Loading...
HomeMy WebLinkAboutRES.2227.12-18-2006 t BILL NO. 06-260 RESOLUTION NO. � � A RESOLUTION AUTHORIZING THE CITY r1ANAGER TO EXECUTE AN AGREEMENT WITH FRONABARGER CONCRETERS, INC. , FOR THE BROADWAY PHASE II IMPROVEMENTS, IN THE CITY OF CAPE GIRARDEAU, MISSOURI BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS : ARTICLE 1 . The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute an Agreement with Fronabarger Concreters, Inc . , for the Broadway Phase II Improvements, in the City of Cape Girardeau, Missouri . A copy of said Agreement is attached to this Resolution and made a part hereof . PASSED AND ADOPTED THIS �� DAY OF ���yYl� _, 20�_. ��� �����'� � � �c--..., p � y B.y Knudtson, Mayor � � � v � �,�� *T 8 �'I1TI $.�A.L * Gay e L Conrad, City Clerk � CITY OF CAPE GIRARDEAU BROADWAY PHASE 11 IMPROVEMENTS Pavement Widening & Reconstruction at Clark Street, and From Perry Avenue to Park Street STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE THIS GREEMENT is dated as of the ��, day of � �,�v P in the year 200��y and between the City of Cape Girardeau, Missouri (herein fter called OWNER) and F r o n a b a r 9 e r Go n c r e t e r s�hereinafter called CONTRACTOR). Inc . OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: The work to be performed under these Contract Documents consists of... Widening the pavement of Broadway at the intersection of Clark Street, widening the pavement of Broadway from Perry Avenue to Park Street, together with all related improvements as indicated in the project plans, and the modification of the traffic signals at the intersections of Broadway and Clark Street, Broadway and Perry Avenue, and Broadway and West End Blvd., all in the City of Cape Girardeau, Missouri. Article 2. ENGINEER. The City Engineer or his designee is to act as OWNER'S representative, assume all duties and responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. Article 3. CONTRACT TIMES. 3.1 The work requiring the closure of Broadway to all traffic between Perry Avenue and West End Blvd shall be completed within Fiftv (50) calendar days after the date when the Contract Times commence to run. All work will be substantially completed within � A-1 . Ninetv ( 90 ) calendar days after the date when the Contract Times commence to run as provided in paragraph 2.3 of the General Conditions, and completed and ready for final payment in accordance with paragraph 14.13 of the General Conditions within One Hundred-Twentv ( 120 ) days. 3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above,plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by OWNER if the Work is not competed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER Three Thousand($3,000) dollars for each � day that expires after the time specified in paragraph 3.1 for the opening of Broadway � between Perry Avenue and West End Blvd. Additionally,the OWNER and CONTRACTOR agree that as liquidated damages for delay(but not as a penalty)CONTRACTOR shall pay OWNER Three Thousand ($3,000) dollars for each day that expires after the time specified in paragraph .3.1 until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER Three Thousand ($3,000) dollars for each day that expires after the time specified in paragraph 3.1 for completion and readiness for final payment: Article 4. CONTRACT PRICE. OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to paragraphs 4.1 and 4.2 below: 4.2 for all Unit Price Work, an amount equal to the sum of the established unit price for each separately identified item of Unit Price Work times the estimated quantity of that item as indicated in the bidding documents. One Million Four Hundr,ed Twenty- STx Thousand Six Hundred Sixty- TOTAL OF ALL UNIT PRICES: E i g h t a n d 3 6/ 1 0 0 (� � ( 51 , 426 , 668 . 36/ 100 ) As provided in paragraph 11.9 of the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classification are to be made by � ENGINEER as provided in paragraph 9.10 of the General Conditions. Unit prices have been computed as provided in paragraph 11.9.2 of the General Conditions. Article 5. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. A-2 ,.. . 5.1 Progress payments;Retainage. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR'S Application for Payment as recommended by ENGINEER, on or about the 10th day of each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below. All such payments will be measured by the schedule of values established in paragraph 2.9 of the General Conditions(and in the case of Unit Price Work based on the number of units completed)or, in the event there is no schedule of values, as provided in the General Requirements. 5.1.1 Prior to Substantial Completion,progress payments will be made in an amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. 