Loading...
HomeMy WebLinkAboutRES.1446.04-05-1999! • - BILL NO. 99-80 RESOLUTION NO. 4 A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AUTHORIZATION NO. 9 TO THE MASTER SERVICES AGREEMENT WITH BURNS & McDONNELL ENGINEERING COMPANY, INC. FOR THE POTABLE WATER TREATMENT SYSTEM BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute Authorization No. 9 to the Master Services Agreement, I dated o arch 21, 1994, with Burns & McDonnell Engineering a° d Authorization No. potable water treatment system. A copy Of 9 is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THIS � DAY OF4, 19 • ATTEST: 4(5ayl+eL.42Co�n�rad Deputy City Clerk A. T. Spradling, III, May CITY OF CAPE GIRARDEAU, MISSOURI POTABLE WATER TREATMENT SYSTEM AUTHORIZATION NO. 9 — RISK MANAGEMENT PLAN For PROFESSIONAL ENGINEERING SERVICES To BURNS & McDONNELL ENGINEERING COMPANY, INC. St. Louis, Missouri In accordance with the AGREEMENT for PROFESSIONAL ENGINEERING SERVICES dated March 21, 1994 between the City of Cape Girardeau, Missouri (hereinafter called OWNER) and Burns & McDonnell Engineering Company, Inc. (hereinafter called ENGINEER), OWNER hereby authorizes ENGINEER to proceed with the following services: I. SCOPE This Authorization No. 9 covers services involved in development of Risk Management Plan (RMP) under section I I 2 of the Clean Air Act for the Cape Rock Water Treatment Plant. A detailed description of the scope of services to be completed by Engineer and major assumptions upon which ENGINEER will rely in providing these services are presented in "Exhibits A and B." II. TIME OF SERVICE ENGINEER will proceed with providing the services set forth herein within seven (7) days upon authorization from OWNER, and will complete these services by no later than June 21, 1999, assuming a Notice -to -Proceed on or before April 15, 1999. It is understood that completion according to this schedule is contingent on the timely review by OWNER of submittals from ENGINEER, as does not contain contingency for any delay created by events beyond the control of the ENGINEER (such a adverse weather conditions, regulatory agency actions, force majeure events, etc.). III. COMPENSATION A. Amount of Payment 1. For services performed, OWNER shall compensate ENGINEER for providing the services set forth herein in accordance with the terms of the existing Agreement, as follows: MAMK\CAPEGIR\RMP\AUTH9for1.doc Page I of 5 a. For time spent by personnel, payment at the hourly rates indicated in the Schedule of Hourly Labor Billing Rates Form BMR899. Such rates include overhead and profit. The schedule is effective to December 31, 1999. b. For expenses incurred by ENGINEER, such as authorized travel and subsistence including airfare, food, lodging, automobile rental, commercial services, and incidental expenses, the cost to ENGINEER plus 10 percent. C. For reproduction, printing, long-distance telephone calls, facsimile transmissions, company vehicle usage, testing apparatus, computer services and computer-assisted drafting (CAD), amounts will be charged according to the ENGINEER standard rates in effect at the time service is provided. 2. The payment for the Scope of Services described in this Authorization 9 shall not exceed the maximum amount of Fourteen -Thousand -Five -Hundred Dollars ($14,500). ENGINEER shall invoice OWNER monthly for work done on this project. AY: CAPE GIRARDEAU, MISSOURI Dr. Robert T.Berry, P.E. Vice Presidentand Manager, St. Office ATTEST I By M:\MK\CAPEGIR\RMP\AUTH9f6r1.doc Page 2 of 5 CITY OF CAPE GIRARDEAU, MISSOURI AUTHORIZATION NO. 9 — RISK MANAGEMENT PLAN EXHIBIT A LIST OF ANTICIPATED MAJOR WORK TASK Kick Off Meeting will be held in Cape Girardeau, Missouri. The goals of the meeting are: • Confirm all the data required for modeling, including chemicals, quantities, locations, meteorological data, passive mitigation devices, etc. for Offsite Consequence Analyses. • Confirm what information will be provided to the ENGINEER, and what items the ENGINEER will determine. Some information like Dun and Bradstreet Numbers would be best provided by the OWNER. • ENGINEER will discuss preliminary identification of worst case and alternative release scenarios with OWNER to obtain agreement on both scenarios. • Determine the sites' five-year accident history. 2. Document the sites' five-year accident history. 3. Following agreement on the defined scenarios, one risk management chemical (chlorine) will be modeled for offsite consequence analyses. EPA's modeling software, RMP*Comp, will be used to evaluate the toxic gas endpoints associated with chlorine. One "worst case" and one "most likely" case scenario will be developed for each site. Develop a summary of the potentially affected population and public receptors using Landview III, which contains the US Census Bureau Tiger database, as well as the latest topo map from the US Department of Interior, Geological Survey. Following completion of the modeling analysis, and if desired by the owner, ENGINEER will overlay the model -determined toxic endpoint over a MARPLOT plot, or a 75 minute USGS map or aerial photograph, if readily available from OWNER. 