HomeMy WebLinkAboutRES.1474.06-07-1999 �
BILL NO. 99-126 RESOLUTION NO. _
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE AUTHORIZATION NO. 12 TO THE MASTER
SERVICES AGREEMENT WITH BURNS & McDONNELL
ENGINEERING COMPANY, INC. FOR THE POTABLE
WATER TREATMENT SYSTEM
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU,
MISSOURI, AS FOLLOWS:
ARTICLE l. The City Manager, for and on behalf of the City
of Cape Girardeau, Missouri, is hereby authorized to execute
Authorization No. 12 to the Master Services Agreement, dated
March 21, 1994 , with Burns & McDonnell Engineering Company, Inc. ,
for the potable water treatment system, said Authorization No. 12
being a Route Study for 20-inch Main Project. A copy of said
Authorization No. 12 is attached to this Resolution and made a
part hereof.
PASSED AND ADOPTED THIS �v DAY OF ,
19�_.
. M. pradling, III, yor
ATTEST:
�..
� � CApB � .
O
r ' �,
L i J.- weedy � � �
�� ��
bepu�y City Cler �'� __�:; G'
,�r\� , �. �
, �:' L�M����� �q
f �. �_Y��.' 1�¢O
#
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AUTHORIZATION N0.12 — ROUTE STUDY FOR 20-INCH MAIN PROJECT
For
PROFESSIONAL ENGINEERING SERVICES
To
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT for PROFESSIONAL ENGINEERING SERVICES
dated March 21, 1994, between the City of Cape Girardeau, Missouri, (hereinafter
called OWNER), and Burns & McDonnell Engineering Company, Inc. (hereinafter called
ENGINEER), OWNER hereby authorizes ENGINEER to proceed with the following
services:
I. SCOPE
This Authorization No. 12 covers services involved in the study and determination of
route and alignment of a 20" water main befinreen the Cape Rock Treatment Plant and
Big Bend Road in the City of Cape Girardeau, Missouri.
A detailed description of the scope of services anticipated to be completed by
ENGINEER and major assumptions upon which ENGINEER will rely in providing these
services are presented in "Exhibits A and B".
II. SCHEDULE
ENGINEER will proceed with providing the services set forth herein immediately upon
verbal notice to proceed from OWNER, and will complete the study defined herein
within four(4) weeks following receipt of notice to proceed from OWNER.
It is understood that adherence to this schedule is contingent on the timely receipt from
the OWNER of information needed by the ENGINEER to carry out this assignment, and
the prompt review and return of all documents by OWNER of submittals from
ENGINEER for comment and approval, as well as any delays created by events beyond
the control of the ENGINEER (such as adverse weather conditions, regulatory agency
actions, force majeure events, etc.)
Page 1 of 2
\\STLSRV�MKTG\MFC�CAPEGI R\distsys120routeCONT.doc
III. COMPENSATION
OWNER shall compensate ENGINEER for providing th ased on a max mum fee with a
accordance with� the terms of the existing Agreement, b
not-to-exceed cost basis. The ENGINEER proposes to complete the required study
services for this project for a cost not to exceed Nineteen Thousand Nine Hundred
Dollars ($19,900). A breakdown of this amount, provided as background information
onl to furnisti a frame of reference for the proposed maximum fee, is enciosed as
Exhibit No. 1 — Compensation Schedule.
AUTHORIZA"�'iON BY:
CITY OF CAPE G{RARDEAU, MISSOURI
Attest: j:
BY� � . , �>
�
Qate: G - Z� --��
ACCEPTE Y.
BURNS & c N LL NGI EERING COMPANY, INC. ,�,,,,
By: .
Dr. obert . Berry, P.E.
Vice President -
Page2of2
_ _�.,T �--
CITY OF CAPE GIRARDEAU, MISSOURI
Water Main Route Study for 20" Main Project
EXHIBIT A
LIST OF ANTICIPATED MAJOR WORK TASKS
Following is a listing of the major work tasks anticipated to be completed for this project.
■ Hold kick-off meeting with OWNER staff concerned with this effort. Purpose of the
meeting will be to confirm the project limits and objectives, verify required schedule
for study, and obtain other pertinent guidance regarding project from OWNER staff.
■ Examine three possible routes:
➢ Along Cape Rock Drive west to intersection of Big Bend and Cape Rock Drive
(approximately 4800 linear feet)
➢ North from Cape Rock Plant to golf course and along Country Club Drive to
intersection of Cape Rock Drive and Big Bend (approximately 7200 linear feet)
➢ Along Cape Rock Drive east and north along river to Hwy 177 —follow Hwy 177
west and south to Big Bend (Hwy 177) and Cape Rock Drive (approximately
17,300 linear feet)
■ Analyze possible routes:
➢ Field review of each route
➢ Develop a property strip map of each route from photocopies of tax maps for
each route. Tax maps are assumed to be available from local assessor office or
City Planning office.
➢ Prepare a preliminary route layout on city topographic quad sheets for each
route.
➢ Prepare preliminary construction costs for each route.
➢ Prepare a constructibility review of each route.
■ Prepare letter report summarizing above activities. Meet with OWNER to discuss
OWNER'S review.