90% of Work completed (with the balance being retainage). If Work has been 50%completed as determined by ENGINEER,and if the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER, on recommendation of ENGINEER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed, in which case, the remaining progress payments prior to Substantial Completion will be an amount equal to 100% of the Work completed. 90% (with the balance being retainage) o# materials and equipment not incorporated in the Work(but delivered, suitably stored and accompanied by documentations satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions). 5.1.2 Upon Substantial Completion, in an amount sufficient to increase total payments to CONTRACTOR to 95%of the Contract Price(with the balance being retainage), less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. 5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. Article 6. INTEREST. All moneys not paid when due as provided in Article 14 of the General Conditions shall bear interest at the maximum rate allowed by law at the place of the Project. Article 7. CONTRACTOR'S REPRESENTATIONS. In order to induce OWNER to enter into the Agreement, CONTRACTOR makes the following representations: A-3 - 7.1 CONTRACTOR has examined and carefully studied the Contract Documents (including the Addenda listed in paragraph 8) and the other related data identified in the Bidding Documents, including "technical data". 7.2 CONTRACTOR has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance and fumishing of the Work. 7.3 CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, performance and furnishing of the Work. 7.4 CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1 of the General Conditions. CONTRACTOR accepts the determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent of the"technical data" contained in such reports and drawings upon which GONTRACTOR is entitled to rely as provided in paragraph 4.2 of the General conditions. CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and may not be complete for CONTRACTOR'S purposes. CONTRACTOR acknowledges that OWNER and ENGINEER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect #o Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies and data concerning conditions(surface, subsurface and Underground Facilities)at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents. 7.5 CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the site that relates to the Work as indicated in the Contract Documents. 7.6 CONTRACTOR has correlated the information known to CONTRACTOR, information and observation obtained from visits to the site, reports and drawings identified in the Contract documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents. 7.7 CONTRACTOR has given ENGINEER written notice of all conflicts,errors,ambiguities or discrepancies that CONTRACTOR has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable ta CONTRACTOR, and the Contract A-4 Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. Article 8. CONTRACT DOCUMENTS. The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR concerning the Work consist of the following: 8.1 This Agreement(pages A�4 to A-7 inclusive). 8.2 Exhibits to this Agreement(pages BF- to BF- , inclusive). 8.3 Performance, Payment, and other�Bonds, identified as exhibits and consisting of pages. 8.4 Notice to Proceed. 8.5 General Conditions (pages 1 to 55 , inclusive). (EJCDC No. 1910-8 1990 Edition) 8.6 Supplementary Conditions (pages SC-1 to SC-5 , inclusive). 8.7 Specifications bearing the title B r o a d w a y P h a s e I I I m p r,o v e m e n t s 8.8 Drawings. 8.9 Addenda numbers�to�, inclusive. 8.10 CONTRACTOR'S Bid (pages BF- � to BF� 2 , inclusive) marked exhibit A 8.11 Documentation submitted by CONTRACTOR prior to Notice of Award (pages_to , inclusive). 8.12 The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: All Written Amendments and other documents amending, modifying or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. The documents listed in paragraphs 8.2 et seq. above are attached to this Agreement (except as expressly noted otherwise above). There are no Contract Documents other than those listed above in the Article 8. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. ' Article 9. MISCELLANEOUS. A-5 9.1 Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 9.2 No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent ot the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent(except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 9.3 OWNER and CONTRACTOR each binds itself, its partners, successors,assigns and legal representatives to the other party hereto, its partners,successors, assigns and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents. 9.4 Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the str�cken provision. 