HomeMy WebLinkAboutRES.910.03-21.1994 . , � ,
BILL NO. 94-59 RESOLUTION NO. �t `"
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE AN AGREEMENT WITH BURNS & MC DONNELL
ENGINEERING COMPANY, INC. FOR IMPLEMENTATION
OF THE WATER SYSTEM MASTER PLAN
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU,
MISSOURI, AS FOLLOWS:
ARTICLE 1. The City Manager, for and on behalf of the City of
Cape Girardeau, Missouri, is hereby authorized to execute an
Agreement with Burns & McDonnell Engineering Company, Inc. for
implementation of the Water System Master Plan. A copy of said
Agreement is attached to this Resolution and made a part hereof.
PASSED AND ADOPTED THIS ,,��r`%�;i�i DAY OF i i ����' �r�%1.���_, 19 `�.
�'--,
�---_
��
Francis E. Rhodes, Mayor
ATTEST:
� ', � '� c' ..�f
Gayle .�; . Conrad
Deputy City Clerk
� ..
AGREEMENT
For
PROFESSIONAL ENGINEERING SERVICES
Between
CITY OF CAPE GIRARDEAU, MISSOURI
And
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
THIS AGREEMENT made as of , 1994, by and between the City
of Cape Girardeau, Missouri (hereina ter called OWNER) and Burns & McDonnell
Engineering Company, Inc. , a Missouri Corporation specializing in consulting
engineering services (hereinafter called ENGINEER) .
OWNER from time to time requires professional engineering services in
connection with the construction, operation, maintenance, management, and
financing of their Potable Water Supply System required to serve the OWNER'S
area. Therefore, OWNER and ENGINEER in consideration of their mutual
covenants agree as follows:
ENGINEER shall serve as OWNER's professional engineering consultant
in those assignments to which this Agreement applies, and shall give
consultation and advice to OWNER during the performance of his services. Al�
services shall be performed under the direction of a professional engineer
registered in the State of Missouri and qualified in the particular field.
SECTION 1 - AUTHORIZATION OF SERVICES
, 1.1 Services on any assignment shall be undertaken only upon written
Authorization of OWNER and agreement of ENGINEER.
1.2 Assignments may include services described hereafter as Basic
Services or as Additional Services of Engineer.
SECTION 2 - BASIC SERVICES OF ENGINEER
2.1 General
2.1.1 Perform professional design services in connection with
specifically authorized Projects as hereinafter stated which shall include
normal environmental/sanitary, civil, structural, mechanical and electrical
engineering services and normal architectural design services incidental
thereto.
2.1.2 Advise OWNER as to the necessity of his providing or obtaining
services or data from others of types described in paragraph 4.3, make
recommendations as to the possible sources of such services, and act as
OWNER'S representative in connection with any such services.
- 1 -
• ' � �
2.2 Concept Development
2.2.1 Consult with OWNER to determine OWNER'S requirements for the
Project.
2.2.2 Provide special analyses of OWNER'S needs, planning surveys, site
evaluations and comparative studies of prospective sites and solutions.
2.2.3 Provide general economic analyses of OWNER'S requirements
applicable to various alternatives.
2.2.4 Prepare a Concept Development Report summarizing studies performed
in accomplishing 2.2.2 and 2.2.3 and including findings and recommendations
for the Project and furnish five copies of same to OWNER.
2.3 Schematic Planning Phase
2.3.1 On the basis of OWNER'S concurrence with recommendations of the
Concept Development Report, prepare schematic planning documents indicating
clearly the considerations involved and the alternative solutions available to
OWNER; the schematic design shall include schematic layouts, sketches and
preliminary design criteria, and set forth ENGINEER'S recommendations and
establish the scope of the Project.
2.3.2 Prepare a preliminary cost estimate for the Project.
2.3.3 Furnish two copies of the above schematic documents and estimate.
2.4 Preliminary Design Phase
2.4.1 On the basis of the approved schematic documents prepare
preliminary design documents consisting of final design criteria, preliminary
drawings and outline specifications.
2.4.2 Prepare a revised preliminary cost estimate for the Project based
on the information contained in the preliminary design documents.
2.4.3 Furnish two approval copies of the above preliminary design
documents and revised estimate.
2.5 Final Design Phase
2.5.1 On the basis of the approved preliminary design documents, prepare
for incorporation in the Contract Documents detailed drawings to show the
character and scope of the work to be performed by contractors on the Project
(hereinafter called the "Contract Drawings") , and Invitation to Bid,
Instructions to Bidders, Bid, Agreement and Bond forms, General Conditions,
and Specifications (all of which are hereinafter called the "Bid Documents") .
2.5.2 Furnish to OWNER such documents and design data as may be required
for, and assist in the preparation of, the required documents so that OWNER
may secure approval of such governmental authorities as have jurisdiction over
design criteria applicable to the Project.
2.5.3 Advise OWNER of adjustments in excess of ten percent of the cost
estimate for the Project caused by changes in scope, design requirements or
construction costs and furnish a revised cost estimate for the Project based
on the final Contract Drawings and Bid Documents.
2.5.4 Furnish five approval copies of the final Contract Drawings and
Bid Documents.
2.6 Bidding (or Negotiating) Phase
2.6.1 Assist OWNER in obtaining and evaluating bids (or negotiating
proposals) and preparing construction contracts.
- 2 -
' r � �
2.6.2 Consult with and advise OWNER as to the acceptability of
subcontractors and other persons and organizations proposed by the prime
construction contractor(s) hereinafter called "Contractor(s)" for those
portions of the work as to which such acceptability is required by the Bid
Documents.
2.6.3 Make recommendations regarding award of construction contracts.
2.7 Construction Phase
2.7.1 Consult with and advise OWNER and act as his consultant as
provided in ENGINEER'S standard General Conditions of the Construction
Contract. The extent and limitations of the duties, responsibilities and
authority of ENGINEER as assigned in said General Conditions shall not be
modified without ENGINEER'S written consent.
2.7.2 Review Contractor(s' ) schedules for work progress, equipment and
materials procurement, compliance submittals, and values for partial pay
purposes and project cash flow requirements.
2.7.3 Review and accept compliance and other submittals of Contractor(s)
for conformance with the design concept and intent of the Contract Documents.
2.7.4 Make visits to the site at intervals appropriate to the stages of
construction to (consult with and advise ENGINEER'S Resident Project
Representative, ) observe the progress and quality of the executed work, and to
determine, in general, if the Project is proceeding in accordance with the
Contract Documents. ENGINEER shall not be required to make exhaustive or
continuous inspections to check the quality or quantity of the work nor shall
the ENGINEER be responsible for construction means, methods, techniques,
sequences or procedures or for safety precautions or programs or for
Contractor's failure to perform construction work in accordance with the
Contract Documents.
2.7.5 Issue all instructions of OWNER to Contractor(s) ; prepare routine
change orders as required; act as interpreter of the terms and conditions of
the Contract Documents and judge of the performance thereunder by the parties
thereto and make decisions on claims of OWNER and Contractor(s) relating to
the execution and progress of the work and other matters and questions related
thereto; but ENGINEER shall not be liable for the results of any such
interpretations or decisions rendered by him in good faith.
2.7.6 Review Contractor(s) ' applications for payment and supporting
data, determine the amounts owing to Contractor(s) and approve in writing all
payments to Contractor(s) in accordance with the Contract Documents.
2.7.7 Render periodic work progress reports to OWNER.
2.7.8 Conduct an inspection to determine if the Project is substantially
complete and a final inspection to determine if the Project has been completed
in accordance with the Contract Documents and if each Contractor has fulfilled
all of his obligations thereunder so that ENGINEER may approve, in writing,
final payment to each Contractor.
2.8 Post-Construction Phase
2.8.1 Provide qualified engineers during equipment start-up and instruct
OWNER'S personnel in equipment function and intended use.
- 3 -
. . . � �
2.8.2 Prepare a reproducible Record Set of drawings revised to show
significant changes made during construction of the Project in accordance with
records provided by Contractor and ENGINEER'S Resident Project Representative.
SECTION 3 - ADDITIONAL SERVICES OF ENGINEER
3.1 General
If authorized in writing by OWNER and agreed to in writing by
ENGINEER, ENGINEER shall furnish or obtain from others Additional Services of
the following types which are not considered normal or customary Basic
Services. The scope of Additional Services may include:
3.1.1 Grant and Loan Assistance
Prepare applications and supporting documents for governmental
grants, loans or advances.
3.1.2 Financial Consultation
Consult with OWNER'S fiscal agents and bond attorneys and provide
such engineering data as required for any bond prospectus or other financing
requirements.
3.1.3 Property Procurement Assistance
Determine land and easement requirements and provide consultation
and assistance on property procurement as related to professional engineering
services being performed.
3.1.4 Administrative Assistance
Provide contract and project administration to the degree
authorized by OWNER.
3.1.5 Obtaining Services of Others
Provide through subcontract the services or data set forth in
paragraph 4.3.
3.1.6 Furnishing renderings or models of the Project for OWNER'S use.
3.1.7 Miscellaneous Studies
Investigations involving detailed consideration of operations,
maintenance and overhead expenses, and the preparation of rate schedules,
earnings and expense statements; feasibility studies; appraisals and
valuations; detailed quantity surveys of material, equipment and labor; and
audits or inventories required in connection with construction performed by
OWNER.
3.1.8 Extraordinary Construction-Related Services
3.1.8.1 Additional or extended services during construction made necessary
by (1) work damaged by fire or other cause during construction, (2) a
significant amount of defective or neglected work of any Contractor, (3)
prolongation of the construction contract time of any prime construction
contract by more than sixty days, (4) acceleration of the work schedule
involving services beyond normal working hours, and (5) default by Contractor
under any prime construction contract.
3.1.8.2 Consultation or other services after completion of the
Construction Phase, such as frequent inspections during any guarantee period
and reporting observed discrepancies under guarantees called for in any
construction contract.
3.1.8.3 Preparing to serve or serving as a witness for OWNER in any
litigation or other proceeding involving the Project.
3.1.9 Preparation of an operating manual for use by OWNER.
- 4 -
• � �
3.1.10 Extra Services
Services not specifically defined heretofore that may be
authorized by OWNER.
3.2 Resident Services During Construction
3.2.1 If requested by OWNER or recommended by ENGINEER and agreed to in
writing by the other party, a Resident Project Representative and assistants
shall be furnished and shall act as directed by ENGINEER in order to provide
more extensive representation at the Project site during the Construction
Phase.
3.2.2 The Resident Project Representative, through more extensive
on-site observations of the work in progress, field checks of materials and
equipment, and maintenance of jobsite records on conditions and activities,
shall assist ENGINEER in determining that the Project is proceeding in
accordance with the Contract Documents, but the furnishing of such resident
project representation shall not make ENGINEER responsible for construction
means, methods, techniques, sequences or procedures or for safety precautions
or programs, or for Contractor(s' ) failure to perform the construction work in
accordance with the Contract Documents.
SECTION 4 - RESPONSIBILITIES OF OWNER
OWNER shall, within a reasonable time, so as not to delay the services of
ENGINEER:
4.1 Provide full information as to his requirements for the Project.
4.2 Assist ENGINEER by placing at his disposal all available
information pertinent to the assignment including previous reports and any
other data relative thereto.
4.3 Furnish ENGINEER services or data such as core borings, probings
and subsurface explorations, hydrographic surveys, laboratory tests and
inspections of samples, materials and equipment; appropriate professional
interpretations of all of the foregoing; property, boundary, easement,
right-of-way, topographic and utility surveys; zoning and deed restriction;
and other special data or consultations, all of which ENGINEER may rely upon
in performing his services under this Agreement.
4.4 Guarantee access to and make all provisions for ENGINEER to enter
upon public and private property as required for ENGINEER to perform his
services under this Agreement.
4.5 Examine all studies, reports, sketches, estimates, Bid Documents,
Drawings, proposals and other documents presented by ENGINEER and render in
writing decisions pertaining thereto.
4.6 Provide such professional legal, accounting, financial and
insurance counseling services as may be required for the Project.
- 5 -
4.7 Designate in writing a person to act as OWNER'S representative with respect to
the services to be performed under this Agreement. Such person sha11 have complete
authority to transmit instructions, receive information, interpret and define OWNER'S
policies and decisions with respect to materials, equipment, elements and systems to be
used in the Project, and other matters pertinent to the services covered by this
Agreement.
4.8 Give prompt written notice to ENGINEER whenever OWNER observes or otherwise
becomes aware of any defect in the Project.
4.9 Furnish approvals and permits from all governmental authorities having �
jurisdiction over the Project and such approvals and consents from others as may be
necessary for completion of the Project.
4.10 Furnish, or direct ENGINEER to provide, necessary Additional Services as
stipulated in Section 3 of this Agreement or other services as
required.
SECTION S - PERIOD OF SERVICE
S.1 This Agreement will become effective upon the first written notice by OWNER
authorizing services hereunder and shall run until completion of the last agreement
authorized within three years of the Date of Notice.
5.2 This Agreement shall be applicable to a11 assignments authorized by OWNER and
accepted by ENGINEER subsequent to the date of its execution and shall be effective as to
all assignments authorized.
5.3 Performance time for individual assignments shall be agreed upon at the time
of authorization. Work shall be started within seven (7) days of authorization and
prosecuted expeditiously to an early completion.
SECTION 6 - PAYMENTS TO ENGINEER
6.1 Amount of Payment
6.1.1 For services performed, OWNER shall pay ENGINEER the sum of amounts
determined as follows:
6.1.1.1 For time spent by personnel, payment at the hourly rates indicated in the
"Schedule of Hourly Labor Billing Rates" Form BMR893. Such rates include overhead and
profit. The schedule is effective to May 31, 1994, and will be revised annually
thereafter.
6.1.1.2 For expenses incurred by ENGINEER, such as authorized travel and subsistence
including airfare, food, lodging, automobile rental, commercial services, and incidental
expenses, the cost to ENGINEER.
6.1.1.3 For reproduction, printing, long-distance telephone calls, company vehicle
usage, testing apparatus, computer services and computer-assisted drafting (CAD) , amounts
will be charged according to the ENGINEER's standard rates in effect at the time service
is provided.
6.1.1.4 For professional services rendered by others as subcontractor(s) to ENGINEER
such as surveying, real property descriptions, soil borings, subsurface investigations,
laboratory testing, field quality control tests, progress photos, or other activities
required or requested by OWNER, will be billed at the cost to ENGINEER.
- 6 -
. • � �
6.1.1.5 For time spent by outside individual professional consultants
employed by ENGINEER in providing services to OWNER, the cost to ENGINEER plus
10 percent. Expenses incurred by such outside consultants in service to OWNER
shall be reimbursable in accordance with 6.1.1.2 above.
6.1.1.6 For expenses incurred by ENGINEER in providing resident field
services such as vehicle lease or rental, telephone services, miscellaneous
resident office expenses, commercial services, field personnel moving
expenses, housing impact or per diem allowance, mileage allowance for
personnel assigned in the field, authorized travel and subsistence expenses of
personnel temporarily assigned from ENGINEER's offices to assist the resident
representative, and other such items incidental to operating these field
offices, the cost to ENGINEER.
6.1.2 Payment for the Scope of services described herein shall be as
indicated on each Authorization executed under this Agreement.
6.2 Statements (See Notes on the attached "Schedule of Hourly Labor
Billing Rates, " Form BMR893. )
6.3 Payments
6.3.1 Statements are payable upon receipt. A late payment charge of
1-1/2 percent per month will be added to all amounts not paid within 30 days
of the statement date. Any costs incurred by ENGINEER in collecting any
delinquent amount shall be reimbursed by OWNER. In the event a portion of
ENGINEER's statement is disputed by OWNER, the undisputed portion shall be
paid by OWNER by the due date. OWNER shall advise ENGINEER in writing of the
disputed portion of any statement.
6.3.2 Taxes other than federal and state income tax assessments, as may
be imposed by state and local authorities, shall be in addition to the payment
stated under 6.1.2.
SECTION 7 - GENERAL CONSIDERATIONS
7.1 Insurance
7.1.1 During the course of performance of its services, ENGINEER will
maintain the following minimum insurance coverages:
Tvpe of Coverage Limits of Liabilitv
Workers' Compensation Statutory
Employers' Liability $500,000 Each Accident
Comprehensive General Liability
Bodily Injury and Property Damage $1,000,000 Combined Single
Limit
Automobile Liability
Bodily Injury and Property Damage $500,000 Combined Single Limit
If requested, ENGINEER will provide to OWNER certificates as evidence of the
specified insurance.
- 7 -
. . � �
7.1.2 If the Project involves on-site construction-phase services by the
ENGINEER, construction contractors shall be required to provide (or OWNER may
provide) Owners' Protective Liability Insurance naming the OWNER and ENGINEER
as Named Insureds, and to endorse OWNER and ENGINEER as additional insureds on
construction contractor's liability insurance policies covering claims for
personal injuries and property damage. Construction contractors shall be
required to provide certificates evidencing such insurance to the OWNER and
ENGINEER.
7.2 Professional Responsibility
7.2.1 ENGINEER will exercise reasonable skill, care, and diligence in
the performance of its services and will carry out its responsibilities in
accordance with customarily accepted good professional engineering practices.
If the ENGINEER fails to meet the foregoing standard, ENGINEER will perform at
its own cost, and without reirnbursement from OWNER, the professional
engineering services necessary to correct errors and omissions which are
caused by ENGINEER's failure to comply with above standard, and which are
reported to ENGINEER within one year from the completion of ENGINEER's
services for the Project.
7.2.2 In addition, ENGINEER will be responsible to OWNER for damages
caused by its negligent conduct during its activities at the Project site or
in the field to the extent covered by ENGINEER's Comprehensive General
Liability and Automobile Liability Insurance as specified in Section 7.1.
7.2.3 In no event will ENGINEER be liable for any special, indirect or
consequential damages including, without limitation, damages or losses in the
nature of increased Project costs, loss of revenue or profit, lost production,
claims by customers of OWNER, or governmental fines or penalties.
7.2.4 The obligations and remedies stated in this Section 7.2,
Professional Responsibility, are the sole and exclusive obligations of
ENGINEER and remedies of OWNER, whether liability of the ENGINEER is based on
contract, warranty, tort or otherwise.
7.3 Estimates and Projections
Estimates and projections prepared by ENGINEER relating to
construction costs and schedules, operation and maintenance costs, equipment
characteristics and performance, and operating results are based on ENGINEER's
experience, qualifications and judgment as a design professional. Since
ENGINEER has no control over weather, cost and availability of labor, material
and equipment, labor productivity, construction contractor's procedures and
methods, unavoidable delays, construction contractor's methods of determining
prices, economic conditions, competitive bidding or market conditions and
other factors affecting such estimates or projections, ENGINEER does not
guarantee that actual rates, costs, performance, schedules, etc. , will not
vary from estimates and projections prepared by ENGINEER.
- 8 -
. • . � �
7.4 On-Site Services
Project site visits by ENGINEER during construction or equipment
installation, or the furnishing of Project resident representatives shall not
make ENGINEER responsible for construction means, methods, techniques,
sequences or procedures; for construction safety precautions or programs; or
for any construction contractor(s') failure to perform its work in accordance
with the plans and specifications.
7.5 Changes
OWNER shall have the right to make changes within the general
scope of ENGINEER's services, with an appropriate change in compensation, upon
execution of a mutually acceptable amendment or change order signed by an
authorized representative of the OWNER and the President or any Vice President
of the ENGINEER.
7.6 Suspension of Services
Should OWNER fail to fulfill his responsibilities as provided
under Section 4 to the extent that ENGINEER is unduly hindered in his services
or if OWNER fails to make any payment to ENGINEER on account of his services
and expenses within 90 days after receipt of ENGINEER'S bill therefor,
ENGINEER may, after giving seven days' written notice to OWNER, suspend
services under this Agreement until OWNER has satisfied his obligations under
this Agreement.
7.7 Termination
Services may be terminated by the OWNER or ENGINEER by seven (7)
days' written notice in the event of substantial failure to perform in
accordance with the terms hereof by the other party through no fault of the
terminating party. If so terminated, OWNER shall pay ENGINEER all amounts due
ENGINEER for all services properly rendered and expenses incurred to the date
of receipt of notice of termination, plus reasonable costs incurred by
ENGINEER in terminating the services.
7.8 Publications
Recognizing the importance of professional development on the part
of ENGINEER's employees and the importance of ENGINEER's public relations,
ENGINEER may prepare publications, such as technical papers, articles for
periodicals, and press releases, pertaining to ENGINEER's services for the
Project. Such publications will be provided to OWNER in draft form for
OWNER's advance review. OWNER will review such drafts promptly and will
provide its comments to ENGINEER. OWNER may require deletion of proprietary
data or confidential information from such publications but otherwise will not
unreasonably withhold its approval. The cost of ENGINEER's activities
pertaining to any such publication shall be for ENGINEER's account.
7.9 Successor and Assigns
OWNER and ENGINEER each binds himself and his successors,
executors, administrators and assigns to the other party of this Agreement and
to the successors, executors, administrators and assigns of such other party,
in respect to all covenants of this Agreement; except as above, neither OWNER
nor ENGINEER shall assign, sublet or transfer his interest in the Agreement
without the written consent of the other.
- 9 -
• � �
7.10 Disputes
In the event that a dispute should arise relating to the
performance of the services to be provided and should that dispute result in
litigation, it is agreed that the prevailing party shall be entitled to
recover all reasonable costs of litigation, including staff time, court costs,
attorneys' fees and other related expenses.
7.11 Rights and Benefits
ENGINEER's services will be performed solely for the benefit of
the OWNER and not for the benefit of any other persons or entities.
7.12 Entire Agreement
This Agreement represents the entire and integrated Agreement
between the ENGINEER and OWNER relative to the Scope of Services herein. All
previous or contemporaneous agreements, representations, promises and
conditions relating to ENGINEER's services described herein are superseded.
Since terms contained in purchase orders do not generally apply to
professional services, in the event OWNER issues to ENGINEER a purchase order,
no preprinted terms thereon shall become a part of this agreement. Said
purchase order document, whether or not signed by ENGINEER, shall be
considered as a document for the OWNER's internal management of its
operations.
IN W TNESS WHEREOF, the City of Cape Girardeau, Missouri by and through its
, and Burns & McDonnell Engineering Company, Inc. , by its
auth iz off'cer have made and executed this Agreement as of the day and
year first abo e written.
OWNER
B -Cg� � 5
y
Ti e � Q�t��6i'�'
APPROV
,
BURNS & c N NEERING COMPANY, INC.
sy �
Robert T. erry, P.E.
Vice President
- 10 -
: � .
� �
AUTHORIZATION N0.
For
PROFESSIONAL ENGINEERING SERVICES
To
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT for PROFESSIONAL ENGINEERING SERVICES dated
between the City of Cape Girardeau, Missouri (hereinafter called OWNER)
and Burns & McDonnell Engineering Company, Inc. (hereinafter called ENGINEER) , OWNER
hereby authorizes ENGINEER to proceed with the following services:
The Scope of Services to be provided by ENGINEER, in connection with this Authorization,
is as follows:
I. SCOPE
(Insert Scope of Services here. ) OWNER will provide, in connection with this
Authorization, the following: (Insert Owner's responsibilities here. )
II. TIME OF SERVICE
ENGINEER will proceed with providing the services set forth herein within seven days of
this Authorization.
III. COMPENSATION
OWNER shall compensate ENGINEER for providing the services set forth herein in accordance
with the terms of the existing Agreement. Total payment for the Scope of services
described herein shall not exceed $ without written authorization of OWNER.
AUTHORIZATION BY:
CITY OF CAPE GIRARDEAU, MISSOURI
By
Date
ACCEPTED BY:
BURNS & McDONNELL ENGINEERING COMPANY, INC.
By
Robert T. Berry, P.E.
Vice President
� , � .
� �
Schedule of Hourly Professional Service Billing Rates
Position Classification Hourly •
Classification Level Billing Rate
General Office* 1 $13.00
2 14.00
-- 3 19.00
Technician* 4 21.00
5 25.00
6 29.50
Assistant* 7 33.50
8 47.50
9 53.50
Staff 10 57.00
11 62.50
Senior 12 68.50
13 75.00
Associate 14 86.00
15 90.00
Principal 16 93.00
17 95.00
Notes
1. Position classifications lis2ed above refer to the firm's internal classification system for employee compensation. For example,
"Associate,""Senior,"etc.,refer to such positions as"Associate Engineer,""Senior Architect,"etc.
2. The hourfy rates shown above are effective for services through May 31, 1994,and are subject to revision thereafter.
3. For any nonexempt personnel in positions marked with an asterisk (*), oveRime will be billed at 1.5 times the hourly labor
billing rates shown.
4. Project time spent by corporate officers will be billed at the Principal rate (Level 17)plus 25 percent.
5. Monthly statements will be submitted for payment covering services and expenses during the preceding month.
BMF893
� . ,
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AIITHORIZATION N0. 1
For
PROFESSIONAL ENGINEERING SERVICES
To
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES dated
March 21, 1994 between the City of Cape Girardeau, Missouri (hereinafter
called OWNER) and Burns & McDonnell Engineering Company, Inc. (hereinafter
called ENGINEER) , OWNER hereby authorizes ENGINEER to proceed with the
following services:
I. SCOPE.
This Authorization No. 1 covers services involved in providing assistance to
OWNER's staff in the preparation of an application to the Economic Development
Administration (EDA) for a grant to improve the reliability of the OWNER's
existing Cape Rock water treatment plant raw water intake system.
Specifically, ENGINEER will prepare the ArcHitect/Engineer Report required for
submittal by Line 14 of Section B of Form ED-540 (Rev. 7/92) , as further
described by the Section B - Legal/Engineering Information Instructions
accompanying Form ED-540, attached hereto.
The detailed description of the anticipated scope of services is presented in
Attachment "A" .
I2. TIME OF SERVICE
ENGINEER will proceed with providing the services set forth herein immediately
upon verbal notice to proceed from OWNER, and will complete these services by
no later than April 27, 1994, in order that OWNER can submit the completed
application package to EDA by May 1, 1994.
It is understood that such completion is contingent on the timely review by
OWNER of submittals from ENGINEER, as well as on any delays occasioned by
events beyond the control of the ENGINEER (such as adverse weather conditions,
regulatory agency actions, force majeure events, etc. ) .
1 of 2
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT �AND DISTRIBUTION SYSTEM
AIITHORIZATION NO. 1
III. COMPENSATION
1. OwNER shall compensate ENGINEER for providing the services set forth
herein in accordance with the terms of the existing Agreement, based on
a cost reimbursable basis with a maximum (ceiling) amount.
2. Total payment for the Scope of Services described in this Authorization
shall not exceed the maximum of Thirteen Thousand Five Hundred Dollars
($13,500.) without prior written approval by OWNER.
AUTHORIZATION BY:
CITY OF CAPE GIRARDEAU, MISSOURI
t h
By: �?� Attest: /� L
Date: �/�- 9�/
ACCEPTED BY:
BURNS & MCDONNE ENGINEERIN OMPANY, INC.
By:
Dr. Ro ert T. Berry, P.E.
Vice President
2 of 2
ATTACFIMENT "A"
AIITHORIZATION NO. 1
DETAILED SCOPE OF SERVICES
1. Conduct a site visit to gather data on current intake conditions and to
obtain clearer understanding of nature and extent of OWNER-desired
modifications. As presently understood, items to be addressed include:
� revisions to structure and/or pumps and other equipment to protect
against water damage from high river level
• improvements to protect intake structure from possible physical
damage due to collisions with barges, debris, etc. during high
river level
• modifications to rock-tunnel conduit from river to intake
structure to improve reliability (i.e. , physical integrity) and
maintainability (i.e. , ability to remove portion of conduit from
service for repair without shutting down entire plant
• addition of equipment to protect intake pumps from internal damage
due to excessive debris present in the river during flood events
• addition of equipment to provide an emergency standby source of
power to intake systems to prevent service interruption during
flood events
• addition of equipment to control possible shut-down of intake by
zebra mussel infestation accelerated by flood event.
2. Prepare draft outline of report investigating feasibility of various
alternate means of addressing above items and determining costs
associated with recommended solution for each item. Submit draft
outline to OWNER for review, then incorporate OWNER comments and
finalize report outline.
3. Evaluate identified alternates and select recommended approach to
address each of above items.
4. Develop procurement/installation cost estimates for recommended
approaches.
5. Prepare draft report briefly summarizing the major results of the
performance of Items 3. and 4. Submit draft to OWNER for review.
6. Incorporate appropriate OWNER review comments, finalize report, and
transmit to OWNER for inclusion with application package.
7. Administer/manage above tasks (including quality control activities) .
By: Burns & McDonnell
April 8, 1994
1 of 1
. • --
' Section B—Leflal/Enyinee�infl Information Inatructions
It�ms t throuyh 4—SeM e:ptanatory c. Propos�d m�cfwd o( conscn,ctan 4.�.. cort+petnive Dd� kd�-
ft�m 5—Oesc��be ths land. nghts-o(-way and assanents requred cau I a�+y P�^ar+o( the co�st�uctan wo�1c a p►oposed to be
do�e py the spp�cu+t's own forc�s.
(or co�struct�on ot the p�o�ect tauht�es McluCiny �rea pres�ntly
owned and to be xquaed. Anach tFws propct site aescr�ptan and d. Prohnrnary desgn cons�dentans, nckidn9 Iww the proposed
a utle op��wn from sn acceptable t�tl� counsel descnb�ng the propct wrl b�ntegnted�nto any e�nstw�g faciit�s.
Appbcant"s bgat�nterest�n the propct srte as EXHlB/T N-B-S.N s�y �
propeny has been o��s to be scqwrod specd�cslFy!or ttus propcL e•Estwnate o(the use(ul ule ot the(aulity.
then Item !•"Land Acqws�t�on Estimates" ot EXHI8IT ll•A-7,
"Cslculauon ol Est�mateG Reiocaaon and Land Acqws�aon Ex- � A curre�t coostructan cost astunste showmg qua�trt�es, urut
pr�ces snd total costs. If project cons�sts of mo�e than o�e
penses"'. must be comp�eted snd an amount entered in line�tem 3. ������ (�s., road �mprovements on B Street, co�.suuct,on
"Lsnd, structures. nghts-of-way" ot the BuGget, fo� costs-
u�c�dental-to-land-acqu�s�t�on �n add�t�on to the estimated pur- o(Dulding C a�+d w�denu+g o(twghwsy�),wbrtrt cost estmates
chase pnce of the property. If the appl�cant does not �ntend to to�exh component�n sdditan to a total cost estimsta.
reaw� the trtle to the pro�ect facdity, or to operats snd ma�nta�n rt 9, perrtnt status. Identify mapr consaucta� permrts requved fo�
upon completion o( construct�on, e:pla�n the reasons theretore tMs pro�ect snd A sny are pending, prov�de ststus o(request. H
snd dent�fy tra�sie�ee and/or operatw. Attach as EXHlBlT ll-B-Si. � a� �� �� ��, stortn sewer, sewsge treat-
ftems 6 snd 7—SeH ezplanatory ment or wsste disposal tacdit�es, the prelimvwry approval o�
cert�tication by the appropriate swte sgency respons�We fo�
Item 8—The plot plan must show tha locat�on oi all existi�g water pollutan contrd �s requked and shoub be attsct�ed as
pro�ct tacd�t�es and a�ex�st�ng utd�t�es servu�g the pro�ect s,te. EXHlBlT q-B-l<g(1�. N the propct nvolves other conswcuon
It�n 9—Selt exptanatory Pe��s, such ss draAgu�g/channeluatio� xtnrty may reqwre a
Section 404 permit (rom the Corps oi Engmeers ot s n�IroaC
Item 10—The target dates should reflect the est�mated cumula• ��ght-o/-way permit irom a Radroad Company, attach s report
t�ve days reawred trom the est�mated Cate of grant approval o�tfieu ststus ss EXHlBlT.11-B-ldg/?J.
tlwough each mdestone. The schedule should be made �n concert �t�m 15—If item 15 is answered "yes", sttac� a stsceme�t
w�th ehe A/E and mclude suHK�ent time (or the targets descnbed explamr+g how the pro�ect �s compatibb w�th the autieb la�+d use
as folbws�
plan prepared for the tederatly owned or operated arfield u EXh�IT
• Bid Advertisement—Seti e:planatory 11-8-15.
• ContractAward—Selfexplanaiory. Item 1�—If �iem 16 �s answered "yes". prov�de �nformatwn �n
• Co�struetion Completion—Cumulahve days from grant ap- Exh�b�ts as(oNows:
proval to when the owner accepts the pro�ect as be�ng com-
pleted �n accordance w�th plans/spec�t�cations as cert�fied a EXHIBIT II-8-16s—Sg�ed statements of concurre�+ce anth the
recommended by the A/E prc�posed �rr►provert�ents hom the Oepnrtment oi Heatth and Fl�xnan
• Oeeupsney—SeH e:planatory. Serv�ces snd the Stats Heahh Planning and DevNopment Agency.
Not�: H s scheduk re8ect�ng a/f of the items above �s avadable n '�appropnate,rtwst be prov�ded.
snother form,you msy attsch it ss EXH181T p-B-f0 O(HIBR U-B-16b—Explan how the project satis5es tM req�are-
ft�n 11—Selt ezplan�tory. R+ents of 13 CFR 305.42(a heshh cxe fsality irtprovemencs.
h�m 72—SeH ezplanatory. hem 17—H item 17 a answered "yes", prov�de intormation �n
Exhibits ss fotbws:
h�m 13—Attach an A/E agreament tor tMs pro�ect or prov�de an EXHIBIT 11-B-17a—Ezplain the Iim�tano� o( avs�lable gas or
ezptanatwn rf an A/E agreement �s noi avsilable as EXNIBIT ll-B- electncal energy wpplies as they relate to the bss o(pbs or the
13. creata�o(new jobs.
Item 14—The Arch�tect/Eng��eer repon attached as EXH/81T EXHIBIT 11-B-17b—Cop�es ot correspondence trom appropn-
1-8-14 should�nckide wch�tems as follows:
ste pnvste lendir+g institut�ons showing that pro�ect tu�snang �s
s. Ststement ot propct components. Ind�cate if �t w�tl be s new not avs�lable irom prnste lenders.
facdity, enlargement, expansio� or replaceme�t o( an e:�sting ��� '�.&���_
isality. Oescnbe pro�ect componants and attach sketches �°p°s a th° stst�ts ^wd° by th°appro-
show�ng genenl la�rout and location o!components. P��ate State or Federsl regulatory Dody that the fac�ity to be
tinanced vwll not compete wlth a� e�ciste+g puW�c utiGty provdmg
b. A teas�bd�ty analys�s, �ncluding a rev�ew of ex�stuy cond�t�ons. such s serv�ce to the pu�l�c: ot ii there �s s determmat�on o(
O�xuss sny potent�al problems whicn might deby constructa� competition, that ths State oi Fedenl regulatory body hss deter- - -
wch ss seasonatity (�.e. Could the pro�ect beg�n and cont�nue mined thst thers-a� need for an inerease o(wch sernces in the .
construct�on m rtud-wmter�. Indicate whether seasonality was areas to be served by the pro�ect which the eustmg pubtic utdrty -
cons�dered m the preparatwn of the construct�on schedute rsted n cannot meet through ns ea�sung faulities or through an ezpans�on
Item II-B-10 wMch�t agrees to undertake.
w
FORM ED-540(Rev. 7/92) 8 .
� G�e3 A��fo•.i�_s..•t5��^yuSt J�, toOd
xA �
�.
_ a
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AUTHORIZATION NO. 2
- For
PROFESSIONAL ENGINEERING SERVZCES
To
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES dated
March 21, 1994 between the City of Cape Girardeau, Missouri (hereinafter
called OWNER) and Burns & McDonnell Engineering Company, Inc. (hereinafter
called ENGINEER) , OWNER hereby authorizes ENGINEER to proceed with the
following services:
I. SCOPE
This Authorization No. 2 covers services involved in providing the design of
piping and valve actuating systems to protect the OWNER'S existing four major
water storage tanks and the clearwells at the two water treatment plants `
during a seismic event. These systems are intended to prevent rupture of the
connections to the distribution system at these tanks, and to isolate the
storage tanks from the distribution system to minimize the loss of treated
water and reduce the riak of cross-contamination due to distribution system
piping failures.
Specifically, ENGZNEER will prepare detailed plans and specifications required
for the installation of flexible, expansion joint piping at the inlet and
outlet of the Gordonville tanks (2), College tank, Meadowbrook tank, and at
the clearwells at each treatment plant. ENGINEER will prepare detailed plans
and specifications for a seiamic actuation system to positively close
isolation valves for each of the above-mentioned tanks.
The detailed description of the anticipated scope of services is presented in
Attachment "A".
II. TIME OF SERVICE
ENGINEER will proceed with providing the services set forth herein immediately
upon verbal notice to proceed from OWNER, and will complete these services
within six (6) weeks from work initiation.
It is understood that such completion is contingent on the timely review by
OWNER of sul�mittals from ENGINEER, as well as on any delays occasioned by
events beyond the control of the ENGINEER (such as adverse weather conditions,
regulatory agency actions, force majeure events, etc. ) .
1 of 2
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AUTSORIZATION NO. 2
III. COMPENSATION
1. OWNER shall compensate ENGINEER for providing the services set forth
herein in accordance with the terma of the existing Agreement, based on
a lump sum basie. Total payment for the Scope of Services described in
this Authorization shall be the lump sum amount of Eighteen Thousand
Dollars ($18,000.) .
2. ENGINEER shall invoice OWNER for one-half of this lump sum amount
following submittal of� preliminary plans and specifications. One-half
of the remainder of this lump sum amount shall be invoiced following
submittal of the completed final plans and specifications and ENGINEER'S
Construction Cost Estimate. The final remainder of the lump sum amount
shall be invoiced following submittal of the record drawings to OWNER.
1
AUTHORIZAT�ON BY:
. ,, �. _. � '�.
f' . CITY OF- CAP� ,GIRARDEAU, MISSOURI
j._ .
� r >
� � B�r; . ¢� Attest: �7 ,
` -
Date: �4- 7-�c�
ACCEPTED BY:
BURNS & MCDONNE E GINE RIN C PANY, INC.
By: •
Dr. Rober T. Berry, P.E.
Vic President �
2 of 2
ATTACHMLNT "A"
AUTHORIZATION NO. 2
DETAILED SCOPE OF SERVICES
1. Conduct a site viait to gather data on current storage tank conditions
and to obtain clearer understanding of the nature and extent of OWNER-
desired modifications. As presently understood, items to be addressed
include:
a. Design of flexible, expansion joint piping sections at the inlet
and outlet of the Gordonville tanks (2) , College tank, Meadowbrook
tank, and at both treatment plants' clearwell.
b. Design control valves to isolate all storage tanks from the
distribution system in the occurrence of a specified seismic
event.
c. Investigate alternatives to positively actuate closure of the
isolation valves. Evaluate multiple seismic triggers/switches
versus a single seismic trigger/switch and a SCADA system.
d. Design selected seismic trigger/switch system to positively �
actuate closure of isolation valves.
2. Briefly investigate the ramifications of water storage isolation in
light of emergency planning considerations.
3. Prepare preliminary plans and specifications for each of the six
specified storage tanks.
4. Submit preliminary plans and specifications to OWNER for review.
5. Incorporate OWNER review comments and finalize the detailed plans and
specifications.
6. Submit final plans and specifications to MDNR for review and approval.
7. Incorporate MDNR comments and otherwise complete final plans and
specifications.
8. Develop Engineer's Estimate of Construction Cost for OWNER'S use in
evaluating construction bids.
9. Assist OWNER during the bidding process in responding to bidder
questions on design intent.
10. Provide construction-phase engineering services consisting of:
a. Shop drawing review.
b. Response to field questions.
c. Final inspection to confirm construction's conformance to design
intent.
d. Prepare record as-built drawings.
11. Administer/manage above tasks (including quality control activities) .
By: Burns & McDonnell
May 6, 1994
1 of 1
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AIITHORIZATION NO. 2A
For
PROFESSIONAL ENGINEERING SERVICES
To
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES dated
March 21, 1994 between the City of Cape Girardeau, Missouri (hereinafter
called OWNER) and Burns & McDonnell Engineering Company, Inc. (hereinafter
called ENGINEER) , OWNER hereby authorizes ENGINEER to proceed with the
following services:
I. SCOPE.
This Authorization No. 2A authorizes additional compensation for services
involved in providing the design of piping and valve actuating systems to
protect the OWNER's existing major water storage tanks during a seismic event.
The original work to develop a Design Basis Memorandum and a bid package
(plans and specifications) for installation of seismic event sensors and the
related protection system for the College Tank was previously authorized by
Authorization No. 2, dated 06-07-94.
The detailed description of the anticipated scope of services for this
work remains as it was presented in the previously-developed Attachment "A" to
Authorization No. 2 (copy attached for reference) , as this applies to the
establishment of seismic protection for Gordonville Tanks 1 & 2 and
Meadowbrook Tank. In addition, services associated with the re-bidding of the
College Tank improvements (as part of a package revised to also include the
Gordonville Tanks) are also included within the scope of services covered by
this additional compensation.
II. TIME OF SERVICE
ENGINEER will proceed with providing the services set forth herein immediately
upon execution of this Authorization by OWNER, and will complete the services
associated with designing the Gordonville Tank improvements and incorporating
those improvements into the previously-prepared College Tank improvements so
that this revised package can be bid in October 1995. The schedule for
completion and bidding of the remaining improvements will be mutually arrived
at through discussion between OWNER and ENGINEER at a later date.
It is understood that such completion is contingent on the timely review by
OWNER of submittals from ENGINEER, as well as on any delays occasioned by
events beyond the control of the ENGINEER (such as adverse weather conditions,
regulatory agency actions, force majeure events, etc. ) .
1 of 2
AUTHORIZATION NO. 2A
III. COMPENSATION
1. OWNER shall compensate ENGINEER for providing the services set forth
herein in accordance with the terms of the existing Agreement, based on
a cost reimbursable basis with a maximum (ceiling) amount. Details of
the maximum (ceiling) cost estimate are presented in Attachment B.
2. Total additional payment for the Scope of Services described in this
Authorization shall not exceed Seventeen Thousand Dollars ($ 17, 000. )
without prior written approval by OWNER. This brings the total maximum
fee billable for Authorization Nos. 2 and 2A to $ 35, 000.
AUTHORIZATION BY:
CITY OF CAPE GIRARDEAU, MISSOIIRI
gy; ' Attest: �
Date: � ��-Q5
ACCEPT$D BY:
BIIRNS & McDONNELL BNGINS$RING COMPANY, INC.
By: -
Dr. Robert T. Ber�ty, P.E.
Vice President I
2 of 2
ATTACffi�iENT "A"
AUTHORIZATION NO. 2
DETAILED SCOPE OF SERVICES
1. Conduct a site visit to gather data on current atorage tank conditions
and to obtain clearer understanding of the nature and extent of OWNER-
desired modifications. As presently understood, items to be addressed
include:
a. Deaign of flexible, expansion joint piping sections at the inlet
and outlet of the Gordonville tanks (2) , College tank, Meadowbrook
tank, and at both treatment planta' clearwell.
b. Design control valves to isolate all storage tanks from the
distribution system in the occurrence of a specified seismic
event.
c. Investigate alternatives to positively actuate closure of the
isolation valves. Evaluate multiple seismic triggers/switches
versus a single seismic trigger/switch and a SCADA system.
d. Design selected seismic trigger/switch system to positively
actuate closure of isolation valves.
2. Briefly investigate the ramifications of water storage isolation in
light of emergency planning considerations.
3. Prepare preliminary plans and specifications for each of the six
specified storage tanks.
4. Submit preliminary plans and specifications to OWNER for review.
5. Incorporate OWNER review comments and finalize the detailed plans and
specificationa.
6. Submit final plans and specifications to MDNR for review and approval.
7. Zncorporate MDNR comments and otherwise complete final plans and
specifications.
8. Develop Engineer's Estimate of Construction Cost for OWNER'S use in
evaluating construction bids.
9. Assist OWNER during the bidding process in responding to bidder
questions on design intent.
10. Provide construction-phase engineering services consisting of:
a. Shop drawing review.
b. Response to field questions.
c. Final inspection to confirm construction's conformance to design
intent.
d. Prepare record as-built drawinqs.
11. Administer/manage above tasks (including quality control activities) .
By: Burns & McDonnell
May 6, 1994
1 of 1
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AIITHORIZATION NO. 2A
ATTACHMENT B
Estimate of Additional Costs
Design of Storage Tank Seismic Protection Improvements
The total estimated increase in the maximum cost for the design of potable water
storage tank seismic protection improvements (as defined by Attachment A to
Authorization No. 2) is $ 17, 000. and includes the following:
• Costs associated with unanticipated complexity of existing water
storage tank piping systems and selection of suitable monitoring
device for sensing seismic event / initiating tank protection system
are estimated to be $ 4, 000.
