56 76 96' - 1011 17 37 57 77 97 ' 18 38 58 78 98 - 1" 1 19 39 59 79 99 1' - 1211 20 40 60 80 100 TIME: START TIME 1:20 FINISH DRIVING Z 5 DRIVING TIME INTERUPTIONS (TIME, TIP ELEV. & REASON) REMARKS: ALIGNMENT, PLUMBNESS, WATER, CLEANNESS, CONCRETING, DELAYS AND UNUSUAL DRMNG. GEOTECHNOLOGY, INC. ENaINEERINa 8 ENVIRONM[MAL SERVICES ST. LOUIS KANSAS CITY INDIANAPOUS PILE DRIVING RECORD JOB NO. g00600- 1! r l Y PROJECT NAMECAP& G(ZAi'deAk-J e iFi s`r'A . CONTRACTOR 'P0 e3i N SON, DATE PREPARED � HAMMER: ( MAKE & MODEL l �3-� RAM WT Z�Zy LB. ACCESSORIES: HAMMER CUSHION, DIMENSIONS MATERIAL. PILE DRIVING CAP., MAKE WT. PILE CUSHION, DIMENSIONS MATERIAL. ADAPTER TYPE , WT. MANDREL DESCRIPTION DIMENSIONS WT. FOLLOWER DESCRIPTION DIMENSIONS WT. LB. LB. LB. LB. ANVIL WT. (a20 LB. STROKE RATED IN., MEASURED IN. ENERGY RATED2e FT -LB, DELIVERED FT -LB SPEED RATED B>_owsrMlN, MEASURED BUM-SWIN STEAM OR AIR PRESS., HAMMER BOILER BOUNCE CHAMBER PRESS., RATED MEASURED PILE: PILENUMBER UNIT WEIGHT 3 VERTICAL ELEVATION OF GROUND S ELEVATION OF PILE TIP 30p, JETTING PRESSURE & ELEVATIONS -*1 - a rr�r cz—�4�!erin � •rvpG: ? LOCATION C I TYPE LB/FT DIMENSIONS CROSS -SECTIONAL -LL --G- K(y�O" BATTER 1 ON FT. ELEVATION OF CUT-OFF 3 �� FT. ELEVATION OF SPLICES tl • a FT. DRIVING RESISTANCE NUMBER NUMBER FT. OF BLOWS FT. OF BLOWS FT. NUMBER NUMBER NUMBER OF BLOWS FT. OF BLOWS FT. OF BLOWS LAST FOOT BLOWS/IN. 1 (d•(/ 21 41 61 81 �yl� 2 22 42 62 82 3 23 43 63 ' -211 4 24 44 64 84 5 45 65 85 ' -311 " 6 26 46 66 86 ' 7 27 47 67 87 -411 8 28 48 68 88 9 29 49 69 89 10 30 50 70 90 - 611 CJ 11 31 51 71 91 12 32 52 72 92 13 33 53 73 93 14 34 54 74 94 15 35 55 75 95 36 56 76 96 37 57 77 97 38 58 F1917 7898 39 59 79 99 20 40 60 80 100 TIME: START TIME FINISH DRIVING DRIVING TIME INTERUPTIONS (TIME, TIP ELEV. & REASON) REMARKS: ALIGNMENT, PLUM BNESS, WATER, CLEANNESS, CONCRETING, DELAYS AND UNUSUAL DRIVING. FAWAYNEVORMS FRODOM F' � GEOTECHNOLOGY, INC. PILE DRIVING RECORD ENGINEERING & ENVIRONMENTAL SERVICES ST. LOUIS KANSAS CITY INOIANAPOUS JOB NO. yoaocic'? • 1 I 1 PROJECT NAMECf+pc U�QA.QOF.4 u L r� s I CONTRACTOR'Ro31 N SO N DATE 2/ / (O 1 PREPARED BY Des HAMMER: ACCESSORIES: MAKE & MODEL Df (1-- b I a 3 2- HAMMER CUSHION, DIMENSIONS MATERIAL. RAM WT. 20 2- Q LB. PILE DRMNG CAP., MAKE WT. PILE CUSHION, DIMENSIONS MATERIAL. LB. ANVIL WT. Co 2-0 LB. STROKE RATED IN., MEASURED IN. ADAPTER TYPE WT- LB. ENERGY RATED70, G� FT -LB, DELfVERED FT -LB MANDREL DESCRIPTION SPEED RATED BLOws1MIN, MEASURED BLOWSIMIN DIMENSIONS WT. LB. STEAM OR AIR PRESS., HAMMER , BOILER FOLLOWER DESCRIPTION BOUNCE CHAMBER PRESS., RATED MEASURED DIMENSIONS ''WT. LB. PILE: PILE NUMBER LOCATION TYPE -0'1V X -U- UNIT WEIGHT i3 LB/FT DIMENSIONS CROSS-SECTIONAL ( -�G " X V-6 VERTICAL BATTER 1 ON IJ E P T -IC FAL ELEVATION OF GROUND 3 - 5 FT. ELEVATION OF CUT-OFF 3 13 FT. ELEVATION OF PILE TIP 305- FT. ELEVATION OF SPLICES /1-ck. FT. JETTING PRESSURE & ELEVATIONS /I - - A GHU I AKY LUKILLINU. HULt DA DRIVING RESISTANCE NUMBER NUMBER NUMBER FT.OF,BLOWS FT. NUMBER NUMBER NUMBER FT. FT. LAST FOOT FT. BLOWS BLOWS BLOWS BLOWS BLOWSAN. 1 21 41 61 81 ( Nr 2 22 42 62 82 3 23 43 63 83 1-211 4 24 44 F6 64 84 5 25 45 ' 65 85 ' -311 26 46 66 86 I 7 IA&�y/69112" 27 47 67 87 _ 4.I 8 28 48 68 88 l-511 9 29 49 69 89 10 30 50 70 90 ' - 6" 11 31 51 71 91 , -711 12 32 52 72 92 13 33 53 73 93 ' - 81' 14 34 54 74 94 15 35 55 75 95 16 36 56 76 96 - 1011 17 37 57 77 97 18 38 58 78 98 19 39 59 79 99' - 1211- 2"20 20 40 60 80 100 TIME: START TIME 3 ' -5 FINISH DRIVING 3 3 5 DRIVING TIME INTERUPTIONS (TIME, TIP ELEV. & REASON) -- REMARKS: ALIGNMENT, PLUMBNESS, WATER, CLEANNESS, CONCRETING, DELAYS AND UNUSUAL DRIVING. �_ GEOTECHNOLOGY, INC. ENGINEERING A ENVIRONMENTAL SERVICES ST. LOus KANSAS CITY INDIMAPOUs PILE DRIVING RECORD JOB NO. C/cCo o - Ig PROJECT NAME CAP& C-i�'4P��Au L (F7 s� 1 CONTRACTOR ,o F -q NSON DATE Z X 1/0 PREPARED BY L," Ij HAMMER: fACCESSORIES: MAKE &MODEL -b a - �� RAM WT 2 ?,Z0 LB. HAMMER CUSHION, DIMENSIONS MATERIAL. PILE DRIVING CAP., MAKE WT. LB. PILE CUSHION, DIMENSIONS MATERIAL. ADAPTER TYPE WT. LB. MANDREL DESCRIPTION DIMENSIONS WT. LB. FOLLOWER DESCRIPTION DIMENSIONS , WT. LB. ANVIL WT. CO 20 LB. STROKE RATED IN., MEASURED IN. ENERGY RATED F -T -LB, DELIVERED FT -LB SPEED RATED BLOWS/MIN, MEASURED BLOWSJMIN STEAM OR AIR PRESS., HAMMER , BOILER BOUNCE CHAMBER PRESS., RATED MEASURED PILE: PILE NUMBER I 1 UNIT WEIGHT %3 VERTICAL ✓ ELEVATION OF GROUND 31(• S ELEVATION OF PILE TIP 3o-7 JETTING PRESSURE & ELEVATIONS ✓1 - a . LOCATION C TYPE -73 LB/FT DIMENSIONS CROSS-SECTIONAL 3• X y• (o BATTER 1 ON FT. ELEVATION OF CUT-OFF 3 i3 FT. FT. ELEVATION OF SPLICES fl - C;� FT, $T7kRY-DR T. DRIVING RESISTANCE FT NUMBER NUMBER OF BLOWS FT' OF,BLOWS �' NUMBER NUMBER NUMBER OF BLOWS �' OF BLOWS �' OF BLOWS LAST FOOT BLOWSIIN. 1 21 41 61 81 2 22 42 a 62 82� 3 23 43 63 83 _ 2 4 24 44 64 84 5 ss' 25 45 65 85 ' _ 3'f 6 26 46 66 86 ' 4 7 27 47 67 87 - 8 28 48 68 88 ' - 5 1 1 9 29 49 69 89 10 30 50 70 90 _ 6.. 11 31 51 71 91 7'• 12 32 52 72 92 13 33 `� 73 93 14 34 54 74 94 _ 9 15 35 55 75 95 16 36 56 76 96 ' -1011 101 17 37 57 77 97 18 38 58 78 98 19 39 59 79 99' - 12" 20 40 60 60 100 TIME: START TIME—'] FINISH DRIVING 4 • 2 S DRIVING TIME INTERUPTIONS (TIME, TIP ELEV. & REASON REMARKS: ALIGNMENT, PLUM BNESS, WATER, CLEANNESS, CONCRETING, DELAYS AND UNUSUAL DRIVING. ______ FAW AYNC,FORM S -1 El_D003. R GEOTEC&EWPO otaA SENA.ENGNEERING PILE DRIVING RECORD ST. LO VIS KANSAS GN INDIAN AF'OlJS PROJECT NAMEC4-pc JOB NO. oc'�G 09- l / l .CLr�.4R pERV ��Fi i I CONTRACTOR DATE PREPARED BY HAMMER: r ACCESSORIES: MAKE & MODEL �e\Fz HAMMER CUSHION, DIMENSIONS MATERIAL. RAM WT. 2 82t) LB. PILE DRIVING CAP., MAKE WT. LB. ANVIL WT (/ ZO LB. PILE CUSHION, DIMENSIONS MATERIAL. STROKE RATED IN., MEASURED IN, ADAPTER TYPE WT.. LB. ENERGY RATEDW_ ( FT -LB, DELIVERED FT -LB MANDREL DESCRIPTION SPEED RATED BLOws/MIN, MEASURED BLowsnliN DIMENSIONS WT. L8. STEAM OR AIR PRESS., HAMMER , BOILER FOLLOWER DESCRIPTION BOUNCE CHAMBER PRESS., RATED MEASURED DIMENSIONS , WT. LB. PILE: PILENUMBER Z LOCATION IE7 4 TYPE HPIVX-73 UNIT WEIGHT LB/FT DIMENSIONS CROSS-SECTIONAL ! 3• x !�I•Co� VERTICAL ✓ BATTER 1 ON VCP- ICA L ELEVATION OF GROUND 3 �- FT. ELEVATION OF CUT-OFF 3 3 FT. ELEVATION OF PILE TIP ��8 FT. ELEVATION OF SPLICES - FT. I JETTING PRESSURE & ELEVATIONS n-0 . _ � ROTARY DRILLING DRIVING RESISTAt4CE NUMBER OF BLOWS FT' NUMBER NUMBER OF BLOWS FT' OF BLOWS NUMBER FT. NUMBER BLOWS NUMBER FT. NUMBER BLOWS LAST FOOT BLOWS/IN. 1 21 41 61 81 2 22 42 62 82 3 23 43 63 83 - 2`1 4 24 44 64 84 s 6 2s 26 , 4s 46 66 85 86 1 - �].7 II ' - 41I 7 27 47 67 87 s 28 48 68 88 ' - 5 1 I 9 29 49 69 89 `- 10 30 50 70 90 6n 11 31 51 71 91 ' - 711 1 2 32 52 72 92 13 33 53 73 93 , _ 81' 34 54 74 94 35 55 75 95 36 56 76 96 ' - 1 01I f2O 37 57 77 97 38 58 78 98 39 59 79 99 ` - 1211 40 60 60 100 TIME: START TIME FINISH DRIVING DRIVING TIME INTERUPTIONS (TIME, TIP ELEV. & REASON) REMARKS: ALIGNMENT, PLUMBNESS, WATER, CLEANNESS, CONCRETING, DELAYS AND UNUSUAL DRMNG. T / (- T I !� /e o T N O R T -H �S a cl ] fJ 3�Q �FO D'T Td wvA iP- D) \MeP 7 , F \WAYNEIFORMS'FRELDOOJ FF GEOTEC&ENONOGA SEaN�.ENGINEE PILE DRIVING RECORD ST. LOVAS KANSAS CRY INOIANAPOUS JOB NO. -/Uo762 of 1 Ni PROJECT NAMEC G-IRAPACA0 CZFT STA- I CONTRACTOR 7 o B, SIS 0"DATE z / I (o ( PREPARED BY HAMM ACCESSORIES: MAKE & MODELHAMMER �===::;�LB. CUSHION, DIMENSIONS MATERIAL. RAM WT PILE DRIVING CAP., MAKE WT. PILE CUSHION, DIMENSIONS MATERIAL. ZAP E WT. AD LB. LB. ANVIL WT. STROKE RATED IN., MEASURED IN. ENERGY RATED FT -LB, DELIVERED FT -LB MANDREL DESCRIPTION--_ SPEED RATED BLOWSn+N, MEASURED ILOWSMN DIMENSIONS LB. STEAM OR AIR PRESS., HAMMER BOILER FOLLOWER DESCRIPTION BOUNCE CHAMBER PRESS., RATED MEASURED DIMENSIONS WT. LB. U� �� 21 D D5 E Ez,PE PILE: PILE NUMBER LOCATION UNIT WEIGHT LB/FT DIMENSIONS CROSS-SECTIONAL VERTICAL BATTER 1 ON ELEVATION OF GROUND FT. ELEVATION OF CUT -OFF -FT. ELEVATION OF PILE TIP FT. ELEVATION OF SPLICES FT. , JETTING PRESSURE & ELEVATIONS j PRE -EXCAVATION TYPE: Ei JETTING, Ei AUGERING, [] ROTARY DRILLING: HOLE DIA IN., DEPTH -FT. DRIVING RESISTA-NCE NUMBER NUMBER �' �' �' NUMBER NUMBER NUMBER �' OF BLOWS �' OF BLOWS LAST FOOT BLOWS/IN. OF BLOWS OF.BLOWS OF BLOWS 1 21 41 61 81 2 22 42 62 82 3 23 43 63 63 2" 4 44 64 84 5 25 45 65 85 ' -31( 6 26 46 6686 ' 4" 7 27 47 67 87 - 828 68 88 11 1 -511 `J 9 29 49 59 C 11 10 30 50 70 90 _ V 11 31 51 91 ' - 711 12 32 52 72 92 13 33 53 73 93 ' - 811 14 34 54 74 15 35 55 75 95 16 36 56 76 96 ' - 1 011 17 37 57 77 97 18 38 58 78 98 19 39 59 79 99 20 40 60 t 80 100 1 TIME: START TIME FINISH DRIVING DRIVING TIME INTERUPTIONS (TIME, TIP ELEV. & REASON) REMARKS: ALIGNMENT, PLUMBNESS, WATER, CLEANNESS, CONCRETING, DELAYS AND UNUSUAL DRIVING. FS I /-a T o c t AT A,'(- r c, T ! 