9.5 The General Contractor shall provide to the City of Cape Girardeau City Engineer's Office weekly certified payrolls from the General Contractor and all Subcontractors during the course of the project. These may be provided on a weekly basis or submitted monthly with each pay request. A-6 IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed the Agreement in multiple copies, One counterpart each has been delivered to CONTRACTOR and ENGINEER and two counterparts to the OWNER. All portions of the Contract Documents have been signed, initialed or identified by OWNER and CONTRACTOR or identified by ENGINEER on their behalf. This Agreement will be effective on �A-ti�v�P��i l c� , 200�(which is the Effective Date of the Agreement). OWNER City of Cape Girardeau CONTRACTORF r o n a b a r q e r �o n c r e t e r,s , � n c . Douqlas K. Leslie, Citv Manaqer G I e n n F r o n a h a r g q; P;r e s 1 d e n t ! By; � y � B ., - [CO ORATE SEAL] [C ORATE S L] Attest � Attest /+y�.C� �l c_.oa'.e..p� �1• Address for giving notices Address for giving notices 401 Independence Street 3 2 9 0 s t a t e H W y E Cape Girardeau, MO 63703 o a k R i d g e , M o 6 3 7 6 9 (If OWNER is a public body, attach License No. evidence of authority to sign and resolution or other documents Agent for service of process: authorizing execution of Agreement. (If CONTRACTOR is corporation, -�'"`��` attach evidence of authority to sign.) b4� ����'�P; O a �'� o �` � � � F � r �,� `�*r s trxi '�' * B�AL A-7 BROADWAY PHASE U „ „ Nov.3,2006 EXHIBIT A CITY OF CAPE GIRARDEAU BROADWAY PHASE ll IMPROVEMENTS Pavement Widening& Reconstruction at Clark Street, and From Perry Avenue to Park Street . BID FORM (EJCDC 1910-18) (1990) PROJECT IDENTIFICATION: The work to be performed under these Contract . Documents consists of the construction of the following: Furnish and installation of all requirements according to the improvement plans titled"Improvement Plans for Broadway Phase II, Pavement Widenin.g and Reconstruction at Clark Street and From Perry Avenue to Park Street; in the City of Cape Girardeau, Missouri", and also as described herein: Removal of existing improvements, place and grade earthwork to bring the project to the proposed final grade, install storm sewer improvements, install new concrete pavement for street surfacing, drives, and sidewalks, install new traffic signal equipment and modify existing traffic signal equipment, provide complete erosion control measures, preparation of final grades and surfaces, and all other improvements as required for construction in accordance with the improvement plans, located along Broadway from Perry Avenue to Park Street, and all other related improvements indicated on the plans for the City of Cape Girardeau, Missouri. THIS BID IS SUBMITTED T�: CITY OF CAPE GIRARDEAU, MO 401 INDEPENDENCE STREET CAPE GIRARDEAU, MO 63703 Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#1 BROADWAY PHASE II Nov.3,2006 the Bidding Documents with respect to Underground Facilities at or contiguous to the site. BIDDER has obtained and carefully studied(or assumes responsibili#y for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions(surface,subsurface and Underground Facilities)at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider that any additional examinations, inv�stigations, explorations, tests, studies or tlata are necessary for the determination of this Bid for performance and furnishing of tlie Work in accordance with the times, price and other terms and conditions of the Contract Documents. (e) BIDDER is aware of the general nature of Work to be performed by Owner and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents. (f) BIDDER has correlated the information known to BIDDER, information and obsenrations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations,explorations,tests,studies and data with the Contract Documents. (g) BIDDER has given Engineer written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER-has discovered in fhe Contract Documents and the written resolution thereof by ENGINEER is acceptable to BI.DDER, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for perforrning and furnishing the Work for which this Bid is submitted. (h) This Bid is genuine and not made in thE interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agr�ement or rules of any group association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over 01NNER. (I) (Any other representation required by La�rs and Regulations.) 4. BIDDER will complete the Work in accordance with the Contract Documents for the following price(s): Koehler Engineering& Land Surveying,Inc. Bid Form 0041Q-Page#3 BROADWAY PHASE II , Nov.3;2006 UNIT PRICE SCHEDULE BROADWAY IMPROVEMENTS FROM PERRY AVENUE TO PARK STREET BROADWAY IMPROVEMENTS FROM PERRY AVENUE TO PARK ST. Item Est No. Item Descriptt�n Unit Quantity Unif Price Item Total � 1 General Contract Requirements(Mobilization, Demobilization, etc.) LS 1 $�,�p�00$ �����-�� Removal of Ex. Improvements(excluding : 2 trees) LS 1 $� �CX)0.�� �4 400t��ao � 3 Removal of Tree with Trunk<12" - EA 3 $ 1{sp,�o $ 135O,Oo 4 Removal of Tree with Trunk 12"to 18" EA 2 $ SpO,oo $ I�Ooc�.OQ 5 Removal of Tree with Trunk 18"to 24" EA 1 $ �pp,mo $ '�ma,o0 6 Removal of Tree with Trunk 24"to 30" EA 1 $ qp�,a o $ Q OO„O 0 7 Removal of Tree with Tr�nk 2 30" EA � � 9aa,oo .