HomeMy WebLinkAboutRES.1502.10-04-1999 � -� . BILL NO. 9 - . .� RESOLUTION NO. /�j�;s;,� A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT WITH HUFFMAN, INC. , FOR THE CAPE ROCK WATER TREATMENT PLANT EXPANSION AND ALLWIAL WELL FIELD CONSTRUCTION BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute an Agreement with Huffman, Inc. for the Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction. A copy of said Contract is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THIS � DAY OF � � fl '�`� , 19 �, ! . � A. . Spradling, III, Ma or ATTEST: �) � � � r ;� j Gayle! . Conrad, City Clerk CITY OF CAPE GIRARDEAU, MISSOURI _� Cape Rock Water Treatment Plant Expansion and Aliuvial Well Field Construction Treatment Plant Expansion and Improvements Construction Contract CR-2 STANDARDFORM OFAGREEMENT BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE THIS AGREEMENT is dated as of the �� day of a in the year 19�by and between the City of Cape Girardeau, Missouri (hereinafter called OWNER) and uffman. Inc. (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: Improvements to the Cape Rock Water Treatment Plant generally described as two aerators, one new solids contact clarifying mechanism and concrete basin; procurement and installation of two new solids contact mechanisms and associated modifications to the existing basins, blend tank and mixing mechanisms; modification to existing secondary sedimentation basins, new circular secondary sedimentation basin with flocculating mechanism and sludge scraper; rehabilitation of six rapid sand filters, construction of 14 new rapid sand filters and associated building; new high service pump station, secondary sludge recirculation pump station, new chemical feed building and chemical feed equipment; new lime feed building and lime feed equipment; laboratory/office and control room buildout, and yard piping and site improvements as defined by the Contract Drawings and Specifications Article 2. ENGINEER. The City Engineer or his designee is to act as OWNER's representative,assume all duties and responsibilities and have the rights and authority assigned to ENGINEER in the I:\94159\1008\SPECWGR2. A-1 Contract Documents in connection with completion of the Work in accordance with the Contract Documents. Article 3. CONTRACT TIMES 3.1 The work will be substantially completed within 600 calendar days after the date when the Contract Times commence to run as provided in paragraph 2.3 of the General Conditions, and competed and ready for final payment in accordance with paragraph 14.13 of the General Conditions within 700 days after the date when the Contract Times commence to run. 3.2 "Liquidated Damage": Owner and Contractor recognize that time is of the essence of this Agreement and that Owner may suffer financial loss and/or legal penalties if the Work is not completed within the time specified above, plus any extensions thereof allowed in accordancewith the GENERAL CONDITIONS. Ownerand Contractoralso recognize the delays, expense, and difficulties involved in proving the actual loss suffered by Owner if the Work is not Substantially Completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty)Contractorshall pay Owner One-Thousand Dollars($1,000.00)for each day that expires after the time specified above in this Article 3. SCHEDULE for Substantial Completion until the Work is Substantially Complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete remaining Work within the time specified in this Article 3. SCHEDULE for completion and readiness for final payment or any proper extension thereof granted by Owner, Contractor shall pay Owner One-Thousand Dollars($1,000.00)for each day that expires after the time specified for completion and readiness for final payment. Article 4. CONTRACT PRICE. OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to paragraphs 4.1 below: 4.1 For all Work other than Unit Price Work, a Lump Sum of: Fifteen Million Six Hundred Thousand Dollars and no cents ($ 15.600.000.00). All specific cash allowances are included in the above price and have been computed in accordance with paragraph 11.8 of the General Conditions. None of the Alternates, No. 1 through No. 5 are included in the above price. I:\94159\1008\SPECIAGR2. A-2 Article 5. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. Application for payment shall include a Schedule of Values and a Schedule of Stored Materials. 5.1 Progress payments;Retainage. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER,on or about the 10th day of each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below. All such payments will be measured by the schedule of values established in paragraph 2.9 of the General Conditions (and in the case of Unit Price Work based on the numberof units completed) or, in the event there is no schedule of values, as provided in the General Requirements. 5.1.1 Prior to Substantial Completion,progress payments will be made in an amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. 90% of Work completed (with the balance being retainage). If Work has been 50% completed as determined by ENGINEER,and if the characterand progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER, on recommendationof ENGINEER, may determinethat as long as the characterand progress of the Work remain satisfactoryto them,there will be no additional retainage on account of Work completed, in which case, the remaining progress payments prior to Substantial Completion will be an amount equal to 100% of the Work completed. 90% (with the balance being retainage) of materials and equipment not incorporated in the Work(but delivered,suitably stored and accompanied by documentations satisfactoryto OWNER as provided in paragraph 14.2 of the General Conditions). 5.1.2 Upon Substantial Completion, in an amount sufficient to increase total payments to CONTRACTOR to 95% of the Contract Price (with the balance being retainage),less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. 5.2 Final Payment. Upon final completion and acceptance of the Work in accordancewith paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. I:\94159\1008\SPECWGR2. A-3 Article 6. INTEREST. 6.1 All moneys not paid when due as provided in Article 14 of the General Conditions shall bear interest at the maximum rate allowed by law at the place of the Project. 6.2 If the Owner fails to make payment thirty (30) days after receipt of the Contractor's application for payment, in addition to other remedies availableto the Contractor,then shall be added to each sum payment interest in accordance with Section 34.057 RSMo. as amended. Article 7. CONTRACTOR'S REPRESENTATIONS. In order to induce OWNER to enter into the Agreement, CONTRACTOR makes the following representations: 7.1 CONTRACTOR has examined and carefully studied the Contract Documents (including the Addenda listed in paragraph 8) and the other related data identified in the Bidding Documents, including "technical data". 7.2 CONTRACTOR has visited the site and become familiarwith and is satisfied as to the general, local and site conditions that may affect cost, progress, performance and furnishing of the Work. 7.3 CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, perFormance and furnishing of the Work. 7.4 CONTRACTOR has carefully studied all reports of explorations and tests of subsurFace conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1 of the General Conditions. CONTRACTOR accepts the determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which CONTRACTOR is entitled to rely as provided in paragraph 4.2 of the General conditions. CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and may not be complete for CONTRACTOR's purposes. CONTRACTOR acknowledges that OWNER and ENGINEER do not assume responsibilityfor the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and carefufly studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, perFormance or 1:\94159\7 008\SPEC W G R2. A-4 furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider that any additional examinations, investigations,explorations, tests, studies or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents. 7.5 CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the site that relates to the Work as indicated in the Contract Documents. 7.6 CONTRACTOR has correlated the information known to CONTRACTOR, information and observation obtained from visits to the site, reports and drawings identified in the Contract documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents. 7.7 CONTRACTORhas given ENGINEERwritten notice of all conflicts,errors, ambiguities or discrepanciesthat CONTRACTOR has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptableto CONTRACTOR,and the Contract Documents are generally sufficientto indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. Article 8. CONTRACT DOCUMENTS. The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR concerning the Work consist of the following: 8.1 This Agreement (pages A-1 to A-7 inclusive). 8.2 A. Performance Bond (Pages 00610-1 through 00610-2). B. Labor and Material Payment Bond (pages 00620-1 through 00620-3). 8.3 Notice to Proceed. 8.4 General Conditions (pages 1 to 44 , inclusive). 8.5 Supplementary Conditions (pages SC-1 to SC-6, inclusive). 8.6 Specifications bearing the title Tieatment Plant Expansion and lm�orovements Construction Contract CR-2. 8.7 Drawings. 8.8 Addenda numbers 1, 2, 3, 4, 4A, 5, 6, 7, and 8. I:\94159\1008\SPECWGR2. A-S 8.9 CONTRACTOR's Bid include 1. Bid Forms (Pages BF-1 through BF-8) 2. Bid Bond ( 1 Page) 3. Schedule of Major Equipment Manufacturers/Suppliers (Pages SCHOF-1 through SCHOF -2) 8.10 Documentation submitted by CONTRACTOR prior to Notice of Award. (1 Page) 8.11 The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: All Written Amendments and other documents amending, modifying or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. The documents listed in paragraphs 8.2 et seq. above are attached to this Agreement (except as expressly noted otherwise above). There are no Contract Documents other than those listed above in the Article 8. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. Article 9. MISCELLANEOUS. 9.1 Terms used in this Agreementwhich are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 9.2 No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent(except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 9.3 OWNER and CONTRACTOReach binds itself, its partners, successors, assigns and legal representativesto the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents. 9.4 Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. I:\94159\1008\SPEC�AGR2. A-6 IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed the Agreement in multiple copies, One counterpart each has been delivered to CONTRACTOR and ENGINEER and two counterpartsto the OWNER. All portions of the Contract Documents have been signed, initialed or identified by OWNER and CONTRACTOR or identified by ENGINEER on their behalf. This Agreementwill be effective on - , 19.�which is the Effective Date of the Agreement). .._- :-E�tI�/NER Ci Cape Girardeau_ CONTRACTOR Huffman. Inc. By: Micha G. M' er gy: Michael J. Huffman ___.