7Z,!- ,' -7-FT L7ES!(�/ PlL�I D E6ETc-o -t -r�EJF �oc/� T�oxts. FIELD ORDER FIELD ORDER NO: LS -12 PROJECT NO: L13328 DATE: May 23, 2001 This form is to be used only for emergency instructions to a contractor where the time requires for prcEaauvu xulu �,..,.,-- a formal Change Order would result in delay or stoppage of the work, in accordance with Articles 1.19 and 9.5 of the General Conditions of the Contract. PROJECT: Lift Stations and Force Main Cape Girardeau Sanitary Sewer Improvement Program TO CONTRACTOR: Robinson Construction Co. CONTRACT DATE: June 27, 2000 You are hereby authorized to make the following changes in your contract for the above project: Cast 4,000 p.s.i. concrete collars around field modified (enlarged) pipe openings in the precast concrete Wet Well and Valve Vault at Lift Station No. 4. The concrete collars shall be a minimum of (five) 5" thick around the exterior circumference segment of each structure's pipe penetration and shall have a minimum height and width that will provide six (6) inches of concrete beyond the field enlarged openings horizontally and vertically. Number 5 rebar dowels shall be installed according to the attached sketches/data prepared by the Project Engineer, P.K. Mathai and dated May 23, 2001. This Field Order is issued as a corrective measure for the unauthorized enlargement of pipe openings. The pipe openings as cast by the Contractor's supplier did not match the elevation of pipe as shown on the contract drawings and approved submittals. The foregoing field order is issued in accordance with Section 9.5 of the Contract and does not involve an adjustment in the contract price or the contract times and is compatible with the design concept of the completed project as a functioning whole as indicated by the contract documents. FOR R THE ENGINEER TTY OF CAPE EAU FOR THE CONTRACTOR DISTRIBUTION: City of Cape Girardeau Engineer Contractor Inspector L3328-12.33ah.doc 05/23/01 10:54 U314 770 5113 SVERDRUP EN1' ll1V Iz•-o' n•-o• 2a' r 2+• ALUNaIUM 71-d WS*E O.AWETER KArCN LAODEF d-O. e.-aOC DSA k-TER VALVE MT PRECAST LFT STATION PRECAST CONCRETE PPE 8. CHECK CONCRzn PIPE VALVE (T'M.) E4- rLEXIME XPANSM JOINT PPE SUPPORT,• VENT (TYSCAL) ♦; MECH. CPLC. _ . (TAP. S PLCS.) A X aS HATCH 0�'r 16002 wAM/FACT6Pt&S RCUAROANT 05/23/01 10:55 SVERDRUP JOB --.- V314 770 5113 SVERDRUP ENV DIN' COMPUTATIONS FOR SHEET NO. __-_---- 0F._____�r_ -- DATE -- BY U003 i• U003 5/23/01 10:56 + OVAL ITy V314 770 5113 C CprpnON adur 3t, Hi Gel, is a 2-compo- �nt. t00% solids, moisture -tolerant, gn-modulus, high-strength, structural rroxypaste adhesive. Itconforms tc the cLrrent ASTM C-881 and AASHTO M- .35 specifications. WHERE TO USE Structural bonding of concrete, ma- sonry, metals, wood, etc. to a maxi- mum glue line of 1/8 in. Grout bolts, dowels, pins, vertical and overhead, etc. • Seals cracks and around injection pores prior to pressure -injection grout- ing. Interior, vertical, and overhead repair otconcrete as an epoxy mortar binder. As a pick -proof sealant around vAn- dows, doors, lock -ups etc. inside cor- rectional facilities. ADVANTAGES • Tolerant of moisture before, during, and after cure. . High -modulus, high-strength, struc- tural paste adhesive. • Excellent adhesion to concrete, ma- sonry, metals, wood, and most struc- tural materials. • Paste consistency ideal for vertical and overhead applications. • Fast -setting and strength -producing adhesive. • Convenient easy mix ratio A:B=2:1 by volume. • Potable -water approved. • USDA -approved for use in food plants. COVERAGE 1 gal. yields 231 cu. in. of epoxy paste adhesive and grout. 1 gal. mixed with 1 gal. by loose volume Of oven -dried aggregate yields approxi- mately 346 cu. in. of epoxy mortar. PACKAGING 3 -gal. units, 12-fi-oz. units, 12/case. S1'RRDR[JP END i \ _ tµJ U U 4 1/97 Sikadur® 31, Hi -Mod Gel High -modulus, high-strength, structural, epoxy paste adhesive TYPICAL •, •- • •r IMaterial and coring conditions @ 73F (23C) and 507. R.H.) SHELFLIFE 2 years in original, unopened containers STORAGE Storedryat40-95F(4-35C).Conditionmateria lto65-75Fbefore CONDITIONS using. COLOR Concrete gray. MIXING RATIO Component'A' : Component'B' - 2:1 by volume. CONSISTENCY Non -sag paste. POT LIFE Approximately 30 minutes 0 73F. (60 gram mass) TACK-FREET/ME 2-3 hours. TENSILE PROPERTIES (ASTM D-639) 14 day Tensile Strength 3,600 psi (24.8 MPa) Elongation at Break O.4% Modulus of Elasticity 7.5 X 101 psi FLEXURAL PROPERTIES(ASTit1 D-790) 14day Flexural Strength (Modulus of Rupture) 4,400 psi (30.3 MPa) Tangent Modulus of Elasticity in Bending 1.0 X 106 psi SHEAR STRENGTH(ASTM D-73.2) 14 day Shear Strength 3,400 psi (23.4 MPa) BOND STRENGTH (ASTM C-882): Hardened Concrete to Hardened Concrete 2 day (moist cure) Bond Strength 2,300 psi (15.9 MPa) 14 day (moist cure) Bond Strength 2,400 psi (16.6 MPa) 2 day (dry cure) Bond Strength 3,300 psi (22.7 MPa) DEFLECTION TEMPERATURE(ASTM D-648) T day Def lection Temperature 128F (fiber stress loading = 264 psi) WA TER ABSORPTION (ASTM D-570) 24 hour Total Water Absorption 0.79% COMPRESS/VEPROPERTIES (ASTM D-695) Compressive Strength, psi 4OF 73F 90F 2 hour - 900 (6.2 MPa) 4 hour 140 (0.9 MPa) 5,400 (37.2 MPa) 8 hour - 6,800(46.9MPa) 8.800 (60.7 MPa) 16 hour 400 (2.8 MPa) 9,600 (66.2 MPa) 10,100 (69.7 MPa) 1 day 3,900 (26.9 MPa) 9,800 (67.6 MPa) 11,700 (80.7 MPa) 3 day 6,700 (46.2 MPa) 11,300 (77.9 MPa)11,900 (82.1 MPa) 7 day 9,100 (62.8 MPa) 12,000 (82.8 MPa) 13,000 (89.7 MPa) 14 day 10.400 ( 71.7 MPa)12, 000 (82.8 MPa) 13,000(89.7 MPa) 28 day 11,200 (77.2 MPa)12,000 (82.8 MPa) 13,00(89.7 MPa) MODULUS OFELASTTCtTY, PSI 7 day 3.9 X 105 24.3 FIELD ORDER FIELD ORDER NO: LS -13 PROJECT NO: L13328 DATE: May 30, 2001 This form is to be used only for emergency instructions to a contractor where the time required for preparation and execution of a formal Change Order would result in delay or stoppage of the work, in accordance with Articles 1. 19 and 9.5 of the General Conditions of the Contract. PROJECT: Lift Stations and Force Main Cape Girardeau Sanitary Sewer Improvement Program TO CONTRACTOR: Robinson Construction Co. CONTRACT DATE: June 27, 2000 You are hereby ordered to make the following changes in your contract for the above project: Remove all visible oil, dirt, grout residue and loose paint from Lift Station No. 1 Wet Well walls by compressed air nozzle blasting (SSPC-SP7/NACE 4 Brush-off Blast Cleaning). Tightly adherent patch grout and paint may remain on the substrate if they cannot be removed by lifting with a putty knife. Perform all work in accordance with the previously referenced standards of the Steel Structures Painting Council (SSPC) and the National Association of Corrosion Engineers (MACE). Notify the undersigned Engineer's Representative for inspection after blasting and clean-up (prior to coating). REASON FOR FIELD ORDER: The painting contractor did not perform satisfactory surface preparation work prior to applying the epoxy first coat to the wet well walls. Cross Hatch Adhesion Tests performed by the Engineer's Representative on May 29, 2001, failed severely. See attached copy of test tape. The foregoing field order is issued in accordance with Section 9.5 of the Contract and does not involve an adjustment in the contract price or the contract times and is compatible with the design concept of the completed project as a functioning whole as indicated by the contract documents. THE ENGINEER FO HE CITY OF CAPE IRARDEAU FOR TOf CONTRACTOR DISTRIBUTION: City of Cape Girardeau Engineer Contractor Inspector L3328-12.33aj.doc CF S�� STr2(� lE S�pC pF C�c, AT1ti C, r 1REScLLT5 of ADNES16t1 TEST L1F7i STA TIo,,-I tip, 2 — �2oJ�CT 1L133Zg CAPE G1Q.A217EALk SAN,-ra 2y Sc WC2 /MPRvVEMEn� 1 �2oGRFlM MR'J 2 Q Z c O l �y : ,/o t1 ts R. i3c jt jETT Y�P�SE> SIDE (Instructions on reverse side) CHANGE ORDER PROJECT Lift Stations and Force Main No. LS -04 (FINAL) DATE OF ISSUANCE E1U11 d IbNC [11R�R_FSOIIrZPFC OWNER City of Cape Girardeau Missouri APR 1 i 2002 OWNER's Contract No. 3521 Lift Stations and Force Main CONTRACTOR Robinson Mechanical Contractors, Inc. ENGINEER Sverdrup Civil Inc. d b a Robinson Construction Company You are directed to make the following changes in the Contract Documents: Description: Increase the Contract Price and modify the Contract Documents to incorporate the changes set forth in the attached Work Change Directives and Field Order. Adjust unit price items to actual quantities installed as detailed in Attachment 1. Utilize Remedial Funds placed in Escrow on November 6, 1997. Reason for Change Order: Change in Contract Price is due to actual quantities of vi i'k performed and/or authorized by the attached Work Change Directives. Attachments: List of Additions and Deletions, Work Change Directive Nos. LS -08 through LS -10, Field Order No. LS -14 and Agreement to Utilize Remedial Funds dated December 4, 2001. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times Substantial Completion: 425 Calendar days $ 4,899,665.00 Ready for final payment: 455 Calendar days days or dates Net changes from previous Change Orders No.LS-01 to No.LS-03 Net change from previous Change Orders No.LS-01 to No.LS-03 $ + 25 411.72 122 Calendar days days Q Contract Price prior to this Change Order Contract Times prior to this Change Order Substantial Completion: 547 Calendar days $ 4,925,076.72 Ready for final payment: 577 Calendar days days or dates Net Increase () of this Change Order Net Increase (decrease) of this Change Order $ 373.41 - days Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion: 547 Calendar days $ 4,925,450.13 eady for final payment: 577 Calendar days days or dates RECOMMENDED: APPROV ACCEPTED: BY: B BY: Engineer (Authorized Signature) er Michael G. Miller, City Manager Contractor (Authorized Signature) Date: T'/ ��y'` Date: 2 r— b Z—_ s Date: EJCDC No. 1910-8-B (1990 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America L3328 -12.42g CHANGE ORDER INSTRUCTIONS A. GENERAL INFORMATION This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into a subsequent Change Order if they affect Contract Price or Times. Changes that affect Contract Price or Contract Times should be promptly covered by a Change Order. The practice of accumulating change order items to reduce the administrative burden may lead to unnecessary disputes. If Milestones have been listed any effect of a Change Order thereon should be addressed. For supplemental instructions and minor changes not involving a ch?.nge in the Contract Price or Contract Times, a Field Order may be used. B. COMPLETING THE CHANGE ORDER FORM Engineer initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from Owner, or both. Once Engineer has completed and signed the form, all copies should be sent to Contractor for approval. After approval by Contractor, all copies should be sent to Owner for approval. Engineer should make distribution of executed copies after approval by Owner. If a change only applies to Contract Price or to Contract Times, cross out the part of the tabulation that does not apply. ATTACHMENT 1 CHANGE ORDER NO. LS -04 (FINAL) TO CONTRACT NO. 3521 LIFT STATIONS & FORCE MAIN PROJECT CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM LIST OF ADDITIONS AND DELETIONS The following changes are hereby made to the Contract Documents: ADD: AMOUNT A. Remove and replace a 7 -inch thick by 20 ft. wide by 20 ft. long section of P.C.C. Pavement, in accordance with Work Change Directive No. LS -08, dated October 18, 2001 +$1,555.56 B. Install a float switch complete with control panel modifications at Lift Station No. 1, in accordance with Work Change Directive No. LS -09, dated November 20, 2001 + 1,275.35 C. Install one (1) sewer service lateral reconnection (Bid Item G), in accordance with Work Change Directive No. LS -10, dated November 30, 2001 + 1,514.00 D. Fill 30 -inch pipe from LS4MH-B1 to existing 60 -inch storm sewer with fly ash slurry. Adjust the quantities of Bid Item H.2.b from 110 L.F. to 130 L.F. with additional footage over the original contract amount: 20 lineal ft. at $13.00 per L.F. = + 260.00 DELETE: E. Bid Item D.1, 24 -inch Storm Sewer Pipe is decreased to 325.5 lineal feet with a reduction of footage below the original contract amount: 6.5 lineal ft. at $59.00 per L.F. = (383.50) F. Bid Item E.5, Manholes with Air Valves is decreased from 9 each to 8 each. Re-routing of Force Main from Station 76+42 to 81+46 eliminated the need for Combination Air Valve No. 4. Reduction of quantities below the original contract amount: One (1) each at $2,788.00 ea. _ (2,788.00) G. Bid Item H. La, Pipe and Manhole Abandonment — Sewer and Force Main Plugs 6" — 12" Pipe is decreased from 33 each plugs to 23 each plugs. Reduction of quantities below the original contract amount: Ten (10) each at $106.00 ea. = (1,060.00) TOTAL INCREASE IN CONTRACT PRICE: S 373.41 L3328 -12.42g ATTACHMENT 1 CHANGE ORDER NO. LS -04 (FINAL) TO CONTRACT NO. 3521 LIFT STATIONS & FORCE MAIN PROJECT CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM LIST OF ADDITIONS AND DELETIONS Note: 1. Also attached is Field Order No. LS -14 directing the Contractor to over -excavate soft soil in the bottom of Lift Station No. 3 Wet Well excavation and backfill with clean compacted sand with no change in contract price or contract time. 2. Agreement to Utilize Remedial Funds, dated December 4, 2001, will compensate the Owner for defects defined on Page 2 of the agreement. (See attached copy.) EJCDC No. 1910-8-B (1990 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America L3328-12.428 CHANGE ORDER . •1 (Instructions verse side) No. LS -04 (FINAL) PROJECT Lift Stations and I+brce Main DATE OF ISS ANCE EFFECTIVE DATE OWNER Ci otC a Girardeau Missouri OWNER's Contract No. 3521 Lift Stations and Force Main CONTRACTOR Robinson Mechanical Contractors, Inc. ENGINEER Sverdrup Civil, Inc. d b a Robinson Construction Company You are directed to make the following changes in the Contract Documents: Description: Increase the Contract Price and modify the Contract Documents to incorporate the changes set forth in the attached Work Change Directives and Field Order. Acutist unit price items to actual quantities installed as detailed in Attachment 1. Utilize Remedial Funds placed in Escrow on November 6, 1997. Reason for Change Order: Change in Contract Price is due to actual quantities of work performed and/or authorized by the attached Work Change Directives. Attachments: List of Additions and Deletions, Work Change Directive Nos. LS -08 through LS -10, Field Order No. LS -14 and Agreement to Utilize Remedial Funds dated December 4, 2001. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times Substantial Completion: 425 Calendar days $ 4,899,665.00 Ready for final payment: 455 Calendar days days or dates Net changes from previous Change Orders No.LS-01 to No.LS-03 Net change from previous Change Orders No.LS-01 to No.LS-03 $ + 25 411.72 122 Calendar days days Contract Price prior to this Change Order Contract Times prior to this Change Order Substantial Completion: 547 Calendar days $ 4,925,076.72 Ready for final payment: 577 Calendar days days or dates Net Increase () of this Change Order Net Increase (decrease) of this Change Order $ 373.41 -0- days Contract Price with all approved Change Orders C tract Times with all approved Change Orders Substantial Completion: 547 Calendar days $ 4,925,450.13 Ready for final payment: 577 Calendar days days or dates RECOMMENDED: APPR ED: ED: BY:;4. se (f (/C�/� BY: Engineer (Authorized Signature) Owner Michael G. Miller,�CityMan�agcr Contractor ( uthorized Signature) Date: 9� � 0't-- Date: S Date: EJCDC No. 1910-8-B (1990 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America L3328 -12.42g ' A ATTACHMENT 1 CHANGE ORDER NO. LS -04 (FINAL) TO CONTRACT NO. 3521 LIFT STATIONS & FORCE MAIN PROJECT CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM LIST OF ADDITIONS AND DELETIONS The following changes are hereby made to the Contract Documents: :11 A. Remove and ::;place a 7 -inch thick by 20 ft. wide by 20 ft. long section of P.C.C. Pavement, in accordance with Work Change Directive No. LS -08, dated October 18, 2001 B. Install a float switch complete with control panel modifications at Lift Station No. 1, in accordance with Work Change Directive No. LS -09, dated