$ 9�,r�4 8 Temporary Erosion Control . LS 1 $��pp,tla $ ��Sf��,f�1i4 9 Compacted Fiil On Site CY 438 $ �{,pQ $ I��$�,DO 10 Excess Earth Removal � CY 2693 $ I 1,�p O $�q_(0�3,04 �1 Replace grate&curb box with concrete lid& manhole access frame&lid(S-E12) EA . 1 $ �o pcp $ SOO [)O 12 Replace 6'dia:Junction Manholes (ID) EA 2 $��'�,00 $ ��3�HQp,Oa 13 6'dia.Junction Manhole over ex. Pipe EA 1 $ �.S�p,Qp$ o0_a� 14 Replace inlet curb box with plate(S-E16) EA 1 $ �4p.Q�$ y p,�o 15 Double inlet(2'x6' ID)with curb box EA 1 $ � ��� �Ap $, (�,Qd 16 Pipe Connection to existing inlet EA 1 $ �Qp,QQ$ 1�C�,t�61 17 Adjust existing grate(SE-13) EA 1 $ "�,p0 $ '�00,Do 18 Trench grate assembly(I-7) EA 1 $ '�,�qp,(10 $ '��$Q�,�O 19 Singl�Grated Inlet(2'x3' ID) &curb box EA 1 $ �,�$p.00$ (ti5_9D.cao 20 Single Grated Inlet(2'x4' ID)&curb box EA 1 $ ���.OU $ �tigta0•U8 21 Single Grated Inlet(2.5'x4' ID)&curb bQx EA 1 $ (�C3 $ � . 22 Single Grated Inlet(2.5'x3' ID)&curb box EA 3 $ Oo $ ..Clo Single Grated Inlet(2.5'x3.5' ID)with curb 23 box EA 1 $ �,QQ,Qa $ }�po.o0 24 Single Grated Inlet(3'x3' ID) &curb box EA 1 $ �,R(�,Q� $ � m,o0 25 Single Grated Inlet(4'x4' ID)with Neenah R- 3246-AL&curb box EA 1 ��p0,lD8 $��5(k?.Oo 26 Single Grated Inlet(2.5'x3' ID)with Neenah R-3246-AL&curb box SA 1 $=��,� $ ��,�d 27 R-3246-AL&curb box EA 2 $ �j,�a $ �,Oa 28 Remove Steel Pipe at Walk &connect pipe to � new Inlet(I-4) EA 1 $ �0,�0 $ ln 5O.0� 29 15"Class III RCP LF 514 $ 3�,�Q $ ����O 30 18"Class III RCP LF 25.5 $ 0 00 $ a� 31 24" Class III RCP LF 160 $ �0 d4 $ 0� � Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#4 , _ BROADWAY PHASE U Nov.3,2006 32 Headwail at end of 24" RCI'(P2) EA 1 � ' �(�yQ $�,ap 33 Rip-Rap SY 14 $ '�5.00 $ "35C1,�� 34 Remove&Replace segmental retaining wall at S.W.corner of Lacey SF 39 $ ��,p0 $ �,'��(,�0 0 . 35 Kidds Sign Relocation LS 1 $�,QO $�(,�,pp 36 Hardees Sign Relocation LS 1 $ 5���•�$ S-�!.,d,pa 37 Pavers at Freedom Comer SF 1355 $ � $,t�d $ i�.Sym,ao 38 Gray stone pavers for Park Sign bases SF 261 $ �,�p $ � 1�,qq • 39 Adjusted Waterline&Gas Valve Cover EA 17 $ tSO,Qa $ � �Sd,p o 40 8"C-900 PVC Pressure Class 150 LF 1926 $ p4 $ Oo 41 6"C-900 PVC Pressure Class 150 LF 72 $ q $ 4a 42 Cap Existing Main with Thrust Biocking EA 1 $ �,om � 3� .O� 43 45°Bend with Thrust Blocking EA 5 $ ��Q ,�� $ �;�„�O.O� 44 11.5°Bend with Thrust Blocking EA 3 $ ����� $ '�Sp,pp 45 Connections to Existing Mains EA 5 $�,�,�fl $ �'�Y�Qp,�}O 46 8"Gate Valves EA 6 $ $ qc� 47 6"Gate Valves EA 4 $ a $ e7 ' 48 2"Gate Valve EA 1 $ L��Q,�p $ y(1�,Qa 49 Extension of other service lines(<_2") LF 77 ��',Q� $ �,Q�S.0� 50 Reconnect service lines EA 4 $ 6�Qd,� $ ����d,;� 51 Relocate Hydrants EA 1 $ ��.r.J�p�Qm $ 1 kS�,Ck� 52 8"x6"x6"Tee EA 1 $ ��(j�p� $ S�Q,q� 53 8"x8"x8"Tee EA 1 $ �C�,(l�@; $ '3p(�.pQ 54 8°x8"x5'Tee EA 3 $ '�,00 $ q(�0.Q 4 55 8"x8"x2"Tee EA 1 $ �;1�� $ '3�,� 56 Adjusted Sanitary Manhole Rims with Frame and Lid Replacement EA 7 $ �� ,��} $���e�Q,�d 57 Sanitary Sewer Manhole(9'depth) EA 1 $����O $ ��SOO:Q�O 58 Not used $ ��C. �et$ Ol�i,xx 59 7"P.C.Concrete Pavement SY 1160� $ .';�,'�,�Q $ 313.`335,oa 60 6"Granular Base Under T'Pvmt. SY 11605 $ �,Q 0 $ 3�.�IS�40 61 6"P.C.Conc. Entrances&Parking Lots SY 231 $ ��,(p4 $ [,,y.(�g RQ p 62 Concrete Curb as indicated on Plans LF 3912 $ ( ��p $ 3,91�.R4� 63 Truncated Dome Panels (2'x2') EA 50 $ 135�f?�o $ (Fi'�D,oO 64 Concrete Sidewalk SF 15730 $A ,'�-S $ �{3.�5�,Sa 65 4"Granular Base under Sidewalk SF 15730 $ ���� $ 3,��3�,5 0 66 Furnish and Install all signal poles; bases, mast arms,video detection system, signs, conduit,wiring, pullboxes, power supply, and all other equipment for the complete signalized intersection at Broadway and Perry LS 1 $ ��+Q'}t�p��$ (�,���.� Koehler En�ineering& Land Surveying,Inc. Bid Form 00410-Page#5 , � BROADWAY PHASE II - Nov.3,2006 67 Furnish and Install ali signal poles, bases, _ . mast arms, video detection system;signs, conduit,wiring, puNboxes, power supply, and alf other equipment far the compiete signalized intersection at Broadway and West End Blvd. LS 1 $��.000.41J $ ��.`����0 68 Temporary Traffic Control LS 1 $ $ � s p0 69 Installation of remaining New Signs EA 1 $ »Q,pQ$ o SO.�,p 70 Relocate Existing Signs EA 13 $ �5,0� $ ; .i� 05.�a 71 Pavement Marking(Striping) LS 1 $ `;��SQ0�0q$ � �spp,0� 72 3"Schedule 40 PVG Elect Conduit for Hospital Sign at West End L� 11 $ p $ _ S � 73 Fertilizing, Seeding&Mulching � LS 1 $ ,$�,Q(� $ L�,�� p� 74 Fumish and Install Turt Sod Sq.Yd. 450 $ 3,�� $ '�- 50-d q SUB-TOTAL,BID FOR BROADWAY IMPROVEMENTS FROM PEFiRY TO PARK ST. � v �� � c u � �$ �.0� . (1Nritt n figure) (Numerical figure) BROADWAY IMPROVEMENTS ON HARDEES SITE Item Est. No. Item Description Unit Quantity Unit Price Item Total 100 Removal of Tree with Trunk< 12" EA 4 $ q $ Q 00 101 Removal of Tree with Trunk 12"to 18" EA 1 $ (�p $ �(a q 100-A Compacted Fill On Site CY 20 $ Q � $ �pp,�c� 101—A Excess Earth Removal CY 871 $ ��,QO $9 S�I.04 102 Single Grated Inlet(2.0'x3.5' ID)with curb box EA 1 �_-�,Qp g�T�pADp 103 15 Class III RCP LF 13 $ �� q q $ (�,09 104 Concrete Curb LF 672 $ pQ $ pp 105 6'`P.G Conc. Entrances&Parking Lots SY 1094 $ �(o QQ $ t p p �06 8° P.G Conc. Pavement C� Dumpster Pad SY 24 $ ''�Q,�p $ �.