• Costs associated with remaining services described in Paragraph I2.
of the actual text of this Authorization No. 2A (per previously-
transmitted letter of July 12, 1995; attached for reference) are
estimated to be $ 13,000.
* * * * *
By: L. A. Ebel
August 7, 1995
. . � � `
1 � '
ENGINEERS•AR(HIiE(iS•(ONSUl1ANiS
July 12, 1995
Mr. J. Kensey Russell
City of Cape Girardeau
401 Independence Street
P.O. Box 617
Cape Girardeau, Missouri 63702-0617 .
Seismic Protection Improvements Proiect
Dear Mr. Russell:
Per our request, we are forwarding updated cost estimates for the various
project locations. These updated estimates have been developed to reflect
certain enhancements included in the final design for the College Tank
improvements that were not factored into the prior estimates included in the
Design Basis Memorandum.
After you have had a chance to review this information, please contact us to
discuss the manner in which you would like us to proceed.
If you have any questions or need any additional information regarding these
estimates, please contact me or Jeff Kaiser.
S' cerely,
� � �.�L''v"
Leo A. Ebel, P.E.
Project Manager
T.AR/j lm
94159�001\C , _
cuuell.002
�
370!South lindbergh Boulevard,St.(ouis,Missouri 63I27
Phone(314J 8T1-9016 Fox(314)81f•5406
CITY OF CAPE GIRARDEAU
TREATED WATER STORAGE TANK
SEISMIC PROTECTION IMPROVEMENTS
CONSTRUCTION COST ESTIMATE
SEISMIC SENSOR INSTALLATION
ESTIMATED
ITEM NO. DESCRIPTION COST
1. Seismic Sensors $17,200
(one at Cape Rock, one at Ramsey Branch)
2. installation $7,300
(includes conduit, wiring, etc.)
Construction Cost $24,500
Contingencies at 10% +/- $2,500
Total Estimated Cost $27,000
By: Bums & McDonnell
July 12, 1995
i:\projects\9415914002\work\costests.xls
CITY OF CAPE GIRARDEAU
TREATED WATER STORAGE TANK
SEISMIC PROTECTION IMPROVEMENTS
CONSTRUCTION COST ESTIMATE
COLLEGE TANK
ESTIMATED
ITEM NO. DESCRIPTION COST
1. Concrete Vault Construction � $6,500
2. Actuated Valve $6,200
3. Actuated Valve Instaliation $12,000
(includes air piping, solenoid valve, electrical, etc.)
4. Isolation Valve $2,100
5. Flexible Joint $7,500
6. Valve and Joint Installation $5,200
(includes approximately 20 LF, 14" DIP)
7. Protection and Restoration $2,500
8. SCADA System Improvements $4,200
Construction Cost $46,200
Contingencies at 10% +/- $4,800
Total Estimated Cost $51,000
By: Burns& McDonnell
July 12, 1995
i:\projects194159\4002\work\costests.xls
CITY OF CAPE GIRARDEAU
TREATED WATER STORAGE TANK
SEISMIC PROTECTION IMPROVEMENTS
CONSTRUCTION COST ESTIMATE
GORDONVILLE TANKS #1 AND #2
ESTIMATED
ITEM NO. DESCRIPTION COST
1. Concrete Vault Construction (4) � $26,000
2. Actuated Valve (4) $24,800
3. Actuated Valve Instailation $48,000
(includes air piping, solenoid valve, electrical, etc.)
4. Isolation Valves (4) $8,200
5. Flexible Joints (4) $30,000
6. Valve and Joint Installation $20,800
7. Air Compressor and Piping $4,500
8. SCADA System Improvements $4,200
Construction Cost $166,500
Contingencies at 10% +/- $16,500
Total Estimated Cost $183,000
By: Bums & McDonnell
July 12, 1995
i:\projects194159\4002\work\costests.xls
CITY OF CAPE GIRARDEAU
TREATED WATER STORAGE TANK
SEISMIC�PROTECTION IMPROVEMENTS
CONSTRUCTION COST ESTIMATE
MEADOWBROOK TANK
ESTIMATED
ITEM NO. DESCRIPTION COST
1. Concrete Vault Construction � $6,500
2. Control Building Construction $12,000
3. SCADA System Improvements/Relocation $6,200
4. Air Compressor and Piping $3,000
5. Actuated Valve $6,200
6. Actuated Valve Installation $12,000
(includes air piping, solenoid valve, electrical, etc.)
7. Isolation Valve $2,100
8. Flexible Joint $7,500
9. Valve and Joint Installation $5,000
(includes approximately 20 LF, 14" DIP)
10. Protection and Restoration $2,200
Construction Cost $62,700
Contingencies at 10% +/- $6,300
Total Estimated Cost $69,000
By: Burns & McDonnell
July 12, 1995
i:lprojects\94159�40021worklcostests.xls
CITY OF CAPE GIRARDEAU
.TREATED WATER STORAGE TANK
SEISMIC PROTECTION IMPROVEMENTS
CONSTRUCTION COST ESTIMATE
CAPE ROCK PLANT CLEARWELL
ESTIMATED
ITEM NO. DESCRIPTION COST
1. Actuated Valve $6,700
2. Actuated Valve Installation $16,000
(includes air piping, solenoid valve, electrical, etc.)
3. Piping Modifications $2,500
4. Air Compressor and Piping $4,200
5. SCADA System Improvements $4,200
Construction Cost $33,600
Contingencies at 10% +/- $3,400
Total Estimated Cost $37,000
By: Bums & McDonnell
July 12, 1995
i:lprojects\94159\4002\work\costests.xls
CITY OF CAPE GIRARDEAU
TREATED WATER STORAGE TANK
SEISMIC PROTECTION IMPROVEMENTS
CONSTRUCTION COST ESTIMATE
RAMSEY BRANCH PLANT CLEARWELL
ESTIMATED
ITEM NO. DESCRIPTION COST
1. Concrete Vault Construction � $13,000
2. Actuated Valve $13,400
3. Actuated Valve Installation $24,000
(includes air piping, solenoid valve, electrical, etc.)
4. Isolation Valve $5,000
5. Flexible Joint $15,600
6. Valve and Joint Installation $10,400
7. Protection and Restoration $4,300
8. SCADA System Improvements $4,200
Construction Cost $89,900
Contingencies at 10% +/- $9,100
Total Estimated Cost $99,000
By: Burns & McDonnell
July 12, 1995
i:\projects\94159\40021work\costests.xls
C� I- �;
Q � � ' � a�i
Z V � � o 0 0 0 �
O W Z f n. n. � u�i � � �
F- Z C9 x E E cri cfl c cri �
� C7 v� : o o � � v� � �
0 Z W ' U U o c
Q LLI � ;; a�
, � �
Q � o � � � .o
� � � U
O � �
Q � y � O O p � � O � Q � � C d
� � 0 :: I� � M � � ~ (D � � � � U
f j V� V :' � .��. � tD � V.�q '� p�y Q �0 �
W Z � EH 69 t�? C � � � y
u) V 3 � U o N
Z � W y 3 � E o
W a � ° � a�i `o � � �
� Q � � � � i� � �' � �
W W � � vi O U � O c0 � � N
c � � � U �
� Q � a W f0 w � � (n � ?.
Q � a � L _ F" � tA � C � olf �
� � � � U � Q C � � � � � fA �
� V C 22 � a V y U j C `
W y � Q . C� N � — � n � � � � � m
a Q' � C� � � � � W t0 (0 C V7 �
W V F- � c�i � � `- >.
u- a Fw- � O m � .x c�a °� � � a��i > � � � m
O � � J � y c�u a V O °� m t0 'a� o 0
� W a 0 : c � �c � � ~ x �v� , � � c�
N � O � �
F- V W (II C � O� � a .'�.�. '� N y � t�
U �Q � a o � > � � o � L � o � a
� tn � � a� c 3 �. �. n
� W o � � v� � � � �n
� = a a�i -°�� � � a � > ° ° � c
� V (0 � N
C.) U C7 � Q..' U � � C� '�q wU-. � �
.� � � � o � �
� � > � o n-
� � c a�i > � � o
0 3 °'
� � L � � >
Z - fd '0 � U Q U j 'D tn
� ;�a c0 � � rn � ..�. p X
C � Vf +'
a . c � -°o � � � a� � c��n
V - �- c c c c c � o o �� � � o �
N !' N o 0 0 0 o L C� c � a p � p
W " � �i� i� i� i� i� c� �- o � co � 'o c�
� , � a> a� a� a� a� �u o '� � � o � �
0 0 0 0 0 � - y � � �a o
" a a a n`_ n`_ f° � �°
� N cv u� � .� 3
NY .�L �C Y Y � � C `� O p. (p N
, � c� c0 c0 c0 c0 � U � U O W o0
cn F- F- I— F- H .., � ^. c
rn
�
�
v
rn
�
�
U
�
C
�
C
t� �
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AUTHORIZATION N0. 3
For
PROFESSIONAL ENGINEERING SERVICES
To
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES dated
March 21, 1994 between the City of Cape Girardeau, Missouri, (hereinafter
called OWNER) and Burns & McDonnell Engineering Company, Inc. (hereinafter
called ENGINEER) , OWNER hereby authorizes ENGINEER to proceed with the
following services:
I. SCOPE
.
This Authorization No. 3 covers services involved in providing an Alluvial
Well Field Supply Feasibility Study to improve the reliability of the water
supply to OWNER's existing Cape Rock Water Treatment Plant.
The detailed description of the anticipated scope of services is presented in
Attachment A.
II. TIME OF SERVICE
ENGINEER will proceed with providing the services set forth herein immediately
upon verbal notice to proceed from OWNER, and will complete Phase I of these
services within eight (8) weeks from start of work.
It is understood that such completion is contingent on the timely review by
OWNER of submittals from ENGINEER, as well as on any delays occasioned by
events beyond the control of the ENGINEER (such as adverse weather conditions,
regulatory agency actions, force majeure events, etc. ) .
It is further understood that Phase II work will not commence until a
separate, subsequent Authorization is developed by ENGINEER and approved by
OWNER covering such Phase II services.
1 of 2
i• .
III. RESPONSIBILITIES OF OWNER
For this Authorization No. 3 only, the OWNER shall be responsible for
providing the following:
1. Surveying necessary to locate the borings advanced by the drilling
subcontractor, with respect to the State plane coordinate system;
and to determine the top-of-ground elevation (USGS datum) at each
such boring.
2. Equipment to furnish reasonable assistance to the drilling
subcontractor in getting the drilling equipment into and out of
the proposed drilling site.
IV. COMPENSATION
1. OWNER shall compensate ENGINEER for providing the services set forth
herein in accordance with the terms of the existing agreement, based on a
cost reimbursable basis with a maximum (ceiling) amount. Details of the �
cost estimate and unit price adjustments are presented in Attachment B.
2. Total payment for the Phase I scope of services described in this
authorization shall not exceed the maximum of Sixty-Five Thousand Hundred
Dollars ($65,000.00) without prior written approval by OWNER.
AUTHORIZATION BY:
,��",, CIT�'-fj�=.�Ag� GIRARDEAU, MISSOURI
, � ��:
•�j� _-i . - .
.� � !`� � ' � �� � �
By: Attest: n
, � •. .
. .r; , -
Date: v �D l- �y
ACCEPTED BY:
BURNS & McDONN L G E I COMPANY, INC.
By:
Dr. Rob�rt T. Berry P.E.
Vice President
2 of 2
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AUTHORIZATION N0. 3
ATTACHMENT A
Detailed Scope of Services
Alluvial Well Field Supply Feasibility Study
Introduction
The City of Cape Girardeau is interested in expanding and finding alternate
water supply capabilities at its Cape Rock Water Treatment Plant north of the
City. Currently, this plant treats Mississippi River water; however, after
the 1993 flood, siltation in the existing surface water intake and the down-
river migration of the zebra mussels which clog surface water intakes have
prompted the consideration of a new water supply source. Groundwater from the
Mississippi River alluvium has been proposed as an alternate source. �
The primary site for groundwater development is 20 to 30 acres of alluvium
immediately downstream of Cape Rock on the Missouri (west) side of the
Mississippi River as shown on the attached Figure 1. The area is undeveloped,
and no source of potential contamination is readily apparent. If the geology
of this primary site proves to be inadequate, a secondary site may be
investigated upstream from Cape Rock.
Scope of Work
Burns & McDonnell will perform a two phase investigation to determine the
hydrogeologic characteristics of the proposed site and to provide a conceptual
design for planning purposes. Final well design will be provided when it is
authorized by the City. If during any phase of the investigation, unsuitable
conditions are found, Burns & McDonnell will consult with the City to mutually
decide on an alternate course of action.
Phase I - Data Review, Preliminary Test Drilling, Geophysical Logging, Water
Quality Sampling, and Letter Report
Data Review - Corps of Engineers drill logs from the area will be reviewed
to determine the feasibility of water supply development and to plan the
layout of the five preliminary Phase I borings, if the information can be
obtained from the COE.
Preliminary Test Drilling - Up to five rotary-wash test borings will be
drilled to bedrock or to 150 feet to determine the nature of the alluvial
materials at the site. A Burns & McDonnell geologist will be on the site
1 of 3
7" '. � '•v' , --"�, �. ��jf '/ `� � )�,".%: �+ •r�_ ..r.:-��)�r'�� '(;' � . �
� � . . -�-- �I ��`_��_��\:-- --- �j� / � ��� � c` . � ����\�'�.,, W oune
: .,. .. '__ �_ � .a�.,..Y ' `�� /�pf�';� � �\\
`��/�IT •.• . V .: .��� �/ 1 ' / Q\�\ �� •_� �
' •\ :. � �,.� ��_..� • �•�SY•:� •.� ✓.N�� ' C �
:/ ,A .�. �� .' w _ ..� O 7, �� ` �.
ic : t:,;. �; ..� .'��i: �� ;: . :I•: .�; .� r�y 5���� �.� - � y= � �27-
.,:o. .t . c: � . � �=], =; .� s,..i' ,� � �'.;:.�.o ,�+ -::- • /� .
.;� :. �:.. '``� � �t`� i, : ,:1 ;l•.:�� � ��(1'�-:::j,' ''l� ! -=��' ��'•'� ' l /�
' � p S~'.. • �.
Y.\• _ (I.a.6• /'jl .� •.�; �:� ��. � � , � . ` `�. .;C OCa ' -_ � ��� / //�
• �� �.
r � .�' '� e 1: .. �� '� : .�. ,� � �. � �5�. �;-�„ ��� _ -�
� l I . l,' �\� C c:. ' . .._ Gp .
'�I�`.:`�l N�' '^ � `': .) • w Jb� l�� I ny '���� {�'".;�. ric• / . . .
__�� • r _ :.i.,� • •.c. y� .�: l�•�., - .,�.�.p � � - ,�
"� . 1 �'"` � c � .�. �
i°! S� ��'i�.,\ r./�' '.l'�� '. ��.) .�� •e• �`' •�\�'•c� `�; . `:•`�',� 1 ..y ��1
., �� � i � q/
� � " �� �� � • `R� !'� '_�`c'�� '�� • �• •"� � � .
��.. �" :�; _ ; .,�' 1 8 •,';�. - •��� = _ -:���;;�:.. ' .,.��=.��- ^� n� e�
=�::.�- 'r: ���� _ �;j•,�..(`�.�:_f,.:�:� • ( ���•��� v 4,yq
�'� \\� 4
`^ ,, �G �, ; �- , ;� ��._ i^\;•�4\�- �-: �, "
�•.: �/� 1. . .• �••:•'�`,f;: i���'�.`• ' ::: �) =j � /..�C
�'��, � .�"' u
,/ ��':�� :r ':�i. C.'- , ,. ,, �l c� -, ---� �.
;�:��: �i�../�• �� , ,Q�Vi
�`=\� ' � _, � `�?1-� 3sS:=� .� ��.4^n�``'..rJ,���{���/�. i V F''y
� � .." .�; .•C n ::>'.(i `_ TZ _�/;�"
i i. i� �t \ �', 1 !/ •
� � t L��\� . � �. /.:1(`�. �.••. ...7�� /
���� . / �l� `�O r�� �
, �,x�� ,$ ,�� b�,;,, . _ �, f f „ .,� ,;�\��, ; ��. ,
�'�;�1 '" ��(''�.�'�/' '•'y�� i � � � _ n J..�� G . :
�� � ,� �� ��y��---- f D v .� /
- ��/ ,,`:�;n.' �� i�_� ,�,- �� (4:��.15 � `•F�, ��`'��;'�,G`7 /'� . o T EK T/ r
S����� ���T_� .,����_ :� � ::, ��� ;,'`_...
� ��2L�2J1Ll�i. "Z_`�� ' _ �'�'� �( � 7��� �� ry" .�,Pr �/ r WC�-1 IE�D � .5�.
�� .,r . �� l.T. '' r .�i.
((1-=� �.��o J�t_�?o•: ����y� T� �� t Y� .�, ,. _ _.%',_
�� ,'1 ,� �
� �-y�• —��- . �� ii�� 5 ..i' � . -_
�� /'r �--c� J ��y� , �� � i./��C;�^� _/ �i r,Q i �� I� ���1
���c�, (� `•�(,'�i ;l��h�--�}! �� ; r' ,` ,r� - .. � .
l �s Y ��_,!J\: / ��
�l` �' �(�,'��� � I r� ��� � \ /��`
Ju»� � �� =�` .J•�"�tJ h� ) ���� / �' /. � / � �
�"�.'r �� _�',.����=-'` � l.����. � �/ !'G ./ . 1 �/., . .Q .. /
�1 �C: � f, ily,.-_:� '� �'r� - ,�/ '�' �� / ,/�y '� .
�:-� (�.�, �� t. ' '.0 �"•✓1„uj� n . .�—_✓ ��..�� :.
�� � ,� �:,r�. ,�, �F--�•- .st " �7 M�ic �. / ;
� � ��� �• Y a '`,.�.�r " �� �:-Y--''�-_��,"�� O � � ;• .�.:
� �� � �il'�r. ':„�y?_..� ������ �-- -.r�r: ,� � �.. � � 1�
IJ.s�„ L ;1 "� ,���S��';�:�ao�`Y I �G��/![:/�--�`�•��e,�,, �'�..�_�'� �o �i/ \./�( �/ '�'f - '� --��.•- , .�.
�`� �i�l�'_�.'^„�� L� � /.� 1 '� e.� � /' � � l 1� .�.
1�Dh� � ������ � 1 14� J ,/ I 9 G � • 1 i,. I�
,ark ,!�`rc'�����,��,L�` .:l,l,'!;.V•57+cIti -„i .:% �� / ��;� / i
J
� �! "' �� ���=�'-'--;��J u a �✓ •�� � �- , •�• :
`- .('� ,'., �.��1��/� 1 J��,�, ��•i �:�� / .�ao � � � . �� ,l'.
�%/ ri 1'��'aI• � J �-��CeT��• � C„/;` � G • � , li
�. -,- IJ � �'4`�:=���'C =s��s,•��� � w � . , .
� ----�: �.-�i�� �'� y, � ; i:
�� �E�� ;,.�f� ,�'�ra�� � �� �. v
�,,,� H u :�:`-_ �,'�i�-�-�� �-�, �i -� .- , ' .. Dj', . .-= ��
:r � 1 e� ,��'�.�=.��_�'��,.��,�'f`( �i �/ � 3Z. � ,
�Ra..: i � '� ' �'::.� �o �,'
_l��i��l�� � ` I�a . „�a��n 7wni����1 J�'i S '� �` ^j r "..1 �—_� - -o �.�
�:r1���{ T /. � /fKFV..Io_��, JE1 -.�j' %, � t ------'' �.
:� 7I C��.�n �/�� I� i y=_� '.� "��.� � ��i � / .i:� '!/!�" ( �°
�� � n t.� !�^• � `� �'9M�ZS.:'f f,��� ( .E� � � �i .
-,-� 1� `� F i, ��.)' �li) � � _ %a�� C , '
� q ,. :.�.-� �¢k � � f��- ,� ',
.._ r,� �, ��z� ,:,: ; ;� .,
p�/) ���'j°� � p J • „i. ,,.
( � j �� � J � '� . ; ��, ' , i �
a , -• �;•� �'�'�t'�' � '� + I� "; `� '�
�4��I( � 1 r ��� ' S'`� � I� . (� �n + :l _ 1 : ' I� .
t .
� Sr� p�p�l , �� �r b\'.�.,d� o ��1 Ga6inE � /N j� I�jp •� ��_� r � II
�' � � StaLon 1 11 � s—"
�,.�_f,��,£ � "f' II,(y �� �-- `" , I .-u . 'LIr I . �_ ', II
�I ' �. � --s-a�..� ,., � � �.„ � ' 8 ''
� , I �_ ,
� 2 \ � sT Sth ��� �i. � .�' �� 1 ,1:3 _. . ..
r � t � � ' _ IJ�I � � ���' ° � / . , . . �I ,�
� So o ,�,� a-� II � ��, , ;,�t_ ., � Y . � r-..:-;�� . . , :,:
� !` .. �BM 350 f � 'n ' ' '� '+ . I
0' ��� �m I ,�g. ��_y/ �t. � ;.►; °_ � Ea.sC�r����� . II � ;,
;�. irardeau
. -- ° a� �� � ���I --.f��;r , ��6 I . ; �<9 � s��o�-:__ --� �. ,
'y. r Ii ZNCeenu � � l�, �ilY } .� " � � *�
'Y1�; , ._ _i��� G� :�n _I16, � , , ��� 116 A6II
�; ��, ( � � � �� •I ROAD CL.ASSIFICATION
� • ���� /
�•^'�:;z� -,'jt\� � Hea�yduly L�ght�duly - -
� � '.-.�!���1,'�' Medium duly Unimproved dirt ..e�..a=
. , � �-,���
.. P ��
.i.� ; � �✓� .•�a , Inlerstale Route U S Route : State Route
' '�8 r_�•Y�•f � MiSSouai
�`. �� ��/ '/i/�
'��1' �I s �4". � 1 �
� ���1�- 1 ' ��•�; �
� .. • �� � 1,�� - ;1�,� � OUAORANGIEIOU��ON CAPE GIRARDEAU, MO.-1LL.
I . ���� ,,� . 4,�, � POTENTIAL NEW WCLL FIELD LOCATION MAP N3715-w8930/7.5
'�,""'�'_�J-'J`��, " j FIGURE I
.. ' . . --. %-� ���''
to log the borings and to direct the drilling operations. Soil samples
will be collected from these borings and analyzed for grain size.
It is understood that the City will negotiate access rights with affected
property owners for test drilling, including option for possible future
installation/operation of permanent wells. Burns & McDonnell will furnish
City with typical language/format for such agreements for use by the City.
Burns & McDonnell will also furnish City with map denoting proposed
locations for test holes.
Geophvsical Logging - Because little is known of the subsurface materials,
geophysical logging including electrical resistivity, spontaneous
potential and gamma logging will be used to better define the alluvial
geology.
Water Quality Samplin� - Each boring will be completed with a 2-inch PVC
monitoring well. After completion, each monitoring well will be purged,
and a water sample will be collected for inorganic chemical analysis. Two
of the proposed five samples will be tested for a partial list of
constituents or parameters contained in the current Safe Drinking Water �
Act amendments. The analysis to be performed includes regular inorganic
chemistry, heavy metals, pesticides, herbicides, radionuclides, volatile
organic chemicals, synthetic organic chemicals, total organic carbon, and
trihalomethane precursor potential. Throughout the hydrogeological
investigation, the monitoring wells will also be used to observe the
effects of changes in river stage on the groundwater elevation.
Letter Report - For the City's review, Burns & McDonnell will prepare a
brief letter report on the findings of the preliminary test drilling.
This report will also include detailed design and cost estimates for the
Phase II test well as well as other recommendations for the Phase II
drilling and aquifer testing.
Phase II - Test Well Construction, Piezometer Installation, Aquifer Pumping
Test, Analysis and Evaluation, and Hydrogeological Report
After receiving notice to proceed with Phase II from the City, Burns &
McDonnell will complete Phase II of the investigation - an aquifer testing
program consisting of the following elements:
Test Well Construction - Burns & McDonnell will design and contract for
the construction of a test well at the proposed site. It is anticipated
that the well will be designed as a permanent installation for later
operation. Final sizing of the test well will depend on geologic
conditions at the site and on the City's anticipated groundwater needs
(number and size of wells) .
Piezometer Installation - Approximately four to six additional piezometers
will be installed to collect the groundwater drawdown data needed for the
aquifer analysis. The final number of piezometers will depend on the
location of the test well in relation to the original monitoring wells
2 of 3
installed during Phase I. It is anticipated that all or part of these
additional piezometers will be abandoned after the aquifer pumping test is
complete.
AQuifer Pumping Test - An aquifer pumping test will be conducted on the
test well. This pumping test will include a preliminary step-drawdown
test and a 72-hour constant rate test. It is anticipated that the pumping
rate will range from 2,000 to 2,500 gpm (depending on geology) . Following
this pumping period will be a 24-hour recovery period. During the pumping
test, automated data-collection equipment and manual measurements will
record groundwater levels, pumping rate, river level, and water quality
information. As part of the aquifer pumping test, water samples will also
be collected for inorganic laboratory analysis. One of the samples
collected during the pumping test will be tested for a partial list of
constituents or parameters of the current Safe Drinking Water Act
amendments. The laboratory testing will include regular inorganic
chemistry, heavy metals, pesticides, herbicides, radionuclides, volatile
organic chemicals, synthetic organic chemicals, total organic carbon, and
trihalomethane precursor potential.
Analysis and Evaluation - The aquifer pumping test data will be evaluated �
to determine the effective transmissivity and river infiltration values.
Preliminary estimates of the number of wells, the well design criteria,
and the well spacing will be developed during this analysis. In the event
that difficult geologic conditions are encountered, groundwater modeling
(not included in this proposal) may be required to determine a
satisfactory well placement.
Hvdro�eologic Report - At the conclusion of the Phase II work, Burns &
McDonnell will submit to the City a report detailing the activities,
findings, analysis and results of the Phase I and Phase II investigations.
This report will also include cost estimates for future well field
development.
3 of 3
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AUTHORIZATION N0. 3
ATTACHMENT B
Cost Estimate and Unit Price Adjustments
Alluvial Well Field Supply Feasibility Study
Phase I
The total payment for the Phase I scope of services described in this
Authorization includes the following elements:
• Engineering
- 88 hours of field coordination and geologist supervision of the
drilling operations and expenses.
1
- 98 hours for data evaluation, analysis, recommendations for Phase
II, report preparation, and meetings with the City to present the
Phase I results and expenses.
• Drilling
- Mobilization.
- Drilling five borings to 150 feet (total 750 lin. ft.) .
- Collect 15 split spoon samples.
- Monitoring well construction five wells each 150 feet (total 750
lin. ft. ) .
� Installation of protective covers.
� Development and sampling.
• Geophysical Logging
- Natural gamma ray.
- Spontaneous Potential (SP) .
- 16" SN 64" LN Resistivity.
• Water Quality Analysis
- Five samples for standard inorganic analyses.
- Two samples for analyses of the Safe Drinking Water Act parameters
as listed in Exhibit I, attached.
• Survey Monitoring Locations
- Survey location and elevation of the five monitoring wells.
(by OWNER)
lof2
EXHIBIT I
vATER QIIALITY PARA�TERS
POR ANALYSIS
pg Total Colifozms
Specific Conductance Fecal Colifocros
Hardness (mg/1 as CaCO3) Total Count'
Total TOC
Calcium Pescicides
'IDS Herbieides
Chloride Cyanide
Sulfate T'hallium
Calcium SOCs .
Magnesium Radionuclides
Iron VOGS
Sodium Ranadium
Ammonia as N Holybdenium
Nitrata as N Stzontium
Nitrite as N THI�i Formation (Precursor) Potential
Alkalinity (mg/1 as CaCO3)
Total
Bicarbonate
Manganese
Fluoride
Potassiuin
Silica
Phosphates
Turbidity
Hetals:
. Arsenic
Boron
Cadmiwn
Chromium
Le.ad
Mercury
Copper
Zinc
Barium
Silver
Selenium , .
Antimony
Beryllium
Nickel
Aluminum
The Phase I base price will have unit price adjustments according to the
following schedule:
Item Unit Price `
1. Drilling $17.25 per lin. ft.
2. Monitoring Wells $18.40 per lin. ft.
3. Water Quality Analysis I $660 per sample
(basic inorganics)
4. Water Quality Analysis II $3,775 per sample
(Safe Drinking Water Act
parameters as listed)
Phase II
The estimated budgetary cost for Phase II is currently believed to be within
the range of $100,000 to $150,000 which includes engineering and construction �
of a 150-foot deep test well, which may or may not be designed as a permanent
installation to be incorporated in to the final well field system. Also
included is the installation of additional piezometers needed for the pumping
test, water quality sampling and analysis, and a detailed report.
This estimate is based on information from a single well contractor. The cost
estimates will be refined at the end of Phase I based on aquifer conditions
and will be reduced by use of competitive bids for the well construction.
2 of 2
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AIITHORIZATION NO. 3A
For
PROFESSIONAL ENGINEERING SERVICES
To
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES dated
March 21, 1994 between the City of Cape Girardeau, Missouri (hereinafter
called OWNER) and Burns & McDonnell Engineering Company, Inc. (hereinafter
called ENGINEER) , OWNER hereby authorizes ENGINEER to proceed with the
following services:
I. SCOPE.
This Authorization No. 3A authorizes services involved in completing Phase II
of the Alluvial Well Field Supply Feasibility Study, Phase I of which was
previously authorized by Authorization No. 3, dated 06-07-94.
The detailed description of the anticipated scope of services for this
Phase II work remains as it was presented in the previously-developed
Attachment "A" to Authorization No. 3 (copy attached for reference) .
II. TIME OF SERVICE
ENGINEER will proceed with providing the services set forth herein immediately
upon execution of this Authorization by OWNER, and will complete these
services within ten (10) weeks following initiation. It is understood that
such completion is contingent on the timely review by OWNER of submittals from
ENGINEER, as well as on any delays occasioned by events beyond the control of
the ENGINEER (such as adverse weather conditions, regulatory agency actions,
force majeure events, etc. ) .
1 of 2
AUTAORIZATION NO. 3A
III. RESPONSIBILITIES OF OWNER
For this Authorization No. 3A only, the OWNER shall be responsible
for the following:
1. Surveying necessary to locate the test well and observation wells
installed by the drilling subcontractor, with respect to the State
plane coordinate system; and to determine the top-of-ground
elevation (USGS datum) at the well casings.
2. Equipment as necessary to reasonably assist the drilling
subcontractor in getting his drilling equipment into and out of
the proposed test well site.
IV. COMPENSATION
1. OWNER shall compensate ENGINEER for providing the services set forth
herein in accordance with the terms of the existing Agreement, based on
a cost reimbursable basis with a maximum (ceiling) amount. Details of
the maximum (ceiling) cost estimate and unit price adjustments are
presented in Attachment B.
2. Total additional payment for the Scope of Services described in this
Authorization shall not exceed the maximum of One Hundred and Sixteen
Thousand Dollars ($116, 000.) without prior written approval by OWNER.
AIITAORIZATION BY:
CITY OF CAPB GIRARDEAII, MISSOIIRI
, , - � n
� �
,- By; ,, Attest: �
• , 'Date:� . �-��-/�
��
'.�
'�.. � ACCEPT$D BY:
BIIRNS & McDONNE NGINEERING CO ANY, INC.
By:
Dr. Rob rt T. Berry P.E.
Vice P esident
2 of 2
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AUTHORIZATION N0. 3
ATTACHMENT A
Detailed Scope of Services
Alluvial Well Field Supply Feasibility Study
Introduction
The City of Cape Girardeau is interested in expanding and finding alternate
water supply capabilities at its Cape Rock Water Treatment Plant north of the
City. Currently, this plant treats Mississippi River water; however, after
the 1993 flood, siltation in the existing surface water intake and the down-
river migration of the zebra mussels which clog surface water intakes have
prompted the consideration of a new water supply source. Groundwater from the
Mississippi River alluvium has been proposed as an alternate source.
The primary site for groundwater development is 20 to 30 acres of alluvium
immediately downstream of Cape Rock on the Missouri (west) side of the
Mississippi River as shown on the attached Figure 1. The area is undeveloped,
and no source of potential contamination is readily apparent. If the geology
of this primary site proves to be inadequate, a secondary site may be
investigated upstream from Cape Rock.
Scope of Work
Burns & McDonnell will perform a two phase investigation to determine the
hydrogeologic characteristics of the proposed site and to provide a conceptual
design for planning purposes. Final well design will be provided when it is
authorized by the City. If during any phase of the investigation, unsuitable
conditions are found, Burns & McDonnell will consult with the City to mutually
decide on an alternate course of action.
Phase I - Data Review, Preliminary Test Drilling, Geophysical Logging, Water
Quality Sampling, and Letter Report
Data Review - Corps of Engineers drill logs from the area will be reviewed
to determine the feasibility of water supply development and to plan the
layout of the five preliminary Phase. I borings, if the information can be
obtained from the COE.
Preliminarv Test Drillinr� - Up to five rotary-wash test borings will be
drilled to bedrock or to 150 feet to determine the nature of the alluvial
materials at the site. A Burns & McDonnell geologist will be on the site
1 of 3
/ . .. V /� _• � �:. -• {} � _:i ti<n � � . ,
''• ' _�_ �I t`^`� . �"'v. I` . ,^r`• •� �� :!1�y�F\��'���T�,����_ ;���\C� 1 :: \� c,:cu�i
•..^ -�-..� ��r i in.--�,—'��.�:i.���—'�t+�'+ �1 �.��/I '�I .f �..���� •��� �
�v.'�� . . . •� ��•
..... _ • � . .,;,r�:-- _��, , � � �, C u.�.� , � �
.i� • . %��. '� . \� .
.i� ;�C:';• � •:�� ..' •J�.�l'• ���� �' •� •' l. �' '�, rS�O �; '?-� J���` C\` � tis �')27
, ..!•o.i. o. , , I •• -.1 ' .,,..6' , L� � :1 , •.` -_.. • � /,
�. ../, �;=I •�ll �i.,�� ) 'o'l; •• i -• l
;� :� .�; 1 > ..��� r�l��-:.,�).� �, =�� r/:, �
, � • .. : » �� s�-:. _ .., -
'�� � , „ .� �, � �.... �. fa'.... ,
',� ' _ .��• }�_ ( . • � � '"� ' �':1 " ��'.�''�"�3 G� . �tt�aca _ � :i % .
�(�/,j,t� � '��IE T�:` , ; _�•'��''� .� rl� ` s� � \��� ' .c�+'...- � -�
I J� -- �;. . ,. � �rr C-`� . � G ,
�:iL1�� ,. � „ ' b 1L ��> > r�; ., �v `�: ,i: �sc• _ /
.� `\ � �� _ ��-\� . l � ""� , ' � . . . .
�/ �� I� �����1�.� `,`'� ^'L. f�Ver� �\e._ t1i•�1�� '� •��.�Q �/� .��l.'
- �i� Ut:YI'.' '.�) �� p�.� . �0. a
�r )�`�• • :�; r� �tSd � �I �' . __ �t\ <'•a '�'` . •• ' W V.
��5_._. :�.—��• ' .. I - ,� '� •�: ,^ = ' � ' .`�: \ :��' "'� q . .
�.,- �. � g .. � �J :�`c' r•��,� � f . �'j •/ .�� �/y�'
___;',����• _ � ''��� ' .'� ' — —:�����"'`- ... � ;�-�� �- �^ D i
' • � '� ...� , ,:••-' .�. � , > ''-.' ��'4:-�.�' _ . � ���4 :�,
�-=:�_ � ,:,���:.;: � �. .,�, �.�'i� �:.(�� _.:�^�•;� � .—� 1 � � ti � .
� . - , �.._ �.•.:��:'-_� �
1 /... � 1 . .. -�a .� ��::.•;; �.; - � ••'', . C7/Q
� nit� , � •• � `�::':;r: � ,. �• v +�M...� ,�._./' .._.
�;� �^��.., .'Iti :r �':1�•\_ � ,`��.�`0��r�../,•:�• —�\`�cc % Q�ViCy .... . ..
' "1/1'� 395. r, .]���J�f� �""Sy r" y
�_� P�� �' �t .i � �. .
^F���l� i � •' - 1' \ .. ,�: ,.•� r. :.,�; .. .� �'✓.< /Q-
I� ���,W r C�/_`_�� •'� l R ��, �'_ �/.�•,�.� �
�.l x�������,�,, � •;� �� � 'I ,��....,_'g ;`-r,` �
_����`J-���' ,�.:��j�v���'� �� ��(��ia�l,8 �� /� )`J`Y��l_�� "'� LDY .!� // ,
�? \_'`��_ ��((( ��. .����;}itll�� 1'��,_�J�^�^;�,:=1,h�' G�� �-/� � PoTFNT� _
� 1 1��3�,.� � '^'��;�� ���.'���0��_• , _�;�f � �1 `� .y% �,P' �/ r� WC�L rE�D � .:j'.� •
,��D�� . ��J��4'` �� �� t ...
i'�~--=� ��f��;� ��� ( _1� '��-� '' � ;,-
•csGt_ it':./r o.: �l .�� ' ,�.. � •S,. .:� �/ �,� �
��.�� -� ���.�f• � �� Ii�,�� � � =
� � I"f �J.. �� � ..�,,,���� /S ./� .i/ / �+ i I ./ .
'v���l �� �f ,�t�f='�� / ��� �_^ ��.,'� �' /� /��� � �� ..
�:
� r „�,�;L,i='�� ��/,: : � T.,, •.h �` / �� \�� f .:�: �.
Jw�� ���:�.�=fJ- IIIC ����..' /�✓�� �� �,-vJ i/y I"-`� /
-_, : .�=_�;� �. - / .
-J�R.\�` 1, ' .V.'"'_ � ✓�/1'..,1/ll�f��'-c�_ ��'^' ,l " '� // � � '
\ ���. i•� � � � �'� . Milc i
�:��1•• � �,.�D; r�� •-�.� �_=---1-t�-t; :3 r. ' ,/ . . • .I'
•�/�/�t; 1�!`�""�?,�� �`1�ir,rp L . ;-=p�-.=r�.� O . `/ i I �__ _ . ,:
'3� �� W � •i L/ �//'' n• .� •�;
�� �,�.:'Ijl.�,�r-!'^1 `c�li��:/��������-�:../I,;_ � ��^o ��` 6 -
'�_�� i rj ��,�� �� c,�a! Ir � � I f 1 . .�.
�^_��� -s�� �r. `��� � ' w v / �. � �1
i•�.
'a�k f� ���V.� ,�e .��� �. � fi/fl s, ' � .:� ti• 1, �
�� �-`'�.z._��c���lrl�`•� �� ���j'r' � ���r�, � ; J �.,J� i; :; � G
, ���. ��"'�%�.-'.'.j� �J� �f: �i� .��� � I l • �.
_ :� .,., .._ _,s...� .��.� /, � � � �� : . .�,
-u-:,�„� � °:�',�:=_,���r�';�a ``��' ) f"I ��: , ., ; i�
h � '^•�. �.� l�i�. ��°�{=�✓�� 1�; :7,'� �� ;' i:
-�7� � �F�� w'�:'JI '���:...��}'Y�i`!�� r ji� 1�y •/ . J /a • ' �� i
�,� :�� �r�II .,�J� �;�1:,, ,� v/ I;
� � 1 ,�I .��_�`�����;` '�.� ^. � ;� . `iN �� ,? o .I;.
=ti�-'�� � � • � �����o++r• �a���T�we���{i;3 '�. l�i.. f =/ 4 _-=-=�-s_�•-_��v
�:r��.i� �r r � '/tK�v p��.��J, /::T �f:. i. �� I�•��
��In Il�: I� 1 ��P �• �.� cJ� �\ .�. ./';r I '.
'�J*+�lT � ' _ ✓ 1 nM Z1n J ��l f • � ` �%i� c I; .
` � .�N � � �� T / �.
� � �y n Q I � 1 „�
1 ' , � ` '� " '`/J�k Iji �•l.: ;�%�i.Ii� 1 \� ;i. I
`J� j I�.. � .I ~ �'.� ' II°,p ^ � � � ►
�� ,f �.,,,,'J� '' �"� � � � T . } � �I
� _, >' ;y�[ Si V� + � �f�� ' ��
/p � � � ,
� � M/q� �K d�C•� GacinQ � 1y• 1+r n •i _ � , � .
p � �• `:I��i3 ^ � �� $tation 1 %� ..-•11 I ��i s ' i I
`� � �..�� �•� n � b`. €� � 'l•n ' I ;, II
�II ,. � ��" —��� ,;�� l �� I r ��:. . ,:^ ': • L= s
�r � �,���, �... � "o �� �tr '.I� i •�,�•�� :� 13 ' � 13 _ ' •• ►'
.t � ,-.� �� �`�° '� _� �� I:��I , . .,. . . � �.:_:::;, • .� ,�
'_---°���`'a'S� �� 1. � N•!e►,asc :►. �:; . a:: . : .:t�t�.:i � .
� � /a .��. ��� " r I i ��I� �:: ; � '�'• '� 1 . II .
. � I � � _� j1i � ; . EzC'r����irardeau � .II
O �_ ° 0.1 �. � � II�� � I 1�6 .. � �c9 � S�i�oG�'_• �.' e
' r �j\ZNineen�s ��l � J, ��U !�. .. M` . I `+ * =,�
�. , ` 1` t a 7ob ll
a. `,�C � :�a U :116, ;. � v� 1�6
�� �• �,;" �^ � r �• \• � ROAD CLASSIFICA710N
� '' � � ���� /°
)'^•.•�::?�.*.� �-��•t\� � Heavy•duly L�ght•duly - -
:��� � ��%��.��� Medwmduly �_ Ummpro�ed diK .,.�....�
. . � �G..�
'' I P�':�
�it� ,��; ,;�� _:.i� ,:, � Interst�te Route U S Route ; State Route
�� � qeC-�':,� �
�h J M�SSOUR��
�v �� ,�,'�.��J ../ /� .�
� �`_{l� � .{ •
.,��1 r !�� �.,.Il
a ,. • •v � ��- � OUApRAN�.�[�Q[J1110N CAPE GIRARDEAU, MO.-1LL.
� �';, � POTENTIAL NEVH WcLL FIELD LOCATION MAP N3�15-w9930/7.5
� ..�„'"^,,_�-JJ'; � `r,i FIGURE I
- . .. �•f•� �° :
to log the borings and to direct the drilling operations. Soil samples
will be collected from these borings and analyzed for grain size.
It is understood that the City will negotiate access rights with affected
property owners for test drilling, including option for possible future
installation/operation of permanent wells. Burns & McDonnell will furnish
City with typical language/format for such agreements for use by the City.
Burns & McDonnell will also furnish City with map denoting proposed
locations for test holes.
Geophvsical Lo��in� - Because little is known of the subsurface materials,
geophysical logging including electrical resistivity, spontaneous
potential and gamma logging will be used to better define the alluvial
geology.
Water Qualitv SamplinQ - Each boring will be completed with a 2-inch PVC
monitoring well. After completion, each monitoring well will be purged,
and a water sample will be collected for inorganic chemical analysis. Two
of the proposed five samples will be tested for a partial list of
constituents or parameters contained in the current Safe Drinking Water
Act amendments. The analysis to be performed includes regular inorganic
chemistry, heavy metals, pesticides, herbicides, radionuclides , volatile
organic chemicals, synthetic organic chemicals , total organic carbon, and
trihalomethane precursor potential. Throughout the hydrogeological
investigation, the monitoring wells will also be used to observe the
effects of changes in river stage on the groundwater elevation.
Letter Revort - For the City's review, Burns & McDonnell will prepare a
brief letter report on the findings of the preliminary test drilling.
This report will also include detailed design and cost estimates for the
Phase II test well as well as other recommendations for the Phase II
drilling and aquifer testing.
Phase II - Test Well Construction, Piezometer Installation, Aquifer Pumping
Test, Analysis and Evaluation, and Hydrogeological Report
After receiving notice to proceed with Phase II from the City, Burns �
McDonnell will complete Phase II of the investigation - an aquifer testing
program consisting of the following elements:
Test Well Construction - Burns & McDonnell will design and contract for
the construction of a test well at the proposed site. It is anticipated
that the well will be designed as a permanent installation for later
operation. Final sizing of the test well will depend on geologic
conditions at the site and on the City's anticipated groundwater needs
(number and size of wells) .
Piezometer Installation - Approximately four to six additional piezometers
will be installed to collect the groundwater drawdown data needed for the
aquifer analysis. The final number of piezometers will depend on the
location of the test well in relation to the original monitoring wells
2of3
installed during Phase I. It is anticipated that all or part of these
additional piezometers will be abandoned after the aquifer pumping test is
complete.