November 20, 2001 C. Install one (1) sewer service lateral reconnection (Bid Item G), in accordance with Work Change Directive No. LS -10, dated November 30, 2001 D. Fill 30 -inch pipe from LS4MH-B 1 to existing 60 -inch storm sewer with fly ash slurry. Adjust the quantities of Bid Item H.2.b from 110 L.F. to 130 L.F. with additional footage over the original contract amount: 20 lineal ft. at $13.00 per L.F. = DELETE: E. Bid Item D.1, 24 -inch Storm Sewer Pipe is decreased to 325.5 lineal feet with a reduction of footage below the original contract amount: 6.5 lineal ft. at $59.00 per L.F. = F. Bid Item E.5, Manholes with Air Valves is decreased from 9 each to 8 each. Re-routing of Force Main from Station 76+42 to 81+46 eliminated the need for Combination Air Valve No. 4. Reduction of quantities below the original contract amount: One (1) each at $2,788.00 ea. _ AMOUNT +$1,555.56 + 1,275.35 + 1,514.00 + 260.00 (383.50) (2,788.00) G. Bid Item H. La, Pipe and Manhole Abandonment — Sewer and Force Main Plugs 6" — 12" Pipe is decreased from 33 each plugs to 23 each plugs. Reduction of quantities below the original contract amount: Ten (10) each at $106.00 ea. = (1,060.00) TOTAL INCREASE IN CONTRACT PRICE: S 373.41 L3328 -12.42g ATTACHMENT 1 CHANGE ORDER NO. LS -04 (FINAL) TO CONTRACT NO. 3521 LIFT STATIONS & FORCE MAIN PROJECT CAPE GIRARDEAU SANITARY SEWER IMPROVEMENT PROGRAM LIST OF ADDITIONS AND DELETIONS Note: 1. Also attached is Field Order No. LS -14 directing the Contractor to over -excavate soft soil in the bottom of Lift Station No. 3 Wet Well excavation and backfill with clean compacted sand with no change in contract price or contract time. 2. Agreement to Utilize Remedial Funds, dated December 4, 2001, will compensate the Owner for defects defined on Page 2 of the agreement. (See attached copy.) EJCDC No. 1910-8-B (1990 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America 13328-12.42g (Instructions on reverse side) WORK CHANGE DIRECTIVE PROJECT: L13328 Lift Stations and Force Main Sanitary Sewer Improvement Program DATE OF ISSUANCE: October 18, 2001 No. LS -08 EFFECTIVE DATE: October 18, 2001 OWNER:. City of Cape Girardeau, Missouri OWNER's Contract No.: 3521, Lift Stations and Force Main CONTRACTOR: Robinson Construction Co. ENGINEER: Sverdrup Civil, Inc. You are directed to proceed promptly with the following change(s): Description: Remove and replace a 7 -inch thick by 20 ft. wide by 20 ft. long section of Portland Cement Concrete Pavement immediately South of the pavement removed for construction of the gravity sewer for EXMH-SR19 to EXMH-SR20. Reconstruction of this pavement shall be in accordance with the City of Cape Girardeau Pavement Standards and Specification 02520 of this Contract. The above work shall be at a cost of $35.00 per sq. yd. X 44.444 sq. yd. = $1,555.56. Purpose of Work Change Directive: During construction of the gravity sewer from EXMH-SR19 to EXMH-SR20 it was observed that the 20 ft. X 20 ft. block of pavement developed cracks due to the deteriorated condition. This condition was beyond the control of the Contractor and warranted replacement. Attachments: Request for Proposal No. LS -06, Contractor's Proposal and City of Cape Girardeau Cost Index 2000-2001. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: ❑ Unit Prices ❑ Lump Sum ❑ Other Contractor's Proposals Estimated increase () in Contract Price $ 1,555.56 If the change involves an increase, the estimated amount is not to be exceeded without further authorization. RECOMMENDED: Method of determining change in Contract Times: ❑ Contractor's records ❑ Engineer's records ❑ Other Estimated increase (decrease) in Contract Times: Substantial Completion: N/A days; Ready for final payment: N/A days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. AUTHORIZED: Sverdrup Civil Inc. City of Cape Girardeau ENGINEER OWNER By. ow1� By: (Autho�igawdlurc) (Authorized Signature) L3328-12.34t.doc EJCDC No. 1910-8-F (1990 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America. DATE: October 10, 2001 PROJECT NO.: L13328 SVERDRUP CIVIL, INC. REQUEST FOR PROPOSAL City Project No.: 3521 PROJECT TITLE: Lift Stations and Force Main Sanitary Sewer Improvement Program Cape Girardeau, Missouri CONTRACTOR: Robinson Construction Company P.O. Box 388 Perryville, MO 63775 OWNER: City of Cape Girardeau, Missouri c/o City Engineer's Office 401 Independence Street Cape Girardeau, MO 63701 s R.F.P. No. LS -06 Proposals for each item of work, as described below, shall be in strict accordance with Article 1 U — CHANGES IN THE WORK of the General Conditions of the Contract. ITEM DESCRIPTION: Remove and replace a 7 -inch thick by 20 ft. wide by 20 ft. long section of Portland Cement Concrete Pavement immediately South of the pavement removed for construction of the gravity sewer for EXMH-SR19 to EXMH-SR20. Reconstruction of this pavement shall be in accordance with the City of Cape Girardeau Pavement Standards and Specification 02520 of this Contract. Authorized by: Requested by: CD62-1= le Mark ster R Bennett City Engineer Resident Project Rep. odghw: Co*=Wr Copy: Construction Inspedor & Project En&W 2 32$4"5L&0W1 Robinson Construction "Delivering Experience" 2411 Walters Lane Perryville, Missouri 63775 October 11, 2001 Mr. John Bennett Sverdrup Civil, Inc. 401 Independence Stree - P.O. Box 1604 Cape Girardeau, MO 63702-1604 Re: Lift Stations Et Force Main Project Cape Girardeau, MO Dear John, Reference is made to your Request for Proposal No. LS -06 dated October 10, 2001. In accordance with your request, the lump sum price to remove and replace a 7 -inch thick by 20 ft. wide by 20 ft. long section of Portland Cement Concrete Pavement is $1555.56. Your consideration of this proposal will be greatly appreciated. Sincerely, ROBINSON CONSTRUCTION COMPANY Chris Cissell Assistant Project Manager SvCv FiE't�D oFFicE o 573-547AM7 f 573.547.8398 71' a 90 www.rob insoncons truction.com RAConstruction\job files\430 - Cape Lift Stations iY Force Main\01A - Change Orders\430 letter to john re rfp 1s-06 10-11-01.doc 11 2000-2001 Cost Index UNIT OLD COST REVISED COST LOW COST HIGH COST AVERAGE AVERAGE AVERAGE Street Section 4" SIDEWALK SY $27.73 $25.14 $22.35 $30.74 6" INTEGRAL CURB LF $3.27 $2.18 $1.70 $3.67 6" P.C.C. TRAFFIC ISLAND SY $25.00 $36.54 $23.08 $50.00 8" COMBINED UPRIGHT P.C.C. CURB AND GUTTER LF $9.00 8" INTEGRAL CURB LF $4.50 $3.81 $1.71 $8.00 8" P.C.C. PAVEMENT WITH 6" INTEGRAL CURB SY $23.50 ADJUST MANHOLE EA $250.00 $296.57 $236.00 $507.50 ADJUST WATER/GAS GUARDS EA $100.00 $59.38 $35.00 $100.00 AGGREGATE BASE 4" SY $2.64 $3.38 $2.36 $4.27 ASPHALT TON $35.31 $46.45 $38.79 $57.17 ASPHALT OVERLAY SY $22.09 ASPHALT PAVEMENT 10" SY $14.50 BORROW CY $7.00 BORROW, COMPACI ED IN PLACE CY $153.00 CLEARING & GRUBBING ACRE $4,917.58 $4,584.06 $2,130.00 $7,038.12 COMBINATION CURB & 6" GUTTER LF $13.75 $19.63 $15.50 $21.00 COMPACTION OF EMBANKMENT CY $4.63 CONCRETE CY $51.25 CONCRETE 4 HOUR M!X CY $112.20 $141.70 $66.10 $156.82 CONCRETE MEDIAN SY $46.63 CONCRETE REMOVAL SY $18.20 $15.28 $10.09 $23.43 CURB RAMP EA $490.90 $511.50 $369.17 $725.00 DEMOLITION & REMOVAL PAVEMENT SY $32.87 DRIVEWAY APPROACHES GRAVEL SY $9.50 DRIVEWAY APPROACHES P.C.C. SY $25.00 DRIVEWAY -6" P.C.C. SY $27.00 $27.26 $22.90 $31.38 EXCAVATION CLASS A CY $112.86 $118.33 $90.00 $175.00 EXCAVATION CLASS B CY $4.38 $4.45 $3.06 $6.26 EXCESS EXCAVATION CY $8.50 GRANULAR BACK FILL CY $23.25 GRAVEL TON $8.00 $9.00 $8.00 $9.50 GRAVEL SHOULDER -4" SY $2.75 GROUT FILL CY $150.00 LIQUID ASPHALT GAL $1.06 $1.65 $1.33 $2.02 MILLING SY $8.40 $11.93 $6.04 $20.75 P.C.C. PAVEMENT 6" SY $16.00 $22.63 $20.43 $24.82 P.C.C. PAVEMENT 7" SY $19.00 $21.78 $19.74 $25.30 P.C.C. PAVEMENT 8" SY $22.00 PAVEMENT DEMOLITION SY $2.00 .PAVEMENT FABRIC SY $1.32 $1.97 $1.45 $2.18 PAVEMENT LUG EA $3,856.25 PAVEMENT REPAIR SY $7.50 PREPARE SUBGRADE-TYPE If AGGREGATE TON $12.50 $14.40 $12.00 $19.20 REMOVE AND REPLACE CURB AND GUTTER LF $18.78 $16.60 $15.00 $19.00 REMOVE AND REPLACE ASPHALT PAVEMENT SY $68.66 REMOVE AND REPLACE PAVEMENT sy $61.38 $45.04 $35.00 $77.60 -4 C LTi COST ANIGcRA GE.S REMOVE AND REPLACE PAVEMENT & CURB LF $73.53 REMOVE CONC. AND REPLACE W/TEMP ASPHALT LF $75.47 REMOVE EXISTING CURB LF $8.50 $10.40 $10.00 $12.00 ROLLED CURB LF $2.92 STREET GRADING LF $2.81 $3.00 $2.50 $3.50 STRIPING LF $2.25 $0.84 $0.52 $1.47 SUBGRADE REPAIR