���Q 107 Pavement Marking (Striping) LS 1 $ �,��_�,� $ � � Qp pq 108 Wood Board on Board Fence LF 85 $ p��0 $ � Q p q 109 Dumpster Enclosure LS 1 � Qp $ � 110 Fertilizing, Seeding &Mulching LS 1 $ ����d,OQ $ �}r��0,�� 111 Relocate Light L$ 1 $ Q Q $ �p 112 4 Ft.Tall White Pine Trees EA 14 $ �j� $ aQ Koehler Engineering& � Land Surveying,Inc. Bid Form 00410-Page#6 , BROADWAY PHASE II Nov.3,2006 SUB-TOTAL BID FOR BROADWAY IMPROVEMENTS ON HARDEES SITE. --, � Qo �`,f���,v �,� �'���r��n ;f i�,,�v-Nr�,d�b � �a►„�( (Written figure) � (Nu erical figure) BROADWAY IMPROV�EMENTS AT CLARK STREET � item Est. No. Item Description Unit Quantity Unit Price Item Total 2� General Contract Requirements(Mobilization, Demobilization, etc.) LS 1 $'��Op.Qv$ a,5�.t?Q Removal of Ex. Improvements (excluding 201 trees) LS 1 $ A'� $ /8.��tl� 202 Clearing&Grubbing LS 1 $ 4 p� $ 203 Removal of Tree with Trunk< 12" EA 1 $ �0,� $ (�'$O,Oc� 204 Temporary Erosion Control LS 1 $ �QO,04 $ Sm,Oc� 205 Compacted Fill On Site CY 15 $ ]5.00 $"� ,C� 206 Excess Earth Removal CY 781 $ �'Z,a� $9*��� _Op 207 3' dia. Shallow Manholes EA 2 $ ���C�,y,p9 $ '3_Qa�,�a 208 Single Grated Inlet(2'x3' ID) &curb box EA 2 $ ��(��,(19 $`3_�,a,po 209 12"Class III RCP LF 26.6 $ �p,p,� $ ��`33p1 a c� 210 Remove and Reuse Segmental Retaining wall at 2103 Broadway(Dr. Dennington's Office) SF 28 $ ,QO $ �i 2,po 21� Segmental Retaining wall along North side of Broadway, East of Clark SF 1700 �,p� $'3"�.�{()p,pp 212 Concrete Retaining Wall SF 296 $ �f$�d� $ I'�,3��,OA � 213 Adjusted Waterline&Gas Valve Cover EA 4 $ pp l�S�f� $ Sm, 214 6"C-900 PVC Pressure Class 150 LF 480 $ '�, � ,O� $ �d,[�,pp 215 Connections to Existing Mains EA 2 $ ap $ p pr� 216 6"Gate Valves EA 2 $ �J'�Q,do $ y p 217 Extension of other service lines (<_2") LF 8 $ ' p $ p q 218 Reconnect service lines EA 6 $ Qd,Qp $ �,1�QQ,� 219 Relocate water meter& install new meter tile EA 1 $ ?�(�,Q� $ �m,do � 220 Install new meter tile (only) � EA 1 $ �� (�p $ r pp � 221 Install new meter and meter tile EA 2 $ � Q Qp $ ���,p 2 2 2 Re loca te Hy dran ts E A 1 $ � $ o0 223 6"x6"x6"Tee EA 2 $ ���,()� $ �y�,� 224 Adjusted Sanitary Manhole Rims with Frame and Lid Replacement EA 3 $ 3S0,OQ $ ��LpC7 225 6" SDR-35 PVC Sanitary Sewer LF 75 $ �'�Y QO $ , ,po 226 Cleanout EA 1 $ �0.aEll $ 9O,�o Koehler Engineering& ' Land Surveying,Inc. Bid Form 00410-Page#7 BROADWAY PHASE II Nov.3,2006 227 7" P.C. Concrete Pavement SY 733 $ � $�� ,(,�O 228 6"Granular Base Under 7°Pavement SY 733 $ $ pp 229 6" P.G Cona Entrances SY 413 $ '3Q�p�3 $ ��Tq.p,po 230 Concrete Curb as indicated on Plans LF '1019 $ �,dp $ �,(���,�}ca 231 Truncated Dome Panels(2'x2') EA 26 $ 1�S.C�f'I $ 3,5l0,E3e 232 Concrete Sidewalk SF 2563 $ •�� 5 $ �i �,S 233 4"Granular Base under Sidewalk SF 2563 $ „�� $ �,�p�'� 234 Milling Strip(8'Wide)&Mill Intersection SY 1946 $ �, �,b $ ��,pT��(o 235 Asphaltic Base Course Ton 50 $ '�5,c�p $ ��o 236 Asphaitic Type BP2 Wearing Surface Ton 550 $ ,pp $ ,� 237 Concrete Stair SF 197 $ ��p� $ �!q��O� 238 Metal Handrail: LF 47 $�,p� $ 9�a-�(et,� 239 Furnish and InStall all signal poles, bases, mast arms,video detection system, signs, conduit,wiring, pullboxes, power supply, and all other equipment for the complete signalized intersection at Broadway and Clark st. �s � $ 1D�Z-E�..00$10.2.�.Oo 240 Temporary Traffic Control LS 1 $ ,�,qo$ ����,pp 241 Installation of remaining New Signs EA 1 $ �SQ,� $ �sO,p� 242 Relocate Existing Signs EA 7 $ 8�Qa $ ��5 pe� 243 Pavement Marking(Striping) LS 1 $ � �$ �q � 244 Fertilizing, Seeding&Mulching LS 1 $,�_((J��,�O $ � ppp,�Q 245 Furnish and Install Turf Sod Sq.Yd. 450 $ �,v�, �So O d 246 4"Dia. Dogwood Tree(N.E. corner Clark& Broadway) EA 1 $ "�,�} $ 2 pp �p� ' SUB-TOTAL BID FOR BROADWAY IMPROVEMENTS AT CLARK STREET � /�'�.�i S r � d /�Tl��lYG� �����ti, F� ���Id � (Written fi ure) � �x�-.�- p,,�,� c� 3G� � �d,�� (Numerical figure) TOTAL BID FOR ALL SECTIONS � �� T � �: a ($ �(� l���3.�' � (Written figure) �t.��, -�?