HomeMy WebLinkAboutRES.1902.07-21-2003 �
ADDENDUM TO ENGINEERING SERVICES CONTRACT
FOR DESIGN OF THE INTERSECTION OF SILVER SPRINGS ROAD
AND US HIGHWAY `61'
CITY OF CAPE GIRARDEAU,MISSOURI
THIS ADDENDUM TO THE EXISTING ENGINEERING SERVICES CONTRACT
dated September 5th, 2001, for general engineering services for engineering
projects, is between the City of Cape Girardeau, hereinafter referred to as the
"City" and Koehler Engineering and Land Surveying, Inc., hereinafter referred to
as the "Engineer".
This addendum shall be for the purposes of obtaining design documents for the
construction of a new signalized intersection of Silver Springs Road and Highway
`61', located at the southern terminus of Silver Springs Road. All related
demolition, new pavement construction, signal design, storm water and utility
improvements shall be addressed by the design under this contract.
Except as modified hereafter, all articles and provisions of the original contract
shall remain in full force and effect.
ARTICLE I — SCOPE OF SERVICES
A specific scope of services for this contract addendum and the identified project
shall be as identified below:
A. PRELIMINARY DESIGN PHASE — After written authorization to proceed with
the Preliminary Design the Engineer shall:
1. Assist the City in coordinating and deciding the needs and
requirements of the project.
2. Conduct topographic, property and utility surveys as needed and
supplement existing data and to be fully sufficient to determine the
existing conditions for the project and to develop plans for the project.
3. Arrange for any subcontractor services as may be required.
4. Prepare alternate designs and cost estimates, develop preliminary
plans, and recommend the best design based on these studies,
develop final plans and specifications for the specific project. In
addition to normal design activities, specific services to be addressed
by the preliminary and final design phases are to be as indicated
hereafter.
a. Coordinate the project through initial schematic reviews of both
the City of Cape Girardeau and the Missouri Department of
Transportation.
b. Provide for the preliminary design of new pavement for the
intersection, new access from the frontage, and the connection
from Silver Springs Road in accordance with the requirements
of the City of Cape Girardeau and the Missouri Department of
Transportation.
c. Provide for the preliminary design of drainage improvements
along the project route, as required by the design, and in
accordance with the requirements of the City and the Missouri
Department of Transportation.
d. Provide the preliminary design of all elements of the Signalized
Intersection including signal poles, mast arms, conductors,
detectors (camera or loops), facings, backings, signage, etc.
e. Provide the preliminary design of a Traffic Control Plan in
accordance with the City of Cape Girardeau and the Missouri
Department of Transportation.
f. Provide the preliminary design of an Erosion Control Plan in
accordance with the requirements of the Missouri Department of
Natural Resources.
g. Coordinate with and stake locations for geo-technical firm to
perForm borings in heavy cut areas, if required.
5. Furnish finro copies of the above Preliminary Design documents to the
City and the Missouri Department of Transportation.
A. DESIGN PHASE —After written authorization to proceed with the Preliminary
Design the Engineer shall:
1. If required, authorize a Title Company to proceed with securing
adequate property title information, determine right-of-way and easements
required for successful execution of the project, and provide assistance to
the City in acquiring right-of-way or easements.
2. Ensure compliance with water quality and flood plain management by
coordinating with the Missouri Department of Natural Resources, the U. S.
Army Corps of Engineer, and other regulatory agencies as required under
the scope of the project.
3. Prepare Specifications and Bid Documents for the Project,
incorporating the Missouri Department of Transportation standard
specifications where available, and preparing special conditions where
said standards are not available.
4. Advise the City and Missouri Department of Transportation of any
adjustments to the latest opinion of probable Total Project Costs caused
by changes in general scope, extent or character or design requirements
of the Project or Construction Costs. Furnish to City and the Missouri
Department of Transportation a revised opinion of probable Total Project
Costs based on the Drawings and Specifications.