__ _ (TYpe N �e) � (Signature) (Signat Title: City Administrator Title: Presi dent [CORPORATE SEAL] [CORPORATE SEAL] Attest Attest . �^ Address for gi ' g notices Address for giving n e 401 Independence Street 1550 Black River Industrial Park Road PO Box 279 Cape Girardeau. MO 63701 Poplar Bluff. MO 63902-0279 (If OWNER is a public body, attach License No. F167629 evidence of authority to sign and resolution or other documents Agent for service of process: authorizing execution ofAgreement. Michael J. Huffman, President (If CONTRACTOR is corporation, attach evidence of authority to sign.) 1:�94159\1008�SPECWGR2. A-7 � RECORD OF PROCEEDINGS CERTIFICATE OF RESOLUTION OF HUFFMAN, INC. I, Sherry J. Huffman, Do Hereby Certify, that the following is a complete, true and correct copy of a certain resolution of the Board of Directors of Huffman, Inc. , a corporation duly organized and existing under the laws of the State of Delaware, which resolution was duly adopted at a duly called meeting of the said Board, held on April 23, 1999, a quorum being present, and is set forth in the minutes of the said meeting; that I am the keeper of the corporation seal and of the minutes and records of this Corporation; and that the said resolution has not been rescinded or modified: RESOLVED, that the proper officer of this Corporation as herein set out; Michael J. Huffman, President, is hereby authorized and directed to execute and deliver in the name and on behalf of this Corporation and under its Corporate seal, any bid, contract, transfer or assignment he shall deem necessary and proper to carry out the purpose of the aforesaid Corporation. IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed the seal of the said Corporation, this 23rd day of November, 1999. CORPORATE SEAL � , Sherry ffman cretary 4 � � Dp 1MFNT 00610 - PERPOPMANCE SOND Bond No. 1 1 1 41 682507 KNOW ALL MEN BY THESE PRESENTS: that Huffman, Inc. P.O. Box 279, 1550 Black River I��dustrial Park Road Poplar Bluff, MO 63901 as principal, hereinaf�er called Concraccor, and Fireman's Fund I��surance Company 777 San Mari�i Drive Novato CA 94998 (415)899-2000 as Surety, hereinafter called Surety, are held and firmly bound unto City ofi Cape Girardeau, Missouri 401 Independence Street Cape Girardeau, MO 63703 as Obligee, hereinafCer called Owner, in the amounc of FIFTEEN MILLION SIX HUNDRED THOUSAND 15 600,000.00 NO/100 dollars (S ' ) , for the payment whereof Contractor and Suzety bind chemselves, their heirs, executors, adminiaZrators, successors and assigna, jointly and aeverally, firmly by theae presents. wFiEREAS, Concractor hae by written Agreement da�ed��,a�,.il�adsJ 7 19.�, entered into a contract with Owr►er for improvements to the Cape Rock water Treacmenc Plant generally dascribed as two aerators, one new solids contact clarifying mechanism and concrete baein; procurement and inatallation of two new solids contact mechanisms and associaCed modifications to the existing basins, blend tank and mixing mechaniams; modification to exiating secondary sedimentation basins, new circular aecondary eedimentation basin with . floccul.ating mechanism and sludge acraper; rehabilitation of eix rapid sand filters, construction of 14 new rapid sand filters and associated building, new high service pump station, secondary sludge recirculation pump station; new chemical feed building and chemical feed eguipment; new 2ime feed building and lime feed equipment; laboratory/office and control room buildout; and yard piping and eite improvements as defined by the Contracc Drawings and Specifications. NOW, THEREFORE, THE CON'DITION OF' THIS OBL2GATION is such that, if Contractor shall promptly and faithfully perform said Contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect. The Surety hcreby waives notice of anY alteration or extension of time made by the Owner. whenever Contractor shall be, and declared by Owner to be in default under the Contract, the Owner having performed Owner�s obligations, thereunder, the Surety may promptly remedy the default, or shall promp�ly: A. Complete tihe contract in accordance with its terms and conditiona, or B. Obfiain a bid or bida for completing the Contract in accordance with its terms and conditiona, and upoa deternination by surety of the lowest responsible bidder, or, if the Owner elects, upon determination by the Ows�er and the Surety jointly of che lowegt responsible bidder, arrange for a contzact between auch bidder and Owner, and make available as Work progresses (even though there should be a default or a succession of defaults under the contract vr contracts of completion arranged under chis paragraph) sufficienc tunde Lo pay the cost of completion less the balarice of the Contract Price; but not exceeding, including other costs aad damages ior which the Surety may be liable hereunder, C8W00610.0a1 00610-1 122798 i - ^^�^^�;ENT 00610 - PERFORMANCE BOND: continued che amount set forth in the firsc paragraph hereof. The term "balance of the Contract Price, " as used in this paragraph, shall mean the total amounL payable by Owner to Contractor under the Concract and any amendmenca thereto, less the amount properly paid by Owner to Contractor. Any euit under this Bond must be instituted before the expiration of two years from the date on which final payment under the Contract falls due. No right of action shall accrue on thia 8ond to or for the use of any persoa � or corporation other than the Owner named herein or the heirs, executors, . administrators, or euccessors of the Owner. ;.�., ,:� IMPORTANT: Surety companies executing SONDS musc appear on tha Treaeury Departmenc's most current liat (Circular 570 as amended) and be authorized to transact buainesa in Missouri. . signed and sealed this /?h� day of � 19.� CONT$a�Q$ (CORFORATE SEAL) Huffman, I��c. ✓ 8y . Michael J. Huffman, P sident '",l SL7REZY �pVNTER�IGNED: Resident Agent : State of Misaouri Fireman's Fund Insurance Company ___ �; - , „ r'gy ` - - ' BY '��-- -- ` Sharolyn L. Norman Janet L. Rehkop, Attorney-in-Fa t ATTORNEY-IN-FACT (CORPORATE SEAL) (This Bond shall ba accompanied with Attorney-in-Fact'e authority from Surety) Approved as to Form: Attorney for E1�TD p g DpCUMENT 0 0 610 1Z2796 00610-2 CPW00610.001 DOCUMEN�' 0062Q LABOR AND MATERIAL PAYMEN'T BOND �Ond No• 1 1 1 41 682507 This Bond is iasued simultaneously with Performance Bond in favor of Owner conditioned on the full and faiLhful performance of the Contract. KNOW ALL MEN BY THESE PRESENTS: that Huffiman, Inc. P.O. Box 279, 1550 Black River Industrial Park Road Poplar Blufifi MO 63901 ae Principal, hereinafter called Contractor, and Fireman's Fund I��surance Compa��v _ 777 San Mari�� Drive Novato CA 94998 (415)899-2000 as Surety, hereinafter called Surety, are held and firmly bound unto City of Cape Girardeau Missouri 401 Independence Street Cape Girardeau, MO 63703 as Obligee, hereinafter called Owner, £or the use and benefit of claimants as hereinbelow defined, in the amount of FIFTEEN MILLION SIX HUNDRED THOUSAND 8 NO/100 dollars ($ �5,600,000.00 ) , for the payment whereof Principal and Surety bind themaelvea, cheir heirs, executors, administrators, successors and aasigna, �ointly and severally, firmly by thesa presenta. WHEREA3, Contractor has by written Agreement dated , 19� entered into a contract with Owner for construction of improvementa to the Cape Rock Water Treatment Plant generally described as two aerators, one new solida contact claritying mechaniam and concrete basin; procurement and installation of Lwo new solids contact mechanisms and associated modifications to the existing basins, blend tank and mixing mechanisms; modi.fication to existing secondaxy sedimentation baeins, new circular secondary sedimentation basin with flocculating mechanism and sludge scraper; rehabilitation of aix rapid sand filters, construction of 14 new rapid eand filters and associated building, new high service pump station, secondary sludqe recirculation pump station; new �chemical feed building and chemica2 feed equipment; new lime feed building and lime feed equipmant; laboratory/cffice and control room buildout; and yazd pipiag and site improvements as defined by the Contract Drawings and Specifications. NOW� THEREFORE, TFiB CONDITION OF THIS OBLIGATION is such that, if Contractor shall promptly make payment to all c].simanta as hereinafter defined, for all labor and material used or reasonably required for use in tha performance of the Contract, then thia obligation shall be void; oCherwise it shall remain in full force and effect, subject, however, to the following condi.tior�s: A. A claimaat is deEined as one having a direct con�ract with the Contractor or with a Subcontractor of the Contractor for labor, material, or both, used or reasonably reguired for use in tha performance of the Contract, labor and material being construed to include that part of water, gas. power, light, heat. oil, gasoline, telephone ser�ice or rental of equipmen� directly applicable to the Concract. B. The above named Contractor and Surety hereby jointly and severaliy agree with the Owrter Chat every claimant a� h�rein defined, who has not C?W00620.001 00620-1 1Z2796 .. n��rnNx�NT 00620 - LABOR AND MATERIAL PAYMENT BOND: continued been paid in full be�ore che expixaCion of a period of 90 days after the date on which the last of such claimant's work or labor was done or performed, or materials were furnished by such claimant, may sue on this bond for the use of auch claimant, prosecute the suit to final judgment for euch sum or auma as may be justly due claimant, and have execution thereon. The Owner ehall not be liable for the payment of any costa or expenses of any such suit. C. No suit or action shall be commenced hereunder by any claimanC: 1. Unless claimanc other than one having a direct con�ract with Principal, shall have given written notice to any two of the following: the Contractor, the Owrier, or the Surety within 90 days , after such claimant did or performed the last of the work or labor, � or furnished the Iast of the materials for which said claim ia made, s�ating with substantial accuracy the amount claimed and the � name of the party to whom the materials were furnished, or for whom the work or labor was done or performed. Such noCice shall be served by mailing the same by registered mail or certified mail, postage prepaid, in an envelope addressed to Contractor, Owner or Surety, at any place where an office ie regularly maintained for the transaction of business, or served in any manner in which legal procesa may be served in the state in which the aforesaid project is located, save that such aervice need not be made by a public officer. �. After the expiration of one year following the date on which Contractor ceased Work on ths Contract, it being underetood, however, that if any limitacion embodied in thia bond is prohibited � by any law controlling the construccion hereof, such limitation ahall ba deemed to be amended so as to be equal to tha minimum period of limitation permitted by such law. 3_ Other than in a state courc of competent jurisdiction in and for the rovnty or other political subdiviaion of the atate in which the Project, or any parc thereof, is situated, or in the Vnited Statas Discrict Court for the diatrict in which tha Projecc, or any part thereof, is situated, and not elsewhere. D. The amount of this bond shall be reduced by and to the extent o£ any payment or payments made ia good faith hereunder, inclusive of the payment by Surety of inechartica' liens which may be filed of record against said improvemenc, whether or not claim for the amount o£ such lien be preaented under and against this Bond. E. IMPORTRNT: Surety companies execucing BONDS must appear on the Treasuzy Department's moet current liet (Circular 570 as amended) and be authorized to cransact business in Misaouri. 