� � �7XDc e�o��ar� �Nurrierical figure) (Total bid amount is to be shown in both words and figures. In case of discrepancy, the amount shown in words will govern. In case of error in extension, the unit and lump sum prices under each Pay Item will be considered correct, and these sums when properly Koehler Engineering& Land SuPveying,Inc. Bid Form 00410-Page#8 BROADWAY PHASE II Nov.3,2006 extended, shall constitute the Bid.) � Unit Prices have been computed in accordance with paragraph 11.9.2 of the General Conditions. If rock excavation, as defined by Specificatlon Section 0231�, is required for the construction of ihe project, the Bidder shall be compensated according fo the stipulafed unit price of$125(one hundred twenty five dollars)per cubic yard. The quantity of rock sha/l be determined in accordance with the procedures outlined in , the previously mentioned Section 023i6. Submission of a Bid on the project utilizing the required form indicates the B�dders full acceptance of this stipulafed price for rock excavation, if required. � � BIDDER acknowledges that quantities are not guaranteed and final payment will be based on actual quantities determined as provided in the eontract Documents. Any specific items or labor required to complete the projeet in accordance with the plans and construction documents which is not explicitly identified above shall be considered incidental to the total project cost, no additional compensation shall be paid for said item or labor. 5. BIDDER agrees that the Work requiring the closure of Broadway between Perry Avenue and West End Blvd.will be complete within 50 calendar days after the date Gontract Times commence to run as provided in paragraph 2.3 of the General Conditions,and that alt work will be substantially complete within 140 calendar days after the date when the Contract Times commences to run as provided in paragraph 2.3 of the General Conditions, and all work will be fully completed and ready for final payment in accordance with paragraph 14.13 of the General Conditions within 170 calendar days after the date when the Contract Times commences to run. BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement. 6. The following documents are attached to and made a condition of this Bid: (a) Required Bid Security in the form of bid bond or cashiers check. . (b) Required BIDDER'S Qualification Statement with supporting data. (c) Any Addenda issued for the project Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#9 BROADWAY PHASE If NoV.3,2006 7. Communications concerning this Bid shall be addressed to: Name A��� �,�,�,1� Address ��,4t 0 ��� v�l, � �� ��,� �'�'�(o � (a) Performance and Payment Bonding Company Name ;���ur� �i2� A- � � �� �w►n�u-f Address ��Or �-� ���� -t t�;�.� R1�-P��e��'rn�.rA- S�1/��`- Agent\Power of Attorney Name (if used) �'Di� ,� �R.� Address �� t�-�r l�-u��Q�� � (�.,�'F��1�r�v-.�,,;T�`��Z 8. Terms used in the Bid which are defined in the General conditions or Instructions will have the rneanings indicated in the General Conditions or Instructions. SUBMITTED on ,���e �� , 20€�t�. State Contractor License No. C� III`�� IF BIDDER is: An Individual By (SEAL) (Individual's Name) doing business as Business address Phone No.: Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#10 . w BROADWAY PHASE 11 Nov.3,2006 A Partnership By (SEAL) (Firm Name) (General Partner) Business address: Phone No.: A Corporation r::.�..� `rxr�., ;yii�'.� �1{titll/l�//j:� B�/ / � �`�����,d���``� , ( , ��� ' , � (Corporation Name) , ,' ';��.' ;��'���+�l�;��=�-�� �:�gS�� �1 F�{ � �i, �P�;,,,_ , � x�-�.e (St te of Incorporation) a '�,y ' �q�� � �" �¢� �°�` �,',��` �..1' �7 �l.� • C/ 4 � rs�'h. �r, ' �� �� '�1Rt1;4�. � r l !,✓ � (Name of rson Authorized to Sign) `� ����' -`.�� � � ' • �`�f' ��wA � .< �' �" � � � �j. r_ � � ��x �'}.�tr•� � .:.� ' liL �.+ 1�'$5:i��FJ 6 =�`r � -/����7 tJ�r�i a,1�'���` � fTitle � � ,E��, ,���, ,�;���> ) x��;_: � �,•t� . _ (Corpbr�te�eal) Attest v"� (Sec etary) Business address: 3��a ��r� �,.� . � Q.�9-.� ����,�/VI�� '(,�3�,q Phone No.: ���� ��n�e °'�0.� Date of Qualification to do business is l��s Koehler Engineering& Land Surveying,Inc. Bid Forrn 00410-Page#11 . + . BROADWAY PHASE II Nov.3,2006 A Joint Venture � By (SEAL) (Name) (Address) By (SEAL) (Name) (Address) Phone Nt�mber and Address for receipt of official communications: (Ea�h joinf venturer must sign. The manner of signing for each individual, partn�rship and corporation that is a party to the joint venture should be in the manner indicated above.) �,�„ia�-` ;,�;a�,�� �.���� '; ;+ ; ,� � Koehler Engineering& ° Land Surveying,Inc. Bid Form 00410-Page#12 � FROItiIABAI�C�R CONCRETERS, INC. CONCRETE CONTRACTOR GLENN FRONABARGER 3290 STATE HWY E PRESIDENT OAK RIDGE, MO 63769 (573)266-3212 November 30, 2006 City of Cape Girardeau 401 Independence Street Cape Girardeau, MO 63701 RE: Qualifications Of Bidder Dear Sirs: Fronabarger Concreters, Inc. is a 21 year old business specializing if concrete flat work and site construction. We have successfully completed many projects for the City of Cape Girardeau as well as many of the surrounding cities and developers. We have a work force of forty men and a great working relationship with many subcontractors in the area which we plan on utilizing for this job. We also have a large inventory of equipment including but not limited to trackhoes, backhoes, dump trucks, bulldozers, tractors, motor graders, utility trucks, concrete forms, and finishing