Aquifer Pumpin� Test - An aquifer pumping test will be conducted on the
test well. This pumping test will include a preliminary step-drawdown
test and a 72-hour constant rate test. It is anticipated that the pumping
rate will range from 2,000 to 2,500 gpm (depending on geology) . Following
this pumping period will be a 24-hour recovery period. During the pumping
test, automated data-collection equipment and manual measurements will
record groundwater levels, pumping rate, river level, and water quality
information. As part of the aquifer pumping test, water samples will also
be collected for inorganic laboratory analysis. One of the samples
collected during the pumping test will be tested for a partial list of
constituents or parameters of the current Safe Drinking Water Act
amendments. The laboratory testing will include regular inorganic
chemistry, heavy metals, pesticides, herbicides, radionuclides, volatile
organic chemicals, synthetic organic chemicals, total organic carbon, and
trihalomethane precursor potential.
Analvsis and Evaluation - The aquifer pumping test data will be evaluated
to determine the effective transmissivity and river infiltration values.
Preliminary estimates of the number of wells, the well design criteria,
and the well spacing will be developed during this analysis . In the event
that difficult geologic conditions are encountered, groundwater modeling
(not included in this proposal) may be required to determine a
satisfactory well placement.
Hvdro�eolo�ic Report - At the conclusion of the Phase II work, Burns &
McDonnell will submit to the City a report detailing the activities,
findings, analysis and results of the Phase I and Phase II investigations.
This report will also include cost estimates for future well field
development.
3of3
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AIITHORIZATION NO. 3A
ATTACHMENT B
Phase II Cost $stimate and IInit Price Adjustments
Alluvial Well Field Supply Feaeibility Study
The total estimated maximum cost for Phase II services (as defined by
Attachment A to Authorization No. 3A) is $ 116, 000. and includes the following:
• Engineering
- 310 hours for field coordination and geologist supervision and
data collection during drilling operations and pumping test
(plus expenses) .
- 88 hours for data evaluation, analysis, developing
recommendations for implementation, report preparation, and
attending meetings with the City to present Phase II results
(plus expenses) .
• Drilling
- Mobilization
- Drilling and constructing one (1) test well to approximately
70 feet depth, that would be convertable to a permanent well.
- Drilling/constructing five (5) observation wells (piezometers) .
- Development of test well and piezometers.
• Pumping Test
- Supervising step-rate drawdown test.
- Supervising aquifer pumping test for 72 hours (or longer,
if necessary) .
• Water Quality Analysis
- Obtain three samples for standard inorganic analyses.
- Obtain one sample for analysis of Safe Drinking Water Act
parameters, as listed in Attachment B to Authorization No. 3.
• Survey Well Locations
- Supervise City's surveying of locations and elevations of
observation and test wells.
• Water Plant Evaluation
- 40 hours for brief review of flow schematic and sizing of
treatment plant components to evaluate capability of existing
water treatment plant to successfully treat well water.
• Hydrogeologic Report
- 114 hours to prepare letter report presenting results of
Phase I and II testing and evaluations.
1 of 2
. - . . �-,
ATTACHMENT B (Continued)
The Phase II base price (maximum) will have the unit price adjustment established
according to the following schedule:
Item Unit Price
1. Additional days pumping (includes $ 2,000.00 per day
drilling and engineering costs)
2. Additional Water Quality Analyses $ 660.00 per sample
(basic inorganics)
3. Additional Piezometer Installation $ 4,300.00 per each
(includes drilling and
engineering costs)
* * * * *
2 of 2
,• _�
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AIITHORIZATION NO. 4
For
PROFESSIONAL ENGINEERING SERVICES
To
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES dated
March 21, 1994 between the City of Cape Girardeau, Missouri (hereinafter-
called OWNER) and Burns & McDonnell Engineering Company, Inc. (hereinafter
called ENGINEER) , OWNER hereby authorizes ENGINEER to proceed with the
following services:
I. SCOPE.
This Authorization No. 4 covers services involved in providing assistance to
OWNER's staff in the preparation of a utility (water and sewer line)
relocation construction package for inclusion by the Missouri Highway and
Transportation Department (MHTD) in their bid/construction package for the
relocation of State Route 74 between Kingshighway and Sprigg Street.
Specifically, ENGINEER will perform the technical activities associated with
determining the proper relocation(s) for the water lines in conflict with the
roadway construction and prepare the plans and specifications for the
construction work involved in the actual relocation of those water lines; as
well as the construction work involved in the relocation of the sewer lines in
conflict with the roadway construction, based on the technical activities
related to sewer relocation as performed by the OWNER's staff.
The detailed description of the anticipated scope of ENGINEER'S services is
presented in Attachment "A" .
II. TIME OF SERVICE
ENGINEER will proceed with providing the services set forth herein immediately
upon verbal notice to proceed from OWNER, and will complete these services by
no later than July 31, 1994, in order that OWNER can submit the completed
construction package to MFiTD by August 1, 1994.
It is understood that such completion is contingent on the timely review by
OWNER of submittals from ENGINEER, as well as on any delays occasioned by
events beyond the control of the ENGINEER (such as adverse weather conditions,
regulatory agency actions, force majeure events, etc. ) .
1 of 2
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AIITHORIZATION NO. 4
III. COMPENSATION
1. OWNER shall compensate ENGINEER for providing the services set forth
herein in accordance with the terms of the existing Agreement, based on
a cost reimbursable basis with a maximum (ceiling) amount.
2, Total payment for the Scope of Services described in this Authorization
shall not exceed the maximum of Twenty-Four Thousand Seven Hundred
Dollars ($24,700.) without prior written approval by OWNER. Refer to
attached spreadsheet, which is submitted for information onl , for
development of not-to-exceed amount.
AUTHORIZATION BY:
CITY OF CAPE GIR.ARDEAU, MISSOURI
�
Attest: ? � � ��
By:
Date: �0 "��'��
ACCEPTED BY:
BURNS & McDONNELL GINEERING CO PANY, INC.
By:
Dr. Rob t T. Berry, P E.
Vice P esident
2 of 2
ti Y
ATTACFII�3NT "A"
AUTHORIZATION NO. 4
DETAILED SCOPE OF SERVICES
1. Conduct a site visit to gather field data on current conditions and to
obtain clearer understanding of nature and extent of needed relocation
modifications. Combine site visit with project initiation (kick-off)
meeting to confirm project objectives, establish lines of communication,
and resolve administrative details.
2. Obtain reproducible copies of MHTD highway relocation plan/profile
drawings to use for analysis of relocation needs and eventual
preparation of water and sewer line relocation bid/construction package.
3. Make initial contact with other utility companies with services in the
highway relocation area (i.e. , gas, electric, telephone, and cable TV)
to establish lines of communication for coordination of all utility
relocation positions.
4. Evaluate water line relocation requirements and alternates by review of
NffiTD plan/profile drawings and City water system distribution maps; then
select recommended approach to address each of relocation situation.
5. Develop preliminary drawings for each water line relocation (using
reproducibles of MHTD plan/profile drawings as background) ; then submit
preliminary water line relocation drawings to OWNER for review and
comment, plus coordination with sewer line relocations being determined
by OWNER' s staff.
6. Obtain OWNER' s review comments on preliminary water line relocation
drawings and OWNER staff's preliminary sketches for sewer line
relocations; then incorporate OWNER's water line relocation drawing
comments and add sewer line relocations to drawings.
7. Develop final draft drawings for water and sewer line relocations (still
using reproducibles of MHTD plan/profile drawings as background) ; then
submit these final draft water and sewer line relocation drawings to
MHTD and to appropriate other utility companies for review/comment and
coordination with roadway work and other utility relocations.
g. Obtain MFiTD' s review comments on final draft water and sewer line
relocation drawings and incorporate appropriate revisions into completed
drawings.
9. Obtain other utility companies' review comments on final draft water and
sewer line relocation drawings and incorporate appropriate revisions
into completed drawings.
10. Coordinate OWNER' s performance of "spot" excavation of portions of
certain key water lines, if needed, to determine physical condition of
lines in order to judge whether line could safely be left in place or
should be relocated.
11. Prepare necessary technical specifications to accompany water and sewer
line relocation construction drawings (assuming that "front-end" bid
documents will be MHTD standard) ; and complete water and sewer line
relocation construction drawings.
1 of 2
r
ATTACFIIdENT "A"
AUTHORIZATION NO. 4
DETAILED SCOPE OF SERVICES (Continued)
12. Submit completed water and sewer line relocation drawings to MfiTD and to
appropriate other utility companies for final review/comment and
coordination with roadway work and other utility relocations.
13. Submit completed water and sewer line relocation drawings to OWNER for
final review/comment.
14. Obtain Nt�iTD's review comments on completed water and sewer line
relocation drawings and specifications; then incorporate appropriate
revisions into drawings and specification bid set.
15. Obtain other utility companies' review comments on completed water and
sewer line relocation drawings and specifications; then incorporate
appropriate revisions into drawings and specification bid set.
16. Obtain OWNER's review comments on completed water and sewer line
relocation drawings and specifications; then incorporate appropriate
revisions into drawings and specification bid set.
17. Prepare engineer's estimate of cost to construct water and sewer line
relocation package.
18. Transmit completed water and sewer line relocation drawings and
specification bid/construction packages, as well as engineer' s estimate
to OWNER for OWNER' s submittal to MHTD for inclusion with highway
construction bid package and/or other use.
It is assumed that two water and sewer line relocation bid/construction
packages will have to be prepared - one for work that will be
reimbursable by MfiTD and the other for work that will not be
reimbursable (i.e. , where the conflicting water and/or sewer line are
within existing state R.O.W. ) .
19. Administer/manage above tasks (including quality control activities) .
By: Burns & McDonnell
June 3, 1994
2 of 2
__�; N O O N N N (O N at N N N a �
� `�
U.
> O O O O O O O O O O O O t0 10
�'.F.':'LO: N f7 C� N O
.V'�,',���,V'.
a
� ' o 0 0 0 0 0 0 0 0 0 0 0 0 0
a. >:,a.
3 wl'�
_ <':<3
d
� t,;; O O O O O O O O N O O O O N
N �';,J p
d y � v W d
d � � o 0 0 0 0 0 0 0 0 0 0 0 0 0 � �'
a¢ � J y w
w •. V Z «c `m
� � � � � �
� �� � � 00000000c� 0000c� Q � � d O1 %
m c y
c
W (/1 •t0 S (A -� �y � y y � C O/ � C l0 N
V d U � Of d '� �p� C •- V C
� y o � tA c�i ro � � d c W rn.4 'c E
Q H N X m �� � W �ow :° � �
¢ m � mavvaacaaaao �a �oov wfw � 'o,� ° � m d �
� m o uj � �o (�j � o � '� � � ro ° E ~ m
� J � Q U a� N a� in W i� L � O U
W I J W O O O N .> r m N N Q G�
a' y � Z a` a` d Q U (q � W C U U
Q C � Z
(� y �p -� N O N f0 < � O N N < N � O N � O
u, E3 w �
0 � � V U � x
� O � W w � w w w w W w H
_ ap a a a a ¢ U m � w w U U
U E O �� c0 < N tG c0 c0 < R N m fO a N <D
- Z w m
E c a J
d O V
N �
T N
y , . � N O N N N N N O < N N N � f0
N
d t d V
3a'
W O O O O O O O O O O O O N N �p y� Nv � 10 OO � O� p� O p
� O O [) N
p. O F- V vi �w ,:fy iAm
� � N
-Y y� fD � N f7 R � N c'7 f7 t7 t0 1n O O
� � c7 N f0 10 cD < � c0 f� t0 iC1 N �p O
� V N � �O � (O O N � �ff N aD f7 � �
in � w � � inviin � w � � in N > > 92 } } a y N
Q Q •� �Q M
~ ,c° r �Ecncn � om
Y = ocovmmmc� oc� ocovoo -�laao I I oo I
� N N c7 v � N N (O N c7 � N � � < � N I I I
H �
� � .. .. ..
0 L r ¢ y °'� o� a c� � �' m t� H
u. O o � ~ rn� m o � c c H W fA
h- � �S �ts � O � U" o "� ¢ °' � Z �
W aCi " �. Y >'.92 z V �6 � ° c ro � a W C
2 EV V N °- U � °y' � � a o�i aLU � wK w
N � ° ° .4� o o > > � O E � a�6 �n � W V
Y � '� -- y p Q m � vi c °� d m F-
e �� •E '' � •E « y F g � o � � � � V ix
0 N � O d O C LL W
3 .N :� 0 \ N L � N � V .� ~ W � E � y Q ~ y ¢ O
J .) � O y �p O •j F- N N O O � C F-
Q � m rn y S �' mH « Q � a � C
O � 'u, °� ° c 3� d :° a E �o � a u°�, Q o W I
H
a ° L �' m 'o F- 3 '- � � U � E � � F- O
� - � ,°� �� o = y � o � � C? w ¢ �? � Z
a vi � Y� c o � � o � U � � � EI � G
H � c°� v v io � �?? > u' o rn o �' Fa- `� � E N Iw-
� w a
O � �'pr � � � E 3 X y y �-p '` OF ,a`? U Q �
V F- - 2 d � � o o d �S c ci & � a F. y
� c °s `- E � � O
a°�i . ,a`_, � , � y m o E ._ E w
E E :° m a� w _ � o � .�
c o 0 3 m' a�i a�i d 3 o a� � m U Q
�y � � m r E y 3 d ; � y �' O
.4 � �y �
.4 0 � y d � c H
:� `° � •E � � c y°a a ` °� c E
E - — ;
'� E y �y � t h E ,a`? 'v,�
°°� � c °��^ ` A: � � c ; o�i d
• a a
a c 3 0 o c � � o c N � c
v m .�i > > :9 a o > :° �a a E
o a d d d � d o m a c d v
2 O ¢ O � O a U � O ii a Q y
W
Q Z y
Q s �- t� r� v in �o r� co rn � � � � W
m y a
g � x
W
•a ., .�
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AIITHORIZATION NO. 5
For
PROFESSIONAL ENGINEERING SERVICES
To
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES dated
March 21, 1994 between the City of Cape Girardeau, Missouri (hereinafter
called OWNER) and Burns & McDonnell Engineering Company, Inc. (hereinafter
called ENGINEER) , OWNER hereby authorizes ENGINEER to proceed with the
following services:
I. SCOPFi
This Authorization No. 5 covers services involved in performing detailed
design engineering, preparing bid documents (drawings and specifications) , and
providing construction-phase design engineer services related to the
implementation of the recommendations contained in April 1994 Report on Study
of Raw Water Supply Reliability Enhancement Methods prepared by ENGINEER for
OWNER's application to the Economic Development Administration (EDA) for a
grant to improve the reliability of the OWNER's existing Cape Rock water
treatment plant raw water intake system; and/or other related improvements
intended to achieve the same purpose (such as the development of an alluvial
well field to provide an alternative to Mississippi River water as the source
of supply for the Cape Rock water treatment plant) .
Specifically, ENGINEER will provide all services as reasonably necessary for
the successful prosecution of this project, including consultations,
surveying, soils investigations, design, supervision, travel, bid document
preparation, scheduling, part-time construction surveillance, shop drawing
review, record drawing preparation, contractor payment request review,
Operation & Maintenance manual development, and incidental costs. All of
these services will be oriented toward the goal of creating a final project in
accordance with the intent of the Grant Agreement between the OWNER and EDA.
The detailed description of the anticipated initial phase scope of services is
presented in Attachment "A��, hereto. It should be noted that only an initial
phase scope (related to the design of a standby power generation system for
the existing Cape Rock Plant and raw water intake) is defined at this time
because the remaining scope of work desired by the OWNER is still under
determination, pending the outcome of well field studies that have been
delayed by high river conditions in the study area. This Authorization No. 5
definitely contemplates the design of additional facilities to enhance the
reliability of the Cape Rock Plant, once the exact nature of the additional
work has been defined.
II. TIMS OF SERVICE
ENGINEER will proceed with providing the services set forth herein immediately
upon verbal notice to proceed from OWNER, and will complete the initial phase
of services described herein, in a timely fashion to permit the OWNER to
conform with a Project Schedule predicated on the EDA-mandated milestone dates
for "Start Construction" and "Complete Construction" (October 4, 1995 and
February 4, 1996, respectively) , as extended by EDA in May 1995.
1 of 2
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AUTHORIZATION NO. 5
It is understood that such completion is contingent on the timely review by
OWNER of submittals from ENGINEER, as well as on any delays occasioned by
events beyond the control of the ENGINEER (such as adverse weather conditions,
regulatory agency actions, force majeure events, etc. ) .
III. COMPENSATION
1. OWNER shall compensate ENGINEER for providing the services set forth
herein in accordance with the terms of the existing Agreement, based on
a cost reimbursable basis with a maximum (ceiling) amount.
2. Total payment for the initial phase Scope of Services described in this
Authorization shall not exceed the maximum of Thirteen Thousand Dollars
($13,000.) without prior written approval by OWNER. The attached
spreadsheet, which is included for information on1v, provides a
breakdown of the above maximum amount.
IV. SPECIAL PROVISIONS
1. OWNER, EDA, the Comptroller General of the U.S. , or any of their duly
authorized representatives shall have access to all records of ENGINEER
directly pertaining to project for the purpose of audit or examination
for a period of three years after EDA has made final payment to OWNER.
2. ENGINEER shall submit a report to OWNER, at least quarterly, covering
the general progress of the job and describing any problems or factors
contributing to delay (if any) .
AUTHORIZATION BY:
CITY OF CAP$ GIRARDEAU, MISSOURI
�
By: Attest:
G� f Ttf I7�AN.9��E-.�° � L►►�G,P�Nk, -
Date: �UL y �7 J���
ACCEPTED BY:
BURNS & McDONNELL E GI $R N COMPANY, INC.
By:
Dr. Rober T. Berry, P.E.
Vice Pre ident
2 of 2
� �.
ATTACE�NT "A"
AUTHORIZATION NO. 5
DLTAILI3D INITIAL PHASS SCOPE OF S13RVICES
1. Conduct a site visit to gather further data on current electric power
supply conditions / reliability, and to confirm ENGINEER understanding of
nature and extent of OWNER-desired improvements. Items to be addressed
include, but are not limited to:
• location of existing switchgear, transformers, and motor controls for
plant and raw water intake equipment
• preferred location for improvements (i.e. , strategically-placed
diesel-engine-driven generator) to protect new facilities from future
flood damage and most efficiently serve electrical loads
� necessary capacity of equipment to provide an adequate emergency
standby source of power for intake pumps and critical plant systems
to prevent service interruption during flood events.
2. Develop a detailed conceptual design for the above-determined diesel-
engine-driven generator (including Design Basis Memorandum and preliminary
installation sketches) , and submit eight (8) copies of this conceptual
design to OWNER for review.
3. Following achievement of consensus on conceptual design, prepare draft
(preliminary) construction drawings and specifications, and submit eight
(8) copies of draft drawings and specifications to OWNER for review.
4. Develop Construction Sequencing Plan (CSP) to define approach to modifying
existing water treatment plant facilities while maintaining full production
operations, and submit draft CSP to OWNER for review.
5. Following receipt of OWNER's review comments on draft drawings and
specifications, complete drawings and specifications for bidding purposes.
6. Prepare engineer's estimate of cost to construct facilities defined by
competed drawings and specifications. [Note: In the event that engineer's
estimate forecasts construction cost in excess of the amount allocated in
the grant, OWNER shall be responsible for deciding (in consultation with
the ENGINEER) whether to initiate design modifications to reduce cost or to
locate additional funding sources. If redesign-to-cost approach is
selected, costs of such redesign will be subject to extra compensation
provisions of agreement between OWNER and ENGINEER.]
7. Submit eight (8) copies of completed drawings and specifications and cost
estimate to OWNER for review and for OWNER's transmittal of those documents
to EDA Project Officer for approval.
8. Incorporate appropriate OWNER and EDA review comments, finalize bid
documents, and transmit original documents to OWNER for use in soliciting
construction bids.
9. Administer/manage above tasks (including quality control activities) .
By: Burns & McDonnell
June 21, 1995
1 of 1
.. � .�
� 000cooroaooa .- ovN
'U':;Ui
--O O O fD O t0 O O O t0 O O N O —
« f+��: a �
� U � o
a 0 rn
U p�
V ��;::��O O O O O O O O O O O O O O � ^
o '<:vr' � .
Q i�+i y� N
��{u.iiJ..
;;:;iU.
�
a �
m >:::;;;: m -',
� U �T:V N st fO N N a O a t0 N N N � 0
J: 2
0 0 `�C�: � � m
� '� w
.�
Q y �������.N!O O O o O O O O O o 0 0 0 o J W
p LYI.•. y
a o ��' o � �
� ' � � m � �
a m � �: O O O O O O O O O O O O O O V C � m C N
W y � (J,[:::*! c d W c y
o � � � � � .� mm ; � '�� � � .�
¢ � � J �� - Qy d � �v � W id W � t �
� � T ` p_O O O N O a O N O a O O O N J W � W C �p� � C �y pCj ~ �
a o ur � V � � � � � � �o ° E �v
W
� 9 a �-�. m m m in W � t � o
J
a a c W;:;>:!U: 'o'o'o'N > 2 m m � ° d
V my J 2 aaa` QUiA � w � UU
E ,� >:>,;N0000000000000o Z
p � � V i t�if
� W � W W � W W W W W W F- —
� E— a aaa ¢ Uvi � wW vU
a
O � Q �:�:iS'N V N N �f N N N O a N N N N �
O � .0.�i.,.(�:.
a �
a, .
y Z � � O O O � O N O O � N � O N Ol
« c a-V
ro
3 �
!� -�x'la. O O O O O O O O O O O O � « N � � N O O � N (a0 ^
'� � N �7 1n tA �
t y;0 H U wviwww
� N
Y c9 a t0 V c0 c0 c0 N O I� a tO
Y1 y O O N a O u� N � O Of c7 O c0 a O
m O to e7 v v e'� �o �n h co v r) co �p O
F V www -w N MMNNlAlAfA N N
(A fA /A '� y � } y j�} PJ
7 � � Q Q a f0 Q N
N tt EN (/1F0fA
w2 wv �oNvamNrn � �oveon CN <000 I 1 00 I
F � � � � I I 1
� � y O1� a a � i0 � m N F-
,� � r � O O c U d o °d ¢ y m Z U
� m m = W . a
c y a m 'o Z V �tS � iR c ia N x a O
� y � .� m Q � � a p V a w
., a•� d m m � � i t � w
_ >, o m � � y O E as a as m m u� w
y �� � � .� p 7 � � J C4a � y C m m m � W
"__T' V � C C � C ..�� �.� � F J C � C1 ~ ` !d` O U
'N •� � m y �+° T� U vQ .> � G � E � " Q �- N � I
j ` � O >'' U O E V LLl N N p 0 � � O
e � �E v
` � (� U p � � � F- � 2 a � �
C
o . � a � H E m v a � °' o F-
�+ m a �' aUa ` � � EQ � E � °C -� �W„ O
�� �7 dS �� N .r(A .�.. C N •N U (Q Q � Q T.
a c � m 'ts c� U a�i � � m � W E m a � 0
0 � U � o c a c E c c°� y- Y J ~ j E y I�W-
y � � V � C C C V V 6. � C ; � 7 � J �
~ .E o � m E 2 �� � y E °��' � ~ v p W
C � p f) N C N V � 7 � Q
.Q C C ; ; � 0 � V C,y y �
c ia � a m U 2 a v ,6 °' � m O
EEc� EyEEv, g ° E F-
� c • c W��
0 0 � � m � � m 'd � c
•o� c 0 a a a m U �
a m � °� m � a
a c 3 o c �y � = c N �y 3 �
� '« •� � � E '_ -
o a m m � d o � a c m a�i �
2O � OOaOyp �ya � Q y
O W
� = 2
O Y � N l7 V tn t0 I� 1D Of � � � .�- �yJ
g � x
� W
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AIITHORIZATION NO. 5A
For
PROFESSIONAL ENGINEERING SERVICES
To
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES dated
March 21, 1994 between the City of Cape Girardeau, Missouri (hereinafter
called OWNER) and Burns & McDonnell Engineering Company, Inc. (hereinafter
called ENGINEER) , OWNER hereby authorizes ENGINEER to proceed with the
following services:
I. SCOPFs
This Authorization No. 5 authorizes additional compensation for additional
services involved in performing detailed design engineering, preparing bid
documents (drawings and specifications) , and providing construction-phase
design engineer services related to the implementation of the recommendations
contained in April 1994 Report on Study of Raw Water Supply Reliability
Enhancement Methods prepared by ENGINEER for OWNER's application to the
Economic Development Administration (EDA) for a grant to improve the
reliability of the OWNER's existing Cape Rock water treatment plant raw water
intake system; and/or other related improvements intended to achieve the same
purpose (such as the development of an alluvial well field to provide an
alternative to Mississippi River water as the source of supply for the Cape
Rock water treatment plant) .
Specifically, ENGINEER will provide all services as reasonably necessary for
the successful prosecution of this project, including consultations,
surveying, soils investigations, design, supervision, travel, bid document
preparation, scheduling, part-time construction surveillance, shop drawing
review, record drawing preparation, contractor payment request review,
Operation & Maintenance manual development, and incidental costs. All of
these services will be oriented toward the goal of creating a final project in
accordance with the intent of the Grant Agreement between the OWNER and EDA.
The detailed description of the anticipated initial-phase scope of services is
presented in Attachment "A" to Authorization No. 5 (related to the design of a
standby power generation system for the existing Cape Rock Plant and raw water
intake) . This Authorization No. 5A covers the design of the additional
facilities to enhance the reliability of the Cape Rock Plant (intake structure
physical protection, intake pump modifications, and intake line reliability
enhancement) contemplated under the original Authorization No. 5, and as
presented in Attachment "A-A", hereto.
II. TIME OF S�RVICE
ENGINEER will proceed with providing the services set forth herein immediately
upon verbal notice to proceed from OWNER, and will complete this second phase
of services described herein, in a timely fashion to permit the OWNER to
conform with a Project Schedule predicated on the EDA-mandated milestone dates
for "Start Construction" and "Complete Construction" (October 4, 1995 and
February 4, 1996, respectively) , as extended by EDA in May 1995. The
presently anticipated schedule for completion of the design services involved
is shown on the attached Gannt diagram.
1 of 2
~ � i ��
�
; : : ; � . . . . . . .
................:.............:.....:.....:.....:......:... .;......;... ..;.....;......;... ..;.....;.. ..;... ;.....;... ;.....;... ;.....;... ;a.
. :
. .
. .
� �
;....;...
.:...
. . , , , . . . , . . . ;
J..
. , . ;
. . . . . . . . . . . . . . . . . : :
, ;
, .
;.....;...
. . . . . . . . . . . . . . . . ;
. . ;
. , , :
;..
. , , . ; ;
. . . . . . . . . . . . . . . ..;.
�� I
<
I I
.;.....;. . . , , . . . .
....:..........................:.............:............: ........:.....:.....:.............
. , . , . ,
. . , . . .
. , . . . , :
. . . . , , , ;
, . . . , . . . :
„
, .
. .
I
� '� I
�
. . . .
. . . . . ; . . . . .
.....: : ....:....... . . : : . . . . .
,........ ........................................,
, . . . , ,
, , , . . ,
, . . . , . : ,
, , . . , . ,
, . , . . . , :
, . . , , , . . �
. . . , . . . . . ,.
...:...
. :
:......:..
. . �
. . . , . . , . , . . : �
,..
....
, .
. .
. .
, .
. . .
� I I
LL I
� . � � . . � . I � : � � � � : � � . � . � � � . � . . � �
I
. . � . . � � � � � . . . . . . . � . . . . . .
. . . . � . � � . � . . : . . . . � . � . � . . � � . . :
. . � . � . � � . . � � . . . .
.......................................:.............�................................................................................�....................................................................
� . � . . . � � � � . . . � � . . . � . . . . .
I
C
� I
I
I
. . . . � �
�
� . . . . .
� • � • � • : : : : � : � : : : I 1 : 7 I : : I � I I �
� � . . � � � � . . . . . . . .
.................................�......�.....,.................................�...................�.............�......�.....�.............�............�..........................�......�.
� . . .
� . � . � .
� . � . . . :
: I : '. : � :
. � . . . � . � � , Y
iai d I
0 1 a , a �
� � � �
H
. . � .
� U
. . � � � � .
. � � � � � � � _ �
. � . � . � . , � _
� � . � . . . . . : � � � '. : � �
� � . � � � � � � . �
. . � � � . , . . . . � . . . � . : � . . . . . . . . . Q C?
. . .
• • • � I o
� . � � �
� . . . 1
.......................................................................................�............................ .. .. �......:... . .........
� � . . � � � � �
� � . � � � � . . : '
. � . � . � � . . . : : '
. . ,
J
� '
G � �
W
W y � � V
� i i ? ! � � i i i ; ; i
� �� i i i i ? i ' i i i i i i � � i ; ; i ! ; i ; i ; i i ! ; i ; i ;
a �� .........................� ....,.....;.....;......;......;.....;.....;......;......;.....: ' ;......;. .;......;.....;......;......;.....;......;......;......;.....;......;......;......;.....;.....;......;......;.....;......
�
z
0
� �� � w
�a � �
o a
V 3¢ � m �' O
d i ! i i i r �
LL'�S� ......y.....i......:......:......y.....;.....:-... . . . . . . . . . . . . . . . .. . . . . .
I � � .
� � . .
' � � U
: ; i
o u • � : : : : : ..:......:... � � W
��� �i
O ' '
��!
}¢b i i ; : ; f t � w N
gH ; ' ; ' ; r�'..'- ' � : � _ _
q......�.
, r,
I O O
V�� N : : � ¢ ¢ a
� � �—�' a
, . , ,
. . . . . . . . . . . . .
. . . . . . . . . . . . . .
. . . . . . : . . . . . . . . . .
i '
a
i �
� I �
' ' ' �
_ ' � ' ' � � ' ' ' o �
E
� I , S m : � ° o : � �°—' �
m �u �. 3 : 2' � '.�, �, E �_� �' '. c� �. � �� � cn
b
I � U D a
x d � 3� ^ , U V �N c
I � � � � a � � ' ~ . C u :Tj ' 0 . �. . 9 '� ' �� I
� S y ro
� . d ; m
p : . y � C . LL . � � �,� �. . m y ��, � �.d � : Q , � .,. .
.� � p � c �� � , � V � 3 � q� :.a a u _c�i �. :U � �, m �,,� m '. � � �,.� � �,. �.
> � �' �'ti '' a am 3 '^ CX`� EEa „pa� � 'y , y� � �. �i � �r � � '� �
� �:� '..V S 7 ;d ..� �C � � �.C �' :y � :U (]j a0 :� . �'.� � ' � .'m � ... � ¢ b � '. �C .�A I
� �� ' '�S E� � '�A 'C �.P � .�.9 '� 0 �.m jI �'uf W !0 '� � C -�� � ' � � �� C Q d m �� � . � �
c 3 u� ,�7i :� u � E � � ''� .� ,a c � :a o ; > .� � a � � � :w W a o 3�
G ,p � , � � , u ; �f' O � .� m ~ � � ~ v 8' , a&i � ' u a a W ,� � ,� 9 � � � c E t,aj
� � ,� : ffi � .� � ;� '� � a � .u � � ' u pl .� 3E 3 � g ' g t�i � � v o p � � S i
a ' � � ;� 10 ' � � T � ,� � °1 E , a aa � .o � � � � . � � c S '3 � i
� 9 z , � a o o � c � aEi � b ,6 'a4 � tl E a V E � Y ' � p .a q 'c rn � � a d Y
I I a �, � :$ a $ g � ,c � c°� � o o � 'u�i o :� � T> 3 a � m � 2 « .d g c � '� � � � 8 � �
� S� � A � € ' a. � m o m .8 . m S ; = �, � � ' � �i � � y Q � .� � Q � � � a
¢ r � � 3 � 3 d > o O '$ 5 t
I I w o � �;� ,y ��.� ° t ��� �' � � y d -� :Y d a�i �� .� �U 'b V ¢ � ��Q W �.9 m �v �.A
I o > �i d g! E � 'u r >y y' �, ¢ . � m L' :a c c o e � _c K _
N p Et 3 ¢ 'c a °' y � d m ¢ c� � ¢ a � a Z g � � '�d � v a �. za, o d £ d �
w o � '� �. ,a �' � = � g r c g Z� � '� D o e � U � � �X s � � 'a c� m � � `o�n I
I F c � c � � � 9 E a p U ; E' C� S� � � � ` Fi E .� � 3 3 � N q � d � � � �rn I
I }� k = V�
cFi � �6 �' 3 � d 'b t � � � 3 � � Q d 3 ; ; w� { _ � �. S � � q 'o d ar � o f c`v i
a o � g a � � � � a g � a � � a ,a a d � � ¢ � � c � a a '� ¢ � a E m� �
C LL
I� I I �O � ��.N ��t7 O N ;�D 1� 'O C. O N Pf O Ifl �D I� aD O� O N !Pi N m�
I li C � N I{7 I C �(1 I 10 �I h I m I O! �� � � � I� ; � i� I.� I N N I N I N N I N I N N N N N! t") Pl I Pi �� ,I P!
' � I
� � : � A
' ^ ao
_ -------- ---
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AIITHORIZATION NO. 5A
It is understood that such completion is contingent on the timely review by
OWNER of submittals from ENGINEER, as well as on any delays occasioned by
events beyond the control of the ENGINEER (such as adverse weather conditions,
regulatory agency actions, force majeure events, etc.) .
III. COMPENSATION
1. OWNER shall compensate ENGINEER for providing the services set forth
herein in accordance with the terms of the existing Agreement, based on
a cost reimbursable basis with a maximum (ceiling) amount. The attached
spreadsheet, which is included for information onlv, provides a
breakdown of the above maximum amount.
2. Total additional payment for the second-phase Scope of Services
described in this Authorization No. 5A shall not exceed the maximum of
Sixty-Seven Thousand Dollars ($ 67, 000.) without prior written approval
by OWNER. This brings the total maximum fee billable for Authorization
Nos. 5 and 5A to $ 80, 000.
IV. SPFsCIAL PROVISIONS
1. OWNER, EDA, the Comptroller General of the U.S. , or any of their duly
authorized representatives shall have access to all records of ENGINEER
directly pertaining to project for the purpose of audit or examination
for a period of three years after EDA has made final payment to OWNER.
2. ENGINEER shall submit a report to OWNER, at least quarterly, covering
the general progress of the job and describing any problems or factors :
contributing to delay (if any) .
AUTHORIZATION BY:
CITY OF CAPE GIRARDSAII, MISSOIIRI
� 7
gy: � �<it.� Attest: �D j^
Date: ��0 '��
ACCEPTED BY:
BIIRNS & McDONNELL FsNGINSERING COMPANY, INC.
By: .
Dr. Rob rt T. Berry, P. .
Vice President
2 of 2
4
ATTACHMSNT "A-A"
AUTHORIZATION N0. 5A
DETAILED SECOND-PHASB SCOPE OF SERVICES
1. Conduct a site visit to gather further data on current intake structure and
pump conditions / reliability, and to confirm ENGINEER understanding of nature
and extent of OWNER-desired improvements. Items to be addressed include, but
are not limited to:
• elevation and location of existing pumps and motor controls, piping,
chemical feed systems, and critical structural components of raw water
intake structure to determine necessary improvements to protect against
water damage from high river levels entering intake structure.
• preferred methodology for twin-pipe slip-lining of existing raw water
intake structure, to minimize disruption of operation of water intake.
• preferred location for proposed intake conduit bar screen to protect
intake pumps from internal damage due to excessive debris present in the
river during flood events entering intake pumps, and modifications to
existing intake pumps to improve abrasion resistance.
• preferred methodology and location for proposed intake conduit backflush
and zebra mussel control systems.
2. Develop a detailed conceptual design for the above-determined improvements
(including Design Basis Memorandum and preliminary installation sketches) , and
submit eight (8) copies of this conceptual design to OWNER for review.
3. Following achievement of consensus on conceptual design, prepare draft
(preliminary) construction drawings and specifications, and submit eight (8)
copies of draft drawings and specifications to OWNER for review.
4. Develop Construction Sequencing Plan (CSP) to define approach to modifying
existing water intake facilities, while maintaining full production
operations, and submit draft CSP to OWNER for review.
5. Following receipt of OWNER's review comments on draft drawings and
specifications, complete drawings and specifications for bidding purposes.
6. Prepare engineer's estimate of cost to construct facilities defined by
competed drawings and specifications. [Note: In the event that engineer's
estimate forecasts construction cost in excess of the amount allocated in the
grant, OWNER shall be responsible for deciding (in consultation with the
ENGINEER) whether to initiate design modifications to reduce cost or to locate
additional funding sources. If redesign-to-cost approach is selected, costs
of such redesign will be subject to extra compensation provisions of agreement
between OWNER and ENGINEER.]
7. Submit eight (8) copies of completed drawings and specifications and cost
estimate to OWNER for review and for OWNER's transmittal of those documents to
EDA Project Officer for approval.
8. Incorporate appropriate OWNER and EDA review comments, finalize bid documents,
ancj transmit originals to OWNER for use in soliciting construction bids.
9. Administer/manage above tasks (including quality control activities) .
By: Burns & McDonnell
August 30, 1995
1 of 1
, �
' �-�� O N O �D O oD N O O N N O a �O
.�.�'�',J�. �
:V�..�....U�..
C �.J. O O O O� O Om O O O N O O 10 N C
d
61 V.'.(J�� � O��f
E o �
01 U
> � tpJ
O ��. O O O a O c0 O O O N O O O � � y
�
E � � � a
�'''V' > >
m m ¢
C � ��.N, O N a N �f O O O a aD ^d O t0 a �
y N a O
� � �,IV' W d m
� V1 W '�
� d �i' 00000 <0000 �0000a y W ,
H � �.,�: Z Y
c�' ° V O � � �
Qa�i p ��..N; �o a m <c v o v o v o v o <o v � c � a�i c �
y a �o �n V c m W c
C � a � y .a: � � � m .e ,� �rnc c � ;c
Q N v J U � fA V C p�� � W � W � t E
S t0 �Q �. g X � C � �
-V, � � Q �eoaoa0000aoomooao w � w � 'rnm � �y d F °�°�
� d O W;;J �o ao n V � � � � W � � c E G c�i
W d a +f+:: J m m m m n � � � � 'c
0. w ltl J�..,�.,,,::��.��:V' W O O O y ;> � Gt G� in Q al
Q eC) = aaaQUv) � wSUU
LLE o � �:o 0 0 0 0 �c o 0 o v o 0 0 0 �
N
O � e t�:^^� p�
} o °r 'V W w � wwwwW w F-
F. a � a aaa ¢ U �n � w W UU
V EO Fy:<ovvcov � <oovo� avaN
E � o�,<."�+
d Q CU:
H �
� .
y � _;�_O O N N O R N O O f0 r � t0 f�
` Z ��:-:�_ N
d � a:a:
ia o >t�
3 '�
N �� ���O O O O O O O O O O O O N N �' O f0 O O O O O V� p
O ��:�T.: O O c0 O N O N !A/A .- �
t �:;p. � V N> N(R 'W i9 �
7 � � N
Q
Y fD N O O N O t0 aD N N � N �A O O
N y � M f� f� N N N O �O � a
Itl 0 N c0 f� f� � f0 O Gf � a t0 � � O
F V f9 � /fl � fA/A � H N � � �
u� isu► �u► �in w � > > � QQ °' �Q �
t0
M t L E f� f� F ❑ fA N
Y aD N a d' N a � N N (O CO a .i' '? m O I I O O I
N = r r N O � �O � .- O1 N �7 N C ^ � O I I I
� � N c7 Of � (D
� 2 F �0 � a � `� � m W N
� r v � O W U m o "� ¢ y m 2 V
� o a m m Q U °� c � g p �j cwd O
V E a ; L N m � � � a � �f c.•t1 m m W W
� T � O � � O 7 � � Q m 3 N CO � � j Q f,,. %
ro <j c a� � c ° >.:Z',y! I- S c a '� �- � � ci W w
at O � F- I
•� 8 0 '� E � ° >,�U �Q > F- W � � v � '¢ � � p
•g ,� ¢ � �= V o E '� ` Q Q C f-
o V U o � � Q a vi
m � y a � m <,i a o o • E m V � a �, � o � H
� �' � E H �, m tn a "- a � E � F E = J f" �
a « ¢ :: < Z
�� � � �V W U u> C � H �y U N �
� " cy `° °� � Vm � d " W mma F °w
� $ « � o c a c E v o �' x J - j E
Yu+ °1� m � a c� y c�i n�. � c 3 ~ � V W <
�
H m a d � a�i o m m 3 V � �� � � a Q F
�
°' 'x � 'H E � � y� E m m a ~ w
E � ro � 0 2 �i e6 m � �y u�i v (� � J
c
.4 � c � 3 0 ° � cNi a y °n � <
•� .4 •Q a s � ` a� N m 'v c O
e6 �
�E E E � m E y E E y � S E H'
� c � 'm c w��
c •
o� � � o au anadc� �
a c 3 o c � � • c N � 3 'c
� 'm .� � '� a v � �;a '�o a m �E
m d m
2 O ¢ � O a 0 N O ii a � Q y
W
O y
2 Z � c� co a �n �c r� ao rn � � � � LL1
m F� W
5
�. ! ,,.Y
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AIITHORIZATION NO. 6
For
PROFESSIONAL ENGINEERING SERVICES
To
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES dated
March 21, 1994 between the City of Cape Girardeau, Missouri (hereinafter
called OWNER) and Burns & McDonnell Engineering Company, Inc. (hereinafter
called ENGINEER) , OWNER hereby authorizes ENGINEER to proceed with the
following services:
I. SCOPE
This Authorization No. 6 covers services involved in performing a bench-scale
study of the Cape Rock Water Treatment Plant (WTP) to determine the optimal
type and dosage of coagulant for use to achieve compliance with current and
proposed regulations regarding Total Organic Carbon (TOC) removal and
Trihalomethane (THM) formation.
Specifically, ENGINEER will conduct jar testing during three different time
periods (representing three different seasons) and analyze test results for
three different types of coagulant for each time period. Test results will be
evaluated and recommendations for treatment modifications will be developed
and summarized in a report.
A more definitive description of the scope of services anticipated to be
completed in order to accomplish this conceptual design is presented in
Attachment "A" .
II. TIME OF SERVICE
ENGINEER will proceed with providing the services set forth herein immediately
upon verbal notice to proceed from OWNER, and will complete the initial phase
(for the summer/fall time period) of services by no later than six (6) weeks
following said NTP; in order that the results from this study can be
incorporated (at least prelimir�arily) into a parallel study of Cape Rock WTP
expansion alternatives, being conducted under another Authorization.
It is understood that such completion is contingent on the timely review by
OWNER of submittals from ENGINEER, as well as on any delays occasioned by
events beyond the control of the ENGINEER (such as adverse weather conditions,
regulatory agency actions, force majeure events, etc.) .
1 of 2
.
. ,,.
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AIITHORIZATION NO. 6
III. COMPENSATION
1. OWNER shall compensate ENGINEER for providing the services set forth
herein in accordance with the terms of the existing Agreement, based on
a cost reimbursable basis with a maximum (ceiling) amount.
2. Total payment for the Scope of Services described in this Authorization
shall not exceed the maximum of Thirty-nine Thousand Dollars ($39, 000. )
without prior written approval by OWNER.
AUTHORIZATION BY:
CITY OF CAPE GIRARDEAII, MISSOIIRI
gy; �r7 Attest: t
Date: ��=��j�
ACCEPTED BY:
SURNS & MCDO LL NGINESRI ObSPANY, INC.
By: •
Dr. Rob rt T. Berry, P.E.
Vice esident
2 of 2
� ' . -"V
ATTAC�NT "A"
AIITHORIZATION NO. 6
DETAILED SCOPE OF SERVICES
I. Perform Jar Testing
a. With the assistance of the OWNER, ENGINEER will examine historical
WTP operating records regarding raw water turbidity, pH, TOC, THM;
filter effluent turbidity; finished water pH; and other pertinent
water quality parameters.
b. ENGINEER will conduct on-site testing at the WTP of the current
raw water source during the summer/fall, winter, and spring
seasons using bench-scale jar testing techniques. Ground water
from the proposed alluvial well field will also be tested during
one of the above seasonal periods. Jar tests will be completed
using the mixing intensities and settling times that correspond to
current WTP practice. Jar testing will be performed using alum,
ferric chloride, and polyaluminum chloride, in turn; and using
varying dosages of said coagulants, with differing pH ranges.
c. Parameters that will be measured during the jar testing will
include: turbidity, W absorption, 7-day THFMP, total and
dissolved organic carbon, particle counts, pH, and other
parameters (as appropriate) to assess the relationship between
coagulation process changes and other Surface Water Treatment Rule
regulatory concerns.