122798 006Z0-2 CDW00620.001 �(�iNENT 00620 - LABOR AND MATERIAIi PAYMENT BQ�: Continued Signed and sealed this �� day of 19C�. COjfrRACTOR (CORPORATE SEAL) Hufifman, Inc. Sy Michael J. Huffman. esident ��� COUNTERSIGNED: Reaident AgenC state of Missouri Fireman's Fund s�r ce Company _ '__ � i ` � By ' ��� 8Y �t L. Rehkop, Attorney-in-Fact Sharolyn L. Norman ATTOIZNF.V_�N-FACT (CORPORATfi SEAL) (Thia Bond shall be accompanied with - Attorney-in-Fact's authority from Surety) Approved as to Form: Ateorney for END OF DOCUMF.NT 00620 Cpw0o6�0.001 00620-3 122798 f 1 FIREMAN'S FUND INSURANCE COMPANY NATIONAL SURETY CORPORATION ASSOCIATED INDEMNITY CORPORATION THE AMERICAN INSURANCE COMPANY AMERICAN AUTOMOBILE INSURANCE COMPANY GENERAL POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That FIREMAN'S FUND INSURANCE COMPANY, a California corporation. NATIONAL SURETY CORPORATION, an Illinois corporation, THE AMERICAN INSURANCE COMPANY, a New Jersey corporation redomesticated in Nebraska, ASSOCIATED INDEMNITY CORPORATION, a Califomia corporation, and AMERICAN AUTOMOBILE MSURANCE COMPANY, a Missouri corporation, (hercin collectively calied "the Companies")doeseachherebyappoint JAMES C. PATEl'DL� MrCHAEL D. WHYPPS� JANET L. REHKOP� MELISSA D. EVANS, PATRYCK T. PRIBYL, KEVIN D. KALISH, DTANE ANGERS, BETTY I. McCREIGHT, KEVIN B. ALEXANDER, SHELBY L. RECK, BETH E. WHITE, PRAIRIE VILLAGE KS thcir true and lawful Attorney(s)-in-Fac4 with full power of authority hereby con(erted in their name,place and stead,to execute.seal,acknowlcdge and detivcr any and all bonds,undertakings,recognizances or other wricten obliga[ions in the nature thereof ------------------------------------------- and to bind the Companies thercby as fully and to the same ezten[as if such bonds wcre signed by the President,sealed with the corporate seals of the Companies and duly anested by the Companies'Secre[ary.hcreby ratifying and confirming all thac the said A[tomey(s)-in-Fact may do in thc premises. 7'his power of attomev is granted under and by the authority of Article VII of the By-laws of FIREMAti'S FUND INSURANCE COMPANY. NATIONAL SURETY CORPORATIOti, THE AMERICAN INSURANCE COhfPANY. ASSOCIATED [NDEMNITY CORPORATION and AMERICAN AUTOMOB(LE 1NSliRANCE COMPAtiY which provisions arc now in full force and effect. This power of attorne�� is signed and sealed under the amhori�y of tht follou•ine Resolution adopted by the Board of Directors of flREMAN'S FUND INSL�RANCE COMP.4hY. NATIONAL SURETY CORPORATION,THE AMERICAN INSURANCE COMPANY.ASSOCIATED INDEM!�iTY CORPORATION and A,vtERICAN AU'COMOBILE INSURANCE COMPANY at a meeting duly called and held,or by w•n«en consent,on the 19eh day of March, 1995.and said Recolucion hu not becn amendzd or repealed: "RESOLVED.that the signature of any Vice-Prcsident.Assistant Secretary,and Resident Assistant Secretary of the Companies.and the seal of thz Companies may be affixed or printed on am•power of attomey.on am•re�•ocanon of any pou•er of atrorney.or on any certificate rclating thereto.by facsimile.and any power of attorney.any revocacion of any pou•er of attorne�,or cenificate bearing such facsimile signature or facsimile ual shall be valid and binding upon the Companies:' IN W] `�ESS WHEREOF, the Companies ha�•e caused the e resen[s to be signed by their Yce-President. and their corpora�e seals to be hereumo affixed �,�s 1 dav o( November �.9�38 . ETYC .w���'�"% .��s ,. ��YER��,,, ,,,.,,,,""",",,, FIREMAN'S FUND INSURANCE COMPAtiY J�Pooq �q �`:,:.�'c'� pE���L,G�1. �:�°••°,••;y', ,.,°ov°B��•��'�'r,.,,; NATIONALSURETYCORPORATiOh � ... +,. ,o �^°i: ''�%"; t''' • o '' � s' �? c O ,_ �" •.•` �" ' �:. • •'s '�'.�� —" '•:��: THE AMERICAN INSURANCE COMPAVI' } _,, � =3:s e..L:s= ASSOCIATED INDEh1NIT1'CORPORATiO� Z SEDT='9'� j ' i +!' - Q ., ''+• �J �'' � '2 ,. ,� .f =-%` —•— <' AMERICAN AUTOMOBILE INSURANCE COhiPANI' �Cb,2��rA``Q� %oi\• ..%•�.�c G4:,,�.� ,.�,"�j,t� `rG Q�i'" ,'��. :��'': . ti � .�""'., a �,�,�...��, 4�N ��OJ' ':,,'rylOUISVO�. ''���9�Nxw�n�a�ao E CE ��N�wu�maao: B�. STATE OF CALIFOR�JIA l v`�P"�s'd`"` . COUNTY OF MAR1N J ss. On[his 11 day of November , 1998 .before me penonally came M.A. Mallonee to me known,who.being by me duly sworn,did depose and say:that he is a Vice-President of each company,described in and which executed the above inswmenc:that he knows[he seals of the said Companies:tha[the seals affixed to the said inswment are such company seals:that they were so affized by order of thc Board of Directors of said companies and that he signed his name thercto by like order. IN WI7'NESS WHEREOF.1 havc hereunto set my hand and affixed my official seal,the day and year herein first above written. L OCM�5P0 + Commission# 1163726 ��� Notary Public-CafiforNo � Marin County � My Comm.Fxp'res Nov 2B.?Lnl ho„�y wm�� CERTIFICATE STATE OF CALIFORNIA l }ss. COUNTY OF MARIN J � I,the undersigned.Resident Assistant Secretary of each cumpany.DO HEREBY CERTIFY that the foregoing and attached POWER OF ATTORNEY remains in full force and hu not been rcvoked;and fun.herm9re that Article VII of the By-laws of each company,and the Resolution of the Boazd of Dircctors;ut forth in the Power of Attomey, are now in foree. Signed and sealed at the County of Marin.Batcd the�_day of ,�� ETYC �M�,°rnWyb �,l�AN'S f �WERi�`iy �,a�wru.rr�.y /� ���q,�,p +����`�,ey1 ``p .�.�G,rO �����re��r��y i�' aa; pNLE IN,w�k' V• O`►:........,. � J �'0 a��f,. '.�i s ��'+.� �3f� :4's � � J7. i-� •l�i ZT y. • �... •�' =�;BEAL:S; � s¢vr�+��o a }et J=� �\'� �2 ,,I ,J•. ,_ �(d��,.,p�g,[3'Y �iz3`�•���•a' G���„�.��,�! sJp�� �� ,�f�+ �#'•i.,�.._...��s Residem Assitnnt Seeretuy � C` •�,,,,,��d` CE C N�E C� tw��.��w CHANGE ENDORSEMENT THIS ENDORSEMENT CHANGES THE POUCY. PLEASE READ IT CAREFULLY. ❑ �. The Name of Insured is changed to: � 2 The following Insured(s)is added to the Named Insured: � 3 The foltowing Insured(s)is deleted from the Named Insured: � 4. The Mailing Address is changed to: � 5� The Policy Period is changed to: 11-30-99 to 11-30-03 � g, Legal Status is changed to: � Individual � Partnership � Corporation ❑ (other) ❑ �• The location is changed to: ❑ 8 The following Coverage Form(s)or Endorsement(s)is added: ❑ 9 The followi�g Coverage Form(s)or Endorsement(s)is deleted: This endorsement is executed by the company below designated by an entry in the box opposite its name. Premium$ Np� Formerty 11-30-02 8 LIBERTY MUTUAL INSURANCE COMPANY LIBERTY MUTUAL FIRE INSURANCE COMPANY Effective Date 11/30/99 Expiration Date11/30/03 � LIBERTY INSURANCE CORPORATION For attachment to Policy or Bond No. TF1-141-431768-579/8 ❑ LM INSURANCE CORPORATION Audit Basis � ❑THE FIRST LIBERTY INSURANCE CORPORATION Issued to City of Cape Girerdeau,MO L��+�.� � C/O Huffman,Inc. � �►� ' ���� PO Box 2T9 F F�,y� T'N4��11�;Z' Poplar Bluff MO 63703-0279 4' � Countersigned by ,.� �� ,; _ Authorized Representative Issued Sales Office and No. End.Serial No. 9 11-15-02 LMo St.Louis 442 _ 2318 07l87 ve��cTcnPV . p . ����� �. H�b H�ldsi �,�,�,�,� _ �.�u��'' ���'('ovemor • Stcphcn M.Mahfood,Dircaor D�� � ',���'����'�1.'�TT OF NATURAL RESOURCES �� � ` ���-:,'�'�;��� ; Tai, v�,i� �,�,, >. � ,� DIVISION OF ENVIRONMEN Q ����;' ` ���' '�, P.O. Box 176 Jefferson Ciry,MO 65102-0176 CI Cape Girardeau, MO Review# 41141-98R PWS ID#4010136 DWSRF # DW291010 February 8, 2001 Mr. Mark Lester, P.E., City Engineer City of Cape Girardeau 401 Independence Street Cape Girardeau, Missouri 63703 Dear Mr. Lester: � We have reviewed Change Order No. 1 (Contract 698) for the water treatment plant improvements for the City of Cape Girardeau, Missouri. We do not have adverse comment on the proposed changes. You may consider this letter our approval for Change Order No. 1 (Contract 698) for the water treatment plant expansion and improvements. If you have any questions, feel free to call me at (573) 751-9429. Sincerely, PUBLIC DRINKING WATER PROGRAM l.f_ � Rolando A. Be abe Environmental Engineer Permit Section RAB:td c: George L. Harris, P.E. - Burns & McDonnell Southeast Regional Office Jeff Pinson—WPCP DWSRF file . � . . � � � ' To: Missouri Dept of Natural Resources Date: September 6,2000 Box 176 Jefferson City, MO 65102 Project: 94-159-2-001-00/CAPEWATR Attention: Mr. Jeff Pinson Via: Mail Subject: Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction �EC E I V E D Treatment Plant Expansion Improvements Construction Contract CR-2 SEP � 8 2000 Chan�e Order No. 1 WPCP Enclosed are the following: No.of Copies Description 2 Originals of Change Order No. 1 Enclosed are two originals of Change Order No.l for the above referenced projects. If there aze any questions,please call. �_ Very truly yours, BURNS & McDONNELL ENGINEERING CO., INC. � Rich Virtue Project Manager cc: Project File � , ' g'� Plan # ����—q �I` Date Rec d ?ublic Orinking Water P�og�am Division of Environmental Gluality � 1630 Des Peres Road,St.Louis,Missouri 63131 TEL:(314)821-9016 FAX:(314)821-5406 010197 GCO-16D 1:\94159�I OOACORRESMPMSON.TRN.DOC . � . t . tK � , � ` �• 0 horn� 6 CHANGE ORDER NO. 1 P�qe.=� of 2 ___ Project Name Cape Rock Water Treatment Piant Exp. B&McD Project No. 94=159-2-001 Owner Citv of Caqe Girardeau, Missouri Client Project No. DW291010-01 Contractor Huffman, Inc. (General Contractor) Contract No. 698 The below noted modifications to subject Contract are directed by Owner and accepted by Contractor: RFP#1 -Change Rebar Spacing as per attached RFP# 1. The rebar design spacing of 2 1/2" and the rock size in the concrete mix would have caused problems. Therefore rebar spacing was changed to 4" on center. There is no time adjustment and a cost decrease of($26,619.29). RFP#2-Change Pipe installation and backfilling Clearwell#2 work as per attached RFP#2. Work was deleted from CR-1 contract and added to CR-2 contract. There is a 14 Day time increase and a cost increase to this contract of$28,845.52. RFP#3- Delete the 18"finished water bypass line as per attached RFP#3. The Alliance personnel were concerned that this installed could cause too much system down time. There is no time adjustment and a cost decrease of($20,126.76). RFP#4-Install a temporary 12"back wash bypass line as per attached RFP#4. The existing line was in the way of the new filter slabs. There is a 3 day time increase and a cost increase of$13,996.66 RFP#7- Install safe�y rails for the chlorine tanks as per attached RFP#7. There were no safety rails in the storage room to set the chlorine tanks on. There is no time adjustment and a cost increase of $2,356.04. RFP# 8-This provided storage space in the aeration tower as per attached RFP#8. This change a unused area into a usable storage room. There is no time adjustment and a cost increase of$ 12,181.25. RFP#9-The contractor requested a chlorine feed system supplier change as per attached RFP#9. The contractor requested this supplier change. There is no time adjustment and no cost adjustr�nent. The modifications noted above result in increase of ($10,633.42) in Contract Price, the current Contract Price being: Original Contract Price.............................................................................$ 15,600,000.00 Total net amount of all previous Change Orders........................j+or-) $ -0- Total net amount of all previous variable quantity adjustments..(+or-) $ -0- Total net amount of this Change Order ...r................................... (+) $ 10.633.42 Current Contract Price Including this Change Order.............................. $ 15.610,633.42 The Contract Time shall be increased (by 17 days), the current Completion Date being: Original Completion Date....................................................................... November 4, 2001 Total net time adjustment of all previous Change Orders...........(+or-) -0- days Total net time adjustment of this Change Order.........................(+or-) -0- days Current Completion Date including this Change Order.......................... November 21. 2001 ��,�I-��� ��,QZ._Plan #_.