GENERAL ENGINEERING SERVICES CONTRACT
CITY OF CAPE GIRARDEAU, MO
THIS CONTRACT, between the City of Cape Girardeau, Missouri, hereinafter referred
to as the "City" and Koehler Engineering and Land Surveying, Inc., 194 Coker Lane,
Cape Girardeau, MO, hereinafter referred to as the "Engineer".
Whereas, the City may require professional Engineering services associated with
design and construction on a variety of projects, and Whereas the Engineer agrees to
provide design and construction inspection services at the discretion of the City, the City
and Engineer hereby agree that such services will be provided only at the request of the
City, and in accordance with the conditions set forth herein, or by mutually agreed
modifications of this Contract. Nothing in this Contract shall prevent the City from
retaining the services of any other Engineer at its sole discretion. It is mutually agreed
as follows:
ARTICLE I — SCOPE OF SERVICES
A. SD (Schematic and Preliminary Design Phase) — After written authorization to
proceed with the Preliminary Design the Engineer shall:
1. Assist the City in coordinating and deciding the needs and requirements of
the project.
2. Conduct topographic, property and utility surveys as needed and
supplement existing data and to be fully sufficient to determine the existing
conditions for the project and to develop plans for the project. All survey
work shall be completed in Missouri State Plane Coordinates, North
American Datum 1983, Eastern Zone.
3. Arrange for any subcontractor services as may be required.
4. Prepare alternate designs and cost estimates, develop preliminary plans,
and recommend the best design based on these studies, develop final
plans and specifications for the specific project.
B. DD (Design Development) PHASE — After written authorization to proceed with
the Design Development the Engineer shall:
1. Determine the right-of-away and easements required for successful
execution of the project. Provide necessary exhibits and legal descriptions
for necessary acquisition of right-of-way and easements. Assist the City in
acquiring the right-of-way and easements.
2. Prepare Drawings, Specifications, and Cost Estimates for the project,
incorporating the City standard specifications where available, and
preparing specifications and standard details where said City standards
are not available.
i
�
.
3. Advise the City of any adjustments to the latest opinion of probable Total
Project Costs caused by changes in general scope, extent or character or
design requirements of the Project or Construction Costs. Furnish to City
a revised opinion of probable Total Project Costs based on the Drawings
and Specifications.
4. Provide exhibits and obtain any necessary permits. Engineer's expense
for permit fees will be reimbursed by the City in addition to the design
fees.
C. CD (Construction Documents) PHASE — After written authorization to proceed
with the Construction Documents the Engineer shafl:
1. Following receipt of final comments from the City, Engineer will complete
the final Contract Drawings, Specifications, and Bid Documents,
incorporating final comments received from the City.
2. Provide the final Engineers estimate of probable cost for the project
construction.
D. BIDDING PHASE —The Engineer will:
1. Furnish the City with 10 copies of the final Contract Drawings and Bid
Documents for purchase by prospective bidders.
2. Provide the City with one reproducible copy of the final Contract Drawings
and Bid Documents for use for additional reproduction, if required.
3. Attend Bid Opening.
E. CONSTRUCTION PHASE — (Construction Phase Services are an option to this
contract, and are to be provided for and detailed in a supplemental agreement
prepared prior to construction activities, if such services are required by the City).
If the City desires to engage the Engineer to provide construction phase services,
the Engineer will serve as the City's representative for administering the terms of
the construction Contract. The Engineer shall not authorize change orders or
otherwise alter the terms of a construction Contract except with the City's
express written authorization. The Engineer will attempt to protect the City
against defects and deficiencies in workmanship and materials. However,
providing project representation shall not make the Engineer responsible for
construction methods or procedures used by the Contractor, nor for the
Contractor's failure to perform work according to the Contract documents. More
specifically, the Engineer's services will include the following.
1. Assist the City with a pre-construction conference to discuss project
details with the Contractor.