II. Report Findings
a. ENGINEER will submit an interim, letter-style report following the
completion of each seasonal test period; summarizing the test
procedures used, results obtained, and conclusions/recommendations
drawn to OWNER for review and comment.
b. ENGINEER will meet with OWNER to discuss each interim report, and
to reach consensus on the test protocol for the next seasonal test
period.
c. ENGINEER will prepare, and submit to the OWNER, a final summary
report encompassing all three test periods, all test results, all
evaluations, and recommendations.
d. Final report shall describe the implications of the test results
and evaluations on the current and future operations/facilities of
the WTP; and provide a budget-level estimate of the anticipated
additional capital and O & M costs that will be incurred by the
WTP in order to achieve compliance with both current and proposed
TOC and THM regulations. In addition, this report will address
the potential relationship of ineasures designed to assure
compliance with TOC and THM regulations with D/DBP and other
Surface Water Treatment Rule regulatory concerns.
* * * * *
By: Burns & McDonnell
September 15, 1995
Revised: September 27, 1995
1 of 1
�
. =
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AIITHORIZATION NO. 7
For
PROFESSIONAL ENGINEERING SERVICES
To
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES dated
March 21, 1994 between the City of Cape Girardeau, Missouri (hereinafter
called OWNER) and Burns & McDonnell Engineering Company, Inc. (hereinafter
called ENGINEER) , OWNER hereby authorizes ENGINEER to proceed with the
following services:
I_. SCOPE
This Authorization No. 7 covers services involved in developing a conceptual
design study to determine the most cost-effective means of expanding the
existing 4.5 MGD design capacity Cape Rock water treatment plant to a design
capacity of 10 MGD; and upgrading the performance capability of the plant to
promote consistent compliance with anticipated proposed regulations.
Specifically, ENGINEER will prepare a report which summarizes the results of a
detailed evaluation of feasible improvement alternatives and outlines a
practical administrative/financial approach to implementing the recommended
improvements.
In addition, ENGINEER will provide technical and other assistance relative to
the promotion of a bond issue election to finance these improvements, as
reasonably requested by OWNER.
A more definitive description of the scope of services anticipated to be
completed in order to accomplish this conceptual design is presented in
Attachment "A�� .
II. TIME OF SERVICE
ENGINEER will proceed with providing the services set forth herein immediately
upon verbal notice to proceed from OWNER, and will complete these services by
no later than January 31, 1996 �(assuming receipt of NTP by no later than
October 5, 1995) ; in order that OWNER can utilize the conclusions and
recommendations from this study to convince the public of the need for and
value of these improvements to the water system.
It is understood that such completion is contingent on the timely review by
OWNER of submittals from ENGINEER, as well as on any delays occasioned by
events beyond the control of the ENGINEER (such as adverse weather conditions,
regulatory agency actions, force majeure events, etc.) .
1 of 2
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AIITHORIZATION NO. 7
III. COMPENSATION
1. OWNER shall compensate ENGINEER for providing the services set forth
herein in accordance with the terms of the existing Agreement, based on
a cost reimbursable basis with a maximum (ceiling) amount.
2. Total payment for the Scope of Services described in this Authorization
shall not exceed the maximum of Sixty-Three Thousand Dollars ($63, 000. )
without prior written approval by OWNER.
AUTHORIZATION BY:
CITY OF CAPE GIR.ARDSAII, MISSOIIRI
G� i� ��
/ / �
%�
gy; , Attest:
Date: ��`>��
ACCEPTED BY:
BIIRNS & McDONNSL SN INSSRIN C PANY, INC.
By: '
Dr. Robe t T. Berry, .E.
Vice Pr sident
2 of 2
ATTACHMSNT "A"
AIITHORIZATION NO. 7
DETAILED SCOPE OF SERVICES
l. Conduct site visits, as necessary, to gather data on the current
operating conditions at the Cape Rock water treatment plant (WTP) , as
well as to evaluate the physical condition of existing equipment and
structures (for continued serviceability) ; and to obtain a clearer
understanding of the nature and extent of OWNER-desired modifications.
2. Obtain information regarding the availability, cost, and suitability of
adjacent properties potentially usable for facilities' expansion.
"Desk-top" geotechnical evaluations may be performed (if necessary) ;
but no underground exploration would be conducted for this level of
evaluation. Minimal degree of field land surveying may be necessary to
determine topographic relationships, if existing topography is not
readily available.
3 . Obtain information regarding the availability and cost of additional
service from other utilities (i.e. ; electric, gas, sewer, etc. ) that
would be required to properly serve the expanded WTP.
4. Develop a brief summary of the apparent impact of pending drinking water
regulations on the treatment capability needed for compliance by the
expanded WTP.
5. Prepare a brief summary of the historical (and anticipated) quality of
the raw water potentially taken in by the Cape Rock WTP for treatment -
both surface and ground water.
6. Identify four or five technically feasible alternative approaches for
expanding the existing WTP; and perform preliminary "screening" of
alternatives to determine any that could be readily eliminated.
7. Prepare a brief Design Basis Memorandum (DBM) to define flows, raw and
finished water quality parameters, and other design criteria (or
constraints) that will serve as the basis for completing this conceptual
design study; then submit this DBM to the OWNER for review.
8. Following achievement of consensus on the DBM, evaluate the relative
merits of each of the identified alternative plant expansion approaches,
with respect to the following key factors:
• life cycle cost (both capital amortization and O & M costs)
• treatment performance capability and reliability
• impacts on surrounding environment
• conservation of available space
• technical ease of operation
9. Also, determine and evaluate the relative merits of alternatives for
upgrading certain existing plant unit operations (in order to make these
unit operations compatible with the expanded plant's other facilities,
serviceable for the life of the expanded plant, and compliant with the
regulations) , with respect to the following key factors:
• life cycle cost (both capital amortization and O & M costs)
• treatment performance capability and reliability
� impacts on surrounding environment
• conservation of available space
• technical ease of operation
1 of 2
AIITHORIZATION NO. 7
DETAILED SCOPE OF SERVICES (Continued)
10. Analyze the results of the above evaluation of the identified
alternatives, and select one to three recommended approach(es) for
optimum expansion of the existing WTP; then submit the list of
recommended approach(es) to the OWNER for concurrence prior to
developing detailed implementation plan(s) .
11. Develop detailed implementation plans (including life cycle cost
estiamtes) for the recommended plant expansion and upgrade approach(es) ,
including the following work products needed to adequately define the
recommended approach(es) for the expanded WTP:
• piping & instrumentation diagrams (P & ID's)
• site layout drawing
• major equipment arrangement drawings
• written operation and control philosophy description
• electrical one-line diagram
• preliminary construction sequence plan
(to avoid disruption of existing WTP operations
during construction of expansion improvements)
12. Prepare a draft report briefly summarizing the major results of the
performance of the above tasks; then submit the draft report to the
OWNER for review.
13. Incorporate appropriate OWNER review comments, finalize report, and
transmit to OWNER for use in promoting the popular election that will
likely be necessary to fund these improvements.
14. Administer/manage above tasks (including quality control activities) .
* * * * *
By: Burns & McDonnell
September 15, 1995
Revised: September 27, 1995
2 of 2
- , �,. 100 % EMPlOYEE •OWNED
�
�
�
� 1 '
ENGINEERS•AA(HIiE(iS•(ONSUl1ANiS
June 16, 1995
Mr. Kensey Russell, P.E.,City Engineer
City of Cape Girardeau
401 Independence St.
P. O. Box 617
Cape Girardeau, MO 63702-0617
Notice of Annual Update of
Schedule of Hourly Billing Rates
Project Numbers 94-159-4-001, -004, -005 & -006
Dear Mr. Russell:
Annually, Burns & McDonnell revises our Schedules of Hourly Billing Rates to reflect
changes in our salary structure. These changes become effective on June 1 of each year.
In accordance with our Agreement for Professional Services, attached is the revised rate
schedule (effective until May 31, 1996) that will now be applicable to our services
performed for the City of Cape Girardeau for the project number(s) referenced above.
Please understand that this change in no way affects other contractual arrangements
within our Agreement, for example the maximum fee.
If you have any questions or concerns regarding this matter, please contact me. We
greatly appreciate the opportunity to continue to serve the Ciry of Cape Girardeau.
Sincerely,
��� � . ��
Leo A. Ebel, P.E.
Project Manager
cc: R. Berry
D. Stephens
Proj. File
_
3701 South Lindbergh Boulevord,Sl.Louis,Missouri 63127
Phone(314J 811-9016 Fax(314J 811-5406
ln��l���G:
1�y '
Burns & McDonnell Engineering Company, inc.
Schedule of Hourly Professional Service Billing Rates
Po�itio� Classification Houriv
Classification Level Billing Rate
General Office` 1 $ 14.00
2 15.00
3 20.00
Technician' 4 22.00
5 26.50
6 31.00
Assistant' 7 35.00
8 49.50
9 56.00
Staff' 10 61.50 .
11 67.00
Senior 12 73.00
13 81.00
Associate 14 89.50
15 93.00
Principal 16 96.50
17 99.00
Notes
1. Position Gassifications listed above refer to the firtn's intemal ctassfiption system for employee compensation. For example,
"Associate,""Senior,"etc.,refer to such positions as"Associate Engineer,""Senior Architect,"etc.
2. The hourly rates shown above are effective for services through May 31, 1996,and are subject to revision thereafter.
3. For any nonexempt personnel in positions mariced with an asterisk(7, overtime will be billed at 1.5 times the hourly labor billing
rates shown.
4. Projed time spent by corporate officers will be billed at the Prinapal rate(Level 17)plus 25 percent.
5. Monthly statements will be submitted for payment covering services and expenses during the preceding month.
Farm BMR895
.1 � � Z � � -- +
� I _
l
AMENDMENT NO. 2
To
AGREEMENT
For
PROFESSIONAL ENGINEERING SERVICES
For
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM IMPROVEMENTS
� With
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with Section 7.5 of the AGREEMENT For PROFESSIONAL ENGINEERING
SERVICES dated March 21, 1994 between the City of Cape Girardeau, Missouri (hereinafter
called OWNER) and Burns & McDonnell Engineering Company, Inc. (hereinafter called
ENGINEER), said Agreement shall hereby be amended to incorporate the following additional
provisions associated with the funding, land acquisition, design, construction and start-up of
facilities for the upgrade and expansion of the Cape Rock Water Treatment Plant and Alluvial
Well Field (the Project). These facilities will be for expansion of the water plant treatment
capacity from 4.5 mgd to 10.0 mgd and for an alluvial well field of 7.5 mgd minimum capacity
as based on prior investigation and reports previously provided by ENGINEER.
The upgraded and expanded water plant will be suitable for lime softening of groundwater from
the alluvial well field or surface water from the existing Mississippi River intake or any
combination thereof.
1.3 ENGINEER shall provide the following services as associated with design, construction,
and start-up of the Cape Rock Water Treatment Plant and the Alluvial Well Field to
supply water to the Cape Rock Water Treatment Plant:
1.3.1 In providing these services, ENGINEER will perform, as a minimum, the tasks
identified in Attachment A.
1.3.2 Prepare a State Revolving Loan Fund(SRF) application and a Facility Plan
describing the planned improvements at the Cape Rock Water Treatment Plant
and associated well field. This report will be for the purpose of providing the
Missouri Department of Natural Resources (MDNR)a document which presents
the planned improvements and from which they will prepare a Finding of No
Significant Impact(FNSI) for the planned improvements. This Facility Plan will
, .
' �� � � ` , ���•
� _ � ' _
�
'
be prepared from data, information, conclusions, and recommendations compiled
in the "Cape Rock Water Treatment Plant Expans'ion Conceptual Design Study,
August 1996" as prepared under Authorization No. 7 and the "Phase II Alluvial
Well field Study, July 1996" as prepared under Authorization No. 3A.
Information will be added regarding the environmental impact expected to result
from construction and operation of the water treatment and well water supply
facilities. This information will only be to the extent normally expected to be �
required from which MDNR may prepare a FNSI. No special assessments,
investigations, wet land determinations, or other such laborious or expensive tasks
will be performed under this Amendment.
ENGINEER will provide OWNER eight copies of the Facility Plan.
ENGINEER will meet with MDNR and OWNER at MDNR offices as necessary
for the Facility Plan and SRF application to be accepted. ENGINEER will
conduct a public hearing presenting the final report.
1.3.3 ENGINEER will provide cost estimates, project scheduling, and project scope
data to OWNER's Financial Consultant if needed far financing the project
improvements. It is not anticipated that any reports will be required beyond those
which have already been prepared or are to be prepared for the project.
1.3.4 ENGINEER will provide land surveying services associated with acquisition of
the alluvial well field site and expansion of the water plant as planned under the
"Cape Rock Water Treatment Plant Expansion Conceptual Design Study".
ENGINEER will also accompany OWNER to meetings with owners of the
property which OWNER is negotiating to obtain, if directed by OWNER.
1.3.5 ENGINEER will provide design services associated with the upgrade and
expansion of the Cape Rock Water Treatment Plant and construction of the
Alluvial Well Field. These design services will be for expansion of the plant to
10.0 mgd of treatment capacity and 7.5 mgd of well field capacity.
The design services will be for preparation of four contracts as described in
Attachment B to this Amendment No. 2.
L�N�C\CAPEGIR\CAPEROCK�AMEND2.WPD Paoe'2
( Z �r
� _r 1 / { `� { 'A�
� � r � r
1.3.10 ENGINEER will provide Resident Project Representative Services during
construction as required by Article 3.2. These services will be provided by one
qualified Resident Project Representative and one part-time office clerk. The
OWNER will provide up to two daily field representatives as required by the
Resident Project Representative depending on construction activity. The field
office, furnishings and utilities (excluding long distance telephone service) for use
by the Re�ident Project Representative and staff will be provided by Construction
Contract CR-3.
The ENGINEER will also provide a geologist on site full time when the water
supply wells are being drilled, tested, and sealed under Construction Contracts
CR-1 and CR-2. The geologist will use field office space provided by
Construction Contracts CR-1 and CR-2.
1.3.11 ENGINEER will provide design services for construction of a PLC system for
automatic control of the water plant , alluvial well field, and existing intake
facilities. PLC programming for operation of the completed water plant upgrade
and expansion and the well field will be provided by OWNER.
5.4 ENGINEER Services shall be completed for each category of service as follows:
5.4.1 SRF Application& Facility Plan shall be submitted to MDNR within 90 days
after authorization of Amendment No. 2.
5.4.2 Contract CR-1 documents will be submitted to MDNR for approval within 100
days after authorization of Amendment No. 2.
5.4.3 Contract CR-2 documents will be submitted to MDNR for approval within 340
days after authorization of Amendment No. 2.
5.4.3 Contract CR-3 documents reflecting 100% design completion will be submitted to
MDNR for approval with 240 days after authorization of Amendment No. 2.
5.4.4 Post-construction Phase services will be completed within 90 days after placing
the water treatment plant facilities into operation.
I:VvIK\CAPEGIR\CAPEROCKWMEND2.WPD Page-4
� 1 � i � T i f � ���,7
r � � � � c
The design services will be provided in accordance with Section 2-BASIC
SERVICES OF ENGINEER, with the understanding that the concept
development has been provided under Authorizations No. 3A and No. 7. Also, it
is understood that altemative solutions referenced under the Schematic Planning
Phase have also been provided under previous authorizations except as may come
about in evaluation of specific features related to the detailed design of individual
facilities.
.
A list of drawings and specification sections which will be prepared by
ENGINEER is included in Attachment C. Other drawings and specifications will
also be prepared if required for a complete set of bidding documents for the
Project. Primary structures, major items of equipment and major instruments
which will be incorporated into the project design are included in Attachments D,
E, and F, respectively. ENGINEER will provide design services for other
miscellaneous structures, items of equipment, and instruments as required to
provide a complete water plant facility suitable for automatic operation with the
exception of sludge thickening and/or dewatering facilities.
1.3.6 ENGINEER will provide surveying, aerial photography and mapping, and
geotechnical services associated with design of the Project.
1 3.7 ENGINEER will provide Bidding-Phase services as required by Article 2.6 for
each of the contracts described in Attachment B and will print and distribute
bidding documents, coordinate with the City in bid advertisements, conduct a
prebid meeting for Contract CR-3 only, issue addenda and attend bid openings if
OWNER desires.
1.3.8 Engineer will provide construction phase engineering services as required by
Article 2.7.
1.3.9 ENGINEER will provide Post-Construction Phase Services as required by Article
2.8. In addition to the services listed, ENGINEER will microfilm key project
documents after construction is complete and final payment has been made to the
Contractor. Drawing originals will be turned over to the Owner along with one
(1) set of CADD disks. ENGINEER will retain microfilm of records and may
destroy all originals of project records not otherwise turned over to OWNER.
C�MIC\CAPEGIR\CAPEROCKWMEND2.WPD Page- 3
p + �a �v � . � c t
i �
6.3 Compensation to ENGINEER for services provided under this Amendment No. 2 shall
not exceed One-Million-Eight-Hundred-Eighty-Five thousand Dollars ($1,885,000). -
Attachment G presents a breakdown of this amount. This compensation is based on a
maximum of 370 working days of Resident Project Representative effort and a maximum
of 150 working days of field geologist effort over and above which ENGINEER shall be
entitled to additional time and compensation as mutually agreeable.
Invoicing and payment for services will be per Section 6�of the original contract.
A .
CITY OF CAP GIRARDEAU, MISSOURI
B Attest:
ate: �-��- 97
ACCEP ED OR:
BURN & cD0 E L GINEERING COMPANY, INC.
,
By: ' Attest:
Dr. Robe T. Berry, P.E.
Vice Presi ent
�:v�uc�cnPEc�x�c.aPExocx�xnz.wpo Page-5
/ T ��t �� � � �� ` ��
i y t
ATTACHMENT A
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction
Lists of Tasks
Property Acquisition Phase
1. Engineer will provide site plans, survey information, and other design documents
� as needed by the City for negotiatiohs with property owners.
Plant Site Geotechnical Investigation
1. Select soil boring locations based on structures layout. Based on site layout from
previous investigation and reports, 34 test borings will be advanced.
2. Conduct subsurface investigation and laboratory testing of collected soil samples.
3. Analyze all data collected during the subsurface investigation and provide
foundation design criteria for the proposed structures.
4. Assemble all subsurface investigation data, lab testing data, and engineering
analyses and recommendations into a final geotechnical report.
Facility Plan and SRF Financing Assistance
1. Contact MDNR to obtain info on SRF program for water treatment facilities,
inquire into feasibility of this funding mechanism and verify application
requirements for water treatment facilities.
2. Prepare Facility Plan in accordance with MDNR requirements for the proposed
improvements to the Cape Rock Water Treatment Plant. Basis for this Facility
Plan will be information generated in the August 1996 Conceptual Design Study.
3. Complete SRF pre-application.
4. Submit Facility Plan to Owner for review.
5. Receive Owner review comments and incorporate into Facility Plan.
6. Submit Facility Plan and Alluvial Well Field Study report (prepared under a
previous authorization) to MDNR.
mk\cape\caperock\task.lst 1
� r ' i ` � � � �
r ' � r
� ,
ATTACHMENT A
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction,
Lists of Tasks (continued)
7. Assist the City with conducting a public hearing on the Facility Plan and prepare
record of hearing proceedings.
, 8. Receive Facility Plan and Alluvial Well Field Study review comments from
MDNR. Incorporate comments and resubmit to MDNR if necessary, then issue
final Facility Plan and Alluvial Well Field Study Report.
9. Prepare SRF application and initial agency clearance documents and submit to
MDNR.
10. Address agency and MDNR questions and coordinate obtaining agency clearances
and approval of SRF application.
Well Drilling Project Phase I
1. Prepare and obtain U. S. Army Corps of Engineers permit application and other
agency clearance requirements for construction of the alluvial well field.
2. Develop preliminary hydraulic model of alluvial well field discharge piping
system and preliminary piping and well field layout.
3. Prepare Phase I well drilling contract (Contract CR-1) documents for the
installation of 10 alluvial wells.
4. Submit well drilling contract documents to Owner for review.
5. Receive Owner review comments on well drilling contract documents and
incorporate comments.
6. Submit well drilling contract documents to MDNR for review and approval.
7. Receive MDNR review comments on well drilling contracts, incorporate
comments, and resubmit if necessary; then issue final contract documents for
bidding.
8. Advertise contract for bid, issue addendum(s) as necessary, address bidder's
questions, assist Owner with bid opening, evaluate bids and prepare
recommendation for award of contract.
mk\cape\caperock\task.lst 2
f f f �, r � ;
f '
) �` �
ATTACHMENT A
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction,
Lists of Tasks (continued)
9. Submit award documents to Owner to award contract subject to MDNR approval.
Submit award documents to MDNR for approval.
10. Prepar� and distribute award documents to selected contractor and issue notice to
proceed.
11. Provide on-site geologist to oversee drilling operations for test borings.
12. Design well screen and well head.
13. Oversee installation of full size production wells and pumping tests on each well
by contractor and evaluate well hydraulic capacity for pump sizing.
14. Prepare a written report summarizing well drilling activities and submit to Owner
for review. Receive Owner review comments and incorporate into report.
15. Finalize well field discharge piping layout and hydraulic design.
Well Pump Procurement Phase I
1. Prepare pump procurement contract documents and submit to Owner for review.
2. Incorporate Owner review comments and submit contract documents to MDNR
for review.
3. Receive MDNR review comments on pump procurement contract, incorporate
review comments, resubmit if necessary, and then issue final contract documents
for bidding.
4. Advertise contract for bid, issue addendum(s) as necessary, address bidder's
questions, assist Owner with bid opening, evaluate bids and prepare
recommendation for award of contract.
5. Submit award documents to City to award contract subject to MDNR approval.
Submit award documents to MDNR for approval.
6. Prepare and distribute award documents.to selected pump supplier and issue
notice to proceed with fabrication of pumps.
mk\cape\caperock\task.lst 3
. ,
t � � `, . � , � r
� , � .
ATTACHMENT A
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction,
Lists of Tasks (continued)
7. Review supplier shop drawings for pump fabrication and testing.
Well Drilling and Pump Procurement Project Phase II
1. Evaluate well field performance from Phase I well field operation data, review
well design and adjust as necessary. .
2. Prepare Phase II combined well drilling and pump procurement contract
documents for the installation of 5 alluvial wells and associated well pumps.
3. Submit well drilling and pump procurement contract documents to Owner for
review.
4. Receive Owner review comments on well drilling and pump procurement contract
documents and incorporate Owner comments.
5. Submit well drilling and pump procurement contract documents to MDNR for
review and approval.
6. Receive MDNR review comments on contract documents, incorporate review
comments and resubmit if necessary, then issue final contract documents for
bidding.
7. Advertise contract for bid, issue addendum(s) as necessary, address bidder's
questions, assist Owner with bid opening, evaluate bids and prepare
recommendations for award of contract.
8. Submit award documents to City to award contract subject to MDNR approval.
Submit award documents to MDNR for approval.
9. Prepare and distribute award documents to selected contractor and issue notice to
proceed.
10. Provide on site geologist to oversee drilling operations for test borings, well
installation, and pump testing.
mk\cape\caperock\task.lst 4
t �
h + �� � I t � - �
� . .
ATTACHMENT A
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction,
Lists of Tasks (continued)
Treatment Plant Expansion Project
Project Kickoff and Pre�aration of Preliminarv Documents
. .
1. Prepare project procedures manual.
2. Conduct project kickoff ineeting with Owner.
3. Conduct and coordinate survey of plant site and well field site, including property
boundary survey, control survey, and aerial mapping of plant and well field site.
4. Prepare design basis memorandum and submit to Owner for review.
5. Conduct design kickoff ineeting with Owner.
6. Revise design basis memorandum incorporating Owner comments and issue final
document.
Preparation of 10% Com�lete Desi�n Documents
7. Prepare preliminary hydraulic profile.
8. Prepare preliminary structures layout.
9. Coordinate geotechnical investigation of plant site.
10. Develop process flow diagrams and process control descriptions.
11. Conduct a 10% complete design review meeting with Owner to discuss the result
of tasks 7 through 10.
12. Incorporate review comments from Owner into the hydraulic profile, structures
layout, process flow diagrams, process control descriptions, and proceed with
preparation of 30% complete design documents.
mk\cape\caperock\task.lst 5
f t � � � � •1 �. �. ' � �
ATTACHMENT A
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction,
Lists of Tasks (continued)
Pre�aration of 30% Complete Design Documents
13. Size major process facilities and pipelines, review available process equipment
options and determine suppliers for process equipment. '
14. Prepare 30 % complete civil plans, structural plans, architectural plans, and
process plans. See Attachment C for a complete list of drawings and
specifications.
15. Develop one-line electrical drawing and determine capacities and physical sizes of
major electrical equipment items .
16. Revise site layout based on structural design of process basins.
17. Submit 30% complete design documents to Owner for review and conduct review
meeting.
18. Revise process flow diagrams, process control descriptions, major process facility
plans, pipeline sizing an routing, structural plans, architectural plans, electrical
on-line diagram, and capacities and sizing of major electrical components to
incorporate Owner review comments.
19. Submit combined 10% and 30% design documents to MDNR for information
only. Incorporate any review comments received from MDNR.
Pre�aration of 60% Com�lete Design Documents
20. Prepare 60% complete civil, architectural, structural, process, electrical,
mechanical, and instrumentation and controls drawings and specifications.
21. Submit 60% complete design package to Owner and conduct review meeting with
Owner and lead design personnel.
Pre�aration of 90% Com�lete Design Documents.
22. Incorporate review comments from Owner on 60% completed documents and
proceed with preparation of 90% complete plans and specifications.
mk\cape\caperock\task.lst 6
:p , F � y� � � c .. .I
ATTACHMENT A
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction,
Lists of Tasks (continuedl
23. Submit 90% complete design package to owner for review and conduct review
meeting with Owner and key design personnel.
. Pre�aration of 100 % Complete Design Documents
24. Incorporate owner review comments from 90% review meeting and finalize
design documents.
25. Submit 100% complete design documents to MDNR for review and approval.
26. Prepare any additional documents necessary to obtain project approval.
27. Receive MDNR review comments and incorporate into design documents.
Resubmit to MDNR if necessary to obtain final approval. Issue design documents
for bidding.
Cost Estimating
28. Prepare construction cost estimates at the 10%, 30%, 100% design phases.
Bid Phase Services
29. Advertise contract for bid, conduct equipment prequalification and contractor
prequalification reviews and issue approved equipment list and bidder list,
conduct a pre-bid conference, issue addendum(s) as necessary, address bidder's
questions, assist Owner with bid opening, evaluate bids and prepare
recommendations for award of contract.
30. Submit award documents to Owner to award contract subject to MDNR approval.
Submit award documents to MDNR for approval.
31. Prepare and distribute award documents to selected contractor and issue notice to
proceed.
mk\cape\caperock\task.lst �
r � � � � �� � � . , � 1
ATTACHMENT A
Cape Rock Water Treatment Plant Expa�io Ontinueduvial Well Field Construction,
Lists of T as
Construction Phase Services
32. Provide one full-time resident project representative during construction and
office construction administration services to include: observation and monitoring
of contractor's work, review of pay estimates, shop drawing review, monthly
progress meetings with the contractor and additional coordination meetings as the
project requires, coordination of MDNR construction phase inspections, and
assistance as needed for initiation of pay request submittals to MDNR for
payment under the SRF program• Provide periodic site visits by key design
personnel to observe contractors work or resolve conflicts with existing facilities.
33. Provide startup assistance with periodic visits by key design staff as necessary to
place the new and rehabilitated process facilities into operation. Provide
operation guide that describes the fun st°�°f BasJ°Tfor process op atio g�uide
chemical feed systems, and control sy
will be expanded versions of the process control descriptions.
;4. Following completion of construcTo ect�and s bmrt tohpwneanded facility,
pro duce r e c o r d d r a w i n g s f o r t h e p �
8
Mk\cape\caperock\Task.lst
t s . ,
. , . , � , , , • r
ATTACHMENT B
- Contract Description
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction
Contract CR-1
Well Drilling Phase I
For each of 10 wells.
Drill test bore to determine if selected location and stratum is acceptable. If not, alternate
locations shall be selected by Engineer.
Drill well bore.
Construct and develop well.
Conduct well pump test to determine steady state capacity and drawdown impact. Contractor
shall provide temporary pump and power source.
Submit the results of pump test to Engineer.
Seal well for protection until well pump can be installed by Contractor for CR-3.
C�MK\CAPEGfR\CAPEROCK\CONTRDES.WPD CD— 1
+ � t� � , � � � , �
ATTACHMENT B
Contract Description
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction
Contract CR-2
Well Pumps Procurement Phase I
Contract documents to be prepared by Engineer to purchase well pumps. The specifications shall
be written to bid pumps at unit price at three flow capacities: 400, 500, ar�d 600 gpm, a
maximum of 10 pumps total.
After Engineer review of well pump test results from Contract CR-1 and completion of hydraulic
models of wells and discharge piping system, 10 pumps shall be ordered for Phase I.
The pumps to be delivered to site. Contractor for CR-3, shall install pumps for Phase I.
Provide start-up services and training.
CUvIIC\CAPEGIR\CAPEROCK\CONTRDES.WPD CD-2
* � � � r . . �
. • � � . �
ATTACHMENT B
_ Contract Description
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction
Contract CR-3
Water Treatment Plant Ex�ansion And Improvements
Construct one new 2.75 mgd lime softening treatment train to treat well water, river water, or any
combination thereo£ Also, construct new associated facilities requifed for a total of four �
treatment trains. Facilities to include:
2 Aeration Towers
1 Primary Flow Splitter(four way)
1 Primary Solids Contact Basin
2 Blend Basins
1 Recarbonation Basin
1 Secondary Flow Splitter(four way)
1 Secondary Flocculation/Sedimentation Basin
14 New Filters, Filter Building, Backwash Pumps
1 Clearwell and High Service Pumps - coordinate work with precast, prestressed tank
subcontractor including grading for foundation.
1 Chemical Feed Building
Install well pumps, discharge piping, valves, and discharge pipeline from well field to the
Aeration Towers at the plant site. Install Phase I Well Pumps procured in Contract CR-2.
Conduct start-up of the treatment train.
Rehabilitate one 2.25 mgd existing treatment train and convert to lime softening of well water, or
river water sources (alternate coagulation of river water). Facilities to include:
1 Existing primary basin rehabilitated and solids contact mechanism installed.
1 Existing primary flocculation basin converted to secondary flocculation basin.
1 Existing secondary sedimentation basin rehabilitated and converted to 2 parallel flow
basins
1 Existing secondary flocculation basin demolished and install temporary piping for
remaining existing treatment train to be kept in service.
Conduct start-up.
Rehabilitate 6 existing filters including:
Install new underdrains and air scour system.
Demolish existing piping system, and install new piping, valves, instrumentation.
Install new backwash troughs.
Rehabilitate clearwell and install baffle to operate in series with new clearwell.
tVdK\CAPEGIR\CAPEROCK\CONTRD6S.WPD CD- 3
� i � . r . . �
� . � � . , .
ATTACHMENT B
Contract Description
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction
Contract CR-3
Water Treatment Plant ExRansion and Improvements
�continuedl
Conduct start-up of rehabilitated filters. '
Miscellaneous Tasks:
Demolish existing Backwash pumps and High Service pumps.
Convert existing chemical storage area to offices and laboratory.
Install new motor control center, control panels and PLC control equipment in existing
building
Rehabilitate remaining 2.25 mgd existing treatment train and convert to lime softening of well
water or river water sources (alternate coagulation of river water). Facilities to include:
1 Existing primary basin rehabilitated and solids contact mechanism installed.
1 Existing primary flocculation basin converted to secondary flocculation basin.
1 Existing secondary sedimentation basin rehabilitated and converted to 2 parallel flow
basins
1 Existing secondary flocculation basin demolished
Conduct start-up.
I:�MK\CAPEGIR\CAPEROCK\CONTRDES.WPD CD-4
F j . . , .
� � � • • � � �
ATTACHMENT B
Contract Description
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction
Contract CR-4
Well Drilling and Pump Procurement Phase II
For each of a total of 5 expected wells Contractor shall: (actual number to be determined from
CR-1, Well Drilling Phase I, and Phase II well pump test results). '
Drill"test bore to determine if selected location and stratum is acceptable. If not, alternative
locations shall be selected by Engineer.
Drill well bore.
Construct and develop well.
Conduct well test to determine steady state capacity and drawdown impact. Contractor shall
provide temporary pump and power source.
Submit the results of pump test to Engineer.
Seal well for protection until well pumps can be ordered and installed under this contract.
Furnish and install well pumps.
Provide start-up services and training.
I:N1K\CAPEGIR\CAPEROCK\CONTRDES.WPD CD- S
� , , ,
� • � ' � ♦ � . i� i
ATTACHiVIENT C
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction
Well Drilling Phase I - Contract CR-1
S�ecification List
Specification Title
Number
Division 0 - Procedural Documents
00020 Advertisement for Bids
00100 Information for Bidders
00300 Bid Form
- - Bid Bond
00500 Contract
00610 Performance Bond
00620 Payment Bond
1910-8 Cape Girardeau Standard General Conditions (1990 edition)
1910-7 Cape Girardeau Supplementary Conditions (1990 edition)
Division 1 - General Requirements
01010 Summary of Work
01200 Project Meeting, Schedules, and Reports
01300 Submittals
01600 Equipment and Materials
01700 Contract Closeout
Division 2
02260 Well Drilling Casing and Well Screen
I:�MK\CAPEGIR\CAPEROCK\SPECSCRLWPD PSL- 1
, a � � ,
, . , . . , , . ,
ATTACHMENT C
Cape Rock Water Treatment Plant Expansion and AlTuvial Well Field Construction
Pump Procurement Phase I - Contract CR-2
�ecification List
Specification Title
Number
Division 0 - Procedural Documents
00020 Advertisement for Bids
00100 Information for Bidders
00300 Bid Form
- - Bid Bond
00500 Contract
00610 Performance Bond
00620 Payment Bond
1910-8 Cape Girardeau Standard General Conditions (1990 edition)
1910-7 Cape Girardeau Supplementary Conditions (1990 edition)
Division 1 - General Requirements
01010 Summary of Work
01030 Alternates
01300 Submittals
01600 Equipment and Materials
Division 11
11212 Submersible Well Pumps
C4�IIC\CAPEGIR\CAPEROCK\SPECSCR2.WPD PSL- 1
, , .
, , � � . . , . . , �
ATTACHMENT C
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction
Water Treatment Plant Expansion and Improvements -Contract CR-3
Specification List
Specification Title
Number
. �
Division 0 -Procedural Documents
00020 Advertisement for Bids
00100 Information for Bidders
00300 Bid Form
- - Bid Bond
00500 Contract
Gu610 Performance Bond
00620 Payment Bond
1910-8 Cape Girardeau Standard General Conditions (1990 edition)
1910-7 Cape Girardeau Supplementary Conditions (1990 edition)
Division 1 - General Requirements
01010 Suminary of Work
01030 Alternates
01045 Cutting and Patching
01200 Project Meeting, Schedules, and Reports
01300 Submittals
01510 Temporary Utilities and Facilities
01530 Temporary Barriers and Controls
01590 Field O�ces and Sheds
01600 Equipment and Materials
01700 Contract Closeout
Division 2
02200 Site Preparation and Earthwork
42502 Crushed Rock Base Course
02508 Bituminous Prime Coat
02512 Asphaltic Concrete Pavement
02515 Concrete Pavement
02525 Curbs, Gutters, Sidewalks, Median and Paved Drainage
02930 Seeding
Division 3
03100 Concrete Formwork
03200 Concrete Reinforcement
I:�IvIIC1C?.PEGIR\CAPEROCK�SPECSCRJ.WPD PSL- 1
r , ' . �, � �, r , . . < .
ATTACHMENT C
Cape Rock Water Treatment Plant Expansion and Alluvial Well Fie1d Construction
Water Treatment Plant Expansion and Improvements - Contract CR-3
Snecification List
Specification Title
i�Tumber •
Division 3 continued
03300 Concrete
03480 Concrete Specialities
Division 4
04200 Unit Masonry
Division 5
05120 Steel
05210 Steel Joists
05311 Metal Floor Deck
05312 Metal Roof Deck
05501 Meta1 Fabrications
Division 6
06100 Rough Carpentry
06200 Finish Carpentry
06610 Fiberglass Fabrications
06700 Anchors and Fasteners
Division 7
07210 Building Insulation
07270 Firestopping
07620 Sheet Metal Flashing and Trim
07910 Joint Fillers
07920 Joint Sealants
Division 8
08110 Hollow Metal Doors and Frames
08305 Meta1 Access Doors
08332 Overhead Coiling Doors
08520 Alutninum Windows
08705 Finish Hardware
08800 Glass and Glazing
[�?4K�CAPEGIR\CAPEROCK�SPECSCR�.WPD PSL-2
r � '
, . . � . � , , . , �
ATTACHMENT C
Cape Rock Water Treatment Plant Expansion and Alluv'ial Well Field Construction
Water Treatment Plant Expansion and Improvements - Contract CR-3
Specification List
Specification Title
. ' Number
Division 9
09255 Gypsum Board Assemblies
09310 (Glazed) (Ceramic Mosaic) Wall Tile
09320 Ceramic Mosaic Floor Tile
09510 Acoustic Ceiling Systems
09660 Resilient Floor Tile
09680 Carpeting
09900 Protective Coatings '
i ivision 10
10150 Toilet Compartments
10200 Architectural Louvers
10440 Specialty Signs
10444 Identification of Fire or Material Hazards
10445 Identification for Piping,Valves, Instruments, and Pumps, Markers and Tags
10522 Fire Extinguishers and Accessories
10800 Toilet And Accessories
Division 11
11165 Dock Bumpers
11210 Horizontal Split Case Centrifugal Pumps (filter backwash)
11211 Vertical Turbine Pumps (high service)
11214 Sampling Pumps
11220 Rapid Mix Equipment
11221 Flocculating Equipment
11225 Solids Contact Basin Equipment
11226 Circular Flocculation Sedimentation Equipment
11230 Aeration Equipment
11240 Polymer Feed System
11241 Lime Silos and Lime Feed Equipment
11244 Chemical Feed Pumps
11245 Chemical Transfer Pumps
11246 Activated Carbon Feed System
11247 Potassium Permanganate Feed System
I:VvIlC\CAPEGIIL\CAPEROCK�SPECSCIi3.WPD PSL-3
� • � � i ' • f � r � � f
ATTACHMENT C
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction
Water Treatment Plant Expansion and Improvements -Contract CR-3
�ecification List
Specification Title
Number .
Division 11 continued
11248 Carbon dioxide storage and feed system (by Mech)
;1249 Recarbonation Diffusers
11260 Chlorine Feed Equipment
11261 Ammonia Feed Equipment
11262 Emergency Chlorine Scrubber
11315 Sump Pumps
Division 13
13200 Liquid Storage Tanks
13210 Ammonia Storage Tanks
13220 Filter Underdrains and Wash Troughs
13221 Filter Air Scour Equipment
13226 Filtration Media
Division 15
15050 Basic Mechanical Materials and Methods
15060 Process Piping
15145 Hangars and Supports
15150 Valves,Flowmeters, and Appurtenances
15250 Mechanicallnsulation
15300 Fire Protection
15410 Plumbing Piping
15430 Plumbing Specialities
15440 Plumbing Fixtures
15453 Water Distribution Pumps
15457 Water Softener
15460 Water Heaters
15481 Compressed Air Systems
15488 Natural Gas Piping Systems
15575 Breechings, Chimneys, and Stacks
15620 Fuel Fired Heaters
15835 Unit Heaters
15853 Power Ventilators
I:�ivllC\CAPEGIR\CAPEROCIC�SPECSCFt3.WPD PSL-4
. . .
. • . � . f , . • . �
ATTACHMENT C
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction
Water Treatment Plant Expansion and Improvements - Contract CR-3
S�ecification List
Specification Title
Number �
Division 15 continued
15891 Ductwork
15932 Air Outlets and Inlets
15971 Electrical Control Systems
15990 Testing, Adjusting, and Balancing
Division 16
16010 Basic Electrical Requirements
16110 Raceways
16120 Wires and Cables
16135 Electrical Boxes and Fittings
16142 Electrical Connections and Equipment
16143 Wiring Devices
16150 Motors,Accessories,Variable-Speed and Frequency Drives
16170 Circuit and Motor Disconnect Switches
16190 Supporting Devices and Seals
16195 ElectricalIdentification
16402 Ducts and Manholes
16425 Switchboards
16452 Grounding
16460 Transformers
16470 Panelboards
16480 Motor Controllers, Contractors, Push Buttons, Selector Switches, Indicating
Lights, and Relays
16481 Motor Control Centers
16500 Medium Voltage Switchgear
16512 Lighting Fixtures
16900 General Requirements-Instruments and Controls
16901 Control Panels-Instrumentation and Controls
16902 Measuring and Controlling Instruments and Loops
16920 Computer System
16924 Programmable Logic Controllers
16926 Control Software
16950 Field Testing
I:UvIIC\CAPEGIR\CAPEROCIC�SPECSCRI.WPD PSL-5
� � .
� • � � . 1 � � �' , ♦
ATTACHMENT C
Cape Rock Water Treattnent Plant Expansion and Alluvial We11 Field Construction
Water Treatment Plant Expansion and Improvements - Contract CR-3
Specification List
Specification Title
. Number '
Division 17 -Installation and Erection of Equipment �
Division 18 - Start-up and Limited Operation
I:VWC\CAPEGIR\CAPEROCK�SPECSCR7.WPD PSL-6
r � , �, � , . , : .