equipment. We have successfully completed projects of this magnitude in the past and we are certainly qualified to work on this project. Please do not hesitate to call with any questions or concerns at(573) 266 - 3212. Sincerely, ��� Glenn Fronabar er President ��� g � � F"ROl`IABARC�ER CONCRETERS, INC. CONCRETE CONTRACTOR GLENN FFiONABARGER 3290 STATE HWY E PFiESIDENT OAK RIDGE,MO 63769 (573)266-3212 Navember 30, 2006 City of Cape Girardeau 401 Independence Street Cape Girardeau, MO 63701 RE: Traffic Control @ Clark Street and Broadway Dear Sirs: In order to complete the work outlined in the construction drawings the existing traffic poles and lights will have to be removed at the above intersection. We have planed on setting up temporary lighting away form the existing lights and out of direct conflict with the construction activities. There will also be a number of lane closures with this work and all closures will be done in compliance with the MLTRC. Please do not hesitate to call with any questions or concerns at(573) 266 - 3212. Sincerely, -r"' � a-� Glenn Fron arger, Presiden�� � � � THE AMERICAN INSTITUTE OF ARCHITECTS AIA Document A310 Bid Bond KNOW ALL MEN BY THESE PRESENTS, that we FRONABARGER CONCRETERS INC 3290 STATE HWY E OAK RIDGE,MO 63769 as Principal, hereinafter called the Principal, and United Fire & Casualty Company, P.O. Box 73909, 118 Second Avenue SE, Cedar Rapids, lowa 52407-3909, 800-3�13-9130 a corporation duly organized under the laws of the State of lowa as Surery, hereinafter called the Surety, are held and firmly bound unto City of Cape Girardeau 401 Independence CAPE GIRARDEAU,MO 63701 as Obligee, hereinafter called the Obligee, in the sum of Five and 00/100 Percent of the Bid Amount Dollars (5% ), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns,jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for Broadway Widening NOW,THEREFORE,if the Obligee shall accept[he bid of the principal and the Principal shall enter into a ConVact with[he Obligee in accor- dance with the terms of such bid,and give such bond or bonds as may be specified in the bidding or ConVact Documents with good and wf- ficient surery for the faithful pertormance of such ConVact and for the prompt payment of labor and material fumished in the prosecuUon there- of,or in the event of the failure of the Principal to enter such ConVact and give such bond or bonds,if the Principal shall pay to the Obligee the difference not to exceed the penalry hereof between Ihe amount specified in said bid and such larger amount for v�,fiich the Obligee may in good faith convact with another party to perform the Work covered by sald bid,then this obligation shall be null and void,otherwise to remain in full force and effect. j "" d € �r5f .a Signed and sealed this 30th day of November , 2006 �y`� r,� � � � ` �f�+��Ils+�lrr����`,, � .� �',��.h�'�' �� {�`�: /ii ���i �� FRONABARGER CONCRET ,:.' �,�' � l� /� (Principal) ' �� '� y"', . .� ��" ��`��, r� ��.{ !� ` `�'��,;, (Witness) .. ir� • r; �,�J , r� `_r��...�� : a� '. C� r f° =�. :^`' < 7 s, � itle ti'•,.s�* ,� ���� �' .` 3�:.:�.. =�r� / � /rtJ�F�t�� r,����� �''���`` � , United Fire& Casualry Comp, � ��;'��rr�,��'�'����''�� �`,�� ` ; � �(f�1 �� (Surery! .fSeai�.�' � � ` 1�-}-� ) 'J � 'r '�'? � '', ..s .,�;� r a� f-'^'� �f,,; n � i;,i:` (Witness) / '` � r�k , { f; r� :� '�U Ul Q ls�L;t/GY r 1 l-, �..��-� i �' } • ::�� �y%� ( i::. � t : ,' rF- �h i. t !�� Todd A. War�;f1e�Attorne ` ' � `� � - y—In—��� `r , ' � �� '�1 V� ..1 AIADOCUMENTA310�BID BOND�AIA��FEBRUARY 1960 ED�THEAMERICAN �''��J �, :- ������ ��'�` ' INSTITUTE OF ARCHITECTS,1735 N.Y.AVE.,N.W.,WASHINGTON,D,C.20006 ;��i;y�t s� � - ACKNOWLEDGMENT OF SURETY State of Missouri County of Cape Girardeau On this 30th�y o f November ,2006 Personally appeared before me Todd A. Ward who being duly sworn did depose and say that he/she is the attorney-in-fact of the United Fire and Casualty Company of Cedar Rapids,Iowa,that the seal affixed to the attached instrvxnent is the Corporate Seal of said Corporation,and that said instrument was signed and sealed on behalf of said Corporation by authority of its Board of Directors and the said Todd A. Ward acknowledged that he/she executed said instrument as such attorney-in-fact and as the free act and deed of said Corporarion. . F y1A'°t�"'''• PRISCILLA B. HUNTER ..r O,r��i . *;NOfAq�; �Notary Publlc, State of Missourl dE�`; � Cape Gtrardec�u Counly s,,,y�,,,uP,���• Commission # 06520356 Notary Public �.,,;s6��... Expires Aprll 20, 2009 • UND-20316 ,' � : • UNITED FIRE&CASUALTY COMPANY ; �n, � .�_. ._,. .. . W00019,1 �.. _ -�- , . Home Office—Cedar Rapids, lowa � � � � ;� �.�_,�' �� � ,�,,,� �,,.,�3����� ,,,;�� Certified Copy of Power of Attorney � ., �� .� ap Gi r e y ,�,,:. w, . (Original on file at Home Office of Company—See Certification) � '��� ,..