-------- Date Rec'd � Water P�ogram ?ublic Drinking pivision of Envi�onmental C]uality � f� , . • ♦ � I 0 Forn� D-J6 The price and/or time extension set forth in this Change Order is full compensation for�ll cQsts and delays, direct and indirect, incu�red in connection with the conditions giving rise to this Change Order, the work specified herein, and any consequen6al costs, delays or effects on unchanged work�esulting therefrom. This Change Order,when executed, constitutes a modification to the Contract and all provisions of the Contract, except as modified above and by any previous Change Orders, shall apply hereto. OWNER CONTRACTOR Cit Ca e ir dea Missouri Huffman Inc. General tr r gy gy , Date �- G- C� Dat �/�� /D� The conditions of the Change Order are noted for compliance and payment. BURNS D N RING COMPANY By Date ��� _ 3 2 o-Uci � � a' t RCQUCST �OR PItOPOSAL (RFP) � 1'ROJI;C'I : City of Cnpc GirarcleAu,Mis.souri Rl�l'Nn.:001 c�n�lt�k wA��r r«m,����i�i�<<:xpa��siou - - __. Aud Alluvial Wcll ficld Construc(ion UA1'E:Ih.ccmbcr 21, fy'�9 'freaUuwl Planl�xpausioa attd Iwprovewcnls I3URNS&McUONNI'sLl. Constructiou Coutract CR-2 PROII;C'C NO:94-159-2-(K)( OWNEIt: Ci1y of Capc Girardcau,Mi.ssot�ti 'I'O: Jack Nolifield,Project Superintendent Ryan Blank,Project Adminisirator I tuffmatt,Inc.General Coutractor t 550131ack River Iudi�strial Yark RoAd P.O.Box 279 Poplar Bluff,Missouri G3902 I'icasc submit au itemized quotation for changes in ILc Contract Suin and/or Tiaic incidenlal to pro�sed malilications lo Ihc Coniract Uocwucuts described hcreii�. 'I'i IIS IS NOT A CHANGr OIZULR NOR A DIRi:C'f'ION TO PROCCF�D WI7'i I TI II;WORK DIiSCRif31:[)1(i;IZI:IN. f)escriptio��oFproposecl ehange: ReUar Spacit�g Verlical Walls�vittt We cuneut bar and bar spaciug as#4 a 2'/�"o.c.or#5 @ 2 '/:"o.c.iu tLe follo�viug sln�ctures: S clure Dratciu�t Number(sl I'tau/Su;tiou/Detail i�cratiou Towcr �. S3 Ploor Sl�b Pla��at Llcvaliou 41G'-0" S4 Scclious J,(i&1 I Pruna�y So(icls Con[act Basin S8 1'lau and Sectiou A No. l S9 Sectiou B(rebar sl�ould malcl�I'in�, D�vg 58)and llctail 1 1.:xisling I'rimary Solicts Contect S 10 Rc��ovAtiou 1'lau I3a�iu No.2&No.3 S I 1 Sextions A,13,C 1Rc l: I ticud'Cai�k�4c Splilter(3ox 512 Slab Plan'fOC l�1A01'-3"�ud Pou��daliou I'l�n'fOC I_'sl.401'-G„ S I 3 Sections A,13,C&U Sccoi�dary P(occtdalion/ S 14 I'lau Pad Seclion A(i�olc: t15(�r�2 '/,") Scclimc�da(ion 13asin No. 1 S I S Section 13 And Ih;lail 2 � i•.xisting Sc:wudaq�Plocculalion/ S IG 1'lau Scdiuicnlaliou I3asii�No.2& S17 Sc;c;lious A,C,D,(�.),K&I, TIo.3 l�illcr t3uildiug S21 l�nundalion nnd Graliag 1'lan al l;lcvalion 4U9'-1 I"/415'-I" S27 Scctiou C nnd I)ctail I ' ��te Rec'd I �'0 Plan #��0 r� ',�blic Drinking Water Program ?i�-,sion of Environmental Ouality . . - --�. iu��#2 rag�a , Rcsidual I3lo�vdo��v ManUolc SC S4 l Ylau/Scctiou ltcsidual I3lotvdcnvn Manl�olc 8A 541 ['lan/Scction �': S6all have Qic bar aad bar spacuig cltauged lo#4 a14"o.c.or#S @ 4"o.c. .- Clariticalion-Ouly spacwg Io cl�angc.I3ar s'v,e to ruuain as original designalioi�. Allacl�mcu(� 1311W�S&Mcn CLL � 4:1 �CItIN 'COMI'ANY Imilalcd by / /- � � ` Datc_�a/�/1� Copics: ❑O�Gucr; ❑ •; ❑Co��Uac , fieid;❑ '� t . • • ' . . . Vertical walls with the current bar and bar spacing as//4�2 '/:"o.c.or t/5 a 2 '/:"o.c. in lhe following . structures: Structurc Drawing Numl�cr(s) I'lan/Section/Uctail ` • Acration Tower S3 Floor Slab 1'lan at Glcvation 41 G'-0" S4 Sections J,G& 1 I , 1'rimary Solids Contact Basin S8 Pian and Section A No. 1 S9 Section [i(rebar should match Plan, dwg S8)and Detail I � C;xisting Primary Solids Contact S 10 Renovation Plan (3asin No.2&No.3 S I I Sections A, B,C& G 131cnd Tank&Splitter F3ox S 12 Slab 1'lan"i'OC GI 410'-3"and Foundation Plan TOC BI 401'-G" S I 3 Sections A,B,C&D Secondary Plocculalion/ S 14 Plan and Section A(note: If5(�2 '/:") Sedimentation Dasin No. I SIS Section [3 and Detail 2 (:xisting Secondary Flocculation/ SIG Plan Scdimentation Basin No.2& S17 Sections A,C, D,G,1, K& L No. 3 riltcr[3uilding S21 I�oundation and Grating Plan 5t ['slevation 409'-I I"/415'-I" S27 Section C and Detail I Residual I3lowdown Manl�ole SC S41 Plan/Section Residual [3lowdown Manliole 8A S41 {'lan/Section Shal I havc thc bar and bar spacing changed to#4�4"o.c.or t15 @ 4"o.c. Clar�fication—Only spacing to cl�ange. I3ar size to remain as original designation. � C � Huffman, Inc. CHANGC ORDCR REQL)CST iS�Q Black Rivcr Induslrial Park Rd � . NO. 0��0�, p�gox 27y Phonc: 573-G8G-142G Poplar Bluti:MO G3902-0279 Faz: 573-785-1428 'TITLE: Rebar Credit DATE:3/1/2000 PROJECT:Cape Rock Water Treatment Plant JOB: 698 _ TO: Burns&McDonnell Engineering Co Inc CONTRACT NO: 1630 Des Peres Road St. Louis, MO 63131 ATTIv: Bob Gray RE: PCO To: BMCD From:HGC Number: DESCRIPTIO�i OF PROPOSAL Credit for rebar spacing changes listed in RFP#001 Item Description Stock# Quantity Units Unit Price Taz Rate Taz Amount Net Atnount 00001 Suboontraa Labor Per Eslimate 1.000 Lsum (57,6U0.00) 0.00°�o SQ.00 (S7,600.00) OUOU' �1atcTial Pr L:.4imate 1.000 Leum (S15_2W.00) 0.0090 5Q.U0 (Si5,20U.00) Q000? Ctmtradocs Fea: 0.150 S°ioCosl (522,800.00) 0.00% 30.00 (53.420.00) 0000� Contrad Bonds&lnsuronce 0.015 l.5°k (526,619.29) O.OU% SO.QO (5399.29) • Unit Cost: ($26,619.29) Unit Tax: $0.00 Lump Sum: $0.00 ~ Lump Taa: $0.00 Total: ($26,619Z9) O ,Bvr,�s /Y��IJ.r�'�� JUL � 6 20�0 ,8o G.� ------�-------------•-----.� 't APPROVAL: r�y: By' Ryan Blank Bob Gray ' Date: nA��: �// DO L',:�Krin�a�m , . +fti�:r=, ' �: � . '�; '. :a'.�r . '''�I!"`:•, . .� , REQUEST FOR PROPOSAL (RFP) PROJECT: City of Cape Girardeau,Missouri RFP No.:002 Cape Rock Water Treabmeat Plaat E.�-pansion - -. " And Allavial Well Field Cons�uction DATE:December 28, 1999 Treamient Plant Expansion and Improvements BURNS 8�McDONNELL Construction Contract CR-2 PROJECT NO:94-159-2-001 OWNER:City of Cape Girardeau,Missouri TO: Jack Holifield,Project Superinteudent v Ryaa Blank,Projeci Administrator Huffman,Inc.General Contracfor 1550 Black River Industirial Park Road P.O.Bos 279 Poplar Bluff,Missouri 63902 Please submit an itemized quotation for changes in the Con�act Sum and/or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH TI�WORK DESCRIBED HEREIN. Description of proposed change: Pipe installation and bac�illing CW-2 Install 18"OverIlow, 12"Drain Lines and 10'Y 15'x 24''Rip Rap Splash Pad as shown on sheet C t -A in CR- 1 Contract drawings found in addendum#2 of your Contract. � Complete bacl�illing around Clearwell#2 to Elevarion 390 as shon�on sheet C 1 -A in Contract dran�ings found in addendum# 2 of your Contract. ��; u .��4,^�`�.-�� � i i� /��7�.:�!.,t;� : J vr;�F y/�%r.%9/,�y.r�/ I L� , �i! 1,�� Jl��� �. U 2�C� i�; � s�! �.�: �-,-�-ry �i 1 i�t-r��-r-rr=,�;r—�=':_� ; .L.. ,.7:_.�J • � L_,....., r Attachmeuts BURNS&McD E E COIvIPANY Imitateci by -• ; Date j� �� �� Copies: ❑ er; ❑ ; ❑ContrG "; .Field;❑ --7 Date Rec'd � �4 Plan # `� �� � ' ��� ?ublic Drinking Water Program Division of Envi�onmental Quality � :.,. . , t�T �:Huf'fman,`�nc. 15,�0 Btac�c Rtvcr Ind��ustrial Park Rd . '�0�1009� a Pd�Box 279 • �,. .'- .�'•:;�� Phone: 573-68G-1426 � `"" p � Paplaz Bluff.MO 63902-0279 Fs�z: 573-785-1�128 / / 1ITLE: Clearwell Bacldll _ DATE: 1/13/2000 PROJEC"T:Cape Rock Water Treatment Plant JOB: 698 TO: Burns&McDonnell Engineering Co Inc CONTRACT NO`698 1630 Des Peres Road �.. St. Louis, MO 63131 ATTN: Bob Crray RE: COR To: BMCD From:HGC Number: 00001 Item Description Stock# Quantity Units Unit Price Taa Rate Taa Amount Net Amount 00001 I.abotPeiF.stimate 1.000 Isum S10,486.Q0 22.00% 52,306.92 510,486.00 0000: 1�lataiatPaEstixnate 1.000 Isum S1,1S2.00 0.00°'o S0.00 S1,152.00 0000'_' EquiPma��Per Fstimate 1.000 Lsum S13,380.00 0.00% 50.00 S13.380.00 0000� CoutradotsFee 0.050 54oCost S23_127.00 0.00"o 50.00 $1.15635 pQpp! ConttaQ Batds&Insurance 0.015 1.5°'o S24,28335 0.00% S0.00 S364.25 Unit Cost: $26,538.60 Unit Tax: $2,306.92 �_ Lump Sum: $0.00 Lump Tag: $0.00 r �! ti�R !1' t �! ;1 ' Total: $28,845.52 �� ��..�• j:;i ; ���,�, �- ';%'su=.:o�i�;,� � i ;I v���1i .i �� LL's� ���I � � � �� �= ��;�.�;�--�;:��,f L��'CG••..�L� �....�__.----•-------------- � - /y �/� .�.- :,,, �, ,,,�� � ,A�, :'_ � / !� APPROVAL: By: BY� Ryan Blank Bob Gray Date: �..._��-�_�� Date: c���� . . . ' ' .. � . � .. .. ... . � . , . . ... ., i . ...i . .. ' . .. . . . . . . ,_I4 . � . '� . i � � � ' RCQUEST FOR PROPOSAL (RFP) , PROJLCT: City of Cape Girardcau, Missouri RrP No.:003-•== Cape Rock Water Treatment Plant Gxpansion ... And Alluvial Weli Field Construction DATE: March 2,2000 Treatment Plant Expansion and Improvements . BURNS& McDONNEI.L Construction Contract CR-2 PROJECT NO:94-159-2-001 OWNCR:City of Cape Girardeau,Missouri TO: Jack I-lolifield, Project Superintendent Ryan F31ank, Project Administcator Huffinan, Inc.General Contractor 1550 Black River Industrial Park Road P.O. Box 279 Poplar Bluff, Missouri 63902 Please submit an itemiied quotation for changes in the Contract Sum and/or Time incidental to proposed moditications to the Contract Docu►nents described herein. T111S IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HI?R�IN. Description of proposed change: l8" Finish Water Bypass Line Delete: lnstallation of Pinish Water[3ypass Line around tl�e New Filter Building and the new header on Drawing U7 Detial " liigl� Service Pipirtg Tie-In At Cape Rock Drive." Attachments QUItNS& Mc QN,NEL -E1� EERI COMPANY _ Imitated by � : % . ,. � .�9- i Date ,�/���� Copics: ❑ ner; A/G; Contrac ;Q Field;❑ t Date Rec'd `�0° Plan # I' �g' \ ?ublic Orinking Wate�Program Division of Environmental �uality sht i m�z _ �• �'Huffman, Inc. CHANGE ORDER REQUEST 1550 Black River Industrial Park Rd ' No. 00003 PO Box 279 Phonc: 573�86-1426 Poplar Blutt',MO 63902-0279 Faz: 573-785-1428 TITLE: FW Bypass Line DATE:3/1/20Q0 PROJEC"T:Cape Rock Water Treatment Plant JOB: 698 TO: Burns& McDonnell Engineering Co Inc CONTRACT.A14�: 1630 Des Peres Road �- St. Louis, MO 63131 ATTN: Bob Gray RE: COR To: BMCD From:HGC Number: DESCRIPTION OF PROPOSAL Price to be credited to the City of Cape Girardeau for taking over the work for the finish water bypass. Item Description Stock# Quantity Units Unit Price Taz Rate Taa Amount Net Amount 00001 LaborPetEstimate 1.000 Lsum ($2,148.00) 22.00% ($472.56) (52,148.00) 0000: Material Per Estimate 1.000 Lsum (515,710.00) 0.00% 50.00 ($15,710.00) 0000? Equipmart Per Estimate 1.000 Lsum (5775.00) 0.00?'0 $0.00 (5775.00) 0000� Contrado[s Fee 0.150 15%Cost ($16,082.00) 0.00% $0.00 ($2,41230) 0000_` C«rt����&Insur3nce 0.015 1.5% ($17,126.70) 0.00% $0.00 ($256.90) OOOOE Material Sold Pa ABraemait 1.000 Isum 51,648.00 0.00% $0.00 51,648.00 � Unit Cost: ($19,654.20) Unit Tag: ($472.56) Lump Sum: $0.00 Lump Tag: $0.00 Total: ($20,126.76) r APPROVAL: By: � By� Ryan Blank Bob Crray, Date: �—;�—���� Date: F�cpali��m m , .,., . �Ach �o ,� '��' . � � 9f , o ,� . �o� �o� i�i��i� X S�o/`�s o � w " -- -- M�t �^^_ f'� n.. rn� �L� �•"- c� -' - t m �;,n C�.�. `�\ .-�m �� �� � �3` �� L'��� m� � (�, D�tC : �`� � � �i r � . � --�� �� � / � 'W� � �� � ,r~ ,f. i' ,`� `', I �\ / i � . \ i �. �. ..�.. ; � /�o%�� I ` i r. �" r-, � \o G ,� ^�, ' ' �\�� � � `'9 - � � J �' �� � \� t • �.� i � / ` / -c- '\\� f' % \:`i� - ` `, � � �--�.,.i :r; ✓���b\.v \.�.. �•,y / , ���/ _,, �`�� � /^�.t:�: '' • ` / i � !��'`�� � �C \i n � �` � G-�_'-. �\�' /-1�,v, � •.�.-� � 1 �� ``� � r�� r I —, `-'- � ---� _ v►' %� \!- T ,- � _ - \r' 1 ._,.. l � /-J /' � �- � �_.�-. �,\ .- i^ .-� � � ;T.\� � '_ \� .�' --, � \i = �'' �- �� .` � I ,_ � r / -' --�, -. -cn . � � _ �y // ' � � � \ �'' �� ` �^ � c� � ' ^ ,, '� ��J c- � � r-� ��\ �� � �� � �X �� (w �'' �� \ :7`\ � � % �, % �r" � C v: / _ � �- ,, � � �c T � �� \� i-- �\ ' ✓ M �� �� ����/� � . . � ,�-�V J � . � �,� � � _ �' _ m«, �� _ '� rn�� � cn �!'� D�{c rn � =J �f� �`�l T \� . �J c n ` G F/r' � ���.�- z7 < ��I)� �'� T � � N -. �� T� ��•.� � -� � "" ... � �O .�o� `� Z.• n Q] �� � orn .