SY $21.75 $28.22 $24.83 $35.00 SUBGRADE REPAIR (C.Y.) CY $94.80 $53.78 $35.20 $59.97 TACK GAL $1.50 $2.00 $2.00 $2.00 TRAFFIC CONTROL LS $3,277.78 $1,100.00 $750.00 $1,275.00 f, " WORK CHANGE DIRECTIVE No. LS -09 (Instructions on reverse side) PROJECT: L13328 Lift Stations and Force Main Sanitary Sewer Improvement Program DATE OF ISSUANCE: November 20, 2001 OWNER:. City of Cape Girardeau, Missouri OWNER's Contract No.: 3521, Lift Stations and Force Main CONTRACTOR: Robinson Construction Co. EFFECTIVE DATE: November 20, 2001 ENGINEER: Sverdrup Civil, Inc. You are directed to proceed promptly with the following change(s): Description: Furnish all parts, labor, equipment and appurtenances to install a float switch complete with control paneTmodifications a redundant float switch control through the Universal Pump Controller all to allow the Lift Station No. 1 control panel to operate as as described in the attached documents. Purpose of Work Change Directive: This proposed change will provide redundant control to prevent a sanitary sewer overflow in the event of a primary sensor failure. Attachments: Request for Proposal No. LS -07, Contractor's Proposal dated November 14, 2001 and the proposal from Vandevanter Engineering dated November 9, 2001. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: ❑ Unit Prices ❑ Lump Sum ® Other Contractor's Proposal Estimated increase () in Contract Price: $ 1275.35 If the change involves an increase, the estimated amount is not to be exceeded without further authorization. RECOMMENDED: Method of determining change in Contract Times: ❑ Contractor's records ❑ Engineer's records ❑ Other Estimated increase (decrease) in Contract Times: Substantial Completion: -0- days; Ready for final payment: -0- days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. AUTHORIZED: Sverdrup Civil Inc. City of Cape Girardeau ENGINEER OWNER By: n By: -a-, 6�� ) (Authorized Signature) (Autho ' Signature) L3328-12.34v.da EJCDC No. 1910-8-F (1990 Edition) ts Committee and endotsod by The Associated General Contractors of America. prepared by the Engineers Joint Contract Documen DATE: October 30, 2001 PROJECT NO.: L13328 SVERDRUP CIVIL, INC,. REQUEST FOR PROPOSAL City Project No.: 3521 PROJECT TITLE: Lift Stations and Force Main Sanitary Sewer Improvement Program Cape Girardeau, Missouri CONTRACTOR: Robinson Construction Company P.O. Box 388 Perryville, MO 63775 OWNER: City of Cape Girardeau, Missouri c% City Engineer's Office 401 Independence Street Cape Girardeau, MO 63701 R.F.P. No. LS -07 Proposals for each item of work, as described below, shall be in strict accordance with Article 10 — CHANGES IN THE WORK of the General Conditions of the Contract. ITEM DESCRIPTION: Install an additional float switch in Lift Station No. 1 Wet Well at elevation 317.00 feet (Pump One off elevation). This float switch shall be a type "S" roto float manufactured by Anchor Scientific as submitted in Shop Drawing Submittal No. LS -19. The float switch shall be wired to the Model No. 11436 Universal Pump Controller to serve as a "float backup" as described in paragraph 3.3.3 of Specification Number DS 114361 published by the Pump Controller manufacturer, Digital Control Corporation. The controller shall operate in accordance with the previously referenced paragraph 3.3.3 by calling the lead pump when the high float is activated. After delay, if the high float is still under water, then the next pump will be called This will continue until all available pumps are on or until the high float is out of the water. When the level is pumped down to the off float all pumps will stop. It is the intention of this proposed change to provide redundant control to prevent a sanitary sewer overflow in the event of a primary sensor failure. The completed installation shall function as described paragraph 3.3.3 of Specification Number DS 11436I. Authorized by: Requested by: iC , Mar sten Jo R Bennett City Engineer Resident Project Rep. Od&aL. Coaft"" Copy. Can*uctiw RMveW & Projat Eagiaar ? t IG t. Robinson Construction "Delivering Experience" 2411 Walters Lane Perryville, Missouri 63775 November 14, 2001 Mr. John Bennett Sverdrup Civil, Inc. 401 Independence Street Cape Girardeau, MO 63701 Re: Lift Stations Et Force Main Project Sanitary Sewer Improvement Program Cape Girardeau, Missouri Dear Mr. Bennett: Reference is made to your Request for Proposal No. LS -07 dated October 30, 2001. In accordance with your request, I propose the following price changes to account for the necessary modifications to the Lift Station No. 1 Control Panel to create a redundant control system: Installation of 1 additional float switch including all necessary control panel modifications X1,109.00 Total Cost Impact - Supplier Cost $1,109.00 15% Contractor's Fee Per General Condition 11.6.2.1 � 166.35 Total Price Change this Proposal $1,275.35 I have also attached a copy of Vandevanter's Proposal No. VE -110901. Your consideration of this proposal will be greatly appreciated. Sincerely, ROBINSON CONSTRUCTION COMPANY Chris Cissell Assistant Project Manager HD[E CO)EN L2 SvC✓ FiF�D OrFiC L332 S ' 10.3' o 573.547.8397 f 573.547.8398 www.robinsonconstruction.com R:\Construction\job files\430 - Cape Lift Stations Et Force Main\01A - Change Orders\430 proposal to john bennett re rfp Ls -07 11.14.01.doc �-VANDEVANTER ENGINEERING a division of Lee Mathews Equipment November 9, 2001 _ .. PROPOSAL NO. VE -110901 r� - Mr. Chris Cissell ROBINSON CONSTRUCTION CO. P.O. Box 388 Perryville, MO 63775 6 NOV I 3 2001 J "u, ' J I SUBJECT: CAPE GIRARDEAU, MO - MODIFICATIONS TO LIFT STATION #1 CONTROL PANEL Dear Chris: We are pleased to provide our quotation on the following equipment for the above -referenced project in response to R.F.P. No. LS -07: ONE (1) Lump Sum of parts and labor, to allow the Lift Station #1 control panel to operate as -a redundant float switch control panel.- Labor will be performed by personnel from the control panel manufacturer to enable a like -new warranty to be provided. Materials to be provided include wire, float switch, intrinsically -safe barrier, terminal strip and new as -built drawings. Work will be performed on site in Cape Girardeau and includes travel TOTAL PRICE FOR ALL LISTED ABOVE..........................................$1,109.00 NOTE: Installation of float switch(es) is not included and is assumed to be provided by the Electrical Contractor. TERMS: NET 30 days with approved credit. An interest charge of 1-1/2% will be added to balances over 30 days. Retainage of any invoiced amount is unacceptable unless specifically agreed to by Vandevanter Engineering at the time of order, and shall in no case exceed a period of 120 days. Any sales/use tax will be in addition to the above price, and will be added to the billing unless the purchaser provides an exemption certificate acceptable to the taxing authorities. Prices quoted shall remain firm for a period of thirty (30) days, after which they are subject to change without notice. If, after reviewing the above proposal, you have any further questions or comments regarding this proposal, please feel free to contact us at (636) 343-8880. If the proposal meets with your approval, please sign, date, and mail or fax a copy back to our office, and we will order your equipment. VA)WEVANTER ENGINEERING a division of Lee Mathews Equipment 1617 MANUFACTURERS DRIVE, FENTON, MISSOURI 63026 (636) 343-8880, FAX (636) 343-1720 Mr. Chris Cissell ROBINSON CONSTRUCTION CO. PROPOSAL NO. VE -110901 Page -2- Thank you for the opportunity to work with you on this project. If we can be of any further assistance, please let us know. Sincerely, VANDEVANTER ENGINEERING CO. Richard L. Koch, P.E. RLK: mj d ACCEPTED THIS DATE BY. COMPANY TITLE ' WORK CHANGE DIRECTIVE No. LS -10 (Instructions on reverse side) PROJECT: L13328 Lift Stations and Force Main Sanitary Sewer Improvement Program DATE OF ISSUANCE: November 30, 2001 OWNER:. City of Cape Girardeau, Missouri EFFECTIVE DATE: November 30, 2001 OWNER's Contract No.: 3521, Lift Stations and Force Main CONTRACTOR: Robinson Construction Co. ENGINEER: Sverdrup Civil, Inc. You are directed to proceed promptly with the following change(s): Description: Add one (1) sewer service lateral reconnection (Bid Item G) at the Contract Unit Price` of $1,514.00 each at the Laundry Building adjacent to the Main CSO Sewer