2. Make periodic site visits to observe the Contractor's progress and quality
of work, and determine if the work conforms to the Contract Documents.
2
.
.
Provide construction surveys and construction staking as required by the
Contractor. The Engineer will accompany the City's representatives on
visits to the project as requested.
3. Check shop drawings, review construction schedules and drawings
submitted by the Contractor.
4. Reject work not conforming to the project documents.
5. Prepare change orders for issuance by the City as necessary to assure
that proper approvals are made before performance of work.
6. Review wage rates, postings, equal employment opportunity requirements
and other related items called for in the Contract.
7. Inspect materials, review material certifications furnished by Contractor,
sample concrete and other materials, and if required, arrange for
laboratory testing of samples by others on a subcontractor basis.
8. Maintain project records, construction diary and other project information,
measurements of quantities, and review monthly estimates for payments
due the Contractor. Estimates are to be submitted to the Engineer by the
10th of the month so that the Engineer can make their review to the City on
or before the 15th of the same month.
9. Be present during critical construction operations.
10.Participate in final inspection, and provide the City with project
documentation diaries, test results, certifications, etc., also provide record
plans for the City's records if requested.
11.Prepare finat record survey and plans of the project.
ARTICLE 11 — ADDITIONAL SERVICES
The City reserves the right to request additional work, and change the duties of the
Engineer as deemed appropriate for specific projects, including modifying this Contract.
ARTICLE III — RESPONSIBILITIES OF CITY
The City will cooperate with the Engineer in the development of the project, including
the following.
A. Provide the Engineer with all pertinent file information concerning the project.
B. Provide the Engineer with the City's requirements for the project.
C. Make provisions for the Engineer to enter upon property at the project site for the
performance of his duties.
3
,
,
D. Examine all studies and layouts developed by the Engineer
E. The City will perform appraisals and appraisal review, negotiate with property
owners and otherwise provide all services associated with getting right-of-way or
easements.
F. Send Invitation to Bid to newspaper and qualified Contractors.
G. Distribute Bid Documents to Prospective Bidders.
H. Conduct Bid Opening.
ARTICLE IV— STANDARDS
Project design criteria will conform to Standard Specifications of the City of Cape
Girardeau. In the event such specifications are not applicable, another generally
acceptable specifications such as the latest version of Missouri Standard Specifications
for Highway Construction, America Association of State Highway Officials, etc., will be
appropriately used or amended to meet specific project requirements.
ARTICLE VII — SUBLETTING, ASSIGNMENT OR TRANSFER
No portion of the work covered by this Contract, except as provided herein, shall be
sublet or transferred without the written consent of the City. The subletting of the work
shall not relieve the Engineer of his primary responsibility for the quality and
performance of the work. It is the intention of the Engineer to engage subcontractors for
the purposes of: foundation borings and tests, abstracts of title, and archaeological
studies, environmental studies, if required.
ARTICLE VIII — PROFESSIONAL ENDORSEMENT
All plans, specifications and other documents, shall be endorsed by the Engineer and
shall reflect the name and seal of the Professional Engineer endorsing the work.
ARTICLE IX— RETENTION OF RECORDS
The Engineer shall maintain all records, survey notes, design documents, cost
accounting records, construction records and other data concerning the project, for
three years following completion. Said records shall be made available for inspection
by authorized representatives of the City.
ARTICLE X— OWNERSHIP OF DOCUMENTS
All plans, tracings, maps and specifications prepared under this Contract shall become
the property of the City upon termination or completion of work. Basic survey notes,
design computations and other data prepared under this Contract shall be made
available to the City upon request. All information produced under this Contract shall be
available for use by the City without restriction or limitation. If the City incorporates any
portion of the work into a project other than that for which it was done, the City shall
save the Engineer harmless from any claims and liabilities resulting from such use.
4
J
J
ARTICLE XI —TERMINATION FOR CONVENIENCE OF CITY
The City may terminate this Contract any time by giving a minimum of ten (10) days
written notice to the Engineer. If the Contract is canceled, the Engineer will be paid for
the time extended and expenses incurred to the date of termination.