� � ` ;� Z � c � �� D, rn n � � � �. , . . _ A ` � e t, � • � : � � • R�QU�ST FOR PROPOSAL (RFP) PROJGCT: City of Cape Girardeau,Missouri RFP No.:004. _ ' Cape Rock Water Treatment Plant Gxpansion ' ~ And Alluvial Well Field Construction DATE: March 2;�2000 Treatment Plant Expansion and Improvements BURNS& McDONNELL Construction Contract CR-2 PROJECT NO:94-159-2-OU 1 OWNER:City of Cape Girardeau,Missouri TO: Jack Holifield, Project Superi�tendent Ryan Blank, Project Administrator Huffman, lnc.General Contractor 1550 Iilack River lndustrial Park Road I'. O. Box 279 Poplar I3luff, Missouri 63902 Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed moditications to tl�e Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED W[TH TH6 WORK DESCRIBGD HCRGIN. Description of proposed change: Gxis[ing Back V��asli Bypass Line tnstall Temporary 12" Back Wash Bypass Line coming out of the west side of tlie Existing Filter Building and going south to the Gxisting RcsiduaJ,Pit. Place temporary line uiider the floor of tlie New Pilter Quilding. Attachments 13URNS 8c McD � �G l� CT� � �RIN PANY �` ,•�� ��' Date ..3�G/� Imitatcd by � / : ' °� Copies: ❑O ner, ❑A/; 0 Contractor;Cq'�ield;❑ _ � i .•� v Date Rec'd � �� Plan #� I 1�l-�$R ' ?ublic Drinking Wate� Program � Division of Environmental Quality ; ,� .. • • .. . . . . • . . . . . . . . .� . —'—` 1'RO['OSCD C[IANC1: ORDCR �-Iuffm�n, Inc. � . . No. 0000r I550 Diack Itivcr[nduslrial Park Rd � pp I3ox 279 Plwnc: 573-Ci8C-142G Popl�r f31u(i; MO G3�102-c1279 F'ax: 573-785-1428 TITL[?: I3W'liypass Line DATC:3/i/2000 PRO.II�:CT:Capc ltock Water Treatmcnt Plant JO[3: 698 TO: 13urns& McDonnell Cngineerinb Co lnc CONTItACT1V+E�:= I G30 Des Peres Road �� Sl. Louis, MO 63131 ATTN: Bob Gray, R[:: PCO To: IIMCD rrom:HGC Numbcr: uH:sciz�rrtoN or��izorosA� Chanbc Or�cr Proposal lor lhc rc-ruutc of thc I3ackwash linc coming out of tl�c cristing riltcr Bld�. Rcclucslinb a 3 ci:ry cxtcnsion. Itcm Dcscription Stocic# Quantity Units Unit Pricc Taz R:UcTax Amount Net Amount 0OOt11 falwr P�latirn•rt.: L000 Isum SJ,4Q8.00 22.OQ4o S7d9.7G S),4U8.1111 IH1UO2 �lalaial P�1?stimalc L000 Isum 55,349.00 0.00% S(1.00 SS,349.0(1 O(H)(13 GyuipmuilP�Tl:.uinwte IAOQ Isum S2,7UU.00 0.00% SO.OQ 52,70O.00 OOU04 C�n�lradorsFa: 0.150 IS%CoA S10,G17.0O 0.O090 50.00 51,592.55 pppO5 C�mtradBaxL�Rclnsurviue O.QIS 1.5% S13,156.66 OA04o SO.01) 5197.35 Unit Cost: $13,24G.90 Unit Tax: $749.7G � Lump Sum: $0.00 Lu�np Tax: $0.00 Total: $13,99G.GG ;� APPROVAL: �y; _ ay: Ryan [3lank [3ob Gray, D:�te: �— �—�(�C� _ Di�te: rX�wru„„v ' -•r. . . . . . . . . . . _ , . - ' , - . f ,- . � ' : � � � REQU�ST [�'OR PROPOSAL (RFP) . PROJCC'I': City of Cape Girardeau,Missouri Rf P No.:U07�,:_. Cape Rock Water Treatment Plant Expansion ' And Alluvial Weli Field Construction DATG: March �16,2000 Treatment Plant Expansion and Improvements BURNS& McDONNELL Construction Contract CR-2 PROJECT NO:94-159-2-001 OWNGR:City of Cape Girardeau,Missouri TO: Jack I�olifield, Project Superintendent Ryan Blank, Project Administrator Huffman, Inc. General Contractor I550 Black River Industrial Park Road P.O. Box 279 Poplar Bluff, Missouri 63902 Please submit an itemized quotation for changes in tlie Contract Sum and/or Time incidental to proposed modifications to tliz Contract Documents described herein. TIiIS IS NOT A CHANGE ORDER NOR A DIRBCTION TO PROCEED W[TH TI{E WORK DESCRI[3ED HE.RriN. Description of proposed change: Chemical Feed Building,Chlorine Cylinder Trunnions Inside the Chlorine Storage Room install in the floor two(2)railroad rails twenty eight and one half inches(28.5")each �i.�� of the center line of each overhead monorail.Top of rail to be about two inches(2")above the finish floor. Rails are to be forty feet(40') long with stops on each end of eacl�rail. A Auachments [3UItNS 8c. Mc[) �1 jlELL �NC;1 f�RING PANY � / Imitated by .' " f '_ •.,. �' Date J//l !'c% Cu��ics: OPwner; •;,�Contracto ; � icld;❑ —T- Date Rec'd�L4 w Plan # �� ` o/� ?ublic Orinking Water Program Division of Environmental �uality r _. Ht�ffman, Inc. . PROPOSED CHANGE ORDER 1550 81ack Rivec Industrial Park Rd ' N0. 0000�' PO Box 279 Phone: 573-686-1426 � Foplar Bluff;MO 63902-0279 Fu: 573-785-1428 TITLE: Chlorine Cylinder Trunnions DATE:5/2/20Q0 PROJECT:Cape Rock Water Treatment Plant JOB: 698 TO: Burns&McDonnell Engineering Co Inc CONTRAC"F-1�.(�:. 1630 Des Peres Road St. Louis, MO 63131 , oI B�r�.�f�O.�rd , , MAY 9 20�� �• .f�� G� ATTN: Bob Gray . , •�._ '� �._�. ���.' RE: COR To: BMCD From:HGC Nuctrbe�-:------""""'"""""" DESCRIPTION OF PROPOSAL This is a request from B&M to install four 32'railroad rails in the slab of the Chlorine Storage Room to support the chlorine tanks. Item Description Stock# Quantity Units Unit Price Taz Rate Taz Amount Net Amount 0000i ta�P�� 1.000 � saao.00 o.00^io so.00 saao.00 00002 EqutPme�rt Per Estimate 1.000 I.sum 5450.00 0.00% S0.00 5450.00 00003 MaterialPaEstimate 1.000 Lsum 51,128.00 0.00% 50.00 51,128.00 00004 ��d�F� 0.150 IS%Cost S2,018.00 0.00% 50.00 5302.70 00005 C��a��&insutance 0.015 1.5% 52,356.03 0.00% 50.00 $35.34 Unit Cost: $2,356.04 Unit Tax: $0.00 ! Lump Sum: $0.00 Lump Taa: $0.00 Total: $2,356.04 . APPROVAL: By: By� Ryan Blank Bob Gray Date: S��p Date: �m�• ` _. + . ,� . . ' REQUEST FOR PROPOSAL (RFP) PROJECT: City of Cape Girardeau,Missouri RFP No.:008 Cape Rock Water Treatment Plant Expansion "". " And Alluvial Well Field Construction DATE:April 25,2000 Treatment Plant Expansion and Improvements BURNS&McDONNELL Construction Contract CR-2 PROJECT NO:94-159-2-001 OWNER: City of Cape Girardeau,Missouri TO: Jack Holifield,Project Superintendent Ryan Blank,Project Administrator Huffinan,Inc.General Contractor 1550 Black River Industrial Park Road P. O. Box 279 Poplar Bluff,Missouri 63902 Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Description of proposed change: Aeration Tower Storage Room The area between Aeration Tower footing,see Drawing S2 and the floor slab at elevation 416'-0"to become a storage room. � � Provide a eight inch(8")concrete floor at elevation 400'-6"top of floor. G• •.• Provide two(2)3'-�l0''x 7'-.10"x 1 3/4"door at center of east wall of room. ;=.��,3r r ��.• Provide four(4)No. 8 bars vert on each side of door similar to detail 2 on Drawing S4. Place rebar over doorway as per attached sketch. Thank you for your continued cooperation. � Date Rec'd ' J� Plan # � �'�/—�O R ?ublic Drinking Water Program Division of Environmental Ouality Attacl�ments [iURNS& McDO EL NEER G COMPANY Imitatcd by �� �� �' Date _y�� �"D Copics: ❑ ner; A/E; �Con tor;O Field;❑ • a�r. 2L �GuO._. 1 31°�I ._._E�IFNS & .V.CI��)P?N�l: .. . .....- "—�---�:� 516-=f. �----., - ;�, F, . . , i ! � Y • tY 11 li li w ti , , . � r'`����1�R. IOwfx. �+iNC� a 4-�-�o G� �,�o� : A �-. u.wa�� a�0�0 w�n!Ali� + a�c wMo uc�Rr � � �-s u.+.sM v�wo a m iuw�a�rn I y� J � � I ' I -�� -------•---�=� � ,.�- •4'S���C�.•S2��o.c. � ---_�..�_ -.--•--______ I-- --- - � N Ci1�6T� 6 _---�(� i "i . � . � j � I . i ; �._..._,�,,,""'i�(I�A2 i`� A � �� � .5��n;..a A I � I A�P.t�,a..�w�. � '; '� (4�• e s .�f .` � ��� I �4t1iS Q'i�"o� � � � . �� � I : i � I I �------�-�-_� ,_-----� ��� � ��� �-J V���JE �.� �ec�+o Fo�r�e��wnc REFER�0 SMT SG mr � A7Y-a' �S 10' D �^ � a � ' a� v cs �u�anc Puw �'eaiac ���' � '�ENEEP. y6 9 f'Ot VERT E� 0 9'OC'�ERT G'TSii fACE 0 9'iC h+OmZ EF j9�1 E'OC tifRT Mb1GE fAC[ �'�' . 0(�'ETNI�OT h CCNC �• �� ��"6� ��2'�x nocr, ��e'a � ' �, ��a !icwt Ev �RT wt w�i uu�,cx ao�. P'�N qaTUc YERTS fEBR � aespn� � �,��, � gd05'OC 'R8 1 Y r-r � � ?oP c►rtc iN cRanc � �inr a F*o R �oo._c. E� +oo . . : .. . � �., �, . 30f El�A7'-6' •"'�, '.'.• • :' •. L�.:- eCi E:59C'-C' n � l�oa•ocTae�' �, ' . . ... ,. �uffman, Inc. PROPOSED CHANGE ORDER uso B�a�xi�inau��Ra � No. 00008 PO Box 279 Phonei 573�86-1�t26 Poplar Bluff.MO 63902-0279 Faz: 573-785-1428 TITLE: Aeration Tower Storage Room DATE:5/22/2000 PROJECT:Cape Rock Water Treatment Plant JOB: 698 TO: Burns&McDonnell Engineering Co Inc CONTRAC�P�FO: 1630 Des Peres Road � St. Louis, MO 63131 ATTN: Bob Gray RE: PCO To: BMCD From:HGC Number: DESCRIPTION OF PROPOSAL Cost for added store room at the Aeration Tower Bldg. Item Description Stock# Quantity IInits Unit Price Taa.Rate Taa Amount Net Amount 0000i R�� i.000 � s2so.00 o.00�io so.00 asso.00 00002 Canaete 1.000 Isum $808.00 0.00% 50.00 5808.00 00003 Shoring 1.000 I.sum 51,183.00 0.00% 50.00 51,183.00 00004 Doo� 1.000 L.sum $1,916.00 0.00% $0.00 $1,916.00 00005 L.aba Pa F�imate • 1.000 Tsum $4,496.00 22.00% $989.12 $4,496.00 00006 Equipma�tPaFstimate 1.000 Isum $1,001.00 0.00% $0.00 $1,001.00 00007 Conttado[s Fee 0.150 15% 510,695.00 0.00% $0.00 $1,604.25 00008 CortUad Bonds&Insucance '`' 0.015 1.5% $11,192.13 0.00% S0.00 5167.88 00009 Dirt Dedud 1.000 I.sum ($234.00) O.Oa% $0.00 ($234.00) Unit Cost: $11,192.13 Unit Taa: $989.12 r'i Lump Sum: $0.00 , �� � i�L'exs�✓i �',: Lump Tag: $0.00 r��ii JUL 2 5 2000 ,; Total: $12,181.Zs �06 C ra1S� :1 � ,. ..._. ��....-•-----•' ""_ ;A APPROVAL: By: By: Ryan Blank Bob Gray Date: �2c�-�Q� Date: ��m ��- ' 4 " P , REQUEST FOR PROPOSAL (RFP) PROJECT: City of Cape Girardeau,Missouri RFP No.:009 Cape Rock Water Treatment Plant Expansion - And Alluvial Well Field Construction DATE: Apri125,2000 Treatment Plant Expansion and Improvements BURNS&McDONNELL Construction Contract CR-2 PROJECT NO:94-159-2-001 OWNER: City of Cape Girardeau, Missouri TO: Jack Holifield,Project Superintendent Ryan Blank,Project Administrator Huffman,Inc.General Contractor 1550 Black River Industrial Park Road P.O.Box 279 Poplar Bluff,Missouri 63902 Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Description of proposed change: Chlorine Feed System Your RFI#12 request a change in Chlorine Feed System equipment manufacturer from CCG listed in the Major Equipment Supplier list to Wallac�&Tierman. Please provide a proposal with contract price change and contract time change. Thank you for your continued cooperation. � Attachments BURNS& McD ELL EN RING MPANY [mitatcd by /� .. Date y�.,?`��'� Copics: ❑O ner; A/ , Contractor; ield;❑ Date Rec'd � � Plan # `��� �'�� b~ ?ublic Orinking Water Program Division of Environmental �uality ,�. � ,Huffman, TIIC. PROPOSED CHAIVGE ORDER ISSO Black River Industrial Park Rd ' N0. 0000�` PO Box 279 Phone: 573�i86-1426 � Poplat Bluff,MO 63902-0279 Faz: 573-785-1428 T'ITLE: Chlorine Feed System DATE:5/2/2000 PROJECT:Cape Rock Water Treatment Plant JOB: 698 TO: Burns&McDonnell Engineering Co Inc CONTRACT-N4: 1630 Des Peres Road St. Louis, MO 63131 ATTN: Bob Gray RE: COR To: BMCD From:HGC Number: DESCRIPTION OF PROPOSAL This a request to change the Major Equipment Supplier list to read Wallace&Tiernan as the Chlorine Feed System supplier. Item Description Stock# Quantity Units Unit Price Taz Rate Taz Amount Net Amount 0000i ccc(�t��� i.000 r� so.00 o.00^� so.00 so.00 00002 wett��&Ti��(�ri��> i.000 t,s„m so.00 o.00�io so.00 so.00 Unit Cost: $0.00 Unit Tax: $0.00 Lump Sum: $0.00 Lump Taa: $0,00 �_ Total: $0.00 r I �1�'i ,.;� � ,%� s'i v����/ � U :.vP�W � � 1 !'i � MAY 9 24�0 �} . , .�o� ;,:� .. � ..:�� � ._. - � APPROVAL: By; � By: Ryan Blank Bob Gray Date: f�q fp Q Date: ��,,,. , �. • • CHANG� ORDER No. 2 Page 1 of 1 Project Name Ca e Rock Water Treatmt. Plant&Alluvial Wel) Pield Construct. B& MeD Project No.94-159-2-001 O�vner Cit �of Ca e Girardeau Missouri Client Project No. DW291010-01 Contractor Huffinan Inc (General Contractorsl Contract No. 698 'The below noted alternates to subject Contract are directed by Owner and accepted by Contractor: � IZPP #5 - The above project was bid on Wage Order No. 5 but the Missouri Department of Natural Resources has deternlined that Missouri Division of Labor Standards Annual Wage Order No. 6 is to be used on this projcct. There is no time adjustment for this change. The Total-Not-To-Cxceed-Cost(N.T.