Loading...
HomeMy WebLinkAboutRES.2164.04-03-2006 ADDENDUM TO ENGINEERING SERVICES CONTRACT FOR DESIGN OF TECHNOLOGY PARK DRIVE FROM COUNTY ROAD #618 TO LASALLE AVENUE CITY OF CAPE GIRARDEAU, MISSOURI THIS ADDENDUM TO A AN EXISTING ENGINEERING SERVICES CONTRACT, for general engineering services for engineering projects, between the City of Cape Girardeau, hereinafter referred to as the "City" and Koehler Engineering and Land Surveying, Inc., hereinafter referred to as the "Engineer". This addendum shall be for the purposes of obtaining design documents for the construction of a new roadway to be known as "Technology Park Drive" from existing County Road Number 618 northward to the future location of proposed LaSalle Avenue, including geometric design, stormwater structures design, and all other related improvements required for the construction of a serviceable road within the project limits. All related excavation, new pavement construction, storm water and utility improvements shall be addressed by the design under this contract. The design shall also make provisions and provide design plans for the extension of potable water service and sanitary sewer facilities, where applicable, along the project route. Except as modified hereafter, all articles and provisions of the original contract shall remain in full force and effect. ARTICLE I — SCOPE OF SERVICES A specific scope of services for this contract addendum and the identified project shall be as identified below: A. PRELIMINARY DESIGN PHASE — After written authorization to proceed with the Preliminary Design the Engineer shall: 1. Assist the City in coordinating and deciding the needs and requirements of the project. 2. Conduct topographic, property and utility surveys as needed and supplement existing data and to be fully sufficient to determine the existing conditions for the project and to develop plans for the project. All survey work shall be completed in Missouri State Plane Coordinates, North American Datum 1983, Eastern Zone. 3. Arrange for any subcontractor services as may be required, including but not limited to cultural / historical resources surveys and geotechnical investigations, which may be required. If 4 subcontractor services are required, these services will be provided for in an addendum to the proposed contract. 4. Prepare alternate designs and cost estimates, develop preliminary plans, and recommend the best design based on these studies, develop final plans and specifications for the specific project. In addition to normal design activities, specific services to be addressed by the preliminary and final design phases are to be as indicated hereafter. i. Coordinate the project through initial schematic reviews by the City. ii. Determine the appropriate size and configuration of the box culvert structures to convey drainage under the proposed route on William's Creek and the tributary to Williams Creek adjacent to County Road #618. iii. Submit permit applications to the United States Army Corps of Engineers for the stream crossings for the tributaries in paragraph ii. iv. Coordinate additional services including cultural / historical resources study of the route, and geotechnical investigation along the route, if project funding or other requirements make this necessary. v. Provide the preliminary design of a Traffic Control Plan in accordance with the City of Cape Girardeau requirements. vi. Determine the appropriate location for potable water lines and sanitary sewer facilities, as applicable to the project, in conjunction with the City Staff. vii. Assist the City in preparation for public meetings and semi- private meetings with individual property owners, as required for the project. viii. Attend public and semi-private meetings for the project, and assist the City in presenting the project to the public and private individuals at said meetings. 5. Furnish two copies of the above Preliminary Design documents to the City. B. DETAILED DESIGN PHASE — After written authorization to proceed with the Preliminary Design the Engineer shall: 1. Determine right-of-way and easements required for successful execution of the project, and provide assistance to the City in acquiring right-of-way or easements. 