_ ATTACHMENT C
Cape Rock Water Treatment Plant Expansion
Water Treatment Plant Expansion and Improvements - Contract CR-3
Drawin�List
Drawing Description
Number �
C 1 Plant Site Plans
C2 Plant Site Plans
C3 Wellfield Site Plans
C4 Grading & Paving
CS Grading & Paving
C6 Road Profiles
C� Details
Cg Details
C9 Cross Sections
C10 Cross Secrions
yl Coversheet: Drawing list, vicinity map
y2 Site Plan
y; Layout Plan
Ul Yard Piping
U2 Yard Piping
U3 Yard Structures: High service pump station valve vault
U4 Miscellaneous valve and meter vaults details
US Miscellaneous valve and meter vaults details
U6 Profiles: well field discharge, gravity lines, other selected pipelines
U'7 Profiles: well field discharge, gravity lines, other selected pipelines
Ug Profiles: well field discharge, gravity lines, other selected pipelines
Note: for most process pipelines call out beginning and end
elevations on Yard Piping plan and structures drawin�s
F 1 Wellfield Process Flow Diagram
F2 Plant Process Flow Diagram
F; Activated Carbon
F4 Ammonia
FS Carbon Dioxide
F6 Chlorine
F'7 Ferric Chloride
CwIlC\CAPEGIA\CAPEROCK\SPECS.WPD DL- 1
r , . ', • �. . , . , •
ATTACHMENT C
Cape Rock Water Treatment Plant Espansion
Water Treatment Plant Expansion and Improvements - Contract CR-3
Drawin�List
Drawing Description
� Number
F8 Fluosilicic Acid
F9 Lime
F 10 Polymer
F 11 Potassium Permanganate
F 12 Sulfuric Acid
FP1 Fire Protection Plari
Fp2 Fire Protection Details
P 1 Hydraulic profile
p2 Aerator Tower, Primary Flow Splitter Plan
p3 Aerator Tower, Primary Flow Splitter Sections and Details
p4 Primary Solids Contact Basin No.l Plan and Section
p5 Primary Solids Contact Basin No.2 Plan and Section
p( Primary Solids Contact Basin No.3 Plan and Section
p� _ Blend Basin/Recarbonation Basin Plan
pg Blend Basin/Recarbonation Basin Sections and Details
p9 Secondary Flocculation Plans No.l and No2
P10 Secondary Flocculation Plans Sections and Details
P11 Secondary Sedimentation Plans No.l and No.2
P12 Secondary Sedimentation Sections and Details
P 13 Secondary Flocculation/Sedimentation Basins No.3 Sections and Details
P 14 Filters No.1-6 Plans
P15 Filters No.l-6 Sections and Details
P16 Filters No.l-6 Sections and Details
p 1� Filters No.7-20 Plans
P 18 Filters No.7-20 Sections ancl Details
P 19 Filters No.7-20 Sections and Details
p2p Filters Backwash and High Service Pumps Plan
P21 Filters Backwash and High Service Pumps Sections and Details
p22 Lime Silos Feed Building Plan
P23 Lime Silos Feed Building Sections and Details
P24 Lime Silos Feed Building Process Sections and Details
p25 Lime Silos Feed Building - Process Piping
C�h1K\CAPEGIR\CAPEROCK\SPECS.WPD DL-2
e �
, . � • . . , , • , •
_ ATTACHMENT C
Cape Rock Water Treatment Plant Expansion
Water Treatment Plant Expansion and Improvements - Contract CR-3
Drawina List
Drawing Description
Number '
P26 Lime Silos Feed Building - Sections and Details
P27 Chemical Feed Building Equipment Layout Plan
p28 Process Piping Perspective - Chemical Feed Building
P29 Process Piping Plan- Chemical Feed Building
p;0 Process Piping Partial Plans and Elevations - Sheet 1
p;l Process Piping Partial Plans and Elevations - Sheet 2
p32 Process Piping Partial Plans and Elevations - Sheet 3
P33 Process Piping Partial Plans and Elevations - Sheet 4
P34 Process Piping Details - Sheet 1
P35 Process Piping Details - Sheet 2
P36 Process Tank Schedules
D1 Demolition Secondary Sedimentation Plan& Rapid Mix
D2 Demolition Secondary Sedimentation Sections
D; Demolition Pump Room Plan and Sections
D4 Lab/MCC Area Demo Plan
M1 Mechanical Legend and Abbreviations
M2 HVAC and Piping Plan- Chemical Feed Building
M3 HVAC and Piping Plan - Filter Building
M4 HVAC and Piping Plan - Existing Building
MS Mechanical Details - Sheet 1
M6 Mechanical Details - Sheet 2
IvI7 Mechanical Schedules
Mg Plumbing Details and Schedules
M9 HVAC Controls - Chlorine Feed and Storage Rooms
M10 HVAC Controls - Ammonia Feed and Storage Rooms
M11 HVAC Controls - Activated Carbon Room
M12 HVAC Controls - Filter Building
M13 HVAC Schedules and Details
S-1 Foundation Plan - Filter Building
S-2 Filter Level Plan - Filter Building
S-3 Floor Framing Plan - Filter Building
I:�WC\CAPEGIR\CAPEROCK�SPECS.WPD DL-3
� , . ,
. . � . . � , , • , -
- ATTACHMENT C
Cape Rock Water Treatment Plant Erpansion
Water Treatment Plant Expansion and Improvements - Contract CR-3
Drawing List
Drawing Description
Number
S-4 Roof Framing Plan- Filter Building
S-5 Concrete Schedules and Details - Filter Building
S-6 Sections - Filter Building
S_� Sections - Filter Building
S-8 Concrete Details - Filter Building
S-9 Concrete Details - Filter Building
5-10 Masonry Details -Filter Building
5-11 Framing Details - Filter Building
S-12 Miscellaneous Filter Building Details - Filter Building
5-13 Foundation Plan and Details - Lime Building
5-14 Roof Framing Plan and Details - Lime Building
5-15 � Sections and Details - Lime Building
5-16 Foundation Plan and Details - Chemical Feed Building
S-17 Roof Framing Plan - Chemical Feed Building
5-18 Concrete Schedules and Details - Chemical Feed Building
5-19 Sections - Chemical Feed Building
5-20 Sections - Chemical Feed Building
S-21 Concrete Details - Chemical Feed Building
S_22 Masonry Details - Chemical Feed Building
S-2; Framing Details - Chemical Feed Building
5-24 Structural Demolition Plan -Existing Filter Building Renovations
5-25 Framing Plan and Details - Existing Filter Building Renovations
5-26 Details - Existing Filter Building Renovations
S_27 Plan and Sections - Secondary Sedimentation Tank
g_28 Sections - Secondary - Sedimentation Tank
5-29 Details - Secondary - Sedimentation Tank
5-30 Plan and Sections - Primary Sedimentation Tank
5-31 Sections -Primary - Sedimentation Tank
S_;2 Details -Primary - Sedimentation Tank
S_;; Plans and Sections - Lime Silo Foundations
S-34 Sections and Details - Lime Silo Foundations
5-35 Plan and Sections - Aeration Tower Foundations
5-36 Sections and Details - Aeration Tower Foundations
S_;� Plan and Sections - Clearwell Retaining Walls
CV.4K\CAPEGIR\CAPEROCK\SPECS.WPD DL-4
, .
. . , . . . . , . , .
ATTACHMENT C
Cape Rock Water Treatment Plant Espansion
Water Treatment Plant Expansion and Improvements - Contract CR-3
Drawin� List
Drawing Description
Number � �
�-38 Elevations - Clearwell Retaining Walls -
5-39 Sections and Details - Clearwell Retaining Walls
S-40 Plan and Sections - Blend Tank and Splitter Box Foundations
5-41 Plan and Sections -Blend Tank and Splitter Box Foundations
S-42 Plan and Sections -Transformer Towers
5-43 Sections and Details - Transformer Towers
5-44 Sections and Details - Miscellaneous Structures and Details
5-45 Sections and Details -Miscellaneous Structures and Details
5-46 Sections and Details - Miscellaneous Structures and Details
5-47 Sections and Details - Miscellaneous Structures and Details
5-48 Sections and Details - Miscellaneous Structures and Details
S-49 Sections and Details - Miscellaneous Structures and Details
A-1 Architectural Legend
A-2 Chemical Feed Floor Plan
A-3 Chemical Feed Roof Plan
A-4 Chemical Feed Elevations
A-5 Chemical Feed Building Section
A-6 Chemical Feed Building Wall Section
�,-� Filters Building Floor Plan
�,_g Filters Building Roof Plan
A-9 Filters Building Elevations
A-10 Filters Building Section
A-11 Filters Building Wall Sections
A-12 Secondary Flocculation Floor Plan and Refl. Ceiling
A-13 Secondary Flocculation Enlarged Plans and Details
A-14 Secondary Flocculation - Interior Elevations
A-15 Lime Feed Building - Floor and Roof
A-16 Lime Feed Building Elevations
A-17 Lime Feed Building Wall Sections
A-18 Building Details
A-19 Building Details
A-20 Penetration Details
A-21 Finish and Window Schedule
I:�MK\C.�.PEGIR\CAPEROCK\SPECS.WPD DL - 5
. �
. • '� , . . , , . , ,
_ ATTACHMENT C
Cape Rock Water Treatment Plant Expansion
Water Treatment Plant Expansion and Improvements - Contract CR-3
Drawin�List
Drawing Description
Number � '
A-22 Window Details
A-23 Door Scheciule
A-24 Door Details
A-25 Door and Louver Details
E-1 General Notes, Legends, and Symbols
E-2 Electrical Site Plan- Main Plant
E-3 Electrical Site Plan- Well Stations
E-4 One Line Diagram (4160 volt)
E-5 One Line Diagram (Major 480 volt)
E-6 Chemical Feed Building Electrical Plan
E-� Chemical Feed Building Lighting Plan
E-g Chemical Feed Building Schedules
E-9 Chemical Feed Building Details and Elevations
E-10 Lime Feed Building Electrical Plan
E-11 Lime Feed Building Lighting Plan
E-12 Lime Feed Building Schedules
E-13 Lime Feed Building Details and Elevations
E-14 Laborafory/Administration/Control Rooms Electrical Plans
E-15 Laboratory/Administration/Control Rooms Lighting Plans
E-16 Laboratory/Administration/Control Rooms Schedules
E-17 Laboratory/Administration/Control Rooms MCC Schedule
E-18 Laboratory/Administration/Control Rooms Section and Details
E-19 Filter Building Electrical Plans
E-20 Filter Building Lighting Plans
E-21 Filter Building Schedules
E_�2 Filter Building Section and Details
E-23 Existing Filters - Electrical Plans
E-24 Existing Filters -Electrical Details
E-25 Electrical - Partial Plans and Details
E-26 Electrical -Partial Plans and Details
E-2'7 , Well Field Pump Stations - Typical Plans and Details
E_?g Well Field Pump Stations - Schedule
E-29 Valve Vault Electrical Details
kVviK\CAPEGIR\CAPEROCK\SPECS.WPD DL-6
� ' t ' i • .
ATTACHMENT C
Cape Rock Water Treatment Plant Expansion
Water Treatment Plant Expansion and Improvements - Contract CR-3
Drawing List
Drawing Description
Number ' •
E-30 Details - Man-holes, Ductbanks, UG Conduits
E-31 Details - Ductbank Arrangement
E-32 Details -Motor Conns, Panel Mounting, Pads, etc.
E-33 Details - Lighting Fixtures Schedule
E-34 Details - Medium Voltage Switchgear
E-�5 Cable/Feeder Schedule - Sheet 1
E-36 Cable/Feeder Schedule - Sheet 2
E-37 Miscellaneous Panelboard Schedules
E-38 VFD Schedule and Details
E-39 Specifications (approx. 18 sections)
IC-1 Symbol Sheet
IC-2 Device Index
IC-3 Details Sheet 1 of 2
IC-4 Details Sheet 2 of 2
IC-5 Phase I, Control Plan
IC-6 Phase I, Electrical Schematics
IC-7 Phase I, Electrical Schematics
IC-8 Phase I, Panel Layouts
IC-9 Phase II, Control Plan
IC-10 Phase II, Electrical Schematic
IC-11 Phase II, Panel Layout
IC-12 Chemcial Feed Building Sheet 1 Of 2
IC-13 Chemcial Feed Building Sheet 2 Of 2
IC-14 New Filter Building Plan
IC-15 Existing Filter Building Plan and Control Room
IC-17 Lime Feed Building Plan
IC-19 Miscellaneous Plans
IC-21 Chemcial Feed Building Schematic - PLC
IC-22 Chemcial Feed Building Schematic - PLC
IC-23 Chemcial Feed Building Schematic - PLC
IC-24 Chemcial Feed Building Schematic - PLC
IC-25 Chemcial Feed Building Schematic - PLC
IC-26 Chemcial Feed Building Schematic - PLC
C�MK\CAPEGIR\CAPEROCK\SPECS.WPD DL-7
'' � '` � �, . . . . , � , .
ATTACHMENT C
Cape Rock Water Treatment Plant Espansion
Water Treatment Plant Expansion and Improvements - Contract CR-3
Drawing List
Drawing Description
' Number '
IC-27 Chemcial Feed Building Schematic - PLC
IC-28 Chemcial Feed Building Schematic -PLC
IC-29 Chemcial Feed Building Schematic - PLC
IC-30 Chemcial Feed Building Schematic -PLC
IC-31 Chemcial Feed Building Schematic - Sulfuric Acid
IC-32 Chemcial Feed Building Schematic - Sulfuric Acid
IC-33 Chemcial Feed Building Schematic - Sulfuric Acid
IC-34 Chemcial Feed Building Schematic -Ferric Chloride
IC-35 Chemcial Feed Building Schematic -Ferric Chloride
IC-36 Chemcial Feed Building Schematic -Ferric Chloride
IC-37 Chemcial Feed Building Schematic -Fluosilicic Acid
IC-38 Chemcial Feed Building Schematic - Fluosilicic Acid
IC-39 Chemcial Feed Building Schematic -Fluosilicic Acid
IC-40 Chemcial Feed Building Miscellaneous Schematics
IC-41 Chemcial Feed Building Panel Layouts - PLC
IC-42 Chemcial Feed Building Panel Layouts - PLC
IC-43 Chemcial Feed Building Panel Layouts Sulfuric Acid
IC-44 Chemcial Feed Building Panel Layouts Ferric Chloride
IC-45 Chemcial Feed Building Panel Layouts Fluosilic Acid
IC-61 Typical Filter Panel Schematic
IC-62 Typical Filter Panel Layout
IC-77 MCC Schematic
IC-78 MCC Schematic
IC-80 Nameplate Schedule
IC-81 Control Cable Schedule
IC-82 Control Conduit Schedule
LD-1 Loop Diagrams Part of Section 16902 - Raw Water Flow
LD-2 Loop Diagrams Part of Section 16902 - Raw Water Temperature
LD-3 Loop Diagrams Part of Section 1690? - Primary Solids Contact Unit Flow
LD-4 Loop Diagrams Part of Section 16902 - CL Residual
LD-5 Loop Diagrams Part of Section 16902 - Turbidity
LD-6 Loop Diagrams Part of Section 16902 -pH
LD-7 Loop Diagrams Part of Section 16902 - Filter Flow Control
I:UdK\C:IPEGIR\CAPEROCK\SPECS.WPD DL- 8
� � � �� . • . • , ' � .
ATTACHMENT C � -
Cape Rock Water Treatment Plant Expansion
Water Treatment Plant Expansion and Improvements - Contract CR-3
DrawinQ List
Drawing Description
Number �
LD-8 Loop Diagrams Part of Section 16902 - Filter Backwash Flow
LD-9 Loop Diagrams Part of Section 16902 - Filter Pressure
LD-10 Loop Diagrams Part of Section 16902 - Volumetric - Feeders - Lime,
Carbon, Potassium Permanganate
LD-11 Loop Diagrams Part of Section 16902 - Metering Pumps - Sulfuric, Ferric
Chloride, Polymer, Fluosilicic Acid
LD-12 Loop Diagrams Part of Section 16902 - Gas Feeders - Chlorine, Ammonia
LD-13 Loop Diagrams Part of Section 16902 - Weigh Scales
LD-14 Loop Diagrams Part of Section 16902 - Clear Well Level
LD-15 Loop Diagrams Part of Section 16902 -High Service Pump Speed
Treatment Plant Automation Design
IC-16 Secondary Sedimentation Plan
IC-18 Control Room
IC-20 Site Plans
IC-46 New Filter Building PLC Panel Schematic
IC-47 New Filter Building PLC Panel Schematic
IC-48 New Filter Building PLC Panel Schematic
IC-49 New Filter Building PLC Panel Schematic
IC-50 New Filter Building PLC Panel Schematic
IC-51 New Filter Building PLC Panel Schematic
IC-52 New Filter Building PLC Panel Schematic
IC-53 New Filter Building PLC Panel Schematic
IC-54 New Filter Building PLC Panel Layout
IC-55 Existing Filter Building PLC Panel Schematic
IC-56 Existing Filter Building PLC Panel Schematic
IC-57 Existing Filter Building PLC Panel Schematic
IC-58 Existing Filter Building PLC Panel Schematic
IC-59 Existing Filter Building PLC Panel Schematic
IC-60 Existing Filter Building PLC Panel Layout
IC-63 Lime Feed Building PLC Panel Schematic
IC-64 Lime Feed Building PLC Pane1 Schematic
IC-65 Lime Feed Building PLC Panel Schematic
I:VviK\C.IPEGIR\CAPEROCK�SPECS.WPD DL-9
' , ` . '. • . , , • , .
ATTACHMENT C
Cape Rock Water Treatment Plant Espansion
Water Treatment Plant Expansion and Improvements - Contract CR-3
Drawing List
Drawing Description
Number •
IC-66 Lime Feed Building PLC Panel Schematic
IC-67 Lime Feed Building PLC Panel Schematic
IC-68 Lime Feed Building PLC Panel Layout
IC-69 Control Room PLC Panel Schematics
IC-70 Control Room PLC Panel Schematics
IC-71 Control Room PLC Panel Schematics
IC-72 Control Room PLC Panel Schematics
IC-73 Control Room PLC Panel Schematics
IC-74 Control Room PLC Panel Schematics
IC-75 Control Room PLC Panel Schematics
IC-76 Control Room PLC Panel Layout
IC-79 Communications Schematic
f:�MK\CAPEGIR\CAPEROCK\SPECS.WPD DL- 10
. � • , . ,
� . , . � . . ,
ATTACHI�IENT C
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction
Well Drilling and Pump Procurement Phase II - Contract CR-4
Specification List
Specification Title
Number
Division 0 - Procedural Documents
00020 Advertisement for Bids
00100 Information for Bidders
00300 Bid Form
- - Bid Bond
00500 Contract
00610 Performance Bond _
00620 Payment Bond
1910-8 Cape Girardeau Standard General Conditions (1990 edition)
1910-7 Cape Girardeau Supplementary Conditions (1990 edition)
Division 1 - General Requirements
01010 Summary of Work
01200 Project Meeting, Schedules, and Reports
01300 Submittals
01600 Equipment and Materials
01700 Contract Closeout
Division 2
02260 Well Drilling Casing and Well Screen
Division 11
11212 Submersible Well Pumps
C�MIC\CAPEGIR\C?.PEROCK�SPECSCR4.WPD PSL- 1
' , . , . . � , • , •
N
U m n
O Co � N �
� w L .@ � m � C � C Q
a N
Q' 3 U1 T� � f0 > � ��
� y �L a � m in O � C �
F- a� 3 � � a � E °'�
u� 3 � �i N xO o m � � 2 -'� �
� o � �n. .m
Q O � "��a� y�j 0 C � 3 7 7 ��C���
N n
N � m �, m Y
V (0 � � a 3 'c U �C � (/1 y 1] Y > C 7
d N a p N N L L v@-. 'p.N U (~�p C p� C � N
(�J ¢ N t N <p U 7 N � � n F T
y N Q � � T � n. -C y E p•d
d � � � O C
i-- � 0 3i° �' � E � a °� o• 3m � n rn
Z �.c � rn a� ar,,, � '> m � .
w O-o °�� `°-o m N `_' ° y 3 c'E � $ o �
a ? m ��� o� Q �.3 �`n� � � �c $•��v
U m
� C � � Vi � y�'7 7 m - �� 7 t l0 y C �
N ? U n. � U ��L 7 ...
C7 ��e d � vL y `c n n �' o a� � rno m
W a n m °m in�3� in >' tn ii� � E dt E n
v
a�
N C
m �
3� a �
= O y U �
O �' m
Z C � � �� $ � '$
� m � �n EL N �
..�. � � y
� N N N N N N C�� T��m� C
� � c c c n c c E aL c '�
c� E c� c°� cg ' c4 cg c�i a�2 `m H $
ti
c
0
� w
� o
� > rn
C � N �
O C.� � L O'- U (6 N C N
v � �F N 3 c E r c c� r a
m O m c m w� ai.y a� a m m o. m i9aa n8
iy„ m � o mt0 m N 3L � c � �c � � o �v
Q m � �
°r cfO ca� � N /4m cm � c�i c�� c°»� aa°
3 cg Q c��a � 3 E c°�a :°
m
.�
� W
Q �q p O
�C (L N �
h R � = C m N (0 N
W = 3 0 o r r m � c r r m
_� � � a� dm m � O1 ° a� m m � ay
C lD N N m N ul_
V � W m N N C N C O � V C V C C- .
�W m C � U� �� N ] Cp Vl C N V1 L
U O t0 N � O U d �� � O
a C� >
A W
n' �j O eD r (O � N N N �
C M N N N� � Q �f � V
� � � 7 V
E �
m
d >
� W � � rn c� r 'n o o �
°1 v v v v v v v c�
A � v
� m
Y m
p W � Y L ul 67�
d' N N � y � cp E m
� y — m�
� N m y L ��� � L� �U
�0 W ��L y 6; .y L�O7 'O O�01 � 01� �U � p Cf�. 01�d
(� F- � OI aI � �' m �x `.._ C . C ... E C l9
� ; �t m 3 a'3 a��iz o� 3 a� � m 3 ��� ��N o N 3
v ro v � v c�� � � � = 5 m
X � O N �N �� a0 � O��� N N� O� @ �ONf� ���C N
� � V N N� � d y 1� 3 I� R�
N � ��
a � U ao �v
Q � �
x C C � N m
.� C O.-.
p �� � C,Q d f6
� m � c0 7 f6 O @ C " � ;
� �nc o a� �,� � � � c m3a �
Z ° ��_ � 3 � c�° '� or
� m � ar o "o � c 3c c�' c4 o;a �c `n y
F- .�N- c� ; � c'co �•N�2� 3 � c �o� "c
3 �`
Z o � > o � a�i o m y� ��v � o E �� � `o m
� o.. �' c � w3� m .'�� "� d �
� � C E � � y@ � � C C l9 N 3 �N m N N � m U
� � �� ..�.. � � N� X� � � � . 3 (0� y� � �
x p �2
� � C � � � J U N E V�l��N � U (6 L w. (0 n1 V� c6
Q.� l0 U 3 C 2�.V
.y N d
� a
�m o a m
u, � � aoo
� go omZ
w " a �� LL ��° ~ �� �� �
� � �
� o 0 o.N .y o � ra�i = — �od
Z o Zm �m� a m � cv� � � ~mZ !N-
d c
.� � � � � � � � �� � m � � p
E " E �a� a��i� °'= m�c.? °.' U w
a a�n a 8: w �' ��n � °� i� � z �
N
r , f . . � � .. . '• � .
N
O y
N � >
W � � C
� � � N Co C d
C > J � 7
HQ' O N O
Ll.l � ry � � � �p d
N O �'
J � °n � - V a� � a�i
a � ai
a � m � m g ° u' � aai
W N N � Ol � ,�O� � � N
Q. 'Q � �.•N N Y l9 � N
� L C 7� f0 � � j � y�N
N N U N'O
Z v °� >,U '� �m a � � @.-.
(11 V C N � E N m'O � N f6,�7
av° c'�iaEi o''a��i � 'a,o � > > � �
rna� a� � " � � nQ c ca—
� cc c a� c°1i � �E EE.�'
� � O O O m y (0 � O V 7 7 � O.
�U U ln a W Va/ Q' o(n Q Q,.�..�n.
7 � ' �
F, V O U 0
2 � =� a`�� y a`� , .
w t � r t a �L a� S2 m m
� Y � C' y �V..� � � Gl d U) m
X f6.` fE C � 3� N C Y f0 C Y � V '
W �� "L N U >i p (6 .V 'L V Co Cp
_ �L N � N V � m p � � O � � U U
UJ �. � N � U � ul Ol � Of Ol
z c33�� c@:°a@� c� m cc
� �'� a� nrn acY nrnc in arn .m�
� � ua— '9o� n—L '� a� R'�
c�a:9L `9 .oEat �6m t Wa
c
0
v W
�3.. � y
� O
y �lq
O U� C C N
U W � =o E
v > '9 �_
d O a m m
a m
m m � m
LL Q �' Q V1 U U
GI N N C N � � U
� N .- c0 �+ >`
IC �
> O �
7 W � C � C � C
Q � t9� >.�p �Y O
�� N �� � C N
i0 � " > O C U j N C 7
> 7 fp
W p > C a) �'T�� m O >
�'N � O � V'O'D O N m m
2 C W m v N N m y y y N m
U l0 m � cp N.0 O W�p V U U
�W O ��L y �.� � C C U U
Q C i9 C U �i - V
N w N
d J N tp N � m
W N c �
c � � v v v d' >
� O
F
i �
W y
J
m
N W O � N N
10 � � � � �
3 �
m
Y
U
d' N
d � N l7 L L
m w t� t� �� 3 �� = � rn
V �- Drn � rn � � rn � rn � y
� '3 � o o��3�o o m N �3 m 3 � �m '�
� N C�Z� O � �� �� � >
X �N �N O �� O p � O ��
�' �� m!� �� �� � � �N �N
a
a � o
Q � <n
`o �� E
rn E c�
� N � o oa $ `o
0
p c� �i� `� o a°'ic
F= L�E �L � c� > o
U � a� m E � �o �, > �a
� C t N� �� J 7 O C m
�0 U �U O Ly,' 'D N m j
u' @� o Cj a 3 m � m 3 d` m
U 7
inc � � JN E > m� 2� �
`o•n
$ '� N a
m .o � � oam
� � � E > �mZ
w � c � a' >> ~� u Y
� a� `0 y Ep �+ > > �OQ �
Z lL O C O C � �C�Z N
H
� N o� E � °� c �0 m iri O
� c Q o rno � E m a
� E� � c o,'� �n v o w
� �J„m � U x u� E �a Z �
U
� � � . � � � , .. � • � r
ATTACHMENT E
_ Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction
Ma�or E4uinment List
DESCRIPTION MOTOR TYPE APPROX CONTROL/
HP MO1vITOR
Aeration Towers Electric Constant 20 hp each R&L/R
2 blowers Speed
1 per tower
Primary Solids Contact Basins
1 new, 2 converted primary basin
3 Solids contact mixers Electric-variable speed 15 R&L/R
3 Sludge scrapers Electric constant speed 2 R&L!R
Blend Basin/Recarbonation Basin
2 new basins
2 new mixers Electric-variable speed 10 R&L/R
Recarbonation diffusers None
Secondary Flocculation Electric-variable speed 5 L&R/R
2 converted existing basins
4 new flocculation mixers
Secondary Sedimentation
2 rehabilitated existing basins
4 vacuum sludge removal (?) or Electric 3 or L/L
4 chain and flight type mechanisms (?) Electric 3
Secondary Flocculation/Sedimentation
1 new flocculation mixer Electric-variable speed 5 L&R/R
1 sludge scraper Electric 2 L&R/R
Filter Backwash pumps
2 new(rated at 20 gpm/feetZ, 180 feet2
/filter)
3600 gpm at 40 feet 50 L&R/R
Horizontal Split Case
High Service Pumps
4 new Vertical Turbine
2320 gpm at 200 feet Electric -VFD 200 L&R/R
L=Loca1 R=Remote NA=Not Applicable A=Automatic Operation
I:V.�C\CAPEG6t\CAPEROCKUtEPOT.WPD Page 1 of 3
r , � , ', . . , . •• .
ATTACHMENT E
Cape Rock Water Treatment Plant Expansion and AlIuvial Well Field Construction
Major Ec�uipment List
DESCRIPTION MOTOR TYPE APPROX CONTROL/
HP MOr1ITOR
Activated carbon slurry feeders Packaged skid mounted �
2 Carbon slurry feed pumps, mixer, bulk bag system L&R/R
volumetric feeder
Sulfuric Acid Feed System
Bulk storage tank 5500 gallons L&R/R
Day tank- 50 gallons
2 transfer pumps
2 metering pumps
Ferric Chloride
Bulk storage tank 5500 gallons
Day tank- 150 gallons L&R/R
2 Transfer pumps
2 metering pumps
Chlorine Feeders
2 Primary Vacuum type L&R/R
2 Secondary Chlorinators
2 Post Cylinders mounted
Vacuum regulation
Chlorine Cylinder Scales
Primary
L/R
Secondary
Post
Ammonia L�
2-1000 gallon bulk tanks with
vaporizers
2 Ammonia gas feeders -vacuum type L&R/R
Polymer
Solution feeder with Package System L&R/R
Metering Pump, feed from
polymer totes
L=Loca1 R=Remote NA=Not Applicable A=Automatic Operation
1:UvIIC\CAPEG[R\CAPEROCK�REPOT.WPD Page 2 of 3
� • ,
, . , . � . � _ �• , .
ATTACHMENT E
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction
Major EabiiAment List
DESCRIPTION MOTOR TYPE APPROX CONTROL/
HP MONITOR
Emergency Chlorine Scrubber- 1 " A&L/R
1 ton capacity horizontal packed bed type fan and caustic pump, 40 hp
control panel(provided total
by supplier) �
Lime Silos /Lime Feed Building-All New
Dry lime volumetric feeders for Ca(OI�2 L&R/R
3 Solution Tanks
6 Metering pumps (hose type)A
1 Future solution tank
2 F�ature metering pumps
Potassium Permanganate Skid mounted system L&R/R
Solution tank,volumetric with cycle bin storage
feeder and feed pump
Fluosilicic Acid
1 1300 gallon bulk tank L&R/R
1 55 gallon day tank
2 transfer pumps
2 metering pumps
Well Field Pumps Submersible 40 Hp L&R/R
10 - Phase I each
5 -Phase II
L=Loca1 R=Remote NA=Not Applicable A=Automatic Operation
Page 3 of 3
I:VvIIC\CAPEGIR\CAPEROCKUtEPOT.WPD
F , ` , �. � , , , . . . .
ATTACHMENT F
Cape Rock Water Treatment Plant Expansion and Aliuvial Well Field Construction
New and Existing Instrumentation
EXISTING INSTRUMENTATION
River Intake (low service) Flowmeter Panametrics ultrasonic
Flowmeter Model#6488 �
ABB Chart Recorder(relocate?)
Raw water Turbidity Meter �
(Low Service from river intake) Great Lakes Model 8202
Mode1925 Transmitter
Bristol Babcock Circular Chart Recorder (relocate)
Rapid sand filter- Turbidity Meters (6) HACH#1720C, (reinstall)
with LED readout, provide transmitter to
communicate with PLC or replace entirely
High Service Flowmeters Remove, possibly reuse
Finished Water - Chlorine residual monitor Remove, possibly reuse
NEW INSTRUMENTATION
Treatment Plant Process Control
Raw water flowmeter(1 Flowmeter/well) 15 wells total
Turbidmeter - Tray aerator effluent
pH - Tray aerator effluent
Temperature - Tray aerator effluent
Flow�-Yrimary solids contact unit- influent flow 3 meters
pH -primary solids contact unit- effluent flow 3 meters
CL residual - primary solids contact unit effluent flow 3 meters
Turbidity - primary solids contact unit effluent flow 1 meter
pH - blend tank/recarbonation tank effluent flow 1 meter
CL residual - combined secondary sedimentation effluent 1 meter
pH - combined secondary sedimentation effluent 1 meter
Turbidity - combined secondary sedimentation effluent 1 meter
Page 1 of 6
` , , � '� • � r � � � � X
ATTACHMENT F
Cape Rock Water Treatment Plant Expansion and AlIuvial Well Field Construction
New and Existina Instrumentation
NEW INSTRUMENTATION
Turbidity - Clearwell effluent 1 meter
pH - Clearwell effluent 1 meter
Flow- High service pump station . 1 meter
Filter Flow-Backwash 1 meter
Filter Flow control 1 each filter 20 meters
Backwash turbidity 1 meter
High level -primary flow splitter 1 meter
Continuous level - clear well, low level alarm 1 meter
Pressure head each filter cell 20 cells
Activated Carbon System
Water feed rate flow- pressure gauge
Feed pump discharge flow switch, pressure gauge
Sulfuric Acid S s�tem
Transfer pump flow switch low, pressure gauge
Day tank level continuous
Day tank high level cutoff
Bulk storage tank level continuous
Bulk storage tank level high
Metering Pump or effluent flow switch low
-pressure relief flow switch high
- pressure gauge
Ferric Chloride
Transfer pump flow switch, pressure gauge
Page 2 of 6
` � ' . , . . • � , .
ATTACHMENT F
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction
New and Existin�Instrumentation
NEW INSTRUMENTATION
Day tank level continuous
.
Day tank high level
Bulk storage tank level continuous
Bulk storage tank level high
Metering Pump - Effluent flow switch
- pressure relief flow switch
-pressure gauge
Dilution water flow meter
Chlorine System
Chlorine Feeders (chlorine feed room)
Leak detection system
Motion detection system
Prim
-vacuum gauge header piping (1)
- gas flow meter (2)
- pressure gauge water line (2)
- flow meter water line (1)
-pressure gauge - solution line (2)
- weight element - cylinder scale (1)
Secondarv
- vacuum gauge header piping (1)
- gas flow meter (2)
- pressure gauge water line (2)
Page 3 of 6
� � � �� • . , ` ( ' r .
ATTACHMENT F
Cape Rock Water Treatment Plant Expansion and Altuvial Well Field Construction
New and Existin..g Instrumentation
NEW 1NSTRUMENTATION
- flow meter water line (1)
- pressure gauge - solution line (2) ,
- weight element- cylinder scale . (1)
Post
- vacuum gauge header piping (1)
- gas flow meter (2)
-pressure gauge water line (2)
-flow meter water line (1)
-pressure gauge - solution line (2)
-weight element- cylinder scale (1)
Ammonia
Prim
-vacuum gauge header piping (1)
- gas flow meter (2)
- pressure gauge water line (2)
- flow meter water line (1)
- pressure gauge - solution line (2)
- weight element- cylinder scale (1)
Secondarv
- vacuum gauge header piping (1)
- gas flow meter �2)
- pressure gauge water line (2)
- flow meter water line (1)
Page 4 of 6
i( ' ' • , . ,t . � ' � , �
ATTACHMENT F
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction
New and Existin� Instrumentation
NEW INSTRUMENTATION
-pressure gauge - solution line (2)
- weight element - cylinder scale (1)
Fluosilicic Acid
Transfer pump flow switch, pressure gauge
Day tank level continuous
Day tank high level
Bulk storage tank level continuous
Bulk storage tank level high
Metering Pump - Effluent flow switch
-pressure relief flow switch
- pressure gauge
Dilution water flow meter
Polvmer Feed System
- Tote scale weight element and transmitter
- dilution water flow meter
-pressure relief line flow switch
Lime Feed System
- solution tank high level/switch
- vendor supplied system, pick up all monitoring instrumentation to PLC on solution tank, volumetric
feeder, and silo levels
Potassium Permanganate
- flow switch on feed pump
- vendor supplied system with control panel
- flow meter on dilution water
Page 5 of 6
� ' . � �
� . , � � e � � , .
ATTACHMENT F
Cape Rock Water Treatment Plant Expansion and Alluvial Well Field Construction
New and Existing Instrumentation
NEW INSTRUMENTATION
Chlorine Eme�ency Scrubber
,
Chlorine leak detection
Vendor supplied scrubbing system with control panel
Connect ou�tputs from panel to PLC
Page 6 of 6
� - .
,. . < < < . • -
ATTACHMENT G
Cape Rock Water Treatment Plant and Alluvial Well Field Construction
Engineerin_g Cost Breakdown
Manhours Compensation
Prepare Report and CAnduct Public Hearing:
Labor: 400 $18,900
Expenses:
Reproduction $200
Long distance telephone $100
Computer (WP) $400
Mileage and Meals 400
Subtotal $1,100
Total $20,000
I:�IvIIC\CAPEGIR\CAPEROCKWTTCHMC.WPD ATC- 1
a �
. .
a • 4 t � ♦ � w
r
ATTACHMENT G
Cape Rock Water Treatment Plant and Alluvial Well Field Construction
Engineerin Cost Breakdown
Manhours Compensation
Design: • �
Labor:
Well Field Design Phase I 85 $6,000
Well Field Design Phase II 40 $3,000
Water Plant Design:
Civil 660 $39,300
Process 2880 $196,500
Mechanical 1570 $104,600
Structural 3180 $186,3 00
Architectural 1530 $105,000
Electrical 2180 $124,700
Instrumentation and Controls 2680 129 600
Subtotal 14,805 $895,000
Expenses:
Reproduction $3,000
Long Distance Telephone $1,500
Computer(WP) $5,000
Computer(CADD) $90,000
Mileage and Meals $4,600
Surveying & Arial Mapping $16,900
Geotechnical Engineering 32 000
Subtotal $153,000
Total $1,048,000
I:VvRC\CAPEGIR\CAPEROCKIATCCHMC.WPD ATC-2
� r
�i t ~ G � �. � •~ D
f ..
ATTACHMENT G
Cape Rock Water Treatment Plant and Alluvial Well Field.Construction
Engineeri� Cost Breakdown
Manhours Compensation
Bid Phase Services: '
, Labor: 680 $40,800
Expenses:
Reproduction(Bid Sets) $19,900
Postage $800
Long Distance Telephone $1,200
Computer (WP) $2,900
Mileage and Meals 600
Subtotal $25,400
Total $66,200
Construction Cost Estimating:
Labor: 425 $28,500
Expenses:
Computer (WP) 300
Total $28,800
�:�r,uc�cArEcm�c�rExocxwrrc�c.wPD ATC-3
� � , .�
, t `� � i ,. � _ �
ATTACHMENT G
Cape Rock Water Treatment Plant and Alluvial Well Field Construction -
En�neering Cost Breakdown
Manhours Compensation
Construction Phase Engineering:
Labor:
Civil 20 $1,000
Mechanical 230 $14,100
Structural 350 $23,600
Electrical 210 $12,200
Process 1,040 $62,100
Architectural 200 $13,300
Geologist 375 22 600
Subtotal 2,425 $148,900
Expenses:
Bluelines � $500
Photocopies $200
Long Distance Telephone $2,500
Mileage/Meals $2,500
Air Fare $200
Computer (WP) $3,400
Computer (CADD) 2 500
Subtotal $11,800
Total $160,700
LVvIlC\CAPEGIR\CAPEROCKWTTCHMC.WPD ATC-4
r c ,� .�
a � �r i � . '
ATTACHMENT G
Cape Rock Water Treatment Plant and Alluvial Well Field Construction
Engineerin� Cost Breakdown
Manhours Compensation
Residenf Representative Services:
Labor:
Resident Representative 3,100 $248,500
Clerk(half time) 1,500 $44,300
Geoglogist 1.230 91 700
Subtotal 5,830 $384,500
Expenses:
Per Diem for Resident Project Rep. 1,000/Mo $20,000
Per Diem for Geologist 1,000/Mo $8,000
Long Distance Telephone $2,000
Postage $500
Computer(WP) $4,000
Office Supplies 200
Subtotal $34,700
Total $419,200
I:�MIC\CAPEGIR\CAPEROCK�.4TI'CHMC.WPD ATC-5
r
� ' V
Sf� R+� � � � + ? �
ATTACHMENT G
Cape Rock Water Treatment Plant and Alluvial Well Field Construction
Engineerin�Cost Breakdown
Manhours Compensation
, Start-Up And Record Drawings:
Labor:
Start-up and Testing 530 $35,000
Record Drawings 315 11 700
Subtotal 845 $46,700
Expenses:
Bluelines $2,000
Long Distance Telephone $200
Computer (WP) $500
Computer (CADD) $2,900
Mileage $1,500
Motels and Meals (80 Days) 6 400
Subtotal $13,500
Total $60,200
Plant Automation:
Labor:
Instrumentation and Controls 2,360 $65,900
Expenses
Computer (WP) 16 000
Total �81,900
C�&IIC\CAPEGIR\CAP6ROCKWTCCHMC.WPD ATC-6
�
.
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AUTHORIZATION N0.8 - DISTRIBUTION SYSTEM HYDRAULIC ANALYSIS
For
PROFESSIONAL ENGINEERING SERVICES
To '
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT for PROFESSIONAL ENGINEERING SERVICES
dated March 21, 1994, between the City of Cape Girardeau, Missouri, (hereinafter
called OWNER), and Burns & McDonnell Engineering Company, Inc. (hereinafter called
ENGINEER), OWNER hereby authorizes ENGINEER to proceed with the following
services:
I. SCOPE
This Authorization No. 8 covers services involved in development and updating of
OWNER's existing Cybernet distribution system model, ENGINEER's analysis of the
impact of proposed improvements identified by OWNER to better define pressure zone
boundaries, and to identify other improvements necessary to provide a su�cient water
supply at acceptable pressures to OWNER's customers.
A detailed description of the scope of services anticipated to be completed by
ENGINEER and major assumptions upon which ENGINEER will rely in providing these
services are presented in "Exhibits A, B, and C".
II. TIME OF SERVICE
ENGINEER will proceed with providing the services set forth herein immediately upon
verbal notice to proceed from OWNER, and will complete these services by no later
than November 20, 1998, assuming a Notice-to-Proceed on or before April 15, 1998
and performing the flow testing by July 24, 1998.
It is understood that completion according to this schedule is contingent on the timely
review by OWNER of submittals from ENGINEER, as does not contain contingency for
any delays created by events beyond the control of the ENGINEER (such as adverse
weather conditions, regulatory agency actions, force majeure events, etc.)
C:\OFFICE\WPWIN\WPDOCS\CAPECONT.WPD Page 1 of 2
.
III. COMPENSATION
OWNER shall compensate ENGINEER for providing the services set forth herein in
accordance with the terms of the existing Agreement, based on a maximum fee with a
not-to-exceed cost basis. Total payment for the scope of services described in this
Authorization No. 8 shall not exceed the maximum amount of Seventy-Five-Thousand-
Dollars ($75,000.00).
ENGINEER shall invoice OWNER monthly only to the extent of work completed for this
project each month as outlined on the COST PROPOSAL WORKSHEET. Request for
final payment by ENGINEER to OWNER shall only be made following submittal of ten
(10) copies of the final report by ENGINEER to OWNER.
AU R17JaT N BY:
TY OF C E GI .,.__ . U, MISSOURI
By. Att st:
,
D e: �'o�o� - 9�
1
ACCEPTED �Y: `
BURNS & M¢D N L E INE RING COMPANY, INC.
By. � w
Dr. Robert T. erry, P.E.
Vice President
C:\OFFICE\WPWIMWPDOCS\CAPECONT.WPD Page 2 of 2
CITY OF CAPE GIRARDEAU
Computer-Generated Hydraulic Analysis and Pressure Zone Study For
City of Cape Girardeau Potable Water Distribution System
EXHIBIT A
LIST OF ANTICIPATED MAJOR WORK TASKS
1. Hold kick-off meeting with OWNER. Purpose of ineeting will be to confirm project
objectives, gather data/information, select six inch lines to be modeled, verify required
schedule for completion of pump testing and flow/ pressure/elevation monitoring, and
obtain other pertinent guidance regarding project from OWNER.
2. Coordinate, assist, and direct OWNER in ENGINEER's collection of flow and pressure
monitoring data required to further calibrate distribution system computer model.
OWNER will operate all valves and hydrants. It is anticipated that OWNER will provide
finro people for one week to accomplish this. ENGINEER will provide and operate flow
nozzle meassurement equipment on discharge of fire hydrants. ENGINEER will
provide, install and maintain 24-hour pressure recorders for one week during the time
that flow measurements are taken.
3. PerForm pump testing at booster pump stations and water treatment plant to determine
pump perFormance. OWNER will provide connections for pump suction and discharge
pressure guages and ENGINEER will provide guages. OWNER will operate all
pumping equipment and valves at direction of ENGINEER. It is anticipated that
OWNER will provide two people for one week to accomplish this.
4. Gather/review current and future population data and water use demand as provided by
OWNER.
5. Review existing and future water use/demand findings with OWNER and develop model
scenarios.
6. Review existing distribution system components and define model zone boundaries with
OWNER.
7. Update OWNER's distribution system Cybernet model and develop model assumptions
for review by OWNER.
8. Conduct distribution system modeling and develop improvements program from results.
Specific modeling tasks will include those identified in OWNER's December 2, 1997
letter to ENGINEER.
Page 1 of 2
Exhibit A (Cont.)
9. Perform extended period simulation analyses for the average day demand, maximum
day demand, peak hour demand, maximum day demand plus fire flows, and minimum
hour demand plus tank replenishment. The analyses will be performed for the years
2003, 2008, and 2018.
10. Prepare preliminary report identifying results of model analyses, recommending
immediate and future distribution system/storage improvements, for review by OWNER.
11. Prepare final report and submit ten (10) copies to OWNER.
12. ENGINEER will provide full access to work by OWNER's staff as OWNER desires.
13. Provide one Cybernet Program to OWNER. This Amendment No. 8 includes $2995 for
acquisition of the software, OWNER will pay ENGINEER added compensation should
the actual cost of the software exceed this amount.
14. Administer, manage, and coordinate ENGINEER's staff effort and provide liaison with
OWNER staff during this effort.
By: Burns & McDonnell
March 16, 1998
I:\MK\CAPEGIR\EXHIBIT.A Page 2 Of 2
CITY OF CAPE GIRARDEAU
Computer-Generated Hydraulic Analysis and Pressure Zone Study For
City of Cape Girardeau Potable Water Distribution System
EXHIBIT B
LIST OF MAJOR ASSUMPTIONS
It is ENGINEER's understanding that the OWNER will provide the following assistance,
information, and/or related work items:
1. Assistance by placing at ENGINEER's disposal all available current information
pertinent to this assignment, including previous Cybernet model, drawings of
existing distribution system, topographic contour drawings of study area, reports,
permits, pump curves, water use records, population data, ISO rating(s), and
other data.
2. Appropriate liaison with distribution system staff involved in this effort.
3. Reasonable access to other data and records related to this assignment that
ENGINEER may determine a need to review.
4. Assistance in procuring any required field monitoring measurements (flow tests,
pressure tests, pump tests, C values) necessary to further calibrate the
distribution system computer model. ENGINEER will develop a complete list of
monitoring locations for review by OWNER and coordinate data collection field
activities to be performed by OWNER.
ENGINEER will rely on information, drawings, etc. made available by the OWNER as accurate,
based only on verification of certain key parameters (as necessary).
ENGINEER will model only those improvements identified by OWNER in OWNER's letter of
December 2, 1997.
ENGINEER will not add to the model any existing pipes less than 8" in diameter or new pipes
less than 8" in diameter unless believed to be hydraulically critical by OWNER. It is recognized
that certain existing 6" lines are critical and these will be added to the model as specifically
directed by OWNER.
Final deliverables provided by ENGINEER will be limited to all electronic (Cybernet) files
generated by ENGINEER in the course of performing the work and a summary report. A
verbose report and plotted drawings (except for those used in the summary report) shall not be
required.
By: Burns & McDonnell
March 16, 1998
I:\MK\CAPEGIR\EXHIBIT.B Page 1 Of 1.
CITY OF CAPE GIRARDEAU
Computer-Generated Hydraulic Analysis and Pressure Zone Study For
City of Cape Girardeau Potable Water Distribution System
EXHIBIT C
PRELIMINARY
TABLE OF CONTENTS
INTRODUCTION
A. Purpose
B. Scope
C. Sources of Information
D. Abbreviations
SUMMARY
A. Summary
B. Existing Water System
C. Population and Water Demand Projections
D. Water System Analysis and Recommended Improvements
PART I - EXISTING WATER SYSTEM
A. General
B. Supply
C. Distribution and Storage
D. Operational Summary
PART II- POPULATION AND WATER DEMAND PROJECTIONS (Information provided
by Owner)
A. Community Development
B. Population Projections
C. Water Use Data
D. Water Demand Projections
EXHIBIT C
PRELIMINARY
TABLE OF CONTENTS (Cont.)