�.) is estimated at$275,000.00. The costs will be paid based on tlle montlily certified payroll hours submitted by Huffman, Inc., for all of the crafts effected by this change. The project to date total will be tracked each month and at project completion the N.T.L. amount will be adjusted down to the actual ainount expended. If at a later date in tracking t11e project to date costs, the$275,00.00 appears to be a low estimate a cllange order will be issued to adjust the amount prior to exceeding it. The modifications noted above result in inerease of($275,000.00) in Contract Price, tlie current Contract Price being: Original Contract Price . . . . ... . . . . . . .. . . . . .. . . . . . . . . . .. . .. . $ 15.600.000.00 Total net amount of all previous Change Orders': .. . . . . . . . .. . . . . . . . (+or-) S ]0.633.42 Total net amount of this Change Order .. . . . . . . . .. . . .... . . .. . . . .. (+or-) $ 275.000.00 Current Contract Including this Change Order .. . . . . . . . . . . . . . .. . .. . .. . . . . . S 15.885.633.42 The Contract Time shall be unchanged,the cunent Completion Date being: Originai Completion Date . . . . . .. . . . .. .. . . .. November 4 2001 Total net time adjustment of al(previous Change Orders .. . . . . . .. ... . . . (+or-) =0- days Total net time adjustment of this Change Order . . . . . . . . . . . . . . .. . . . . . . (+or-) -0- days Current Completion Date Including this Change Order . .. . . . . . . . . . . . . . . . November 21.2001 Tlie price and/or time extension set forth in tltis Change Order is full compensation for all costs and delays,direct ' and indirect, incurred in connection with the conditions giving rise to this Change Order,the work specified herein, and any consequential costs,delays or effects on unchanged work resulting tlierefrom. Tl�is Cliange Order,when executed,constitutes a modifications to the Contract and all provisions of the Contract, cxccpt as modifcd above and by any previous Change Orders,shall apply hercto. OWNER CO�N.T/RACTOR f�Ll.�/.d'��/ %/v� .� � � By /.�i�__/�_'�,t�Y.�r y - - Date (O — !�— oJ Date /O-- �D� �� llic conditions of thc Changc Ordcr are notcd for compliance and payment. 6URNS&Mc N � ERi C PANY tnitiatcd by Date ���� �G _ Copics: wner; ❑ ; ❑Contr ; O Pield; ❑ � . . � Huffman,Mc. Genera/Contractors Ht/FFIMAN s:.�:. �o�s l//� September 27, 2000 Burns & McDonnell Engineering Co. , Inc. 1630 Des Peres Road St. Louis, Mo. 63131 Reference: Cape Rock WTP Cape Girardeau, Missouri Subject: Annual Wage Order No. 6 Allowance Gentlemen: Per your request, an estimated allowance was calculated on the above referenced subject. The estimated allowance is as follows: � . Total Add $275, 000 If any additional information is needed, feel free to contact me at anytime. Respectfully sub itted, G(� � : �—' . J. Keit ffman Operation Manager j kh 1550 Black River lndustrial Park Road P.O. Box 279 Popla�Blu/1, Missouri 63902-0279 c�o i�o� �w�a C.,.,• �7?/7A�_fQ7R o.�,�ih h��//rnan�hu//man-inC.COm �1�tD.���K!�1U�//T1�3/l-l/1C.00/'T1 � � O y � U U a � �ccooaoo �n �nMONui �n �n �oo ooaoe M p, •n G1 � �oomoor �o � McrN �v .�, � ooaom .�+ ' �p � � o rn �v .-+ �o ui v .-� v o fn o �o M r �v v �o m �o y a A �n v .r ao tv r �n o .�r o o .r cv � �o ao •rl 01 V' (V �O CD (V rl l0 ri .-1 r-1 N '�'� Q 1!1 N Q 1!1 � � .-1 1-1 W U N � a� O V x oo �nvi000 �no �no �n000 0000 �n 'P1 dI 1'�1 eti N N O Ul �ll (V V O 1A O 1A f"1 �!1 N N V V V Q ,tJ T .-�1 1fl .-1 (V .-1 .-1 rl O 1A �O aD f'1 f�l t�l f'�1 V � ro N � (V rH 1r1 �! 'i l!1 rl rl �O a A O� V � A1 ' 01 rl Q � � � .� 00 O O O O O �(1 O O O O O O O O O O O O fr1 -,� y d n oa0000 �oon000 �nc� o 0000 �o NtA O W . . . . . . . . . . . . . . . . . . . . � � V � o � o 0 0 � o � o 0 o v � o 0 0 0 0 � N O "'� N .� N r .� � U � � � t0 .,� � +� �W cV � •d C7 �I N O b a s� -.� f+ U d N f+ �n o 0 0 0 0 0 � ro w s, d N i� w � a ni ..: .; ao o �o 0 0+ •.1 U -rl O � �`+ c� rn cv .o �n . C7 �0 A �2 N � �`+ .� rn H •� a � a+ � U U $ .� �0 .,.� � �naoouior �n �n �n �n �no �nrv �o o �nro �o � �oaomrnM �n �o .o �o �o �o �nrr� n �nrriN � y�,� 0000 .�+ .�+ 0000000 .-� .�+ oo �-+ .-+ � d ' � w w .,� 0 G� 0 tT E a o � O+E+ U�E b�E � 1 y � y � y � H H co a o a o a o a a � 1 1 1 1 H H O'F H F� Q rn •� ,..�� a w F o+E• .� ,-� cn u� a a o�c \n �i `i ' C J� 01 [G O W � U ,0 \ � b� b+E+ H H •• Q� O+ •.-1 b � G! O�F PC O 11 LI N N U! W � (J C7 N 1 1 C G v � >. w � i i m w aao i i � ww W aH o a o i i c � N ++ rnrn a ►+ N .'� ri R G W W N N 1 1 1 G q W W W tT O� U W 1 I O O 1� N f7 C7 •-� •� W W .�. +� ++ C C TJ V � N N W W H la H 1� +� i� •.-1 �.i O W N N W W X .Y 1 1 1 1 W W N O+ O� N •.i �.i � a� •./ � N W S. � N N 7 Y � C C � W w i0 W H R +i N O O N 3� N IN �.i +� a� •.i •.1 •r� W 01 H N w a a a v a� 3 3 d w a� ar H •.� �.+ v .� �o a a w d m a s ddaa NNwNvwwaa �s •.+ �.� aa .-� w aava� aa0000www ►, N aaoo a >, w N H e e O 0 A A A .� .-+ a a d w a. ++ a a audw ►+ ►, aaq •-� •�+ •�+ aa a o a a� uuuu � � aaaaaaaoo a F � � O N z U U a 01 �o p�, •n OJ � ,�n � O +� � � � .� M A °,ti° ,.`�i m � O �-+ r' N � N V W N +� O U x o 0 0 � .� d � o .+ O +� c� '' �'+ � b � � � a a � 0 � �o o • .,., � �+ � o W .� tn d .* v , . � N p W � o N O H U � � � � N O ""� ul U � .,� � � � N .,1 CJ i, 0� O .,� {a V y N 1a o 0 0 W W LI Gl . . • FI i� 4� � Q. v �o 0 •.I U ••1 O `O "' °O c� � a x � . m � a� x a a a+ +� U U � .� � •.1 L�i v � N G! �T 1� .� o � w w •,i c� r N . y w � � o � � � E O � W •..�, � k � � V ,� rl � H U W V ►� V t'�i u .� o � � , N W 'N y yr a � u N .1 A � � � `a ,.Cl.� q O W A W ..7 E" � o � z U U a � o m o 0 00 p, O � ri co �n o �o ty LI �p � r .�-� rv m y a Q cv r � r� .� � w •�+ O +� yl N W V tll �1 � 0 V x' O O O O O d •►1 d N Oi t�l � aD Q � V �!1 V� V` � � .-1 N a a 0 +� b 0 � +� � .,� v, d o 0 0 0 0 o a � � V o 0 0 0 0 O tA � N O ''� w U � -�1 +� � � N .,� . � � , 01 i� Gl O b a s� •.� �"o v w � a�i � s� +� w � a o •�I U •r1 O � �o a x v� w •., a � o+ � U U � � ro -., � � m � � a� a� a, s� o .� o 0 � w w .,� r �1 • N W N T � � W b a rn a A � a � p � w ac .� rn ""� ,-.1 m i a �.�i �0 � m v] � .i � p' H �u i o� 7 W U N v W o � � N o� w �N w N �.�i ,�+ ►+ � w x N a w ..°�r� .1 p a U G H N � >. a� A W 4L 7 p� O r7 O a a F � � O N z U U a � � N � a .O +� 'n �n v a A n n •�+ o 0 w •a O v d' N � N v � , v N � � N x 'n �n •n m r�1 r1 O 1� O O 11 � � •�-� Q� Q M �"1 � � b � .� � � � � •� y � N N N y o a . . � � V N N O M � r�i r�i � U � � � ro .,.� � +� ro cv � b b a � ° b V w t�i o�i � � S� � w � a N �i •a U -•-� O ", '^ c� �o a x u� N N s, •.+ d +� a� x rooro '' U U � ri . ro .,� � o � � d d v+ w � � w w .,.� A N W N � � O . r1 �"� � � W � u O y b .,i � d o� b +� a v � N 'a [ U '� W U y N o � m .°i •.-1 N � � � � .-1 a a 3 C a� P, 7�L' �-�i E ..�r'z u k;. F.�12�Y:1'�S�:'S``~�t� .. /�:yA; 4l.-: � �f.�:;� /�.r�ra+ , �U�',,, Bob Holden,Govemor•Stephen M.Mahfood,Direcror f ��*., 1 y r���,"' '. D'�� , ;�, , .�����T OF NATURAL RESOURCES � Y �'<'� �,�,�'�,;�i�`���`� DIVISION OF ENVIRONMENTAL QUALITY r-�zr>���'�� --�,. ��'y`:�`_';r` P.O. Box 176 Jefferson Ciry, MO 65102-0176 � nr, F�� �.> .uJ� i 7�< <;- 'k;'�, CI Cape Girardeau, MO Review#41141-98R PWS ID#4010136 DWSRF #DW291010 November 21, 2001 Mr. Mark Lester, P.E. City of Cape Girardeau 401 Independence Street Cape Girardeau, MO 63703 Dear Mr. Lester: We have reviewed Change Order No. 3 for the water treatment plant improvements(CR-2, Contract 698)for the City of Cape Girardeau; lVlissouri. We do not have adverse comment on the proposed changes. You may consider this letter our approval for Change Order No. 3 (CR-2, Contract 698) for the water treatment plant expansion and improvements (CR-2, Contract 698). If you have any questions, feel free to call me at(573)751-9429. Sincerely, PUBLIC DRINKING WATER PROGRAM � � Rolando A. Bernabe Environmental Engineer Permits Section � RAB:be c: George L. Harris, P.E. - Burns & McDonnell Southeast Regional Office Jeff Pinson—WPCP DWSRF file �a RECVCLFD PAPER . , ,. � . 4 � , , , .� �� 119083 hbrni(',Cl)-J( CHANGE ORDER NO. 3 Page 1 of 2 ___ Project Name Cape rock Water Treatment Plant &Alluvial Well Field Construction CR-2 Burns & McDonnell Project No. 94-159-2-001 (20181) Owner Citv of Cape Girardeau Missouri Client Project No. DW291010-01 Contractor Huffman Inc ( General Contractor) Contract No. 698 The below noted modifications to subject Contract are directed by Owner and accepted by Contractor: RFP #006 Description of change: 18" Finish Waterline Delete: One 18" Finish Waterline between High Service Meter Pit up the hill to existing 14" Water Main. Delete: One Meter inside the High Service Meter Pit Add: One 18" 45, one 18" laterals, one 18" tee, and one 18" gate valve. There is no change to contract price or time adjustment. RFP #O11 Description of change: Chlorine Cylinder Room Doors Increase height of Chlorine Cylinder Room Doors 107A and 107B to accommodate monorails shown 5-34. There will be no time adjustment and a cost increase of$1,887.44. RFP #012 Description of change: New Filter Building Beams Increase size of beams B-6 and B-7 in floor slab of New Filter Building. There will be no time adjustment or cost adjustment. RFP #013 Description of change:New Automatic Transfer Switcli Add: New 1200 Amp SKv ATS installed and bused in switchgear line up. This RFP was not accepted. RFP #014 Description of change: Removin� Geogrid System Delete: Geo�rid Material on site. Add: Change slops to a 3:1 and construct retaining wall on the north and west side of High Service Pump Station driveway. There will be no time adjustment and a cost decrease of($35,530.00). RFP #O 15 Description of change: 4160-Volt Switchgear and Load System Delete: Conduits 1 A and 1 B Complete. Add: 4160-Volt Switchgear and Load Transfer System per attached specification Section 16390. � This RI'P was not accepted. . .,, �� , ��.nx ��,�.�n c;�•n-�� Page 2 of 2 --- RPl' #016 Description of change: Main Circuit Breaker and Utility Metering cabinet Install new Main Circuit Breaker and Utility Metering cabinet in New Electric Substation. This RFP was not accepted. RPP #017 Description of cliange: Main Circuit Breaker and Utility Metering cabinet Install new Main Circuit Breaker and Utility Metering cabinet in New Electric Substation and move existiug ATS into New Electric Substation. There will be an increase of 20 days time adjustment and an increase of$91,301.73. The modifications noted above result in increase of ($57,659.12) in Contract Price, the current Contract Price being: Original Contract Price................. . . . . . . . .$ 15 600.000.00 . . . . . ............................................ . .. Total net amount of all previous Change Orders........................(+or-) $ 285 633.42 _ Total net amount of all previous variable quantity adjustments..(+ or-) $ -0- Total net amount of this Change Order ........................................ (+) $ 57.659.17 Current Contract Price Including this Change Order.............................. $ 15 943 292.59 The Contract Time shall be increased (by 20 days), the current Completion Date being: Original Completion Date.......................... . November 4, 2001 ....... ..................................... Total net time adjustment of all previous Change Orders...........(+or-) 17 days Total net time adjustment of this Change Order.........................