5. Furnish the City and the Missouri Department of Transportation with
finro approval copies of the final Contract Drawings and Bid Documents
B. BIDDING PHASE —The Engineer will:
1. This project is to be Bid by the Missouri Department of Transportation.
The engineer will assist as necessary to answers questions pertaining to
the design, however all other aspects of the project bidding will be
provided by the Missouri State Department of Transportation.
C. CONSTRUCTION PHASE — (Construction Phase Services are an option to
this addendum, and are to be provided for and detailed in a supplemental
agreement prepared prior to construction activities, if such services are required
by the City or the State). It the City or the State desires to engage the Engineer
to provide construction phase services, the Engineer will serve as the City or
State's representative for administering the terms of the construction Contract.
The Engineer shall not authorize change orders or otherwise alter the terms of a
construction Contract except with the City's or State's express written
authorization. The Engineer will attempt to protect the City and State against
defects and deficiencies in workmanship and materials. However, providing
project representation shall not make the Engineer responsible for construction
methods or procedures used by the Contractor, nor for the Contractor's failure to
perForm work according to the Contract documents. More specifically, the
Engineer's services will include the following.
1. Assist the City or State with a pre-construction conference to discuss
project details with the Contractor.
2. Make periodic site visits to observe the Contractor's progress and
quality of work, and determine if the work conforms to the Contract
Documents. Provide construction surveys and construction staking as
required by the Contractor. The Engineer will accompany the City's or
States representatives on visits to the project as requested.
3. Check shop drawings, review construction schedules and drawings
submitted by the Contractor.
4. Reject work not conforming to the project documents.
5. Prepare change orders for issuance by the City or State as necessary
to assure that proper approvals are made before performance of work.
6. Review wage rates, postings, equal employment opportunity
requirements and other related items called for in the Contract.
7. Inspect materials, review material certifications furnished by
Contractor, sample concrete and other materials, and if required, arrange
for laboratory testing of samples by others on a subcontractor basis.
8. Maintain project records, construction diary and other project
information, measurements of quantities, and review monthly estimates for
payments due the Contractor. Estimates are to be submitted to the
Engineer by the 10t" of the month so that the Engineer can make their
review to the City on or before the 15th of the same month.
9. Be present during critical construction operations.
10.Participate in final inspection, and provide the City and State with
project documentation diaries, test results, certifications, etc., also provide
record plans for the City's and State's records if requested.
ARTICLE II — PERIOD OF SERVICE
The Engineer will commence work required by the addendum within 10 days
after receiving notice to proceed from the City. The addendum work shall be
completed in accordance with the following schedule:
A. Preliminary Plans shall be completed for review by city staff — Within
90 calendar days after receipt of notice to proceed.
B. Final Plans shall be revised and Completed within 60 calendar days
after completion of review of preliminary plans by City.
C. Easement plats and documents completed — Within 30 calendar days
of completion of review of preliminary plans by City.
D. The period of service for construction phase services will be detailed in
a supplemental agreement, if required.
The above times are exclusive of review time by other agencies and exclusive of
time needed to acquire right-of-way. The City will grant time extensions for
unavoidable delays beyond the control of the Engineer. Requests for extensions
of time shall be requested in writing by the Engineer, stating fully the reasons for
the request.
ARTICLE III — STANDARDS
For services provided under this addendum, the City will compensate the
Engineer as follows:
A. For design services, including work through the completion of the final
design plans and specifications, the City will reimburse the Engineer
for the hours expended and at the hourly rates set forth in Attachment
"A" of the original contract. For the basic design services set forth in
this addendum, reimbursement to the Engineer shall not exceed $
38,390 (Thirty-Eiqht Thousand, Three Hundred Ninety Dollars) which
sum includes the desiqn services for the Intersection of Silver Sprinqs
Road and US Hiqhway `61', as detailed herein.
B. Reimbursable expenses under this contract not included with the
above maximum fee are detailed on Attachment `B':
ARTICLE IV
This addendum is made and entered into subject to the approval of the City of
Cape Girardeau.