PART III- WATER SYSTEM ANALYSISAND RECOMMENDED IMPROVEMENTS
A. General
B. System (Pressure Zone) Boundaries
C. Fire Protection
D. Hourly Demands
E. Supply Analysis
F. Storage Analysis
G. Hydraulic Analysis
H. Recommended System Improvements
I. Cost Estimates
APPENDIX A - CALIBRATIONDATA
APPENDIX B - CODED SYSTEM MAP AND COMPUTER PRINTOUTS
APPENDIX C - PUMP/STORAGE DATA
I:\MK\CAPEGIR�EXH f BIT.0
EXHIBIT C
PRELIMINARY
TABLE OF CONTENTS (Cont.)
PRELIMINARY
LIST OF TABLES
SUMMARY
S - 1 Cape Girardeau Population and Demand Projections
PART I - EXISTING WATER SYSTEM
I - 1 High Service Pumping Stations Physical Data
I - 2 Storage Data
I - 3 Operational Control Parameters
I - 4 Summary of Cape Girardeau Operating Statistics
PART II- POPULATION AND WATER DEMAND PROJECTIONS
II- 1 Historical Population Data
II- 2 Largest Consumers of Water
II- 3 Population and Demand Projections
PART III- WATER SYSTEM ANALYSISAND RECOMMENDED IMPROVEMENTS
III- 1 Summary of Fire Demands
III- 2 Summary of Projected Demands
III- 3 Existing System Capacities
III- 4 Storage Requirements
III- 5 Summary of Piping Network Analyses
III- 6 Recommended Improvements and Cost Estimates
I:�MK\CAPEGIR�EXHIB[T.0
9
EX�-IIBIT C
PRELIMINARY
TABLE OF CONTENTS (Cont.)
PRELIMINARY
LIST OF FIGURES
PART I - EXISTING WATER SYSTEM
I - 1 Existing Distribution System - Skeleton Model
PART II- POPULATION AND WATER DEMAND PROJECTIONS
II- 1 Customer/Population Projections
II- 2 Demand Projections
PART III- WATER SYSTEM ANALYSISAND RECOMMENDED IMPROVEMENTS
III- 1 Diurnal Curve
III- 2 Recommended System Improvements
III- 3 Pressure Zone Boundaries
* * x� * *
1:UviK\C AP E G I R\E XH I B I T.C
. �
• a m N N N N I N N N t`1It0�fD m a � f-
3 - N
R 4; o
�
� i �
o II i � °
a p� ao o m m ao o�
U � `+ II i
r '; i �
ro - � �
h �
5' i
L a�:.��. I �
u
aW � �
��,..
w �
Ea�
m
t
U�� I
�
m W i;.j. I � I �I
J—a s: �
.�
�U ":
W;s<. I � ❑
m tn:;;.. o�
9 d
CN W� m R Q tD V'? fD Y 00 O R t0 O O O a0 OD
`a.�' IN N N W N'-O R V I � �
m I �
C > `'
W W'(O<tDIW m t0 N Y 700NNtD0��tOOvfOtO GDm7 O ? Ol
N �� � ~ �
O U � � d
w. W W ymU
�a iX � d �v
m � � ��� �a�
Ww`:', �W� d
�� i I o;�� E�
� � o� soo
w aarnac�3
W �n.
� � � �x�wwo�
A wdv�ao
'� a in�;� a v
3
O
y � W .--
N o„ t d:..:
C � � d
L � ��� i N I N C
O
C7 C �
.� Y �1H«�V�...N N� V I N�N N � V OJ 7�N f�0 �
� a,` I �
i d "
i v �n E
� y dl'�� I I I I
fl'� <mio ao�o rn��c�cn m m mlv o�n m ao wlm m a m m o 0 o rn a�o rn o m
�o�cnrnr�ar nwm� oon�om rn N �ncoov�n rn � o
(„� � m �Q�I00 cOfDu7 W aD Of�������(000 m� K YiKM N � p� Yf
OlO �0 N ��m �N N w � O V N OI R(O t'� � K N Vi i H N
3 E o �wv, v.�inw vs u,�wwwwu,inw.� �
• U �
c�i c "' I
� ��
d N u7 V<O O O[O Q)O N N�tD N N N O O�O f'7 O V
� y� �I O I'-��th N M�N N(O 1�CI V 1�T e-0')Y � �W V!(A Y Y Y
i. I l0 Q Q Q
L � N N N
� I I
' � N �'" Oaz..�E no m� � m d W t~n
� N 7 0 � ,l,�C� U� N � j C Z U
' - O V Q ro $ a�� d
I � � S � �E c a r o ��N x a w
� I I z m E� ��a�Uo y W �-
i I I a � y � � F' y W �at m°b`o o � �
w o m y
� � �; -� d n� � n o m c W �
al C 9 �> � aE��a'dLLa W � W
m �c.r-i °c' � E `�° ° EU'=� �a V � o a
w� 5 ^� % E ° ~ V a ~ � ¢ ~
Im'� 3 � ' � � o O O
a� m " m a v a d U !-
c i c•- Ev� � E 9? c d�
6 ul a 6 � d W� 0�`7 m �9 � m C�A
' c ,� m � �� aEiV v� > o,°pE $ '
� y � G � �y v� c� E �m E E > h
N C� �
m y c p o c ��0 3 c E v a0 E � o m c
G n ci `c_� 'Q y � m m m� a;� uJ m a 2•n�
Y N�G mdc•cEdm � °' oE c��
N IC m V N. 'C y.� �p N."' T; N ��'�-U..
R O m o C J� p ; y >n � m p y h G� C
F' Y �U�H �� ,� C C�y C C C Hl'�rJ E
Y;I�''vw mw=� o °'�� EE� � ; 3� a�i
� mE� ° � c3maEaaHL°aE °c `" °
» � �.o HamEEEa5a�5 � m�c `
v�� c� � m m::°% E „ " m o w y
� � � y� n�3vya�'n've �'vaZ`Z,c
c�v:.. c w3o�2N Nmo� cT� E � w °a�
.�
a°ia �a5a�° aaTii >>�idaac� o,� E� E I
� �o`—°p °pE� a;i�S� � o� 'y � d'
n��c� ���y a 3 0 o E oi a E d a>i n n� d
m m m m a � n� a d � m d;n
cm �av �aoi °� Emc.2'mf0ova�2"t° mmc i
'° cct >$o >�ct > m'C > •c �> yE I
d O N N l0 N N 07 N N d N W N m �
�c�iw�c�a�c9w�o>oad�c»a�a¢
rn i
c � � �Qf
q N E.�Nlpl 7�t0 1�m���N Ol V i!1 f0 f�W Of N N N 1!�
F-� 7 � I �
O Z � I � g
f
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT SYSTEM
AUTHORIZATION NO. 9—RISK MANAGEMENT PLAN
For
PROFESSIONAL ENGINEERING SERVICES
To
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT for PROFESSIONAL ENGINEERING SERVICES dated
March 21, 1994 between the City of Cape Girardeau, Missouri (hereinafter called OWNER)and
Burns&McDonnell Engineering Company,Inc. (hereinafter called ENGINEER), OWNER
hereby authorizes ENGINEER to proceed with the following services:
I. SCOPE
This Authorization No. 9 covers services involved in development of Risk Management Plan
(RMP)under section 112r of the Clean Air Act for the Cape Rock Water Treatment Plant. A
detailed description of the scope of services to be completed by Engineer and major assumptions
upon which ENGINEER will rely in providing these services are presented in"Exhibits A and
B."
II. TIME OF SERVICE
ENGINEER will proceed with providing the services set forth herein within seven(7) days upon
authorization from OWNER, and will complete these services by no later than June 21, 1999,
assuming a Notice-to-Proceed on or before April 15, 1999.
It is understood that completion according to this schedule is contingent on the timely review by
OWNER of submittals from ENGINEER, as does not contain contingency for any delay created
by events beyond the control of the ENGINEER(such a adverse weather conditions, regulatory
agency actions, force majeure events, etc.).
III. COMPENSATION
A. Amount of Payment
1. For services performed, OWNER shall compensate ENGINEER for providing the
services set forth herein in accordance with the terms of the existing Agreement, as
follows:
M:�ivIK\CAPEGIR�RMP�,AUTH9forl.doc Page 1 of 5
.
•
a. For time spent by personnel,payment at the hourly rates indicated in the
Schedule of Hourly Labor Billing Rates Form BMR899. Such rates include
overhead and profit. The schedule is effective to December 31, 1999.
b. For expenses incurred by ENGINEER, such as authorized travel and
subsistence including airfare, food, lodging, automobile rental, commercial
services, and incidental expenses,the cost to ENGINEER plus 10 percent.
c. For reproduction,printing, long-distance telephone calls, facsimile
transmissions, company vehicle usage, testing apparatus, computer services and
computer-assisted drafting (CAD), amounts will be charged according to the
ENGINEER standard rates in effect at the time service is provided.
2. The payment for the Scope of Services described in this Authorization 9 shall not
exceed the maximum amount of Fourteen-Thousand-Five-Hundred Dollazs ($14,500).
ENGINEER shall invoice OWNER monthly for work done on this project.
AUTHORI ON Y:
CITY CITY CAPE GIRARDEAU, MISSOURI
f
� ATTEST
/
, �B µ,.�;=�----;_..__
Y �
By ,��
�
z << . -
,� f+ �� '.-^ �«�3
�' > / �` `�� - ��_,`
ACCEP BY: -. �" � ` �. - �
� f � x'
�,`. � �' � :
:?. ;$,
<,,tj
'r
�< ,��
��' ��' �
' ��,�`�`i .. t� �
Dr. Robert T. Berry, P.E. --�- � �
Vice Presiden and Manager, St. uis Office
M:uVIK\CAPEGIR�RMP�AUTH9forl.doc Page 2 of 5
s
CITY OF CAPE GIRARDEAU, MISSOURI
AUTHORIZATION NO. 9—RISK MANAGEMENT PLAN
EXHIBIT A
LIST OF ANTICIPATED MAJOR WORK TASK
1. Kick Off Meeting will be held in Cape Girazdeau, Missouri. The goals of the meeting are:
• Confirm all the data required for modeling, including chemicals, quantities, locations,
meteorological data, passive mitigation devices, etc. for Offsite Consequence Analyses.
� Confirm what information will be provided to the ENGINEER, and what items the
ENGINEER will determine. Some information like Dun and Bradstreet Numbers would
be best provided by the O WNER.
• ENGINEER will discuss preliminary identification of worst case and alternative release
scenarios with OWNER to obtain agreement on both scenarios.
• Determine the sites' five-year accident history.
2. Document the sites' five-year accident history.
3. Following agreement on the defined scenarios, one risk management chemical (chlorine)will
be modeled for offsite consequence analyses. EPA's modeling software, RMP*Comp,will
be used to evaluate the toxic gas endpoints associated with chlorine. One"worst case"and
one"most likely"case scenario will be developed for each site.
Develop a summary of the potentially affected population and public receptors using
Landview III, which contains the US Census Bureau Tiger database, as well as the latest topo
map from the US Department of Interior, Geological Survey.
Following completion of the modeling analysis, and if desired by the owner,ENGINEER
will overlay the model-determined toxic endpoint over a MARPLOT plot, or a 75 minute
USGS map or aerial photograph, if readily available from OWNER.
4. Assist in the development the site's Management System to meet the requirements of RMP.
ENGINEER will draft Management System based on the OWNER's inputs for the
OWNER's review. Then ENGINEER will document the system.
5. Review OWNER'S Accidental Release Prevention Procedures and make recommendations
to upgrade these procedures for an Accidental Release Prevention Program, as necessary. It
is our understanding that OWNER'S operations and maintenance procedures are in place, but
need to be documented. The Process Safety Information, and procedures covering Hazard
Review, Training, Incident Investigation, and Compliance Audit for the chlorine process will
be developed. The Hazard Review will be done jointly by the ENGINEER and OWNER,
M:VvIK\CAPEGIR�RMP�AUTH9forl.doc Page 3 of 5
s
lead by the ENGINEER. The training will be outlined by the ENGINEER and the training
conducted by the OWNER. After OWNERS review, the ENGINEER will complete the
Process Safety Information, and procedures covering Hazard Review, Training, Incident
Investigation, and Compliance Audit.
6. Review OWNER'S Emergency Management Procedures and make recommendations to
upgrade these procedures for an offsite Emergency Response Program as necessary. For the
cost estimate it was assumed that the preliminary Emergency Management Procedures would
be drafted by the ENGINEER, for the OWNERS review, then completed by the ENGINEER.
7. Compile the RMP elements for OWNER's review and comments.
8. Assist OWNER with the RMP Executive Summary. The ENGINEER will draft a RMP
Executive Summary based on the OWNER's inputs for the OWNER's review. Then
ENGINEER will put the Executive Summary into RMP*SUBMIT.
9. ENGINEER will draft Program Certifications for OWNER.
10. ENGINEER will insert all the information into RMP*SUBMIT, and label the diskettes for
submission. Two paper copies of the Risk Management Plan will be provided to the
OWNER.
1 l. ENGINEER is prepared to assist Owner in Program implementation and communication with
the Public but no significant effort is anticipated.
M:\MK\CAPEGIR�RMP�,AUTH9forl.doc Page 4 of 5
�
♦
CITY OF CAPE GIRARDEAU, MISSOURI
AUTHORIZATION NO. 9—RISK MANAGEMENT PLAN
EXHIBIT B
LIST OF MAJOR ASSUMPTIONS
• A Risk Management Plan is required for only the Cape Rock Water Treatment Plant.
• Chlorine is the only Risk Management Chemical at the plant.
• Existing drawings require little modified for"Process Hazards Analysis and Operation
Procedures.
• No significant effort required for Program implementation or communication with the Public.
M:\MK\CAPEGIR�RMP�AUTH9forl.doc Page 5 of 5
� EXHIBIT NO. 1: COST PROPOSAL WORKSHEET BY TASK
Client Name: CITY OF CAPE GIRARDEAU, MISSOUR!
Project Title: RISK MANAGEMENT PLAN (RMP)
B'llin Level
- . Task ; I Estimated PEx PM SE PE CADD
Number� Task Descri tion Mhrs � Cost °�_`t�.. �„�'��2.� ,k�3° �° :;9�
1 Organize Project/Kick Off Meeting/divide RMP elements 2� $1,94s � 8 �2
2 Document 5-year Accident History 1 $95 �
3 Offsite Consequence Analysis 8 $636 1 3 a
'1Norst-case"and"Altemative Release"Scenarios
a Assist in Development of a Management System 3 $285 3
5 Developed or review Prevention Program
A. Provide Process Safety Information 3 $285 3
B. Conduct Hazard Review �o $933 2 8
C. Document Operation Procedures �3 $�,�53 � �0 2
D. Document Training Procedures s $84� 1 s
E. Document Maintenance Procedures �s $�,503 2 �a
F. Developed Incident Investiga6on Procedures a $372 1 3
F. Developed Compliance Audit Procedures 5 $as� 1 a
6 Document the Emergency Response Program 8 $�a3 2 6
7 Compile RMP elements 17 $�,s0� � 16
e Write an Executive Summary 9 $�� � 8
9 Complete Program Certification 1 $95 1
�o Complete EPA's RMP*SUBMIT documentation �� $�,03� 1 �o
�� Assist in Program implementation and communication 3 $2�� � 2
with the Public
Total Estimated Man-Hours: 142 1 23 112 4 2
Labor Cost: S13,125
QualjYy ControL•
Gt1 - Concept Phase Review 1 $95
Q2- Technical Review 3 $285
Q3- Final Plan Review 2 $190
Total Quality Control: 6 �570
Fstimated Exnenses:
Rate
Com uter Time CADD : I$21.00 $42 Leggnd
Com uter Time En ineerin MIP : I$11.00 $495 PEx -Project Executive
Milea e&PerDiem: ;$0.325 $230 PM -Project Manager
Tele hone&Lon Distance: $24 SE -Senior Engineer
Air Fare&Car Rental: - PE -Project Engineer
Re roduction&Photoco : i
Hotel: i
Miscellaneous Ex enses:; $14
Total Direct Expenses: $805
Total Estimated Cost: ;14,500
n�u��nn R��mc R lulcllnnnall COSTFOR�.WK�
s
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AUTHORIZATION N0.10 - CAPE ROCK WATER TREATMENT PLANT
AND
ALLUVIAL WELL FIELD PROJECT
CONSTRUCTION CONTRACT CR-2 RE-BID
For
PROFESSIONAL ENGINEERING SERVICES
To
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT for PROFESSIONAL ENGINEERING SERVICES
dated March 21, 1994, between the City of Cape Girardeau, Missouri, (hereinafter
called OWNER), and Burns & McDonnell Engineering Company, Inc. (hereinafter called
ENGINEER), OWNER hereby authorizes ENGINEER to proceed with the following
services:
I. SCOPE
This Authorization No. 10 covers services involved in re-bidding construction contract
CR-2 for the Cape Rock Water Treatment Plant Expansion, Treatment Plant Expansion
and Improvements and redesign of plant heating systems to change from electric heat
to natural gas heat.
A detailed description of the scope of services anticipated to be completed by
ENGINEER and major assumptions upon which ENGINEER will rely on in providing
these services are presented in "Exhibits A and B" and modifications required to
Contract Documents are outlined in "Exhibits C and D".
11. TIME OF SERVICE
ENGINEER will proceed with providing the services set forth herein immediately upon
verbal notice to proceed from Owner. Assuming a notice-to-proceed on May 4, 1999,
ENGINEER will complete documents necessary for re-bid of contract CR-2 on June 15,
1999 and issue to Owner for review. On July 28, 1999, ENGINEER will issue re-bid
documents to current plan holders and prequatified bidders. Dates defined herein are
necessary to support proposed project schedule outlined in "Exhibit E". One week is
allowed for Owner review of re-bid documents.
I:\94159\I00100\CONTRAC'IICAPECONTAlO Page 1 of 2
.
It is understood that completion according to this schedule is contingent on the timely
review by OWNER of submittals from ENGINEER, as well as any delays created by
events beyond the control of the ENGINEER (such as adverse weather conditions,
regulatory agency actions, force majeure events, etc.)
III. COMPENSATION
OWNER shall compensate ENGINEER for providing the services set forth herein in
accordance with the terms of the existing Agreement, based on a maximum fee with a
not-to-exceed cost basis. Payment for re-bidding services shall not exceed $59,300 as
defined in Compensation Schedule No. 1. Payment for redesign services to change
heating systems to natural gas shall not exceed $24,450 as defined in Compensation
Schedule No. 2. Total payment for the scope of services described in this Authorization
No. 10 shall not exceed the maximum amount of Eighty-Three Thousand-Seven
Hundred and Fifty Dollars ($83,750.00).
ENGINEER shall invoice OWNER monthly only to the extent of work completed for this
project each month as outlined on the Compensation Schedules No. 1 and No. 2.
Request for final payment by ENGINEER to OWNER shall only be made following
opening of contractor bids. F��� ��.� �,��
;1��,�: �- �,,.
. �{� 4 �J..g��
. ��',�a�� '�4 ,�t��„w`r,:
,�,f f ��� �, �
�`����r rtt�..,� _����a"�� a�'r�''� .
AUTHORIZATION BY: �����,� � t �� ¢�,��,
CITY OF CAPE GIRARD U, MISSOURI _�� �,�`1,, '°;���:;,'���� �;a;
� � F d: ,�
r �Pa %�
,�," '���`�,� ;�+; `` � , ,,-'
� �
BY� Attest.; � �;�` -' , ,���_.
��✓t !'' ,,� �3� �:�'` ." ''„,�'"�,,��
Date: �,� � � ,� :,....�.��:;���
,�� °,`��s�'����:�
r� �,. �.�.� 5
�� ���� �
;r,�:•::._�,.
�r; :
ACCEPTED BY:
BURNS & cD N EL INEERING COMPANY, INC.
By: ,
Dr. Robert . Berry, P.E.
Vice President
I:\94159\I00100\CONTRAC'IICAPECONT.010 Page 2 of 2
.
CITY OF CAPE GIRARDEAU
CAPE ROCK WATER TREATMENT PLANT AND ALLUVIAL WELL FIELD
PROJECT
CONSTRUCTION CONTRACT CR-2 RE-BID
EXHIBIT A
LIST OF MAJOR WORK TASKS
1. Finalize proposed deduct list for contract CR-2 and discuss with OWNER.
2. Prepare Addendum No. 5 (re-bid documents) including redesign of heating systems to
accomadate switch to natural gas and contractor prequalification documents. Drawing
and specification modifications, additions and deletions are defined in"Exhibits B and
C"
3. Review Addendum No. 5 documents with Owner and incorporate Owner comments.
4. Issue Addendum No. 5 to current plan holders and issue complete documents sets to new
bidders.
5. Submit and coordinate approval of Addendum No. 5 with MDNR.
6. Review Contractor Prequalification packages.
7. Address bidders questions.
8. Evaluate bids received.
1:�94159\I00100\CONTRAC7IEXHIBITA.010
CITY OF CAPE GIRARDEAU
CAPE ROCK WATER TREATMENT PLANT AND ALLUVIAL WELL FIELD
PROJECT
CONSTRUCTION CONTRACT CR-2 RE-BID
EXHIBIT B
LIST OF MAJOR ASSUMPTIONS
It is ENGINEER's understanding that the OWNER will provide the following assistance,
information, and/or related work elements:
A. Assistance by placing at ENGINEER's disposal all available current information
pertinent to this assignment.
B. Liaison with other City of Cape Girardeau Departments and governing officials
involved in the project.
C. Reasonable access to other data and records related to this assignment that
ENGINEER may determine need for.
D. Timely review of all documents by Owner in accordance with project schedule.
ENGINEER shall rely on information,drawings, etc.,made available by OWNER as accurate,
based only on verification of certain key parameters (if necessary).
L\941591100100�CONTRAC7�EXIiIBITB.W PD
Cily of Cape Girardeau,Missouri
Cape Rodc WTP Expansion
Treatment Plant Expansion and Improvements
ConsWcfion ConVad CR-2
Exhibit C
Drawing Modication List
Drawings Addendum No.5
Reissue Delete Edit Verbally Add Sketch Drawing Title
UtA YARD PIPING
UtC YARD PIPING
U1 D YARD PIPING
U1 E YARD PIPING
US MISC.VALVE AND METER DETAILS
Ut2 CHEMICAL PIT SCHEMATIC DIAGRAMS
U13 CHEMICAL PIT SCHEMATIC DIAGRAMS
FZ WELLFIELD PROCESS FLOW DIAGRAM
F3 PIANT PROCESS FLOW DIAGRAM
F4 P&ID-FIRST STAGE TREATMENT
F5 P81D-SECOND STAGE TREATMENT
F6 P&ID-FILTRATION,CLEARWELL AND HIGH SERVICE PUMPING
F� TYPICAL FILTER AND BACKWASH PUMP STATION
F8 ACTIVATED CARBON FEED SYSTEM
F9A AMMONIA FEED SYSTEM
F98 AMMONIA FEED SYSTEM
F10 CARBON DIOXIDE FEED SYSTEM
F11A CHLORINE FEED SYSTEM
F��B CHLORINE FEED SYSTEM
F�� COAGULANT FEED SYSTEM
F�2g COAGULANT FEED SYSTEM
F12C COAGULANT FEED SYSTEM
F13 FLUOSILICIC ACID FEED SYSTEM
F14 LIME FEED SYSTEM
F15 CATIONIC POLYMER BLEND SYSTEM
F16 POTASSIUM PERMANGANATE FEED SYSTEM
F�8 FILTERAID FEED SYSTEM
F19 PHOSPHATE FEED SYSTEM
Fz1 CHEMICAL FEED SYSTEM DILUTION WATER
F22 SAMPLE SCHEMATIC
P3 AERATOR TOWER,PRIMARY FLOW SPLITTER PLAN
P4 PRIMARY BLEND BASIN AND PRIMARY FLOW SPLITTER SECTIONS&DETAILS
P5 PR�MARY SOLIDS CONTACT BASINS NO.1 PLAN AND SECTIONS
P6 PRIMARY SOLIDS CONTACT BASINS NO.2 AND NO.3 PLAN
P7 PRIMARY SOLIDS CONTACT BASINS NO.2 AND NO.3 SECTION AND DETAILS
P9 BLEND/RECARBONATION BASIN AND SECONDARY LOW SPLITTER PLAN AND SECTION
P11 SECONDARY FLOCCULATION/SEDIMENTATION BASINS NO.1 PLAN SECTION AND DETAILS
P12 SECONDARY FLOCCULATION NO.2&NO.3./SECONDARY SEDIMENTATION NO.2&NO.3 PLAN
P14 SECONDARY RESIDUALS RETURN PUMP STATION
P75 FILTERS N0.1-8 LAYOUT PLANS
P19 FILTERS N0.7-20 PIPING PLAN
P20 FILTERS N0.7-20 PIPING SECTIONS AND DETAILS
P23 LIME FEED BUILDING PLAN
P24 LIME FEED BUILDING PLAN
P25 LIME FEED BUILDING SLAKER CROSS SECTION
P26 LIME FEED BUILDING PROCESS SECTION AND DETAILS
P27 CHEMICAL FEED BUILDING EQUIPMENT LAYOUT PLAN
P28 CHEMICAL FEED BUILDING PROCESS PIPING PERSPECTIVE
P29A CHEMICAL FEED BUILDING PROCESS PIPING PLAN AND SECTIONS
P298 CHEMICAL FEED BUILDING ENTIRE BUILDING PROCESS PIPING PLAN AND SECTIONS
P30 CARBON DIOXIDE SYSTEM PROCESS PIPING PLAN AND SECTIONS
P33A COAGULANT SYSTEM PROCESS PIPING PLAN AND SECTIONS
P336 COAGULANT SYSTEM PROCESS PIPING PLAN AND SECTIONS
P36 CARBON ROOM PROCESS PIPING PLAN AND SECTIONS
P39 POTASSIUM PERM.SYSTEM PROCESS PIPING PLAN AND SECTIONS
P41A CHEMICAL FEED BUILDING TANK SCHEDULE
P43 CHEMICAL AND SAMPLE PIPING SECTIONS AND DETAILS
F44 SAMPLE PUMP INSTRUMENTATION ROOM
A3 NEW CHEMICAL FEED BUILDING ROOF PLAN
A4 NEW CHEMICAL FEED BUILDING EXTERIOR ELEVATIONS
A6 NEW CHEMICAL FEED BUILDING WALL SECTIONS
AB NEW FILTER BUILDING ROOF PLAN
A9 NEW FILTER BUILDING EXTERIOR ELEVATIONS
A11 NEW FILTER BUILDING WALL SECTIONS
Al2 EXISTING FILTER/CONTROL BUILDING FIRST FLOOR/CEILING PLAN
A13 EXISTING FILTER/CONTROL BUILDING SECOND FLOOR/CEILING PLAN
A18 BUILDING DETAILS
1:�94159\10041spec�SPECDWGADD.xIs 1
City of Cape Girardeau,Missouri
Cape Rock WTP Expansion
Treatment Plant Expansion and Improvements
ConsWction Contract CR-2
Exhibit C
Drawing Modica6on List
Drawings Addendum No.5
Reissue Delete Edit Verbally Add Sketch Drawing Title
�� BUILDING DETAILS
�1 FINISH AND WINDOW SCHEDULE
A23 DOOR AND WINDOW SCHEDULE
�6 EXISTING CHLORINE FEED BUILDING RENOVATION/SHOWERS FLOOR AND CEILING PLANS
S�$ EXISTING FILTER BUILDING RENOVATIONS
S28A FILTER BUILDING-FRAMING SECTIONS AND DETAILS
S�4 CHEMICAL FEED BUILDING FOUNDATION PLAN
S42 WELLFIELD TRANSFORMER TOWERS PLAN AND SECTIONS
S43 WELLFIELD TRANSFORMER TOWERS SECTIONS AND DETAILS
S� SECONDARY RECIRC PUMP STATION FOUNOATION PLAN AND SECTIONS
S45 SECONDARY REC�RC PUMP STATION ROOF FRAMING PLAN AND SECTIONS
M2 CHEMICAL FEED BUILDING HVAC PLAN
M10 CHEMICAL FEED BUIIDING LOWER DUCT DETAILS
M12A LIME FEED BUILDING HVAC AND PIPING PLAN
M�6 CHLORINE BUILDING RENOVATION MECHANICAL PLANS
M17A EXISTING FILTER BUILDING HVAC PLANS
M178 EXISTING FILTER BUILDING HVAC PIPING AND PLUMBING PLANS
M17C EXISTING FILTER BUILDING SANITARY WASTE AND VENT PLANS
M17D EXISTING FILTER BUILDING PLUMBING ISOMETRICS
M17E EXISTING FILTER BUILDING PLUMBING ISOMETRICS
M78 LOUVER SCHEDULE
M19 POWER VENTILATOR SCHEDULE
M20 UNIT HEATER SCHEDULE
M21 MECHANICAL SCHEDULES
M24 SECONDARY RESIDUAL RECIRC PUMP STATION MECHANICAL PLAN
E2 ELECTRICAL SITE PLAN MAIN PLANT
E4 4160 AND 480 VOLT ONE-LINE SUBSTATION
E5 480 VOLT ONE-LINE SWBRD-1 AND SWBRD-2 FILTER BUILDING
E6 480 VOLT ONE-LINE SWITCHBOARD 5 LIME FEED BUILDING
E18 EX�STING FILTER BUILDING SECOND FLOOR POWER AND LIGHTING PLANS
E33 POWER VENTIIATION CONTROL-DETAII A,SCHEMATIC 8 PANEL DETAILS
E34 POWER VENTIWTION CONTROL-DETAIL B,SCHEMATIC &PANEL DETAILS
E35 POWER VENTILATION CONTROL-DETAIL C,SCHEMATIC &PANEL DETAILS
E36 POWER VENTILATION CONTROL-DETAIL D,SCHEMATIC &PANEL DETAILS
E37 POWER VENTILATION CONTROI-DETAIL E,SCHEMATIC 8 PANEL DETAILS
E38 POWER VENTILATION CONTROL-DETAIL F,SCHEMATIC 8 PANEL DETAILS
IC2,SHT 1 GENERAL SITE AREA,I&C EQUIPMENT LAYOUT
IC2,SHT 2 UNDERGROUND YARD PIPING,IBC LAYOUT
IC2,SHT 3 UNDERGROUND YARD PIPING,18C LAYOUT
IC2,SHT 4 AERATION TOWER,I6C EQUIPMENT
IC2,SHT 5 RESIDUALS BLOWDOWN PIT,I&C LAYOUT
IC2,SHT 6 BLEND BASINS,I&C LAYOUT
IC2,SHT 7 SECONDARY RESIDUAL RETURN,18C LAYOUT
IC2,SHT 8 NEW CIEARWELL,I&C LAYOUT
IC2,SHT 9 WELL FIELD ELECTRICAL SITE PLAN
IC2,SHT 10 WELL PUMP,IBC LAYOUT
IC3,SHT 1 FILTER BUILDING,1&C LAYOUT
IC3,SHT 2 FILTERS N0.7-20,18C PLAN VIEW
IC3,SHT 3 FILTERS N0.7-20,I&C ELEVATION VIEW
IC3,SHT 4 FILTER NO.1-6,I&C EQUIPMENT LAYOUT
IC3,SHT 5 SECONDARY SEDIMENTATION BASIN,IBC LAYOUT
IC3,SHT 6 SAMPLE ROOM,18C EQUIPMENT LAYOUT
IC4,SHT 1 CHEMICAL FEED BUILDING,18C EQUIPMENT LAYOUT
IC4,SHT 2 CARBON DIOXIDE FEED
IC4,SHT 3 CATIONIC POLYMER FEED
IC4,SHT 4 FLUOSILICIC ACID FEED
IC4,SHT 5 COAGULANT FEED
IC4,SHT 6 CHLORINE STORAGE AND FEED
IC4,SHT7 EMERGENCYSCRUBBER
IC4,SHT 8 ACTIVATED CARBON
IC4,SHT 9 PHOSPHATE FEED
IC4,SHT 10 FILTER AID FEED
IC4,SHT 17 POTASSIUM PERM.FEED
IC4,SHT 12 AQUA AMMONIA FEED
IC5,SHT 1 HIGH SERVICE PUMP BUILDING
ICS,SHT 2 LIME FEED BUILDING
1:�.94159\10041spec�.SPECDWG.ADD.xIs 2
Cily of Cape Girardeau,Missouri
Cape Rock WfP 6cpansion
Treatment Planl Expansion and Improvements
Construction ConVact CR-2
E�ibit C
Drawing Modication List
Drawings Addendum No.5
Reissue Delete Edit Verbally Add Sketch Drawing Title
ICS,SHT 3 PRIMARY SOLIDS CONTACT BASIN
IC9 CP116
IC10 CP116
IC12 CP116
IC13 CP117
IC14 CP117
IC16 CP117
IC17 CP118
IC18 CP118
IC20 CP118
1C2� CP102&CP108
IC22 CP102 8 CP110
IC23 CP102&CP109
IC24 CP102&CP107
IC25 CP102
IC26 CP102
IC27 CP102
IC28 CP102
IC29 CP102
IC34 CP103
IC35 CP103
IC36 CP103
IC37 CP103
�C� CP103
IC39 CP103
��� CP103
��� CP103
IC42 CP103
IC43 CP703
IC44 CP104
IC45 CP104
IC46 Cp�pq
IC47 CP104
IC48 CP104
IC49 Cp�pq
IC50 CP104
IC51 CP104
IC52 CP721-CP140
IC53 CP121-CP140
IC55 CP121-CP140
IC56 CP105
IC57 CP105
�C58 CP105
IC59 CP105
�C60 CP105
IC61 CP105
IC62 CP105
IC64 CP107
IC65 CP109
IC67 CP301&CP302
IC69 CP101
IC70 CP101
IC74 CP101
IC75 CP101
IC77 CP101
IC86 CP120
IC87 CP120
IC90 CP120
IC91 CP120
IC92 CP120
IC100 PLC NETWORK
IC105 MISC ELECTRICAL CONNECTIONS
1:�94159N 004�spedSPECDWG.ADD.xIs 3
v
City of Cape Girardeau,Missouri
Cape Rock WTP Expansion
Treatment Plant Expansion and Improvements
ConsUudion Contrad CR-2
Exhibit D
Specification Modification List
SPECIFICATIONS Addendum 5
REISSUE DELETE EDIT VERBALLY ADD SPECIFICATION DESCRIPTION
07312 ASPHALT SHINGLES
09900 PROTECTIVE COATINGS
10505 METAL LOCKERS
11210 HORIZONTAL SPLIT CASE CENTRIFUGAL PUMPS
11211 DRY PIT CENTRIFUGAL SLUDGE PUMPS
11220 BLEND/RECARBONATION BASIN EQUIPMENT
11221 FLOCCULATING EQUIPMENT
11225 SOLiDS CONTACT UNIT EQUIPMENT
11226 CIRCULAR FLOCCULATION-SEDIMENTATION EQUIPMENT
11230 AERATION EQUIPMENT
11240 POLYMER FEED SYSTEM
11241 LIME SILOS AND LIME FEED EQUIPMENT
11242 PRESSURE BLOWER PACKAGE
11244 CHEMICAL FEED PUMPS
11246 CARBON FEED SYSTEM
11247 POTASSIUM PERM.FEED SYSTEM
11248 CARBON DIOXIDE STORAGE AND FEED SYSTEM
11260 CHLORINE FEED EQUIPMENT
13200 LIQUID STORAGE TANKS
13205 AMMONIA STORAGE TANKS
13220 FILTER UNDERDRAINS AND WASH WATER TROUGHS
13226 FILTRATION MEDIA
15150 VALVES AND APPURTENANCES
15135 METERS AND GAGES
15440 PLUMBING FIXTURES
15782 PACKAGED ROOFTOP HEAT PUMP UNITS
15835 UNIT HEATERS
15853 POWER VENTILATORS
15854 SPLIT SYSTEM AIR-HANDLiNG UNITS
15985 SEQUENCE OF OPERATION
16111 CONDUIT,FITTINGS,AND ACCESSORIES
16311 4160 VOLT METAL ENCLOSED SWITCHGEAR
16450 GROUNDING
16901 CONTROL PANELS-1&C
16902 MEASURING AND COM'ROLLING INSTRUMENTS AND LOOPS
16910 SEISMIC EVENT SENSOR SYSTEM
16920 COMPUTER SYSTEM GENERAL
16921 OPERATOR WORKSTATIONS
16923 UNINTERRUPTIBLE POWER SYSTEMS
SPECDWG.ADD.xis �
CITY OF CAPE GIRARDEAU
CAPE ROCK WATER TREATMENT PLANT AND ALLUVIAL WELL FIELD
PROJECT
CONSTRUCTION CONTRACT CR-2 RE-BID
EXHIBIT E
Proposed Project Re-Bid Schedule
May 4 Notice-to-Proceed.
May 13 Issue revised Invitation to Bid, revised Instructions to Bidders, and contractor
prequalification packages to Owner for review.
May 20 Receive Owner's review comments on Invitation to Bid, Instructions to Bidders,
and Contractor prequalification packages.
May 27 Advertise for bid,mail out Instructions to Bidders, and Contractor
prequalification packages to prospective bidders.
June 11 Deadline for submission of prequalification packages from prospective bidders.
June 15 Complete redesign work and re-bid documents to issue to Owner for review.
June 16 Engineer reviews Contractor prequalification packages and issues approved
bidders list and prequalification documents to Owner to review.
June 21 Notify prospective bidders by mail of bid qualification status.
June 22 Receive review comments on re-bid documents from Owner.
June 28 Issue re-bid documents to prequalified prospective bidders and current
planholders. Issue re-bid documents to MDNR for approval..
July 21 Bids opened.
July 26 Issue recommendation to award, issue bid documents to MDNR for approval.
August 2 CiTy Council authorizes Award of Construction Contract contingent upon MDNR
approval.
August 25 Receive MDNR approval of bid documents.
August 30 Issue Contract documents to successful bidder, issue Notice-to-Proceed.
1:\94159�I OO I OO�COMRAC7IEXF{IBITE.WPD
0
a n n M r, r, m n r, m
3 N
�
� m � °'
o a o °'
� N � �
� r1 N
Q O
U �n
.i �
�
t
a �
�
Q i' �o
w �
�
,' � o m
+ C N
W �II! "� �
a �
U p
^� ro
— .a
W U
� .i
N �
�
U
� W '-I
W N p
_ a N F N b
m � U q �0
m U
J w � � � �
� O m fa
C l+ Ol U
� N a \ Vl
W �
m W m � N �
C � � ro
> +i U
�d� rl m m o o V� � '�
o W W N ro a r� N W
C �
.�
�
a � N ai U N �
V
-.1 LI lJ N U G/ W bl
a w 7 bi a�i C u -.ui w -.Ci
O W m u ro q -.� -.a ,q ro m
« a w C •�+ bi.0 u N m
m W � q W t+ RC Q U
W L1 L w L � L N ll
W O D U 11 U 11 U U W
fb C1 W O N O N y
o O C o R O E�
� a I � � � a a v�i a v�i a u° 3
fq W o � X £ W W FC Q .0 Ll W
� W W vl W V1 !L U 3 —
a W
F � c
d, c
w I o a�
0
t �y „r d, O
� �
� y
w o E
� �
m
O aD d' rl (V �O C tM N d'
N �-1 .� .�1 m
a "'
x �
w
a
� aor� �noM � vwm0000000o m mrn m nimrc a vaoc� 0000 io 0
+, co v m m � c� ro ao o v� rn vi rn vs w w rm m � n m � n a ro rn rn u� o o w �n � o
w p mv_rnnwmnvc�� nn M N a n o, o .nnvso vi m ,•i
H d1 H M Ni H i9 H
p V fA!9�K� H(9 f9�� w H N fA 19 t9 � N
W
N O M N N N f� h f0 Y t0 OD O O O O O O O N N N lh (O N a0 M
� � N /7 OD 1n � P7 '- �- N 1� l7 � �"! � l� V� V�
L N tD � V)v�vA
� �
L Y! yU N 0 Q .. Ol E d N � Y 1. N y �N
_ �"� N Ol~ Q Q � � � � � N d � C � C.�
0 0 � 3 U m d o'� � d a v
c m R Z 3 > �, m E �a L � m � w W ie
,c o � m ; � � .� rncp � E � � �tfa „� Ur u� 2'i E
° c � °1 � m ?' � :9 � m ° y�'i ° r '' W rn°� y °� � o �-' »
� � � � � � � � � � �in o 3 '> o c� :: d 3 O m Q °' m a o W o c � w
" � � t•i Q �� L � ° � � k' > � 's '•E Z Q a3i > .�g Q E F °� d n LL m m m m
� Y E a "� a�i d m 'cZi a!� v d ' � � � � c�a, u � H o U y � � � Q � � F F
w a � � � � � � � o v d d N N t > � � N � � U Q � �
o e F �n u� in u� �n v� �n '- � a v � L a � � o a E
C C C
� E E E E E E E E � v `o m 0° a Z. �a o o � o
� > > J � 7 7 7 7 !t C � q « C N Ol � U U � U
� U V 'O V V V � W N N Q•-
m m v v v v v a v �� c v` m � � � ; i a°i a�i c
a v v v v v v v v �' Q o v > o �' d P d a a o
ti < ¢ ¢ Q ¢ ¢ ¢ ¢ a � c> ¢ w Uaoa � rn�nU
ei m �` • • � � � �
oc� cr a oci
Z �'j A � E 'y N m c in �n n m m � ,'�-� .N-� .�-'
C � ~ � Z
O p^ G V1
� a` rc
�
N
V
V
Q
NO.2:COMPENSATION HEDULE
CIieM Nama:Capewah
Projeet TMa:Natural Gas
Diaeipli're and Billing Lavel
Task EsHmated Meeh Eleet CADD WP
orDrawinp TaskDeseriptbn Mhrs Cost a�c Ra Ss rs Ss Ps
Number
PIPING DESIGN
Underground from meter to buildings
-size main lines 10 =829 z 8
-routepiqngonUlqB,C,D,E 18 51,179 6 iz
Size 3 bwte regulator at each building 3 spp7 3
Size pipe from regulator lo users,route
gas 6 vent piping
-Add M3D,Chemical Feed Bldg. 26 57,797 2 8 i6
-M2,edit notes 2 5151 2
-M10,verify heatere fit in chior.Stor. 2 E151 2
-M77A,HSPbldg 5 5348 3 z
-M12A,Ume Feed Bidg. 5 f3qg 3 2
-M13,New Filler Bldg. 5 E348 3 z
-M16,Chlorine Bldg.Renovation 4 E272 2 z
-Add M17F,Existing Filter Bldg. 6 y408 3 3
Specifications
-Piping,spec 15496 5 E341 a i
-Isolation whres,spee 15496 2 5175 1 1
-Regulators,apee 75496 4 5266 3 1
Drawing details
-Add M22C,gas unit heater details, 16 51,028 a i2
gas�rdter eooler detail
UNIT HEATERS
Resize.pick new models(27 totaq 30 =2,376 3 n �
ReissueM20-sehedule 20 51,330 a 1z
Rewrite spec 15835-Unil Healers 72 5760 8
4
AHU-1&AHU-&
Resize,pick new modeis 4 5376 2 2
Update achedule-M21 2 5136 1 1
Rewrite spec 15854 6 15932 5 5342 1 2 z
Water Healers(WH-1,VYH-2)
Resize,pick�ewmodels 2 5151 2
Update achedule M21 2 5136 1 1
Rewrile spee 15461 5 E232 1 4
Dwg.E4
Rewlwlate switchboard bus size � 3 520C y z
Recalwlate substation xfrnr size 2 5143 1 1
Dwg.E8
Change home run designaGons 4 5286 2 2
� Rewlculate voNage drop 2 5165 p
Consolidatdroduce number of arcuiLs 1 t83 1
Dwg.E12 �
Change Aome run designafions 3 5204 i z
Recalculata voNage drop 1 S83 i
coosa�a.wree����mno�apran� 7 S83 i
Dwg.Ei6
Change roWng of conduk and drarit inPo. 2 51�3 i i
W+g.E21
Change home run designations 2 5143 i i
Recalculate voHage drop 1 583 i
Consolidalelreduce number of dreuils 1 =41 1
Dwg.E25
_Change routing ot eoeduit and circuk iok. 7 S72 1 1
Dwg E32
Coordinale unit healer shuldown circuits 6 t421 q 2
91159100100/work/maWNatgas.xls Page 1 ot 2 04l27/1999
NO.2:COMPENSATION S HEDULE
CI(ent Name:Capewatr
Projee!Tkle:Natunl Gas
Discipline and Billing Level
Task Estirtuled Meeh Ekct CADD WP
or Drawing Task DesCription ' Mhrs Cost PFsc ant SE PE Sfi p6
Number
Dwg.E39A
Changa home run designations 2 5143 1 1
Recalwlate voltage drop 7 E83 1
Consolidale/reduce number of circuits 1 sg3 1
Dwg.E40
Modify panel schedule 2 E143 1 1
Recalculale panel loading 1 yg3 1
Dwg.E41
Modiry panel schedule 2 E143 y 1
Recaiculate panel toading 1 S83 1
Dwg.E42
Modiy panel schedule 2 E743 1 1
Recalculale panel loading 1 §g3 1
Specificalions 8 y670 2 5 i
Coordination Sludy 18 E7,485 lg
Coordination with UE 8 E604 g
AdministratioNProjed Man. 4 5358 q
Total Man+lours: 275 o a 10 115 z so 80 o i4
Labor Cosl: 579,895
�uali(y Controi:
Q1- Concept Phase Review 1 y11g
Q2- PreliminaryPhaseRaview 1 fttg
Q3_ Designen Review of Design Noles,Drewings and
Spedfications 4 5474
Review of Design Notes,Drawings d Specifications by
�4 ProjectReviewTeam 76 51,896
QS- Specificafions Review 3 5356
Q6- ConsVuctability Review 1 5119
Total Ouality Control: 26 f3,081
Exxnses•
Rate
Com rTime CADD: 57 5560
Com erTime 5a t42
Com erTime E 'neerin : Sa 5708
Milea d Per Diem:
Re d Photoco : ;75
Tele one 6 Lon Dist.: 550
Air Fare 6 Car Rental:
Geotechnical ro rt:
Surve:
Miseellaneous nses:
539
Tofal Direcl Expenses: 51,474
Tohl Esdmatad Cost: {24,150
94159700100Mrork/mech/Natgasxls Page 2 of 2 04/27Hggg
. ',, +,�
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AUTHORIZATION NO. 11 — POTABLE WATER STORAGE TANKS
SEISMIC PROTECTION IMPROVEMENTS
For
PROFESSIONAL ENGINEERING SERVICES
To
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT for PROFESSIONAL ENGINEERING SERVICES
dated March 21, 1994, between the City of Cape Girardeau, Missouri, (hereinafter
called OWNER), and Burns & McDonnell Engineering Company, Inc. (hereinafter called
ENGINEER), OWNER hereby authorizes ENGINEER to proceed with the following
services:
I. SCOPE
This Authorization No. 11 covers services involved in design/bid phase and construction
phase seismic protection improvements to the Cape Rock Plant, Ramsey Branch Plant,
and Gordenville Tank.