(+or-) 20 days Current Completion Date including this Change Order.......................... December 15, 200_1 The price and/or time extension set forth in this Change Order is full compensation for all costs and delays, direct and indirect, incurred in connection with the conditions giving rise to this Change Order, the work specified herein, and any consequential costs, delays or effects on unchanged work resulting therefrom. This Change Order, when executed, constitutes a modification to the Contract and all provisions of the Contract, except as modified above and by any previous Change Orders, shall apply hereto.' OWNER CONTRACTOR Cit of e Girarde u ' souri Huffman Inc. Gener n actor Bv By� Date � 2'� o� Date The conditions of the Change Order are noted for compliance and payment. BURNS_ MCDON LL ENG NEERING COMPANY By � 7 ,- Date 3 ��� L�/ � ` ., � � . . , �• �Q� - , 113083 Fonrr CSD-46 CHANGE ORDER NO. 4 Page 1 of 3 Project Name Cape Rock Water Treatment Plant &Alluvial Weli Field Construction CR-2 Burns & McDonnell Project No. 94-159-2-001 (28997) Owner City of Cape Girardeau, Missouri Client Project No. DW291010-01 Contractor Huffman, Inc. (General Contractor) Contract No. 698 The modifications noted below to subject Contract are directed by Owner and accepted by Contractor: Change Order Request (COR) 6 Change air scour 2- inch to 6-inch valves. There will be an increase in contract price of$12,616.77 and an increase of 7 calendar days. COR 7 Aug. 3, 2000 letter citing delays for utilities not shown. There will be an increase in contract price of$14,596.24 and an increase of 10 calendar days. COR 8 Roof slope at High Service Pump Station. There will be an increase in contract price of $1,012.26 and an increase of 2 calendar days. COR 9 Provide female half of quick disconnects to lime slurry system. There will be an increase in contract price of$6,967.74 and no change in calendar days. RFP 10 Additional handrail in Chemical Feed Building. There will be an increase in contract price of$2,681.78 and no change in calendar days. RFP 18 Delete wells 1, 2, and 3 from well field. There will be a decrease in contact price of ($50,370.24) and no change in calendar days. RFP 19 Add masonry veneer at aeration tower. There will be an increase in contract price of $9,434.01 and an increase of 10 calendar days. RFP 20 Remove bedding material around water well pipelines in well field. There will be a decrease in contract price of($7,003.50) and no change in calendar days. RFP 21 Delete 90-deg elbow and well piping at each of 10 wells. There will be a decrease in contract price of ($373.60) and no change in calendar days. RFP 22 Delete 6-inch flanged coupling adapters at each of 10 wells. There will be a decrease in contract price of($1,439.39) and no change in calendar days. aEl�'"�C�='�i�^+�,,� . RFP 23��+sd�cr�t,ezlugs�a�. ci�te paving. There will be a decrease in contract }��f 4$15 062.49) and e � �j�'�in calendar days. �SS s�t-��:tr �e:.a«:�s:�:'�'�1��`b'r` t M'T�... '��'�� *�+:._: , �.� � ,: �i"fF F Z,e;;,+R� 1.r i / ����, �"�l�P �•. .��:., ��p� o �Z 'C'd !�—_/-dZ _ i�i ; i t ���,// ��3/� �'`��1�k�,�,i !4�-9�,ta�,�Ltit'_• , " —�`('— /` :� �'y �'���'�''��'��4��� ��.�� '����1dd.1lelsc�rt � � ,� - i � ' � � �� 113083 Fonn CSD-46 Page 2 of 3 RFP 24 Add valves into three lines between old and new filter buildings. There will be an increase in contract price of$6,982.64 and an increase of 10 calendar days. RFP 25 Changes to louvers, dampers and ductwork in the Chemical Feed Building. There will be an increase in contract price of$5,349.54 and an increase of 15 calendar days. RFP 26 Addition of butterfly valves and deletion of sluice gates at three locations. There will be an increase in contract price of$10,100.45 and an increase of 7 calendar days. Work by the owner and water plant operator to re-routing finished water by-pass lines between March 1 and April 20, 2000 hindered the start of the New Filter Building foundation. There will be no change in contract price and an increase of 50 calendar days. Flooding from the Mississippi River from June 8, 2001 to July 4, 2001 delayed construction in the well field. There will be no change in cor�tract price and an increase of 26 calendar days. Shannon &Wilson geotechnical services to support the deletion of the geogrid on the slope around the High Service Pump Station have reduced the cost of the project. There will be an increase in contract price of$2,041.97 and no change in calendar days. The roof on the Existing Filter Building is to be completely removed and new roofing installed. There will be no change in contract price and no change in calendar days. AmerenUE field services to add protection to the on-site power line have cost the Owner $1,014.88. There will be no change in contract price and no change in calendar days. Since the start of the contract, Weather Days beyond that allowed in the contract have hindered construction. There will be no change in contract price and an increase of 32 calendar days. Permits for the railroad bores have not been secured in a timely fashion by the Owner. There will be no change in contract price. If the Contractor's portion of the project is not ready to convey water on the date water piping and electrical conduit is installed through the bore casings, there will be no change in calendar days. Well contract CR-4 materials are to be supplied by others but are not on-site. General Contractor is entitled to 30 days from delivery of well materials to perform pump installation, startup and testing, and aeration tower startup and testing. ' e: �?�7�/ d����%D z� b��'� �3°�� o�. Dates for substantial completion and final completion in the Notice to Proceed are different from contract requirements. The request for additional days is rejected. . , � • . ♦ �• � � 1 f 3083 Fornr CSD-J6 Page 3 of 3 The modifications noted above result in a decrease of($2,469.35) in Contract Price, the current Contract Price being: Original Contract Price..........................................................................$ 15,600,000.00 Total net amount of all previous Change Orders....................(+ or-) $ 343,292.59 Total net amount of all previous variable quantity adjustments(+ or-� -0- Total net amount of this Change Order........................................(+) $ (2,469.35) Current Contract Price Including this Change Order......................... $ 15,940,823.24 The Contract Time shall be increased by 169 days, the current Completion Date being: Original Completion Date..............................................................November 4, 2001 Total net time adjustment of all previous Change Orders(+ or-) + 37 days Total net time adjustment of this Change Order...............(+ or-) + 169 days Current Final Completion Date including this Change Order....... May 29, 2002 The Substantial Completion Date continues to be 100 days earlier than the Final Completion date. The Substantial Completion date including this Change Order is February 18, 2002. The price and/or time extension set forth in this Change Order is full compensation for all costs and delays, direct and indirect, incurred in connection with the conditions giving rise to this Change Order, the work specified herein, and any consequential costs, delays or effects on unchanged work resulting therefrom. This Change Order, when executed, constitutes a modification to the Contract and all provisions of the Contract, except as modified above and by any previous Change Orders, shall apply hereto. OWNER CONTRACTOR Cit o Ca e Girardeau, Missouri Huffman, Inc. General Contractor Sy �(c �^�i/��.�,���� �� G���c�-f't�� Date �=' z- -/,.�._ c. �. Date 4,L//y��� The conditions of the Change Order are noted for compliance and payment. BURN & MCD GINEERIN ��aqJIR�J�IY � � .� ��OF MIS��'�• B .. ... ���.,., Q'� � �/ D � � —.� �i� Davld Ear1 = _ _ =rn= MizeN : w: _�' ' NUMBER � "' ' �N'' E-17832 '�c?: , ;�9�0, �._ ,,:�►`r`. �� � .....••''� �►���` �y���aFESS10�P�' �'���,�n�m�u�u�``'� ' � AUG 2 1 2002 �-�� '' �'� ` . CHANGE ORDER NO. 5 Page 1 of 3 Project Name Cape Rock Water Treatment Plant & Alluvial Well Field Construction CR-2 Burns & McDonnell Project No. 94-159-2-001 (30527) Owner City of Cape Girardeau, Missouri Client Project No. DW291010-01 Contractor Huffman, Inc. (General Contractor) Contract No. 698 The modifications noted below to subject Contract are directed by Owner and accepted by Contractor: Change Order Request (COR) 10 Monorail Cord Reels at Chemical Feed Building. There will be an increase in contract price of $3,420.81 and no change in calendar days. COR 11 Well water bypass valve. There will be an increase in contract price of $7,426.07 and no change in calendar days. COR 12 Remove electric heat coils from air handling units. There will be an increase in contract price of$3,349.34 and no change in calendar days. COR 13 Mounting brackets for monorail cable reels in Chemical Feed Building and High Service Pump Station. There will be an increase in contract price of $3,124.03 and no change in calendar days. _ COR 14 Granite Caps in New Filter Building. There will be no change in contract price and no change in calendar days. COR 15 Flovu�switches at 10 well pumps. There wifl be an increase in contract price of $12,022.99 and no change in calendar days. COR 16 Chlorine injector 1,000 pounds per day at Aeration Tower basins. There will be an increase in contract price of$2,116.80 and no change in calendar days. RFP 27 Control valves at Solids Contact Units 1, 2 and 3. There will be an increase in contact price of$9,099.01 and no change in calendar days. RFP 28 Power to Chemical Feed Building Leak Detectors. There will be an increase in contract price of$1,023.35 and no change in calendar days. RFP 29 120-volt power to tote scales in Chemical Feed Building. There will be an increase in contract price of $1,040.41 and no change in calendar days. RFP 30 Change pipe painting to pipe banding. There will be a decrease in contract price of ($5,683.86) and no change in calendar days. RFP 31 Two borings beneath railroad tracks. There will be an increase in contract price of $15,198.27 and no change in calendar days. � 1Y �A.. ., �j4��� . � a • � � / , �• Page 2 of 3 I13083 Form CSD-46 RFP 32 Surge relief valves in the High Service Pump Station. There will be an increase in contract price of $4,035.30 and no change in calendar days. RFP 33 Increase walkway width at Backwash Station in New Filter Building. There will be an increase in contract price of$3,530.83 and no change in calendar days. RFP 34 Add bollards to protect influent piping at Aeration Tower. There will be an increase in contract price of $1,248.07 and no change in calendar days. RFP 35 Add downspouts at High Service Pump Station. There will be an increase in contract price of$575.58 and no change in calendar days. RFP 36 Add air release valves to backwash piping at New Filter Building. There will be an increase in contract price of$2,227.62 and no change in calendar days. RFP 37 has been cancelled. RFP 38 Move pressure gauges at Air Compressors. There will be an increase in contract price of $1,792.33 and no change in calendar days. RFP 39 Add ceiling hatchways in electric control rooms for access to HVAC equipment. There will an increase in contract price of $2,857.37 and no change in calendar days. RFP 40 Filter effluent control valve actuators. There will be an increase in contract price of $2,335.03 and no change in calendar days. RFP 41 Add 24-volt power to tote scale indicators. There will be an increase in contract price of $969.04 and no change ir� calendar days. RFP 42 has been cancelled. RFP 43 Add ball valves at chlorinators in the Chemical Feed Building. There will be an increase in contract price of$991.70 and no change in calendar days. RFP 44 Install larger circuit breaker for Air Handling Unit-2. There is no change in contract price and no change in calendar days. RFP 45 Modify selector valves at Solids Contact Units 1, 2 and 3. There will be an increase in contract price of $6,722.55 and no change in calendar days. RFP 46 Add switch for low pressure detection at chlorine storage room of Chem Feed Building. There will be an increase in contract price of $624.62 and no change in calendar days. RFP 47 Add man-door limit switch at the Fluosilicic Acid storage room in Chem Feed Building. There will be an increase in contract price of $329.15 and no change in calendar days. RFP 48 Convert Asphatt Paving to Concrete Paving top of well field roadway. There will be an increase in contract price of $2,408.03 and no change in calendar days. + .. . L�J �ev� iJ unC�� � t. � � � ,` , Page 3 of 3 1J3083 Form CSD•46 The modifications noted above result in an increase of $82,783.84 in Contract Price, the current Contract Price being: Original Contract Price.......................................................................