2. Prepare Drawings, Specifications, and Bid Documents for the Project, incorporating the City of Cape Girardeau standard specifications where available, and preparing specifications and standard details where said City standards are not available. 3. Advise the City of any adjustments to the latest opinion of probable Total Project Costs caused by changes in general scope, extent or character or design requirements of the Project or Construction Costs. Furnish to City a revised opinion of probable Total Project Costs based on the Drawings and Specifications, 4. Furnish the City with two approval copies of the 95% Complete plans and Bid Documents for final review and comment. 5. Following the review of the 95% plan submittal, the Engineer shall complete the final Contract Drawings and Bid Documents, incorporating the comments from the 95% review. 6. Provide the final Engineers estimate of probable cost for the project construction, and a digital copy of the design documents (Plans and specifications) in a drawing exchange format or AutoCAD drawing format (latest version). Specifications shall be in Microsoft Word format. C. BIDDING PHASE — The Engineer will: 1. Furnish the City with 10 copies of the final Contract Drawings and Bid Documents for purchase by prospective bidders. 2. Provide the City with one reproducible copy of the final Contract Drawings and Bid Documents for use for additional reproduction, if required. 3. Attend Bid Opening. For all phases of the design development (Preliminary Design Phase, Detailed Design Phase, and Bidding Phase), the Engineer shall submit design progress reports with each application for payment. D. CONSTRUCTION PHASE — (Construction Phase Services are an option to this addendum, and are to be provided for and detailed in a supplemental agreement prepared prior to construction activities, if such services are required by the City). If the City desires to engage the Engineer to provide construction phase services, the Engineer will serve as the City's representative for administering the terms of the construction Contract. The Engineer shall not authorize change orders or otherwise alter the terms of a construction Contract except with the City's express written authorization. The Engineer will attempt to protect the City against defects and deficiencies in workmanship and materials, however providing project representation shall not make the Engineer responsible for construction methods or procedures used by the Contractor, nor for the Contractor's failure to perform work according to the Contract documents. More specifically, the Engineer's services will include the following. 1. Assist the City with a pre-construction conference to discuss project details with the Contractor. 2. Make periodic site visits to observe the Contractor's progress and quality of work, and determine if the work conforms to the Contract Documents. Provide construction surveys and construction staking as required by the Contractor. The Engineer will accompany the City's representatives on visits to the project as requested. 3. Check shop drawings, review construction schedules and drawings submitted by the Contractor. 4. Reject work not conforming to the project documents. 5. Prepare change orders for issuance by the City as necessary to assure that proper approvals are made before performance of work. 6. Review wage rates, postings, equal employment opportunity requirements and other related items called for in the Contract. 7. Inspect materials, review material certifications furnished by Contractor, sample concrete and other materials, and if required, arrange for laboratory testing of samples by others on a subcontractor basis. 8. Maintain project records, construction diary and other project information, measurements of quantities, and review monthly estimates for payments due the Contractor. Estimates are to be submitted to the Engineer by the 10th of the month so that the Engineer can make their review to the City on or before the 15th of the same month. 