A detailed description of the scope of services anticipated to be completed by
ENGINEER and major assumptions upon which ENGINEER will rely in providing these
services are presented in "Exhibits A and B".
II. SCHEDULE
ENGINEER will proceed with providing the services set forth herein immediately upon
verbal notice to proceed from OWNER, and will complete the design work defined
herein within two (2) weeks to allow submission to grant authority for review.
It is understood that adherence to this schedule is contingent on the timely receipt from
the CLIENT of information needed by the ENGINEER to carry out this assignment, and
the prompt review and return of all documents by OWNER of submittals from
ENGINEER for comment and approval, as well as any delays created by events beyond
the control of the ENGINEER (such as adverse weather conditions, regulatory agency
actions, force majeure events, etc.)
M:\MK\CAPEGIR\distsys\11CONT.doc Page 1 of 2
. �. . ��
III. COMPENSATION
OWNER shall compensate ENGINEER for providing the services set forth herein in
accordance with the terms of the existing Agreement, based on a maximum fee with a
not-to-exceed cost basis. The ENGINEER proposes to complete the required design
bid phase, and construction phase services for this project for a cost-not-to-exceed
Twenty-Four-Thousand-Three-Hundred-Dollars ($24,300). A breakdown of this
amount, provided as background information onlv to furnish a frame of reference for the
proposed maximum fee, is enclosed as Exhibit Nos. 1 and 2 — Compensation
Schedules for Design Phase, Bid Phase, and Construction Phase, respectively.
s.l,..�. _
�AUTHORIZATI BY:
CITY OF Cf, _ GIRARDEAU, MISSOURI :-^�
� �j / r ��
�' ' Attest: - ,
te: L��� � � �� �� �� , ,
� � - .,�
ACCEPT .
BURNS DO NE L E GINEERING COMPANY, INC.
By: '
Dr. Robe T. Berry, P. .
Vice President
M:\MK\CAPEGIR\distsys\11CONT.doc Page 2 of 2
. 7�
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER STORAGE TANKS
SEISMIC PROTECTION IMPROVEMENTS
EXHIBIT A
LIST OF ANTICIPATED MAJOR WORK TASKS
Following is a listing of the major work tasks anticipated to be completed for this project.
DESIGN / BID PHASE SERVICES
1. Review previous bid document package. (Previous package includes all seismic
protection improvements previously proposed for construction.)
2. Recompile and update plans and specifications. Work defined for Cape Rock,
Ramsey Branch, and Gordenville Tank (largest tank of the two) will be
recompiled for bidding under this project.
3. Update front-end documents to include Year 2000 compliance requirements and
prevailing wage requirements.
4. Submit documents to City for review.
5. Revise documents to reflect review comments.
6. Assist with bid advertisement.
7. Coordinate reproduction of bid sets.
8. Answer bidders questions.
9. Evaluate bids and prepare recommendations.
10. Submit documents to City to award.
M:\MK\CAPEGIR\distsys\16EXHIBA.DOC Page 1 of 2
• f• . .
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER STORAGE TANKS
SEISMIC PROTECTION IMPROVEMENTS
EXHIBIT A
LIST OF ANTICIPATED MAJOR WORK TASKS continued
CONSTRUCTION PHASE SERVICES
1. Distribute Contract Documents and issue Notice-to-Proceed.
2. Review Submittals.
3. Coordinate correspondence will Contractor and Owner.
4. Periodic site visits during Construction (2-3 visits maximum).
5. Allen Bradley programming modifications (3 PLCs) and WonderWare
Programming Services, including start-up services by Burns & McDonnell or
Subconsultant.
6. Complete Conforming-to-Construction record drawings.
7. Complete Contract closeout documents.
M:\MK\CAPEGIR\distsys\16EXHIBA.DOC Page 2 of 2
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER STORAGE TANKS
SEISMIC PROTECTION IMPROVEMENTS
EXHIBIT B
LIST OF MAJOR ASSUMPTIONS
It is ENGINEER's understanding that the OWNER will provide the following assistance,
information, and/or related work elements:
A. Assistance by placing at ENGINEER'S disposal all available current
information pertinent to this assignment, including previous plans,
specifications, reports, permits, easement documentation, and other data.
B. Liaison with other City of Cape Girardeau Departments and governing
officials involved in the project.
C. Available data on construction costs for similar and/or related work
recently completed by the City of Cape Girardeau.
D. Reasonable access to other data and records related to this assignment
that ENGINEER may determine need for.
E. OWNER will provide resident construction representative.
F. Programming Services are based on the following:
1. No new WonderWare screens will be made. New tags will be
added to the existing screens.
2. Each location has an existing PLC and radio in place and in
service.
3. All new I/O signals can be added to each existing system with no
major changes to the current radio system.
4. Programming and start-up services are based on three trips to
Cape Girardeau.
G. Bid documents are sold through ENGINEER's office. Plans and Project
Manuals will be sold at a cost to recover printing charges.
ENGINEER shall rely on information, drawings, etc. made available by OWNER as
accurate, based only on verification of certain key parameters (if necessary).
Page 1 of 1
M:\M K\CAPEGI R\distsys\16EXH I BB.DOC
, �.'
a y� m c� r, in m r� N
. 3 �s�, �
m� �
0
o '°
O �'
Q o
U � � �
�
r
u �
d
�
� '! o
a ;,
L
u
..�
a W, o
�
C
p7 ' o ro
E °' � u
r c
U �y o �
� u
v
F �
S� .ti
j w� � V N 4
y a v C .9
J _ � 01 i
j p
.1 :1
c U � � v �
= m... o °' p :�
m �.a ' N �
9 a� ..
c aP! �
�a W�,- o �+ N
m .. a ,� "
� . ' � N
> �� v v
'a c �,� c
•� w W, � v ., u
N VI �. C' �D e-I m N N � YI L V l,
S1 N 71 U Ul N Q�
� 7 t71 N C L u u .a
�"`.�� U ia C �ti +i t �0 m
41'/t: � N C �.i bl.0 U S� vl
a� r X m O� C u s� � v
y W � fsCl W Q � 11 O
W y� u a� a+ u a� t,
�,' p m N O U V 41 U 11 V U O�
��� ry 7/ N O W O v O.'O
O O C O C O E �+
� N 41 N 41 N S� O O
�..' 0 O� 0. U1 W N W U 3
� a� � � � � � � � ,
�
w�§ � % � w w a a r ❑ a
tq � o mo� �nafna uqa
m a v
E V
c W q � N
C
F' u a o
N N N;. �
> � �� � �
C �
o E
� � �
'U� a� .i ,-� io n, c� ,.�°, m
' �
C
� X�' o
a a�i
t
u
` 'O c'I � N O �D m O I� O n O O O O O O O ch N u'Y O O O � < O
y �1� cp I� I� Of � 1� M N Vi O fA!A(A W 69 1A N M O c] O O O N m O
m � N 7 V (�l Q N Y LL� t0 N � N N V f9 � l7
T 1A Nj w V!Vi w vi N Vi op w K Hi Ni Vi� ' a�
y E V w w w in w
N N
q W
� �no � rmmco �o � r� o �n o00000 0
N I� P ?
C L � � � N N 4T
N t !0
a � �
Y
O ..
L� N O .. .. .. G in O m N �
m O U C Q �'C � � � y y Z C C U
a
q O N V U N d � � C� N � z N
U A N N � d � O�a a J U � LLI W N
'3 f � c � �m E c °ts aS r H u E
C m W y M a7 � � N '
d .�. � V � ~ Ol O � N 7l O N
E ° � C7 � ad '° no d o w
A o c
o ~ � p, `� a, o f" � � o'�' � � o '�
`a n a F' o V y y a � ~ F
E v� H U a � �
c c � o
O C N y m �
N
V
d � n a�i E �p �'c`7
o a -
w E � 3 a
u a�i m � v° c � �
� N 3 V � O N N
— y Y N N N 'n E l0 N O�
o �ai m a a��i a�i O u m Z 3
N F- �p
y C � U O V O � O �Q
� A N L L'G N J � � N N y�
�~ E � V da c nU 3 "> p a"i 3 x
d rn u � o o a '^ c n° i � `o ° a3i > �
1�0 � N � C C N C N C C • � N � C d � E
� y O G d U1 G) �p N f0 01 N L 'j .OI Q' � N
C� � ' E E 'v C 'Q N E ,� a d d '^ °'
m � o a�i c c� c�i � � v � c'.i L � 0 o a tn
a m cr m o o u � � o a �' � � m
'� � Z a d � � u�i � � � d � n c d ° � � rn
U y m ;= y � o y a A . � c 3 �c 2 d
`o a N y a'E H y ; c � E u E rn m � y a
m '> E a > > n m � m n c -y > d c �
d o � a� v d � o- > > o v a� n o
Ua° L �c� �n � ¢ � ¢ Ow <n c� ao � v� c� E
m � a
E
E « 9 = ;, ooaoaa
m f- m -'� 3 a a
2 c q �v E .y rv n c u� �n r m m
c a�i o� � p` �
�o Z
°1 m `o
U d �
� .'
. ' • •
3 a N N r+ �
rn
�
�
o N
� �
�
Q
V m m
L p
U
m
F
�-... �
d
L
U
< n, a
�
c
a � "'
E �
m ''
L
� W a �
� v .�
N �o
y +� U1 N
> � o U G �o
J = d � �y
� � O N 4
� V o a A a�i
= W � v�
m � � s+ �
'o .�+ m
c a �
m w a ,� .
m � a a� w
c � 0 �
a W o w u � u
N fWl1 N nl V' � C' rl L C/ 71 71 41 L Y C
� 7 01 v C a� -.i W �.1
U �O C �.a �.a .0 �0 m
W �.. � X N b� G u Fui nH v
a
� W � w W Q a w o
m
W � m V V 1-I U 11 U L G�
�n m p � a .Ni m L v o W O N a'O
0 o c O c o E u
�,. o
a a N a v�i d u i
ua � � � � � � � �
:
� x E w w �¢ �C t o a
W - O a d N W N d � Ll 3
N V
F
Y W � 7)
c t o. �
f' y �
m � W � �
j N
N
o E
v
� a... .i N a m c� .� .+ °� _
.� m
C K.. �
N
a a
L
10 O O O O O O O <O N O O O O 1� O O
� � fD t0 � N � � � O W V!ff! N N V! N W W m m � N N u� O
N �� N � ���
m A N � � �{ W N N �fl
�. � V M{9 W V!N H ~ N
m y
E W
q o 0 0 0 0 0 0
� �n � � � vu�iN � � d r a v
� W N N Vf
C L �
N �
a
� 7 0 � o Q .. � � a y � o � y c a
m o V � a Q �'m � 2S � aci � � d � U
� c a m V U E � °� ° �d � '� � X �y �
u � J �� �' E � �� a � � •� � � �
� s 10 i- � w d ,� ae ,a � � �
a`� o ° a d 'a °' m a`o m c � w
� � �' E d '3 5
m � �� � �aoF= � n LLC'�) � a
'o � v Qp � a �.�. E U y � 361i a � t' �
E � � c n � U � F- �
v y � �
c a � t9 c Q
0 0 0 10 a c W U
.� a � � � o � 3
a U � �
a � z � � ° '3" �n
°' °' � �E � ee
J � ai Va� o a ui m
'C .M N !? 2'J' U p��'j N � �
O m � c 3 � E 3 � 2 3
y 10 c�' � E co a�i c �a
� 1O C N � � V E � N � N
F
� m E o c n� � a;i asi � °� 3 d Ci
m � � a v m c� �a�i m ° Z s a�i E
E � � y � i � � O . 2' N d W N d' 41
� m y ; E 2 S � o o m a � y c � �
� a o � � � c� a t'� � � �R 'o�
6 R Z � N � 'N y N R � O ry N
U3 (n � ; � � � d d n� c � � � a
m m a mL $ °tf nn $ � a O w `�
`o a m S �s c c> E E � '� d � �
L.3 L y a� g d � o o � d d d n o E
c� a° a o � c� aac� c� c� ao � cnc�
mo o � , . . � . E
u Y
� O d a � d d
Z ~ � � Q; .+ cv ri a �n �v r
C � c � Z
� � O O
U G. U
1 c
CITY OF CAPE GIRARDEAU, MISSOURI
POTABLE WATER TREATMENT AND DISTRIBUTION SYSTEM
AUTHORIZATION NO. 13 — ENGINEERING SERVICES FOR WATER MAIN
IMPROVEMENTS
For
PROFESSIONAL ENGINEERING SERVICES
To
BURNS & McDONNELL ENGINEERING COMPANY, INC.
St. Louis, Missouri
In accordance with the AGREEMENT for PROFESSIONAL ENGINEERING SERVICES
dated March 21, 1994, between the City of Cape Girardeau, Missouri, (hereinafter
called OWNER), and Burns & McDonnell Engineering Company, Inc. (hereinafter called
ENGINEER), OWNER hereby authorizes ENGINEER to proceed with the following
services:
I. SCOPE
This Authorization No. 13 covers services involved in design, pre-construction, bid, and
construction phases as well as program management services for the below listed SRF
water line improvements:
■ Lexington / Melody Lane Water Extension — North Sprigg Water Extension
(Exhibit A)
■ Mt. Auburn Corridor Water Distribution Main (Exhibit B)
■ Meadowbrook Storage / Perryville Road Transmission — Lexington Road Extension
(Exhibit C)
■ 16-Inch Main Project (Bertling Ave.) (Exhibit D)
■ 20-Inch Main Project (Cape Rock Drive) (Exhibit E)
A detailed description of the scope of services anticipated to be completed by
ENGINEER and major assumptions upon which ENGINEER will rely in providing these
services are presented in the above referenced Exhibits.
I1. SCHEDULE
ENGINEER will proceed with providing the services set forth herein immediately upon
verbal notice to proceed from OWNER, and will complete the design and program
management work defined herein following receipt of notice to proceed from OWNER.
Page 1 of 3
C:\My Dowments\environ-sa�itarylcape\CAPECONT-rev.doc
� �
It is understood that adherence to the schedule is contingent on the timely receipt from
the CLIENT of information needed by the ENGINEER to carry out this assignment, and
the prompt review and return of all documents by OWNER of submittals from
ENGINEER for comment and approval, as well as any delays created by events beyond
the control of the ENGINEER (such as adverse weather conditions, regulatory agency
actions, force majeure events, etc.) The ENGINEER will complete Pre Construction
Phase and Design services within 180 days of the Notice to Proceed. Bid Phase
services will be completed within 120 days of advertisement for bids. Construction
phase services will be complete within 365 days of Notice of Award to contractor.
III. COMPENSATION
OWNER shall compensate ENGINEER for providing the services set forth herein in
accordance with the terms of the existing Agreement, based on a maximum fee with a
not-to-exceed cost basis. Total payment for the scope of services described in this
Authorization No. 13 shall not exceed the maximum amount Three Hundred Thirty Nine
Thousand Dollars ($339,000). The breakdown by project is as follows:
■ 2-36/2-37: Lexington / Melody Lane Water Extension —
North Sprigg Water Extension (Exhibit A) $ 46,600
■ 2-47: Mt. Auburn Corridor Water Distribution Main (Exhibit B) $ 40,300
■ 2-48: Meadowbrook Storage / Perryville Road Transmission —
Lexington Road Extension (Exhibit C) $ 40,300
■ 16-Inch Main Project (Bertling Ave.) (Exhibit D) $100,400
■ 20-Inch Main Project (Cape Rock Drive) (Exhibit E) - 95 200
TOTAL $ 322,800
A breakdown of these, provided as background information onlv to furnish a frame of
reference for the proposed maximum fee, is enclosed in the attached Exhibits —
Compensation Schedules for Pre-Construction Phase, Design Phase, Bid Phase,
Construction Phase, and Program Management.
Page 2 of 3
C:Uvly Documents\environ-sanitary\capelCAPECONT-rev.doc
� t
AUTHO TION BY:
CITY OF P€ GIRARDEAU, MISSOURI
_._..
_.__...__. B .
�� Atte t:
�
Date: �-��-�D
ACCEPTED B :
BURNS & Mc O N L EERING COMPANY, INC.
By: �
Dr. Robert T. Berry, P.E.
Vice President
Page 3 of 3
C:Vv1y Documentslenviron-sanitary4cape\CAPECONT-rev.doc
l j
CITY OF CAPE GIRARDEAU, MISSOURI
Design of Water Main Improvements
Lexington / Melody Lane Water Extension
and North Sprigg Water Extension
EXHIBIT A
LIST OF ANTICIPATED MAJOR WORK TASKS
Following is a listing of the major work tasks anticipated to be completed for this project.
Development of the pipe alignment will be based on offsets from existing utilities and
topographical features.
PRE-CONSTRUCTION PHASE SERVICES
■ Hold kick-off meeting with appropriate OWNER staff. Purpose of the meeting will be
to confirm the project limits and objectives, verify design schedule, and obtain other
pertinent guidance regarding project from OWNER staff. Project includes
installation of approximately 4000' of 12" main along Lexington, between Big Bend
and Old Sprigg St. as well as approximately 1400' of 12" main along North Sprigg to
Lexington.
■ Conduct a site visit to view general area of construction and confirm design plans.
■ Prepare technical specifications using the City's standard specification for water
main replacement and extension, including but not limited to pipe, valves, hydrants,
excavation, pavement restoration, and other surFace restoration.
■ Prepare bidding documents, construction documents, and schedule of quantities for
bid package. Contract documents shall be City of Cape Girardeau standard
documents modified to incorporate necessary language for participation in the State
Revolving Fund (SRF) load program.
■ Assist OWNER in obtaining easements.
■ Assist OWNER in obtaining necessary construction permits.
■ Assist OWNER in presenting improvements to City Council and public.
Page 1 of 3
C:\My Documents\environ-sanitary\cape\amendl3-mains\exhibitA.doc
\ j
CITY OF CAPE GIRARDEAU, MISSOURI
Design Water Main Improvements
Lexington / Melody Lane Water Extension
and North Sprigg Water Extension
EXHIBIT A
LI_ST OF ANTICIPATED MAJOR WORK TASKS, continued
BID PHASE SERVICES
■ Maintain bidder's list / issue bid documents.
■ Address questions submitted by bidders.
■ Issue necessary addenda.
■ Develop opinion of construction cost.
■ Evaluate bids received
■ Coordinate bid approval with MDNR.
CONSTRUCTION PHASE SERVICES
■ Assist OWNER in conducting pre-construction conference with successful bidder.
■ Approve Contractor requests to OWNER for payment for construction work
successfully completed.
■ Review compliance submittals (shop drawings) submitted by Contractor, for
conformance with plans and specifications.
■ Provide interpretations of design intent for Contractor when field questions arise
during construction; and prepare Change Orders (or review Change Requests by
contractor), if any.
■ Attend monthly contractor meetings.
■ Prepare record (as-built) drawings from mark-ups provided by Contractor, following
completion of construction.
■ Assist OWNER with close-out of construction contract.
Page 2 of 3
C:\My Documents\environ-sanitary\cape\amendl3-mainslexhibitA.doc
, ,
CITY OF CAPE GIRARDEAU, MISSOURI
Design of Water Main Improvements
Lexington / Melody Lane Water Extension ,
and North Sprigg Water Extension
EXHIBIT A
LIST OF MAJOR ASSUMPTIONS
It is ENGINEER'S understanding that the OWNER will provide the following assistance,
information, and/or related work elements:
A. Assistance by placing at ENGINEER'S disposal all available current
information pertinent to this assignment, including previous plans,
specifications, reports, permits, easement documentation, and other data.
B. Liaison with other City of Cape Girardeau Departments and governing
officials involved in the project.
C. Available as-built drawings, specifications, design notes, etc. defining the
configuration of the existing water distribution system layout for the City of
Cape Girardeau service area.
D. Available data on construction costs for similar and/or related work
recently completed by the City of Cape Girardeau.
E. Reasonable access to other data and records related to this assignment
that ENGINEER may determine need for.
F. OWNER staff will negotiate and procure all necessary easements for
construction of project.
G. OWNER will provide resident construction representative.
H. Bid documents are sold through ENGINEER's office. Plans and Project
Manuals will be sold at a cost to recover printing charges.
I. No allowance is included for rock probing pipe alignment.
ENGINEER shall rely on information, drawings, etc. made available by OWNER as
accurate, based only on verification of certain key parameters (if necessary).
By: Burns & McDonnell
Page 3 of 3
C:\My Documents\environ-sanitary\cape\amendl3-mains\exhibitA.doc
. s
.:IQ; N aD a0 7 N �
�� N
> ��
(D
� � m
C
� � � N
� N
0 � N
� N � �
Q �' N C � N
`y N ' U
j �'� N .0 �:� .
� ;Ol��.: aD aD c0 CO CO a0 C �W � �
� � y c W � � U
M C L11 > N W � � � C
N � � � j m� f0 O � rn
co m � � y c c � ap` ai
!+f j �� x c0 N U
N c � er ao ao ao � v oo ao ao w � E m o
LL ia W e+: � c� °o c W W � a`
� � °° m ac�i o <n d n-o
tA c � o o c o 0
� - a` d w U �
p •v �� � � � � �
y C! �O � N a0 c0 c0 a0 �t a0 X Q d>
m � ~�: � W a C � >
x � �a W U
W � ��
�.
m �
.c '� �
y �
L w ��
r a �
z° �
v
c �o ococovocomooco ao 000000 0 oroo �no c� o
R Gl cD � m N CO N f0 00 O 7 O O O O O O O M (O O � c'�7 O N O
C 16 CO fD � N � N ? � � � h � tD b9 ('7 �t N fA N N �f
O p � C1 7 N tA ' � b4 69 tH tA fA tH VJ tA fR EH fR �
•y � U fR fH b9 64 EA b9 t+4 fA r E9 N
� �y H W
w W
X
W 01 � N (O a0 (O f0 a0 V' a0 (O •- � r- �- �- � t0 O O
� ` r N r � � '- N .- C7 y u7 u�
m N I` C,j
� � � Vi d9
m
C
�
-� '"' 7 O c� � � � E a N N y O
� � o U o � � � 0 � � � y V
o E � `o n- U �? c a� o c a x m
� � o `° � a � a� �ydL J �i W ia
� � U � J y i0 F C � �S °� j N �
« N � N ..�+ � O � Of p� p G7 O `' N
� � y �' ` F- � i4 � 4: W N �. O C � 1W�0
C N � � N U � 7 — N L f0 iO
X y � t � C V p � � � � y U � Q
J C y � � Z 3 y H o E y N �"'
Q �, p o � � � �y � V F- F- �
W ° �Q, Y a 3 T y � ,� �
U N N
.� N Y � � U N y � d
N m � a m� v� o " Q Z m U
� m a d 3 V N V N C 3 ��
7 N F� V � aS � �= ..�'. U 'w,�- � m V1
m t c � rn o o_V �' a � � � � 0 3 .�
aa o io c �o m � � p 'a '> � `oZ a� >
� � � � c a�i �
� n
` o � d � ,y c � 3 •m � J � � rn� H
� V m � � '> ?� •C 3 U � . y L > N y .� X
Oi 3 O� N y C t •> 'j .N � fC a. 2 � C a
� N n > � H r`-. 4: � O. C n. a r y � � �.0 �
d 'G N
U C N � U d d U y w N d CC d � V ` O
O U fC0 L d � � � � N E � V C m d 'U N N
U �+' m 01«. > C � � C > � y C � N > 41 C y
N y O O N 7 O d N C O
r V n. Q (� � U n. a c� � cn a U � � � C/) U N
U
Q aj Qj ` � N M � h c0 �Of
� .�+ Y d � � Q � � � n
l0 F- �
m Z `+ R � r N (") a �['1 CD I� 00 W � U
� � H 3 Y
x m �o Z �
U C`. E
� .
� � �
N �
G��;' N
3 ,,�; �
� ��
�
��,
o �`' � � � �
o �, o �,
a � � � �
m U � � �rn'c� �
m � � � rn�j � a�
� � �W � � rn
c W \� > y W � ,� � �
_ a � ? �m � a m .
f9 y
m � •� d C C � a y
W N � � � U
C C r^. N a0 e0 a0 '�t W � E W w al O
R W t''- � � � U U O (n a 7 �
m W::.��1" � d d .j �'C
c � a` aw c� �
� , � , � �
^� �- c� v � m vv N w � .� p� a>
M � � a w U >
N 6. ,
�o
M
N �
{y 1[,, O
� X ._,
y a r
c �0
N
� 'C O N (D �0 c0 N � a O O O O O O O O � O O � fD c0 O
� m I� O � (O � (O M Of 64 69 69 69 EA E,9 fA c'7 � u) 1n M � O O
W R y �' 7 O � � O � 1` 5ff ER� �ER � � T
� is� Fss<a ia is► w iss w
w � U
m N
' W
a
_ � � � � � T � o 0 0 0 0 0 0 0 � � �
� � r ri
o r m »s4
Z � 2
B
C
R .. .
O 7 O � � � a � n N � u�i O
y � V y � � � p � � c y V
�y c o c � U �? c `m o c a X m
W � J .@ U � a� `y a L � W W is
� o �a � � °� a ot5 N U E
m lC � � � ~ � p) O d O � N
j � d T � � C � d O C � W
0 ~ (n y «R+ Q N � � p.� +� w
C � o F E E °' U f-- �
J R '— U F F N
T C N U � �
p O N C'�j 7
� Q G
V � � y `3�° � o
U
C m U :O N N R' ��S
_ � O � a � c�i Z a� o�
O � �t >+ N 0 O C
H � m � a o � Z 3
N /p � w •-
Cf F N d C V t C �
� J 3 � � � � 3 '�'�
�
Cf � N 7 � O � � N N n � N
>
'O � y N 'y U j p 'j � p Z N 'j
n a�
� V N C G O U d . Q.' N 3 C N � N
� m N � N C O � � y L > 'N � T X
mV� � a� � .,. C `� a Ld �' � cn �
c �
R m � � a� m 'o a a� a, � y � m .
. U l6 C y 'O N n 07 C d C `y � V ` O
'� L '�p N N . O c0 d C 3 w �
0 Q. C � N � N ? � V � of C7 V y y
.��. 9 ' � � 07 > fC O C —y �N �> d � y
U m � Q `� O 0 11J U C� d � R' tn U N
'o
01 m e- N M � �q tD 'p�
� CIC7CSQC7CS N
� � F Y � Q
Z R � � N f`9 �' � f0 1� �
V H 3 Y
m O Z �
U a E
, ,
.tQ�.: � N � O N �
{�",..���� N N
> �` �
������. C t9
I� t0 7 � N
N
� � N � � N
� �"' N 0 (/)
Q�������. N C � (9
m � .a � C � � 'U
J ������ � � � �W � V
� � W W � � rn
c Wa; .7 � � � .o � c
^ N
m L ., y C C (n a' N
j 1�� x c0 N � U
C W e*; � ao N ao � W � � W W � O
,o !c= � c� U U o cn a � a`
r m W°'� � N N � d"�
t7 �,.. . . > �
N � aa. W U �
� � � � � � �
�y 6.1 :'.��.t
LL � � NNaocovNv o W a .0 Q �
�
N d y � a W U
c
0
N � N
C �`
" W�
x
w a`_:
�
�
� � W N N � O � O O O O O O O O O O O � � 6) O
�' C� N 1� � � c`1 r b Hi EA ER fH fA ti9 W O �['J O O M c0 � O
N O � c'7 O a0 � � P C') � N V' b9 .- N O
L E � N N N K) ' 'fH � fH 64 EA fR 69 ' t�
� b9 6A fH EA EA tH � N9 r
p i. V f/! N
Z N
�
W
� O o O o O o 0
� N CD I� c+0 O O � �O O O
C ` N N N cD c'7 c7 O � u) �
O L N � i� M
N � � U3 E9
C
m
X
� N 7 O N « 0 d � �. N N y O
� � o U �> c � � � O c � U
g S � ,� � o U m� o � � m
� � � o c U � c � o c �- x m
� v � J ia °' =' E � asaJ v, U �
� a A wa � ~ � o,o a� 'o � in
� rn � � a�i �. � a`� � `° n o c � W
p m � � na � � W°� m t m m R
m -' r H � � p a a� � � y y o p
� ul N � U j C O ~ � � y N ~ F-
c o � oY m � V1= F—
� _ — — � N U �
W O O Gr�i j N G�i � Y C1!C �
a� � y �, `o � E o a�i
c a � c, V1 V � o 3 @ n �
U X '� C C C � C U � � O
O •
J N d � C N � fNC � c+� V
� ` � U y V O U t
� O Q ` � ` V n O Q Vl Vl
..�.. �
0 "' Y C N N y U C p C
y m a�i � � �6 ° 2 3
l7 � V C O O y � U C R
� � ~ � �pf V 'O C i 01�
� C �`p C (0 N y � �y
G
my vW � N °' 0 3 > p a= 3 .3
m m C O � 01�N, C U � N � N
'� y y V j C C 3 N �> Q' O Z N >
(O N N
� � � 3 C N Q'
� L � N N E � R � N N N
� a C O � � � � � t�i1 L > �N � T x
ar o mU c aa `o E coa � 0 c � ci
U �:.. � �'>,L � y a � N � �o g
. U V N � N O f0 U N
� „ « � � U 3 d d 'c y� c 3w � �
Q o y a � y a� n Q._ � E a a� � y �n
� o � � N a�i � � � o � a`"i a�i c. o ..HT,
c� c� a ¢ a � aa ¢ c� ao � <nc� ti
�
Of QI , N M � � tD �
� CTQCJCJCJ N
� i= y a o.
Z R E � N C7 � �A 1� 00 �
U
V H 7 .iC
C m Z E
m o
t� a` E
. ,
CITY OF CAPE GIRARDEAU, MISSOURI
Design Water Main Improvements
Mt. Auburn Corridor Water Distribution Main
EXHIBIT B
LIST OF ANTICIPATED MAJOR WORK TASKS
Following is a listing of the major work tasks anticipated to be completed for this project.
Development of the pipe alignment will be based on offsets from existing utilities and
topographical features.
PRE-CONSTRUCTION PHASE SERVICES
■ Hold kick-off meeting with appropriate OWNER staff. Purpose of the meeting will be
to confirm the project limits and objectives, verify design schedule, and obtain other
pertinent guidance regarding project from OWNER staff. Project includes
installation of approximately 1500' of 8" main westward from the intersection of Mt.
Auburn and Wisteria, then south to the intersection of Julie Dr. and Farrar Dr. and
approximately 5100' of 12" main from West Park Mall, westward along William St. to
Mt. Auburn, then north along Mt. Auburn to Wisteria.
■ Conduct a site visit to view general area of construction and confirm design plans.
■ Prepare technical specifications using the City's standard specification for water
main replacement and extension, including but not limited to pipe, valves, hydrants,
excavation, pavement restoration, and other surface restoration.
■ Prepare bidding documents, construction documents, and schedule of quantities for
bid package. Contract documents shall be City of Cape Girardeau standard
documents modified to incorporate necessary language for participation in the State
Revolving Fund (SRF) load program.
■ Assist OWNER in obtaining easements.
■ Assist OWNER in obtaining necessary construction permits.
• Assist OWNER in presenting improvements to City Council and public.
Page 1 of 3
C:UVty Documents\environ-sanitary\cape\amendl3-mains\exhibitB.doc
CITY OF CAPE GIRARDEAU, MISSOURI
Design Water Main Improvements
Mt. Auburn Corridor Water Distribution Main
EXHIBIT B
LIST OF ANTICIPATED MAJOR WORK TASKS (continued�
BID PHASE SERVICES
■ Maintain bidder's list / issue bid documents.
■ Address questions submitted by bidders.
■ Issue necessary addenda.
■ Develop opinion of construction cost.
■ Evaluate bids received
■ Coordinate bid approval with MDNR.
CONSTRUCTION PHASE SERVICES
■ Assist OWNER in conducting pre-construction conference with successful bidder.
■ Approve Contractor requests to OWNER for payment for construction work
successfully completed.
• Review compliance submittals (shop drawings) submitted by Contractor, for
conformance with plans and specifications.
■ Provide interpretations of design intent for Contractor when field questions arise
during construction; and prepare Change Orders (or review Change Requests by
contractor), if any.
■ Attend monthly contractor meetings.
■ Prepare record (as-built) drawings from mark-ups provided by Contractor, following
completion of construction.
■ Assist OWNER with close-out of construction contract.
Page 2 of 3
C:�My Documents\environ-sanitary\cape\amendl3-mainslexhibitB.doc
CITY OF CAPE GIRARDEAU, MISSOURI
Design of Water Main Improvements
Mt. Auburn Corridor Water Distribution Main
EXHIBIT B
LIST OF MAJOR ASSUMPTIONS
It is ENGINEER'S understanding that the OWNER will provide the following assistance,
information, and/or related work elements:
A. Assistance by placing at ENGINEER'S disposal all available current
information pertinent to this assignment, including previous plans,
specifications, reports, permits, easement documentation, and other data.
B. Liaison with other City of Cape Girardeau Departments and governing
officials involved in the project.
C. Available as-built drawings, specifications, design notes, etc. defining the
configuration of the existing water distribution system layout for the City of
Cape Girardeau service area.
D. Available data on construction costs for similar and/or related work
recently completed by the City of Cape Girardeau.
E. Reasonable access to other data and records related to this assignment
that ENGINEER may determine need for.
F. OWNER staff will negotiate and procure all necessary easements for
construction of project.
G. OWNER will provide resident construction representative.
H. Bid documents are sold through ENGINEER's o�ce. Plans and Project
Manuals will be sold at a cost to recover printing charges.
I. No allowance is included for rock probing pipe alignment.
ENGINEER shall rely on information, drawings, etc. made available by OWNER as
accurate, based only on verification of certain key parameters (if necessary).
By: Burns & McDonnell
Page 3 of 3
C:WIy Documents\environ-sanitary\cape\amendl3-mains\exhibitB.doc
�,tQ;; N N N N N �
aa��
,y,g� �
�3�;' m
a � �
c �
A ��
0� � � � a�i
p ; ` � ptn
Q ; a� c a`� ia
� � �a's' y � .�.m �a`U-i
� as ao ao m ao ro ao � � �'W � U
,,,� c �
et y C W U
C LL1 �� � G1 W � � � C
m � a .� y C C � a � N
> �...� x cL N U
� W � ao ao m ao ao w st ao o W � � W W = O
� cp � � o � a na
c � ' o o c o 0
— o. n`. W U �
� � � � � �
y E'!�: a0 e- N � 7 N t c0 �,.� X � � Q a.
Q �"� I.0 a c pQ �
� �a W U
a
n � �
x
N W ' '
LL a
�
�
C � O fD CD <t N N oD c0 O f0 N O O O O O O O O O O � N �O O
� m (O �C1 O� N O O (O CO O � N O O O O O O O c7 CO O �'7 M O I� O
R y (D t0 � N f� I� c0 � 7 u) t9 c0 b9 N � N fA N
� � O f9 fA 'E/9 N fA 69 fA ER fH fA W M fH fR b9 � �7
C � U Ef3 ff!59 b9 (A EA �f? r Vf r
� y N Vi
= W
a
�� Q� 6� N (D N N a0 (D � a0 fD � � � � � •- f0 O O
y y � N r N N � � � y �7 �
� � �
� � � 69 GA
m
R
N
�N..
O C � 0 d O � d � d N N N O
� � S U p O a � Q U � C � U
� � � �o a U �? c y o o X X a�i
v y � � J � �, � �� aL JW w R
E � = E d �rs a N U E
C y y 3 C �p � � � � �S � � .
7 Vl � G7 .R,. � O 3 01 p> p N O N
7 � N n N H � � � C y d O C O W
Q N C � � tA U M 7 w— N L (O (6 l0
y O L � ��"' p n � � � N p� O p
� e Q a « O m � ~ V � F � ~ ~
� o �
W '��" p Y N 3 T y � �f �
N � Y � � U N n
�7 p7
U � V N V O C N O 'O O C E
N m 0 p �� N O y Q Z � V
Y C � � � C
� � � G' ai V N U f�O C i .��
7 N F- v � aLS E i` �,T, U � d a� V1
'°70` a � :..° o' �o n L � n � '> � `o o a3i >
o m c � m o v �n y Z �� y
a �- °� 3 c m �
� o � � m ,y � � 3 '� � � � � � �� N
� N � � ' 3 V N • � L > �N � X
61 7 'p (C � > L d 4- N � c4 d � N C =
.�. � � p � U c0 N � O � 0�
a A N a > � H V- .�.. � G C G � Z' y � - f0
N
U C N � � U N N U y �` N Q.. �
C N � U `
O V N L � � a p.� N E n � .E �•� U N N
?..� 01 07•.• > C � � C > � y C y N > G) C y
� N N O O N 7 O N N d O
• V d Oc� � Uaac� � cna (� d � � � U N
L
' t
L Cf Gi N C) i! �f fD p�
r Y Q � � � � � N
0.
Z ~ F- 7 .- N C7 R �A (D I� oO � � i
V
C 47 Z �[
m � �
ci a` E
�: N � N
> �.
��;li �
N �
C �,
� d
� � � U
� � � �
Ua�i � � c�i
� c rnm •-
m .
m ;" � rnW y m
� as: ao � '� c � U
y C W U �
c W�. > a� W � � � C
_ a; �� o'm :° a m �n
m •` � C c � � � c�
j x m N
O
c C c�' N ao N ao � W � c W W �
R lL ?"e. 7 `_ � U U O Cn �- Q a
m d a� . a
c � 'o'o � a o
- a` a` w U �
•� , . , � �
.Qy- `� av .- ao vv �,.� W � .� � a
N a a � 0 3
� � W U
d
'a"> o
x'�
W
d
�p p N CO a0 f0 00 7 � O O O O O O O O LL) O O � f0 fD O
07 I� O m CO �c7 c0 c'7 Q1 b9 EA tA tH fH EH �f► ch � �(7 � M V' O O
R N 7 V O 7 � O � 1� bR fR N�� fR N� � N
� � � �
V us us in in s9 v► vs w
.y
W
n
O O O O O O O
Y � CD � tD W � 00 O . � �
N y �
LL L � m n f�
� � Q, b9 b9
N
C „
� � Q y M � Q. � d N N y O
c � V y � � � p � � c c�i V
0 2 ` �n � o U o' o o' n
�' o c V �. 5 a`� o c x X m
m ,a, s � >, �, ';, a L J W w R
•w � J U O !E F C � cd � 7 N �
� y w .� d 7 p) p� � C � � N
� O al T � � � n O c � W
W m � n a � w°� a> t m m A
:°
J � c � ° o E � � y N � �-°
� o F E
� 0 N U � y ~ �
W � Q y �.) O.
(� ° a y w `��° cn o
U '-
c v � � `� � 06 U
V � U � N y R� N N
3 d 0 � � C U � � �
>. y O .
— N Q N � � � O � Z 3
N Ip � � - = C t0
� � ~ � a: �o ` •3 3 .y�
�
m o `" a � c � 3 > p a`"i 3
m '� � � a o y � a� a> 3 a�
'O � N N y U > � �> 2 O Z d >
� ` Ci - C O.O V d . Q' y 3 C d �
� 'y O � C N � y f9 � �Q' �., x
C7 y y 'N <0 C O N � u) t y � N _
N
G1 (A � y C ... C � � L a � � C � C�
R m � � a� m �-a a; a, Z' ` o
V N �� y � � �p lE O f0 U p
L C N N .IJ � � C C'C C 3 �..V-.. � i
f7 N
O a C N y � -y � � V � O� N V y T
�`v 'cc � oi � a�i > o o � ayi a�i n o �
Um � Q NOo WU Udo � tnU y
=o
� t
01 QI e- N e+f 7 N tD p�
� � � � d � n
Y
Z ~ Iy0 E � N M � � t0 f� U
� ° ~ z' E
m 'o
U a �
tR'_ � N � O N �
N N
a ;�
3� m
a� �
c
!r:; m v ��
Q��,;� � N � y U
�'' NQ (q
Q a`� c a`� m
m U ° � � ��•� .�
m � � c rn�j m
�
J � 'mc � U
> W w aUi a> �
c W ��: _ � � . � ,c
= d � 3 �ia :° � m fn
. U � � a N
� ���':'�.: C C
m � `� X (7 d � � � U
� W � � aO N OD � W � C W W ��.• O
m � � � N N .� � d G�
W p.�" . .
C (Q, O O C � p
- a` aw c� �
'� �_._'; , � , , �
� � c� Ncocovc.iv o W g .� � a
r� �d �- c � �
n. `-� W U
�fk: N
X �
a�:;;
� 00 N N V' O � O O O O O O O O O O O � � � O
n Gf N 1� � �7 c") W7 b9 b4 � fH E9 tA W O � O O M t0 �7 O
N � N N N N � � .- ER uj fA 69(A� �fA N h
� � R9 69 69 EA fA K b9 e�
LL W W
� •N U
tA W
C o O o O o O o
'� N cD 1� aD O O � N O O
� . N N N CO f7 M O � �A �
� N ^ �
� � � b9 fH
O
.'
.O .. .. ..
`� N 7 O 01 « � d � G M d N N
� � = U � O Q � � V � C � U
� � o rn � a �
� '" O � � U (� c n
� c R � a � � �, '�, at � W w R
� m J � � � F- � a� °� °� � � �
v �n m � a�i >. � � � � n o c 0 W
�, � � ~ C� � 3 W� d L f0 N 16
r
p � L N � C O � � � N N O p
U N N � U j � C O F � � � y F H
� c o � o �c co io U ~ ~ �
� O N 7 N � � Y C � 7
7 � .-. � � � 0 V
U Q a c c .y ` � 0 3 •� n a
• � � . C C V � � O
� y U y O O U � � � � �
� `o � 2 E � � Q o n ai rn
� � Y y y y y V C p C
N � y C � C L �, Q Z 3
O p y � V C N
� � � � C U C N � � 3 .��
p � y � N
e�a in �o W o �n n c o 3 '> p a`"i 3
m m � o ._ m� . � a� a� o ; a�
'a �n a� � � c � 3 y '> � `o Z ,� >
� L fO � uoi m � � m � r�i� 3 c a�i �
� � c o � a � v � v°�iL � �v� � = X
m p caU c aa `o� � ma � � � � �
�� � «��L N � � a Z. y � O � C�
V tq N O f0 U y
,,., � � � U 3 m d � y c c 3 .� 2 c�i
� y N C y y a7 cC ._ U � �.� U ul N
� C d y •y > �' fl' E C N > y C T
O � N N � � � O � N C) n. O �
V V a ¢ ¢ � a a ¢ V Q- 0 � � V N
�
m C7 � N M Q � 1D 'C
�' � � d � � � N
A � Y � O.