ARTICLE V —ATTACHMENTS
The following exhibits are attached hereto and are hereby made part of this
contract:
Attachment A— Development of Engineering Services Cost
Attachment B — List of Reimbursable Fee Items
Executed by the Engineer this day of , 2003.
Executed by the City this �day of �_, u; , 2003.
,
FOR: City of Cape Girardeau
BY:
Mr. Dougla eslie, Interim City Manager
ATTEST: , ;, ;r- ���.; i�
Gayle C rad, City Clerk
FOR: Koehler Engineering and Land Surveying, Inc.
BY:
ris Koehler, PE, PLS, VP of Engineering Services
ATTEST:
Lois Koehl r, Secretary Corporate Seal
Attachment'A'
Intersection of Silver Springs Road & US Highway '61'
Each Phase of the proposed project has been estimated to contribute the following amounts toward the total project
estimated design cost.
Description: Classification: Proj. Hrs. Rate/hr: Subtotal:
Project Boundary 8�Topographic Survey GPS Survey Crew 4 $ 130.00 $ 520.00
Project Boundary&Topographic Survey 2 Man Survey Crew 16 $ 85.00 $ 1,360.00
Project Boundary&Topographic Survey PLS 16 $ 60.00 $ 960.00
Project Basemap Preparation PLS 12 $ 60.00 $ 720.00
Project Basemap Preparation Project Engineer 16 $ 60.00 $ 960.00
Project Basemap Preparation Cadd Technician 16 $ 45.00 $ 720.00
Project Design Project Manager 80 $ 70.00 $ 5,600.00
Project Design Project Engineer 100 $ 60.00 $ 6,000.00
Project Design Cadd Technician 60 $ 45.00 $ 2,700.00
Plan Production Project Manager 80 $ 70.00 $ 5,600.00
Plan Production Project Engineer 80 $ 60.00 $ 4,800.00
Plan Production Cadd Technician 40 $ 45.00 $ 1,800.00
Specification Production Project Manager 20 $ 70.00 $ 1,400.00
Specification Production Project Engineer 20 $ 60.00 $ 1,200.00
Specification Production Engineer I 5 $ 50.00 $ 250.00
Right of Way Deeds& Plats PLS 12 $ 60.00 $ 720.00
Right of Way Deeds& Plats Cadd Technician 12 $ 45.00 $ 540.00
Right of Way Acquisition Project Manager 8 $ 70.00 $ 560.00
PLS 8 $ 60.00 $ 480.00
All Reimbursable Expenses: Est. Not to Exceed: 1 $ 1,500.00 $ 1,500.00
Projected Cost to Project: $38,390.00
The project is to be charged on an hourly basis,(excluding reimbursable expense items described on attachment'B')with
total cost not to exceed the above stated:
Thirty Eight Thousand Three Hundred Ninety Dollars
Rates for all categories of work,to be used for this addendum,and for additional work as required by extensions or options
of this addendum,are included with the original General Services Contract,titled`Attachment A'.
Attachment `B'
Contract Reimbursable Items
1. Travel, subsistence, and incidental cost.
2. Use of motor vehicles on a mileage basis of 0.32 (excluding
vehicular travel within the Cape Girardeau County).
3. Long distance telephone cost and project "on site" telephone cost.
4. Reproduction of reports, drawings, specifications, and other project
related documents.
5. Postage and shipping charges for project related materials.
6. Rental charges for use of equipment not owned by Koehler
Engineering & Land Surveying, Inc. (if required).
7. Cost of acquiring other materials or services specifically for and
applicable to this project.
8. Subcontract cost including those for soils and geotechnical
investigations and reports, title insurance company research and
reports, testing and laboratory services (if performed by others), and
other subcontract services.
9. Charges of special consultants requested or authorized by the City.
10. Special insurance coverage required by the City, including the cost
of naming the City as an additional insured. (if in excess of current
overages, included in the appendix.
11. Local taxes or fees applicable to the work or payments therefore.
12. Charges for review of drawings and specifications by governmental
agencies, if any.