ARTICLE XII —TERMINATION OF CONTRACT FOR CAUSE
If, through any cause, the Engineer fails to fulfill, in a timely and proper manner, his
obligations under this contract, or any amendment thereto, or if the Engineer violates
any of the covenants, agreements, or stipulations of this Contract, the City shall
thereupon have the right to terminate this Contract by giving written notice to the
Engineer of such terminations and specifying the effective date thereof, at least five
days before the effective date of termination. In such an event, all finished or unfinished
documents, data, studies, surveys, drawings, maps, models, photographs and reports
prepared by the Engineer shall be entitled to receive just and equitable compensation
for any work satisfactorily completed hereunder.
ARTICLE XIII — DECISIONS UNDER THIS CONTRACT
The City will decide the acceptability of work under this Contract, and will decide all
questions that may arise concerning the project. The City's decision shall be final and
conclusive.
ARTICLE XIV— SUCCESSORS AND ASSIGNS
The City and the Engineer agree that this Contract, and all amendments entered under
the provisions of this Contract shall be binding upon the parties hereto and their
successors and assigns.
ARTICLE XV — COMPLIANCE WITH LAWS
The Engineer shall comply with all applicable laws, ordinances and codes of the State
and Local Governments, and the Engineer shall save the City harmless with respect to
any damages arising from any tort done in performing any of the work embraced by this
Contract.
s
ARTICLE XVI — FINDINGS CONFIDENTIAL
All reports, information, data, etc. prepared or assembled by the Engineer under this
Contract are confidential, and the Engineer agrees that they shall not be made available
to any individual or organization without the prior written approval of the City.
ARTICLE XVII — INSURANCE
Without limiting the liability hereunder, Koehler Engineering and Land Surveying, Inc.,
shall maintain during the life of this agreement the following insurance and furnish the
City, certificates of insurance as evidence thereof. Such certificates shall provide that
cancellation of said insurance shall not be affected without thirty (30) days prior written
notice to the City. The certificates shall plainly designate the name of the project for
which the certificate is provided.
Insurance limits shall meet or exceed the insurance limits for Automobile and General
required under Missouri Revised Statutes Chapter 537.610 for the contract period.
In addition to these limits, the following insurance shall be provided under this
agreement.
1. Workers' Compensation insurance, providing coverage in compliance with the
laws of the state in which any part of the work is to be performed, and Employer's
Liability Coverage in the minimum amount of$1,000,000.00 for each occurrence.
2. Architect's and Engineers Professional Liability Insurance. Professional Liability
(errors and omissions) shall be carried by the Engineer in the amount of $2,000,000 per
incident and $2,000,000 aggregate.
The Architect's and Engineer's Professional Liability Insurance shall include contractual
Liability Coverage for the liability assumed by Koehler Engineering & Land Surveying,
Inc., under this agreement, subject to the terms and conditions of the policy. The City
shall be named as an additional insured in the Certificate for Commercial General
Liability.
ARTICLE XVIII — PERIOD OF SERVICE
This Contract shall remain in effect for a period of two years.
ARTICLE XIX— ATTACHMENTS
The following exhibits are attached and are with this made part of this Contract:
Attachment A— Rate Schedule, 2009
6
Executed by the Engineer this Z4 day of ��ec�A�Ry' , 2009.
Executed by the City this � day of�;�_,�,�./,,, , 2009.
FOR: City of Cape Girardeau
4�,a'`"�" �,�� s .
BY: ; �
�r�ti�
Ken Efti k, In rim City Manager q . �� d'``�
�`�� �� � �
'Q`' �� ;��;;� Ot
M� �:.� .y..l., \ � 1
�-' ��,1� .rr
�i
ATTEST: , , .�.='\\ `� ;,?:`� io� �
,�� ,k
Ms. G e Conrad, City Clerk �`�` f� c e �€¢� ti
;�: �;.�•
����.��, ,_
�
FOR: Koehler En ineering an ying, Inc. ,. � �,,•,�
�.���. !� c' � J �,�.