Line B between manholes MNMH-B6 and MNMH-B7. (See attached drawings for details.) Reconnect the service lateral to Sanitary Sewer Line `B". Purpose of Work Change Directive: The Cape Girardeau Public Works Department has determined that a sewer service lateral from the rear of the brick Laundry is connected to the existing 22 -inch combined sewer. Reconnection of this service is necessary to complete the separation of sewers. Attachments: MAIN CSO PROJECT -Location Map; Copy of Robinson Construction Co. Work Plan Dwg. No. MN -006.2 and Profile of Sanitary Line "B". If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: 0 Unit Prices ❑ Lump Sum ❑ Other Estimated increase O in Contract Price: $ 1,514 00 If the change involves an increase, the estimated amount is not to be exceeded without further authorization. RECOMMENDED: Sverdrup Civil Inc. ENGINEER Method of determining change in Contract Times: ❑ Contractor's records ❑ Engineer's records ❑ Other N/A Estimated increase (decrease) in Contract Times: Substantial Completion: -0- days; Ready for final payment: -0- days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. AUTHORIZED: City of Cape Girardeau OWNER BY By. (Author' ' Signature) (Authorised Signature) L3328 -12.34x EJCDC No. 1910-8-F (1990 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America. at .... .. . .. ....... -----------i. - LEdi -���I TH 1� �IS Ln. ... ... ... Ui CITY HALL ii . . ........ 1!77 ........... L MORGANOAK .... ...... 7 1 _ �7_ rte__ J 41 1 500 CITY OF CAPE MAIN CSO PROJECT ENGINEERING DIV. W, C, D. -jr / -r S-10 Loc-og I&M MAP PROPOSED SEWER PIPE I \�\, zuk-lu 2 S T= /ALU G _ ------------- - .............. ! ... 8Y L349.67'-8"PIPE 345.67' ® 0.86% 0 7.0' OUTSIDE WIDTH X 12' MN LONG CONC. CULVERT M u INV.OF EX.10"=347:271 Q 1 f 1 BOTT. OF EX 10'=347.12} rPt TOP OF NEW 8"=342.77 = Ej<i ST LAT V) B7 2, -� ccoT TS B CLEARANCE -4.35'± ; z d 10' TEMP. ESMT. INV.OF EX.12 345.67± BOTT. OF EX. 12"-345.51± TOP OF NEW 8-342.39 CLEARANCE- 3.12'± •I i co C1 (DRAINS EAST TO SPANISH ST.) II SDWG MN -C 611 B 7X N Z � 99-2MIT CSO SEWER 1- = 20 ( LLEY: MEOR�WETHER TO WI A-ro — CAPE�SIRARDEAU, MO. � i I � I X I E I f IliI N-22 o,i s r L10 c — A 215 West S o. Perrr571) T7-8 97 75 6. U� ESM A c < < D H A D v � a� r TBA V) Y CA / < p o V Y O CD \ � in lECT _Lli 2 S T= /ALU G _ ------------- - .............. ! ... 8Y L349.67'-8"PIPE 345.67' ® 0.86% 0 7.0' OUTSIDE WIDTH X 12' MN LONG CONC. CULVERT M u INV.OF EX.10"=347:271 Q 1 f 1 BOTT. OF EX 10'=347.12} rPt TOP OF NEW 8"=342.77 = Ej<i ST LAT V) B7 2, -� ccoT TS B CLEARANCE -4.35'± ; z d 10' TEMP. ESMT. INV.OF EX.12 345.67± BOTT. OF EX. 12"-345.51± TOP OF NEW 8-342.39 CLEARANCE- 3.12'± •I i co C1 (DRAINS EAST TO SPANISH ST.) II SDWG MN -C 611 B 7X N Z � 99-2MIT CSO SEWER 1- = 20 ( LLEY: MEOR�WETHER TO WI A-ro — CAPE�SIRARDEAU, MO. � i I � I X I E I f IliI N-22 o,i s r L10 c — A 215 West S o. Perrr571) T7-8 97 75 6. nn(MH S8) IN, " . (V STA. 3+ 9.67(MH B7) STA. 0+00(M B6) 4 �I 345.70(TO BI) TOP 350.39( ER) TOP '358:00- 349.42(VER)DH DROP-IN HOLCBM, OUTSIDE M N 04 50 MN 6 MH M)8' INV.E .=343.49(T B6) 8' INV.EL.= 40,50(TO B) M TOP 3 INV 3 7.66 3.49INV MH 0 347 327 B8' INV.E .=343.66(T B8) 8' INV.EL.= 39.77(TO B ) BS INV 3 7.44 B3 349.67' EX.24' INV. L.=340.77( ER)I.S.DROP 56.59' 44.0' 102.00' - 8' PIPE -355 fry 8' PIPE PIPE 47' - P PIPE 8' @ 002.08% I @ 6% @ 4.86% @ 2.67' 98 @ 345.67' @ 0.86% I I I � ZI STA 5+6347 I TOP 34976 N INV 33775 ., ---- ____-- ------ ------ EXISTIE 10' STOR 6 ' WJ 24IST PROPOSED 36'' =, 12 STORM STORM I 3� G I 6' W ECoNN�CT 54' AS❑NARY - l-�T Na LS Cl INV. 32.001 �C.�. P O P I L E"B" I 8' FROM Cl EXIST 10' — 'SANITARY (UIP) 38' - 0' PIPE 11+00 10+00 9+ DO 8+ 0 7+()0 6+00 5+00 4+ Do v MN N - MH M STA0 00.00 UTSIDE DR P MANHOLE "STA1+0-1.13 73 TOP 3 1 0.28 STA 0+ 7.29INV MNSTA 0+00.00 'C' LINE 43 INV 345.41 TOP 348-32 (CM MH TOP 347.45 INV 33 .00 334.68 B3 INV 327.00 IPE 107.13' - 2 4PIPE S 3 .29' - 8' PPE EXI T MANHO /• 8 % I 1. A XISTIN 8' LINE. REMOVE STA 0+32.83 EXISTING MA ND VALVE.TOP VALVE 340.64 E EXISTI G 15' WIDE T❑ REMAIN PROPER TY. IW THER ST. 3 5 0 INV 326.12 2. TEMPORARY BYPASS PUMPING MAY REQUIR D FOR CON ECTING NEW SEWERS _ 1 = 3 83' - 12 TO EXI TING MANHOLE, 4 . 3A' 3. 1 1/4 W LINE SERV BUILDI G EXISTIN 22' AT NE ❑RN ANISH ANIN. VTH 8' PIPE (UIP) W 340 //—EXIST INV. 335-00 STAL , BY THE ATER C❑.,WATER (FIELD IFY _ _ SERV IC T❑ THE B ILDING FROM 6'W MAIN _ IN SPA ISH ST. AFTER NEW SE VICE IS 12' STO _ _ INSTAL ED, CONTRA :TOR TO PL JG 1 1/4 ' 18' FROM 'B4' LINE A THE CONNEICTION TO ' W MAIN AT SPA ISH ST. 18' O 'B2' 330 r P R.11T F C„ FIELD ORDER FIELD ORDER NO: LS -14 PROJECT NO: L13328 DATE: July 18, 2001 This form is to be used only for emergency instructions to a contractor where the time requirea for preparation ana execution ut a formal Change Order would result in delay or stoppage of the work, in accordance with Articles 1.19 and 9.5 of the General Conditions of the Contract. PROJECT: Lift Stations and Force Main _- Cape Girardeau Sanitary Sewer Improvement Program TO CONTRACTOR: Robinson Construction Co. CONTRACT DATE: June 27, 2000 You are hereby authorized to make the following changes in your contract for the above project: Over -excavate the bottom of Lift Station No, 3 to approximate elevation 314.50 (+/-) ft. and backfill with clean Mississippi River sand to elevation 316.50 ft. Compact the sand fill with a vibratory plate type compaction unit and add additional compacted sand as needed to obtain the required bottom of footing elevation. Construct a dewatering sump in the Northwest corner of the sheet pile supported excavation and keep the excavation dewatered as needed until backfilling operations are completed. REASON FOR FIELD ORDER: Extremely soft, high moisture content alluvial silt with some fine sand was encountered at elevation 315.50 ft. to 318.50 ft. of the wet well excavation. After discussion with John E. Reinfurt, P. E., Geotechnical Engineer for Sverdrup Civil, Inc., it was agreed by the Sverdrup design team to use this method to stabilize the Wet Well subgrade. The foregoing field order is issued in accordance with Section 9.5 of the Contract and does not involve an adjustment in the contract price or the contract times and is compatible with the design concept of the completed project as a functioning whole as indicated by the contract documents. F ENGINEER FO CITY OF CAPE GIItARDEAU DISTRIBUTION: City of Cape Girardeau Engineer Contractor Inspector 4a --4e //"-- FOR THE CONTRACTOR AGREEMENT TO UTILIZE REMEDIAL FUNDS AND REMOVE FROM ESCROW ADDENDUM TO CONTRACT #3516-COLLEGE/HENDERSON SOUTH CSO AND CONTRACT #3521 -LIFT STATIONS AND FORCE MAIN CITY OF CAPE GIRARDEAU, MISSOURI — OWNER ROBINSON CONSTRUCTION COMPANY — CONTRACTOR THIS AGREEMENT is made and entered into this day of , 2001, by and between CITY OF CAPE GIRARDEAU, MISSOURI, hereinafter referred to as "Owner", and ROBINSON MECHANICAL CONTRACTORS, INC. d/b/a ROBINSON CONSTRUCTION COMPANY, hereinafter referred to as "Contractor". WITNESSETH: WHEREAS, the parties entered into Contract #3516 and #3521 whereby the Contractor was to construct, and has constructed, sewer lines in the City of Cape Girardeau, Missouri. On November 6, 1997, the parties agreed that part of the College/Henderson South CSO Sewer Project, #3516, and particularly a sewer line referred to as "K -Line" in the construction contract documents, has settled in excess of the 1" tolerance provided as the deviation tolerance in the specifications on the aforesaid Contract; and WHEREAS, to avoid expensive replacement and/or repairs, the parties had agreed to provide a remedial escrow fund in order to fund the cleaning of said line on an annual basis as necessary for the proper operation of said "K -Line" sewer line. The parties, with the assistance of Engineer, Sverdrup Civil, Inc., as summarized in the attached Exhibit 1, had reached the agreement and memorialized same in writing; and f r -2- WHEREAS, two (2) defects have been identified in the work under contract #3521. The 12 -inch pipe that flows into Lift Station No. 4 from the manhole referred to as "LS4MH-Al" in the construction contract documents does not meet the specified deviation tolerance and is lower on the upstream end by 0.07 (+/-) feet. The second defect is a structural defect in the concrete openings (access hatches) in the top of