Z � � � N (") �f � I� CO V
v F� 3
m p Z E
= �
U a �
CITY OF CAPE GIRARDEAU, MISSOURI
Design Water Main Improvements
Meadowbrook Storage / Perryville Road Transmission
and Lexington Road Extension
EXHIBIT C
LIST OF ANTICIPATED MAJOR WORK TASKS
Following is a listing of the major work tasks anticipated to be completed for this project.
Development of the pipe alignment will be based on offsets from existing utilities and
topographical features.
PRE-CONSTRUCTION PHASE SERVICES
■ Hold kick-off meeting with appropriate OWNER staff. Purpose of the meeting will be
to confirm the project limits and objectives, verify design schedule, and obtain other
pertinent guidance regarding project from OWNER staff. Project includes
installation of approximately 4800' of 12" main along Perryville Rd., from West Cape
Rock Dr., north to Kenneth Dr. Installation of the Lexington Rd. Extension will also
be included as follows:
■ 1400' of 12" main along Lexington between North Church and Route W
■ 825' of 12" main along Lexington between Abbey Rd. and Dixie
■ 2700' of 12" main along Lexington between Rampart and Perryville Rd.
■ 1150' of 6" main along David Dr. from Lexington to Lisa Dr.
■ Conduct a site visit to view general area of construction and confirm design plans.
■ Prepare technical specifications using the City's standard specification for water
main replacement and extension, including but not limited to pipe, valves, hydrants,
excavation, pavement restoration, and other surface restoration.
■ Prepare bidding documents, construction documents, and schedule of quantities for
bid package. Contract documents shall be City of Cape Girardeau standard
documents modified to incorporate necessary language for participation in the State
Revolving Fund (SRF) load program.
■ Assist OWNER in obtaining easements.
■ Assist OWNER in obtaining necessary construction permits.
■ Assist OWNER in presenting improvements to City Council and public.
BID PHASE SERVICES
Page 1 of 3
C:Uvly Documents\environ-sanitary\cape\amendl3-mains\exhibitC.doc
. ,
CITY OF CAPE GIRARDEAU, MISSOURI
Design Water Main Improvements
Meadowbrook Storage / Perryville Road Transmission
and Lexington Road Extension
EXHIBIT C
LIST OF ANTICIPATED MAJOR WORK TASKS, continued
■ Maintain bidder's list / issue bid documents.
• Address questions submitted by bidders.
■ Issue necessary addenda.
■ Develop opinion of construction cost.
■ Evaluate bids received
■ Coordinate bid approval with MDNR.
CONSTRUCTION PHASE SERVICES
■ Assist OWNER in conducting pre-construction conference with successful bidder.
■ Approve Contractor requests to OWNER for payment for construction work
successfully completed.
■ Review compliance submittals (shop drawings) submitted by Contractor, for
conformance with plans and specifications.
■ Provide interpretations of design intent for Contractor when field questions arise
during construction; and prepare Change Orders (or review Change Requests by
contractor), if any.
■ Attend monthly contractor meetings.
■ Prepare record (as-built) drawings from mark-ups provided by Contractor, following
completion of construction.
■ Assist OWNER with close-out of construction contract.
Page 2 of 3
C:UAy Documents\environ-sanitary\cape\amendl3-mainslexhibitC.doc
CITY OF CAPE GIRARDEAU, MISSOURI
Design of Water Main Improvements
Meadowbrook Storage / Perryville Road Transmission
and Lexington Road Extension
EXHIBIT C
LIST OF MAJOR ASSUMPTIONS
It is ENGINEER'S understanding that the OWNER will provide the following assistance,
information, and/or related work elements:
A. Assistance by placing at ENGINEER'S disposal all available current
information pertinent to this assignment, including previous plans,
specifications, reports, permits, easement documentation, and other data.
B. Liaison with other City of Cape Girardeau Departments and governing
officials involved in the project.
C. Available as-built drawings, specifications, design notes, etc. defining the
configuration of the existing water distribution system layout for the City of
Cape Girardeau service area.
D. Available data on construction costs for similar and/or related work
recently completed by the City of Cape Girardeau.
E. Reasonable access to other data and records related to this assignment
that ENGINEER may determine need for.
F. OWNER staff will negotiate and procure all necessary easements for
construction of project.
G. OWNER will provide resident construction representative.
H. Bid documents are sold through ENGINEER's office. Plans and Project
Manuals will be sold at a cost to recover printing charges.
I. No allowance is included for rock probing pipe alignment.
ENGINEER shall rely on information, drawings, etc. made available by OWNER as
accurate, based only on verification of certain key parameters (if necessary).
By: Burns & McDonnell
Page 3 of 3
C:WIy Documents\environ-sanitary\cape\amendl3-mains\exhibitC.doc
SQ N N N N N p
'���`
�-ag
>'yib,qd,g. (C
> �F
d �
�•, c
.....,.3 � `7
� � N U
0'• d N
o O . N � C`
•y Q a� c � m
„�°', i � .�: � � c y U
W � Ot' ao ao ao 0o m co � �� �W p U
� y C W U �
R C W�.. � � w � � Z C
O � a�.. j �m N O �y N
� m � y C C � a y
? 0 N
C � > ` x � � � � �
� � W e-�'�. co co co 0o m ao v ao o W � � W W Q Q.
, c D � � o c n d
c m W a� d . a
x � t/� o o c o 0
°f — ddW U �
J
� V � � � � �
� .QN- � aD � N 7 < N 7 c0 �,.� W � .) Q d
M n, C � �
Y a ' �a W v
N
W
N �: �
C x
� W:.�
,y d
N
.£
N 'O O (O CO � N N a0 oD O (O N O O O O O O O O O O � N a0 O
C C� t0 � 6� N O O CO (O O � N O O O O O O O c'7 f0 O Y] c`i O I� O
i l0 y (O (D � N I� h t0 � V' K7 M iD M N � N fA N � �
F O tA fA 'ER N fA 69 tH 69 fH ER Y! !A EA tA b9 a
,� £ U fR fH 4Y 69 69 EH d9 � �A �
N f9
R N
� W
m Q� Q� N (O N N 00 CO � a0 CD e- � r- r e- � �D O O
y � N � N N � � � y �7 u'1
•� � � M
� s � v�v�
� �
m
a
m .. .. .. .. .. � ..
R C 7 O y � � d � C_N G7 y O
$ °1 2 V � O Q � � � � � a� V
y o a�
`o a. V U �, rn a a, a
o N o m � � « �, '�, a .�c � w w A
U V � � a
O E y '- E N oiS � v� U E
4? � !6 F;, G � ejS 7 N '�
� C N 0 N .�+ � O � � p> O N O N
; Q T `d '� O �p C�J `y C cp C N � W
� �m C � � ~ ul U M 7 �� N L c0 � .q+
R y O L Q' �,�'-' p d y � � y y O p
� C O � L � � � ~ � F � � ~ ~
`. O �
� d
w •a Y N 3 T N �
� y � Y � ••�• V � y y �-
U O V y V p C y O ,O O C �
m y � � � Z 3 0
y m � a rn y p N Q � U
� o � � c
� N y a 3 � a�i � m c 3 .��
7 N F- V � oiS � �`- ..�`. U � � d N
� d L 'O YO u) U N C� N G. U d N � p 3 N
Q s a o m c -�o uai t c � n '> � o Z a� '>
� o j � 3 ... �c � �; � a � � H 3 c a�i � y
U � R f/1 C U � � y c0 � �� >,
a c� o� � .' � L .a3i �.�-. N 'E md � .a"i � = x
� a; o � > 'u •� � L �� p o a U
'° a o' > � �N « � n c a a m � `o m � N
V � N t0 u m d � u' �«-' � a c a� � ` o
o U .� � a3i � � � � v�i _ � °� E rn,a3i •`- �
V mt •- a an� ._ E a c� ._ . � N N
�. m p�... > C � y C > d y C y ul > y C Y
•. N N O O N 7 O N N d O
• V d Oc� � UaaU � cna (� d � � (n () N
�
V m m ` � Nena �n �n 'rn
C7C7ClC7QC'J a
M � � Y �
W Z �0 � .- N ch st t[') cD I� aD Q) O N
U
V F- 7 y
C m Z �
X Ua` E
� � � �
� N N
a
�? ' � m
a� �
C
Ql y
�"� � � � a�i
D�r ` � � �
m U` � m m �
� c
� . c y
m c �W a�
,� a: ao � 'o, c � U
> w W a�i a� o'
c W , _ c� � . � c
= n.> � o�� m o � v�
m � a�i � � N a y
� a>
x t0 N U
c W c�: •f N co ao a0 v � W � � W W � O
O � ��� � N N � VJ d � 'O
m �
W ' ' > �
� � � a` a` w U �
m
XV i i � i �
� � � N � �- CO 7 t �v� � � .j � Q.
N � d C � �
� a a w V
c
0
a� vs' o
c e-
X .
m W__ '
J 0. .'
'o
C
l0
'O O N CO a0 CO aD '7 � O O O O O O O O LL) O O � tD CO O
00 N f� O � CO � f0 M � f9 EH 69 eR fH EA fA C7 � �f] � ch � O O
N � y � �O � � O � n � � 6R tH � EA � G)
�y � V vr sa �a is► v� w ia w
� N
Vf W
o ` � � � � � � � o 0 0 0 0 0 0 0 � � �
q 1� C'1
y L � Vi 69
•� �
N
C
` .. ..
� N y
~ � p d � � a2 � d N N N C
A � V y � � G � � � � � V
o = � N � ° U o� o o� � o. v
� c ° c U c y o c o- x �
� 10 � 0 U T y � d L J w W 10
— � J U O •10 F C y e+6 °� 7 N �
•) .
� � N �. � d C � G O C � W
a ~ n� jp 3 W� N L c9 i7 17
� C O n � � � N G7 O p
� � O ~ � N � y ~ ~
� U
o °�
` O N C V 7 �
N
(� o a a� H `° c� o
� a m o � � o � � y U
� 3 G � a � � Z d �
O O y � T y C 0 � C
� N V N � �`y, O � Z 3
N l0 Ip 'a � - L C cp
� � F"' 3 " cci � 3 3 'y'0
�. y N
m �" � � d O y � N N � � 3 N
'O � y N 'y U > � > � O Z .� >
� V � C G O V On. . 2' t�il 3 C � Q'
� � L � N C O � C � L > 'N � � X
a� .'�o � c '" � � � La � p o � U
� m � � a� m �n� °: a Z' y - m
(� N �� y � � � f4 O i0 U y
' N C N � N d C d C � �
t '� 'n m • o m � y c 3y.�-.. � �
(� � n, � � � � � � � � E orn a� � ;� �n
�`� . -c � � > m o c � �n > a� c y
c� m � ¢ y0ow' U Uao � <nU y
=o
m ei � a eh a �n �c 'rn
� Cl C7C7C3fJ0 d
� � Y � (9
Z ~ F 7 � N C7 � � t0 t� V
C � Z �
m O
` E
U a
'iSQ';l � N � O N �
�"�'���., N N
>;�''i
t�,�g'�.: N
d �
C f,
01 y
(D �t 0 y U
� ' N � � d
� " N � �
Q '' N C � fO
a� V � � �o�'m �
� '„' � ��w � a`�
J �:Rt:l � � 'p� C � (�
� C W U
O C W � � N W � � � C
y � Q• ". j �� N O � M
,.m„ m � � N � � a � U
L! C C t'::�.; aO N QO W � E W W « O
.a � W � °O -- �"� m � � o v� a n a`
m a� m . �
o � � : , .o•o � o 0
� — a a W U �5
c •� , � � � �
� y 8
�Q ��. N N aD t� � N V 0 w � .j � n.
c � a � Q �
� �a W U
J a
�
C
R �': N
�:
CD X '
'� w >
N d D °
LL
�
N '6 r c0 N N R O ? O O O O O O O O O O O � <Y Q� O
C 0i N f� 7 �t! M � b4 NH EA N)b9 E9 W O � O O M (O � O
O i4 y O � c'7 O aO � �A I� c'� N � EA N O
� N N N � � fA Yj fH fA ER G9 d3 ^
�N E V «n v� vs v> iss v> � �ss �
�N f/J H
NW
C O O O O O O O
` N f0 1� aD O O u� N O O
F i N N N (D c'7 c`� O � � � .
N ^ �,.�
� L � E9 E9
O �
�
m
� i .. .. .: N
�� y � Q N � O d � O.fn N y O
c p V '> � � 2{ � � p � c V
m � _ ` w � G U a� o rn y n v
a :o � �o � U " c y a c X x m
o � R � � � a� ��, aa � w w �a
� o� " � � � �o R � � ,� ,� °� � � �
!6 � ..�, �" 7 � �� � N O N
O N m � N T � 4: W � G O C � W
W (A f4 N ~ �y l0 n`�� � n� f0 10
O N N � U 7 C � ~ O � � C1 y ~ �
Q o � 0 7 � Y m � UF �'- �
N -p (p Y
� - - N U
pO N � p .0 E `p C p 7
'6 rp- � �'y U N O 3 � n E
V m •C y .= c � c � d cn o
� N - m � c N � N � o�$ U
` � Ei j � U V V L
3 � 0 � � � G O n N Of
0 w Y y N y y V C Q C
m N C o�f Z �i
C L �
�' y A V p � C <D
Ci C O y � U
� ~ y Of V � C ,., � ��
Z c o c m 3 �,�
3 m G W C R a � C � a) rri
Ry � o y _ � o � �� Q � 3 �
m
W -a y y � '� �� '; � '> � `o Z a� >
R -- � a� > m
� L � � N l0 � � f0 ' �-' N d � N �'' y
� C� a C C � �` N 'O � y L > 'u1 � � X
m o mU c aa `o E ma � � � � V
U �.—. � �'�,s � d d �' ,n � �a
(� V •.• N ��„ f0 O t0 U y
� M N V U y N N N d C C 3 4:. � U
0 y f4 C y � f0 f0 C V � Of N �U N N
U � O �' .--°�. v`�i a'� � � � O � aNi a'� a o �
c� c� a ¢ ¢ � aa ¢ c� ao � cnc� N
�
� t
CI CI a- N M �f N tD �Of
R H Y � d � d � � � n
� Z R £ .- N M � � 1� c+D �
V
v F- 7 Y
C m Z �
X m �O
c� a` E
CITY OF CAPE GIRARDEAU, MISSOURI
Design of Water Main Improvements
16-inch Main Project (Bertling Ave.)
EXHIBIT D
LIST OF ANTICIPATED MAJOR WORK TASKS
Following is a listing of the major work tasks anticipated to be completed for this project.
Development of the pipe alignment will be based on offsets from existing utilities and
topographical features.
DESIGN PHASE SERVICES
■ Obtain and/or gather additional information on distribution system as needed to
complete design of improvements, from OWNER and other sources. Design
services include replacement of an existing 12" main along Bertling Avenue befinreen
Old Sprigg Street and the Cape Rock/Perryville Pump Station with 16" pipe.
Approximately 5300 ft. of pipe is required along Bertling Avenue from Old Sprigg
Street to Perryville Road, then north along Perryville Road to Cape Rock Drive.
Installation of an additional 1500' of 6" main along Lyndhurst, north from Bertling
Avenue to Huntington, and west along Huntington to Cape Rock Drive will also be
needed.
■ Hold kick-off meeting with appropriate OWNER staff. Purpose of the meeting will be
to confirm the project limits and objectives, verify design schedule, and obtain other
pertinent guidance regarding project from OWNER staff.
■ Coordinate subconsultant's topographic and property survey efforts. Below ground
utilities will be located as marked in the field by the respective utility companies.
Subsurface investigations will not be conducted.
■ Following completion of the field survey, conduct a site visit to view general area of
construction and confirm topographical features and utilities.
■ Develop preliminary pipe alignment and confirm layout with OWNER staff.
■ Prepare detailed contract drawings (22" x 34") for installation of 6" and 16" diameter
pipe. Drawings will consist of a cover/index sheet, an abbreviations/general notes
sheet, approximately thirteen sheets containing plan and profile views of the pipe
alignment at 1"=20' scale, and approximately three detail sheets. Hydrant location
will be coordinated with fire department officials.
Page 1 of 5
C:\My Documents\environ-sanitary\cape\amend13-mains\exhibitD.doc
. ,
CITY OF CAPE GIRARDEAU, MISSOURI
Design of Water Main Improvements
16-inch Main Project (Bertling Ave.)
EXHIBIT D
LIST OF ANTICIPATED MAJOR WORK TASKS, continued
DESIGN PHASE SERVICES, (cont'd)
■ Prepare technical specifications using the City's standard specification for water
main replacement and extension, including but not limited to pipe, valves, hydrants,
excavation, pavement restoration, and other surFace restoration.
■ Submit 95% plans and specifications to OWNER and MDNR and meet with OWNER
to discuss review comments.
■ Incorporate OWNER, MDNR and QC review comments and finalize plans and
specifications, then submit to OWNER for use in soliciting bids and obtaining
necessary permits.
■ Prepare bidding documents, construction documents, and schedule of quantities for
bid package. Contract documents shall be City of Cape Girardeau standard
documents modified to incorporate necessary language for participation in the State
Revolving Fund (SRF) load program.
■ Assist OWNER in obtaining easements.
■ Assist OWNER in obtaining necessary construction permits.
■ Assist OWNER in presenting improvements to City Council and public.
BID PHASE SERVICES
■ Maintain bidder's list / issue bid documents.
■ Address questions submitted by bidders.
■ Issue necessary addenda.
■ Develop opinion of construction cost.
BID PHASE SERVICES, (cont'd)
Page 2 of 5
C:\My Documents\environ-sanitary\cape\amend13-mains\exhibitD.doc
♦ �
CITY OF CAPE GIRARDEAU, MISSOURI
Design of Water Main Improvements
16-inch Main Project (Bertling Ave.)
EXHIBIT D
LIST OF ANTICIPATED MAJOR WORK TASKS, continued
■ Evaluate bids received
■ Coordinate bid approval with MDNR.
CONSTRUCTION PHASE SERVICES
■ Assist OWNER in conducting pre-construction conference with successful bidder.
■ Approve Contractor requests to OWNER for payment for construction work
successfully completed.
■ Review compliance submittals (shop drawings) submitted by Contractor, for
conformance with plans and specifications.
■ Provide interpretations of design intent for Contractor when field questions arise
during construction; and prepare Change Orders (or review Change Requests by
contractor), if any.
■ Attend monthly contractor meetings.
■ Prepare record (as-built) drawings from mark-ups provided by Contractor, following
completion of construction.
■ Assist OWNER with close-out of construction contract.
Page 3 of 5
C:\My Documents\environ-sanitary\cape\amend13-mains\exhibitD.doc
. ,
CITY OF CAPE GIRARDEAU, MISSOURI
Design of Water Main Improvements
16-inch Main Project (Bertling Ave.)
EXHIBIT D
LIST OF MAJOR ASSUMPTIONS
It is ENGINEER's understanding that the OWNER will provide the following assistance,
information, and/or related work elements:
A. Assistance by placing at ENGINEER'S disposal all available current
information pertinent to this assignment, including previous plans,
specifications, reports, permits, easement documentation, and other data.
B. Liaison with other City of Cape Girardeau Departments and governing
officials involved in the project.
C. Available as-built drawings, specifications, design notes, etc. defining the
configuration of the existing water distribution system layout for the City of
Cape Girardeau service area.
D. Available data on construction costs for similar and/or related work
recently completed by the City of Cape Girardeau.
E. Reasonable access to other data and records related to this assignment
that ENGINEER may determine need for.
F. OWNER staff will negotiate and procure all necessary easements for
construction of project.
G. OWNER will provide resident construction representative.
H. Surveying subconsulting services do not include any easement
descriptions. Easement descriptions can be prepared at a cost of$200
each.
I. Bid documents are sold through ENGINEER's office. Plans and Project
Manuals will be sold at a cost to recover printing charges.
Page 4 of 5
C:\My Documents\environ-sanitary\cape\amend13-mainslexhibitD.doc
CITY OF CAPE GIRARDEAU, MISSOURI
Design of Water Main Improvements
16-inch Main Project (Bertling Ave.)
EXHIBIT D
LIST OF MAJOR ASSUMPTIONS, continued
J. No allowance is included for rock probing proposed pipe alignment.
ENGINEER shall rely on information, drawings, etc. made available by OWNER as
accurate, based only on verification of certain key parameters (if necessary).
By: Burns & McDonnell
Page5of5
C:\My Documents\environ-sanitary\cape\amend13-mains\exhibitD.doc
� }
f,y� N N N N N N ^
a' `
� ,+ � m
� c �
rn d
LD � � pp � U
O d
O � Q ` � � �
Q:' N C N <0
N U�.. d C �C�� U
W d �
J p�?;� ao ao ao 7 a0 co aD w � � �W U � �f
...._��; ] � W � N N C
C a �F. �� �� �,0 � � 'N .
- ` y c � � a � a�
CG .� �':4� m ar ' o
D W � � W W �
_ � � w ao ao co v co m ao o ao � co
Rw �. m m � � o �na na
W�.:3: N N N . �
C (n�:;a: �` �` C � �
- aaw c� �
,U : � �
� �.: °o � cvv vvvmmmvao x � ` � �
� � �a a W U
a,
� �
x.
W"
a
� O t0 � c0 V �O N N N O QO O O c0 t0 O O O O O O O O l") O O �l1 O t0 V �
N (O uY N 7 N � W O O <D 01 O 7 P O O O O O O O (O � O h C'1 O N N O
� y t0 �� � N �N f� 1� t�1 C 7 V � O� V' (O N O a O ��!A�� � � 7
E �j ^ 7 y� f9 1A fA Vi f9 N M
° in ia ia w ss w i» c%� w w in in in w v� r
� U vi w ia ia w
.y
N W
Q `
Of � 4D � (O (O 0� N N GD (O 7 7 W N e- C (O N O V O O
N � �
p� ` � N N N V •- I� � N
C � � � �- � m � I� l`�
L � ��
� �
d
m ` y O .. .. E T ' T N y N
v « v ❑ 0. a in a� a� rn O
m � c � � y � p ?� d p Z � c U
O U
O N N
a t � = o a V . U 5 m o � 7 a n d .
c x
m
� L, �n E m � �, y a� •a� a t J W W R
�, E = i� � 8 � � y •� E � �a � ,� � � E
L H 'p � ; a? d o � ,o Q � � @ ° c a�i O w
n o c
C � y l0 3 � � ~ N � M 7 W� N t l0 :� ��-.
N C N N ,NF N � pf c n N "2 � n N � O
� � O L 71 'j �X � C U F � E y � � F-
�p O
C � a L ,_> U � n 2,+ �p � o. U �' F' �
y � O 'C U t � �''- � � G1
C G Y N 3 � � N �� �,�^ N � � 7
� N V Y � ..�. C Of C �- U N d pl �
O d N �J � C N a E N C 3 y O '� O .0 O
y > y N � o � c ; 3 c y '� 2 3 U
N a o .o c � m °- m °1 °- y a � `°
Y o �p tp
� E A ` .N U N � .� � U � � U Y O N N'�
C C N � � U N �= N N
A C ~ j � � r'6 p �. � '�j f� U �U lU0 rtp N N � � 3 N
y ._ � � N = (.> N '- U y .r G1 y U p
a c a o n c � > � o � >
lLJ 9 � o m c � c c Z v u� H �n� - d Z "> a>
` � v ; � '; m � � vaa � u°1i 3 c m �
� " � � `� ac1OE � � � m � y `0 Nr > 'N'� L' x
m3 �° `-° � N �m a �a� _ � = m �'N E � a' � � o � o
V �jo m � vmaaa� '3vna� � ac � ° � � y
c N c �- a � d d i� d n. c 3 c � %�n
�,w `° t > O " > > n n n v •`-' E n, � � �' °� � N �.
d �'m d o fO d a� d d � o a'> > � o d 'w n o =
UG Oc9 � U � � � 2aaU � �na Uao � u> U �'
a
� N Nf � M t0 Of
d � d � �Q d � �
E Y m a
iO ~ � � � � � � '�
Z � E � c� c� vv� � � aorn r.
c d F- 7 y
°i a Z E
U a
- ,
� a � �
��` N N
x�
a ::,�,
�i s��; m
2'.� N �
�� C
Cf y
r; � � �H V
0� � N
� d � �
m U °� �'<a �
� C
� N .
G� c m W � �
J v> co � 'm c O U
c W.:".�. > y W � � � c
_ d � m� m o co v,�i
m � y c c � a p` a�
y� f0 N U
� W .�: � N ao ao ao v � W � c W W � a
�.�,: � U U O q� � a
y m N . �
W
c � d a W U �
•� � � � � �
N M� N v .- m v v �,., xg � oa
0 e-��, N a a C Q Zi
� � W U
a
�o` o
�:
w ���
a "
� O N f0 a0 c0 N �' d O O O O O O O O � O O u) f0 CO O
Gf I� O � tD � CO M Ol 69 tH � 69 EH tA f/i c7 O) � u� c'7 � O O
; RC y ? � O � � O � � � � �Er9�fA � Of
Q G � ER Ei9 ER E9 fH W 69 IR
:: U
c W
m o � � � � � � r o 0 0 0 0 0 0 0 0
_ m y ch O . � u� � .
� r ri
t � ea Fa
� � �
'o
c � N a3i ° O a E a u� ayi a�'i in
m o U �� c Q � � � � � � U
� _ � �, � c U rn o � a� Q v
L 'C O C U C y p C X X d
V 16 � � U �+ m � d L � W W i0
C � J V .� � � C o2S a � u7 U E
tD � !«' a � ~ � p) O N O � N
� � N T � m C � O. O C 0 W
N � C.L � 7 w� N L f4 f4 l0
J C � C O � � � � N � � C
E m � ~ � H F°�- `� ~ ~
m N V V �
� C Ql t� :�
O vl C p a
U E •°- � y `��° cn o
c �y � c w � 06 V
V � � O � U O � y y
� � Q � L C V Z N m
� Y � �„ y C � � C
N +C�+ � � � ..y— C � Z c3p
� {p r � � L C
3 � � � ` •3 3 .N�
N y
y '� � � 2] O y > N N � � 3 .N
'0 � y N 'y U > � > � O Z N >
` V - C G O V G . a' y 3 C N d'
i O � C N � y f0 � �� �, N
� m y f0 C O 'G y = � N N _ x
aN adc '� � a � La � poa p
(� io m � Q, u' c° o a °: d Z' rn - �° m
V1 � � � c0 O i0 U
' V /0 C tA � N d� C n C N V ` V
O L {7 � � C O f0 .� � E � N � y N
� �a C �p 7 � > �p O C N > d C >'
U m � Q y � 0 ll.� U U a � d' fn U y
�
� t
0> 0f e- N M � � tD p�
£ � m Q d � � Q � Q
Y
Z ~ N E � N f7 � � (D 1� U
V �.. 3 �[
� m Z E
m 'o
c� a �
• ,
':SOE'. � N r- N N (O
N
�>
?:.�' R
N �
C .,,,
m d
� � N p � U
0 . � N 0 fn
Q N C � N
U: a`� � �m•@ cv
c
� � �w � d
J � � � a� �W � � rn
c W � >_ � W � � � c
� �,m„ � (C N
Cd . a ,. U c0 N � a O U
� N
> x O
= C e.�; ao � ao W � c W W �
N W �< � � U U O � a na
m � � . �
c � .o,o c o 0
= d d W U �
� � � � � �
� ��:MF N � c0 (O V' N � p x rL ` � >
C � N � a a � Q
� „ � w U
d
iQ; N
L�
X+
m W -
> a- :
a
�
__ � o00000 0 0000 � � � o
Ci N � � � (`�') � � �1 b9 !A fA 64 b4 69 4► O � O O c'7 (O V' O
Cf 10 O � ch O c0 � KY h E9 69 tA N1� fH N O
m � O N N N � � � �
V f» v►�ss» ia ifl w s�s
•y W
m W
� O O O O O O O
a N CO I� W O O � � O O
y N N N CO f") c7 O y u� �
C � N
� L � �K fR
�
L
V „ .. ..
� N 3 O Gl O 0 a N Q y y N N
� � o U > c � 'p � � c � U
0 2 °� o Q rn o a� s
� � � `o c � U C? c y o c X X m
� � A � o � � � '� ar � W w m
e� � � � � o '� E c °6 aS °� j � E
-c R �_. � � •m °� m o a
o ,� rn o aUi >. � d � f° n o c � W
c �- n a 5 W a' a� r ca �
a :? t H � N c a � g � y y o p
E y y .E � a c co F o � � y � F
e c o � o ` `° m V ~ �' g
3 ul U �
{O N �p f0 Y G)w
� O N d c U �
� r O -p � O O,
�' a C C N � � � N � (!) O
3 � s ��, o � � ` � o ,� �
�
V L N u1
3 p G � E .�.. U p_ p n N 07
"' C p C
N Ifl y C Ol C t N � � Z 3
N � R � � O O � � U C �
� ~ V C V N � ` OI
� •2 a� '�o � � ,,. 3 .y o
Rtli nW � � � � 3 > p a�'i 3
(j� � umi a,,,ci � � c c 3 aUi > � `o Z � >
� L f9 � G 3 � � � � t�i1 3 C d Q' y
� a C O � � � � f0 N L � y � �'_'-' X
m a mU c na � E La � p oa p�
U � t1 � '"' �y N � N a �C y O c4 U p
� � d V U 3 m d �n a� c 3 w 2 �
o •' A � y �o m .� � E rn d •� y T
�. C d ..d.. y � N `1 � C � Vl > d C y
V V a ¢ ¢ � a a ¢ V d � � Cn (� N
a
N G1 e- N M Q � t0 Qi
� � Q d � Q 0 �
A H Y � �
Z � E .- N l+1 7 � 1� [O V
Y
C CI ~ Z �
m Q
U a E
. -� �
CITY OF CAPE GIRARDEAU, MISSOURI
Design of Water Main Improvements
20-inch Main Project (Cape Rock Drive)
EXHIBIT E
LIST OF ANTICIPATED MAJOR WORK TASKS
Following is a listing of the major work tasks anticipated to be completed for this project.
Development of the pipe alignment will be based on offsets from existing utilities and
topographical features.
DESIGN PHASE SERVICES
■ Obtain and/or gather additional information on distribution system as needed to
comptete design of improvements, from OWNER and other sources. Design
services include a new 20" main from the Cape Rock Drive Water Treatment plant to
the intersection of Cape Rock Drive and Big Bend (Hwy 177). The length of this
project is estimated at 5,760 feet and the actual route will be as determined by the
Route Study For 20-inch Main Project under Authorization No. 12.
■ Hold kick-off meeting with appropriate OWNER staff. Purpose of the meeting will be
to confirm the project limits and objectives, verify design schedule, and obtain other
pertinent guidance regarding project from OWNER staff.
■ Coordinate subconsultant's topographic and property survey efforts. Below ground
utilities will be located as marked in the field by the respective utility companies.
Subsurface investigations will not be conducted.
■ Following completion of the field survey, conduct a site visit to view general area of
construction and confirm topographical features and utilities.
■ Develop preliminary pipe alignment and confirm layout with OWNER staff.
■ Prepare detailed contract drawings (22" x 34") for installation of 20" diameter pipe.
Drawings will consist of a cover/index sheet, an abbreviations/general notes sheet,
approximately thirteen sheets containing plan and profile views of the pipe
alignment at 1"=20' scale, and approximately three detail sheets. Hydrant location
will be coordinated with fire department officials.
■ Prepare technical specifications using the City's standard specification for water
main replacement and extension, including but not limited to pipe, valves, hydrants,
excavation, pavement restoration, and other surface restoration.
Page 1 of 5
C:\My Documents\environ-sanitary\cape\amend13-mains\exhibitE.doc
/ -� �
CITY OF CAPE GIRARDEAU, MISSOURI
Design of Water Main Improvements
20-inch Main Project (Cape Rock Drivej
EXHIBIT E
LIST OF ANTICIPATED MAJOR WORK TASKS, continued
■ Submit 95% plans and specifications to OWNER and MDNR and meet with OWNER
to discuss review comments.
■ Incorporate OWNER, MDNR and QC review comments and finalize plans and
specifications, then submit to OWNER for use in soliciting bids and obtaining
necessary permits.
■ Prepare bidding documents, construction documents, and schedule of quantities for
bid package. Contract documents shall be City of Cape Girardeau standard
documents modified to incorporate necessary language for participation in the State
Revolving Fund (SRF) load program.
■ Assist OWNER in obtaining easements.
■ Assist OWNER in obtaining necessary construction permits.
■ Assist OWNER in presenting improvements to City Council and public.
BID PHASE SERVICES
■ Maintain bidder's list/ issue bid documents.
■ Address questions submitted by bidders.
■ Issue necessary addenda.
■ Develop opinion of construction cost.
BID PHASE SERVICES, (cont'd)
■ Evaluate bids received
■ Coordinate bid approval with MDNR.
Page 2 of 5
C:\My Documents\environ-sanitary\cape\amend13-mains\exhibitE.doc
/ "' '
CITY OF CAPE GIRARDEAU, MISSOURI
Design of Water Main improvements
20-inch Main Project (Cape Rock Drive)
EXHIBIT E
LIST OF ANTICIPATED MAJOR WORK TASKS, continued
CONSTRUCTION PHASE SERVICES
■ Assist OWNER in conducting pre-construction conference with successful bidder.
■ Approve Contractor requests to OWNER for payment for construction work
successfully completed.
■ Review compliance submittals (shop drawings) submitted by Contractor, for
conformance with plans and specifications.
■ Provide interpretations of design intent for Contractor when field questions arise
during construction; and prepare Change Orders (or review Change Requests by
contractor), if any.
■ Attend monthly contractor meetings.
■ Prepare record (as-built) drawings from mark-ups provided by Contractor, following
completion of construction.
■ Assist OWNER with close-out of construction contract.
Page 3 of 5
C:\My Documents\environ-sanitary\cape\amend13-mains\exhibitE.doc
. -� �
CITY OF CAPE GIRARDEAU, MISSOURI
Design of Water Main Improvements
20-inch Main Project (Cape Rock Drive)
EXHIBIT E
LIST OF MAJOR ASSUMPTIONS
It is ENGINEER's understanding that the OWNER will provide the following assistance,
information, and/or related work elements:
A. Assistance by placing at ENGINEER'S disposal all available current
information pertinent to this assignment, including previous plans,
specifications, reports, permits, easement documentation, and other data.
B. Liaison with other City of Cape Girardeau Departments and governing
officials involved in the project.
C. Available as-built drawings, specifications, design notes, etc. defining the
configuration of the existing water distribution system layout for the City of
Cape Girardeau service area.
D. Available data on construction costs for similar and/or related work
recently completed by the City of Cape Girardeau.
E. Reasonable access to other data and records related to this assignment
that ENGINEER may determine need for.
F. OWNER staff will negotiate and procure all necessary easements for
construction of project.
G. OWNER will provide resident construction representative.
H. Surveying subconsulting services do not include any easement
descriptions. Easement descriptions can be prepared at a cost of$200
each.
I. Bid documents are sold through ENGINEER's office. Plans and Project
Manuals will be sold at a cost to recover printing charges.
Page 4 of 5
C:\My Documents\environ-sanitary\cape\amend13-mains\exhibitE.doc
• �� a
CITY OF CAPE GIRARDEAU, MISSOURI
Design of Water Main Improvements
20-inch Main Project (Cape Rock Drive)
EXHIBIT E
LIST OF MAJOR ASSUMPTIONS, continued
J. No allowance is included for rock probing proposed pipe alignment.
ENGINEER shall rely on information, drawings, etc. made available by OWNER as
accurate, based only on verification of certain key parameters (if necessary).
By: Burns & McDonnell
Page 5 of 5
C:\My Documents\environ-sanitary\cape\amend13-mains\exhibitE.doc
r •� �
... -: N N N N N N �
a „
��"� -m_
m;�• � .
� m
� m o � ��
�
� � U
�, � � � � �
V a� c � m
> � C �� U
J GD CD OD < OD OD GD OD 0 Ol �W 0 V
C
�...:I fp ry C W U �
' � W>..'�G > y W � ar � �
_ a�..'I'� �� �m :° � m m
m � !F y c c �? d p aNi
� t._�p: x l4 G/ U
� W m aD m ao O <O w w O aD t0 a0 p W � C W W 7 a
O
t� �n iJ U O fn d
y w�..�., N N N . n a
C y' O O C O O
— a` a` w c� �
� , � , , �
� rx. ao � c� v vvvmaomvm � x � � pa
� � W d c � �
� �a W U
a
� �
x
w
a
� O f0 V (O V t0 N N N � aD O O t0 O O O O O O O �fi lh O O vf O t0 Q+ O
GI f0 � N V N N � O O � t0 Of O ? N O O O O O O O aD N O � M O fD f� O
A y f0 (O R '- N W N I� I� c0 <l 7 V � Pf C t0 N T t'7 (O � C N /A c7 M O
0 � � N f0 R (A ^ fA W/9 f9 fA iA N N fA fH(A 1/7 � � Of
� � V /A !A(A W M W W N�f9 fA K V� N (A �A f9 N
6. •N
Q W
Y
0 Ql T m t cD (D aD N N m f0 � V W ? � � 7 (O N T N O O
R� a�y. � .- .- � � N N N � � f� .- ^ � � iA
O. � � �H
R
U
N
y « �,N„ � p U � � d � d N d d N O
O N � = U � O Q � � � 0 j � � U
a t o a U V c d p c � n m
c 2� N E A � �, ' a r o x w
'° E � U °r c4 � � � � E dasn' � uWi u E
'i y Ol N Lr, ], 3 N �O F C � uD 7 N '�
� y � � C 7 � U1 O YJ
� c 'n ` � ; u? > o � o Q y c � o c O W
oN c d �n m 3 � � ~ rn `�-� :° � y� � a a> o �
w y o = d =� ? '" � � � o � � d � `- o
y p . �p � o Z y � o E y m �
y� � p � " V L c mU � � � U � ~ �
c c Y N ; � � m -- � � � �
CI L V �C Y N.'L_' U1 tll N
7 � y Y 0 N C O N 3 U � � � E
0 � 6i U y C N E N C y O a p C p
w � Q N 'O � Q C C 3 y C y � Z � C�
y � Y 'p C > O>� O � . O � Q C N
� E R .3 � y ` N N � � N � l0 C ?� .y 0
� � � � v` °6 � � � u � `c3� � � 3 > p a"i 3
°' � c � `n � j H `b' °� c a °� � g °' o ; °'
�O � o m c � c c Zv m � N y a n � � o Z � a'>
� � '� �3 ��3 f0v — � � a a . C u�'i 3 c a> �
� V O7 /0 � � f0 C C � � C C �p A � (p d 01 a' H7
� A m a � C � � a� �� d m m d . y t > 'u, y L� X
y� �� f0 c� y 'rp a� '� c � :9 � � N � L a � � p a
�� �, y o � � � z � w
A p � > � d m n w � m c a a � N o '�p � ,n
V N � � C •- � n N N N U �` N O..0 N U ` O
; ._ y p > d = � C 3 �.-.. �
O Of C N y � N - l4 /0 @ � N � � V E � N 'V N N
�y f6 L •� � 'j > � � N C > a y C � N > N C 1.
(� � � � � v � � oaaaU �ina V d � � � V y
. �
y � N M V �(f 1D �
E �, Y y OOQOOf7 a�
iF n
; E � N � v � �o � �orn � � � � � �
U � � y
do Z �
ci n`. E
, . : �
� � �
N N
a
�_ �
°' �A
c
rn d
v � � �
� a`� pcn
Q a� c � ia
U a`� � '�•m c�
> c '�w a� �
� � � � 'mc DU
> yw � .a�i a`� �'
� a '� �� m o� •m
m � °� m a�i � a � c�i
> x o
e � � vcvaoco oov w � E W W �?
� w !a d' � a�i o c� d ac
c �_ ���� c o �
a a w U �
� � � � � �
-� Q ays��.. c� v � eo v v N �j a �� � �
��- w ¢
a : U
�".
� o
x
W
a
m
> 'O O N c0 a0 fD CO � 7 O O O O O O O O � O O �A t0 � 0
m I� O O� (D � (D c7 O1 fH d>69 tH b4(A V! (A� N 1� /A N �T N
0 st 7 O �t �A O 1� A
R N tA 69 r fA tA N9 fH W
� E Cj iflenwia ia �►
o �
� w
ro
Q, o � � � � � � o 0 0 0 0 0 0 0 0 0
l0 M � u� �A
�? � � r ri
t � w v►
u �
m
0
c � o a3i � 0 d � n v� aNi y o
'R o U �� = Q � 'p c°� � c y C�
0
� = p c � V U � � o � a x m
� � � o � y � 'ydL � W w A
c � J c`4i o ��o E c °a ots °� � a`�i �
w 3 � ' �
N � N >. � � C � C. O C � W
� F G.a ja 7 �� N L N N l0
O d � y N O
C -p C � E � U H F
01 C O �"' O N N
� �p � V � f-' �
C 4'
O p y C'a a
Ea d N `3�° tn o
c � � v 'n � ,� U
m V � � p �
� N N
� � � � � C V 0 p C
�. y
y m N P .n � a � Z 3
� � ~ � � � � � 3 'id �
N ' V y
;O fO
m w y j � Q � > N N � � 3 N
M ` N U > � �> 2� O � �
y c� Z •
A V — y G O � C � y 3 C G7 Q.' y
� � -y O � C N � y �0 � ��' T X
� m � y � « C N � � a N N C N
� m � � N f4 �-a N 4. �� � p � y
y Q� � � � N O (O U O
r- � C N N N O f0 C N C C 7i w � N
t .,�, C � E Gf N '
� a � � °' `° m � � . .N .� � � w
�'�o 'm � ei �' ayi > o o � a� a� n o
t� m � Q yOowU c� ao � cnc� �
, t
e- N e'1 O �p �D �
E " m CJC7ClCJCJa �
i.. Y
a
Z .. � � � N c� v �n co � Y
� m r � �
m o Z C
L G
t� a
a � • �
;tOrt .� N � O N �
� N N
a ��
.
�,,� � m
°' �m
c
it� co v °f�
p N � a� �
� a`� Oco
Q a� c � m
m V �
C � � U
W �
� �W;' � C � C N
� � '� c � V
> w w a"i � rn
c W y � . c
= d ._ �m ^ o m
� N
m b' y C C � a y
C C �'4 00 N oD W � E �jJ u,J � O
R W � � M CO D U O (n Q. � Q.
m N N •` �'�
w > E
c N d a` w U �
� � � � � �
y N V' c0 CO V' N � � X � � 0 d
� � N ^ a a C Q �
� � w U
a
m � N
> �
'� X
� a
Y
V
O
� 'O a0 N N � O 7 e' O O O O O O O O O O O �A � 01 O
a m N 1� V' 49 c'7 b 69 69 tA b9 fH 69 N O � O O ch t0 V O
U £ O O R c7 O a0 4'f � h tA Vi�E�3�fR N O
N N N u7 N n
._ U fR 69 N9 V�� Uf � � N
vy W
a y N N N f0 M M � O O O O O O O O � � �
C L N � I� f7
'R � � V�fA
�
t
V .. .. ..
C ` .. .. .: N
N 7 O N � 0 a y d Vl G7 y O
N C O U > C � � 0 V � C N V
° ? .. m � o V o� g o� Q n a
� � � �° o c� c °' c c " �;
� c � ,� u � „ ��, a � � W w m
m � � � � o '� E � as a ,a �n u E
8 F . das � � «
o w �' � a�i �. � �? W y n o c 0 W
a `..° m ~ �m « a — � n `_° •`° :°
t w � o °' � � m o 0
� rn c a U � c o F' ° 1- F�- � ~ ~
� c o � ° �c f4 m V �
� C N fp y 'O c0 Y Of w .�-.
� O N 3 p � � �p C U d
m a E rn'�+ � � `0 3 � ma E
m
3 " ° � � _ � � � � � �
N
_ � Q � � ` V a p a d Of
0 Y y � y V C p C
a m m o y c L �S � Z 3
� V F U C � O y � U C �
� � d c o c � „ � 3 .y�
N N N
AN aW c � �' rn � ; �> p� � 3
e+ m c o � rn m � c°� d a� o ; a�
a � y � � c � � d 'a�i � `o Z > a�i
� a v c d � y � c a�iL � y� � x
a o m U c oa a $ E L a � � a � W
'° u � ���N f�/1 m �, a � � o �m i a
U N
," y N U U N N N d C C Ti w � i
Q W � C V1 N f0 f0 .0 V � m d Cj jn �n
� 0 N .�. y � N d � O � N N d O r
V V a` ¢ ¢ � a` a ¢ Ua � � � V N
V
01 0 � N M � N tD �Of
� � m � � � � � � Q
Y
m F. a
m
Z « � N c+� v u� r ao v
C m F 7 Y
m o = �
U a` �