.,,J .'�' , ,�,�r;
'�y .,f�'�i a !.' _ ',,
.� a� � ,�
� i .�� �. ��' � - .
BY: °� � �� ���`� �'� �
� � �
Chris Koehler, PE, PLS, President �. '� `r� �. � =
, � �
,•-- ��-�f.--, ; � ,, ,
_.. j ,,` . �R,.
.'��'� `��i���:�!`—� f`ti ,,
ATTEST: ��
Lois Koe ler, Secretary Corporate Seal
�
� . -
Rates forAdditional Services
KOEHLER ENGINEERING 8� LAND SURVEYING, INC.
General Labor Rates for Standard Projects-2009
(Classifications Listed Below;All shifts)
Emplovee Classification Hourly Rate overtime Rate
Expert Witness $ 125.00 $ 125.00
Principal Engineer $ 85.00 $ 85.00
Professional Engineer $ 75.00 $ 75.00
Environmental Professional $ 75.00 $ 75.00
Registered Geologist $ 75.00 $ 75.00
Engineer II $ 60.00 $ 60.00
Engineer I $ 50.00 $ 50.00
Senior Engineering Technician $ 55.00 $ 65.00
Engineering Technician $ 47.50 $ 56.00
Registered Land Surveyor $ 65.00 $ 75.00
Surveyor II $ 50.00 $ 60.00
2 Man Conventional Survey Crew $ 105.00 $ 120.00
3 Man Conventional Survey Crew $ 120:00 $ 145.00
Senior Construction Inspector/Materials Tech. $ 47.00 $ 57.00
Junior Construction Inspector/Materials Tech. $ 39.00 $ 49.00
Clerical/Administrative $ 27.50 $ 35.00
Testinq Fees:
Concrete/Asphalt/Masonrv: Per Test
Concrete Mix Design, Testing, report(Sub-Con.) $ 1,250.00
Aggregate Base Gradation Design/Spec.for Concrete $ 500.00
Cylinder-Cube: Cast/Break $ 13.00
Capping Cylinders(when necessary) $ 5.00
Masonry Prism-Cast, Cure, Break $ 75.00
Concrete Coring Varies, based on#& Dia.
Nuclear Gage: $ 24.00 per Day
(Slump, temp, and air content provided at no charge when technician is already in field).
A minimum charge of 2 hours/trip is charged to all job field calls for engineering,
surveying, or inspection/testing staff personnel. Specimen retrieval on days following
pours or masonry assemblies is charged at the hourly rate for a materials technician.
Additional Rates for many other test, including triaxial strength, unconfined compression,
Marshall mix design, etc. are furnished based upon number of test required and project
specifics. Standard prices above may be decreased forsubstantial projects.)
s
_
� ' !
Soil(asqhalt as applicable):
Atterburg Limits(Liquid, Plastic, Plasticity Index) $ 150.00
Relative Density Test(aggregates) $ 175.00
Dynamic Penetrometer Bearing Values $50.00/hr
Standard Procter $ 175.00
Modified Procter $ 200.00
Sieve Analysis Varies, Based on Sample
Various Other Test Rates Available upon request:
Materials charged @ Cost x 1.10; Travel Time is typically charged one-way, and
mileage is charged at$0.40/mile
Geotechnical Drillinq and Samplinq
Mobilization of Drill Rig Dependent upon job site location
Drilling for Depth to Refusal Only $ 10/ft.
Drill&Sample with SS $ 13/ft.
Rock Coring $50/ft.
Laboratory Analysis&Report Generation: Dependent upon Job specifics.
Various Other Drilling Rates Available upon request:
Materials charged @ Cost x 1.10;Travel Time is typically charged round trip,and
mileage is charged at$0.495/mile