4. Assist in the development the site's Management System to meet the requirements of RMP. ENGINEER will draft Management System based on the OWNER's inputs for the OWNER'S review. Then ENGINEER will document the system. 5. Review OWNER'S Accidental Release Prevention Procedures and make recommendations to upgrade these procedures for an Accidental Release Prevention Program, as necessary. It is our understanding that OWNER'S operations and maintenance procedures are in place, but need to be documented. The Process Safety Information, and procedures covering Hazard Review, Training, Incident Investigation, and Compliance Audit for the chlorine process will be developed. The Hazard Review will be done jointly by the ENGINEER and OWNER, M:\MK\CAPEGIR\RMP\AUTH9f6r1.doc Page 3 of 5 lead by the ENGINEER. The training will be outlined by the ENGINEER and the training conducted by the OWNER. After OWNERS review, the ENGINEER will complete the Process Safety Information, and procedures covering Hazard Review, Training, Incident Investigation, and Compliance Audit. 6. Review OWNER'S Emergency Management Procedures and make recommendations to upgrade these procedures for an offsite Emergency Response Program as necessary. For the cost estimate it was assumed that the preliminary Emergency Management Procedures would be drafted by the ENGINEER, for the OWNERS review, then completed by the ENGINEER. 7. Compile the RMP elements for OWNER'S review and comments. 8. Assist OWNER with the RMP Executive Summary. The ENGINEER will draft a RMP Executive Summary based on the OWNER's inputs for the OWNER's review. Then ENGINEER will put the Executive Summary into RMP* SUBMIT. 9. ENGINEER will draft Program Certifications for OWNER. 10. ENGINEER will insert all the information into RMP* SUBMIT, and label the diskettes for submission. Two paper copies of the Risk Management Plan will be provided to the OWNER. 11. ENGINEER is prepared to assist Owner in Program implementation and communication with the Public but no significant effort is anticipated. M:\MK\CAPEGIR\RMP\AUTH9f6r1.doc Page 4 of 5 CITY OF CAPE GIRARDEAU, MISSOURI AUTHORIZATION NO. 9 — RISK MANAGEMENT PLAN EXHIBIT B LIST OF MAJOR ASSUMPTIONS • A Risk Management Plan is required for only the Cape Rock Water Treatment Plant. • Chlorine is the only Risk Management Chemical at the plant. • Existing drawings require little modified for "Process Hazards Analysis and Operation Procedures. • No significant effort required for Program implementation or communication with the Public. M:\MK\CAPEGIR\RMP\AUTH9for1.doc Page 5 of 5 I EXHIBIT NO. 1: COST PROPOSAL WORKSHEET BY TASK Client Name: CITY OF CAPE GIRARDEAU, MISSOURI Project Title: RISK MANAGEMENT PLAN (RMP) Rillinn 1 oval Task Number i Task Description I Estimated Mhrs Cost PEx I PM SE PE CADD $230 Telephone & Long Distance: , 1 2 3 4 5 6 7 8 9 10 11 Organize Project/Kick Off Meeting/divide RMP elements Document 5 -year Accident History Offsite Consequence Analysis "Worst-case" and "Alternative Release" Scenarios Assist in Development of a Management System Developed or review Prevention Program A Provide Process Safety Information B. Conduct Hazard Review C. Document Operation Procedures D Document Training Procedures E. Document Maintenance Procedures F Developed Incident Investigation Procedures F Developed Compliance Audit Procedures Document the Emergency Response Program Compile RMP elements Write an Executive Summary Complete Program Certification Complete EPA's RMP*SUBMIT documentation Assist in Program implementation and communication with the Public 21 1 8 3 3 10 13 9 16 4 5 8 17 9 1 11 3 $1,948 $95 $636 $285 $285 $933 $1,153 $847 $1,503 $372 $467 $743 $1,607 $847 $95 $1,037 $2771 Hotel: i 1 8 12 $14 1 1 3 4 3 3 2 8 1 10 2 1 8 2 14 1 3 1 4 2 6 1 16 1 8 1 1 10 2 F1 - Total'Estimated Man -Hours: 142 1 23 112 4 2 Labor Cost: $13,125 Quality Control: Q1 - Concept Phase Review 1 $95 Q2 - Technical Review 3 $285 Q3 - Final Plan Review 2 $190 Total Quality Control: 6 $570 Estimated Expenses: a n+o Computer Time (CADD): 1$21.00 $42 Computer Time En ineerin /WP : I $11.00 $495 Mileage & PerDiem: 1$0.325 $230 Telephone & Long Distance: , $24 Air Fare & Car Rental: - Reproduction & Photocopy: i Hotel: i Miscellaneous Expenses: i $14 Total Direct Expenses: $805 Total Estimated Cost: $14,500 Legend PEx - Project Executive PM - Project Manager SE - Senior Engineer PE - Project Engineer 03/17/99 Bums & McDonnell COSTFOR1.WF