9. Be present during critical construction operations. 10.Participate in final inspection, and provide the City with project documentation diaries, test results, certifications, etc., also provide record plans for the City's records if requested. 11.Prepare final record survey and plans of the project. ARTICLE II — PERIOD OF SERVICE The Engineer will commence work required by the addendum within 10 days after receiving notice to proceed from the City. The addendum work shall be completed in accordance with the following schedule: A. Preliminary Plans shall be completed for review by city staff — Within 60 calendar days after receipt of notice to proceed. B. 95% final plan shall be revised and completed to within 60 days of receipt of comments relevant to the preliminary plan submission. C. Final Plans shall be revised and submitted within 21 days of receipt of comments relevant to the 95% submission noted in item B above. D. Easement plats and documents completed — Easement plats and documents shall be submitted with the 95% plan documents. E. The period of service for construction phase services will be detailed in a supplemental agreement, if required. The above times are exclusive of review time by other agencies and exclusive of time needed to acquire right-of-way. The City will grant time extensions for unavoidable delays beyond the control of the Engineer. Requests for extensions of time shall be requested in writing by the Engineer, stating fully the reasons for the request. ARTICLE III — STANDARDS For services provided under this addendum, the City will compensate the Engineer as follows: A. For design services, including work through the completion of the final design plans and specifications, the City will reimburse the Engineer for the hours expended and at the hourly rates set forth in the original Master Engineering Services Contract. For the basic design services set forth in this addendum, reimbursement to the Engineer shall not exceed $ 85,950 (Eiqhty-Five Thousand, Nine Hundred fifty Dollars) which sum includes the desiqn services for the Desiqn of Technoloqv Park Drive from County Road #618 to future LaSalle Avenue. ARTICLE IV This addendum is made and entered into subject to the approval of the City of Cape Girardeau. ARTICLE V—ATTACHMENTS The following exhibits are attached hereto and are hereby made part of this contract: Attachment A— Design Cost Development for Project Attachment B — Sketch of project area. Executed by the Engineer this �-v day of �vfA-2u,[ , 2006. Executed by the City this ��-�'� day of ��;Y"� ( , 2006. FOR: City of Cape Girardeau �.,: BY: �, �.��,a�:`�,, Mr. ou as Leslie, City Manager %�'; ��� `�\ ° r ��,� Ri�'`-�.._. ���; � �i �'��" ;>,` �, } °�'' ,t '" � ATTEST: (?l� � " ' 1 ;r,�,, -�,.:_ ��- . ��� � �. ' Ms. Gayl onrad, City Clerk #�� °T°":"=� �� �8A►I. � FOR: Koehler Engineering and Land Surveying, Inc. -• •�••���-�,,,, � , _ ,.�� ; f ,ar�. � .� �• �,�' / /���z , ` ,� � : _ �J (1: o — BY: , �_ a,.'.J �, - Chris Koehl PE, PLS, Pr s nt � ' ;���L'� N�,,+' ' ;,� , _ ,.�J�,K�' �' - . _ f ,.�.i 4'`�n;tt' �'`�,,.� `.' ��.,.. =•oNrk'Xaqns- ATTEST. ois oehler, Secretary Corporate Seal � • � � • � - •� �• � � .� Initial Property Line 8�Topographic Data Acquisition&Base Map Preparation: Classi�cation: Units: #Units Rate/Unit: Total: 2 Man Survey Crew: Hr. 120 $ 90.00 $ 10,800.00 Professional Land Surveyor: Hr. 16 $ 65.00 $ 1,040.00 Professional Engineer Hr. 40 $ 70.00 $ 2,800.00 Engineering Technician Hr. 80 $ 47.50 $ 3,800.00 Principal Engineer: Hr. 16 $ 85.00 $ 1,360.00 Survey&Research Materials: LS 1 $ 50.00 $ 50.00 Subtotal: $ 19,850.00 Preliminary Design Phase: Classification: Units: #Units Rate: Total: Professional Land Surveyor: Hr. 8 $ 65.00 $ 520.00 Professional Engineer Hr. 160 $ 70.00 $ 11,200.00 Engineering Technician Hr. 160 $ 47.50 $ 7,600.00 Principal Engineer: Hr. 60 $ 85.00 $ 5,100.00 Subtotal: $ 24,420.00 Easement 8 Right of Way Document Preparation Classification: Units: #Units Rate: Total: Professional Land Surveyor: Hr. 12 $ 65.00 $ 780.00 Professional Engineer Hr. 8 $ 70.00 $ 560.00 Engineering Technician Hr. 24 $ 47.50 $ 1,140.00 Subtotal: $ 2,480.00 Final Design Phase: Classification: Units: #Units Rate: Total: Professional Land Surveyor: Hr. 8 $ 65.00 $ 520.00 Professional Engineer Hr. 160 $ 70.00 $ 11,200.00 Engineering Technician Hr. 160 $ 47.50 $ 7,600.00 Principal Engineer: Hr. 60 $ 85.00 $ 5,100.00 Subtotal: $ 24,420.00 Water 8�Sanitary Sewer Design Classification: Units: #Units Rate: Total: 2 Man Survey Crew Hr. 32 $ 90.00 $ 2,880.00 Professional Engineer Hr. 60 $ 70.00 $ 4,200.00 Engineering Technician Hr. 60 $ 47.50 $ 2,850.00 Principal Engineer: Hr. 40 $ 85.00 $ 3,400.00 Subtotal: $ 13,330.00 Projected Expense Cost: Classification: Units: #Units Rate: Total: Copies of Preliminary Plans Ea. 60 $ 2.50 $ 150.00 Final Plans Ea. 400 $ 2.50 $ 1,000.00 Specification Book Ea. 12 $ 25.00 $ 300.00 Subtotal: $ 1,450.00 . . -. i �� Cost above are exclusive of any potential fees for either cultural/historical resources surveys,which may well be required,or for geotechnical investigation,which may be required as well. If the project conditions or funding requirements determine that these services must be obtained,they will be obtained under an addendum to the proposed contract. � �� .� �:� �F t � �x.��� 1'aL ��i� C ,�Y'� � �, ��,,�� l�v �t � '� �`t � �_, � .. 's=:�: � �,� � } g �'�.� _ k �' � 3,g�°i•v fZ � � � , ,�� � ��� ' �.. : s 1 � ..:, 't'� $% '....- ,;;. �y�`'a �, .�^a.- d � J� � �a �.. � y, i r ��� A � Ky�' � °�� ,: F� ��� �� � � a . �N �� M. �� � � ' t ' ' s � �j � � ���� �� j v� �r � � ����� 4.�.. .� � �,�� ,,,�,,,r�;� �.�� �ta`..� � ��,�rsi "��� �.� . �'3�, 3 ,5��.. � , ytlr� N �r������ � �i ����, � x ��:��� -�a �e � .�+ ��` . ���, ��,� � ., „� , ''��y� •� ��° i.�i. 4 �,x?J �� � �,_ ' � " �� �� 5' � � L 4� Ka.'x , ���Yy y`� v� k_.: .� d ��'� �� ���� '�.��. � * �� � c� ��" � ;�� � ���� �.,,, �� ` ;� � �" � � � � � � ��� � � �. _ �� � : � µ , � ,� � � �` � x �� �' ����� ��s�` �� � � �•. ��� ��� � �� �t� ��� ��� � a �� �� a t�i �� r�,.-�_' «r ��� , �� ,s #�,. . � � � �� f����� �q '� 1 ���� , ��,"'�,� �'�� � � � ��IP" �,, � ' , ; ' ��, ,,.= , >.. . . � � H 3-:,. . '� " Y � � � ,�--:- I � ��. , .:, -- �. _ ,. .. ' .. �... _� <: , � � ��c v� :a ��:���� # �•, a i'='' ��^�; -�;< ac ' ,�_:,.�.: c � � �� � k � s a � � �- .. ����'�. :-k �-v� s ���.�.�� �H ` .:�� - 7s�t� .:;,� °���II Ili��,II, li I. ,,�II � �a p� � ��� � � � ill � �� j III � ill �I. . �,� ,� �� v ,i � x � „r �� �i,��� i�r 11�Ij I i i �. � _� �,-u � � „�,"y�" �N �- I � � ' ..��"s �r., � � -. � �' �, `�� � � �� ��� �� �rk,�� "a(�" iM�i � � � � ° �, r ' %�`� - ��a�+li��� t_ '�''��`'- � � � sy.,"�- ::n,^'"'� �Mr ������ �:, � � 4 y q, :;;.. � �,f " � ��� ��: -, � �, a�.. a � � �w �� � ;,s- �`� ' ,s���pa��g '� �r�,�' � _ �P, �i� �}.� c� ?!a ,F., �`"N,��O' 3i� _3 � - � q��'.P�l. 4�.; �� � Y S w q ,� �� ^ t i qr�� y�' '$Y �-�f` � �, a�ta� � E ,�yy'.{` y' ` ,+ o' �'4�„ za s �� � J � r �`s_ , �r,y � . �i � � � �`�fu ���, , z, � ��r � � � a # 9 '�" µ Ri � �' $ F� V:��}��" �l� " �c `� �• ��� � �:� , �,yy�^� ��, �•, ;'. ��� �� � . � a�� �� �'" �z- £t a''� ,i. d•,� ; �-:�� ������ �, �F", �^ �'' a"'b"o-. 'Y �.� (r� .. ' '.i,, 3 �3�� �✓ � € .2..� ^`�" %5 y�. k� � ,b�J'� ^ N � ;�ti�'w r,a � � '� - �.4 e` , ';T , . \4C��3 � �., �' : ., . � . � 3- s �-p,�y`W' ���.,� n`. $'� `y� � � k _ � `*r 8 - itP�'`'� , a �°_�f� '�"�, \� � Y� .ti:�a«�' 'F'= . ,� :, �,�,.; ��1"�.n� �'�€� �« � �c � �; xr � s�, ' �� z��s`�a tke 'n m,.� Y� a .z..� �, � a � � 2 :�`F�"q;: y s� ,�"� � � �` p( �.;. � �% _rd,6 �y, �� ,ra m �,�� i'�''�i�y"� > �,�' ]�-:;, �' �'.�m:� � u? �y'���' y � �� ;, �� ' - �'(e�'"`�.rr�3� , .� n� y � y, � -S �,� �,�.��`� � ✓m � �v.�€��;. �-a�,R,� �,w : ',g,+� ,,,;-:r � � �� �. �' � � ��3�-�� " r a��� ,�. � U �'� .�� �. � .,r�^ � � � �� � �� � � .,,. � ��'. � � � ` � � �� �?"� ,� � � �`" � z r� �, .:�i � �'� �.a` �i �� - ,. .. ��• � ..�� �.' � ,� E ; ��r�.€•�.. �:.. � � � ���� ^a ��;�'��"`' l �x�vZ ,,:.„y� � r � �:P �; ,w: .,: ,.. �' , :m�t,� x:� . ; � � � , . ,.F � � � <�� � .�. ., ��.� '�, .,, - ,, s. W ; ;� . �._ . ,.,_�� �. �