By: Burns & McDonnell
Page 1 of 1
M:WIK\CAPEGIR�DISTSYSU20UTEEXHA.DOC
CITY OF CAPE GIRARDEAU, MISSOURI
Water Main Route Study for 20" Main Project
EXHIBIT B
LIST OF MAJOR ASSUMPTIONS
It is ENGINEER's understanding that the OWNER will provide the following assistance,
information, and/or related work elements:
A. Assistance by placing at ENGINEER'S disposal all available current
information pertinent to this assignment, including previous plans,
specifications, reports, permits, easement documentation, and other data.
6. Liaison with other City of Cape Girardeau Departments and governing
officials involved in the project.
C. Available as-built drawings, specifications, design notes, etc. defining the
configuration of the exiting water distribution system layout for the City of
Cape Girardeau service area.
D. Available data on construction costs for similar and/or related work
recently completed by the City of Cape Girardeau.
E. Reasonable access to other data and records related to this assignment
that ENGINEER may determine need for.
ENGINEER shall rely on information, drawings, etc. made available by OWNER as
accurate, based only on verification of certain key parameters (if necessary).
By: Burns & McDonnell
\\STLSRV�MKTG\MK�CAPEGI R\distsys\routeexhb.doc
� �
� �
" '�
� ..
N � �
0:,::., � � ,� �
�: ` � 0 N
V y d C � �
C/ Yj C C�,N, 'C
J aoaomvv m ip �cW pU
•- N fV W
C W � ? �� � Q� N .
m � a ,
� X m a�i N a � o
WW � 0000m0000 �o v � w � Eww � a
W ^ � � ;<na Ev
C � a a w U �
v � � � , �
Q � � CO � � � V GO `7 N W � •j O �
� aaw ¢
a � v
x
W
a
v �nc� vnmomvao v� t� � r0000 m ovoo �n ao � o
y O N N a0 V O OD W OD CD a0 �t M f9 f9 V �fI 1n O C�
� r+ 1n f0 O� h � t0 O c7 (O O W(9 lh N NM�M(9(A� (A N 01
� O � �f N ch � 00 � tA �
:. 0 in winwv>viw a w
N
W
� rnv �n �om � aoao �n � •- v000 �o 00
� aa � c� v N P: rai
L � b/W
�
t/1
7 O .. � .. � .. y C � N N O
o U o o QZ � $ � d � � a�i V
n >. U y o N
� O d � U c c x w
:> � �, �� aa ° V u� W a
a Q � .� v o ia F c � ea � e6 � a�i E
y U O N U O y C �p � C L N 0 W
0 dj � F C� � � W N N L li N �o «
'= Y �
C Oa O � .°7.. �.�- 3 n F�- � E � yQ � � ►�-
U � N N N � O .h-� 4/ � � V � ~ �
d N V •- t L Np r � yj yl �
� C V IC O N � N C � C � � 7
p A y Q N S] 47 O � �p Z 3 �
tll � � V C � � � �j U C C �0 V
� W b Y .3 l6 7 y"'2j � C C � •��
a3 � da � E � = � � � 3 -> 0 � �
„ _ •Q � Y .� � g3sr dm o3 .
P � m °� E > � o Z °' a'>
N a °� " m m � c4 3 � u°1i ;y c a'� � H
� p � a> � c c � d y m .� .N� �, x
c7 �.. � � `o °' 'E 'E � �' adu, N = :;
L � � o n �
nv $ •� 3Q � � n � a�i @ � cm o
w � � > a� � dE aAL"o �� t'i o
V M r� 1O � o d d � � ; n� c 3 �c �
� " l0 L � d l6 l0 y f0 N � � � N V y T
�O N N N � � O � N O � N N �. O «�.
(� Q' O � lL � d d U d Q' U n. � Q' N U H
�
d dl � N M d if1 t0 ��
� C7OQC70C! �
M o.
W Z � R E � N M at � t0 f� OD Of �
C � ~ Z �
c� a E
S'I'A'I'E��i MISS�U� Bob Holden,Govemor•Stephen M.Mahfood,Director
DEPARTMENT OF NATURAL RESOURCES
DNISION OF ENVIRONMENTAL QUALITY
�� ���� y;��� P.O. Box ll6 Jefferson Ciry, MO 65102-0176
��
�� ` 3�;� �i
f . :
February 22, 2002
Mr. Mark A. Lester, P.E.
City of Cape Girardeau
401 Independence Street
P.O. Box 617
Cape Girardeau, MO 63702-0617
RE: DW291010, City of Cape Girardeau, Engineering Agreement 2A to Authorization
10 and Authorization No. 12.
Dear Mr. Lester:
Executed Engineering Agreement Amendment Number 2A to Authorization Number 10
and executed Authorization Number 12 for the above referenced drinking water project
between the City of Cape Girardeau and Burns and McDonnell were received on
February 4, 2002. After review, both are approved.
Please note that if additional services are required, draft amendments to the agreement
must be submitted for review and approval before they are executed. Feel free to call me
at(573) 751-1406 if you have any questions.
Sincerely,
WATER POLLUTION CONTROL PROGRAM
. .t�n_
E. Jef Pinson
Projeci Coordinator
EJP/amb
c: Mr. David Mizell, Burns and McDonnell
Mr. Rolando Bernabe, Public Drinking Water Program
Ms. Kendra Boos, Staff Accountant, City of Cape Girardeau
iJ