Lift Station No. 3 and has heretofore been reinforced by the Contractor on his own initiative; and WHEREAS, the City Engineer has decided that the funds escrowed under the Agreement dated November 6, 1997, are adequate and will be necessary for the proper operation of the sewers and Lift Stations for the prescribed forty (40) year period defined in the November 6, 1997 Agreement and in accordance with paragraph 5 of the Agreement desires to remove the escrow funds from the separate account and utilize the same for sewer operation and maintenance; NOW, THEREFORE, in consideration of the mutual covenants and conditions hereinafter contained, the sufficiency of which is hereby acknowledged by the parties hereto, the parties hereto agree as follows: 1. The Contractor agrees that the Fifteen Thousand Dollars ($15,000.00) deposited in an interest bearing account as a remedial escrow fund by the City of Cape Girardeau under the terms of the Agreement dated November 6, 1997, are adequate and just compensation for the previously described defective work under Contract Nos. 3516 and 3521 and shall be used for cleaning the defective sewers and all other maintenance associated with the defects. -3- 2. The Contractor agrees that the escrowed funds described herein may be released to the Owner forthwith. 3. The Contractor is not due a refund under the terms of the November 6, 1997 Agreement. 4. The Contractor's obligations under the terms of the November 6, 1997 Agreement have been fulfilled and no additional funds are required from the Contractor. 5. The acceptance by the City of the escrowed remedial funds shall not be construed as acceptance of all work under Contract No. 3521. 6. The City accepts the escrowed remedial funds as an appropriate amount for all operation and maintenance costs (above normal operating costs) associated with the previously defined defective work. 7. The Owner's receipt and utilization of escrowed remedial funds shall terminate the Contract dated November 6, 1997. 8. The obligations, representations and terms of Contract No. 3521, dated June 27, 2000, remain binding and this Agreement does not relieve the Contractor of any warranty requirements set forth therein. 9. The release and utilization of escrowed remedial funds shall be full and complete compensation for the three (3) items of defective work described heretofore and does not apply to any other work under Contract No. 3521. 10. This agreement shall be binding on the parties hereto, their successors, heirs and assigns. -4 - IN WITNESS WHEREOF, the parties hereto have hereunto set their hands and seals the day and year first above written. (Seal) ATTEST: ( cretary) (Witness) ATTEST: (Secretary) k")-&" —tness) "OWNER" CITY OF CAPE U, MISSOURI Michael G. Miller, City Manager "CONTRACTOR" ROBINSON MECHANICAL CONTRACTORS, INC. d/b/a ROBINSON CONSTRUCTION COMPANY BY 1 Francis E. Robinson, President L3328-I4.37adoc CONTRACT TO ESCROW REMEDIAL FUNDS ADDENDUM TO CONTRACT #3516-COLLEGE/RENDERSON SOUTH CSO SEWER CITY OF CAPE GIRARDEAU, MISSOURI - OWNER ROBINSON CONSTRUCTION COMPANY - CONTRACTOR THIS AGREEMENT is made and entered into this /, yH day of \1 f,-L�,,,1 �th � , 1997, by and between CITY OF CAPE GIIZAIZDEAU, MISSOURI, hereinafter referred to as "Owner, " and ROBINSON MECHANICAL CONTRACTORS, INC. d/b/a ROBINSON CONSTRUCTION COMPANY, hereinafter referred to a "Contractor." WITNESSETH: WHEREAS, the parties entered into Contract #3516 whereby the Contractor was to construct, and has constructed, sewer lines in the City of Cape Girardeau, Nfissouri. The parties have agreed that part of the College/Henderson South CSO Sewer Project, and particularly a sewer line referred to as "K -Line" in the construction contract documents, has settled in excess of the V tolerance provided as;the deviation tolerance in the specifications on the aforesaid. Contract;.and.. .. WHEREAS, to avoid expensive replacement and/or repairs the parties have agreed to provide a remedial escrow fund in order to fund the cleaning of said line on ad annual basis as necessary fore the proper operation of said "K -Line" sewer line. The parties, with the assistance of Engineer, Sverdrup Civil, Inc., as summarized in the attached Exhibit 1, have reached the agreement and desire to memorialize same in writing; NOW, THEREFORE, in consideration of the mutual covenants and conditions hereinafter contained, the sufficiency of which is hereby acknowledged by the parties hereto, the parties hereto agree as follows: -2- 1. Contractor agrees to deposit based on the calculations in Exhibit 2, the sum of Fifteen Thousand Dollars ($15,000.00) in an interest bearing account to be established and held as a remedial escrow fund by the City of Cape Girardeau. The parties agree that said remedial escrow fund shall bear interest based upon the money market account interest at Union Planters Bank of Cape Girardeau, Missouri (currently 3.45% rate). The City of Cape Girardeau may draw upon said account for the reasons and in the manner as hereinafter set forth. 2. The parties acknowledge that the current estimated cost of cleaning the aforesaid line is One Hundred Twenty -Five Dollars ($125.00) per cleaning and the parties agree, it may be necessary to clean said line up to three (3) times or more per year to maintain its proper operation. 3. Based upon the calculations of the engineer, to which the parties have agreed, the initial deposit of the escrow account should provide for up to three (3) cleanings per year of the affected line. Sverdrup Civil, Inc. has calculated that the fund would be depleted after approximately forty (40) years. 4. The parties acknowledge that, although Engineer Sverdrup has calculated a formula for the funding of continuous (3. times per year) cleaning of the affected line; neither o1'the parties nor' the engineer car! be certain at the current time whether or not continuous cleaning will be necessary for proper operation. The parties acknowledge that after approximately one (1) year of operation the City should be able to make definitive determination as to the nature and scope of the cleaning process necessary. Pursuant thereto the parties have agreed that the City of Cape Girardeau shall, within thirty (30) days from the one (1) year anniversary date of the final acceptance of the completed sewer project of the City of Cape Girardeau, make its determination as to whether or not a different cleaning schedule or other action, and therefore less funding, will be necessary to insure proper -3 - operation of the affected line for a period of forty (40 ) years. At that time the City of Cape Girardeau, at the discretion of the City Engineer, shall either: a) Advise Contractor in writing that the three (3) cleanings per year schedule as a result of the one (1) year test under actual operating conditions is the minimum amount necessary to insure proper operation of said line and thus there sha!l be no partial refund of escrowed monies, or b) That the cleaning schedule funding is in excess of the amount necessary to maintain proper operation of the line for the forty (40) year period listed above and thus a refund of escrowed monies is due Contractor, or c) That the cleaning schedule funding is not sufficient to maintain proper operation of the sewer line for the forty (40) year period and resolution of the issue shall be negotiated in accordance with Article 13 of the Construction Contract General Conditions. In the event lesser escrow fund is needed then the City of Cape Girardeau shall, along and together with its aforesaid report, refund the unneeded funds to Contractor. 5. In the event the City Engineer decides that the escrowed hinds for the cleaning program willbe necessary for the proper operation -of the: sewer.. -line for, the,prescribed forty (40) -yeas..period, : �. the City shall have the right to, and shall, remove the escrow funds from the separate account, utilize same for sewer operation and maintenance, and this Contract shall be terminated. 6. In the event Contractor is due a refund, Contractor's receipt of said refund shall terminate this Contract. 