$ 15.600.000.00 Total net amount of all previous Change Orders....................(+ or -) $ ___340,823.24 Total net amount of all previous variable quantity adjustments(+ or-)$ _p_ Total net amount of this Change Order .......................................(+) $ 82.783.84 Current Contract Price Including this Change Order........................ $ 16,023.607.08 The Contract Time shall be increased by 0 days, the current Completion Date being: Original Completion Date.......................................:................... November 4, 2001 Total net time adjustment of all previous Change Orders.(+ or -) + 206 days Total net time adjustment of this Change Order...............(+ or-) + 0 days Current Final Completion Date including this Change Order...... Mav 29. 2002 The Substantial Completion Date continues to be 100 days earlier than the Final Completion date. The Substantial Completion date including this Change Order is February 18, 2002. The price and/or time extension set forth in this Change Order is full compensation for all costs and delays, direct and indirect, incurred in connection with the conditions giving rise to this Change Order, the work specified herein, and any consequential costs, delays or effects on unchanged work resulting therefrom. � This Change Order, when executed, constitutes a modification to the Contract and all provisions of the Contract, except as modified above and by any previous Change Orders, shall apply hereta OWNER � CONTRACTOR Ci of Ca e Girardeau Missouri Huffman, Inc. B� C'��� - BY MA�eK �4. �'sr�� c iry EAlrs/A.)g�'�Q - Date_ �-7— � Date������ The conditions of the Change Order are noted for compliance and payment. BURNS & McDONNELL ENGINEERING COMPANY BY Date The parties acknowledge that the price stated herein for this Change Order includes all direct costs of every type, and fee, for the work identified in this Change Order, hut Contractor reserves its rights, subject to the Contract's terms, to seek an extension of its time for performance, as well as addational overhead costs of up to $30,000.00, as a result of this work and the conditions giving rise to this Change Order. Contractor agrees that, except for such extension of time and additional overhead costs, it has no other claim arising out of this worl�-o��-t�e -- --- - conditions giving rise to this Change Order. '+Aln J 1 l �% k. . . �`t1l Y.('�` ��N, � . t * �' Bob Holden,Governor . Stephen M.Mahfood,Directot ��� f�� T OF NATURAL RESOURCES � \ '�� ,r,., ��., _ �,, �+; �,•r �'.> wwwd n� r.state.mo.us ':�s-= � �v.C,i�! '�:;s�k;tr� P.O.BoX 176>Jeffetson Clty>MO 65102 ���`<t+:,,s�,:xt�'� r 573/751-5331 ar ccc�`� Cape Girardeau, M� Review#41141-98R-CO#5 PWS ID#4010136 DW5RF#DW291010 August 29, 2003 Mr. Mark Lester, P.E. � 4Q1 Independence Street Cape Girardeau, MO 63703 Dear Mr. Lester: We have reviewed Change Order No. 5 for the Water Treatment Plant Improvements and Expansion(CR-2, Contract No. 698)for the City of Cape Girardeau, Missouri. We do not have adverse comment on the proposed changes. You may consider this letter our approval for Change Order No. 5 for the Water Treatment Plant Improvements and Expansion(CR-2, Contract No. 698). If you have any questions, feel free to call me at(573) 751-9429. Sincerely, PUBLIC DRINKING WATER PROGRAM Q. . Rolando A. Bernabe Environmental Engineer Permit Section RAB:mw c: SoutheastRegionalOffice � !3.��M��.�,�.t� JeffPinson, Water Pollution Control Progam �.! °�� DwsxF' file : �"; SEP � 5 20D3 ;f s� v �� ��� . O�`I�;�s� �������r������r.��.�.��r���� oya�,���f�G Vc� � �:�C Integrity and excellence in everything we do � �--�I „ iJ Recyded Rper � E�P/oyqe Mluouri'e R�pO� ' AUti 2 � �tiO� r CHANGE ORDER NO. 5 . Page 1 of 3 Project Name Cape Rock Water Treatment Plant &Alluviai Well Field Construction CR-2 Burns & McDonneil Project No. 94-159-2-001 (30527) Owner Citv of Cape Girardeau. Missouri Client Project No. DW291010-01 Contractor Huffman, lnc. (General Contractor� Contract Na 698 The modifications noted below to subject Contract are directed by Owner and accepted by Contractor: Change Order �iequest (COR) 10 Monorail Cord Reels at Chemicaf Feed Building. There will be an increase in contra�t price of$3,420.81 and no ch�nge in•calendar days. � COR 11 Well water bypass valve. There will be an increase in contract price of$7,426.07 and no change in calendar days. COR 12 Remove electric heat coils from air handling units. There will be an increase in contract price of $3,349.34 and no change in calendar days. COR 13 Mounting brackets for monorail cable reels in Chemical Feed Building and High Service Pump Station. There will be an increase in contract price of $3,124.03 and no change in cafendar days. . COR 14 Granite Caps in New Filter Building. There will be no change in contract price and no change in calendar days. COR 15 Flow switches at 10 well pumps. There will be an increase in contract price of $12,022.99 and no change in calendar days. COR 16 Chlorine injector 1,000 pounds per day at Aeration Tower basins. There will be an increase in contract price of$2,116.80 and no change in calendar days. RFP 27 Con#rol valves at Solids Contact Units 1, 2 and 3. There will be an increase in contact price of$9,099.01 and no change in calendar days. RFP 28 Power to Chemical Feed Building Leak Detectors. There will be an increase in contract price of$1,023.35 and no change in calendar days. RFP 29 120-volt power to tote scales in Chemical Feed Buifding. There will be an increase in contract price of$1,040.41 and no change in calendar days. RFP 30 Change pipe painting to pipe banding. There will be a decrease in contract price of ($5,683.86) and no change in calendar days. RFP 31 Two borings beneath railroad tracks. There will be an increase in contract price of $15,198.27 and no change in cafendar days. DEPT OF NATURAL RE80URCES Water Prooe�on Sop Consewetion dNeloil spedflaitlo�t��ewfhsple�and ��ate f?ec'd �'�$'0.3 Plan #_`�"�_t�'�-9�R Olvhtonde1ed ��a� T ublic Drinking Wa4er Program ^Q�r N�x�d» �livision of �nvironme�tal i�uality .y fy,,,,�� . ' r i � ♦ �` ' Page2of3 //3083 Form CSD-16 RFP 32 Surge relief valves in the High Service Pump Station. There will be an inerease in contract price of $4,035.30 and no change in calendar days. . RFP 33 Increase walkway width at Backwash Station in New Filter Building. There will be an increase in contract price of$3,530.83 and no change in calendar days. RFP 34 Add bollards to protect influent piping af Aeration Tower. There will be an increase in contract price of$1,248.07 and no change in calendar days. RFP 35 Add downspouts at High Senrice Pump Station. There will be an increase in contract price of$575.58 and no change in calendar days. ; RFP 36 Add air refease valves to backwash piping at New Filter Builcting. There will be an increase in contract price of$2,227.62 and no change in calendar days. RFP 37 has been cancelled. RFP 38 Move pressure gauges at Air Compressors. There will be an increase in contract price of$1,�92.33 and no change in calendar days. RFP 39 Adc! ceiling hatchways in electric control rooms for access to HVAC equipment. There will an increase in contract price of$2,857.37 and no change in calendar days. RFP 40 Filter effluent control valve actuators. There will be an incre�se in contract price of $2,335.03 and no change in calendar days. RFP 41 Add 24-volt power to tote scale indicators. There will be an increase in contract price of $969.04 and no change in calendar days. RFP 42 has been cancelled. RFP 43 Add ball valves at chlorinators in the Chemical Feed Building. There will be an increase in contract price of$991.70 and no change in calendar days. RFP 44 Install larger circuit breaker for Air Handling Unit-2. There is no change in contract price and no change in calendar days. RFP 45 Modify selector valves at Solids Contact Units 1, 2 and 3. There will be an increase in contract price of$6,722.55 and no change in calendar days. RFP 46 Add switch for low pressure detection at cMlorine storage room of Chem Feed Building. There will be an increase in contract price of $624.62 and no change in calendar days. ,RFP 47 Add man-door limit switch at the Fluosilicic Acid storage room in Chem Feed Building. There will be an increase in contract price of$329.15 and no change in calendar days. RFP 48 Convert Asphalt Paving to Concrete Paving top of well field roadway. There will be an increase in contract price of$2,408.03 and no change in calendar days. ,..�� ,.�.a, f � . � � � . , � � . Page 3 of 3 i/3083 form CSD�46 The modifications noted above result in an increase of $82,783.84 in Contract Price, the current Contract Price being: � Origina) Contract Price.......................................................................$ 15.600.000.00 Total net amount of all previous Change Orders....................(+or-) $ 340,823.24 Total net amount of all previous variable quantity adjustments(+ or-)$ -0- Total net amount of this Change Order .......................................(+) $ 82,783.84 Current Contract Price Including this Change Order........................ $ 16.023,607.08 ThE Contract Time shall be increased by 0 days, the current Completion Date being: Original Completion Date........................................................... November 4. 2001 Total net time adjustment of all previous Change Orders.(+ or-) + 206 days Total net time adjustment of this Change Order...............(+ or-) + 0 days Current Final Completion Date including this Change Order...... Mav 29. 2002 The Substantial Completion Date continues to be 100 days earlier than the Final Completion date. The Substantial Completion date including this Change Order is February 18, 2002. The price and/or time extension set forth in this Change Order is full compensation for all costs and delays, direct and indirect, incurred in connection with the conditions giving rise to this Change Order, the work specified herein, and any consequential costs, delays or effects on unchanged work resulting therefrom. This Change Order, when executed, constitutes a modification to the Contract and all provisions of the Contract, except as modified above and by any previous Change Orders, shall apply hereto. OWNER ' CONTRACTOR City of Cape Girardeau. Missouri Huffman Inc. By �Q� B �,,�', A .�e .��e� c�ry �iuG� �e�� Date �� 7—�3 Date Q�/� l�.a The conditions of the Change Order are noted for compliance and payment. BURNS & McDONNELL ENGINEERING COMPANY By Date � The parties aeknowledge that the price stated herein for this Change Order includes all direct costs of every type, and fee, for the work identified in this Chang� Order, but Contractor reserves its rights, subject to the Contract's terms, to seek � an extension of its time for performance, as well as addational overhead costs of up to $30,000.00, as a result of this work and the conditions giving rise to this Change Order. Contractor agrees that; except for such extension of time and additional overhead costs, it has no other claim arising out of this worrt����---- — conditions giving rise to this Change Order.