� ' 1 n ri'n. ���' CAPE GIRARDEAU, MO 63701 KNOW ALL MEN BY THESE PRESENTS,That the UNITED FIRE&CASUALTY COMPANY, a corporation duly organized and existing under the laws of the State of lowa, and having its principal office in Cedar Rapids, State of lowa,does make,consti- tute and;�p x in..t,.,.;,_a.:,:,,M.,.:��1AE�,1.� . . .pE�u,C � . . RON GLASCO, OR ALAN H RAUSENBERGER,JASON RAUSE��R��i,��F�C�iV�}�.�; I�,,_,Q.� �����ARD, OR NANCY STRAUSER,OR PRISCILLA B HUNTER, ALL INQI�JDUQ�L�Y �. ��. � � � ���::"��;, of , CAP�G�FtA�tT���l�, MO��701�� ��.: � � � k � : ' � k�� �� ;:; � z z:� its true and lawful Attorney(s) in-Fact with power and authority hereby conPetr�d t�si�r�;"se�a�d ex�'i`te i�rtts��eYta�f��1��aw- ful bonds,undertakings and other obligatory instrumenis of similar nature as t�o I` a a �A�� A�y}y�D. LL�.�N�3 �% � �:�.r3..�.�� k€ �.7 �,�z �,;: . .�. and to bind UNffED FIRE&CASUALTY COMPANY thereby as fully and to the same extent as if such instruments were signed by the duly authorized o�cers of UNITED FIRE&CASUALTY COMPANY and all the acts of said Attorney, pursuant to the authority hereby given are hereby ratified and confirmed. The Authority hereby granted shall expire�IV��r,���3�tt��OQ7 �:� �° �nheSs=soio�ter rev�ked. This power of Attorney is made and execute�d p r�u n t�-and�b�aufYt`°oriry�of�I�e�fo�lt�wir�g By-Law.duly adopted by the - Board.of Directors of the Company on April 18,��' �`�� ���"L' �,„ ��� �` ' � � §'� �� � � � � ,���, � �� "Article V—Surety Bonds and Undertakings" Section 2,Appointrnent cfAttorney-n-Fad.°The President or arry�ce president,or any other officer of the Company,may,from time to time,appoint by written certificates attorneys-in-fact ro act in behalf of the Company in the execution of policies of insurance,bonds,undertakings and other obligatory insUu- ments of like nature.The signature of any officer authorized hereby,and the Corporate seal,may be a�xed by facsimile to any pawer of attorney or special p oHer of auorney or certification of either authorized hereby;such signature and seal,when so used,being adopted by the Company as the original signa- ture of such officer and the original seal of the Company,to be valid and binding upon the company with the same force and effect as though manually affixed.Sudi attorneys-in-fact,subject to the limiWtions set forth in their respective certificates of authority shall have full power to bind the Company by their signature and execudon of any such instruments and to attach the seal of the Company thereto.The President or any Yce President,the Board of Directors or any other officer of the Comparry may at any time revoke all power and authority previously given to any attorney-in-Fact. IN WITNESS WHEREOF,the UNITED FIRE&CASUALTY COMPANY has caused these presents to be signed by its vice president and its corporate seal to be hereto affixed this ���u���nn,,,, 2006. ��o����,.F,,� 29th day of November , . , y�9 coxroRrcre��= � " *' �� � ' UNITED FIRE&CASUALTY COMPANY � sswt �: `� �,' _ . . gy ��..�,,,.,,.;._� ''��•,�?�R,,�ro���,: Vice President State of;lowa, Co�nty c�f Linn, �s ':: On this�9th da�of f�fc�vember� ,2006 efore me personally came Dennis Richmann to me known, who being by me � � duly s�uom,d��l d�poser arrd sa��'tha�I�e-r��ic��s n�edar Rapids, State of lowa;that he is a Vice President of the UNITED FIRE &CASUALTY COMPANY, the corporation described in and which executed the above instrument;that he knows the seal of said corporation;that the seal affixed to the said instrument is such corporate seal;that it was so a�xed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said corporation. � ,,.�� • MAFIY A.JAI�i $ �Z coM�nssioN�t� . r �r��� Notary P lic --- My Commission expires October 26,2007 Il��w wl�r� CERTIFICATI�1 '��; � �P�' I, the undersigned officer of the UNITED FIRE&CASUALN COMPANY,,,do hereby certify that l have co,mpared the foregoing copy of the Power of Attorney and affidavit, and the copy of the Sectic�n�ftl��b�-I�vus of said-Co'i��arly�ias,set�fo�rt`h in said Power of Attorney, with the ORIGINALS ON FILE IN THE HOME OFFICE OF SAID COMPANY, and that the same are correct transcripts thereof, and of the whole of the said originals, and that the said Power of Attorney has not been revoked and is now in fu�l force and�ff�ct, � In testimc�ny-�vrh�retif I I�avt�•herei�irr[o su�s�rib�d my name and affixed the corporate seal of the said Company this 30th day;af �Iovei'�be�" ,�2�06. ��o•"�'�'��,,,� <_ :4�' �r�'�� i� �O Secretary. coxroxnTe � ssn� �; �..�,�/� UND-3156(1-03) 2 /'''��R��������``,,: . , . . UNITED FIRE & CASUALTY COMPANY UNITED LIFE INSURANCE COMPANY 118 Second Avenue, S.E., P.O. Box 73909, Cedar Rapids, Iowa 52407 NOTICE TO MISSOURI SURETY BOND HOLDERS Should you have a question about your bond or policy,please contact your insurance agent first. If you are unable to contact or obtain information from your agent,you may contact our company at address and phone number below: UIVITED FIRE&CASUALTY COMPANY ATTENTION: BOND DEPARTMENT P.O.BOX 73909 CEDAR RAPIDS,IOWA 52407 1-800-343-9130 