7. In the event additional funds are required from the Contractor to maintain proper operation of the sewer line for the forty (40) year period, Contractor's payment and Owner's receipt of said payment shall terminate this contract. - S. This agreement shall be binding on the parties hereto, their successors, heirs and assigns. IN WITNESS WIiEREOF, the parties hereto have hereunto set their hands and seals the day and year first above written (Seal) CITY OF CAP IRARDEAU, MISSOURI ATTEST: Y Michael G. Miller, City Manager ( cretary) (Seal) "CONTRACTOR" ,ROBINS0N1v1ECHANICAL . CONTRACTORS, INC. d/b/a ROBINSON CONSTRUCTION COMPANY ATTEST: BY Francis E. Robinson, President 4" (�" (Secretarpl EXHIBIT I SVERI)RUP CIVIL, Inc. FIELD OFFICE Cape Girardeau, Missouri Letter No. s13328-681 Program No. 13328-535 MEMORANDUM August 18, 1997 (revised 8-21-97) TO: Eric Cunningham, City Attorney City of Cape Girardeau, Missouri FROM: John Bennett, Resident Project Representative Cape Girardeau Sanitary Sewer Improvement Program SUBJECT: Contract to Escrow Remedial Funds - City Contract No. 3516 Sanitary Sewer Improvement Program Cape Girardeau, Missouri Sverdrup Civil, Inc. has reviewed the above referenced contract submitted by Buerkle, Beeson and Ludwig, attorneys for Robinson Construction Company. Since we are not attorneys, Sverdrup does not intend to give a legal review, but we have reviewed the document for reasonableness in accordance with General Condition Article 13.13, Acceptance of Defective Work The estimated number of sewer cleanings referred to in paragraphs 2, 3 and 4 of page two was determined by the Cape Girardeau Public Works Department (reference Meeting Memorandum No. sl3328-649, dated July 2, 1997). From this estimate of "no more than four cleanings per year a reasonable compromise of three sewer cleanings was used to. determine the escrow amount at present value to fund the estimated sewer cleaning for the next forty (40) years. The present cost per cleaning of $125.00 per cleaning was also determined by the CiWs,Public Works Department. Using thefiguresfrom the City's Public Works Department, we find tfe restlt`�Eo be reasonable. Union Planters Bank of Cape Girardeau, Missouri (the City Depository) is currently paying 3.45 % interest on Money Market Accounts. Assuming that interest rates do not fall below historical levels and there is no significant deviation in monetary policy established by the Federal Reserve Board, the escrowed remedial funds should earn 3% per anum or more for the next forty years. It was also generally agreed that a three per cent (3%) inflation factor be used to calculate future cleaning costs. Sverdrup again concurs that this is reasonable. The forty -year term is considered to be a minimum life span for a gravity sanitary sewer main. Although most existing sewers in the project area are more than forty years old, we believe this is also a reasonable compromise. C1A WPOOCSIPFUSE 1KciS_CSaS1332814.378 MEMORANDUM TO ERIC CUNNINGHAM August 18, 1997 (rev. 8-21-97) Page 2 The implication that Line "K" could require as many as four (4) cleanings per year, could be provided for with the addition of subparagraph 40 as you had indicated to me. Or the wording could be such that the final remedial amount is determined at the end of one year. Other provisions set forth in the draft contract appear reasonable pending your legal review. Enclosed is a spreadsheet detailing the estimated interest income and annual cleaning cost using a 3% APR and a 3% inflation factor. Using this as an attachment to the escrow agreement will clearly show the basis for the escrow amount and we recommend that it be included. If you have any questions or require additional information/documentation, please do not hesitate to contact me. c: Rich Vedder/File 013328 Mark Lester P. K. Mathai Douglas Leslie fik �4� y: :;; _ c.. �:� .•4;., �}yltx:�: '{!f _�jqw ;� ..vti::�*- M�`h .2�`{.. ':�..`+Y.�P.Ei'b'-ri,�ti.. =•; �...;.", '}..r �nF'r=.'-:h•T:',`f'i!:"� 'Pus tr_ C:1AW1pRoJECi,F1Eu)Amvvp000SV*VZE 11CHS CS01SlS=1<.J7B Cape Girardeau SSIP College/Henderson So. CSO EXHIBIT 2 Sewer Maint. Bond Line "K" Good Hope St. Assuming 3% Interest Earned and 3% Inflation YEAR Interest Withdraw BALANCE 15,000.0 1 g g8 450.00 386.25 $ 15,063.8 1999 451.91 397.84 $ ts,tt7.s 2000 453.53 409.78 $ 15,161.6 2001 454.85 422.07 $ 15,194.4 2002 455.83 434.73 $ 15,215.5 2003 456.46 447.77 $ 15,224.1 2004 456.72 461.20 $ 15,219.7 2005 456.59 475.04 $ 15,2012 2006 456.04 489.29 $ 15,168.0 2007 455.04 503.97 $ 15,119.0 2008 453.57 519.09 $ 15,053.5 2009 451.61 534.66 $ 14,970.5 2010 449.11 550.7 $ 14,868.9 2011 446.07 567.22 S 14,747.7 2012 442.43 584.24 $ 14,605.9 2013 438.18 601.77 $ 14,442.3 2014 433.27 619.8.2 $ 14,255.8 2015 427.67 638.41 $ 14,045.0 2016 421.35 657.56 $ 13,806.8 2017 41426 677.29 $ 13.545.8 2018 406.37 697.61 $ 13254.6 2019 397.64 718-54$ 12.933.7 2020 388.01 740.1 $ 12,581.6 2021 377.45 762.3 s. 12,196.7 2022 365.90 785.17 $ 11,777.5 2023 353.32 808.73 $ 11,322.0 2024 339.66 832.99 $ 10,828.7 +2025 ...r-:= i$2466:'- 57t98 �S i0;2s5.6 2026 308.87 883.72 $ 9,720.7 .2027 291.62 910.23 $ 9,102.1 2028 273.06 937.54 $ 8,437.7 2029 253.13 965.67 $ 7,725.1 2030 231.75 994.64 $ 6,96-2-2 2031 208.87 1024.48 $ 6,146.6 2032 184.40 1055.21 $ 5,275.8 2033 158.27 1086.87 $ 4,3472 2034 130.42 1119.48 $ 3,358.2 2035 100.74 1153.06 $ 2.305.8 2036 69.18 1187.65 $ 1,187.4 2037 35.62 1223.28 $ (0.3) 2038 -0.01 0 0 Prepared by: John R. Bennett Date: August 19, 1997 29087 ROBINSON CONSTRUCTION.CO. 215 NORTH WEST PH. 573.547-397 80.386/819 PGWMq F- M0 63775.1327 to 19_L7 -D 00 PAY .y Dollars �..-_.�Q� THE OROER OF K'0.2'908 ?r 408190.386.?9: 00159?0'0 ACORnn CERTIFICATE OF LIABILITY INSURANCE 03/(25/02 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Welsch, Flatness, & Lutz, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 308 North 21St Street HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P.O. Box 66753 Saint Louis, MO 63166-6753 INSURED Robinson Construction Company P. O. Box 388 Perryville, MO 63775 COVERAGES INSURERS AFFORDING COVERAGE INSURERA:St . Paul Fire & Mar INSURER B: Zurich U.S. INSURER C: INSURER D: INSURER E: THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH wnno�n_w� i IL AMC CU^IAIA1 unV uevc RPGAI Ormi u,.rm RV PAin CI AIKAS INSR TYPE OF INSURANCE POLICY NUMBER TE CITY OF CAPE GIRARDEAU 401 INDEPENDENCE Cape Girardeau, MO 63701 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL EN DEAVORTO MAI L3-0_ DAYS WRITTEN NOTICETOTHE CERTIFICATE HOLDER NAMED TOTHE LEFT, BUTFAILURE TO DOSOSHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANYKIND UPON THE INSURERJTS AGENTS OR Ir ACORD 25-S (7/97)1 of 1 #M83952 " r RLE 0 ACORD CORPORATION 1988 POLICY MM/DCT/� POLICY MM/DAD ION LIMITS A GENERAL LIABILITY KKO8500206 03/30/02 03/30/03 EACH OCCURRENCE $1,000,000 FIRE DAMAGE (Any one fire $3 0 0 0 0 0 X COMMERCIAL GENERAL LIABILITY ME D EXP (Any one person) $5,000 CLAIMS MADE OCCUR PERSONAL & ADV INJURY $1 0 0 O 00 0 GENERAL AGGREGATE s2,000,000 GENLAGGREGATELIMIT APPLIES PER: PRODUCTS-COMP/OPAGG s2,000,000 POLICY X PRO LOC A AUTOMOBILE LIABILITY KK08500206 03/30/02 03/30/03 COMBINED SINGLE LIMIT $1,000,000 X ANY AUTO (Ea accident) ALL OWNED AUTOS BODILYINJURY $ (Per person) SCHEDULED AUTOS BODILY INJURY $ X HIRED AUTOS X NON -OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY- EA ACCIDENT $ OTHER THAN EA ACC $ ANY AUTO AUTO ONLY: AGG $ B EXCESSLIABILITY AUC930323300 03/30/02 03/30/03 EACH OCCURRENCE s5,000,000 AGGREGATE $5 0 0 O 0 0 0 X OCCUR L-1 CLAIMS MADE $ DEDUCTIBLE $ RETENTION $ 1 A WORKERS COMPENSATION AND WVK8500109 03/30/02 03/30/03 X S)fiYwCSTATU- 0TH -- mIT-S _ E.L. EACH ACCIDENT sl 000, 000 EMPLOYERS' LIABILITY E.L.DISEASE-EAEMPLOYE $1 0 0 O 0 0 0 E.L. DISEASE -POLICY LIMIT $1 000 000 A OTHER Contractors IM08500562 03/30/02 03/30/03 Leased/Rented Equip. uipment bqilderS Limit: $302,000 Risk IM08500562 03/30/02 03/30/03 Limit: $2,500,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS PROJECT: LIFT STATIONS & FORCE MAIN PHASE II CITY OF CAPE GIRARDEAU AND SVERDRUP CIVIL, INC. ARE NAMED AS ADDITIONAL INSUREDS ON THE GENERAL LIABILITY AND AUTO WITH REGARD TO WORK PERFORMED BY OR ON BEHALF OF THE NAMED INSURED. TE CITY OF CAPE GIRARDEAU 401 INDEPENDENCE Cape Girardeau, MO 63701 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL EN DEAVORTO MAI L3-0_ DAYS WRITTEN NOTICETOTHE CERTIFICATE HOLDER NAMED TOTHE LEFT, BUTFAILURE TO DOSOSHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANYKIND UPON THE INSURERJTS AGENTS OR Ir ACORD 25-S (7/97)1 of 1 #M83952 " r RLE 0 ACORD CORPORATION 1988